The present disclosure generally relates to multi-stage completions, and more particularly to systems and methods for connecting multi-stage completions.
Many types of wells, e.g., oil and gas wells, are completed in multiple stages. For example, a lower stage of the completion, or lower completion assembly, is moved downhole on a running string. After deployment of the lower completion assembly at a desired location in the wellbore, an upper stage of the completion, or upper completion assembly, is deployed downhole and engaged with the lower completion assembly.
In many applications, it is desirable to instrument the lower completion with electrical or optical sensors or to provide for transmission of fluids to devices in the lower completion. For example, a fiber optic cable can be placed in the annulus between the screen and the open or cased hole. To enable communication of signals between the sensor in the lower completion and the surface or seabed, a wet-mate connection is needed between the upper and lower completion equipment.
In some configurations, a downhole completion system includes a lower completion stage having a receptacle and a first communication line connector; an upper completion stage having a stinger and a second communication line connector; and an alignment feature configured to align the first communication line connector with the second communication line connector upon sufficient insertion of the stinger into the receptacle to enable coupling of the first and second communication line connectors; wherein, when deployed in a wellbore, the receptacle is configured to be positioned below or downhole of a packer, and the stinger is configured to extend through the packer, such that the coupling of the first and second communication line connectors is positioned below or downhole of the packer, and when the stinger is received in the receptacle, a portion of the stinger is positioned above or uphole of the packer and a portion of the stinger is positioned below or downhole of the packer.
Fiber optic lines can be coupled to the first and second communication line connectors. Tubing lines can be coupled to the first and second communication line connectors. The tubing lines can be sized to receive a fiber optic line therethrough. The first and second communication line connectors can be or include electrical connectors, and the coupling of the first and second communication line connectors can be an electrical connection below the packer.
A portion of the stinger can be configured to rotate relative to a remainder of the upper completion during deployment. During insertion of the stinger into the receptacle, rotation of the portion of the stinger can occur at least partially above or uphole of the packer.
In some configurations, a method of forming a completion in a wellbore includes deploying a lower completion stage in a wellbore downhole of a packer, the lower completion stage comprising a receptacle and a first communication line connector; deploying an upper completion stage in the wellbore, the upper completion stage comprising a stinger and a second communication line connector, wherein deploying the upper completion stage in the wellbore comprises extending a portion of the stinger through the packer; inserting the stinger in the receptacle; and coupling the first and second communication line connectors.
The lower completion stage can include a lower fiber coupled to the first communication line connector, and the upper completion stage can include an upper fiber coupled to the second communication line connector. The first and second communication line connectors can be or include electrical connectors. In some configurations, the lower completion stage includes a lower tubing line coupled to the first communication line connector, and the upper completion stage comprises an upper tubing line coupled to the second communication line connector. The method can include pumping a fiber optic line through the upper tubing line, through the coupled first and second communication line connectors, and through the lower tubing line.
In some configurations, a stage of a downhole completion system includes a swivel sub; a shaft coupled to and extending from the swivel sub in a first direction; an inner tube disposed partially within the swivel sub and extending from the swivel sub in a second direction opposite the first direction; and at least one anti-rotation feature configured to rotationally lock the swivel sub relative to the inner tube in a locked position and configured to allow rotational movement of the swivel sub relative to the inner tube in an unlocked position.
The stage can include two anti-rotation features. The two anti-rotation features can be disposed 180° degrees apart from each other about a circumference of the swivel sub. The two anti-rotation features can be axially offset from each other along the swivel sub. The anti-rotation feature can include an anti-rotation pin and a lever, wherein the anti-rotation pin is coupled to the swivel sub and configured to engage the inner tube in the locked position, and wherein the lever is configured to lift the anti-rotation pin out of engagement with the inner tube in the unlocked position. The stage can further include a sleeve configured to move the anti-rotation feature from the locked position to the unlocked position. The sleeve can be coupled to a downhole packer. A method of deploying such a stage can include moving the stage through the packer such that the sleeve contacts the anti-rotation feature and moves the anti-rotation feature to the unlocked position.
Certain embodiments, features, aspects, and advantages of the disclosure will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements. It should be understood that the accompanying figures illustrate the various implementations described herein and are not meant to limit the scope of various technologies described herein.
