In the production of hydrocarbon based fluids, artificial lift equipment can be used to produce a fluid to a surface location or other desired location. For example, a jet pump may be utilized to provide the artificial left. However, operation of a jet pump typically requires the use of two flow passages. A power fluid is pumped down through a flow passage to the jet pump, and commingled production is returned through another flow passage to the surface or other collection point. Due to the dual flow passage configuration, the use of jet pumps in some environments, e.g. offshore production, is rendered difficult as a result of regulations requiring that well control be maintained in a catastrophic situation. Specifically, such well control can be difficult and/or expensive because both fluid passages used in operation of the jet pump must be closed in a catastrophic event.
In general, the present invention provides a system and methodology for utilizing one or more jet pumps in a variety of applications, including offshore production applications. The system comprises a production control unit having a recovery valve deployed at the bottom of a jet pump assembly to provide full subsurface control utility. The positioning of the recovery valve enables full control of well fluid flow in the wellbore with a single valve. Furthermore, the jet pump assembly can be delivered downhole in a single operation to save time and cost. The system also enables the retrofitting of existing wells with the production control unit.
Certain embodiments of the invention will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements, and:
In the following description, numerous details are set forth to provide an understanding of the present invention. However, it will be understood by those of ordinary skill in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
The present invention generally relates to a system and method of providing artificial left for fluids found in a subterranean environment. The system and method are useful in, for example, the production of hydrocarbon based fluids in offshore environments. However, the devices and methods of the present invention are not limited to use in the specific applications that are described herein.
Referring generally to
In the embodiment illustrated, wellbore 26 is lined with a casing 30 having perforations 32. Production fluid flows from formation 28 into wellbore 26 through perforations 32. From this location, system 20 is able to lift the fluids to, for example, a wellhead 34 on platform 22.
In the illustrated example, system 20 comprises a tubing 36 that extends downwardly into wellbore 26 from wellhead 34. A shallow subsurface safety valve 38 may be connected along tubing 36. Below the subsurface safety valve 38, tubing 36 extends to a downhole completion 40 that includes a downhole receptacle 42. Downhole receptacle 42 may comprise, for example, a sliding sleeve or a standard hydraulic pump bottom hole assembly. Downhole completion 40 may also comprise a packer 44. In this embodiment, packer 44 is positioned below downhole receptacle 42. The packer is positioned to seal the annulus between tubing 36 and wellbore casing 30, as illustrated best in
Downhole receptacle 42 is designed to receive a production control unit 46 which may be delivered or retrieved from downhole receptacle 42 by, for example, a deployment system 48 (shown in dashed lines). Examples of deployment systems comprise slickline or wireline deployment systems. In the embodiment illustrated, production control unit 46 comprises a jet pump 50 disposed in cooperation with a subsurface safety valve 52. Subsurface safety valve is deployed in tubing 36 below jet pump 50. In at least some embodiments, subsurface safety valve 52 may be positioned below jet pump 50 and connected thereto to facilitate selective deployment of the production control unit 46 to downhole receptacle 42 as a single unit and in a single trip downhole.
Referring generally to
Although other types of subsurface safety valves may be utilized, the illustrated valve 52 comprises a flapper valve 56 positioned in a valve body 58. The flapper valve 56 is opened via the pressure of power fluid supplied through a conduit 60. Conduit 60 may be formed as internal porting or as an external conduit. Regardless, when power fluid pressure is applied to operate jet pump assembly 50, the pressurized fluid is transferred through conduit 60 to open flapper valve 56. An integral self equalizing circuit 62 may be formed in subsurface safety valve 52 to permit the higher reservoir pressures to be “bled” through the valve, thereby equalizing the pressure on both sides of the flapper valve 56 to facilitate opening of the valve.
In the embodiment illustrated, valve 52 is normally in a closed position, e.g. flapper valve 56 blocks flow through valve body 58. The valve may be biased to the closed position by virtue of wellbore pressure and/or the use of biasing devices, such as a spring, to move the valve to the closed position. Thus, in the event flow of power fluid is manually or accidentally turned off, the delivery of pressurized power fluid through conduit 60 is stopped, and the subsurface safety valve 52 returns to its normally closed position. By utilizing packer 44 and the subsurface safety valve 52 positioned below jet pump assembly 50, complete well control is maintained even after cessation of power fluid flow. Packer 44 blocks upward flow of well fluid intermediate tubing 36 and casing 30, while valve 52 blocks all upward flow through valve body 58 when the valve is closed. Accordingly, well fluid cannot flow upwardly through the wellbore even in the event of catastrophic failure above downhole completion 40.
Jet pump assembly 50 generally comprises a jet pump 64 having a nozzle 66, a throat 68 and a diffuser 70. Power fluid is pumped downwardly through tubing 36 and into nozzle 66. The power fluid continues to flow through the constricted throat 68 before expanding in diffuser 70. The flow through throat 68 creates a low-pressure area that draws on wellbore fluid surrounding jet pump 64. The wellbore fluid is mixed with the power fluid in diffuser 70 and forced outwardly into annulus 54. Simultaneously, the pressurized power fluid acts on subsurface safety valve 52 via conduit 60 to maintain the valve in an open position. Thus, a continuous supply of well fluid is available for commingling with the power fluid at jet pump 64. Annulus 54 conducts this mixed fluid to a desired location, such as wellhead 34.
