This invention relates to systems and methods for building shower enclosures, and more particularly to a system and method for installing shower walls in a shower enclosure.
Shower enclosures are usually set up and installed by professionals, especially when the shower walls for such enclosures are formed of a one-piece material such as natural or artificial stone. Stone shower walls generally require custom sizing, and skilled handling for installation in a shower enclosure. The expenses and complexity of such installation may discourage a do-it-yourselfer from using stone or other similar unitary wall structures in shower enclosures.
As used herein the term “shower enclosure” is intended to refer to a shower chamber or shower stall with two or more shower walls, and is closable by a shower door, and can also include one or more fixed glass or plastic panels that extend away from the shower walls to the shower door.
In accordance with the invention unitary shower wall structures (also referred to as shower walls) can be made in predetermined sizes and packaged individually or in a kit. The invention also includes novel installation tools that enable a do-it-yourselfer to install the shower walls. Thus the present system for installing shower walls is amenable for mass marketing as one or more off-the-shelf products.
In the accompanying drawings,
Corresponding reference numbers indicate corresponding parts throughout the several views of the drawings.
One embodiment of a system for installing shower walls in a three-wall shower enclosure is generally indicated by the reference number 10 in
The development of a three-wall shower enclosure is shown in simplified pictorial fashion in
It should be noted that any structural dimensions and bonding material cure times indicated in
Each shower wall is preferably a laminate of a natural or synthetic stone material such as granite or marble, or a synthetic stone-like material bonded to a backup support layer. The stone or stone-like layer can be approximately 4 mm thick, for example. A suitable bonding adhesive is a combination of Magpow Aluminum Honeycomb Compound Glues 1693A, 1693B, 1693-1(A) and 1693-1(B).
The backup layer for the stone or synthetic stone layer is preferably formed of a flexible PVC material that is fluted at its rear surface. The fluting can be accomplished with a BF2010022 die. The fluted surface provides the backup layer with a desired yieldability under pressure. Such yieldability helps ensure a secure bond between the shower walls and the backup support walls in the shower enclosure.
Referring to
As shown in
The system 10 (
The system 10 (
The system 10 also includes a combination cam tool and holding device 52 (
The system 10 further includes an identical cam tool and holding device 54 (
The pressure transfer members 26 and 28 (
The arms 72 and 74 (
The fins 80 and 88 (
The arms 72 and 74 (
The pressure transfer member 30 (
The engagement arms 128 and 130 are finned in the same manner as the arms 72 and 74 of the pressure transfer members 26 and 28, and are thus identified by corresponding reference numbers.
The arms 128 and 130 (
The adjustable force development device 36 (
As shown in
The projecting end 180 fits into an end 188 (
The jack assembly 162 also includes a hollow externally threaded member 196 (
The externally threaded member 196 has a threaded portion 206 on a reduced diameter section 208 that extends away from the strut engaging end 198. A peripheral bead 210 that limits insertion of the threaded member 196 into the strut 166 is formed on the strut engaging end 198 where it intersects the reduced diameter section 208. The threaded portion 206 is engageable with the internal threads 182 of the rotatable crank member 172 as shown in
Under this arrangement, rotation of the turn handle 176 of the jack assembly 162 (
An opposite force transmitting end 214 of the strut 164 (
The struts 164 and 166 can be formed of any suitable material such as 1½ inch diameter plastic tube.
The force development device 38 includes a threaded crank assembly 220, identical to the crank assembly 162, cooperable with a pair of elongated struts 222 and 224, (
Thus, an end 230 (
An opposite force transmitting end 238 (
The elongated support member 44 has an end 246 (
Similarly, the elongated support member 46 has an end 254 (
The cam tool and holding device 52 (
A support stub 284 (
The device 52 thus holds the support member 44 in its support position, wherein the support member 44 engages the pressure transfer member 26 (
The cam tool and holding device 54, which is identical to the cam tool and holding device 52, is secured to a backup support wall 350 (
The device 54 also includes a support stub 284 that engages the end 256 (
The device 54 therefore holds the support member 46 in a support position, wherein the support member 46 engages the pressure transfer member 28 (
The cam tool and holding device 52 further includes a cam 300 and a cam follower 306. The cam 300 has a cam head 308 that is rotatable on a hub portion 314 that projects from a bottom surface 316 of the base 262, and is integral with the base 262.
