This application also claims the priority of Austrian Patent Application, Serial No. A 1391/2010, filed Aug. 19, 2010, pursuant to 35 U.S.C. 119(a)-(d), the content of which is incorporated herein by reference in its entirety as if fully set forth herein.
The present invention relates to a switching device and to a fault current circuit breaker. The present invention also relates to a method for functional testing of a first fault current circuit breaker without interruption of the power supply to a connected load.
The following discussion of related art is provided to assist the reader in understanding the advantages of the invention, and is not to be construed as an admission that this related art is prior art to this invention.
Fault current circuit breakers have a testing device for testing the functionality of the respective fault current circuit breaker, i.e. triggering, in the event of a fault current. Because the respective fault current circuit breaker is triggered, the downstream partial networks and hence also all connected electrical devices are switched off. This is viewed by most uses of electrical systems as inconvenient, because individual settings are erased in many devices. Moreover, severe problems in many electrical systems may occur when they are switched off, because these electrical systems perform safety-related tasks or control technical processes, so that switching these systems off can lead to problems.
In switching processes where a load current is switched from one fault current circuit breaker to another fault current circuit breaker, a temporary presence of asymmetric potentials on at least one of the two fault current circuit breakers cannot be excluded. Such differences in the potential, however, can act on a fault current circuit breaker like an actually present fault current and thus accidentally trigger the fault current circuit breaker without the presence of a fault current. This may possibly prevent uninterrupted switching from one fault current circuit breaker to another fault current circuit breaker.
It would therefore be desirable and advantageous to obviate prior art shortcomings and to provide an improved switching device which supports functional testing of a fault current circuit breaker without requiring disconnection from the power grid.
According to one aspect of the present invention, a switching device with two operating states includes at least one first electrical switching device input, at least one first electrical switching device output, and at least one second electrical switching device output. In a first operating state of the switching device the first switching device input is electrically connected with the first switching device output, and in a second operating state of the switching device the first switching device input is electrically connected with the second switching device output. The switching device is constructed for uninterrupted transition from the first operating state to the second operating state or from the second operating state to the first operating state.
Such switching device offers the possibility to connect two fault current circuit breakers in parallel and to switch over a load current for one of the two fault current circuit breakers to the other fault current circuit breaker, without triggering one of the two fault current circuit breakers and consequently causing disconnection of the power grid. In this way, the fault circuit current breakers can be functionally tested without causing the loss of settings at electrical devices or safety risks due to importance of the disconnected devices. A fault current circuit breaker identified as being defective can then be exchanged, without requiring disconnection of the electrical partial network connected downstream of the fault current circuit breaker.
This can prevent accidental triggering of one of the two fault current circuit breakers during an intentional uninterrupted switching operation of a load current from a first fault current circuit breaker to a second fault current circuit breaker. Faulty triggering during the switching process can thus be prevented. Unintentional disconnection from the power grid during functional testing of a fault current circuit breaker can then be prevented.
According to another aspect of the present invention, a fault current circuit breaker includes disconnect contacts, and a trigger current circuit at least indirectly operatively connected with the disconnect contacts for disconnecting the disconnect contacts, wherein the trigger current circuit included a first switching arrangement for extending a trigger time of the trigger current circuit by a predetermined time.
In switching processes where a load current is switched from one fault current circuit breaker to another fault current circuit breaker, a temporary presence of asymmetric potentials on at least one of the two fault current circuit breakers cannot be excluded. Such differences in the potential, however, can act on a fault current circuit breaker like an actually present fault current and thus accidentally trigger the fault current circuit breaker without the presence of a fault current. This may possibly prevent uninterrupted switching from one fault current circuit breaker to another fault current circuit breaker.
According to yet another aspect of the present invention, a method for uninterrupted functional testing of a first fault current circuit breaker includes the steps of routing a load current through the first fault current circuit breaker, connecting an input of a second fault current circuit breaker to the load current in parallel with the first fault current circuit breaker, switching the load current over without interruption from the first fault current circuit breaker to the second fault current circuit breaker, performing a functional test of the first fault current circuit breaker, after a successful functional test of the first fault current circuit breaker switching the first fault current circuit breaker on, connecting an input of the first fault current circuit breaker to the load current in parallel with the second fault current circuit breaker, and switching the load current over without interruption from the second fault current circuit breaker to the first fault current circuit breaker.
