Suspended concrete flooring system and method

Information

  • Patent Grant
  • 6755001
  • Patent Number
    6,755,001
  • Date Filed
    Monday, October 15, 2001
    23 years ago
  • Date Issued
    Tuesday, June 29, 2004
    20 years ago
Abstract
A suspended concrete flooring system (100) comprising a plurality of spaced-apart load-bearing members (110) or supporting walls that support a plurality of joists (122) having opposing sides and arranged substantially at right-angles to the load-bearing members. The joists have a support shelf (127) running the length of each opposing side for the purpose of supporting a plurality of fiber cement corrugated sheets (130) that span the space between the joists. A shrinkage control mesh (140) is arranged atop the corrugated sheets and is oriented generally in the direction of the load-bearing members and the joists. A thin layer of concrete (150) is formed over the corrugated sheets and the shrinkage control mesh, to form a flat, horizontal floor surface (151). The load-bearing members and the joists are made of strong, lightweight materials, such as steel. The combination of the light-weight structural materials, the fiber cement corrugated sheets, and the thin concrete layer allows for a suspended concrete floor system that is easily constructed and that has a relatively wide span as compared to conventional suspended concrete floor systems.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to flooring systems, and in particular relates to suspended concrete flooring systems for use in residential and commercial construction projects.




2. Description of the Related Art




Suspended flooring systems are gaining popularity for both residential and commercial construction projects. This is increasingly true for projects on sloped construction sites. Traditionally, a sloped site must be leveled by cutting away a suitable area for a foundation, and then erecting substantial retaining shoring to uphold the surrounding terrain. This is often costly, and thus, suspended flooring systems offer an attractive alternative because the land does not have to be substantially altered before construction can begin.




Additionally, consumers have expressed a preference for concrete floors over wooden floors because of its smooth, flat surface that does not bow or warp, it is silent and does not squeak, it is fire resistant, and it is resistant to termite and water damage. Although consumers have expressed a preference for concrete flooring, many consumers are forced to settle on suspended floors constructed of wood because of its cost advantage over concrete suspended flooring. Generally, suspended concrete floors are both material and labor-intensive and are thus often cost prohibitive regardless of the construction technique.




There are currently a variety of construction techniques for producing suspended concrete floors for single and multi-story buildings. One such method of forming a floor in situ involves pouring concrete into an arranged formwork. In order for this type of floor to perform structurally, the concrete must be quite thick. This results in a floor that is very heavy and therefore requires a significant amount of formwork to hold the floor in place. Furthermore, the substantial amount of concrete results in a floor that is very expensive to install. One way of reducing the cost and weight considerations involves incorporating steel reinforcement into the floor to provide increased tensile strength which allows a thinner concrete slab. However, the substantial formwork necessary is labor intensive and usually makes this option cost prohibitive, especially for residential construction projects.




Another construction technique involves positioning pre-cast slabs or beams into an arranged framework. This method involves less supportwork than traditional poured floors; however, pre-cast slabs or beams are generally too heavy for manual installation and this technique often requires the use of heavy machinery, such as cranes, to position the heavy slabs into the framework, which makes construction projects on sloped construction sites problematic. Additionally, the slabs or beams must be poured and cured off-site and then hauled to the construction site. Not only are there additional costs associated with delivery of the slabs, but the additional handling of the cured slabs, (e.g. truck loading and unloading, lifting the slabs with a crane, positioning the slabs into the framework) presents opportunity for the slabs to become damaged.




Regardless of the construction technique used, an important consideration is the system used to support the concrete floor during construction. Generally, a concrete floor cannot go unsupported over a large span during construction because of its inherent relatively weak tensile strength. Therefore, a significant amount of underlying supportwork is often required to provide adequate structural support for the floor during construction. The installation of the supportwork, usually in the form of framework or formwork, in preparation for such a floor is a predominant component of the labor cost, and often makes large floors economically infeasible.




Accordingly, the ability to span a large area of floor with a minimum of supports during construction is a significant challenge in construction, and is a constant goal of suspended concrete flooring system design.




One approach to strengthening the cement, thus allowing it to span larger unsupported distances, is to incorporate fibers such as steel, asbestos, glass, or synthetics into the cement composite. Two commercially available reinforcing agents are asbestos and glass fibers. Asbestos is an important cement reinforcing material because of its chemical and thermal inertness, fibrous structure and high modulus of elasticity. However, health risks associated with the manufacture of asbestos-cement based materials have restricted their use in recent years. Asbestos-based cement composites also often exhibit brittle failure, while glass fiber reinforced cements are sensitive to age and curing, reducing the efficiency and desirability of these reinforcing agents.




