System and method for ongoing supporting a procurement and accounts payable system

Abstract
A system for deploying to a client accounting installation a general procurement and accounts payable application specifically configured for the client by an enterprise includes a database server for (1) maintaining on a storage device a database of templates describing procedures for assessing, preparing, developing, deploying and supporting the application, and for (2) serving these templates to team members operating web-enabled terminals for coordinating, recording and tracking team activities with respect to the application while generating a description for adapting a front end server and an accounting system server to the requirements of the client.
Description


BACKGROUND OF THE INVENTION

[0002] 1. Technical Field of the Invention


[0003] This invention pertains to the implementation of a procurement and accounts payable system or application. More particularly, it relates to a system and method for assessing, preparing, designing and developing, deploying, and supporting a general procurement and accounts payable system using electronic requisitions.


[0004] 2. Background Art


[0005] A services company may be very good at implementing information technology (IT) solutions. However, as customer engagements increase, the ability of company to execute numerous engagements on time and within budget with quality becomes more difficult.


[0006] Today there exist many different software packages that perform project management and classes that teach methodologies for implementing solutions that involve information technology and services. However, there is no process that combines these activities along with an evaluation of a client's general procurement (GP) and accounts payable (AP) system, or application, into one package while providing detailed implementation instructions along with templates for completing the major deliverables required over the course of the project. Templates, may be used herein as an equivalent term for page, form, or document as used in connection with Lotus Notes. In Lotus Notes, a page is a database design element that displays information; a form, like a page, displays information and also can be used to collect information; and documents are the elements that store information in the database. A user is presented a form including fields for entering information. When the user fills out the information and saves it, the information is saved in the data base as a document. When a user opens the document, the document uses the form as a template to provide the structure for displaying the data or information. Fields store data of various types, including text, dialog list, rich text, and so forth.


[0007] Scalability of engagements is a known problem, the most common solution to which is to increase the number of persons involved. Experience has shown that this increase results in customer dissatisfaction due to inadequate gathering of requirements, poorly trained implementation teams, missed schedules, increased costs, and lower quality.


[0008] It is characteristic of general procurement and accounts payable systems that no two are identical, and may differ even within wholly owned subsidiaries of a single corporation.


[0009] Consequently, there is a need in the art for a system and method for evaluating a potential client system and for adapting a general procurement and accounts payable system to the requirements of each of many potential clients. Further, there is a need for a system and method for evaluating a potential client system and for adapting a general procurement and accounts payable system to the requirements of each of many potential clients which can be licensed to third party providers together with a system and method for monitoring and assuring the quality of services provided by those service providers.


[0010] There is a need in the art for an integrated system for assessing, preparing, designing and developing, deploying, and supporting a procurement and accounts payable system using electronic requisitions.


[0011] During project assessment, typically potential customers are contacted and evaluated by a marketing team that then recommends a product solution from their menu. There is no integration of Technical Team Leaders and Transition Management as key components of the installation. There is also limited to no flexibility to customize the product for the customer.


[0012] There is a large body of work on project planning in industry. While they are all more or less adequate, they do not provide the comprehensive integration of the client and supplier teams, Transition Management, and Quality required to accomplish a particular customer's goals.


[0013] Like project planning, project design and development processes are well known in industry. They usually consist of a project manager or team leader that manages the implementation of a project plan and interfaces with the client.


[0014] Deployment or implementation of a project is, again, a very standard operation. As the project plan steps are completed, they are usually held in queue until all necessary activities reach a point where the solution can be “turned on”.


[0015] All projects have close out functions that wrap up the end of the project. However, they do not provide for continuing support across the multitude of functions that have been used to provide the customer with a solution.


[0016] It is an objective of the invention to provide a system and method for evaluating a client's general procurement and accounts payable (GP/AP) system.


[0017] It is an object of the invention to provide an optimized solution for out-sourcing procurement of goods and services.


[0018] It is an object of the invention to provide a system and method for training service providers.


[0019] It is an object of the invention to provide a system and method for managing service providers to assure quality of service.


[0020] It is an object of the invention to provide a system and method for managing a project.


[0021] It is an object of the invention to provide an optimized general procurement and accounts payable system characterized by lower costs, a paperless process, and more comprehensive service with a shorter cycle time.



SUMMARY OF THE INVENTION

[0022] A system for providing ongoing support for a general procurement and accounts payable application includes a server; a storage device connected to the server; a plurality of team terminals; and a communication link interconnecting the server and terminals. The server is operable for (1) maintaining a database of templates on the storage device describing procedures for supporting the application and (2) serving the templates to team members operating the terminals for coordinating, recording, and tracking team activities executing the procedures with respect to supporting the application. These procedures include user education, survey and quality auditing tasks.


[0023] A method for providing ongoing support for a general procurement and accounts payable application of a customer of an enterprise includes maintaining a database of templates describing procedures for supporting an operational general procurement and accounts payable system; and operating a plurality of web-enabled user terminals to access via a server the database for coordinating tasks by a plurality of enterprise teams implementing the procedures. The procedures include user education, survey and quality auditing tasks.


[0024] In accordance with an aspect of the invention, there is provided a computer program product configured to be operable for providing ongoing support for a general procurement and accounts payable application of a customer of an enterprise.


[0025] Other features and advantages of this invention will become apparent from the following detailed description of the presently preferred embodiment of the invention, taken in conjunction with the accompanying drawings.







BRIEF DESCRIPTION OF THE DRAWINGS

[0026]
FIG. 1 is a high level block diagram of a general procurement and accounts payable development and implementation system in accordance with a preferred embodiment of the invention.


[0027]
FIG. 2 is a block diagram illustrating team relationships within the general procurement and accounts payable (GP/AP) development and implementation system of a preferred embodiment of the invention.


[0028]
FIGS. 3A through 3M, arranged as shown in FIG. 3, are a flow diagram of the assessment, preparation, development, deployment and support phases of the method of a preferred embodiment of the invention.


[0029]
FIG. 4 represents a terminal display of a playbook summary view.


[0030]
FIG. 5 illustrates a terminal display of the template presented by the server at a user terminal of FIG. 1 in response to selection by a user of “create a summary task” from the playbook summary view.


[0031]
FIG. 6 illustrates a terminal display of the template presented by the server at a user terminal of FIG. 1 in response to selection by a user of “create a detailed task” from the playbook summary view.


[0032]
FIGS. 5 and 6 also illustrate fields collected in the database and selectively displayed at user terminals of FIG. 1 for each summary and detail task, respectively, of a GP/AP system for a particular customer or project.







BEST MODE FOR CARRYING OUT THE INVENTION

[0033] Referring to FIG. 1, in accordance with the preferred embodiment of the invention, intranet communication facilities interconnect a plurality of team member terminals 64, zero or more service provider terminals 66, and client (also referred to as customer) terminals 68, and a server 62, preferably a Lotus Notes server.


[0034] Server 62 references and maintains playbook database 70. Database (also referred to as the playbook, or playbook database) 70 is provided for implementing procurement and accounts payable systems. This playbook 70 defines implementation steps and templates for creating the many required deliverables and project management functions. These functions include start and end dates, effort, duration, and so forth. This playbook also provides the steps and templates for training service providers 66 and serves as the repository for completed templates and as a source for auditing the performance of the service providers. As used herein, unless otherwise apparent from the context, system and applications are used to refer to hardware, software, procedures, instructional materials, and so forth, for implementing a general procurement and accounts payable process.


[0035] Also attached to intranet 60 are requisition and catalog (Req/Cat) servers 80. Server 80 functions as a front end server to accounting system server 82, and is connected to a file of vendor catalogs and contracts 72, to a client (customer) host system 74, and through a firewall to SAP servers 82. SAP server 82 is an accounting driver for the procurement and accounts payable (A/P) system of the customer. SAP servers 82 are connected to supplier systems 84, to a customer data warehouse 78, and to customer ledger and accounts payable systems 86, 88.


[0036] During the operational phase of a completed and functioning system, a customer (aka end user, or client) 98 enters requisitions via the intranet to server 80. Server 80 accesses client host system 74 for pricing, reports, etc., and vendor catalogs and contracts 72 to gather information needed by SAP servers 82 to generate purchase orders or requests for quotes (RFQs) to supplier 84, to update data warehouse 78, client ledger 86, and client accounts payable 88 systems. Warehouse 78 stores client data maintained by the supplier of the Req/Cat and general procurement system, which supplier may be the primary enterprise (a primary services organization, such as the IBM Corporation) with control of the design and implementation of the system, or a contractor of the enterprise qualified as a third party service provider.


[0037] In operation, during presales, assessment, preparation, development, deployment and support stages, team members 64, access database 70 via intranet 60 and server 62 to create a playbook including a detailed description of an accounts payable and Req/Cat system for a particular customer (aka client). This description is then used to personalize Req/Cat servers 80 and SAP servers 82 for the customer installation. During operation, a user 98 accesses Req/Cat server 80 via intranet 60 to enter a requisition or to query the status of previously entered requisition. When entering a requisition, Req/Cat responds to end user 98 with a form to complete. Req/Cat 80 accesses SAP server 82 through the firewall with the requisition or request for status. SAP server 82, responsive to a requisition, issues a purchase order or request for quote to supplier 84, and updates accounts payable 88 and ledger 86, as required through the normal procurement and accounting process implemented on behalf of the customer.