A functional test can then be performed on a fault current circuit breaker without disconnection from the power grid. The functional testing can then be also performed on fault current circuit breakers without a loss of settings on electrical devices or without causing safety risks due to disconnection of important devices.
Other features and advantages of the present invention will be more readily apparent upon reading the following description of currently preferred exemplified embodiments of the invention with reference to the accompanying drawing, in which:
Throughout all the figures, same or corresponding elements may generally be indicated by same reference numerals. These depicted embodiments are to be understood as illustrative of the invention and not as limiting in any way. It should also be understood that the figures are not necessarily to scale and that the embodiments are sometimes illustrated by graphic symbols, phantom lines, diagrammatic representations and fragmentary views. In certain instances, details which are not necessary for an understanding of the present invention or which render other details difficult to perceive may have been omitted.
Turning now to the drawing,
The present invention relates to a method for uninterrupted functional testing of at least one fault current circuit breaker 22, as well as devices for advantageously performing the method. Preferred embodiments of the respective devices will be described below, wherein the method according to the invention described below is preferably not necessarily tied to the use of the described devices.
The disclosed devices include preferred embodiments of a fault current circuit breaker 22, 23 according to the invention, a special switching device 1 according to the invention, and a coupling device 12 for at least electrically and additionally particularly mechanically connecting two fault current circuit breakers with the switching device.
With this type of switching device 1, two fault current circuit breakers 22, 23 can be connected in parallel and a load current can be switched from one of the two fault current circuit breakers 22, 23 to the other fault current circuit breaker 23, 22, without triggering one of the two fault current circuit breakers 22, 23, which would cause disconnection from the power grid. The functional test of fault current circuit breakers 22, 23 can then be performed without a loss of settings on electrical devices or causing safety risks due to an unplanned disconnection of important electrical devices. A fault current circuit breaker 22 identified as being defective can also be interchanged without necessitating disconnection of the electrical partial grid connected downstream of the fault current circuit breaker 22, 23, because the respective other fault current circuit breaker 23 protects during the switchover the downstream connected electrical grid and the connected users.
The term “uninterrupted” preferably indicates a switchover of a load current from one switching device, in the present example from the first fault current circuit breaker 22, to another switching device, in the present example to the second fault current circuit breaker 23, without causing interruptions of the power supplied to downstream components, either due to brief disruptions of the grid during the switching process itself or due to accidental triggering of at least one of the fault current circuit breakers 22, 23.
According to the invention, the switching device 1 can assume a first and a second operating state. Preferably, the switching device 1 has only these two stable operating states, and the transition from one of these operating states to the respective other operating state is implemented as a brief switching process, which itself is not viewed as a stable operating state.
In a modification of the invention, the switching device 1 may further have a third operating state, where the first switching device input 2 is electrically connected with the first switching device output 3 and with a second switching device output 4, and the transitions from the first or second operating state to the third operating state and from the third operating state to the first or second operating state are also implemented to be uninterrupted. This approach not only allows a load current to be switched uninterruptedly from a first fault current circuit breaker 22 to a second fault current circuit breaker 23 and vice versa, but also enables a stable parallel operation of the to fault current circuit breakers 22, 23.
The switching device 1 has, as mentioned above, at least one first electrical switching device input 2 and at least one first electrical switching device output 3 and at least one second electrical switching device output 4. The terms input and output should be interpreted so that the terms which are used in the singular preferably include all functionally required connections of an input and output 2, 3, 4. In the illustrated preferred embodiments, the first switching device input 2 has two terminals, and the first end second switching device outputs 3, 4 likewise have two terminals. Preferably, a switching device output 2 has the same number of terminals as each of the switching device outputs 3, 4, commensurate with the number of conductors, such as the phases and the neutral conductor, of the electrical grid to be protected or to be switched.
