This invention relates in general to submersible well pump installations, and in particular to a submersible well pump located within production tubing above a downhole safety valve.
Because of the expense of offshore oil and gas drilling, most wells have sufficient internal formation pressure to flow naturally. However, the internal formation pressure declines as the well fluid is produced over time. Consequently, there are subsea wells that have been shut in because the internal pressure was not adequate. Also there are subsea wells that continue to produce but at a rate below their actual potential. The reduction in production is due not only to a decline in reservoir pressure, but also because of an impairment of the reservoir and/or an increase in fluid gradient. One or a combination of these factors can render the well unable to produce fluid to the processing facility. This is particularly a problem in very deep water where even if the pressure at the wellhead is positive, it may be inadequate to flow the reservoir fluid to a floating production vessel at the surface.
Proposals have been made to install pumps adjacent to or on the production tree. Also, it has been proposed to install electrical submersible pumps (ESP) in nearby specially drilled caissons, which are shallow bores drilled into the sea floor. It has also been proposed to install an ESP in a production riser section extending from the subsea well to the production vessel. Another proposal involves installing an ESP within the production tubing after the reservoir pressure declines.
For safety, if a well is live or has positive pressure at the wellhead, the well is killed before lowering the ESP into the well. Killing the well typically involves pumping a heavy fluid into the well to prevent an accidental blowout while the ESP is being lowered into the well. However, killing a well can cause damage to the formation from the kill fluid. After killing the well, it is possible that the well may not again return to its former pressure level. Because of the risk, killing a live subsea well to install an ESP is not normally done. There have also been proposals to install ESPs in live land wells using various techniques, but these proposals are not easily applicable to subsea wells with subsea production trees.
General safety rules require that a well have at least two pressure barriers at all times, even when undergoing a workover. During its natural reservoir drive, the well fluid is normally produced through tubing that is suspended in the wellhead assembly at the sea floor surface by a tubing hanger. The tubing hanger seals within the wellhead assembly or production tree to provide one pressure barrier. Normally, there will be at least one other structure, such as a tree cap, to provide an additional safety barrier during production.
For offshore wells, downhole safety valves are installed a relatively short distance below the sea bed within the production tubing. A downhole safety valve is a type of valve that is biased closed and held open with hydraulic fluid pressure. If the hydraulic fluid pressure fails, the valve will close. Consequently, in the event that the wellhead assembly is damaged, or if the hydraulic fluid pressure is lost, the valve will close.
While a closed downhole safety valve could serve as a second pressure barrier during the installation of an ESP, the valve would have to be open when the ESP passes through it. Normally, ESPs are located deep within the well, far below the downhole safety valve and just above the perforations leading to the reservoir so as to achieve the most efficient production boost.
In this invention, a subsea well has a string of production tubing and a subsea safety valve located therein a selected distance below the wellhead assembly. When the production declines to an unsatisfactory level, an ESP is installed in an operational position within the production tubing above the valve. The ESP boosts well fluid pressure while the valve is open. Closing the valve enables the pump assembly to be installed within the well while live, because the valve serves as a pressure barrier. This feature allows the operator to install an ESP within a subsea well that is live without first killing the well.
Referring to
In this example, a production tubing hanger 17 lands in bore 13 of tree 11 on a landing shoulder 19. The tubing hanger lands on a shoulder in the high pressure wellhead housing with another type of tree (not shown). Production tubing hanger 17 has a vertical or axial flow passage 21. A lateral flow passage 23 extends laterally from vertical flow passage 21 and registers with tree lateral flow passage 15. Tree 11 has various valves (not shown) for controlling the flow of well fluid through lateral flow passage 15. Production tubing hanger 17 has external seals 25 that seal above and below lateral flow passage 23. Production tubing hanger 17 is located at the upper end of and supports a string of production tubing 27 that extends through one or more strings of casing 28 (
Tubing hanger 17 has a lock-down device 29 that when actuated by a running tool (not shown), locks tubing hanger 17 to a profile or groove located within tree bore 13. Production tubing hanger 17 also has a wireline plug profile 31 located within its vertical flow passage 21. During natural reservoir drive production, a wireline plug (not shown) will be located within tubing hanger passage 21 and locked to profile 31. The wireline plug forms a seal that will require production fluid to flow out lateral passages 23 and 15.