[0038] Referring to FIG. 2, the various departments and individuals representing team members 64 include business office 120, architecture 122, education and training 124, project manager 126, Req/Cat development 128, business process design 112, electronic data interchange (EDI) 114, application development 116, information technology 130, business controls 132, procurement process 134, transition management 136, SAP development 138, marketing 118, general procurement operations 98, and support management 96. Each of these departments and individuals perform various rolls and functions during the life of the project from assessment through deployment and use, as will be more fully described hereafter in connection with FIG. 3.


[0039] Referring to FIG. 3, in accordance with the preferred embodiment of the method of the invention, assessment 101, preparation 102, development 103, deployment 104 and support 105 stages are executed to design, implement, and use a general procurement and accounts payable (GP/AP) system for a customer. Through these stages 101-105, procedures and methods are provided for seamlessly integrating all aspects of a total GP/AP system, including creating an electronic purchase requisition for goods and services with flexible approval functions, through invoicing and payment.


[0040] Further in accordance with the preferred embodiment of the invention, there is provided a web enabled delivery system.


[0041] Further in accordance with the preferred embodiment of the invention, there is provided a system and method for auditing service provider activities without being on site.


[0042] High level summary tasks implemented by playbook 70 database include business controls, information technology, SAP, communication, process, testing, configuration, project management, transition management, education and training, requisition and catalog (Req/Cat). Each of these summary tasks, as well as the drill-down (aka subsidiary) tasks implementing the details of each, may be accessed by team members 64 and service provider 66s within the playbook database 70.


[0043] Referring to FIG. 4, the playbook summary view 400 is illustrated. View 400 includes a title bar 402; pull down menu tabs file 404, edit 406, view 408, create 410, actions 412, window 414, help 416; create a summary task selection button 420, create a detailed task button 422, a folders and views section 424, and a task title display and selection area 426 which also includes a by column 436 and a status column 438 with an entry for each task displayed in area 426. With by category button 430 and all tasks button 432 selected, all tasks 434 is highlighted and display 426 presents a listing of tasks organized by category.


[0044] Referring to FIG. 5, the summary task template 440 presented to the user upon selection of create a summary task 420 is illustrated. As will be described hereafter, there are two flavors of template 440, one for major operations, and one for major steps within each major operation. Referring to FIG. 6, the detail task template 520 presented to the user upon selection of create a detailed task 422 is illustrated.


[0045] Selection of create summary task 420 presents a first summary task template 440 that used to design and describe a high level summary task for one of the playbook operations. In a preferred embodiment of the invention, there are thirteen such high level summary tasks, including assessment, business controls, configuration, education, image, information technology (I/T), marketing, process, project management, requisition and catalog (req/cat), SAP, testing, and transition management. The summary and detail tasks within these high level summary tasks are further organized into five major processing segments: assessment 101, project preparation 102, project design and development 103, deployment 104, and ongoing support 105. A high level summary task provides a summary of the inputs to the task, and of the output (deliverables) after all detailed tasks are completed. There two levels, or templates for summary tasks: one for major operations, the second for major steps within each operation.


[0046] Activation of create a detail task 422 presents to the user a third template 520 which is used to summarize the detailed tasks for each major step of a summary task.


[0047] The first and second templates 440 are almost identical. They include the fields set forth in Tables 1 and 2. Third template 520 contents are summarized in Table 3.
1TABLE 1SUMMARY TASK TEMPLATES PART 1SECTION 1:CREATION STATUSCategory 444:Categories include education,req/cat development, SAPdevelopment, transformationmanagement, architecture,procurement process.Team 446:Specific project team responsiblefor this task.Offering type 448:Kind of product being brought toclient: req/cat only, SAP only, andreq/cat and SAP.Stage 450:The stages are assessment 101,project preparation 102, projectdevelopment 103, deployment 104,and support 105.Doc owned by 452:Team 140 owner of document, thedesigner of this one template. Theteams 140 are those illustrated inFIG 2.Doc created by 454:Author of this one template.Dev status 456:Approval status: first draft, finaledit, final approval, etc. Onlyowner 452 can change this status.Only the owner 452 can approve thecontent of this template (task).SECTION 2:IMPORTANCE BUTTONSEducation 462:Represents a combination of things,including (1) does someone need tobe taught how to do this task, (2)is it something that should beincluded in the education packageto the customer.Certification 464:Indicates whether or not animplementer of this task (ie,service provider) must becertified.Auditable 466:Indicates whether or not it is atask that Enterprise would be ableto or needs to audit performance bythe implementer/service providerMilestone 468:Indicates if this task is acritical accomplishment in the pathof completing the implementation ofthe offering type.Critical path 470:Indicates if this is a task thatmust be completed in order toadvance to the next task in orderto complete the offering type, andcan change during the course of theproject as tasks are completed andthe overall environment changes.SECTION 3:IMPLEMENTATIONTask order 472:A number assigned to a detailedtask that shows its order under thesummary task.% complete 474:An estimate of how complete is thistask document in its developmentfor a particular customer.Executed by 458:Name of service provider (eg.,Enterprise, or some Enterprisepartner).Performed by 460:Technical team responsible fordoing this task.Priority 476:High, medium, low priority, basedon whether this task is in criticalpath, and whether or not it needsto be done in support of somesubsequent task.Work effort 478:Estimated time required to completethis task.Sequence 480:A number assigned to a summary taskthat shows its order under a higherlevel task.Task status 482:Represents how far the serviceprovider has progressed in itsimplementation of this task. Thisis rolled up to Lotus Notesdatabase 70 to enable the owner totrack progress of the serviceproviders during the audit phase.


[0048] Table 2 sets forth the template 440 fields which may vary between templates, including those for major operations and major steps within an operation.
2TABLE 2SUMMARY TASK TEMPLATES PART 2SECTION 4:SUMMARY TASK DETAILSDescription 490:High level summary descriptionof major operations or steps.Assumptions 492:What if any assumptions apply.Prerequisites 494:Tasks that must be completedbefore this task can complete.Critical success factors 496:Description of tools,techniques, relationships,understandings, technical andrelationship skills andcommitments, knowledge base ofteam and customer, and soforth, needed to accomplishthis task.Deliverables 498:Expected output of this task.SECTION 5:APPROVALSTask approver 500:Identity of approvers.Notification date 502:Date approvers notified.Request approval 504:Electronic signature ofapproval.SECTION 6:PROJECT REFERENCEComments and dialog 506:General comments (openseason).Deliverable checklist 408:Checklist of deliverables.Approval status 510:List of approvers of thisdocument and status of theirapproval.Edit history 512:Listing of persons who havemodified this document duringits preparation (serviceprovider is not allowed tochange these taskdescriptions.)


[0049]

3





TABLE 3








DETAIL TASK TEMPLATE


















SECTION 1:
CREATION STATUS



SECTION 2:
IMPORTANCE BUTTONS



SECTION 3:
IMPLEMENTATION









Sections 1, 2 and 3 are the same as for templates 440, with



the addition of:










Support resources 524:
People needed to support




completion of this task.



Assigned to 526:
Person executing this task.



SECTION 4:
DETAIL TASK DETAILS



Description 490:
Description of this task.



Prerequisites 494:
Tasks that must be completed




before this task can complete.



Task steps 528:
Specific detailed steps that




need to be accomplished to




complete the task.



Analysis 540:
A description of what needs to




be analyzed to come up with




the right answer for the




customer. (The resulting




output will vary depending




upon the results of the




analysis - but this document




doesn't change as a result of




the analysis).



Deliverables 530:
Expected output of the task.



Methodology attachments 532:
Potential attachments, may be




blank: anything from




presentation charts, to




questionnaires, to




architecture charts - depends




upon the task.



SECTION 5:
PROJECT REFERENCE AREA



Comments & Dialog 506:
Comments.



Deliverable Checklist 508:
Checklist, attachment listing




(other than method




attachments, supra).



Approval status 510
List of approvers and the




status of their approval (with




respect to approval of this




document, not of the




implementation of the task,




which is handled by the audit




process).



Edit history 512:
Listing of persons who have




modified this document during




its preparation (service




provider is not allowed to




change these task




descriptions.)











[0050] Database 70 at server 62 includes all summary and detail tasks templates which have been completed in a set for a particular customer. An initial set of the tasks listed in Table 4 is provided for each customer, but during project implementation phases 101-105, these are configured or personalized to the customer.


[0051] While many summary and detailed tasks of Table 4 do not, appear in the flow chart of FIGS. 3A-3M, those selected illustrate a flow from start to finish across the five major stages—and form a representative, if not critical, path through them. As shown in FIGS. 3, and 3A-3M, the transitions between stages 100-105 are, in some instances, blurred and a particular task may be allocated to either or both of two of these stages.


[0052] In each stage, the key to success is the integration through the use of the templates of the groups (FIG. 2) and activities (Table 4, both summary tasks and detail tasks.) Also, an important aspect of the invention is the method provided across the five stages (FIG. 3) for effecting a transition from a legacy process, including hardware, software, work procedures and human resources, to a new process.


