The present invention relates to a support pin replacing apparatus for a control rod cluster guide tube.
A plurality of control rod cluster guide tubes are stationary and mounted on an upper core plate of a nuclear reactor. A support pin for fixing the control rod cluster guide tube is required to be replaced periodically or as occasion arises. Patent Literatures 1 to 3 have described a support pin replacing apparatus for a control rod cluster guide tube.
Patent Literature 1: Japanese Laid-open Patent Publication No. 61-003090
Patent Literature 2: Japanese Laid-open Patent Publication No. 61-003091
Patent Literature 3: Japanese Laid-open Patent Publication No. 09-043387
However, in the support pin replacing apparatus for a control rod cluster guide tube described in Patent Literatures 1 and 2, it is not possible to perform all operation under water, and the operation is thus performed utilizing gas environments. The support pin replacing apparatus for a control rod cluster guide tube described in Patent Literature 3 does not specifically contemplate automation of replacement of the support pin.
The present invention is intended to solve the above problems, and an object thereof is to provide a support pin replacing apparatus for a control rod cluster guide tube that allows automation of replacement of a support pin in an underwater environment.
According to an aspect of the present invention, a support pin replacing apparatus for a control rod cluster guide tube includes: a frame submerged in water; a movement device that holds the control rod cluster guide tube and moves the control rod cluster guide tube along the frame; a retrieval manipulator that retrieves a support pin of the control rod cluster guide tube under the water; a supply manipulator that supplies a new support pin to the control rod cluster guide tube in the water; a rotating means that imparts rotation for loosening or tightening a fastening between a nut of the support pin or the new support pin and a support pin main body; and a control device that calculates variation in distance between the nut and the support pin main body on the basis of the rotation, and controls the control rod cluster guide tube to move along the frame in accordance with the variation in distance calculated by the movement device.
Accordingly, automation of replacement of a support pin can be achieved in an underwater environment. As a result, effects of radiation on operators can be reduced. Further, operational time required for the replacement of the support pin can be shortened.
Advantageously, in the support pin replacing apparatus for a control rod cluster guide tube, the control rod cluster guide tube includes a middle flange to be fixed to an upper core support plate, and a lower flange to be fixed to an upper core plate by means of the support pin or the new support pin, and the movement device holds the middle flange. Accordingly, the control rod cluster guide tube can be held with the posture thereof being constantly stable.
Advantageously, in the support pin replacing apparatus for a control rod cluster guide tube, the retrieval manipulator has an unfastening means that unfastens a fixed fastening between the nut and the support pin main body. Accordingly, the fastening between a nut of the support pin and a support pin main body can be loosened.
Advantageously, in the support pin replacing apparatus for a control rod cluster guide tube, the unfastening means is an electrical discharge machining tool, and the fixed fastening between the nut and the support pin main body is unfastened by electrical discharge machining of the electrical discharge machining tool so that the nut and the support pin main body are brought into a rotatable state. Accordingly, the fastening between the nut of the support pin and the support pin main body can be loosened.
Advantageously, in the support pin replacing apparatus for a control rod cluster guide tube, the frame is partitioned such that a retrieval operation rack, in which the retrieval manipulator operates is adjacent to a supply operation rack, in which the supply manipulator operates, and the movement device moves the control rod cluster guide tube from the retrieval operation rack to the supply operation rack. Accordingly, the time required for replacement of the support pin with a new support pin can be shortened.
Advantageously, in the support pin replacing apparatus for a control rod cluster guide tube, the retrieval manipulator and the supply manipulator allow replacement of tools. Accordingly, the operational time can be shortened.
According to the present invention, there can be provided a support pin replacing apparatus for a control rod cluster guide tube that allows automation of replacement of the support pin in underwater environments.
A mode for practicing the present invention (embodiment) will be described in detail with reference to accompanying drawings. The present invention is not limited to the contents of the below described embodiment. Constituent elements described in the following embodiment include those that can be easily assumed by persons skilled in the art, and those that are substantially equivalent thereto. The constituent elements described in the following embodiment can be appropriately combined with each other.