Production tree 11 has an external groove or profile 35 that may be of various shapes. Normally, while running production tubing hanger 17 and completing the well, a drilling riser with a blowout preventer (not shown) will connect to tree profile 35, and production tubing hanger 17 is lowered through the riser and blowout preventer. After installing tubing hanger 17, completing and testing the well, the drilling riser is removed and typically an internal tree cap (not shown) is secured sealingly within tree bore 13.
Production tree 11 has a tubing annulus passage 37, of which only a portion is shown. Passage 37 leads to valves (not shown) for opening and closing communication with the tubing annulus inside casing 28 (
Referring to
Referring to
Referring to
In this embodiment, ESP assembly 53 has a packer 61 incorporated with it. Packer 61 is a releasable type of packer that seals the annulus between ESP 53 and the interior of production tubing 21. ESP packer 61 is located between pump intake 63 and the pump discharge, which is located in an adapter 65 at the upper end. ESP assembly 53 is supported by a conduit 67 connected to adapter 65. Conduit 67 could be a string of small diameter production tubing, but in this example comprises a string of continuous coiled tubing. The discharge from pump 59 is to the annular space surrounding conduit 67. Alternately, pump 65 could discharge into the interior of conduit 67, rather into the annulus surrounding conduit 67. In that event, a packer such as packer 61 would not be required.
In this example, the electrical power for motor 55 is supplied by an electrical cable that is located within conduit 67, shown in
Referring again to
Various techniques for connecting electrical conductors 69 to a power source on the exterior of tree 11 may be employed. In this example, conduit hanger 75 has an electrical receptacle 85 that faces upward and is of a wet-mate type. A tree cap 89, which is shown to be an external type, slides over the upper end of tree 11. Tree cap 89 has locking members 91 that engage external profile 35 on tree 11. Locking members 91 are shown schematically and would be hydraulically moved inward and wedged in place.
Tree cap 89 has an electrical connector assembly 93 that will mate with electrical receptacle 85 when installed. Electrical connector assembly 93 typically has conductor pins or sleeves that will move from a retracted position to an extended position. The movement may be caused by a hydraulically or mechanically driven piston with the assistance of a remote operated vehicle (ROV) or by other means. External tree cap 89 seals tree bore 13 by means of a seal 95.
In operation, during its natural drive production, conduit hanger 75, conduit 67, ESP assembly 53, and external tree cap 89 will normally not be in place. Rather, a wireline installed plug (not shown) will be located at the upper end of production tubing hanger passage 21 in engagement with profile 31. Also, normally, an internal tree cap (not shown) will be located within bore 13 above tubing hanger 21. During normal production, downhole safety valve 39 (
When the production of well fluid declines to an unsatisfactory level, the operator may wish to convert the well to lift-assist. This conversion may be done without killing the well. The operator closes downhole safety valve 39 and removes the existing internal tree cap (not shown). The tree cap may be removed with the assistance of a remote operated vehicle (“ROV”). The two pressure barriers at this point comprise downhole safety valve 39 and the wireline plug (not shown) previously installed within tubing hanger passage 21. The operator would then install a light intervention riser (not shown) to the upper end of tree 11. The light intervention riser connects to profile 35 and has a blowout preventer (“BOP”), and other equipment for subsea well intervention. The riser may be of a fairly small inner diameter, considerably smaller than tree bore 13, but it must be large enough for ESP assembly 53 and conduit hanger 75 to pass through it. The operator optionally could omit the riser and run the BOP in open water using drill pipe or a lift line.