Synthetic fibers are excellent alternatives to supplement or replace glass and asbestos fiber reinforcing agents. Acrylic fibers are one of the most important types of fibers as reinforcing agents for ambient-cured cement composites. These materials offer a high modulus of elasticity, good alkali resistance and good adhesion when properly oriented in a cement mix. Wet stretch, plastic stretch or heat-transfer fluid mediated stretching techniques assure fiber orientation in the composites, which is required for high modulus characteristics.




Fiber reinforcing a cement composite gives it the advantageous characteristics of higher tensile strength and a higher modulus of elasticity. These improved characteristics allow the cement to maintain its structural integrity over greater unsupported spans, achieve sufficient structural strength with less material, and offer a reduced cost option because less material is required. Accordingly, it would be advantageous to have a suspended concrete flooring system that takes advantage of the properties of fiber cement products to make such flooring systems more applicable to residential use. It would be a further advantage for a flooring system to combine the benefits of the above-mentioned flooring systems while eliminating the drawbacks of each.




SUMMARY OF THE PREFERRED EMBODIMENTS




The preferred embodiments disclosed herein solve the above-described problems by combining, among other things, the prior art methods of positioning pre-cast concrete slabs or beams and pouring a floor in situ. Specifically, a pre-cast floor has the benefit of requiring a minimal amount of supportwork, while the poured floor offers the benefits of creating a monolithic floor without the need for slab transportation and heavy machinery installation. This is accomplished by making use of a rigid framework supporting corrugated fiber cement sheets to provide an underlying support layer for a poured in situ concrete floor. The framework includes strong, lightweight load-bearing members or supporting walls and joists arranged so as to allow for a large floor span between supports.




The result is a monolithic concrete floor that is easily constructed, can be installed manually without the need for large machinery, and can span larger unsupported distances thus reducing the necessary framework, installation time, and labor cost.




A first aspect is a cement flooring system suspended above the ground either by a plurality of spaced-apart load-bearing members or supporting walls arranged substantially parallel to one another supported by traditional footings. The system further includes a plurality of spaced-apart joists having opposing sides and arranged at substantially right-angles to the load-bearing members or supporting walls and are supported thereby. Each joist, except perhaps for the outer joists, has a support shelf formed along the length of each opposing side. The system also includes a plurality of deck sheets supported between the joists by the support shelves so as to span the space between the joists in the horizontal plane defined by the support shelves and provide a substructure to receive the poured concrete. In one embodiment, the deck sheets are corrugated fiber cement sheets. A shrinkage control mesh is arranged atop the joists and is oriented in the directions of the load-bearing members and the joists. A concrete topping layer is poured atop the corrugated fiber cement sheets and encompasses the shrinkage control mesh. The concrete topping layer is formed to have a flat, horizontal upper surface that serves as a floor.




A second aspect is a method of installing a concrete flooring system suspended above the ground in which a plurality of footings have been previously installed. The method includes the step of first arranging a corresponding pier on each of the footings. The second step involves positioning and securing a plurality of load-bearing members atop the piers. Alternatively to piers and load bearing members, support for the joists can be in the form of supporting walls, such as masonry walls. The third step comprises positioning and securing a plurality of spaced apart joists to the plurality of load-bearing members or supporting walls at substantially right angles so that the joists are supported by the load-bearing members or supporting walls and define a space for receiving the fiber cement corrugated sheets. The fourth step includes placing a plurality of fiber cement corrugated sheets in the space between the joists so as to be supported in a horizontal plane by the joists and to span the space between the joists. The fifth step involves arranging a shrinkage control mesh atop the joists in orientation with the load-bearing members and the joists. The final step includes pouring concrete over the corrugated sheets so as to encompass the shrinkage control mesh and to form a flat horizontal floor surface.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a cross-sectional diagram of a suspended concrete flooring system according to one embodiment of the present invention.





FIG. 2

is a perspective cut-away view of the flooring system of

FIG. 1

, showing a steel post pier supporting the floor, and also showing the shrinkage control mesh.





FIG. 3

is a cross-sectional diagram of a joist used in the flooring system in one embodiment of the present invention, showing the rebate and shelf used to support and secure the corrugated sheets shown in FIG.