In the following description, numerous details are set forth to provide an understanding of some embodiments of the present disclosure. It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the disclosure. These are, of course, merely examples and are not intended to be limiting. However, it will be understood by those of ordinary skill in the art that the system and/or methodology may be practiced without these details and that numerous variations or modifications from the described embodiments are possible. This description is not to be taken in a limiting sense, but rather made merely for the purpose of describing general principles of the implementations. The scope of the described implementations should be ascertained with reference to the issued claims.
As used herein, the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via one or more elements”; and the term “set” is used to mean “one element” or “more than one element”. Further, the terms “couple”, “coupling”, “coupled”, “coupled together”, and “coupled with” are used to mean “directly coupled together” or “coupled together via one or more elements”. As used herein, the terms “up” and “down”; “upper” and “lower”; “top” and “bottom”; and other like terms indicating relative positions to a given point or element are utilized to more clearly describe some elements. Commonly, these terms relate to a reference point at the surface from which drilling operations are initiated as being the top point and the total depth being the lowest point, wherein the well (e.g., wellbore, borehole) is vertical, horizontal or slanted relative to the surface.
Many types of wells, e.g., oil and gas wells, are completed in multiple stages. For example, a lower stage of the completion, or lower completion assembly, is moved downhole on a running string. After deployment of the lower completion assembly at a desired location in the wellbore, an upper stage of the completion, or upper completion assembly, is deployed downhole and engaged with the lower completion assembly.
Many well completions incorporate one or more control lines, such as optical, electrical, or fluid control lines, to carry signals to or from components of the downhole completion. For example, in many applications, it is desirable to instrument the lower completion with electrical or optical sensors or to provide for transmission of fluids to devices in the lower completion. To enable communication of signals between the sensor in the lower completion and the surface or seabed, a wet-mate connection is needed between the upper and lower completion equipment. The completion of wells in two or more stages, however, can create difficulties in forming dependable and repeatable control line connections between adjacent completion assemblies.
Optical, electrical, and fluid wet-mate connectors typically are designed as discrete stand-alone components. The stand-alone connectors are mated in a downhole environment that can be full of debris and contaminants. For instance, the mating can take place after an open hole gravel pack which creates a high probability for substantial amounts of debris and contaminants in the wellbore at the vicinity of the connectors during the mating sequence. Existing discrete optical, electrical and fluid wet-mate connectors have proven to be very susceptible to contamination by debris during the mating process.
Furthermore, the discrete nature of the connectors results in an unfavorable geometry that can be difficult to integrate into the completion equipment. The outer diameter of the completion equipment must fit within the inner casing diameter. A centralized, large diameter inner port also is needed to provide access for service equipment into the lower completion and to provide a large flow area for production or injection of fluids. The remaining annular space is not well suited to the typical circular cross section of discrete connectors. This limitation compromises the overall design of the completion equipment and also limits the total number of channels that can be accommodated within a given envelope.
The geometry of the discrete connectors also increases the difficulty of adequate flushing and debris removal from within and around the connectors prior to and during the mating sequence. Attempts to protect the connectors from debris and/or to provide adequate flushing have lead to completion equipment designs that have great complexity with an undesirable number of failure modes.
The present disclosure provides systems and methods for connecting an upper completion with a lower completion. As used herein, “lower” can refer to a first or lead equipment/assembly moved downhole. “Upper” can refer to a second or later equipment/assembly moved downhole into engagement with the lower unit. In a horizontal wellbore, for example, the lower equipment/assembly is run downhole first prior to the upper equipment/assembly. Such systems and methods allow for various types of connections and/or communication between the upper and lower completion, for example, control line communication and/or connection, fiber optic communication and/or connection, electrical connection and/or communication, etc.
Systems and methods according to the present disclosure can advantageously allow for monitoring, e.g. continuous real time monitoring, or temperature (or other data) along the entire length of the upper and lower completion, for example, using an optical fiber deployed or housed within a control line. Additionally or alternatively, systems and methods according to the present disclosure can advantageously allow for water injection and/or hydraulic communication to or with the lower completion. In some configurations, systems and methods according to the present disclosure advantageously allow for transmission of signals, e.g., electrical and/or hydraulic signals, to actuate various devices along the lower completion 28 string, such as flow control devices and/or flow isolation valves. Additionally or alternatively, such signals, e.g., electrical and/or hydraulic signals, can be used to actuate setting sequence(s) for packer(s).