[0053] Table 4 is a chart of summary and detail tasks, pursuant to a particular embodiment of the invention, available for presentation in display area 426 of playbook summary view 400 upon selection of button 432. Selection by a user in display area 426 of a task designated with two or three alpha-numeric reference numerals P1, P11, P12, . . . , results in display of a template 440 personalized to the summary task, and selection of a task designated with four or more alpha-numeric reference numerals P111, P112, . . . , result in display of a template 520 personalized to the detail task. A user with appropriate authority may then view, correct, update, approve or otherwise modify the displayed task. The names of the detail tasks set forth broadly the functions or method steps performed in implementing the superior summary task. In Table 4, each summary task is identified in the first column by the stage 100-105 to which it pertains, in the second column by a task identifier P11, P12, . . . , and, for selected tasks, in the third column by the process step (150, . . . , 354 in FIGS. 3A-3M) to which it pertains. In general (with very few exceptions), a detail task pertains to the same stage 100-105 as its summary task.
4TABLE 4CHART OF SUMMARY AND DETAIL TASKSSummary TasksStageTask IDStep  Detail Tasks1FOLDERS AND VIEWS2BY CATEGORY3ALL TASKS4P1ASSESSMENT5101P11Perform customer service offering6assessment7101P111174Perform customer business8assessment9101P112  Perform customer business10  assessment e-Req/Cat11101P113  Develop workshop management plan12101P114  Develop workshop management plan e-13  Req/Cat14101P115  Review findings from marketing15  procurement consulting engagement16101P116  Review findings from marketing17  procurement consulting engagement18  e-Req/Cat19101P117176  Formulate workshop approach20101P118  Formulate workshop approach e-21  Req/Cat22101P119  Prepare for workshop23101P11A  Prepare for workshop e-req/Cat24101P12178Introduce recommend service offering to25customer26101P121  Present service offering to27  customer (perform workshop)28101P122  Present service offering to29  customer (perform workshop) e-30  Req/Cat31101P123  Formulate proposal approach32101P124  Formulate proposal approach e-33  Req/Cat34101P13Create proposal and contract35101P131  Develop and cost proposal36101P132  Develop and cost proposal e-Req/Cat37101P133  Draft and price customer contract38101P134  Draft and price customer contract39  e-Req/Cat40P2BUSINESS CONTROLS41103P21Business control requirements42103P211290  Confirm business controls43  requirements44103P212  Confirm separation of duties (SOD)45  requirements46104P213292  Conduct ASCA self-assessment47104P214  Risk assessment48104P215224, 294  Conduct ASCA/business controls49  review50102P2151  Confirm image production system51  management strategy52P3CONFIGURATION53103P31320Conduct Req/Cat functional detailed fit54gap analysis55103P311  Confirm Req/Cat organizational56  hierarchy57103P312  Define the Req/Cat functional58  detailed fit59103P313  Resolve functional gaps for Req/Cat60103P32324Configure Req/Cat offering61103P321  Confirm and refine “Ives Team62  Studio” for code tracking63103P322  Confirm and refine Req/Cat initial64  settings and organizational65  structure66103P323  Confirm and refine Req/Cat67  authorizations68103P324  Refine and validate final Req/Cat69  configuration70103P33Customize Req/Cat offering71103P331  Validate and customize Req/Cat core72  application change request73103P332  Refine and validate final74  customization for Req/Cat75103P34Produce custom Req/Cat programs76103P341276  Validate and code bridge change77  requests (SAP and Req/Cat)78P4EDUCATION AND TRAINING79102P41Develop customer education and training80strategy81102P411  Validate customer education &82  training objectives83102P412190  Define the training requirements84  and approach85102P413  Confirm the education & training86  strategy87102P42Define system management processes88102P421  Define SAP correction and transport89  process90102P422  Define and agree on service level91  agreement SLA92102P423  Define and administer SAP release93  control process94102P424  Define Req/Cat transport process95102P425  Define and administer version96  control process97103P43192Define user documentation and training98requirements99103P431  Define customer user audiences and100  requirements101103P432  Confirm user documentation102  requirements and standards103103P433  Conduct detailed end-user task104  analysis105103P434  Assess user skills and training106  needs107103P435  Validate end-user courses and108  content109103P436  Identify users and course attendees110103P437  Define and notify training111  attendees112103P44Develop user training documentation113103P441  Produce customer specific end-user114  documentation115103P442  Confirm training evaluation116  materials/approach with customer117103P443194  Setup training system environment118103P444  Validate training logistics119103P445198  Conduct pilot training with super120  users121103P446196  Arrange documentation and training122  material production123103P45Internal (Enterprise, service provider)124training requirements125103P451  Identify and organize appropriate126  internal training127104P46Conduct end-user training128104P461  Conduct train-the-trainer sessions129104P462214, 230  Perform training130104P463212  Conduct new buyer training131P5IMAGE132103P51Conduct image functional detailed fit133gap analysis134103P511  Define the image functional135  detailed fit136103P512  Resolve image functional gaps137103P52Configure image offering138103P521  Refine and validate final image139  configuration140103P522  Confirm and refine image initial141  settings142P6I/T143103P61Establish customer network/computing144infrastructure145103P611  Confirm component delivery146103P612  Establish network/computing147  hardware/software architecture148  infrastructure149103P613  Ready network/computing environment150103P62Establish EDI infrastructure151103P621  Establish EDI infrastructure152103P622  Conduct trading partner testing153  (IT)154102P623  Confirm EDI strategy155102P6231  Setup image system environments156103P6232  Establish cutover checklist and157  perform pre-cutover activities for158  image production environment159104P6233  Validate image production support160  for system management161103P63Develop reporting infrastructure162103P631  Develop reporting infrastructure163  (LIS/EIS)164103P632  Develop DataMart extracts165103P633232  Develop additional reports166  (customer/operations)167102P64Perform bridge architecture assessment168102P641  Perform bridge architecture169  integration point interfaces work170  session171102P642158  Define bridge architecture project172  objectives document173102P65Validate bridge, EDI, vendor reporting174requirements175102P651270  Develop and manage bridge176  architecture implementation work177  plan178102P652  Analyze EDI requirements179102P653  Determine EDI communication180  environment181102P654  Analyze vendor master data load182102P655  Analyze operational reporting183  requirements184102P656  Analyze customer requirements for185  DataMart implementation186102P657  Schedule and conduct weekly187  interlock meeting188102P658  Vendor lead client analysis189102P66Set up development/integration190environment191102P661  Set up SAP development/integration192  environment193102P662  Set up Req/Cat system environments194103P67Set up consolidation/test environment195103P671  Set up SAP consolidation/test196  environment197104P68218Set up production environment198104P681  Convert vendor master into199  production environment200104P682  Determine EDI tasks for production201  environment set up202104P683  Execute SAP cutover checklist203104P684  Set up SAP production environment204104P685  Establish SAP batch schedule205104P686  Set up trading partners in206  production environment207104P687  Vendor lead client deployment208103P688  Establish cutover checklist and209  perform pre-cutover activities for210  SAP production environment211103P689  Establish cutover checklist and212  perform pre-cutover activities for213  e-Req/Cat production environment214105P69Refine/execute production support for215system management216105P691234  Perform on-going support activities217  for Req/Cat218105P692  Post deployment reporting support219105P693  Develop new bridges and application220  extensions post go live221105P694236  Support new EDI transactions post222  go live223105P695  Execute system management security224  support procedures225105P696  Execute data management support226  procedures227105P697236  Execute EDI support procedures228105P698  Execute system management229  operational support desk procedures230105P699  Execute system management batch231  support desk procedures232105P69A  Execute system management SAPBI233  support procedures234105P69B  Execute system management master235  data support procedures236105P69C  Execute production support for237  system management238103P6A  Establish vendor master environment239103P6A1  Establish vendor master240103P6A2  Confirm vendor master241103P6A3  ALE configuration for VLC242103P6BEstablish bridge architecture243infrastructure environment244103P6B1272  Develop detail architecture245  requirements definition246102P6C274Validate system infrastructure247requirements248102P6C1280  Analyze current network/computing249  infrastructure250102P6C2  Determine network/computing251  requirements for project252102P6C3  Confirm and begin network/computing253  component acquisition254102P6C4  Order and delivery of255  infrastructure components256P7MARKETING257100P71Participate in marketing procurement258consulting engagement259100P711170  Qualify potential client260100P712  Qualify potential client e-Req/Cat261100P713  Develop assessment statement of262  work (SOW) e-Req/Cat263100P714  Develop assessment statement of264  work (SOW)265P8PROCESS266267102P81156Customer process introduction268102P811  Conduct customer introduction to269  Golden procurement and A/P270  processes271102P82Process reviews with customer -272procurement and A/P273102P821344  Review procurement processes with274  customer275102P822342  Review A/P processes with customer276102P83Assess customer impact on internal277Enterprise workload278102P831  Identify current and potential279  supplier catalogs for customer280102P832340  Perform assessment of customer281  purchasing business282103P84Process alignment customer/Golden283103P841  Determine GAPs between customer and284  golden processes285103P842  Perform process GAP resolution286103P85BMP process and procedures management287103P851  Codes and procedures288103P852348  Update and review process289  management & procedures manual290103P86Supplier readiness291103P861210  General supplier introduction292103P862  Manage trading partner - EDI293  suppliers294103P863346  Establish ASAP suppliers for295  customer (ASAP = a SAP supplier not296  requiring a buyer)297103P864  Manage customer supplier outline298  agreements299103P865  Customer freight procedures300104P866  Supplier memo mailing301P9PROJECT MANAGEMENT302102P91180Initiate project planning303102P911160  Confirm project scope and304  implementation strategy305102P912  Confirm project organization and306  assign resources to roles307102P913  Prepare and validate project plan308  and procedures309102P914  Establish project team working310  environment311102P915  Orient project team312102P92150Confirm and refine project management313standards and procedures314102P921  Confirm and refine issue management315  plan316102P922  Confirm and refine project317  documentation318102P923152  Confirm and refine quality319  assurance standards320102P924  Create team building plan321102P93Confirm implementation strategies322102P931  Confirm system configuration323  standards324103P9311   Customize image offering325103P9312   Validate and customize image core326   application change request327103P93121    Refine and validate final328    customization for image329102P932  Confirm CR/PTR process330102P933  Confirm testing strategy331102P934  Confirm production support &332  operations strategy333102P935  Confirm SAP production system334  management strategy335102P936  Confirm e-Req/Cat production system336  management stategy337102P937282  Confirm network/computing strategy338102P938  Confirm vendor conversion strategy339102P94162Prepare project team340102P941  Conduct kick-off meeting341102P942  Conduct project team standards342  meeting343102P943  Conduct project team training344102P95352Define production support plans345102P951  Define system management SAP346  resource requirements347102P952  Define system management e-Req/Cat348  resource requirements349102P953  Define production support accounts350  payable plan351102P954  Define production support CSC plan352102P955  Define production support general353  procurement plan354102P956  Confirm SAP system authorizations355  for project team356102P957  Confirm Req/Cat access control list357  (ACL)358102P958  Define system management image359  resource requirements360102P96Initial quality assurance review361102P961  Initial QA review362103363&104P97Review project status and refine project364plan365103,366&104P971  Conduct project team status367  meetings368103369&104P972  Conduct steering committee meetings370101P98Obtain customer approval371102P981  Won bid analysis/transition to372  implementation team373102P982  Won bid analysis/transition to374  implementation team e-Req/Cat375101P983  Conduct lost bid analysis376101P984  Conduct lost bid analysis e-Req/Cat377104P99Validate production support378104P991  Validate SAP production support for379  system management380104P992  Validate production support for381  accounts payable382104P993  Validate production support for CSC383104P994  Validate production support for384  general procurement385104P995  Validate Req/Cat production support386  for system managment387105P996  Validate education & training388  production support activities389104P9APerform go live project office390activities391104P9A1  Ensure go live check lists392  activities393104P9A2  Go/no-go decision for go live394103395&104P9BInterim quality assurance reviews396103397&104P9B1  Interim QA reviews398105P9C244Post-implementation quality assurance399review400105P9C1  Post-implementation QA review401105P9DProduction support review402105P9D1  Confirm production environment403PAREQ/CAT404102PA1Identify customer responsibilities for405Req/Cat406102PA11  Identify country/global407  administrators & neg. con person408102PA12  Perform country administrator409  education410103PA2Prepare and load Req/Cat catalog data411103PA21  Perform Req/Cat catalogue tasks412104PA3Req/Cat production readiness413104PA31  Confirm Req/Cat for production414  environment415104PA32  Set up Req/Cat tables in production416104PA33  Prepare Req/Cat production copy417104PA34  Execute Req/Cat go live checklist418PBSAP419103PB1254Conduct SAP functional detailed fit gap420analysis421103PB11250  Confirm SAP organizational422  hierarchy423103PB12  Define the SAP functional detailed424  fit425103PB13  Resolve SAP functional gaps426103PB2Produce custom SAP programs427103PB21  Develop and validate SAP custom428  programs429103PB3252Configure SAP offering430103PB31  Confirm and refine implementation431  guide432103PB32  Confirm and refine SAP initial433  settings and organizational434  structure435103PB33  Confirm and refine SAP end user436  authorization profiles437103PB34  Refine and validate final SAP438  configuration439103PB4Customize SAP offering440103PB41  Validate and customize SAP core441  application change request442103PB42  Refine and validate final443  customization for SAP444PCTESTING445103PC1256, 260, 322Perform preparation activities for446testing (both Req/Cat and SAP)447103PC11  Confirm and refine test case448  templates449103PC12258, 326  Build comprehensive test plan450103PC13  Develop test environment plan451103PC14  Create test case specifications452103PC15  Build/reuse test cases453103PC16  Determine testing tools454103PC17  Review and validate comprehensive455  test plan456103PC2216Perform comprehensive testing457103PC21  Perform unit test458103PC22262  Perform component test459103PC23264, 328  Perform integration test460103PC24  Administer network/computing461  performance monitoring462103PC25266, 330  Perform system test463103PC26220  Perform user acceptance test464103PC27  Perform other required testing465103PC271  Support comprehensive image testing466103PC28  Support comprehensive e-Req/Cat467  testing468103PC29  Support comprehensive SAP testing469103PC2A  Support comprehensive image testing470PDTRANSITION MANAGEMENT471101PD1172Introduce transition management472(assessment)473101PD11172  Develop initial assessment of474  client475101PD12  Provide transition management476  workshop presentation477102PD2154Model transition management (project478preparation)479102PD21  Provide transition management480  strategy481102PD22  Evaluate cultural impact of482  solution483102PD23300  Develop/confirm transition484  management plan485102PD3Develop communication plan (project486preparation)487102PD31304  Build/confirm campaign plan488102PD32302  Update communications trategy489102PD33  Deliver announcement/kickoff490  communication491103PD4Initialize transition management (design492and development)493103PD41  Create incentive/reward program494103PD42  Assess supplier impacts related to495  transition management496103PD43  Assess Enterprise support impacts497  related to transition management498103PD44  Design detail go live499  material/activities500103PD45308  Create policy changes501103PD46  Identify/plan for security502103PD47  Detail process transition plan503103PD48306  Detail human resources plan504103PD49  Detail employee relations plan505104PD5Ensure transition management activities506(deploy)507104PD51350  Ensure new process management508  system in place509104PD52222  Perform client readiness assessment510104PD53  Perform transition management go511  live activities512104PD54240  Manage human resources activities513105PD6Communication (support)514105PD61  Thanks to users/suppliers515105PD7Validate transition management (support)516105PD71  Monitor human resource issues517105PD72  Assess effectiveness of transition518  management program519105PD8Perform post implementation survey520(support)521105PD81242  Administer post go live survey522105PD82  Present and act upon survey523  findings524PENOT CATEGORIZED525104PE1200Perform go live process activities526104PE11  Allocate buyer codes to commodities527104PE12  Enter blanket orders528. . .PE2Table template document529. . .PE21  Table template document