The hub portion 314 is formed with an opening 318 (
A cam lever arm 322 (
The cam surface 324 or the cam engagement surface 326 can be provided with faceting (not shown) to reduce slippage between the surfaces 324 and 326 when engagement occurs.
The cam follower 306 has a driving surface 332 (
The cam follower 306 also includes flexible end straps 334 and 336 (
The cam follower further includes a surface contacting portion 342 for contacting the exposed surface of the shower wall 16 (
The cam tool and holding device 54 also includes a cam 300 rotatably mounted on a hub 314, and a cam follower 306, as previously described for the cam tool and holding device 52.
During installation of the shower walls 16, 18 and 20 the walls 16, 18 and 20 are positioned in the shower wall enclosure 12 in a manner generally indicated in the
The bonding material will ultimately form a permanent bond between the shower walls 16, 18 and 20, and their backup support walls 348, 350 and 352.
However, to ensure adequate surface contact between the shower walls 16, 18 and 20, and their respective backup support walls 348, 350 and 352, it is desirable to apply pressure on the shower walls 16, 18 and 20 while the bonding material cures.
The system 10 provides the desirable pressure on the shower walls 16, 18 and 20 during the curing period of the bonding material.
However, before the entire system 10 is placed in the position of
The cam tool and holding device 52 and 54 are thus affixed alongside the edges 48 and 58 of the shower walls 16 and 18 (
The cam tool and holding devices 52 and 54 are located relative to the edges 48 and 58 of the shower walls 16 and 18 such that the driving surface 332 of the cam follower 306 contacts the edges 48 and 58 of the shower walls 16 and 18 while a portion 356 (
Under this arrangement rotation of the handle 322 of the cam 300 will cause the cam surface 324 to forcibly engage the cam engagement surface 326 on the cam follower 306. The force exerted by the cam surface 326 on the cam follower 306 is transferred to the driving surface 332 of the cam follower 306 that engages the edge 48 of the side wall 16, for example. Such force will urge the side wall 16 to slide toward the rear wall 20 thereby creating a tight corner engagement at the corner C between the wall 16 and the wall 20.
A similar operation is provided with the cam tool and holding tool 54 to cause the side shower wall 18 to slide toward the rear shower wall 20 thereby creating a tight corner joint at corner D between the wall 18 and the wall 20.
Once the tight corner joints have been established at the corners C and D (
Thus the pressure transfer members 26, 28 and 30 are engaged with the adjustable force development means 36 and 38. The support members 44 and 46 are engaged with the pressure transfer members 26 and 28 as shown in
It will be noted that the cam tool and holding devices 52 and 54 in their previously affixed positions, dictate the height at which the system 10 is positioned in the shower enclosure 12.
Referring to
Similarly counterclockwise rotation of the crank member 220 of the force development device 38 will spread the confronting ends 230 and 232 of the struts 222 and 224 to impose a force on the pressure transfer members 28 and 30 via the struts 222 and 224.
The pressure transfer members 26 and 28 are held in position by the support members 44 and 46 and the pressure transfer member 30 is held in position, by a combination of the force imposed thereon by the force development devices 36 and 38 and the stabilization of the pressure transfer members 26 and 28 by the support members 44 and 46 and the devices 52 and 54.
The devices 52 and 54 hold the support members 44 and 46 in their respective support positions and ultimately maintain the pressure transfer members 26, 28 and 30 in their respective pressure transfer positions.
The affixation of the devices 52 and 54 alongside the shower walls 16 and 18 ensures stability of the system 10 during the installation of the shower walls 16, 18 and 20.