In some configurations, systems and methods according to the present disclosure allow for deploying and connecting a fiber optic sensor network in a two-stage completion. In some configurations, the present disclosure provides systems and methods for coupling control lines, such as hydraulic lines, of the upper and lower completions. Fiber can then be pumped from the surface, for example, with water or another fluid, through the entire length of the coupled control lines to reach the lower completion. In other configurations, an optical fiber can be pre-deployed. The lower completion 28 can be run with fiber, then the upper completion 30 can be run with fiber, and the fiber of the upper completion 30 and fiber of the lower completion 28 can be mated via a connector. This can advantageously save time during deployment and installation as the fiber does not need to be pumped from the surface once a wetmate connection has been established. Once the connection is established, a continuous optical path is established from a surface location to the bottom of an open hole formation and back to the surface location to complete an optical loop.
The connection may also or alternatively be established for other control lines, such as electrical control lines or fluid control lines in various combinations. The connections may be established, broken and reestablished repeatedly. In some configurations, systems and methods according to the present disclosure provide an electrical connection and electrical communication between the upper and lower completions.
Connection systems and methods according to the present disclosure may be used for land applications, offshore platform applications, or subsea deployments in a variety of environments and with a variety of downhole components. The systems and methods can be used to connect a variety of downhole control lines, including communication lines, power lines, electrical lines, fiber optic lines, hydraulic conduits, fluid communication lines, and other control lines. The connections can allow for the deployment of sensors, e.g., fiber optic sensors, in sand control components, perforating components, formation fracturing components, flow control components, or other components used in various well operations including well drilling operations, completion operations, maintenance operations, and/or production operations.
The upper and lower completion assemblies can include a variety of components and assemblies for multistage well operations, including completion assemblies, drilling assemblies, well testing assemblies, well intervention assemblies, production assemblies, and other assemblies used in various well operations. The upper and lower assemblies can include a variety of components depending on the application, including tubing, casing, liner hangers, formation isolation valves, safety valves, other well flow/control valves, perforating and other formation fracturing tools, well sealing elements, e.g., packers, polish bore receptacles, sand control components, e.g., sand screens and gravel packing tools, artificial lift mechanisms, e.g., electric submersible pumps or other pumps/gas lift valves and related accessories, drilling tools, bottom hole assemblies, diverter tools, running tools and other downhole components. In some configurations, the systems and methods may be used to connect fiber-optic lines, electric lines, and/or fluid communication lines below an electric submersible pump to control flow control valves or other devices while allowing the electric submersible pump to be removed from the wellbore and replaced.
Referring generally to
The lower completion stage 28 comprises a housing 32 that forms a receptacle 34 which is run into the wellbore and remains in the wellbore with lower completion stage 28 when the service tool is removed. Housing 32 comprises a lower body section 35 and a shroud 36, e.g. a helical shroud or muleshoe, having an alignment slot 38 and a flush port 40. Lower completion stage 28 also comprises a passageway 42 through housing 32 for routing of a communication line 44 to a communication line connector 46 integrated with the lower completion stage. Communication line 44 may comprise, for example, a fiber optic line, an electric line, an auxiliary conduit, or control line for transmitting hydraulic or other fluids, or a tubing for receiving a fiber optic line. Correspondingly, communication line connector 46 may comprise a fiber optic connector, an electric line connector, a hydraulic connector, or a tubing connector through which a fiber optic line is deployed. By way of specific example, communication line connector 46 comprises a fiber optic ferrule receptacle; communication line 44 comprises an optical fiber disposed within a flexible protected tube; and passageway 42 comprises an optical fluid chamber. The optical fluid chamber can be compensated to equal or near hydrostatic pressure in the wellbore, or the chamber can be at atmospheric pressure or another pressure.