4


.





FIG. 4

is a perspective view of a corrugated sheet used in one embodiment of the present invention.





FIG. 5

is a plan view of an embodiment of a flooring system without the corrugated sheets installed, showing the location of the supporting piers, and the approximate relative dimensions and arrangement of the bearing members and joists.





FIG. 6

is a cross-sectional diagram of a masonry-type pier suitable for use in one embodiment of the present invention, along with the footing installed in the ground to support the pier.





FIG. 7



a


is a cross-sectional diagram of a suspended concrete flooring system showing an edge detail.





FIG. 7



b


is a cross-sectional diagram of a suspended concrete flooring system showing an edge detail from a view orthogonal to that of

FIG. 7



a.







FIG. 8



a


is a cross-sectional diagram of the suspended concrete flooring system showing an external wall detail.





FIG. 8



b


is a cross-sectional diagram of the suspended concrete flooring system showing an external wall detail from a view orthogonal to that of

FIG. 8



a.







FIG. 9

is a flow diagram of the steps associated with installing the flooring system in one embodiment of the present invention.





FIG. 10



a


is an internal set down detail on a ground floor level.





FIG. 10



b


is a view of an internal set down detain on a ground floor level from a view orthogonal to that of

FIG. 10



a.







FIG. 11



a


is one embodiment of an external set down detail.





FIG. 11



b


is another embodiment of an external set down detail.





FIG. 12



a


is one embodiment showing a garage slab set down.





FIG. 12



b


is another embodiment showing a garage slab set down detail.





FIG. 12



c


is yet another embodiment showing a garage slab set down detail.





FIG. 13



a


is one embodiment of a verandah edge detail.





FIG. 13



b


is another embodiment of a verandah edge detail.





FIG. 14



a


shows a plan view of a point load detail.





FIG. 14



b


is a cross-sectional view of the point load detail of

FIG. 14



a.







FIG. 15



a


is a cross-sectional view of an internal set down detail.





FIG. 15



b


is a cross-sectional view of an internal set down detail from a view orthogonal to that of

FIG. 15



a.







FIG. 16

is a cross-sectional view showing an external set down detail having a continuous slab.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS




The present invention is now described with respect to certain preferred embodiments and with reference to the attached drawings.




With reference to

FIGS. 1 and 2

, there is shown a suspended concrete flooring system


100


that includes two or more horizontally arranged elongate load-bearing members


110


each having an upper surface


111


and a lower surface


112


. Bearing member


110


is preferably constructed of metal, such as 2.5 mm gauge, galvanized, rectangular hollow section (RHS), but any suitable material and configuration, including the use of supporting masonry walls, may be used as a bearing member for the joists as long as it demonstrates the requisite structural properties. One such example of a suitable bearing member


110


is SupaGal® RHS Bearer, sold by James Hardie Building Products, Inc., Rosehill, NSW, Australia. Bearing member


110


is typically installed on a pier or support post


260


(FIG.


2


).




Upper surface


111


of bearing member


110


supports two or more elongate joists


122


, arranged perpendicular to the bearing member


110


and spaced apart so that the bearing members and joists form a support grid. The arrangement of joists


122


relative to bearing members


110


is discussed in greater detail below. Before greater discussion of the system, it becomes necessary to describe the joist


122


in relation to FIG.


3


. Each joist


122


has an upper surface


123


, a lower surface


124


, and opposing sides


125


. Opposing sides


125


each have a rebate


126


with a shelf portion


127


formed along the entire length of the joist


122


near upper surface


123


. Rebate


126


and shelf


127


are designed to engage and support the edges of a deck sheet


130


, as discussed below. Shelves


127


define a horizontal plane to be spanned by the deck sheets.




With continuing reference to

FIG. 3

, joist


122


has measurements “x”, “y”, and “z.” Length “x” is a fixed distance from upper surface


123


to shelf


127


formed on sides


125


, and in one embodiment, is preferably about 60 mm. Depth “y” is preferably about 150 mm in one embodiment. For a joist


122


with y=150 mm, the corresponding maximum length is 4.2 meters. In one embodiment, width “z” preferably is about 110 mm. Joists


122


are preferably constructed of metal, such as high strength, galvanized, roll-formed steel, and are preferably fastened to bearing members


110


via self-drilling screws. One such joist


122


is the Hardifloor™ Joist, sold by James Hardie Building Products, Inc., Rosehill, NSW, Australia. The dimensions given are illustrative of one embodiment of the invention, and notably, other configurations of the Hardifloor™ Joist are presently available. Other dimension are easily calculable based on the joists


122


and bearing members


110


used.