The switching device 1 has preferably at least one switch 5, 7 which is electrically connected with the first control device input 2, the first control device output 3 and the second control device output 4, wherein in a first switch position of the switch 5, 7 the first control device input 2 is electrically connected with the first control device output 3, and wherein in a second switch position of the switch 5, 7 the first control device input 3 is electrically connected with the second control device output 4. The respective switch 5, 7 is hereby constructed so that the transition from the first switch position into the second switch position is made without interruption. The switch 5, 7 may only have the two aforedescribed stable switching states. In addition—if the switching device 1 is designed with the aforedescribed third operating state—a corresponding third switch position, for example in form of a center position of the switch 5, 7, can be implemented.
According to the embodiments illustrated in
Preferably, the contacts also mechanical switch 5 are connected to and guided by a switch shaft. Moreover, the mechanical switch can preferably be connected with a switch lock. The switching process of the respective mechanical switch 5 can then be predefined and force-actuated.
According to the embodiment illustrated in
As illustrated in
Preferably, the switching device 1 includes at least one control device 9 for controlling the transitions from one operating state to another operating state. With such control device 9, the switching process can be actively performed and monitored. For example, it can be monitored that the full grid voltage is already present at the second fault current circuit breaker 23, before the first fault current circuit breaker 22 is switched off, i.e. having its input disconnected from the power grid.
The control device 9 is preferably constructed as or includes a programmable logic circuit and/or a microprocessor. Additionally, the switching device 1 may preferably include a power supply, which is not illustrated in the figures, for supplying electrical energy to the control device 9.
According to the illustrated preferred embodiments of a switching device according to the invention, which all include a control device 9, the mechanical or electronic switch 5, 7 may be controlled by the control device 9 and operationally connected with the control device 9. For example, the control device may act on the switch lock, at least indirectly, by way of an electromechanical actuator; or the switch 5, 7 may be implemented as an electronic switch 7 controlling the gate terminal of the illustrated triac. Alternatively, the mechanical switch 5 may be part of a relay arranged in the switching device and controlled by the control device.
According to another illustrated preferred embodiment, the switching device 1 may include at least one voltage measuring device for measuring a voltage on the first switching device output 3 and/or the second switching device output 4. In this way, it can be ensured that the full grid voltage is present at the second fault current circuit breaker 23 before the first fault current circuit breaker 22 is switched off. In this context, the voltage measuring device is preferably constructed as part of the control device 9, and the control device 9 is electrically connected with the first switching device output 3 and/or the second switching device output 4.
Preferably, the switching device has at least one actuating element 25 which is operatively connected with the control device 9 (if a control device is provided), wherein—for example, when simple switching devices 1 are used—the actuating element 25 may be implemented as a manual actuating element of the switch 5 embodied as a mechanical switch 5. Preferably, and as illustrated, the actuating element 25 may be connected with and acting upon the control device 9.
In addition, according to a preferred embodiment of a switching device 1 according to the invention, the switching device 1 may include at least one, in particular optical, signaling means 11 which is controlled in particular by the control device 9. In this way, the operating state of the switching device 1 and/or of the fault current circuit breakers 22, 23 connected with the switching device 1 can be indicated. In this way, a command for unblocking or operating the testing device of one of the two fault current circuit breakers 22, 23 can be communicated to a user. In the illustrated embodiment, the switching device 1 includes two signaling means 11 implemented as LEDs. It should be mentioned that the electrical connections between the control device 9 and the signaling means are not shown in
The switching device 1 has a mechanical switch which is controlled by the control device 5.
According to
The two fault current circuit breakers 22, 23 illustrated in
In an arrangement according to
The basic structure of an arrangement according to
The two fault current circuit breakers 22, 23 according to
The trigger current circuit 19 of the first and the second fault current circuit breaker 22, 23 according to
The first switching arrangement 21 may be configured differently, depending on the design of the trigger circuit. In the present example, the first switching arrangement 21 may be configured for short-circuiting the connection between a secondary winding of the sum current converter 32 and the permanent magnet trigger 31. However, other actuating mechanisms and circuit arrangements may also be contemplated.
