This disclosure e application relates to wireless communications and more particularly to switching between downlink and uplink subframes.
A wireless communication system can be seen as a facility that enables wireless carriers between two or more nodes such as fixed or mobile communication devices, access points such as base stations, servers and so on. A communication system and compatible communicating devices typically operate in accordance with a given standard or specification which sets out what the various entities associated with the system are permitted to do and how that should be achieved. For example, the standards, specifications and related protocols can define the manner how and what communication devices shall communicate, how various aspects of the communications shall be implemented and how the devices shall be configured. Examples of wireless systems include public land mobile networks (PLMN) such as cellular networks, satellite based communication systems and different wireless local networks, for example wireless local area networks (WLAN). Wireless systems can be divided into coverage areas referred to as cells. Different types of cells can provide different features. For example, cells can have different shapes, sizes, power levels and other characteristics.
A user can access the communication system by means of an appropriate communication device. A communication device of a user is often referred to as user equipment (UE) or terminal. A communication device is provided with an appropriate signal receiving and transmitting arrangement for enabling communications with other parties. Wireless systems enable mobility for users where a mobile device can communicate over an air interface with another communication device such as e.g. a base station and/or other user equipment.
Examples of mobile communication systems are those based on standards by the 3rd Generation Partnership Project (3GPP). A recent 3GPP development is often referred to as the long-term evolution (LTE) of the Universal Mobile Telecommunications System (UMTS) radio-access technology. The various development stages of the 3GPP LTE specifications are referred to as releases. In LTE base stations are commonly referred to as enhanced NodeBs (eNB).
LTE provides frequency division duplex (FDD) and time division duplex (TDD) modes for wireless communications. In LTE TDD physical layer the uplink and downlink are divided into 10 ms long radio frames.
In general, loss of critical control information may even prevent the whole system from working. To ensure reliability control information should be communicated in a time period when neighbouring cells have the same UL/DL direction. This is known as a protected time period.
Communication in radio frames can be switched between uplink and downlink subframes. Switching from the downlink to the uplink can be provided on a subframe commonly referred to as a special subframe, denoted by S in
In current control channel arrangements for TDD almost all critical control channels are placed in subframes #0, #1 and #2. Therefore it has been proposed that the three first subframes are protected. A consequence of this is that the transmission order of these subframes is fixed to D-S-U (downlink-special subframe-uplink). This pattern cannot be changed flexibly. This imposes a substantial limitation on the flexibility of UL/DL allocation as it fixes the allocation of 60% of the resources.
It is noted that the above discussed issues are not limited to any particular communication environment and station apparatus but may occur in any appropriate system where cells are selected by mobile devices.
Embodiments of the invention aim to address one or several of the above issues.
In accordance with an embodiment there is provided a method for communications of a time division duplex radio frame provided with at least one special subframe comprising at least one pilot period, the method comprising using the at least one special subframe for signalling of critical control information, and flexibly allocating other subframes of the radio frame than the at least one special subframe for use as downlink and uplink subframes of the radio frame.
In accordance with an embodiment there is provided an apparatus for controlling communications of a time division duplex radio frame provided with at least one special subframe comprising at least one pilot period, the apparatus comprising at least one processor, and at least one memory including computer program code, wherein the at least one memory and the computer program code are configured, with the at least one processor, to use the at least one special subframe for signalling of critical control information, and flexibly allocate other subframes of the radio frame than the at least one special subframe for use as downlink and uplink subframes of the radio frame.
In accordance with a more detailed embodiment a fixed ratio of time periods for a downlink pilot, a guard period and an uplink pilot of the special subframe is used. The ratio between the downlink pilot period, the guard period and the uplink pilot period can be fixed at 6:1:7 or 7:1:6.
A physical uplink shared channel and/or a physical uplink control channel can be transmitted in a pilot timeslot of the at least one special subframe.
Critical control information may comprise any information critical for the operation of the system, for example at least one of a secondary synchronization signal, a physical broadcast channel, a common reference signal, a channel state information reference signal and radio resource control information.