Before returning to the system description of

FIGS. 1 and 2

, one embodiment of a deck sheet, the corrugated fiber cement sheet


130


, must first be discussed. Referencing

FIG. 4

, system


100


further includes a plurality of deck sheets


130


. In one embodiment, these deck sheets are corrugated fiber cement sheets having ends


131


and edges


132


, an upper surface


133


and a lower surface


134


. Sheets


130


are arranged between joists


122


such that edges


132


fit within rebates


126


, with lower surface


134


at edges


132


supported by shelf


127


. Sheets


130


are thus arranged to span the space between the joists and are in a horizontal plane defined by shelves


127


. Sheets


130


are designed to be high-strength and highly impact resistant, even when exposed to moisture. An exemplary sheet


130


is JH Super 6 corrugated fiber cement sheet, sold under the trade name Hardiform™ Corrugate made by James Hardie Building Products, Inc., Rosehill, NSW, Australia. The JH Super 6 sheet has dimensions W=750 mm, L=1080 mm, and H=50 mm. Thus, in one embodiment of the present invention using the JH Super


6


sheet


130


, the spacing between joists


122


is about 825 mm. However, other sheet dimensions could be used. The disclosed dimensions are based upon the corrugated sheet's strength in supporting wet concrete and other construction loads. Therefore, in contemplating other types of deck sheets, the dimensions and spacing of the joists may change as allowable by the deck sheet strength requirements. Furthermore, other types of sheets may be interposed between the joists for a deck layer to support poured concrete. These may include flat fiber cement sheets, composite panels, or extruded panels of various shapes and densities.




Returning to

FIG. 1

, arranged atop joists


122


is a shrinkage-control mesh


140


made up of a cross-grid of metal rods, preferably steel of F62 or F72. The designations F62 and F72 are descriptive codes, referring to characteristics of the mesh. For example, F72 refers to steel mesh fabric having 7 mm diameter bars at 200 mm centers. Shrinkage control mesh


140


is laid such that the mesh grid is generally oriented in the directions of bearing members


110


and joists


122


, thus providing added concrete tensional strength as well as shrinkage control. A concrete topping layer


150


having a floor surface


151


is poured on top of mesh


140


and sheets


130


. Concrete topping layer


150


is finished to form a smooth, horizontal concrete slab surface as required. Concrete topping layer


150


is a standard pre-mixed concrete, and in one embodiment, is mixed to achieve a 28-day cured strength of about 20 MPa. Concrete topping layer


150


is applied in a slump to encompass mesh


140


and to preferably have a thickness between about 75 and 105 mm when smooth. Because of this thickness compared with traditional poured floors, only a minimum of formwork is required to install flooring system


100


.





FIG. 2

shows additional features of a suspended concrete flooring system


100


. Not shown in this figure is a plurality of footings poured into the ground to provide a solid base for the flooring system


100


. Mounted atop the footings are piers


260


arranged so as to support the floor at predetermined locations. Each pier


260


provides support for the bearing members


110


mounted thereon. The bearing members, in turn, provide support for the plurality of joists


122


. As described above, each joist


122


is provided with a rebate


126


into which corrugated fiber cement sheets


130


are inserted and supported by shelf


127


. In this way, the joists


122


and sheets


130


provide the necessary formwork for receiving the poured concrete. A shrinkage control mesh


140


is placed on top of the joists


122


so that when the concrete is poured, the mesh


140


is encompassed by the concrete


150


and provides increased tensional strength in addition to shrinkage control.





FIG. 5

shows a plan view of one arrangement of a suspended concrete flooring system


100


. Joists


122


A-


122


I are laid parallel to each other atop bearing members


110


, and are spaced apart by length “b”. In one embodiment, it has been demonstrated that when “b”=825 mm, 2 kPa design Live Load is supportable. In other embodiments, the spacing of bearing members


110


may be increased or reduced depending on the application and the magnitude of contemplated loads to be supported. As shown in

FIG. 5

, joists


122


are laid substantially perpendicular to bearing members


107


,


108


,


109


, and


110


and are fastened to the bearing members with self-drilling screws, as is generally known in the art. Bearing members are preferably spaced apart at intervals of length “a.” In one embodiment, length “a” is equal to about 3600 mm. In another embodiment utilizing a 150 mm joist, length “a” may be equal to about 4200 mm. The spacing “a” of the bearing members is controlled by the structural properties of the joists


122


. Therefore, joists


122


with greater rigidity and bending strength may be supported at distances longer than described herein. Likewise, the spacing “d” of the piers


260


is a function of the bearing members used in the construction project. The stronger the bearing member, the farther the allowable spacing between the piers


260


.