According to the illustrated embodiment of a fault current circuit breaker 22, 23, the fault current circuit breaker 22, 23 has at least one first control input 24 for controlling the first switching arrangement 21.
Depending on the type of control of the first switching arrangement 21, a control may be separate from the switching device 1 according to the invention, wherein the switching device 1 preferably has at least one first control output 10 for affecting the trigger characteristic of a fault current circuit breaker 22, 23, which is preferably electrically connected with the control device 9, in a predetermined manner.
As illustrated in
Alternatively, one of the fault current circuit breakers 22, 23 may be constructed as fault current circuit breaker with delayed fault current triggering, while the other fault current circuit breaker 23, 22 may be constructed as fault current circuit breaker 22, 23 according to the invention without a delay.
Preferably, the switching device 1, like the fault current circuit breakers 22, 23, has a housing made of an insulating material.
The two fault current circuit breakers 22, 23 and the switching device may be electrically connected, for example, with wire jumpers. Because this is complicated and error-prone, the respective components may be more particularly connected by a coupling device 12 for electrical switching devices. Such coupling devices 12 for electrical switching devices 1 are illustrated, for example in
A preferred coupling device 12 for electrical switching devices has at least one first input 13 and at least one first output 14, wherein the first input 13 is electrically connected with the first output 14, wherein the coupling device 12 has at least one second input 15 and at least one second output 16, wherein the second input 15 is electrically connected with the second output 16, wherein the coupling device 12 has at least one third input 17 and at least one third output 18, wherein the third input 17 is electrically connected with the third output 18.
Preferably, the at least one first input 13 is constructed to include at least one screw terminal, and/or the at least one second and/or third input 15, 17 and/or the at least one first and/or second and/or third output 14, 16, 18 are constructed as plug contacts.
The embodiment of a coupling device 12 according to
The arrangement according to
The arrangement according to
The present invention furthermore relates to a method for uninterrupted functional testing of a first fault current circuit breaker 22, wherein a load current flows through the first fault current circuit breaker 22, wherein the input side of a second fault current circuit breaker 23 is connected in parallel with the first fault current circuit breaker 22 to the load current, wherein the load current is uninterruptedly switched from the first fault current circuit breaker 22 to the second fault current breaker 23, wherein a functional test of the first fault current circuit breaker 22 is performed, wherein after the first fault current circuit breaker 22 has been successfully functionally tested, the first fault current circuit breaker 22 is switched on, wherein the input side of the first fault current circuit breaker 22 is connected in parallel with the second fault current circuit breaker 23 to the load current, wherein the load current is switched without interruption from the second fault current circuit breaker 23 to the first fault current circuit breaker 22, and wherein the second fault current circuit breaker 23 is switched off.
This method can be used to test the functionality of a fault current circuit breaker 22, 23 without interruption.
The process flow of a particular embodiment of a method according to the invention will now be described, wherein not all the described preferred process steps must be necessarily executed.
After the load current preferably flows through the coupling device 12, the load current flows through the switching device 1, as well as through the first fault current circuit breaker 22 to a consumer. The second fault current circuit breaker 23 is electrically connected in parallel to the first fault current circuit breaker 22, wherein the second fault current circuit breaker 23 is switched on at this time, with the disconnect contacts 20 closed, but is on the input side not connected to the power grid. Accordingly, no current flows at this time via the second fault current circuit breaker 23 to the consumer.
However, the output or load side of the second fault current circuit breaker 23 is connected with the corresponding terminals of the first fault current circuit breaker 22, causing its testing device to be essentially at the same electrical potential as the corresponding devices of the first fault current circuit breaker 22. According to a preferred embodiment of the method of the invention, a corresponding functional test of the second fault current circuit breaker 23 is performed, preferably by operating the test button 27 of the second fault current circuit breaker 23, before the functionality of the fault current triggering of the first fault current circuit breaker 22 is further tested.
For uninterrupted testing, the input side of the second fault current circuit breaker 23 is connected by the switching device 1 in parallel with the first fault current circuit breaker 22 to the power supply grid. In this situation, the load current flows to a load via both the first and the second fault current circuit breakers 22, 23, if such load is operated at that time.
