1. Field of the Invention
The present invention generally relates to methods and systems for well intervention operations in subsea wells, and more particularly to a system and method for deploying a subsea well intervention system from a surface vessel to a subsea tree.
2. Background
A subsea well intervention system includes a subsea intervention package connected to the subsea tree and a spoolable compliant guide (SCG) that will link the vessel to the subsea intervention package and allow conveyance of the intervention tools into the wellbore. The subsea intervention package, including the emergency disconnection package, the lubricator and the upper and lower intervention packages, is usually deployed from the vessel to the tree using guide wires. Some sections of the SCG are made buoyant by construction in order to provide a shape for allowing structural compliance when exposed to the environmental effects of the waves and current. Therefore, it requires a dead weight to be lowered to the seabed in a usually congested area, for its bottom connector extremity to be lowered through the water column. It also requires additional installation aids (e.g., remotely operated vehicle (ROV), Active Heave Compensation, winch, buoyancy, guide wires, etc.) and critical path time to align the bottom connector with the lubricator, and make-up and test the subsea connection.
U.S. Pat. No. 4,730,677 describes a method and system for maintaining and servicing subsea well. The system utilizes a flexible riser to link the surface vessel to the X-mas tree. The lower intervention package only is connected on surface to the flexible riser. However, the means of deployment is via the flexible riser powered reel, and the weight of the intervention package applied to the flexible riser is controlled via buoyancy modules attached to the lower intervention package. For deep water, the structure of the flexible riser will require several layers of armor wires and therefore the weight of the flexible riser will increase rapidly with the water depth. The application of this deployment method may therefore be limited in terms of water depth, for example, as:
The buoyancy required along the flexible riser will increase significantly with the weight of the flexible.
The tension capacity of a typical powered reel is limited to approximately 25 Te.
The flexible riser has a limited crushing resistance on the reel when submitted to high tension loads.
Therefore, there is a need for a method and apparatus (which also may be referred to herein as a “system”) that addresses discovered problems with existing systems and methods for deploying a subsea well intervention system from a surface vessel to a subsea tree. The above and other needs and problems are addressed by the present invention, exemplary embodiments of which are presented in connection with the associated figures. The present invention provides an improved method and system that deploys the subsea intervention package and a spoolable compliant guide (SCG) in a single stage, thus improving efficiency of the overall operations by saving the requirement for a separate dead weight and the associated seabed real estate, and saving the subsea operations time for alignment, connection and testing.
Advantageously, the novel method and system need not rely on the buoyancy installed on the SCG or on the intervention package nor the tension/crushing capacity of the SCG for the deployment. Limitation in terms of water depth is solely dependant on the crane capacity to lift and lower the intervention package to the seabed. In the method for deployment of the SCG together with the subsea intervention package, the SCG is connected to the intervention package on the vessel deck and the connection is therefore tested on the surface. Then, the intervention package is sent either overboard or through the moonpool and lowered into the water column using a primary lifting device (e.g., a winch, a crane, etc.) in such a way that the SCG does not see the weight of the intervention package at any time. The SCG is gradually paid out from its reel as the intervention package is lowered to the seabed. The laying process of the SCG from the reel includes a reel drive unit, but may also be supplemented by a tensioner depending on the tension in the SCG due to the water depth. The weight of the intervention package is then transferred to the secondary lifting device (e.g., a crane, winch, etc.) and used as a dead weight to overcome the positive buoyancy of the SCG. The distance between the two lifting devices helps in creating and controlling the SCG shape. Once landed onto the subsea tree with heave compensation, the secondary lifting device is disconnected from the subsea intervention package, and the SCG is hung off at the vessel deck level and the system is ready to be operated. The novel system and method of deployment has the following benefits, including time saving versus the conventional two-stage deployment (e.g., intervention package first and then guide) by removing the attachment and recovery of a dead weight, and the performance of a subsea connection, better reliability of the SCG/intervention package connection as it is performed on surface and can be readily trouble shot if necessary, and reduction of the risks of damage to subsea facilities (e.g., tree, manifold, flying leads, umbilicals, flowlines, etc.), as the requirement to lower a dead weight to the seabed in usually congested areas is removed.
In an exemplary aspect, there is provided a method, system and apparatus for deploying a subsea well intervention system from a surface vessel to a subsea tree, including connecting a spoolable compliant guide (SCG) to a subsea intervention package on deck of a vessel; testing the connection on the deck of the vessel; lowering overboard the intervention package into a water column using a primary lifting device, including a winch or a crane, in such a way that the SCG does not see a weight of the intervention package; gradually paying out the SCG from a reel thereof as the intervention package is lowered to a seabed; transferring the weight of the intervention package to a secondary lifting device, including a winch or a crane, wherein the intervention package functions as a dead weight to overcome a positive buoyancy of the SCG, a distance between the primary and secondary lifting devices creates and controls a shape of the SCG; and once landed onto a subsea tree with heave compensation, disconnecting the secondary lifting device from the intervention package, and hanging the SCG off at the vessel at deck level.
Still other aspects, features, and advantages of the present invention are readily apparent from the entire description thereof, including the figures, which illustrate a number of exemplary embodiments and implementations. The present invention is also capable of other and different embodiments, and its several details can be modified in various respects, all without departing from the spirit and scope of the present invention. Accordingly, the drawings and descriptions are to be regarded as illustrative in nature, and not as restrictive.
The embodiments of the present invention are illustrated by way of example, and not by way of limitation, in the figures of the accompanying drawings and in which like reference numerals refer to similar elements and in which:
Various embodiments and aspects of the invention will now be described in detail with reference to the accompanying figures. The terminology and phraseology used herein is solely used for descriptive purposes and should not be construed as limiting in scope. Language such as “including,” “comprising,” “having,” “containing,” or “involving,” and variations thereof, is intended to be broad and encompass the subject matter listed thereafter, equivalents, and additional subject matter not recited.
Referring now to the drawings, wherein like reference numerals designate identical or corresponding parts throughout the several views, and more particularly to
In
The Spoolable Compliant guide is described in patents U.S. Pat. No. 6.386,290, U.S. Pat. No. 683,724, U.S. Pat. No. 6,691,775, and U.S. Pat. No. 6,745,840 and in patent applications US20080314597A1, US20080185153A1, US2008185152A1, WO2009053022A2, WO2008118680A1 AND WO200122577A2 all assigned to the same assignee as the present invention and which are incorporated herein by reference for all purposes allowed and to the extent that their disclosure does not contradict the specific disclosure and claims of the present invention. The Spoolable Compliant Guide can be made of a continuous pipe, however preferably it is made of a combination of continuous flexible pipe and drill pipe. In one embodiment the drill pipe part of the guide is the lower part of the guide, the one that connects to the X-mas tree and the upper part is made of a continuous flexible pipe such as coiled tubing. However, as it will be appreciated by a person skilled in this art the methodology and system described in this application are equally applicable to many different guide constructions.
The deployment methodology is described as follows, wherein typical equipment layout onboard the vessel is shown on
While the present inventions have been described in connection with a number of exemplary embodiments, and implementations, the present inventions are not so limited, but rather cover various modifications, and equivalent arrangements, which fall within the purview of the appended claims.
This application claims the benefit of U.S. Provisional Application No. 61/089,025, filed on Aug. 14, 2008.
Number | Date | Country | |
---|---|---|---|
61089025 | Aug 2008 | US |