Project Assessment 101

[0054] Referring to FIG. 3 in connection with FIG. 2, project assessment phase 101 follows pre-sales phase 100, during which marketing makes its initial contact with the prospective client, or customer.


[0055] After initial contact from marketing 118, the main thrust of Assessment Project 101 is to provide an integrated, cross-functional customer solution to the client. An assessment team is led by the Business Office 120, but requires input and participation from the project leaders of Architecture 122, Transformation Management 136, Business Process 112, EDI 114, and Application Development 116.


[0056] Assessment 101 begins with a complete review of the client's current general procurement and accounts payable processes. This includes debriefing the initial marketing team 118, instructing the project leaders 126, and accumulating all other relevant data available about the client's processes, tools, and organizational structures. The Assessment Team then defines an integrated customer solution that covers technical, educational, and Human Resource issues.


[0057] The delivery of the Workshop is intended to present an overview of the customer solution, initiate discussions on process analysis and strategic implementation, and confirmation of the solution fit. Specific goals of a workshop phase within assessment stage 101 include the following:


[0058] (1) Prepare and deliver a presentation to the customer defining the service offering, including any essential documentation on the offering, and a demonstration of the end-user tool(s), as applicable.


[0059] (2) Collect area specific information and customer requirements on network process sourcing, procurement, accounts payable, and finance; and EDI, I/T, and transition management.


[0060] (3) Identify high level gaps in each such area.


[0061] (4) Identify additional high level requirements for new process support, and for conversion requirements, including requirements for commodity structure, account structure, vendor, and contracts.


[0062] (5) Identify interface requirements, including requirements for HR, cost center, catalogs, ledger, information warehouse.


[0063] (6) Validate accounting for project, appropriation, contract, job, tax reporting, currency, and check reconciliation.


[0064] (7) Identify requirements for network, EDI, testing, and application development including new reports, new interfaces, and new features.


[0065] (8) Assemble a high-level gap analysis.


[0066] (9) Create a high-level Customer Scope Document.


[0067] (10) Confirm the recommended solution.


[0068] At the completion of the workshop phase, the assessment team 106 convenes to develop and cost the final customer solution and proposal. At this time, the members of assessment team 106 assemble, understand, and validate the collected data; review standard proposal options with assumptions and identify items that apply to this client; create a draft of the proposal including scope, risk, schedule, and resources; review the draft with team and other project members to obtain sizing and costing information for each area; compile costing information to add to the proposal; and perform QA review of the system integration, application development, managed operations (including service delivery center (SDC), application IT, and Process Operations) proposals, and of the overall proposal.


[0069] The resulting proposal is delivered or presented to the client. Final Assessment activities include follow up query responses and, should the proposal be declined, a loss analysis. This loss analysis feeds back into assessment process 101 to improve its overall effectiveness and efficiency.


[0070] Referring to Table 4, summary tasks pertaining to assessment stage 101 are listed, together with included detail tasks. For each task, a template 440 or 520 is maintained in data base 70, and accessed by team 108 members and others through summary view 400 to track progress (including viewing, updating, sharing, and approving) during this assessment stage 101.



Project Preparation 102

[0071] Referring further to FIG. 3, project preparation stage 102 sets up the project, initializes detail planning, and models the plan for making the transition from the client's legacy system and process to the new system and process (or, offering).


[0072] A critical element of this stage is to ensure resources are assigned to transition management 136, both from the project implementation team 126 as well as from the client. During this stage the transition activities required for a smooth migration from the old client process and system to the new service offering are modeled. The result is a detailed transition management plan that is specifically designed for the client. Stage 102 tasks and deliverables include the following:


[0073] (1) Perform analysis on the client HR environment, including organization structure and relationships, labor relations, management, administration, and end user roles and responsibilities, and the general HR environment.