In the nuclear reactor 100 according to the present embodiment, which is provided as a pressurized water reactor as described above, a reactor vessel 101 provided as a pressure vessel is configured by a reactor vessel main body 102 and a reactor vessel head 103 which is attached to the upper portion of the reactor vessel main body 102 and which can be opened or closed with respect to the reactor vessel main body 102 so that a reactor core internal can be inserted therein. Of these, the reactor vessel main body 102 is formed in a substantially cylindrical shape such that the upper portion thereof in a vertical direction when the nuclear reactor 100 is installed is opened, and the lower portion thereof is closed to provide a spherical shape. Also, the reactor vessel main body 102 includes an inlet nozzle 104 and an outlet nozzle 105 formed in the vicinity of the upper end side which is an end portion on the opening side and provided for supplying and discharging light water as primary cooling water, which is cooling water used in the primary cooling system.
Inside the reactor vessel main body 102, below the inlet nozzle 104 and the outlet nozzle 105, there is provided a core barrel 110 formed in a substantially cylindrical shape. The core barrel 110 is formed to have a substantially cylindrical shape. The core barrel 110 is provided to have a predetermined space between the inner surface of the reactor vessel main body 102 and the core barrel 110, and provided such that the central axis thereof coincides with that of the cylindrical shape of the reactor vessel main body 102.
Inside the reactor vessel main body 102, the upper portion of the core barrel 110 is coupled to an upper core plate 111. The upper core plate 111 is formed in a circular plate shape and includes a number of continuous holes (illustration is omitted) passing therethrough. The upper core plate 111 is horizontally provided inside the reactor vessel main body 102. Also, the lower portion of the core barrel 110 is coupled to a lower core plate 112. Similarly to the upper core plate 111, the lower core plate 112 is formed in a circular plate shape and includes a number of continuous holes (illustration is omitted) passing therethrough. The lower core plate 112 is horizontally provided inside the reactor vessel main body 102.
Inside the reactor vessel main body 102, above the core barrel 110, an upper core support plate 113 is fixed. A plurality of reactor core support rods 114 are provided in a suspended manner from the upper core support plate 113, and the upper core plate 111 is supported in a suspended manner via the reactor core support rods 114. That is, the upper core plate 111 is supported by the upper core support plate 113 in a suspended manner via the reactor core support rod 114, as a consequence of which, the core barrel 110 that is coupled to the upper core plate 111 is also supported by the upper core support plate 113 in a suspended manner. On the other hand, the lower core plate 112 is positioned and held by a plurality of radial keys 115 with respect to the inner surface of the reactor vessel main body 102. As a result, the core barrel 110 is positioned and held by the plurality of radial keys 115 with respect to the inner surface of the reactor vessel main body 102.
Further, a reactor core 120 is formed by the core barrel 110 which is thus provided, the upper core plate 111, and the lower core plate 112. In the reactor core 120, a number of fuel assemblies 121 are disposed. The fuel assembly 121 is formed by bundling a number of fuel rods in a grid shape by a support grid. Also, the fuel assembly 121 is configured such that a control rod 122 can be inserted therein. A control rod cluster 123 is composed of a plurality of upper ends of the control rods 122 combined at a single point. The upper core plate 111 is supported by a number of control rod cluster guide tubes 10 passing through the upper core support plate 113. The control rod cluster guide tube 10 serves to guide the control rod cluster 123, and the upper end portion thereof which is passing through the reactor vessel head 103 is extended to a control rod driving mechanism (illustration is omitted). A control rod cluster drive shaft 140 extending out from the control rod driving mechanism passes through the control rod cluster guide tube 10 to connect to the control rod cluster 123, and extends out to the fuel assembly 121. Although not illustrated, a number of in-core monitor guide tubes passing through the upper core support plate 113 are supported by the upper core support plate 113. The in-core monitor guide tubes, each of which lower end portion is extended to the fuel assembly 121, and is provided such that a sensor capable of measuring a neutron flux versus the fuel assembly 121 can be inserted therein.
Inside the reactor vessel main body 102, a portion positioned above the reactor core 120 and communicated with the outlet nozzles 105 is formed as an upper plenum 131. On the other hand, a hemispherical space positioned below the reactor core 120 and defined by the lower core plate 112 and the spherical inner surface of the closed portion of the lower portion of the reactor vessel main body 102 is formed as a lower plenum 132. Further, a portion formed between the reactor vessel main body 102 and the core barrel 110 and communicated with the inlet nozzle 104 and the lower plenum 132 is formed as a downcomer portion 133. The upper plenum 131 is formed by being partitioned by the core barrel 110, the upper core support plate 113, and the upper core plate 111. The upper plenum 131 is communicated with the outlet nozzles 105 and is communicated with the reactor core 120 via a number of continuous holes formed in the upper core plate 111. The lower plenum 132 is formed by being partitioned by the lower core plate 112, which is the bottom portion of the core barrel 110, and the reactor vessel main body 102, and is communicated with the reactor core 120 via a number of continuous holes formed in the lower core plate 112. The downcomer portion 133 is formed by being partitioned by the reactor vessel main body 102 and the side wall of the core barrel 110. The upper portion of the downcomer portion 133 is communicated with the inlet nozzle 104, and the lower portion thereof is communicated with the lower plenum 132.
