Claims
- 1. A control for a gas turbine electric power plant having a gas turbine with compressor, combustion and turbine elements, a generator drivably coupled to said turbine for generating electric power, said control comprising fuel supply means for supplying fuel to said gas turbine combustion element, control means for controlling the operation of said plant, means responsively coupled to said control means for operating said fuel supply means to supply fuel to said combustion elements in controlled quantities, and pressure detection means positioned in said plant to sense combustion shell pressure in said combustion element and coupled to apply a signal representative of combustion shell pressure to said control means means for storing a calibration value for said pressure signal based on the relative values of the actual pressure signal and an expected pressure signal value during the last turbine shutdown, said calibration value being utilized by said control means to compensate the actual pressure signal provided by said detection means during turbine operation.
- 2. A gas turbine control as set forth in claim 1 wherein said storing means stores a calibration value for said pressure detection means equal to the difference between the actual and expected signal values substantially at the time of lightoff during turbine startup.
- 3. A gas turbine control as set forth in claim 1 wherein said control means includes digital computer means which in turn includes said storing means and includes additional means for predetermined monitoring and control functions for said control means.
Parent Case Info
This is a continuation of application Ser. No. 234,491 filed Mar. 14, 1972 now abandoned.
US Referenced Citations (6)
Continuations (1)
|
Number |
Date |
Country |
Parent |
234491 |
Mar 1972 |
|