[0074] (2) Develop and approve the detailed transition management and communication plan.


[0075] (3) Update the client specific transition management strategy.


[0076] (4) Define the quality assurance (QA) process required to assure that a project conforms to documented standards and meets documented requirements. The purpose of this task is to confirm the quality assurance standards between Enterprise and the client, and identifies the tasks that are to be audited by the Enterprise Technical Center.


[0077] The QA review is a beneficial process for the project as it timely recognizes potential risk areas and reduces the possibility of project delays while achieving faster implementation, attaining low cost and increasing the customer's level of confidence. Deliverables of the QA review task include the following:


[0078] (1) Confirm and refine quality assurance standards with the customer.


[0079] (2) Confirm that technical requirements can be met.


[0080] (3) Confirm that business and financial measurements can be met.


[0081] (4) Confirm that the proposal is complete and the required processes have been followed.


[0082] (5) Establish QA schedule for the project.


[0083] Integration of all critical Enterprise and client team members provides the glue to assure a smooth project. By completing the detailed tasks within project preparation stage 102, the recommended implementation standards, procedures and strategies for the project are shared with the technical and business functional members of the project team as well as with the customer. All team members have input in this process, and understand the basic procedures, once they have been agreed to. These procedures, documented in summary and detail task templates listed in Table 4, include the following:


[0084] Configuration Standards


[0085] CR/PTR Process


[0086] Testing Strategy


[0087] Production Support and Operations Strategy


[0088] SAP System Management Strategy


[0089] Req/Cat System Management Strategy


[0090] Network Computing Strategy


[0091] Vendor Conversion Strategy



Project Design and Development 103

[0092] Referring further to FIGS. 3, project design and development phase 103 provides and documents in a database of templates referred to as a Playbook, the business controls, transformation management, and SAP and Req/Cat customization required for an integrated approach to a complete customer solution.


[0093] During this stage 103, business controls 132 provides a comprehensive process that identifies key control points and establishes detailed procedures to assure a quality installation. The deliverables include documentation, separation of duties, sensitive programs, logical access control, logging (audit trail), change control for tables, change control for programs, system testing, input controls, processing controls, error handling controls, output controls, balancing and reconciliation, vital records and disaster recovery, records management, reports, local area network (LAN), and country specifics, as described below:


[0094] (1) Documentation: an assessment of the quality and completeness of existing program documentation and a determination of the degree to which programs could be efficiently reconstructed if they were destroyed.


[0095] (2) Separation of duties: the duties of the programmer, computer operations, and user groups are reviewed to ensure that separation of duties problems do not exist. No one individual can control activities within a process (or any event in a string of events) in a way that permits errors of omission, or commission of fraud, theft, etc., to go undetected.


[0096] (3) Sensitive programs: controls must be in place to prevent unauthorized modification and/or use of the application.


[0097] (4) Logical access control: while programs are generally controlled by a site procedure, application data has a formal access control mechanism.


[0098] (5) Logging (audit trail): a logging mechanism is established to ensure the audit trail is correct.


[0099] (6) Change control (tables): a change control system is put in place to evaluate, justify and control changes to tables.


[0100] (7) Change control (programs): a change control system is put in place to evaluate, justify and control changes to programs.


[0101] (8) System Testing: system testing procedures are effectively planned and carried out to ensure that controls are successfully tested and documented.


[0102] (9) Input controls: to insure accuracy and completeness of information entering an application.


[0103] (10) Processing controls: controls are applied for entry of data into the computer application system that ensure accuracy and completeness of data during computer processing.


[0104] (11) Error handling controls: controls for error handling and reprocessing of transactions.


[0105] (12) Output controls: output controls ensure the integrity of the output data from conclusion of computer processing to delivery to the user.


[0106] (13) Balancing and reconciliation: verifies that procedures to reconcile output to input are effective.


[0107] (14) Vital records and disaster recovery: disaster recovery is designed to provide for the continuity or rapid system restoration of a business process immediately following a natural or man-made emergency or disaster.


[0108] (15) Records management: verify that information is managed with sound business practices and controls.


[0109] (16) Reports: verify that reports are distributed properly.


[0110] (17) Local Area Network (LAN): Refer to ITCS 201, “Security Standards for Local Area Networks and Distributed Computing.”


[0111] (18) Country specifics: verifies that any questions particular to this specific country are completed.


[0112] Req/Cat is a requisition and catalog product designed, developed, and maintained by Enterprise for use in systems such as those developed in this stage 103.


[0113] SAP is an financial and accounting package which an enterprise or company may license for its own use and for its customers. SAP configurators that customize package programs to fit the needs of the client are provided for use during design and development stage 103. All other installations of SAP are “off the shelf”, with the client changing its internal structures to fit SAP requirements.


[0114] Transition management is the most overlooked part of any implementation process. It is critical to address the corporate culture and personality at the earliest contact. Strategic and tactical plans may then be developed that guide the implementation through “Go Live” and for an agreed period thereafter. The purpose of transition management steps of the design and development stage 103 is to provide guidance to the development team members as they work with the client to institute policy changes that might be introduced as part of the implementation of the new process and system. Necessary changes to the legacy system are identified and a plan developed to announce and introduce changes in policy. Policy change includes key business rules that are part of the management system for purchasing and procurement. They may be associated with approval levels or procedural changes in the new system. The target is not the day to day operation but management decision and support systems that might be affected. The areas addressed include:


[0115] Measurements (old and new)


[0116] Management system


[0117] Approval levels


[0118] Supplier contacts and contracts


[0119] Reward systems


[0120] Incentive Plans


[0121] Security


[0122] Employee and user changes


[0123] All of these areas require strategic and tactical planning that includes the following steps:


[0124] (1) Identify the current (legacy) system or process and compare it to the new process or system to be implemented to identify gaps.


[0125] (2) Develop specific recommendations for gaps between the legacy and the new system or process, identifying the level of sensitivity and whether or not action is required as part of the transition.


[0126] (3) Determine the announcement and transition (or, cut over) date for each action identified.


[0127] (4) Design a communications plan to build the message and media for communicating the changes to affected parties.


[0128] (5) Design a process transition plan to ensure the elements of change are integrated into the overall plan for the process.


[0129] (6) Determine how the policies must be modified according to new standards and procedures


[0130] (7) Determine what new policies and procedures will be implemented as part of the process and system.


[0131] Finally, integration of the above design and development stage 103 process steps along with the technical teams involved allow the delivery of a cross-functional solution under one unified and managed plan.



Project Deployment 104

[0132] Referring again to FIG. 3, project deployment phase 104 uses the Playbook to improve deployment of (1) quality, or application systems control and auditability (ASCA), (2) transition management, and (3) integrated project management systems and procedures.


[0133] 1. Quality (ASCA)


[0134] A business controls team provides dedicated resources throughout the life cycle of the project. During the project development stage 103, this team has planned and executed an ASCA self-assessment that has covered an extensive list of technical, business, financial, and client issues. In this deployment stage 104, its members are responsible for managing an independent audit that will cover the same areas. The independent auditors then issue an acceptance position that is required before the client can “Go Live” with the new system and process. Deployment stage 104 activities include:


[0135] (1) Create the project plan for ASCA Review preparation activities.


[0136] (2) Determine which Enterprise organization will conduct the ASCA and business controls review.


[0137] (3) Prepare all ASCA documentation required for the review.


[0138] (4) Prepare all sub-process overviews and descriptions of process flow.


[0139] (5) Ensure the test plan includes those elements of the ASCA checks required to ensure business controls, separation of duties, and authorization matrices, data integrity and security.


[0140] (6) Create, update and complete all required documents of understanding (DOU's) & service level agreements (SLA's).


[0141] (7) Ensure the separation of duties matrix (SOD) is current at time of final review.


[0142] (8) Review all testing and obtain test approvals.


[0143] (9) Ensure all approvals have been obtained and signed approval forms available for ASCA Review. These include approvals for process ownership, ASCA requirements, self-assessment and system cutover.


[0144] 2. Integrated Project Management


[0145] During this deployment stage 104, project manager 126 has the task to validate and confirm that all checklists and status are acceptable prior to Go-live. This includes the readiness of all aspects of the project, and once satisfied, a review is conducted and the customer's formal sign-off for Go-live is obtained. Status transition management and client readiness assessment and confirmation activities include verification that:


[0146] (1) No critical open issues exist in any area.


[0147] (2) All relevant aspects of readiness have been included in the status check.


[0148] (3) Network and computing performance testing is complete.


[0149] (4) System test is complete.


[0150] (5) User acceptance test is complete.


[0151] (6) System management production environment Go-live checklist is complete.


[0152] (7) Any needed CR's and PTR's have been generated.


[0153] (8) Production support is in place.


[0154] (9) Supplier readiness is reviewed and accepted.


[0155] (10) Service provider readiness is confirmed.


[0156] (11) Enterprise GP readiness is confirmed.


[0157] (12) Review of the compiled check information is completed.


[0158] (13) Customer sign-off on the Go-Live decision is obtained.


[0159] 3. Transition Management


[0160] A transition management team prepares for the deployment, or “Go Live” of the client solution. During this deployment stage 104 in the project, virtually all technical problems are resolved and systems configured. The client is now ready to deploy and the human factors must be aggressively managed to assure a smooth transition from the legacy systems to the improved client solution. Transition management activities within deployment stage 104 ensure that organization, measurements, management, support, and labor relations functions are developed, explained, reviewed, understood, in place or on schedule, as appropriate.