In the illustrated embodiment, the lower completion stage 28 further comprises a displaceable member 48 movably disposed along a surface of receptacle 34 to enclose communication line connector 46. Enclosing communication line connector 46 protects the connector from wellbore debris and other contaminants prior to completing engagement of upper completion stage 30 with the lower completion stage. In the embodiment illustrated, displaceable member 48 is a sleeve, such as a spring loaded sleeve biased toward a position enclosing communication line connector 46. Displaceable member, e.g. sleeve, 48 may be sealed to housing 32 via at least one lower seal 50 and at least one upper seal 52. As illustrated, sleeve 48 also may comprise one or more debris exclusion slots 54.
The upper completion stage 30 comprises an upper completion housing 56 that forms a stinger 58 designed for insertion into and engagement with receptacle 34. Housing 56 may comprise an inner tubing 60, a surrounding upper body portion 62, and an alignment key 64. The inner tubing 60 has any interior 66 for conducting fluid flow and one or more radial flush ports 68 through which a flushing fluid can be conducted from interior 66 to the exterior of stinger 58. The surrounding upper body portion 62 may comprise a passageway 70 for routing of a communication line 72 to a communication line connector 74 integrated with the upper completion stage. As with lower completion stage 28, the communication line may comprise, for example, a fiber optic line, an electric line, an auxiliary conduit or control line for transmitting hydraulic or other fluids, or a tubing for receiving a fiber optic line. Correspondingly, communication line connector 74 may comprise a fiber optic connector, an electric line connector, a hydraulic connector, or a tubing connector through which a fiber optic line is deployed. By way of specific example, communication line connector 74 comprises a fiber optic ferrule plug or receptacle; communication line 72 comprises an optical fiber disposed within a flexible, protected tube that is extensible; and passageway 70 comprises an optical fluid chamber. The optical fluid chamber can be compensated to equal or near hydrostatic pressure in the wellbore, or the chamber can be at atmospheric pressure or another pressure.
The upper completion stage 30 further comprises an upper completion displaceable member 76 movably disposed along an outer surface of housing 56 to enclose communication line connector 74. Enclosing communication line connector 74 protects the connector from wellbore debris and other contaminants prior to completing engagement of upper completion stage 30 with the lower completion stage 28. Similar to displaceable member 48, upper completion displaceable member 76 may be formed as a movable sleeve, such as a spring loaded sleeve biased toward a position enclosing communication line connector 74. Displaceable member, e.g. sleeve, 76 may be sealed to housing 56 via at least one lower seal 78 and at least one upper seal 80. As illustrated, sleeve 76 also may comprise one or more debris exclusion slots 82.
As stinger 58 is moved into receptacle 34, alignment key 64 engages alignment slot 38, as illustrated best in
While the upper completion stage 30 is lowered into the wellbore and into engagement with lower completion stage 28, a flushing fluid is circulated continuously from the interior 66 of tubing 60 through a bottom opening 84 of tubing 60 and through radial flush ports 68. From radial flush ports 68, the fluid can circulate outwardly through flush ports 40 of lower completion stage 28 along a flushing flow path 86, as best illustrated in
As the upper completion stage 30 is continually lowered, the upper sleeve 76 contacts the lower sleeve 48, as illustrated best in
Further movement of the upper completion stage 30 causes the lower sleeve 48 to retract, as illustrated best in
The mechanical stops 88 and 90 determine the relative locations between upper body portion 62 and lower sleeve 48 and between upper sleeve 76 and lower body portion 35. Those relative locations remain fixed throughout the remainder of the landing/engagement sequence. Relative spring rates on spring biased sleeves 48, 76 can be used to control the opening sequence by determining which of the two sleeves retracts first.