In another embodiment, system 20 is operated in a reverse circulation mode, as illustrated in
Production control unit 46 may be deployed as a single unit with combined jet pump assembly 50 and subsurface safety valve 52 on, for example, slickline 48. This “single run” downhole substantially reduces the cost of installation and enables the retrofitting of a wide variety of existing installations fitted with sliding sleeves or other downhole receptacles. The production control unit 46 is simply delivered downhole, via deployment system 48, and into engagement with an appropriate downhole receptacle 42. The ultimate landed position of production control unit 46 may locate valve 52 either above packer 44 (see
The production control unit 46 also may be utilized in a variety of other applications. For example, production control unit 46 may be used for well testing in both on and offshore environments. In this application, production control unit 46 comprises a wellbore parameter sensor 74 positioned to sense a desired wellbore parameter. Subsurface valve 52 provides a reliable flow valve that enables the collection of consistent well recovery testing data while maintaining well control. One example of wellbore parameter sensor 74 is a recording pressure gauge positioned proximate the bottom of production control unit 46.
In another application, production control unit 46 is utilized as a temporary, early production control system in both on and offshore environments. For example, when wells are batch drilled offshore, there can be considerable lag time between drilling and installing of permanent artificial lift completions. During this lag time, a simple, basic completion can be installed. The simple, basic completion can comprise system 20 utilized during the lag period by installing a temporary packer and sliding sleeve completion. Subsequently, production control unit 46 is installed as described above to enable production prior to installation of the permanent, artificial lift equipment.
In another application, production control unit 46 can be used as a temporary backup for artificial lift equipment, such as electric submersible pumping systems, in both on and offshore environments. For example, in the event an electric submersible pumping system fails, a production control unit can temporarily be utilized, provided the downhole completion has a packer and a downhole receptacle, e.g. a sliding sleeve. The production control unit enables production until the completion can be removed and the electric submersible pumping system replaced.
The system 20 also can be used for permanent artificial lift production in both on and offshore environments. The combination of jet pump and safety valve in a single production control unit provides an artificial lift system that is easy to deploy and retrieve while providing the desired well control.
Although only a few embodiments of the present invention have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this invention. Accordingly, such modifications are intended to be included within the scope of this invention as defined in the claims.
Number | Name | Date | Kind |
---|---|---|---|
1720863 | Stebbins | Jul 1929 | A |
2114780 | Juelson | Apr 1938 | A |
2158717 | Brock | May 1939 | A |
2732032 | Sandison | Jan 1956 | A |
2744721 | Hatch | May 1956 | A |
3155177 | Anderson | Nov 1964 | A |
3289608 | Laval, Jr. | Dec 1966 | A |
3512651 | Laval, Jr. | May 1970 | A |
3605887 | Lambie | Sep 1971 | A |
3765483 | Vencil | Oct 1973 | A |
3944380 | Kampe | Mar 1976 | A |
4047912 | Markland | Sep 1977 | A |
4066552 | Caine | Jan 1978 | A |
4072481 | Laval, Jr. | Feb 1978 | A |
4155681 | Linko, III et al. | May 1979 | A |
4183722 | Roeder | Jan 1980 | A |
4294573 | Erickson et al. | Oct 1981 | A |
4330306 | Salant | May 1982 | A |
4390061 | Short | Jun 1983 | A |
4444251 | Lefebvre et al. | Apr 1984 | A |
4588351 | Miller | May 1986 | A |
4790376 | Weeks | Dec 1988 | A |
4971518 | Florin | Nov 1990 | A |
4988389 | Adamache et al. | Jan 1991 | A |
5000769 | Raguideau et al. | Mar 1991 | A |
5033545 | Sudol | Jul 1991 | A |
5277232 | Borsheim | Jan 1994 | A |
5368735 | Ford | Nov 1994 | A |
5372190 | Coleman | Dec 1994 | A |
5482117 | Kolpak et al. | Jan 1996 | A |
5555934 | Haufler | Sep 1996 | A |
5562161 | Hisaw et al. | Oct 1996 | A |
RE35454 | Cobb | Feb 1997 | E |
5662167 | Patterson et al. | Sep 1997 | A |
5667364 | O Mara et al. | Sep 1997 | A |
5881814 | Mills | Mar 1999 | A |
5992521 | Bergren et al. | Nov 1999 | A |
6017198 | Traylor et al. | Jan 2000 | A |
6026904 | Burd et al. | Feb 2000 | A |
6045333 | Breit | Apr 2000 | A |
6167960 | Moya | Jan 2001 | B1 |
6168388 | Hughes et al. | Jan 2001 | B1 |
6189613 | Chachula et al. | Feb 2001 | B1 |
6216788 | Wilson | Apr 2001 | B1 |
6269880 | Landry | Aug 2001 | B1 |
6354371 | O'Blanc | Mar 2002 | B1 |
6357530 | Kennedy et al. | Mar 2002 | B1 |
6394183 | Schrenkel et al. | May 2002 | B1 |
6497287 | Podio et al. | Dec 2002 | B1 |
6508308 | Shaw | Jan 2003 | B1 |
6547532 | Gonzalez et al. | Apr 2003 | B1 |
Number | Date | Country |
---|---|---|
2239676 | Jul 1971 | GB |
2264147 | Aug 1993 | GB |
WO920837 | May 1992 | WO |
WO9307391 | Apr 1993 | WO |
WO9711254 | Mar 1997 | WO |
Number | Date | Country | |
---|---|---|---|
20050155767 A1 | Jul 2005 | US |