[0161] (1) Organization: organizational changes for Go-Live, updated communications plans, feedback mechanism for persons displaced by changes in organization, and the new organization.


[0162] (2) Measurements: changes in measurement system, plan to cut over to the new measurements, and communications explaining the new measurements, including how they are derived, how they are used and their importance to the business.


[0163] (3) Management: changes in management or management responsibilities, communications explaining the changes in management structure, and why it is important to the clients' organization, the management chain and path for escalation of issues, normal business reports and their use.


[0164] (4) Support: support structure for both client and technical support.


[0165] (5) Labor Relations: activities associated with the loss of a job role, plan to notify the affected people, communication plan for providing information to remaining employees on the reasons for the changes and for fostering support for the new process.


[0166] Integration of the cross-functional teams to accomplish the deployment of the customer solution is facilitated by use of the system and data base structure of the preferred embodiment of the invention.



Ongoing Project Support 105

[0167] Referring further to FIG. 3, project support stage 105 enables project teams, all of which have continuing responsibilities with the client after “Go Live”, to provide the required ongoing support. As with all other stages, integration of the teams through the use of the systems and methods provided by the invention, including transition management systems and methods, is greatly facilitated. It is a characteristic of the preferred embodiment that each of these areas has specific predetermined plans, actions and responsibilities, and these are audited and tracked through a GP/AP development and deployment system.


[0168] During support stage 105, transition management 136 delivers an approved detailed questionnaire with quality questions in a logical format that allows end-users to express their opinion and provide information that meets the survey objective. Support stage 105 includes a plan for communicating the survey results to the participants and taking action in response to the survey results. This stage also incorporates a continuing education plan for training new employees as well as continually updating the material so that reflects the latest version of the application.


[0169] The survey in stage 105 is structured to determine the end users' perception of the new system, system ease of use, response time from both the system and CSC (Customer Service Center), and customer knowledge level of processes and product. Results of the survey are compiled and presented to the client and Enterprise Management Teams along with action plans, time tables, expected results for approval, and implementation. A Lessons Learned document is reviewed with the project team and appropriate adjustments made for future engagements.


[0170] Project Manager 126 provides a quality function task after “Go Live”. This task aims at checking the implementation of the EPS Offering to determine if anything needs special attention or focus. It is also the formal sign-off on the final delivery of the implementation by the customer. Its deliverables include:


[0171] (1) Customer accepts delivery of the EPS general procurement offering implementation and signs off.


[0172] (2) Action list on issues and CR/PTR's, if applicable.


[0173] (3) Formal transition of operational responsibility to operations 98 and support management 96.


[0174] (4) Preliminary business benefits evaluation.


[0175] The Req/Cat and SAP technical teams 128, 138 provide ongoing reviews and improvements to the client's process through the CR and PTR processes. These are formalized, documented processes with management controls to attain cost, schedule, and customer objectives.


[0176] As part of the new business process, support center 94 is established to provide long term assistance in any area of the application solution. This includes communication of feedback, real time application assistance, and special requests for problems concerning data.


[0177] It is the planned integration of these multi-functional teams that provides an innovative solution to the customer.



Representative Implementation of Ongoing Support Stage 105

[0178] Referring to FIG. 3E, a series of steps illustrating an exemplary selection of tasks in ongoing support stage 105 will be described.


[0179] While steps 230-244 represent a selection of key steps in stage 104, other summary and detail tasks designated in Table 4 as pertaining to stage 104 are typically included in the initial set of templates for this customer, and are also used as they are determined to be applicable. Some field entries are dynamic and changeable during the course of ongoing support stage 105. The templates are also editable for a particular project, and do not necessarily continue during use to conform to the original format.


[0180] In step 230, ongoing training, similar to that of step 214, is provided. Education material is supplied and maintained to the latest version of Req/Cat to the client. this is distributed using distance learning techniques.


[0181] In step 232, the data warehouse team accesses detail task template P633 in the course of developing additional reports. Task P633 is originally executed in stage 103, and is also applicable to on-going support stage 105. This task describes the steps necessary to complete in stage 103 the development required to support the Operational Reporting needs during on-going support stage 105. Template P633, Table 27, provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the data warehouse team.
5TABLE 27DETAIL TASK: DEVELOP ADDITIONAL REPORTSCREATION STATUSCategory:I/TTeam:Data warehouseOffering type:Req/Cat, SAP, Req/Cat&SAPStage:3. Design & DevelopmentIMPORTANCE BUTTONSEducation:NoCertification:YesAuditable:YesCritical path:YesIMPLEMENTATIONExecuted by:Service providerPerformed by:Customer, reporting analystPriority:HighWork effort:15 daysSequence:3 months priorDETAIL TASK DETAILSDescription:This task describes the steps necessary to complete developmentrequired to support the Operational Reporting needs. This taskwill use the CR's identified in the Analyze Operational ReportingRequirements detail task from the Project Preparation stage.Detail requirements will be realized and resolutions will beresearched, defined, documented and agreed on by the customer,Operations team and the Reporting implementation team members.Prerequisites:Gaps must have been documented on a CR form(s) and initiated inthe Analyze Operational Reporting Requirements detail task in theProject Preparation stageTask steps:1. Perform Required Development - Review the CR form, update theform with additional development requirements (if required). Forthe CR's assigned to the Reporting team, complete necessaryactions for development of these:Develop ReportsUpdate Reporting TreeUpdate Report List Document2. Interlock with AD Team - For the CR's assigned to the SAP ADteam review requirements with team and discuss developmentmethods.3. Interlock with Image Team - For the CR's assigned to theImage AD team, review requirements with team and discussdevelopment methods.4. Unit Test - All reports developed via CR must be unit testedprior to transporting the code to the Test environment.Unit test Reporting team development  Document test results  Obtain customer sign off on unit testParticipate in SAP AD team development  Review documented test results  Sign off on successful testingParticipate in Image AD team development  Review documented test result  Sign off on successful testing5. Submit Transport - Once unit testing has been completed andsigned off, the code must be moved into the Test system forformal System, User and Integration testing responsible for owntransports and coordinate any AD involvement).Ensure all transports existSubmit transport to target systemVerify transport successful6. Support Testing Process - It is necessary to be available toprovide explanations of development or to answer questionsregarding any subsequent changes identified via a problem log(PTR).Obtain sign off from Test teamEnsure transport to Production system has been initiated7. Update Reporting Document - Update all relevant documents.Update the document with the changes and additions in fields,values, reports, etc. (i.e. BPMGP)Update the standard list/golden list of reports8. Train Customer - If training is required for the operationsteam on the additional reporting specifications the followingshould be considered.Update training materialSchedule training with OperationsPerform necessary training9. Update Reporting Project Plan - The Reporting Team projectplan should be updated accordingly with new development work,dates and detail required to complete this task.Deliverables:Development Documentation Supporting New/Changes to ReportingCodeUpdated CR FormUnit Test ResultsTransport Request to Test SystemTest Team Sign OffUpdated Report Instruction Document (if required)Reporting Team Project PlanMethodology attachments:The following document links contain the attachments necessary tocomplete this task:Sample Development Documentation Supporting New/Changes toReporting Code =>Report Instruction Document =>Sample DataMart Decision Point Matrix =>PROJECT REFERENCE AREAComments & Dialog:Step Checklist:1.Perform required development - update CR form.2.Interlock with SAP AD team - describe reportingrequirements.3.Unit test - document test results.4.Submit transport to test system.5.Support testing process - obtain sign off on successfultest.6.Update report instruction document.7.Train operations team.8.Develop reporting project plan.


[0182] In step 234, the Req/Cat team accesses detail task template P691, Table 28, in the course of providing ongoing Req/Cat support. After the Req/Cat system has Gone Live, the system is monitored any production problems that occurred solved. Template P691 provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the Req/Cat team through the task.
6TABLE 28DETAIL TASK: PERFORM ON-GOING SUPPORT ACTIVITIESFOR REQ/CATCREATION STATUSCategory:Req/CatTeam:Req/CatOffering type:Req/Cat, SAP, Req/Cat&SAPStage:5. Ongoing supportIMPORTANCE BUTTONSEducation:YesCertification:NoAuditable:YesCritical path:NoIMPLEMENTATIONTask order:1Executed by:Service providerPerformed by:Req/Cat AdminPriority:MediumSequence:One day afterDETAIL TASK DETAILSDescription:After the Req/Cat system has Gone Live, you will need to havepeople allocated to monitor the System and solve any productionproblems that occurred. Generally, the Global and Countryadministrators will be responsible for the daily monitoring ofthe Req/Cat table information and the feed of data through theReq/Cat tables.Prerequisites:The Req/Cat system has Gone LiveThe Post Production Support structure/process has beenimplementedTask steps:Daily, the Country and Global administrators will need to monitorthe Req/Cat Production system to identify errors, analyze thecause, and determine the resolution path. To monitor the system,you will need to look in the systems logs and the bridge ID's e-mail. There will be times when the CA or GA can fix the problemsthemselves and other times when a CR or PTR will need to beraised.Refer to the attachment Req/Cat Production Support Procedures fora complete description of the ongoing support procedures forReq/cat.Daily, the CA and GA will need to maintain the catalogs, HRfeeds, cost centers fields, and country table information.Generally, the most errors will occur with the HR and Cost Centerfeeds.In additional the table monitoring tasks, the support people willneed to look at how the process are working and identify andconcerns or suggestions for improvements.The CA and GA will also need to work closely with the CustomerService Center (Help Desk) to answer questions they may have toserve as the second point of contact for issues or questions thatare raised by callers. Obviously, the SCS/Help desk willattempt to answer all questions first, but there will be problemsor questions where the will need assistance for resolution.For the first few weeks after production cut over, there shouldbe daily support team meeting to identify major problems,concerns, etc. The CA and GA should attends these meetings andactively participate in the discussions and resolution process.Any open issues or unresolved problems should be addressed to theProduction Support Leader and escalated if they are not solvedwithin a reasonable amount of time.Deliverables:A Req/Cat production support structure with defined proceduresand roles.Methodology attachments:Req/Cat Production Support Procedures −>