As the insertion of upper completion stage 30 into lower completion stage 28 continues, lower sleeve 48 and upper sleeve 76 continue to retract, as illustrated best in
One or both of the communication line connectors can be moved into chamber 92 for coupling with the other connector. In the embodiment illustrated, however, communication line connector 74 is moved into and through chamber 92. In this embodiment, upper body portion 62 is formed as a telescoping body having a first component 96 and a second component 98 that can be moved together to force communication line 72 through passageway 70 of first component 96. The movement of communication line 72 pushes communication line connector 74 into chamber 92, as illustrated best in
Telescoping body 62 can be designed in a variety of configurations. For example, the telescoping body 62 can be attached to upper completion stage 30 such that allowing the upper completion stage to move further downhole automatically compresses a telescoping spring and cause movement of second component 98 toward first component 96. In another configuration, a piston chamber can be ported to the interior of tubing 60 on one side and to annulus pressure on the other side. A piston within the piston chamber can be used to compress a telescoping spring by increasing tubing pressure above annulus pressure. In another configuration, the piston chamber can be ported to a control line extending to the surface instead of to the interior of tubing 60. In some configurations, pressure within the control line can be increased above annulus pressure to compress the telescoping spring. Alternatively, both sides of the piston chamber can be ported to control lines run to a surface location. Increasing control line pressure in one control line and taking returns with the other control line can be used to again compress the telescoping spring and move second component 98 toward first component 96. These and other configurations can be used to move one or both of the control line connectors into and through chamber 92 in forming a control line coupling.
The geometry of lower completion stage 28 and upper completion stage 30 enables efficient and thorough flushing and cleaning of the area around and between the communication line connection components prior to initiating the mating of the two completion stages. Additionally, the communication line connectors and communication lines are fully sealed from wellbore fluids during running of the lower completion stage and the upper completion stage in hole, during the mating sequence, and after the wet-mate connection has been established. The seals used, e.g. seals 52 and 78, can be high-pressure seals that are durable in downhole applications. The sleeve members 48 and 76 and other members forming chamber 92 can be correspondingly sized to withstand high pressures, e.g. the maximum hydrostatic pressure plus injection pressure expected in the wellbore, while the sealed chamber remains at atmospheric pressure
In some configurations according to the present disclosure, for example as schematically shown in
As shown in
As shown in
As shown in
In use, as the stinger 58 is moved into the receptacle 34, the coarse alignment key 64 contacts the helical profile 146 and slides along the helical profile 146 as the stinger 58 rotates until the coarse alignment key 64 is aligned with and then slides into and along the slot 148. As the stinger 58 is moved downhole, before reaching the packer and/or receptacle, the stinger 58 is locked against accidental or undesired rotation, for example, via one or more anti-rotation features as shown in
As shown in
To unlock the anti-rotation feature, the sleeve 186 slides over or about the swivel sub 142 (e.g., along or adjacent the radial outer surface of the swivel sub 142). The sleeve 186 contacts the second, radially extending portion of the lever 184, thereby causing the lever 184 to pivot and depressing the second portion of the lever 184 radially inwardly into a recess in the swivel sub 142, as shown in
In the configuration illustrated in
Once unlocked, the stinger nose 138, shaft 59, and swivel sub 142 rotate relative to region 140, cap or connector 57, and/or inner tube 55, which are held rotationally fixed or stationary by and/or relative to the upper completion string 30. In some configurations, region 140 can rotate with the swivel sub 142, depending, for example, on friction of the system. Rotation of the swivel sub 142, and in some configurations, region 140 and/or connector or connection region 141, relative to the tubing string, for example, upper completion string 30, cap 57, inner tube 55, and/or region 140 containing the coiled control line, helps prevent or inhibit the control line from becoming twisted and damaged. Region 140 can also act as a shroud to protect the control line(s) from damage by equipment through which the string or stinger 58 is run.
Alignment of the key 64 with the slot 148 allows or causes alignment of the slots 147 with the keys 150 and the ports 145 with the connectors 152. As the key 64 slides into the slot 148, the keys 150 slide into the slots 147 and the connectors 152 engage the ports 145 or connectors 245 in or on the ports 145, thereby establishing a continuous control line or fluid pathway from the upper completion 30, through the stinger 58, through the receptacle 34, and to the lower completion 28. In some configurations, the ports 145 include seal stacks 149 to seal between the connector 245 and the surrounding port 145. As shown in
In the illustrated configuration, during deployment, rotation of the stinger (e.g., the swivel sub 142 and/or shaft 59) occurs at least partially above or uphole of the packer 134, while alignment and/or control line connection (e.g., connection of the control line of the upper completion 30 with the control line of the lower completion 28, for example, via connection of the port(s) 145 and associated control line(s) or fluid path(s) with the connectors 152) occurs below or downhole of the packer 134 and/or the extension 136.