When operating the thus configured nuclear reactor 100, while circulating light water used as a coolant and a neutron moderator therethrough, a fissile material such as uranium 235 or plutonium contained in the fuel assembly 121 as a fuel constituting the fuel assembly 121 is allowed to make a nuclear fission reaction. In the case where a nuclear fission reaction occurs for a fissile material, an insertion amount of the control rod 122 into the fuel assembly 121 is adjusted by the control rod driving mechanism provided in the reactor vessel head 103. With this configuration, a nuclear fission reaction in the reactor core 120 is controlled. When the fissile material fissions, a thermal energy is generated. However, since the surroundings of the fuel assembly 121 are filled up with the circulating light water, this thermal energy is transmitted to the light water surrounding the fuel assembly 121. With this configuration, the light water filled inside the nuclear reactor vessel 101 is heated. As described above, the high-temperature light water which has been heated by the thermal energy generated upon the nuclear fission reaction is discharged from the outlet nozzle 105 and is sent to the steam generator.
That is, the fissile material contained in the fuel assembly 121 discharges neutrons by the fission thereof. The light water used as a moderator and cooling water in the primary cooling system lowers the kinetic energy of the discharged fast neutrons so that they are turned into thermal neutrons, makes new fission more likely to occur, and takes away the generated heat to achieve cooling.
Further, the control rod 122 is provided so that the neutrons generated in the reactor core 120 can be adjusted by absorbing neutrons discharged upon the fission of a fissile material. For example, when an insertion amount of the control rod 122 into the fuel assembly 121 is increased, an amount of neutrons absorbed by the control rod 122 is increased. Therefore, an amount of neutrons making the fissile material fission is decreased. Conversely, when the control rod 122 is moved in a pull-out direction to reduce an insertion amount of the control rod 122 into the fuel assembly 121, an amount of neutrons absorbed by the control rod 122 is reduced. Therefore, an amount of neutrons making the fissile material fission is increased. Accordingly, it is possible to change a frequency with which the fissile material fissions. Therefore, when operating the nuclear reactor 100, a nuclear fission reaction is controlled by adjusting the insertion amount of the control rod 122, and the amount of thermal energy generated by the fission reaction is thereby adjusted.
Further, when operating the nuclear reactor 100, light water is circulated in the primary cooling system. This light water flows into the reactor vessel main body 102 from the inlet nozzle 104. Then, the light water flows down in a downward direction through the downcomer portion 133 communicated with the inlet nozzles 104 to reach the lower plenum 132, and then changes the flowing direction thereof upwardly by the spherical shaped inner surface of the lower plenum 132. With this configuration, the light water rises out from the lower plenum 132, passes through the continuous hole of the lower core plate 112, and then flows into the reactor core 120. The light water having flowed into the reactor core 120 absorbs the thermal energy generated from the fuel assembly 121 disposed in the reactor core 120, thereby cooling the fuel assembly 121. On the other hand, the temperature of the light water becomes high, and the light water rises up to the upper core plate 111. The high-temperature light water having reached the upper core plate 111 passes through the continuous hole in the upper core plate 111 to reach the upper plenum 131, and is then discharged from the reactor vessel main body 102 through the outlet nozzles 105.
The control rod cluster guide tube 10 may also be affected by the operation of the nuclear reactor 100, and replacement of a below described support pin for fixing the control rod cluster guide tube 10 to the upper core plate 111 may be required.
The control rod cluster guide tube 10 has a middle flange 11 for fixing to the upper core support plate 113, and a lower flange 15 for fixing to the upper core plate 111. The middle flange 11 has guiding holes 12 and 13 passing through the middle flange 11. The lower flange 15 is removed from the upper core plate 111 with the support pin 20 for fixing to the upper core plate 111 passing through the lower flange 15. The support pin 20 is attached at two locations 180 degrees symmetrical with respect to each other via the control rod cluster guide tube 10.