[0183] In step 236, the EDI team accesses detail task templates P694 (Table 29) and P697 (Table 30) in the course of supporting EDI transactions post go live. These tasks cover data management, help desk support procedures, report generation, and security. Templates P694 and P697 provide, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the EDI team through the steps of these tasks.
7TABLE 29DETAIL TASK: SUPPORT NEW EDI TRANSACTIONS POST GOLIVECREATION STATUSCategory:I/TTeam:EDIOffering type:Req/Cat, SAP, Req/Cat&SAPStage:5. SupportIMPORTANCE BUTTONSEducation:YesCertification:YesAuditable:YesCritical path:NoIMPLEMENTATIONExecuted by:Service providerPerformed by:EDI specialistPriority:MediumWork effort:30 daysSequence:One month afterDETAIL TASK DETAILSDescription:The customer may choose to add additional transactions once theselected service offering has been implemented. The followingEDI transactions are standard and are most often added after thecustomer goes live to meet additional requirements:840 - RFQ843 - Response to 840832 - Price/Sales Catalog856 - Ship Notice/ManifestFor non-standard transactions the same steps should be followed,however a CR will need to be created, bid and approved throughthe CR Process Flow before the additional work can be done.Prerequisites:Customer must be using EDI in a production environment for theselected service offering.Task steps:1. Confirm customers current EDI Infrastructure - Review theproject documentation that specifies EDI infrastructure forcustomer2. Define New Requirements - Meet with the customer to definenew requirements and transaction needed for the Productionenvironment, compare requirements to Golden IDOC for transactionAnalyze customer requirements  Transactions  IDOC's  Data Fields    Required    Optional3. Create Trading Partner Transaction Map - For each ANSI X.12transaction selected, independent of how many trading partnersexist4. Interlock with Req/Cat and SAP units of measure - To ensureintegrity of order of dataANSI standards5. Interlock with Trading Partners - Communicate all customerspecific requirements for new transaction to trading partnersDefine Media  Letter  Meeting/Forum  Web PageConvey business strategy for new transaction6. Identify Trading Partner Issues - All issues from theinterlock with trading partners must be documented and presentedto the customer for a decision7. Unit Test - Once system communication has been establishedfollow the test check list to complete the unit testVerify MappingTest JCLAdd to Job StreamDocument Test Results8. Move To Production Environment - Once all testing has beencompleted successfully and customer sign off has been obtainedschedule move into Production, follow EDI Go Live Check ListDeliverables:New Requirements for EDI Transactions documentedCommunication to Trading Partners regarding new transactionrequirementsTrading Partner Transaction MapUnit Test ResultsNew Transaction(s) Moved to Production SystemsMethodology attachments:The following document links include all necessary attachments tocomplete this task:Web Page Link=>EDI Checklist=>EDI TP Package=>PROJECT REFERENCE AREAComments & Dialog:Step Completion Tracking Checklist:1.Confirm customers current EDI infrastructure.2.Define new requirements.3.Create trading partner transaction map.4.Interlock with Req/Cat and SAP units of measure.5.Interlock with trading partners.6.Identify trading partner issues.7.Unit test.


[0184]

8





TABLE 30








DETAIL TASK: EXECUTE EDI SUPPORT PROCEDURES
















CREATION STATUS



Category:
I/T


Team:
System Management


Offering type:
Req/Cat, SAP, Req/Cat&SAP


Stage:
5. Support


IMPORTANCE BUTTONS


Education:
Yes


Certification:
Yes


Auditable:
Yes


Critical path:
No


IMPLEMENTATION


Executed by:
Service provider


Performed by:
EDI specialist


Priority:
Medium


Sequence:
Ongoing support


DETAIL TASK DETAILS


Description:







This task provides the steps, attachments and desk procedures


required to support the EDI process in a Production environment.


Task steps:


1. Maintain and Follow EDI Setup Procedures (GP):


Inbound


Outbound


Test


CPS North Production


CPS Test


2. Maintain and Follow Web EDI Setup:


Analysis:


Deliverables:


EDI Support Maintenance Desk Procedures


Methodology attachments:


The following doclink will provide the attachments necessary to


complete this task =>


EDI Setup Procedures:


Inbound


Outbound


Test


CPS North Production


CPS Test


Web EDI Setup:


PROJECT REFERENCE AREA


Step Checklist:


Use the following table to track the completion of each step:


1.  Maintain/follow EDI setup procedures.


2.  Maintain/follow EDI web setup procedures.


Approval status:


Edit history:










[0185] In step 238, service delivery center (SDC) ongoing support, help desk functions that are supplied to the client through time. This covers problem reporting, new requests for reports, education questions, and so forth.


[0186] In step 240, the transition management team accesses detail task template PD54, Table 31, in the course of insuring that the human resources aspects of the transition plan are in place and in progress. Specifically, this step deals with organizational impacts, changes in roles and responsibilities, labor relations, bonuses and incentives, meetings, feedback and comments. During this step, the auditors check to see the plan is being executed properly. Template PD54 provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the transition management team through the steps of this task during deployment and ongoing support stages 104 and 105.
9TABLE 31DETAIL TASK: MANAGE HUMAN RESOURCES ACTIVITIESCREATION STATUSCategory:Transition ManagementTeam:Transition ManagementOffering type:Req/Cat, SAP, Req/Cat&SAPStage:4. DeployIMPORTANCE BUTTONSEducation:YesCertification:YesAuditable:YesCritical path:NoIMPLEMENTATIONExecuted by:Service providerPerformed by:Transition managerDETAIL TASK DETAILSDescription:This step specifically focuses on the Human Resources aspects ofthe transition and is intended to insure the elements of thetransition plan that focus on this area are in place and inprogress. During this detail task, you will be assessing andensuring the steps in the plan are being implemented and thetransition is moving forward from an HR perspective.Specifically, this step will deal with the following areas.Organizational impactsChanges in roles and responsibilitiesLabor relationsBonuses/IncentivesMeetings/Feedback/CommentsEarlier the client was assessed as to the impact of thetransition on these areas. A plan was developed to respond tothe issues related to HR and built in the transition plan.During this step, you will check to see the plan is beingexecutedWhile it is the responsibility of the Transition Managementcoordinator at the Enterprise/Service Provider project toensure these tasks are completed, the client HR department mustplay a strong role to ensure the actions required of the clientare carried outIn general, issues and concerns identified will be handled withthe right communications and training for those affected.However, there may be cases where actions need to be taken thatis specific to a particular problem. This is particularly truewhere jobs are either eliminated or added.Prerequisites:Ensure a clear understanding of the client various HR worksheetsand the analysis of the sheets as part of the development of thetransition plan.Go-live is completed and the system/process has beensuccessfully implemented.Deliverables:Updated input to the client Transition Management Plan, only asneeded.Any required announcement materialCustomized Presentations for MeetingsMethodology attachments:Organization Announcement Presentation −>PROJECT REFERENCE AREAStep Status Checklist:StepStatus1.Ensure steps are in progress to move towardany changes in organization that are part of thetransition.2.Ensure any changes in organizationalcommunications or relationships are in progress.3.Ensure changes in individual job roles andresponsibilities for managers/administration/process end users4.Ensure activities associated with the lossof a job role are in placeFor any activities directly related to laborunions see next step document5.Make sure the new measurements (if any) arein place and understood by those affected by thechange. Ensure the transition to the newmeasurement system is on tract and anymeasurement that will affect peoples performanceevaluation are understood and working properly.Ensure normal business reporting is working andthose receiving the reports understand eachreport AND what they should be doing with eachreport. Ensure the transition to the newmeasurement system is on track and any reportsor measurements that will affect employee bonusplans are understood and working properly.6.Review the transition management plan forall elements associated with HR and HR impactsand ensure they are on track for completion bygeneral cut over date.7.Ensure the action plans identified areprovided as input and are included as anattachment that updates the final TransitionManagement Plan for the client.8.Ensure user meetings are scheduled. Reviewinitial communications plan to ensure that nochanges are necessary to the base plan. Afterthe meetings, provide a mechanism for feedbackand comments.Approval status:Edit history:


[0187] In step 242, the transition management team accesses detail task template PD81 in the course of distributing and analyzing a survey questionnaire and preparing action plans for implementation by management. Template PD81 provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the transition management team through the steps of the task.


[0188] In step 244, the project office team accesses summary task P9C and its subsidiary tasks in the course of providing post implementation QA review. Template P9C provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the project office team through the steps of the task.



Advantages over the Prior Art

[0189] It is an advantage of the invention that there is provided a system and method for evaluating a client's general procurement and accounts payable (GP/AP) system.


[0190] It is an advantage of the invention that there is provided an optimized solution for out-sourcing procurement of goods and services.


[0191] It is an advantage of the invention that there is provided a system and method for training service providers.


[0192] It is an advantage of the invention that there is provided a system and method for managing service providers to assure quality of service.