In some configurations, the stinger 58 and/or the receptacle 34 includes one or more features to exclude or remove debris that may accumulate on or around the upper and/or lower connectors and inhibit a proper connection and/or that may accumulate around seals 149 and degrade pressure integrity of the seal stack. For example, the stinger 58 and/or the receptacle 34 can include a debris exclusion cover 154, as shown in
In some configurations, corresponding connectors of the lower completion 28 and upper completion 30, for example, connectors 152 and connectors in or on port(s) 145, are electrical connectors to form an electrical connection between the upper completion 30 and lower completion 28. The electrical connectors can be or include, for example, electrical prong connectors that connect to each other, for example, wet-mate electrical connectors available from Diamould. In some configurations, the electrical connectors can be or include inductive coupler components (i.e., a male inductive coupler and a female inductive coupler) to form an electrical connection via an inductive coupler.
Language of degree used herein, such as the terms “approximately,” “about,” “generally,” and “substantially” as used herein represent a value, amount, or characteristic close to the stated value, amount, or characteristic that still performs a desired function or achieves a desired result. For example, the terms “approximately,” “about,” “generally,” and “substantially” may refer to an amount that is within less than 10% of, within less than 5% of, within less than 1% of, within less than 0.1% of, and/or within less than 0.01% of the stated amount. As another example, in certain embodiments, the terms “generally parallel” and “substantially parallel” or “generally perpendicular” and “substantially perpendicular” refer to a value, amount, or characteristic that departs from exactly parallel or perpendicular, respectively, by less than or equal to 15 degrees, 10 degrees, 5 degrees, 3 degrees, 1 degree, or 0.1 degree.
Although a few embodiments of the disclosure have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this disclosure. Accordingly, such modifications are intended to be included within the scope of this disclosure as defined in the claims. It is also contemplated that various combinations or sub-combinations of the specific features and aspects of the embodiments described may be made and still fall within the scope of the disclosure. It should be understood that various features and aspects of the disclosed embodiments can be combined with, or substituted for, one another in order to form varying modes of the embodiments of the disclosure. Thus, it is intended that the scope of the disclosure herein should not be limited by the particular embodiments described above.
Any and all applications for which a foreign or domestic priority claim is identified in the Application Data Sheet as filed with the present application are hereby incorporated by reference under 37 CFR 1.57. The present application is a National Stage of International Application No. PCT/US2021/035478, filed Jun. 2, 2021, which claims priority benefit of U.S. Provisional Application No. 62/704,939, filed Jun. 3, 2020, the entirety of each of which is incorporated by reference herein and should be considered part of this specification.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/US2021/035478 | 6/2/2021 | WO |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2021/247726 | 12/9/2021 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4039208 | Pernet | Aug 1977 | A |