After connecting the BOP, the operator uses a conventional tool to retrieve through the light intervention riser (if used) the wireline plug from production tubing hanger vertical flow passage 21. Once removed, the blowout preventer will maintain the desired second pressure barrier, with the first pressure barrier still being provided by the closed downhole safety valve 39. The operator then lowers ESP assembly 53 through the riser (if used) by connecting a running tool to profile 83 on conduit hanger 75. The length of conduit 67 is selected to place the lower end of ESP assembly 53 a short distance above downhole safety valve 39 once installed. Conduit hanger 75 will land on a shoulder in production tubing hanger passage 21 to support the weight of conduit 67 and ESP assembly 53. The lockdown mechanism 79 engages profile 31 to lock conduit hanger 75 in place. Conduit hanger 75 also serves as a plug to replace the plug initially removed.
The operator sets packer 61 by a conventional technique according to the type of packer. For example, this might include applying hydraulic fluid pressure or axial manipulation of conduit 67. A small hydraulic line could extend alongside conduit 67 from packer 61 through conduit hanger 75 and into electrical receptacle 85 for connection to a hydraulic fluid line within electrical connector 93. Alternately, a tube (not shown) could lead from one of the stages of pump 59 to packer 61 to inflate packer 61 when pump 59 operates by utilizing pump pressure.
Once ESP assembly 53 is installed, the operator removes the riser and installs tree cap 89. After the riser is removed and before installing tree cap 89, the second pressure barrier is provided by the coiled tubing hanger seals 77. The first pressure barrier continues to be supplied by the closed downhole safety valve 39. After securing tree cap 89, the operator uses an ROV to cause electrical connector 93 to make a wet-mate connection with the contacts in electrical receptacle 85. The operator then uses the ROV to connect the electrical lines leading from tree cap 89 to a power source located subsea.
Once ESP assembly 53 is fully installed, downhole safety valve 39 is opened and electrical power is supplied to motor 55. The well fluid flows up production tubing 27 and into intake 63 of pump 59. The well fluid flows out the discharge ports in adapter 65 and through the annulus surrounding conduit 67. The well fluid flows out the lateral flow passages 23 and 15.
If the wellhead assembly is of a type with the tubing hanger landed in the wellhead housing rather than the tree, a different method must be used. A lubricator would be installed on top of the tree to enable the operator to insert a plug through the tree and into the production passage in the tubing hanger. The lubricator is a tubular member that receives the plug running tool within a sealed chamber and seals against the line connected to the running tool as the tool is lowered through the lubricator and into the tree. Then, the tree would be removed with the downhole safety valve and plug providing two barriers. A BOP is then installed on the wellhead housing, preferably on a riser, to enable the plug to be removed and ESP assembly 53 lowered through the tubing hanger and installed above the downhole safety valve. The tree is then placed back onto the wellhead housing.
The invention has significant advantages. An operator is able to convert a natural flowing subsea well to one having a pressure assist without having to kill the well. The operator does not need to pull the tubing or remove the tree. The pressure boost provided by the pump increases the production rate as well as the life of the well.
While the invention has been shown in only one of its forms, it should be apparent to those skilled in the art that it is not so limited but susceptible to various changes without departing from the scope of the invention. For example, rather than land the coiled tubing hanger in the production tubing hanger, a spool configured to support the coiled tubing hanger could be mounted to the upper end of the production tree.
Number | Name | Date | Kind |
---|---|---|---|
4440221 | Taylor et al. | Apr 1984 | A |
6138765 | Russell et al. | Oct 2000 | A |
6298917 | Kobylinski et al. | Oct 2001 | B1 |
6328111 | Bearden et al. | Dec 2001 | B1 |
6412562 | Shaw | Jul 2002 | B1 |
6415864 | Ramakrishnan et al. | Jul 2002 | B1 |
6497287 | Podio et al. | Dec 2002 | B1 |
6508308 | Shaw | Jan 2003 | B1 |
6688392 | Shaw | Feb 2004 | B2 |
6705404 | Bosley | Mar 2004 | B2 |
20050016735 | Ireland et al. | Jan 2005 | A1 |
20050217857 | Rodrigues et al. | Oct 2005 | A1 |
Number | Date | Country |
---|---|---|
2094855 | Sep 1982 | GB |
2347156 | Aug 2000 | GB |
2360302 | Sep 2001 | GB |
Number | Date | Country | |
---|---|---|---|
20070289747 A1 | Dec 2007 | US |