Preferably, before the uninterrupted switchover from the first fault current circuit breaker 22 to the second fault current circuit breaker 23, it is checked if the second fault current circuit breaker 23 is switched on. In this way, the first fault current circuit breaker 23 can be prevented from switching off, as long as the second fault current circuit breaker 23 is not yet ready to carry the load current.
Optionally, the trigger circuits 19 of the first and the second fault current circuit breaker 22, 23 may be inhibited, or a first trigger time of the first fault current circuit breaker 22 and a second trigger time of the second fault current circuit breaker 23 may be extended for a predetermined time during the uninterrupted switchover from the first fault current circuit breaker 22 to the second fault current circuit breaker 23. Completely inhibiting triggering may also represent an extension of the trigger time.
Thereafter, the load current is switched without interruption from the first to the second fault current circuit breaker and the first fault current circuit breaker 22 is then disconnected from the load current, wherein this switchover process is preferably performed with the switching device according to the invention. The first fault current circuit breaker 22 is still connected on the load side with the second fault current circuit breaker 23.
If the trigger circuits of the first and the second fault current circuit breakers 22, 23 were inhibited, this inhibit is canceled.
Preferably, a first signal, in particular an optical signal, is outputted after the uninterrupted switchover from the first fault current circuit breaker 22 to the second fault current circuit breaker 23. This signal informs the user that the first fault current circuit breaker 22 can be checked to test the functionality of the fault current triggering. Preferably, other operating states or instructions, for example relating to the actuation of the testing device of a particular fault current circuit breaker, may be displayed to the user.
The functionality of the fault current triggering of the first fault current circuit breaker 22 can then be tested. To this end, the test button 27 of the first fault current circuit breaker 22 is actuated, which can be done manually, or—if implemented as an electrical circuit—with a remote signal control of the test button 27, for example by the switching device 1. Because of the first fault current circuit breaker 22 is connected on the load side with a second fault current circuit breaker 23, a conventional test circuit 30 continues to function.
After successful testing the functionality of the fault current triggering of the first fault current circuit breaker 22, i.e., if the first fault current circuit breaker 22 was triggered successfully, a switchover occurs from the second fault current circuit breaker 23 to the first fault current circuit breaker 22. The first fault current circuit breaker 22 is then again switched on, at a first step. The input side of the first fault current circuit breaker 22 is then once more connected in parallel with the second fault current circuit breaker 23 to the load current, and the input side of the second fault current circuit breaker 23 is then disconnected from the load current.
In this state, testing of the fault current triggering of the second fault current circuit breaker 23 is planned, unless not previously performed, for example by actuating the corresponding test current circuit 30 of the second fault current circuit breaker 23.
When testing or using fault current circuit breakers 22, 23 having delayed fault current triggering, only the aforedescribed method steps are preferably implemented.
When testing or using fault current circuit breakers 22, 23 which do not have a corresponding delay of the fault current triggering, then the trigger time of the corresponding fault current circuit breakers 22, 23 is preferably extended and/or the triggering is completely inhibited during switchover from one fault current circuit breaker 22, 23 to the other fault current circuit breaker 23, 22—as already described above.
While the invention has been illustrated and described in connection with currently preferred embodiments shown and described in detail, it is not intended to be limited to the details shown since various modifications and structural changes may be made without departing in any way from the spirit and scope of the present invention. The embodiments were chosen and described in order to explain the principles of the invention and practical application to thereby enable a person skilled in the art to best utilize the invention and various embodiments with various modifications as are suited to the particular use contemplated.
What is claimed as new and desired to be protected by Letters Patent is set forth in the appended claims and includes equivalents of the elements recited therein:
Number | Date | Country | Kind |
---|---|---|---|
A 1391/2010 | Aug 2010 | AT | national |
This application claims the benefit of prior filed U.S. provisional Application No. 61/375,179, filed Aug. 19, 2010, pursuant to 35 U.S.C. 119(e), the content of which is incorporated herein by reference in its entirety as if fully set forth herein.
Number | Date | Country | |
---|---|---|---|
61375179 | Aug 2010 | US |