For example, the support pin 20 illustrated in
The movement device 30 illustrated in
The retrieval manipulators 40 of the present embodiment, each of which has an electrical discharge machining tool 41, a fixing tool 42, a nut retrieval tool 43, a support pin retrieval tool 44, and a tool replacement mechanism 45. The tool replacement mechanism 45, each of which holds the electrical discharge machining tool 41, the fixing tool 42, the nut retrieval tool 43, and the support pin retrieval tool 44. The tool replacement mechanism 45 has, for example, a rotating mechanism rotating in R1 and R2 directions about axes O1 and O2 respectively, and a sliding mechanism moving in the X direction. This configuration allows the tool replacement mechanism 45 to replace tools for each procedure. Further, as illustrated in
The supply manipulators 50 of the present embodiment, each of which has a support pin supplying tool 51, a nut supplying tool 52, a nut tightening tool 53, a nut fastening tool 54, and a tool replacement mechanism 55. The tool replacement mechanism 55, each of which holds the support pin supplying tool 51, the nut supplying tool 52, the nut tightening tool 53, and the nut fastening tool 54. The tool replacement mechanism 55 has, for example, a rotating mechanism rotating in R3 and R4 directions about axes O3 and O4 respectively, and a sliding mechanism moving in the X direction. This configuration allows the tool replacement mechanism 55 to replace tools for each procedure.
The rotating means 75 of the present embodiment is a driving source for driving support pin rotating tools 48 and 49 illustrated in
The support pin retrieval mechanism 60 of the present embodiment has a support pin retrieval tray 61, and a support pin retrieval basket 62. The support pin retrieval tray 61 is a retrieval passage for collecting the nut 21 and the support pin main body 22 retrieved by the retrieval manipulator 40 together in the support pin retrieval basket 62. The support pin retrieval basket 62 is storage capable of storing a predetermined amount of the retrieved nuts 21 and support pin main bodies 22. It is preferable that the support pin replacing apparatus 1, as illustrated in
The processing unit 90, the storage unit 94, the input port 82, and the output port 83 are interconnected to one another via a bus 87, a bus 88, and a bus 89. Through the bus 87, the bus 88, and the bus 89, the CPU 91 of the processing unit 90 is configured to exchange control data with the storage unit 94 and with the input port 82 and the output port 83 bilaterally, and issues commands unilaterally.
The input processing circuit 81 is connected to the input port 82. Data is from the rotating means 75 are connected to the input processing circuit 81. The data is are converted into signals that can be utilized in the processing unit 90 by a noise filter or an A/D converter included in the input processing circuit 81, and then are transferred to the processing unit 90 via the input port 82. This configuration allows the processing unit 90 to acquire necessary information.
The output processing circuit 84 is connected to the output port 83. The display device 85 and a terminal for an external output are connected to the output processing circuit 84. The output processing circuit 84 is provided with a display device control circuit, a control signal circuit of the movement device 30, the retrieval manipulator 40, the supply manipulator 50, and the rotating means 75, a signal amplifying circuit, and the like. The output processing circuit 84 outputs an instruction signal id that is transmitted to the movement device 30, the retrieval manipulator 40, the supply manipulator 50, and the rotating means 75. For the display device 85, for example, a liquid crystal display panel or a cathode ray tube (CRT) may be used.
In the storage unit 94, computer programs including operational procedure of the support pin replacing apparatus 1 are stored. The storage unit 94 can be constituted by a volatile memory such as a RAM, a nonvolatile memory such as a flush memory, a hard disk drive, or a combination thereof.
The computer programs may implement operational procedures of the support pin replacing apparatus 1 in combination with computer programs that have already been stored in the processing unit 90. Further, the control device 80 may implement the operational procedures of the support pin replacing apparatus 1 using dedicated hardware in place of the computer programs.
Also, the operational procedures of the support pin replacing apparatus 1 can be implemented by executing a program prepared in advance using a personal computer, a work station, or a computer system such as a computer for plant control, or the like. Further, this program can be stored on a computer-readable recording medium such as recording device including a hard disk, a flexible disk (FD), a ROM, a CD-ROM, an MO, a DVD, and a flush memory, read out from the computer-readable medium, and thus executed by computers. It should be noted that the term “computer system” used here includes both OS and hardware such as peripheral devices.
Further, the term “computer-readable recording medium” may include a medium that dynamically holds a program for a short time, such as a communications line when the program is transmitted through a network such as the Internet or a communications line including a telephone line, or a medium that holds the program for a set period of time such as a volatile memory in a computer system serving as a server or a client in that case. In addition, the program may be those for implementing a part of the above described functions, and may further be those capable of implementing the above described functions in combination with programs that have already been stored in the computer system.