4570707 | Setterberg, Jr. | Feb 1986 | A |
4682848 | Cairns | Jul 1987 | A |
5197546 | Murray | Mar 1993 | A |
5577925 | Schnatzmeyer | Nov 1996 | A |
5838857 | Niekrasz | Nov 1998 | A |
6131663 | Henley | Oct 2000 | A |
6152608 | Ghara | Nov 2000 | A |
6186229 | Martin | Feb 2001 | B1 |
6349767 | Gissler | Feb 2002 | B2 |
6390193 | Martin | May 2002 | B1 |
6510899 | Sheiretov et al. | Jan 2003 | B1 |
6511335 | Rayssiguier | Jan 2003 | B1 |
6568481 | Koehler | May 2003 | B2 |
6571046 | Hickey | May 2003 | B1 |
6668921 | Koehler | Dec 2003 | B2 |
6776636 | Cameron | Aug 2004 | B1 |
6929404 | Jones | Aug 2005 | B2 |
6983796 | Bayne | Jan 2006 | B2 |
7165892 | Grigsby | Jan 2007 | B2 |
7191832 | Grigsby | Mar 2007 | B2 |
7228898 | Grigsby | Jun 2007 | B2 |
7252437 | Ringgenberg | Aug 2007 | B2 |
7398822 | Meijer | Jul 2008 | B2 |
7475734 | Edward | Jan 2009 | B2 |
7487830 | Wolters | Feb 2009 | B2 |
7503395 | Meijer et al. | Mar 2009 | B2 |
7509000 | Coronado | Mar 2009 | B2 |
7510003 | Meijer | Mar 2009 | B2 |
7556093 | Grigsby | Jul 2009 | B2 |
7594763 | Richards | Sep 2009 | B2 |
7607477 | Stoesz | Oct 2009 | B2 |
7611290 | Ringgenberg | Nov 2009 | B2 |
7628543 | Coronado | Dec 2009 | B2 |
7640977 | Jonas | Jan 2010 | B2 |
7644755 | Stoesz | Jan 2010 | B2 |
7736067 | Read | Jun 2010 | B2 |
7798212 | Bolze et al. | Sep 2010 | B2 |
7806190 | Du | Oct 2010 | B2 |
7900698 | Stoesz | Mar 2011 | B2 |
8061429 | Du | Nov 2011 | B2 |
8061430 | Du | Nov 2011 | B2 |
8082990 | Lovell | Dec 2011 | B2 |
8113290 | Sharma | Feb 2012 | B2 |
8496064 | Du | Jul 2013 | B2 |
8550175 | Shafiq | Oct 2013 | B2 |
8596348 | Brookbank | Dec 2013 | B2 |
8752635 | Wang | Jun 2014 | B2 |
8794337 | Thomas | Aug 2014 | B2 |
8839850 | Algeroy | Sep 2014 | B2 |
8936078 | Richards | Jan 2015 | B2 |
9157561 | Martin | Oct 2015 | B2 |
9270051 | Christiansen | Feb 2016 | B1 |
9404314 | Perez | Aug 2016 | B2 |
9523243 | Richards | Dec 2016 | B2 |
9627798 | Plant | Apr 2017 | B2 |
9683412 | Richards | Jun 2017 | B2 |
9759016 | Perez | Sep 2017 | B2 |
9850720 | Richards | Dec 2017 | B2 |
9915104 | Richards | Mar 2018 | B2 |
9945203 | Patel | Apr 2018 | B2 |
9988894 | Malone | Jun 2018 | B1 |
10000995 | Bishop | Jun 2018 | B2 |
10060196 | Richards | Aug 2018 | B2 |
10113371 | Richards | Oct 2018 | B2 |
10267097 | Mendez | Apr 2019 | B2 |
10329855 | Brady | Jun 2019 | B2 |
10329871 | King | Jun 2019 | B2 |
10352110 | Olin | Jul 2019 | B2 |
10502003 | Johnson | Dec 2019 | B2 |
10619424 | Loh | Apr 2020 | B2 |
10934785 | Fripp | Mar 2021 | B2 |
11162306 | Simonsen | Nov 2021 | B2 |
11193339 | El Mallawany | Dec 2021 | B2 |
11646526 | Burrow | May 2023 | B2 |
20030211768 | Cameron | Nov 2003 | A1 |
20050072564 | Grigsby | Apr 2005 | A1 |
20060086508 | Coon | Apr 2006 | A1 |
20060243450 | Head | Nov 2006 | A1 |
20060243454 | Bolze et al. | Nov 2006 | A1 |
20060260803 | Meijer et al. | Nov 2006 | A1 |
20080029274 | Rytlewski | Feb 2008 | A1 |
20080223585 | Patel | Sep 2008 | A1 |
20090045146 | Stoesz | Feb 2009 | A1 |
20090321069 | Jonas | Dec 2009 | A1 |
20100314109 | Garcia et al. | Dec 2010 | A1 |
20110192596 | Patel | Aug 2011 | A1 |
20130048307 | Patel | Feb 2013 | A1 |
20130306316 | Patel | Nov 2013 | A1 |