Timing of feedback information and/or grant information associated with a special subframe can be arranged to coincide with another special subframe.
Uplink and/or downlink subframes can be allocated until a subsequent other special subframe.
All critical control information may be signalled in the at least one special subframe.
An enhanced node B or a mobile station arranged to implement the embodiments may be provided.
A computer program comprising program code means adapted to perform the herein described methods may also be provided. In accordance with further embodiments apparatus and/or computer program product that can be embodied on a computer readable medium for providing at least one of the above methods is provided.
It should be appreciated that any feature of any aspect may be combined with any other feature of any other aspect.
Embodiments will now be described in further detail, by way of example only, with reference to the following examples and accompanying drawings, in which:
In the following certain exemplifying embodiments are explained with reference to a wireless or mobile communication system serving mobile communication devices. Before explaining in detail the exemplifying embodiments, certain general principles of wireless communications are briefly explained with reference to
A non-limiting example of the recent developments in communication system architectures is the long-term evolution (LIE) of the Universal Mobile Telecommunications System (UMTS) standardized by the 3rd Generation Partnership Project (3GPP). More recent development of the LTE, Release 10 and upwards, are sometimes referred to as LTE-Advanced. The LTE employs a mobile architecture known as the Evolved Universal Terrestrial Radio Access Network (E-UTRAN). Base stations of such systems are known as evolved or enhanced Node Bs (eNBs) and may provide E-UTRAN features such as user plane Radio Link Control/Medium Access Control/Physical layer protocol (RLC/MAC/PHY) and control plane Radio Resource Control (RRC) protocol terminations towards the communication devices. Other examples of radio access system include those provided by base stations of systems that are based on technologies such as wireless local area network (WLAN) and/or WiMax (Worldwide Interoperability for Microwave Access).
Mobile communication devices 1 and 2 can be provided with wireless access via base stations or similar wireless transmitter and/or receiver nodes providing radio service areas or cells. The base stations are typically connected to a wider communications network via appropriate gateways.
Base stations are typically controlled by at least one appropriate controller apparatus so as to enable operation thereof and management of mobile communication devices in communication with the base stations. The control apparatus can be interconnected with other control entities.
A possible mobile device for communications with the base stations is often referred to as user equipment (UE) or terminal. An appropriate mobile device may be provided by any device capable of sending radio signals to and/or receiving radio signals from multiple cells. Non-limiting examples include a mobile station (MS) such as a mobile phone or what is known as a ‘smart phone’, a portable computer provided with a wireless interface card or other wireless interface facility, personal data assistant (PDA) provided with wireless communication capabilities, or any combinations of these or the like. A mobile device may provide, for example, communication of data for carrying communications such as voice, electronic mail (email), text message, multimedia and so on. Users may thus be offered and provided numerous services via their devices. Non-limiting examples of these services include two-way or multi-way calls, data communication or multimedia services or simply an access to a data communications network system, such as the Internet. User may also be provided broadcast or multicast data. Non-limiting examples of the content include downloads, television and radio programs, videos, advertisements, various alerts and other information. The mobile device may receive and transmit signals over an air interface with multiple base stations via an appropriate transceiver apparatus.
A wireless communication device, such as a base station and/or a mobile station, can be provided with a Multiple Input/Multiple Output (MIMO) antenna system for enabling multi-flow communications. MIMO arrangements as such are known. MIMO systems use multiple antennas at the transmitter and receiver along with advanced digital signal processing to improve link quality and capacity. More data can be received and/or sent where there are more antenna elements.
A process known as timing advance is provided to prevent conflicts when switching from the uplink to the downlink transmission. When switching from the downlink to the uplink, a guard period (GP) 23 is inserted between Downlink Pilot Timeslot (DwPTS) 22 and Uplink Pilot Timeslot (UpPTS) 24 fields. The duration of the GP 23 can depend on various factors, for example the signal propagation time from a base station to mobile device and back as well as on the time the mobile device requires to switch from receiving to sending.