After a desirable cure period for the bonding material has elapsed, such as for example 24 hours, the system 10 can be removed from the shower walls 16, 18 and 20 by reducing the force imposed by the force development devices 36 and 38, disengaging the force development devices 36, 38 from the respective pressure transfer members 26, 28 and 30 and removing the support struts 44 and 46 from the devices 52 and 54. The devices 52 and 54 can then be detached from their affixed position alongside the edges 48 and 58 of the shower walls 16 and 18.
In another embodiment of the invention a system for installing shower walls in a two wall shower enclosure is generally indicated by the reference number 370 in
The system 370 (
The system 370 (
The system 370 also includes the combination cam tool and holding devices 52 and 54 (
The cam tool and holding devices 52 and 54 also engage edges 386 and 388 of the shower walls in a manner similar to that described for the system 10 engagement of the shower wall edges 44 and 58 by the devices 52 and 54.
The system 370 is operated in a manner similar to that previously described for the system 10. Thus the force development device 36 is operated to increase the space or distance between the confronting ends 188 and 204 of the struts 164 and 166 to impose a force on the pressure on the pressure transfer members 26 and 28 as previously described for the system 10.
The forces exerted on the pressure transfer members 26 and 28 are applied against the shower walls 378 and 380 after they have been shifted into a tight corner joint by the cam tool and holding devices 52 and 54 in a manner similar to that previously described for the system 10.
Thus the system 370 presses against and maintains the shower walls 378 and 380 in a desired securement position against backup support walls 394 and 396 until a bonding material for the shower walls dries and cures.
As various changes can be made in the above constructions and methods without departing from the scope of the invention, it is intended that all matter contained in the above description or shown in the accompanying drawings shall be interpreted as illustrative and not in a liming sense.
Number | Name | Date | Kind |
---|---|---|---|
651924 | Johnson | Jun 1900 | A |
716904 | Lawson | Dec 1902 | A |
2630076 | Stieve | Mar 1953 | A |
2794217 | Croft | Jun 1957 | A |
3327983 | Snapp | Jun 1967 | A |
3689018 | Pelle et al. | Sep 1972 | A |
3752440 | Ream | Aug 1973 | A |
3861634 | Hood et al. | Jan 1975 | A |
4017052 | Azzaroni | Apr 1977 | A |
4747180 | Screen | May 1988 | A |
4772058 | Andersen | Sep 1988 | A |
5114127 | Everhart | May 1992 | A |
5152085 | Baggio et al. | Oct 1992 | A |
5169258 | Raynak | Dec 1992 | A |
5222420 | Sorensen et al. | Jun 1993 | A |
5263260 | Smith | Nov 1993 | A |
5263507 | Chuang | Nov 1993 | A |
5377462 | Beals et al. | Jan 1995 | A |
5421666 | Spears | Jun 1995 | A |
5678331 | Bonaventure | Oct 1997 | A |
5829096 | Perry | Nov 1998 | A |
6371422 | St. Martin et al. | Apr 2002 | B1 |
6508448 | Stewart | Jan 2003 | B1 |
6591574 | Humphrey | Jul 2003 | B2 |
6976339 | Riccio et al. | Dec 2005 | B1 |
7168117 | Gladney et al. | Jan 2007 | B2 |
7665718 | Benson | Feb 2010 | B1 |
20040211039 | Livingston | Oct 2004 | A1 |
20080189922 | Marechal et al. | Aug 2008 | A1 |
20080277849 | Phillips, Sr. et al. | Nov 2008 | A1 |
20090078843 | Trotter | Mar 2009 | A1 |
20090223917 | Grant et al. | Sep 2009 | A1 |
20090277046 | Sartor et al. | Nov 2009 | A1 |
20130047388 | Kavarsky et al. | Feb 2013 | A1 |
Number | Date | Country | |
---|---|---|---|
20120047721 A1 | Mar 2012 | US |