SYSTEM AND METHOD FOR MONITORING BUILDING ENVIRONMENTAL DATA

Information

  • Patent Application
  • 20160124828
  • Publication Number
    20160124828
  • Date Filed
    October 30, 2015
    9 years ago
  • Date Published
    May 05, 2016
    8 years ago
Abstract
The invention provides a system for generating a performance data (PD) report comprising a first module for collecting performance data, a second module for formatting the PD and selecting from at least one of the following types of data: system run time in minutes, heat run time in minutes, cooling run time in minutes, fan run time in minutes, average heating temperature by degrees, average cooling temperature by degrees, average outdoor temperature by degrees, average humidity level by percent humidity, highest indoor temperature by degrees, lowest indoor temperature by degrees, highest outdoor temperature by degrees, lowest indoor temperature by degrees, highest humidity level by percent humidity and lowest percent humidity by percent humidity, date, time, system mode, such as cool or heat or a fan, system state, room temperature, setpoint, fan state, outdoor temperature and humidity level (collectively hereinafter “custom Performance Data”).
Description

The invention pertains to a method and system for monitoring building environmental data and generating data reports from a sensors and thermostats via a remote input device.


BACKGROUND

The controls for thermostats increasingly provide more programming options, as the sophistication of the thermostat functionality expands. As a result, more data points are available regarding the performance of such high-tech thermostats. Capturing and outputting such data allows users of such equipment to more carefully control the environment and plan and predict the results of potential changes in temperature and humidity. Therefore, there is desired a method and system for outputting data regarding the performance of a thermostat and interconnected heating and cooling equipment.


SUMMARY

An embodiment of the invention provides for a method for compiling building environmental data comprising the steps of providing sensors located in the building, the sensors for collecting environmental data including at least one of: indoor temperature, outdoor temperature, humidity, occupancy, smoke, CO2, thermostat data including setpoints, fan on/off states, heating on/off states, cooling on/off states and room location, organizing performance data (PD) from a controller based on the environmental data received from the sensors, formatting the performance data and creating a PD report wherein the user selects at least one of summary data, detail data or all data and transmitting the PD report to a remote device.


In an embodiment the PD report is transmitted to a registered user. Wherein the report may be formatted by selecting from a 24 hour, seventy-two hour, seven day or thirty day period duration during which the performance data is collected. Wherein the PD report may be sent based on one of the following intervals: daily, weekly and monthly.


In an embodiment the method wherein the PD report may be formatted by at least one of: summary data, detail data or all data. The PD report may be used as a room source one of a basement, downstairs, family room, home office, kitchen or bedrooms. The PD report may provide for input of dealer information. The PD report may be generated directly following input of user information or user settings. The PD report may be generated at a time remote from and subsequent to the entry of the user information or user settings. The user may select from preselected data.


Another embodiment of the invention provides for a system for generating a performance data (PD) report comprising a first module for collecting performance data a second module for formatting the PD and selecting from at least one of the following formats: summary data, detail data, all data, system run time in minutes, heat run time in minutes, cooling run time in minutes, fan run time in minutes, average heating temperature by degrees, average cooling temperature by degrees, average outdoor temperature by degrees, average humidity level by percent humidity, highest indoor temperature by degrees, lowest indoor temperature by degrees, highest outdoor temperature by degrees, lowest indoor temperature by degrees, highest humidity level by percent humidity and lowest percent humidity by percent humidity, date, time, system mode, such as cool or heat or a fan, system state, room temperature, setpoint, fan state, outdoor temperature and humidity level (collectively hereinafter “custom Performance Data”).


In an embodiment the system provides a custom PD report is transmitted to a registered user. The report may be formatted by selecting from a twenty-four hour, seventy-two hour, seven day or thirty day period duration during which the performance data is collected. The custom PD report may be sent based on one of the following intervals: daily, weekly and monthly. The custom PD report may have a format including: summary, detailed or all data. The report may use as a room source one of a basement, downstairs, family room, home office, kitchen or bedrooms. The custom PD report may provide for input of dealer information. The custom PD report may be generated at a time directly following the entry of the user input. The custom PD report may be generated at a time remote from and subsequent to the entry of the user input.


In another embodiment, a system for generating building environmental data is provided comprising a first module for collecting building environmental data, a second module for formatting the environmental data and transmitting the environmental data to a remote input device of a registered user. The environmental data may be selected from a twenty-four hour, seventy-two hour, seven day or thirty day period, during which the data is collected.