Next, procedures for the operation of the support pin replacing apparatus 1 will be described.
Next, in the support pin replacing apparatus 1, an unfastening procedure for unfastening the fixed fastening between the nut 21 and the support pin main body 22 is performed by the retrieval manipulator 40 (step S2). It is preferable that electrical discharge machining is performed by the electrical discharge machining tool 41 for unfastening the fixed fastening. Accordingly, unfastening operation can be performed under the light water W. As a result, the unfastening operation can be performed in the state where radiation emitted from the control rod cluster guide tube 10 is shielded by light water W.
Next, in the support pin replacing apparatus 1, a rotation procedure for rotating the support pin main body 22 is performed by the rotating means 75 (step S3).
Next, in the support pin replacing apparatus 1, a nut retrieval procedure for retrieving the unscrewed nut 21 is performed (step S4). Then, in the support pin replacing apparatus 1, a support pin retrieval procedure for retrieving the unscrewed support pin main body 22 is performed (step S5).
Next, in the support pin replacing apparatus 1, as illustrated in
As illustrated in
Next, in the support pin replacing apparatus 1, an inspection procedure is performed (step S12). For example, fastening condition of the support pin 29 is inspected on the basis of imaging information on the monitor 69. Then, in the support pin replacing apparatus 1, a recovery procedure is performed (step S13). For example, the control rod cluster guide tube 10, with the support pin thereof having been replaced is returned to the control rod cluster guide tube temporary stand 151.
As described above, the support pin replacing apparatus 1 of the present embodiment includes the frame 2 submerged in water, the movement device 30 for holding the control rod cluster guide tube 10 and moving the control rod cluster guide tube 10 along the frame 2, the retrieval manipulator 40 for retrieving the support pin 20 of the control rod cluster guide tube 10 under the water, the supply manipulator 50 for supplying a new support pin 29 to the control rod cluster guide tube 10 under the water, the rotating means 75, 53, 53B for imparting rotation for loosening or tightening the fastening between the nut 21 of the support pin 20 or the nut 26 of the new support pin 29 and the support pin main body 22 or the support pin main body 27 respectively, and the control device 80 for calculating variation in the distance between the nut 21 or the nut 26 and the support pin main body 22 or the support pin main body 27 respectively on the basis of the rotation, and controlling the control rod cluster guide tube 10 to move along the frame 2 in accordance with the variation in distance calculated by the movement device 30.
Accordingly, automation of replacement of the support pin 20 can be achieved in an underwater environment. As a result, effects of radiation on operators can be reduced. Further, operational time required for replacement of the support pin 20 can be shortened.
It is preferable that the control rod cluster guide tube 10 includes a middle flange 11 for fixing to the upper core support plate 113, and a lower flange 15 for fixing to the upper core plate 111 by means of the support pin 20 or the new support pin 29. It is also preferable that the movement device 30 holds the middle flange 11. Accordingly, the control rod cluster guide tube 10 can be held with the posture thereof being constantly stable.
It is preferable that the retrieval manipulator 40 has an unfastening means for unfastening the fixed fastening between the nut 21 and the support pin main body 22. It is preferable that the unfastening means is the electrical discharge machining tool 41. It is also preferable that the fixed fastening between the nut 21 and the support pin main body 22 is unfastened by electrical discharge machining of the electrical discharge machining tool 41, so that the nut 21 and the support pin main body 22 are brought into a rotatable state. Accordingly, the fastening between the nut 21 of the support pin 20 and the support pin main body 22 can be loosened.
It is preferable that the frame 2 is partitioned such that the retrieval operation rack 2A, in which the retrieval manipulator 40 operates, is adjacent to the supply operation rack 2B, in which the supply manipulator 50 operates. It is also preferable that the movement device 30 moves the control rod cluster guide tube 10 from the retrieval operation rack 2A to the supply operation rack 2B. Accordingly, the time required for replacement of the support pin 20 with the new support pin 29 can be shortened.
It is preferable that the retrieval manipulator 40 and the supply manipulator 50 allow replacement of tools. Accordingly, the operational time can be shortened.
Although the above described embodiment has been described using the example of a pressurized water reactor nuclear power plant, the present invention may also be applied to a boiling water nuclear reactor, fast reactor, and other types of nuclear power plants.
Number | Date | Country | Kind |
---|---|---|---|
2011-177210 | Aug 2011 | JP | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2012/069745 | 8/2/2012 | WO | 00 | 12/11/2013 |