Bearing members are supported by piers


161


-


164


. First pier


161


and second pier


162


are located under a first internal bearing member


109


, while second and third posts


163


and


164


are located under a second bearing member. Length “c” defines the distance between a first wall


240


and piers


161


and


163


. In one embodiment, length “c” is equal to about 2000 mm. Length “c” also defines the length between first pier


161


and second pier


162


, and similarly, is the distance between third pier


163


and fourth pier


164


. As noted above, this distance is dependent upon the physical characteristics of the bearing members, and is calculated based upon the material and configuration of the bearing member. The recited dimensions are exemplary and do not limit the spacing contemplated herein.




Along the perimeter of outer first external bearing member


107


, first wall


240


, second external bearing member


108


, and second wall


241


, are engaged piers


260


(e.g., 260A-260V), described in greater detail below. Piers


260


are spaced at intervals of length “d,” calculated to provide sufficient load bearing capability while preserving as large a span as possible with the given thicknesses and materials selected for the construction project.





FIG. 6

shows a portion of flooring system


100


that illustrates one embodiment of a pier


260


for supporting a load-bearing member


110


and floor system


100


as a whole. A footing


420


is formed in the ground and has an upper surface


421


on which rests support column


410


, as is generally known in the art. Footings


420


are preferably made of concrete, and are constructed by the builder in specified locations prior to construction of the flooring system


100


, based on the predetermined design of the flooring system


100


. Support column


410


may be a brick pier, as shown in

FIG. 6

, or may be an adjustable steel post system as shown in FIG.


2


. Pier


260


further includes packing


440


placed between bearing member


110


and a support column


410


to position bearing member


110


at a predetermined elevation. Packing


440


may be made of compressed fiber cement, or any other material providing sufficient support with minimal compression. Each pier


260


has a predetermined height in accordance with the particular design of floor system


100


and the elevation of the ground


430


. This system is especially practical in situations where the ground


430


is uneven, and therefore, each pier


260


may have a different length to achieve a horizontal flooring surface. Additionally, it is sometimes desirable to have floors at separate elevations from one another, for example, in a garage, or sunken room, which require the supporting piers


260


to have different heights.




Each component of flooring system


100


may be easily handled and installed by construction workers without the use of heavy lifting equipment. Because heavy equipment is not required, the embodiments of the present invention may be used in locations where conventional concrete laying cannot be used, such as sloped building sites. The strength of the suspended concrete flooring system has been measured to be greater than the sum of its component strengths, and as a result, provides a flooring system that provides all the strength advantages of an on slab concrete floor while utilizing much less concrete.





FIGS. 7



a


and


7




b


show one embodiment of an edge detail of the flooring system


100


. As has been described, the bearing member


110


is supported on a pier (not shown). A plurality of joists


122


are arranged on the bearing members


110


to form a supporting grid for the concrete. A plurality of supporting deck sheets, such as corrugated fiber cement sheets


130


, are inserted into the rebates formed in the joists


122


to create a horizontal surface for supporting the poured concrete. A shrinkage control mesh


140


is placed on top of the joists


122


. To provide a form around the periphery of the formwork to retain the poured concrete, an edge angle


145


is mounted to the joists


122


around the periphery of the floor with self-drilling screws. The poured concrete is poured onto the corrugated fiber cement sheets and bounded by the edge angles


145


around the periphery of the floor.





FIGS. 8



a


and


8




b


show one embodiment of a flooring system adjacent to an exterior wall of the building. Footings are first formed in the ground as is generally known in the art. Piers


410


are erected on top of the footings, which provide support for the bearing members


110


. Alternatively, the joists


122


may be supported directly by the pier


410


, or by a supporting wall. Fastened to the top of the bearing members


110


are joists


122


, separated from the bearing members


110


by packing


440


. The packing


440


is ideally compressed fiber cement and allows small elevational adjustments of the piers before installing the bearing members onto the piers. The use of packing


440


ensures that the finished floor will be level, even if the piers are not exactly the same height.