In accordance with an embodiment the special subframe 20 is used to provide flexible uplink/downlink (UL/DL) allocation for transmission of time division duplex (TDD) radio frames. In the embodiment all critical control information such as control channels/signals is transmitted in a protected special subframe of a TDD radio frame whilst the other subframes, e.g. subframes #0 and #2 in
A base station, for example an eNB and a mobile device can be adapted to be capable of processing the critical information in the special subframe, for example to transmit and/or receive the critical information in the special subframe.
Critical control information can be any information missing of which would prevent access and/or reduce the reliability and/or robustness of communications. The critical control information can include information such as the secondary synchronization signal (SSS), physical broadcast channel (PBCH), common reference signal (CSR) and/or channel state information reference signal (CSI-RS). Certain non-limiting examples of placement of certain critical information, in this example PSS/SSS/PBCH, in a special subframe is shown in
In accordance with an embodiment transmission of a physical downlink control channel (PUCCH) and/or physical downlink shared channel (PUSCH) in Uplink Pilot Timeslot (UpPTS) is allowed.
In accordance with a further embodiment a fixed special subframe configuration with guard period (GP) length of 1 LTE orthogonal frequency-division multiplexing (OFDM) symbol can be used. This is possible since the relevant propagation delays are small compared to the length of one LTE OFDM symbol. Furthermore special subframe configurations which assign similar amount of resources for downlink pilot time slot (DwPTS), and uplink pilot time slot (UpPTS) can be prioritized, e.g. in relation 6:1:7 or 7:1:6.
Specific timing may be provided for the special subframe. The special subframe can be arranged to be the only protected subframe. With such special subframe design it is possible to support efficient communication between a base station and mobile device(s) without relying on any other subframes. This can be used to ensure robust system operation even if other subframes are unusable due to interference between uplink and downlink time slots as the special subframe can nevertheless be used for example for signalling of important radio resource control (RRC) information.
A specific timing can be defined so that the shared channels in special subframe always have their hybrid automatic repeat request acknowledgement (HARQ-ACK) feedback and grant in another special subframe. Certain examples of such timings are illustrated in
Information of UL/DL allocation of subframes until the next special subframe can be provided in a special subframe. This can be provided to achieve a flexible UL/DL allocation in a manner that is between a pure dynamic allocation and semi-static allocation. UL/DL allocation of time slots until the next special subframe can be provided by a new physical channel transmitted in the special subframe.
Other subframes than a special subframe can be flexibly used for the UL or DL. The number of subframe boundaries where D to U switching is allowed can be increased, for example for an UE adapted to operate with truncated PDSCH.
Enhanced Physical Downlink Control Channel (ePDCCH) can be protected by muting PUSCH transmission in neighbour cells on ePDCCH physical resource blocks (PRBs).
Timing relation between Physical Downlink Shared Channel (PDSCH) and the HARQ-ACK transmission on physical uplink control channel (PUCCH) or Physical Uplink Shared Channel (PUSCH) can be flexibly determined by using the first available UL resource allowed by processing delay. Currently the agreed processing delay is 3 ms, but in future reduced processing delays can be expected. Assuming that the uplink is supporting asynchronous HARQ, similar principles can be applied for uplink data transmissions on PUSCH. Latency reduction may be provided by reducing the length of the subframes to 0.5 ms. This can be provided since a DwPTS plus a guard period can be considered to provide a 0.5 ms-subframe while UpPTS can be considered as another 0.5 ms-subframe. This can be combined with a new HARQ timing scheme with reduced processing delays to reduce overall HARQ RTT.
The embodiment can provide more flexible UL/DL allocation in TDD by allowing flexible transmission in all subframes apart the special subframe(s). For example, the currently 3GPP solution can provide 20%-60% UL activity, while the embodiments can be used to provide activity level in the range of 0-80%. Flexibility in switching resources between uplink and downlink while maintaining a minimal set of resources for robust communication may be provided. Moreover, a smooth evolution of time division LTE (TD-LTE) emphasizing properties of time division-synchronous code division multiple access (TD-SCDMA) may be provided. A new short sub-frame length may be provided which can be used to achieve latency reduction.