BRIEF DESCRIPTION OF THE DRAWINGS

For a better understanding of the subject invention reference may be had to embodiments shown in the attached drawings in which:



FIG. 1 is a schematic view of the steps of performing the performance data collection of the present invention;



FIG. 2 is a schematic view of a thermostat in a building including remote input devices and sensors;



FIGS. 3-7 are illustrations of screen shots of the set-up steps for the present invention;



FIGS. 8 and 9 are illustrations of performance data reports of the present invention; and



FIG. 10 is an illustration of a screen shot of a set-up step for the present invention.





The above drawing figures depict only embodiments which are presently preferred and the invention is not limited to such disclosed embodiments or the precise arrangement and instrumentality shown.


DETAILED DESCRIPTION

The present invention is described with respect to FIGS. 1-9. Turning to FIG. 1, a flow diagram is provided which depicts the operation of the invention during a first operation including set up of the reporting parameters in steps 100-115; and a subsequent operation with steps 120-126.


The invention provides for output of performance data for a thermostat or other HVAC control. Data may include the following types of data: system run time in minutes, heat run time in minutes, cooling run time in minutes, fan run time in minutes, average heating temperature by degrees, average cooling temperature by degrees, average outdoor temperature by degrees, average humidity level by percent humidity, highest indoor temperature by degrees, lowest indoor temperature by degrees, highest outdoor temperature by degrees, lowest indoor temperature by degrees, highest humidity level by percent humidity and lowest percent humidity by percent humidity, date, time, system mode, such as cool or heat or a fan, system state, room temperature, setpoint, fan state, outdoor temperature and humidity level (collectively hereinafter “Performance Data”). Other data may be collected including service information to repair or update equipment such as furnaces, HVAC, fans, thermostats, sensors, wireless communications for equipment and appliances, power consumption data, power outages/surges, alarms, open/closed windows and doors, electronic utility data, water consumption, gas consumption, time of sunset/sunrise, or high winds.


In an embodiment, the method starts at step 100 (FIG. 1) with the first iteration and initial set-up of the system. The application is loaded on a remote device at step 101, for example a tablet or smartphone 10 (FIG. 2). At step 102 authentication credentials are provided by inputting them to the remote device 10. For example, the remote device may have a screen such as a touchpad screen 15, 213 (FIG. 2) for entering the data. For example, in FIG. 3 at step 103 (FIG. 1), a party wishes to receive a Performance Data report. The equipment for the report is maintained by Bob's Service Company and the set-up data for the service company is has been entered into screen 15 of the smartphone 10 at fields for Name 22, Phone 24, E-mail 26 and Website 28. To modify the dealer's information, the Update Dealer button 30 is touched. At step 104, the report is created by clicking on the button “Smart Data report” button 32 in FIG. 3.


At step 105, the device (e.g. thermostat, indoor temperature sensor, outdoor temperature sensor, occupancy sensor, etc.) from which a Performance Data report is desired is selected by scrolling up or down on a list presented on the screen 15 of the smartphone 10 (FIG. 4). In an embodiment, the options of family room 34, basement 36, downstairs 38, office 40, and home office 42 are provided; from which the thermostat in any of those rooms may be selected. In an alternate embodiment, other rooms may be listed including: master bedroom, kids' bedroom, pool, shipping dock, storage room, factory processing area, etc. Once the desired location of the thermostat is selected at step 105, the preferential device is saved to the report by touching the “enter” button 44. At step 106, the predetermined time period may be selected by touching the report options screen 15 of the smartphone (FIG. 2). Among the options are one or two days for reporting. In other embodiments, a button 46 may be provided for providing a one day reporting period (24 Hours button) 46; a two day button 48 (or alternatively a 72 hour button), a Seven Days button 50 and Thirty Days button 52 (FIG. 5). In a further alternative, as shown in FIG. 1, step 106, a period of 1, 2, 7 or 30, rolling days, may be provided for the Performance Data report. At step 106 the preferred time period is saved by touching the “enter” button 44 (FIG. 5) on the screen 15.


At step 107 the selection of reporting just a summary 54, included details 56, or all 58 (FIG. 6) may be selected by pressing the appropriate button on the screen 15, and those selections may be saved to step 112 (FIG. 1). In an alternate step, as shown in FIG. 10, Auto Report Features may be selected including time durations of Daily, Weekly or Monthly by pressing buttons 61, 62, 63, respectively. The user may then select Summary, Detail or All by selecting buttons 65, 66, 67, respectively in FIG. 6. At FIG. 7 a confirmation of the sending of the performance data and environmental data report may be sent, such a message that states, “Auto report setting saved. Your report will be sent on July 1.” (such date calculated based on when the report would be sent).


At step 108, the report may be sent by clicking on the appropriate “send” button. After that step, the screen 59 will provide a pop-up window that states “Report sent to account e-mail.” (FIG. 7.)