Deck sheets


130


are supported by the shelves of the joists


122


and provide a supporting platform to receive the poured concrete. A shrinkage control mesh


140


is placed atop the joists


122


, after which edge angles


145


are fastened to the joists around the periphery of the floor to provide a boundary for the poured concrete. According to traditional building methods, a flashing and termite barrier


167


may be installed by the builder along outer walls


160


of the structure. Piers


410


along the outer periphery of the flooring system are termed engaged piers and provide adequate support for the flooring system as well as any bearing walls or other structure built on top of them. Engaged piers


410


are more numerous than point load piers because they are the supporting structure for the entire building structure, while point load piers serve to support only one location along the flooring system.




Method of Installing the Flooring System




With reference now to FIG.


9


and flow chart


600


, one method of installing flooring system


100


is now described.




Step


610


: Pre-designing suspended concrete flooring system




In this step, designers use a computer program to calculate the required number of piers, bearing members, and joists, and to create a design and blueprint to be used for a specific suspended concrete flooring system.




Step


620


: Installing footings and piers




The builder installs strip footings, perimeter face brick walls and engaged piers to required height, and isolated piers (such as masonry or steel post piers) by conventional methods per the design. The footings required to support the piers will already have been installed by the builder.




Step


630


: Positioning bearing members, joists, and corrugated fiber cement sheets




The bearing members are positioned and fixed across engaged piers. After the bearing member installation is complete, the joists are positioned and fixed to bearing members preferably with self-drilling screws. Following joist installation, the deck sheets are positioned in the joist rebates and span the distance between joists.




Step


640


: Installing plumbing services




A plumber (typically engaged by the builder) installs plumbing services through the deck sheets. Holes may be made in the deck sheets for receiving plumbing services by striking it with a hammer, by drilling, or other known techniques.




Step


650


: Placing shrinkage control mesh




In this step, the shrinkage control mesh is placed over the joists and deck sheets.




Step


660


: Installing formwork




A minimal amount of formwork, primarily edge angles, is installed around the perimeter of the suspended concrete flooring system, and in any set down locations to create a bounded volume prior to concrete pouring.




Step


670


: Placing and finishing concrete topping




Pre-mixed concrete is poured onto the corrugated sheets and over the shrinkage control mesh, and is floated to an in-situ finish, thereby forming a flat, horizontal floor surface. After 24 hours, the floor supports walking; after one week, the floor may be worked upon to continue construction. In one embodiment, the suspended concrete flooring system is considered fully cured after 28 days.




In a multiple-story building, the flooring system underside may be finished in any traditional method, such as installing battens to the bearing members and attaching plasterboard sheets thereon.




It should be noted that not all the above-mentioned steps may be necessary to create a suspended flooring system according to the suspended concrete flooring system claimed herein. Additionally, the above steps may be performed in a different order and still result in the suspended flooring described and claimed herein.





FIGS. 10



a


and


10




b


show additional details regarding a typical internal set down. By varying the height of brick piers


410


, a set down is created. Examples of this type of set down are to create a “sunken” room or a “raised” floor. The degree of set down is determined by the height difference in adjacent piers


410


.





FIGS. 11



a


and


11




b


show details for creating an external set down. The interior floor is separated from the exterior by an outer wall


160


, which may be of any traditional construction technique. The exterior wall may be directly supported on a footing


420


, as shown in

figure 11



a


, or may be supported by the concrete floor, according to

FIG. 11



b


. Additionally, as shown, the bearing member may be omitted and the joist can be supported directly by a supporting wall


160


. This construction detail may be implemented for creating an external floor, such as for a patio.





FIGS. 12



a


through


12




c


show various options for creating a garage slab


184


.

FIG. 12



a


shows one arrangement for creating a garage slab


184


set down. This is formed by pouring the garage slab independent of the suspended concrete flooring system in a traditional manner. Because a garage slab


184


is intended to support loads greater than an interior concrete floor, the garage slab


184


is usually much thicker than an interior slab, and is preferably a slab on ground, which allows the garage slab


184


to have the added support of the underlying ground.





FIG. 12



b


illustrates how a slab on ground garage floor


184


can be used as a supporting structure for an interior floor. By forming the garage slab


184


first, a suspended floor can subsequently be constructed on top of the garage slab


184


. Notably, a bearing member is not required, as the joist


122


is supported directly by the garage slab


184


. This creates a set down for the garage slab


184


below the interior floor.