20130319685 | Pike | Dec 2013 | A1 |
20130327546 | Rytlewski | Dec 2013 | A1 |
20140352793 | Martin et al. | Dec 2014 | A1 |
20150368983 | Perez et al. | Dec 2015 | A1 |
20160006161 | Ranalli | Jan 2016 | A1 |
20160273290 | Harms | Sep 2016 | A1 |
20160356095 | Perez | Dec 2016 | A1 |
20170044843 | Hanton | Feb 2017 | A1 |
20170357051 | Bulu | Dec 2017 | A1 |
20200080398 | Loh | Mar 2020 | A1 |
20210032940 | Simonsen | Feb 2021 | A1 |
Number | Date | Country |
---|---|---|
1212510 | Jun 2002 | EP |
1251598 | Oct 2002 | EP |
2881 | Sep 2014 | GC |
2004079151 | Sep 2004 | WO |
2014089132 | Jun 2014 | WO |
2015060817 | Apr 2015 | WO |
2015044208 | Jun 2015 | WO |
2017105434 | Jun 2017 | WO |
2017213726 | Dec 2017 | WO |
2020087001 | Apr 2020 | WO |
2022109157 | May 2022 | WO |
2022192669 | Sep 2022 | WO |
2022216933 | Oct 2022 | WO |
Entry |
---|
International Search Report and Written Opinion issued in the PCT Application PCT/US2021/035478, dated Nov. 12, 2021 (12 pages). |
International Search Report and Written Opinion of International Patent Application No. PCT/US2021/059923 dated Mar. 11, 2022, 11 pages. |
“Control Line Wet Mate (CLWM) Connector”, product sheet downloaded from [https://www.slb.com/-/media/files/co/product-sheet/control-line-wet-mate-ps.ashx] on Jun. 29, 2022, 2 pages. |
“HLWM Hydraulic-line downhole wet-mate connector”, product sheet downloaded from [https://www.slb.com/-/media/files/co/product-sheet/hlwm-ps.ashx] downloaded on Jun. 29, 2022, 2 pages. |
“HEWM Hydraulic and electric downhole wet-mate connector” product sheet downloaded from [https://www.slb.com/-/media/files/co/product-sheet/hewm-ps.ashx] downloaded on Jun. 29, 2022, 2 pages. |
B.K. Drakeley et al., 2014, “Integration into the Sandface Tool System for Gravel and Frack-Pack Installations with a Fiber Optics Wet-Mate Connector System”, OTC-25195-MS, Offshore Technology Conference, held in Houston, Texas, USA, May 5-8, 2014 (15 pages). |
International Search Report and Written Opinion of International Patent Application No. PCT/US2022/019952 dated Jun. 20, 2022, 10 pages. |
International Search Report and Written Opinion of International Patent Application No. PCT/US2022/023838 dated Jul. 26, 2022, 12 pages. |
“SureCONNECT Downhole Intelligent Wet-Mate System”, downloaded on May 21, 2023 from link https://www.bakerhughes.com/completions/well-monitoring-and-analytics/sureconnect-downhole-intelligent-wetmate-system (8 pages). |
“QUANTUM Snap Latch Assembly”, (2014) SLB product sheet, downloaded on May 21, 2023, from link https://www.bing.com/searchq=QUANTUM+Snap+Latch+Assembly search= pc=U522 form=CHRDEF, (1 page). |
“QUANTUM Anchor Latch Assembly”, (2014) SLB product sheet, downloaded on May 21, 2023 from link https://www.bing.com/searchq=QUANTUM+Anchor+Latch+Assembly qs=n form=QBRE sp=-1 ghc=1 lq=0 pq=quantum+anchor+latch+assembly sc=6-29 sk= cvid=C6BC1C74AC8C44EC9D227795D68F1DD9 ghsh=0 ghacc-0 ghpl= (1 page). |
“QUANTUM Shear-Type Anchor Latch” (2014), SLB product sheet, downloaded on May 21, 2023, from link https://www.bing.com/searchq=QUANTUM+Shear-Type+Anchor+Latch qs=n form=QBRE sp=-1 ghc=1 lq=0 pq=quantum+shear-type+anchor+latch sc=6-31 sk= cvid=A2F41C06C6DB44198EEFF506C1CB5DFB ghsh=0 ghacc=0 ghpl= (1 page). |
Number | Date | Country | |
---|---|---|---|
20230212915 A1 | Jul 2023 | US |
Number | Date | Country | |
---|---|---|---|
62704939 | Jun 2020 | US |