At step 109, a Performance Data report may be generated that is stored as snapshot and transitional data and customer report preferences. The user may use the smartphone 10 to access his or her e-mail account where the Performance Data report from the thermostat has been sent and the user may save or access the report accordingly. For example, at step 113 the report may be formatted and e-mailed. At step 114 the data report that was sent from the thermostat or other controller connected to the HVAC may be confirmed as successfully sent. As well, the report may be printed if the device receiving the report is connected to a printer according to a well-known protocol at step 115.


In subsequent iterations, where a report is required but the user preferences and settings were previously input, or the default settings are sufficient, the process starts at step 120 (FIG. 1). At step 121 the user is reminded to “Navigate to Create Report Entity Screen.” On the mobile device 10 a button is displayed on the screen 15 and identifies the data report system. For example, on many smart phones; a list of applications are provided or icons for the applications are displayed on the screen 15. The appropriate icon is activated/clicked at step 122 and a window will appear that provides for a “Quick Report” button 60 (FIG. 5). The “Quick Report” button 60 is clicked to send the report at step 123. The previous settings that have been entered during the first iteration, for example at steps 105-107, will remain in place for later iterations and no further input of that information is required. However, if the user desires to change those settings an option is provided. In situations where the settings do not need to be changed, the report is e-mailed at step 122. At step 125 the Performance Data report is sent to the desired e-mail service provider and the user may display the report or print the Performance Data report completing the process at step 126. Sample Performance Data reports are depicted at FIG. 8 and FIG. 9.


Turning to FIG. 2 the components of the system and the process of transmitting the Performance Data will be described. As discussed above, the smartphone 10 includes a screen 15 to which the appropriate information can be input as discussed above. The input may be via a qwerty key pad that is displayed on the touch screen display 15 or other means such as a mouse or attached keyboard. The smartphone 10 includes telecommunications standard transmission means such as 4G transmission or Wi-Fi transmission via the internet 201. The mobile device transmits via the internet to a Wi-Fi router 220 within a building where the targeted thermostat is located. The Wi-Fi router communicates with a transceiver 215 located within the thermostat 200. The thermostat includes on/off switches 209, its own display 212, a touchpad 213 and a microprocessor 214. The thermostat controls an HVAC system 211 or other heating or cooling system. The microprocessor 214 of the thermostat is programmed to transmit Performance Data regarding the operation of the thermostat 200 on a regular basis, such as every 15 minutes, or more frequently such as every second, or less frequently such as every hour. The transmission of the Performance Data is transmitted via transceiver 215 and Wi-Fi router 220 to the internet 201. For example, a cloud server 201 may collect and organize all of the Performance Data being transmitted from the thermostat 200. The transceiver 215 receives environmental data from sensors 231-236, located in or around a building that houses thermostat 200. Sensors may include outdoor temp sensor 231, indoor temp sensor 233, occupancy sensor 234, smoke sensor 235 and Carbon Monoxide sensor 236. Other sensors may include those for motion detection, barometric pressure, open or closed flu and damper vents and air circulation sensors. In this embodiment, the smartphone 10 and any other device that is linked to the desired e-mail service provider, obtains the Performance Data from the cloud server 201. In an alternate embodiment, the Performance Data may be stored in a memory location within the thermostat or the Wi-Fi router. A request for the data could be processed by the microprocessor 214 by sending the data directly to a requesting mobile device 10 (without use of a cloud server 201).


The Performance Data report may include data such as provided in FIG. 8, which provides a thirty day summary of the thermostat, in a particular room, for example, the Main Floor. The report includes date, time, system mode, system state, room temp, set point, fan state, outdoor temp and humidity level headings. An alternate report, as shown in FIG. 9 includes system run time in hours, heat run time in hours, cooling run time in hours, fan run time in hours, average heating temperature by degrees, average cooling temperature by degrees, average outdoor temperature by degrees, average humidity level by percent humidity, highest indoor temperature by degrees, lowest indoor temperature by degrees, highest outdoor temperature by degrees, lowest indoor temperature by degrees, highest humidity level by percent humidity and lowest percent humidity be percent humidity. In an alternate embodiment, a detailed report as shown in FIG. 9 may be provided which lists a time interval of fifteen minutes to provide the following data: date, time, system mode such as cool or heat or a fan, system state, room temperature, setpoint, fan state, outdoor temperature and humidity level.