FIG. 12



c


illustrates another embodiment for creating a set down garage slab


184


. This construction technique utilizes a shelf formed in the garage slab


184


for supporting the joists


122


. In this edge detail, a bearing member is not required since the garage slab


184


provides the necessary support along this periphery of the interior floor. The set down is optional by varying the thickness of the garage slab


184


as desired.





FIGS. 13



a


and


13




b


show one embodiment for creating a verandah edge. An external wall


160


provide support for the concrete layer


150


. To create this type of edge, traditional formwork is required to create a bounded volume for containing the poured concrete until cured. Additionally, in viewing

FIG. 13



b


, it should be apparent that bearing member


110


could be omitted joist


122


could extend to, and be supported by, the supporting wall


160


.





FIGS. 14



a


and


14




b


show one embodiment for forming a point-load pier for providing additional support at a discrete location along a suspended concrete floor. A traditional footing


420


is provided to support a pier


410


, which may be any suitable pier. Edge angles


180


are affixed to the pier


410


by self-drilling screws


148


and provide a supporting shelf for the deck sheets


130


. The deck sheets


130


are placed to allow the pier


410


to protrude therethrough. As the concrete topping layer


150


is poured, it rests directly upon the point load pier


410


. In this way, the pier


410


provides increased support to a discrete location along the suspended concrete floor.





FIGS. 15



a


and


15




b


show an additional embodiment for creating an internal set down. A metal rod


186


, such as a Y


12


bar, is formed into substantially a Z-shape and is placed on top of the deck sheets


130


to provide additional strength for the concrete. The set down height “x” is determined by the builder according to the building plans. The use of the metal rod


186


provides additional strength to the poured concrete and allows the discrete-height flooring to be monolithic and poured at the same time. Traditional formwork is required to contain the set down portion of the floor until cured.





FIG. 16

shows a continuous slab forming an interior and exterior floor. The exterior floor may be set down a distance “x” as per the building plan. The interior floor is supported as described above, while the exterior suspended floor may be supported by an exterior wall


160


, in addition to the pier


410


and bearing member


110


. The exterior slab provides support for an exterior wall


160


erected thereon. This embodiment has the added benefit of creating a monolithic floor and allowing the entire floor to be poured at once.




Advantages




The flooring system


100


described above has many advantages. A first advantage is that it is easily installed. System


100


is modular and can be put in place step by step without heavy equipment. In addition, the lightweight steel supporting members, (i.e., the bearing members


110


and joists


122


) are quickly fixed together with self-drilling screws. A second advantage of system


100


is that installation and subsequent removal of extensive formwork is not required. The minimal amount of formwork is integral to the floor and is left permanently in place. A third advantage of system


100


is that it is cost competitive with traditional suspended concrete flooring systems. A fourth advantage of system


100


is that the suspended concrete flooring system components are easily mass-produced compared to pre-cast concrete and cast steel sections associated with other flooring systems. A fifth advantage of system


100


is that the suspended concrete flooring system exhibits greater strength than the sum of its parts—known as “composite action,” which results in a floor that is exceptionally strong compared to the individual strengths of the structural members. A sixth advantage of the system


100


is that workers may walk on the suspended concrete flooring system 24 hours after the concrete topping is applied. Continued work may be performed on the suspended concrete flooring system after 7 days of curing. This allows for fast construction of the flooring system and the associated structures (e.g., the building for which the floor has been installed). The suspended nature of the system allows for under floor access for plumbing, electrical, or pest control services. Finally, there is no need to cut and fill sloping terrain prior to construction.




The many features and advantages of the disclosed embodiments are apparent from the detailed specification, and thus, it is intended by the appended claims to cover all such features and advantages of the described apparatus that follow the true spirit and scope of the disclosure. Furthermore, since numerous modifications and changes will readily occur to those of skill in the art, the scope is not limited to the exact construction, operation and examples as described herein. Accordingly, other embodiments are within the scope of the immediately following claims.