It is noted that whilst embodiments have been described using LTE and LTE Advanced as examples, similar principles can be applied to any other communication system or indeed to further developments with LTE where TDD is employed. Thus, instead of LTE, the invention may be applied to other cellular standards as well. Also, instead of carriers provided by base stations at least one of the carriers may be provided by a communication device such as mobile user equipment. For example, this may be the case in application where no fixed equipment provided but a communication system is provided by means of a plurality of user equipment, for example in adhoc networks. Therefore, although certain embodiments were described above by way of example with reference to certain exemplifying architectures for wireless networks, technologies and standards, embodiments may be applied to any other suitable forms of communication systems than those illustrated and described herein.
The required data processing apparatus and functions of a base station apparatus, a communication device and any other appropriate apparatus may be provided by means of one or more data processors. The described functions at each end may be provided by separate processors or by an integrated processor. The data processors may be of any type suitable to the local technical environment, and may include one or more of general purpose computers, special purpose computers, microprocessors, digital signal processors (DSPs), application specific integrated circuits (ASIC), gate level circuits and processors based on multi core processor architecture, as non-limiting examples. The data processing may be distributed across several data processing modules. A data processor may be provided by means of, for example, at least one chip. Appropriate memory capacity can also be provided in the relevant devices. The memory or memories may be of any type suitable to the local technical environment and may be implemented using any suitable data storage technology, such as semiconductor based memory devices, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory.
In general, the various embodiments may be implemented in hardware or special purpose circuits, software, logic or any combination thereof. Some aspects of the invention may be implemented in hardware, while other aspects may be implemented in firmware or software which may be executed by a controller, microprocessor or other computing device, although the invention is not limited thereto. While various aspects of the invention may be illustrated and described as block diagrams, flow charts, or using some other pictorial representation, it is well understood that these blocks, apparatus, systems, techniques or methods described herein may be implemented in, as non-limiting examples, hardware, software, firmware, special purpose circuits or logic, general purpose hardware or controller or other computing devices, or some combination thereof. The software may be stored on such physical media as memory chips, or memory blocks implemented within the processor, magnetic media such as hard disk or floppy disks, and optical media such as for example DVD and the data variants thereof, CD.
The foregoing description has provided by way of exemplary and non-limiting examples a full and informative description of the exemplary embodiment of this invention. However, various modifications and adaptations may become apparent to those skilled in the relevant arts in view of the foregoing description, when read in conjunction with the accompanying drawings and the appended claims. However, all such and similar modifications of the teachings of this invention will still fall within the spirit and scope of this invention as defined in the appended claims. Indeed there is a further embodiment comprising a combination of one or more of any of the other embodiments previously discussed.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/CN2012/074726 | 4/26/2012 | WO | 00 | 10/24/2014 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2013/159304 | 10/31/2013 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
9197683 | Fwu | Nov 2015 | B2 |
20100246456 | Suo | Sep 2010 | A1 |
20110211503 | Che | Sep 2011 | A1 |
20120020256 | Tujkovic et al. | Jan 2012 | A1 |
20130083736 | Yin | Apr 2013 | A1 |
20130083753 | Lee | Apr 2013 | A1 |
20130176952 | Shin | Jul 2013 | A1 |
20130336177 | Gao | Dec 2013 | A1 |
20140161003 | Han | Jun 2014 | A1 |
20150043392 | Susitaival | Feb 2015 | A1 |
20150078220 | Hu | Mar 2015 | A1 |
20150236804 | Lindoff | Aug 2015 | A1 |
Number | Date | Country |
---|---|---|
101262322 | Sep 2008 | CN |
101425845 | May 2009 | CN |
102415014 | Apr 2012 | CN |
2648444 | Oct 2013 | EP |
2648446 | Oct 2013 | EP |
Entry |
---|
ETSI TS 136 211 V10.4.0 (Jan. 2012); LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation (3GPP TS 36.211 version 10.4.0 Release 10). |
3GPP TS 36.211 V10.4.0 (Dec. 2011), “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 10)”, 101 pgs. |
Number | Date | Country | |
---|---|---|---|
20150103704 A1 | Apr 2015 | US |