In an alternative embodiment, the interval data may be replaced or supplemented with transition data, where the data would consist of the time when a parameter changed state. As a non-limiting example, the system heating state is recorded in 15-minute intervals and tabulated. The heating system changes state between the 15-minute intervals. The tabulated data may consist of the 15-minute interval data, supplemented with the transitional data of the change between the 15 minute interval. Therefore, it is understood that an application may be loaded onto a mobile computing device such as a smart phone, smart watch, virtual device, PDA or other hardware and software provided on the mobile computing device that allows for quick and easy set-up. The application may link to multiple thermostats in multiple buildings in different locations. So a user may quickly obtain Performance Data about the heating and cooling system in multiple buildings using a single application on a single mobile computing device. Alternate embodiments may provide the report in different formats including excel spreadsheet, charts, dashboard visualization illustrations, or portable document formats. Such alternate reports can provide the entire Performance Data information only segments of the Performance Data or a combination of Performance Data parts combined with other types of data pertaining to a building's environment.


The invention could be embodied in other forms without departing from the spirit or essential attributes thereof and accordingly reference should be had to the following claims rather than the foregoing specification as indicating the scope of the invention.

Claims
  • 1. A method for compiling building environmental data comprising the steps of: providing sensors located in a monitored building, the sensors for collecting environmental data including at least one of: indoor temperature, outdoor temperature, humidity, occupancy, smoke, CO2, thermostat data including setpoints, fan on/off states, heating on/off states, cooling on/off states and room location;organizing performance data (PD) from a controller based on the environmental data received from the sensors;formatting the performance data and creating a PD report wherein the user selects to include PD for at least one of summary data, detail data or all data; andtransmitting the PD report to a remote device
  • 2. The method of claim 1 wherein the PD report is transmitted to a registered user.
  • 3. The method of claim 1 wherein the report may be formatted by selecting from a 24 hour, seventy-two hour, seven day or thirty day period duration during which the performance data is collected.
  • 4. The method of claim 1 wherein the PD report may be sent based on one of the following intervals: daily, weekly and monthly.
  • 5. The method of claim 1 wherein the PD report may be formatted by at least one of: summary, detailed or all data.
  • 6. The method of claim 1 wherein the PD report may use as a room source one of a basement, downstairs, family room, home office, kitchen or bedrooms.
  • 7. The method of claim 1 wherein the PD report provides for input of dealer information.
  • 8. The method of claim 1 wherein the PD report may be generated directly following input of user information.
  • 9. The method of claim 1 wherein the PD report may be generated at a time remote from and subsequent to the entry of the user information.
  • 10. The method of claim 1 wherein the selection of a least one of selections of summary, detail or all are preselected.
  • 11. A system for generating a performance data (PD) report comprising: a first module for collecting performance data;a second module for formatting the PD and selecting from at least one of the following formats of data: summary data, detail data or all data, wherein the data consists of one or more of system run time in minutes, heat run time in minutes, cooling run time in minutes, fan run time in minutes, average heating temperature by degrees, average cooling temperature by degrees, average outdoor temperature by degrees, average humidity level by percent humidity, highest indoor temperature by degrees, lowest indoor temperature by degrees, highest outdoor temperature by degrees, lowest indoor temperature by degrees, highest humidity level by percent humidity and lowest percent humidity by percent humidity, date, time, system mode, such as cool or heat or a fan, system state, room temperature, setpoint, fan state, outdoor temperature and humidity level (collectively hereinafter “custom Performance Data”).
  • 12. The system of claim 11 wherein the custom PD report is transmitted to a registered user.
  • 13. The system of claim 11 wherein the report may be formatted by selecting from a twenty-four hour, seventy-two hour, seven day or thirty day period duration during which the performance data is collected.
  • 14. The system of claim 11 wherein the custom PD report may be sent based on one of the following intervals: daily, weekly and monthly and the interval data may be replaced with transition data.
  • 15. The system of claim 11 wherein the custom PD report may use as a room source one of a basement, downstairs, family room, home office, kitchen or bedroom.
  • 16. The system of claim 11 wherein the custom PD report provides for input of dealer information.
  • 17. The system of claim 11 wherein the custom PD report may be generated at a time directly following the entry of the user information.
  • 18. The system of claim 11 wherein the custom PD report may be generated at a time remote from and subsequent to the entry of the user information.
  • 19. A system for generating building environmental data comprising: a first module for collecting building environmental data;a second module for formatting the environmental data; andtransmitting the environmental data to a remote input device of a registered user.
  • 20. The system of claim 19, wherein the environmental data is selected from a twenty-four hour, seventy-two hour, seven day or thirty day period, during which the data is collected.
Parent Case Info

This application claims priority to provisional application No. 62/072,819, filed Oct. 30, 2014.

Provisional Applications (1)
Number Date Country
62072819 Oct 2014 US