Claims
  • 1. A flooring system suspended above the ground, comprising:a plurality of spaced-apart load-bearing members arranged substantially parallel to one another; a plurality of spaced-apart joists having opposing generally vertical sides and arranged at substantially right-angles to said load-bearing members and supported by said load-bearing members, each joist having a substantially horizontal support surface formed along the length of at least one of said opposing generally vertical sides and spaced below an upper surface of the joist; a plurality of deck sheets having first and second edges and supported between said joists at said edges by said support surfaces so as to span the space between said joists; and a concrete topping layer formed atop the deck sheets.
  • 2. The system according to claim 1, wherein said load-bearing members are supporting walls.
  • 3. The system according to claim 1, further including a shrinkage control mesh arranged atop said joists.
  • 4. The system according to claim 1, further including one or more piers having a first end fixed to the ground and an opposing second end in contact with at least one of said load-bearing members.
  • 5. The system according to claim 1, wherein each of said deck sheets is corrugated.
  • 6. The system according to claim 5, wherein each of said deck sheets is made of fiber cement.
  • 7. The system according to claim 1, wherein said support surface comprises a sidewall of a longitudinal groove formed along the length of at least one of said opposing generally vertical sides.
  • 8. A method of installing a concrete flooring system suspended above ground upon a plurality of footings installed in the ground, the method comprising:arranging on each of said footings a corresponding pier having a predetermined height; positioning and securing a plurality of load-bearing members atop said piers; positioning and securing a plurality of joists each having longitudinal rebates along sides thereof to said plurality of load-bearing members at substantially right-angles so that said joists are supported by said load-bearing members with a space between said joists; placing a plurality of deck sheets in the longitudinal rebates thereby spanning the space between said joists which support each said sheets in a horizontal plane; and pouring concrete over said deck sheets so as to encompass said shrinkage control mesh and form a generally flat horizontal floor surface.
  • 9. The method according to claim 8, further including, after placing a plurality of deck sheets, installing plumbing through said deck sheets.
  • 10. The method according to claim 8, further including, after placing a plurality of deck sheets, arranging a shrinkage control mesh atop said joist.
  • 11. A suspended flooring system, comprising:a plurality of spaced apart load bearing members or supporting walls arranged substantially parallel to each other and supported above ground by supports fastened securely in the ground; a plurality of spaced apart elongate joists mounted atop, and supported by, said load bearing members, each joist having a rebate formed along the length of one or more sides thereof; a plurality of deck sheets configured to reside within said rebates thereby supported by said joists and forming a substantially horizontal deck spanning the distance between said joists; a mesh placed above said deck sheets; and a concrete topping poured onto said deck sheets and encompassing said mesh, the concrete being worked to form a smooth, flat, horizontal upper floor surface.
  • 12. The system of claim 11, wherein said joists have opposing sides, and further comprising rebates formed along both sides of said joists.
  • 13. The system of claim 12, wherein said mesh is placed on top of said joists.
  • 14. The system of claim 11, wherein said deck sheets are corrugated.
  • 15. The system of claim 14, wherein said deck sheets are made of fiber cement.
  • 16. The system of claim 11, wherein said mesh is a steel shrinkage control mesh.
  • 17. A concrete flooring system, comprising:a plurality of spaced apart parallel joists, each having a groove formed along a side thereof spaced below a top surface of said joist; one or more deck sheets having first and second opposing edges configured to be slideably inserted into cooperating grooves of adjacent hoists, the first edge inserted into a groove in a first joist, and the second edge inserted into a groove in a second joist, thereby spanning the distance between the joist and forming a horizontal deck that is below the top surface of the joists; and a concrete layer atop the deck sheets.
  • 18. The concrete flooring system of claim 17, further comprising a steel mesh placed atop said joists such that said mesh is spaced above said deck sheets.
  • 19. The concrete flooring system of claim 17, wherein said deck sheets are formed of corrugated fiber cement.
RELATED APPLICATION

This invention claims priority from U.S. Provisional Application Serial No. 60/241,042, filed on Oct. 16, 2000, the entire disclosure of which is hereby incorporated by reference.

US Referenced Citations (10)
Number Name Date Kind
4335557 Morton Jun 1982 A
4597233 Rongoe, Jr. Jul 1986 A
5519971 Ramirez May 1996 A
5809722 Bertsche Sep 1998 A
5857292 Simpson Jan 1999 A
5927041 Sedlmeier et al. Jul 1999 A
6044610 DeVon et al. Apr 2000 A
6094873 Hoffman et al. Aug 2000 A
6189274 Ollikainen Feb 2001 B1
6192636 Hayashi et al. Feb 2001 B1
Provisional Applications (1)
Number Date Country
60/241042 Oct 2000 US