[0193] It is an advantage of the invention that there is provided a system and method for managing a project.


[0194] It is an advantage of the invention that there is provided an optimized general procurement and accounts payable system characterized by lower costs, a paperless process, and more comprehensive service with a shorter cycle time.



ALTERNATIVE EMBODIMENTS

[0195] It will be appreciated that, although specific embodiments of the invention have been described herein for purposes of illustration, various modifications may be made without departing from the spirit and scope of the invention. In particular, it is within the scope of the invention to provide a computer program product or program element, or a program storage or memory device such as a solid or fluid transmission medium, magnetic or optical wire, tape or disc, or the like, for storing signals readable by a machine, for controlling the operation of a computer according to the method of the invention and/or to structure its components in accordance with the system of the invention.


[0196] Further, each step of the method may be executed on any general computer, such as an IBM System 390, AS/400, PC or the like and pursuant to one or more, or a part of one or more, program elements, modules or objects generated from any programming language, such as C++, Java, Pl/1, Fortran or the like. And still further, each said step, or a file or object or the like implementing each said step, may be executed by special purpose hardware or a circuit module designed for that purpose.


[0197] Accordingly, the scope of protection of this invention is limited only by the following claims and their equivalents.


Claims
  • 1. A system for providing ongoing support for a general procurement and accounts payable application, comprising: a server; a storage device connected to said server; a plurality of team terminals; a communication link interconnecting said server and said terminals; said server being operable for (1) maintaining a database of templates on said storage device describing procedures for supporting said application and (2) serving said templates to team members operating said terminals for coordinating, recording, and tracking team activities executing said procedures with respect to said application; said procedures including user education, survey and quality auditing tasks.
  • 2. The system of claim 1, each said template storing, either directly or by way of links to other documents, one or more instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of said enterprise teams.
  • 3. The system of claim 1, further comprising: said server being operable for maintaining a plurality of databases on said storage device customized to applications for a plurality of customers of an enterprise for serving to said team terminals.
  • 4. A method for providing ongoing support for a general procurement and accounts payable application of a customer of an enterprise, comprising the steps of: maintaining a database of templates describing procedures for supporting an operational general procurement and accounts payable system; and operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of enterprise teams implementing said procedures; said procedures including user education, survey and quality auditing tasks.
  • 5. The method of claim 4, each said template storing, either directly or by way of links to other documents, one or more instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of said enterprise teams.
  • 6. A system for integrating assessment, preparation, development, deployment, and support stages for a general procurement and accounts payable application using electronic requisitions, comprising: a server; a storage device connected to said server; a plurality of team terminals; a communication link interconnecting said server and said terminals; said server being operable for (1) maintaining a database on said storage device of templates describing procedures for assessing, preparing, developing, deploying and supporting said application and (2) serving said templates to team members operating said terminals for coordinating, recording and tracking team activities with respect to said application.
  • 7. The system of claim 6, each said template storing, either directly or by way of links to other documents, one or more instructions, flow charts, questionnaires, report models and checklists for guiding, coordinating and documenting the work of said enterprise teams.
  • 8. A method for integrating assessment, preparation, development, deployment, and support stages for a general procurement and accounts payable system using electronic requisitions, comprising the steps of: maintaining a database of templates describing procedures for assessing, preparing, developing, deploying and supporting said general procurement and accounts payable system; operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of teams implementing said procedures.
  • 9. The method of claim 8, each said template storing, either directly or by way of links to other documents, one or more instructions, flow charts, questionnaires, report models and checklists for guiding, coordinating and documenting the work of said enterprise teams.
  • 10. A system for evaluating a potential client system and for adapting a general procurement and accounts payable application to the requirements of each of many potential clients operable by third party providers and for monitoring and assuring the quality of services provided by said service providers, comprising: a server; a storage device connected to said server; a plurality of terminals; a communication link interconnecting said server and said terminals; said server being operable for (1) maintaining on said storage device, for each of a plurality of customers, a database of templates describing procedures for assessing, preparing, developing, deploying and supporting each of said applications, and (2) serving said templates to members of enterprise teams and provider teams operating said terminals for coordinating, recording and tracking team activities with respect to said application during assessment, preparation, development, deployment and support stages.
  • 11. The system of claim 10, said terminals being web-enabled terminals and said server being operable for serving to said terminals a panel enabling task creation by said enterprise team and task use by said enterprise and provider teams.
  • 12. A system for integrating technical team and transition management personnel during design and deployment of a general procurement and accounts payable application, comprising: a database server, a front end server, an accounting system server, a firewall, a plurality of team terminals, a database store, an accounting system store, a communication link interconnecting said server and said terminals; said server being operable for (1) maintaining a database on said storage device of templates describing procedures for a plurality of tasks relating to aspects of said application and (2) serving said templates to members of said technical team and transition management personnel operating said terminals for coordinating, recording and tracking team activities with respect to said tasks.
  • 13. The system of claim 12, said tasks including procedures for assessing, preparing, developing, deploying and supporting said application.
  • 14. The system of claim 12, said tasks including procedures for activities related to a plurality of categories from the set of categories including assessment, business controls, configuration, education, image, information technology, marketing, process, project management, front end server, accounting system server, testing, and transition management.
  • 15. A system for customizing a general procurement and accounts payable application for a customer, comprising: a server; a storage device connected to said server; a plurality of terminals; a communication link interconnecting said server and said terminals; said server being operable for (1) maintaining a database on said storage device of master templates describing procedures for assessing, preparing, developing, deploying and supporting each of said applications and (2) serving said master templates to members of enterprise teams operating said terminals for personalizing for each of a plurality of customers a unique database of templates.
  • 16. The system of claim 15, said procedures including tasks for coordinating team activities with respect to said application during general procurement and accounts payable application assessment, preparation, development, deployment and support stages.
  • 17. A system for providing continuing support to a customer's general procurement and accounts payable application by enterprise teams which design and deploy said application, comprising: a database server; a storage device connected to said server; a plurality of team terminals; an accounting system for implementing said application; a front end server connected to said accounting system through a firewall; a communication link interconnecting said database server, sad front end server, and said terminals; said database server being operable for (1) maintaining a database of templates on said storage device describing procedures for supporting said application and (2) serving said templates to enterprise team members operating said terminals for coordinating, recording, and tracking team activities executing said procedures; and said interface server being operable for serving to said enterprise team members information from said accounting system implementing said application.
  • 18. A process using an on-line data gathering tool for evaluating a customer's general procurement and accounts payable system, comprising the steps of: gathering data describing requirements of said customer for procurement and data describing currently used tools and processes for satisfying said requirements; and gathering data from said customer which describes a cost for future years of continuing with said currently used tools and processes; designing and deploying a new system including alternative tools and processes satisfying said requirements; and thereafter auditing the operation of said new system using said on-line data gathering tool to provide performance data to said customer.
  • 19. A system for training and assessing the quality of service provided by a general procurement and accounts payable service provider to a customer of an enterprise, comprising: a server; a storage device connected to said server; a plurality of team terminals; a communication link interconnecting said server and said terminals; said server being operable for (1) maintaining a database on said storage device of templates describing procedures for use by enterprise teams for training said service provider and assessing the quality of service provided with respect to the general procurement and accounts payable application of said customer and (2) serving said templates to enterprise team members operating said terminals for coordinating, recording and tracking team activities with respect to said application.
  • 20. A system for providing a repeatable process for training, managing, certifying and educating a service provider to operate a general procurement and accounts payable application on behalf of a customer of an enterprise, comprising: a first server; a storage device connected to said server; a plurality of team terminals; a second server interfacing through a firewall to an operational accounting system connected; a communication link interconnecting said first and second servers and said terminals; said second server being operable for serving operational accounting data to said team terminals; and said first server being operable for (1) maintaining a database on said storage device of templates describing procedures for executing said application, and (2) serving said templates to team members operating said terminals for coordinating, recording and tracking enterprise team activities with respect to said service provider.
  • 21. A program storage device readable by a machine, tangibly embodying a program of instructions executable by a machine to perform method steps for providing ongoing support for a general procurement and accounts payable application, said method steps comprising: maintaining a database of templates describing procedures for supporting an operational general procurement and accounts payable system; and operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of enterprise teams implementing said procedures; said procedures including user education, survey and quality auditing tasks.
  • 22. An article of manufacture comprising: a computer useable medium having computer readable program code means embodied therein for providing ongoing support for a general procurement and accounts payable application, the computer readable program means in said article of manufacture comprising: computer readable program code means for causing a computer to effect maintaining a database of templates describing procedures for supporting an operational general procurement and accounts payable system; and computer readable program code means for causing a computer to effect operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of enterprise teams implementing said procedures; said procedures including user education, survey and quality auditing tasks.
  • 23. A computer program product or computer program element for providing ongoing support for a general procurement and accounts payable application according to the steps of: maintaining a database of templates describing procedures for supporting an operational general procurement and accounts payable system; and operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of enterprise teams implementing said procedures; said procedures including user education, survey and quality auditing tasks.
  • 24. A program storage device readable by a machine, tangibly embodying a program of instructions executable by a machine to perform method steps for integrating assessment, preparation, development, deployment, and support stages for a general procurement and accounts payable system using electronic requisitions, said method steps comprising: maintaining a database of templates describing procedures for assessing, preparing, developing, deploying and supporting said general procurement and accounts payable system; operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of teams implementing said procedures.
  • 25. An article of manufacture comprising: a computer useable medium having computer readable program code means embodied therein for integrating assessment, preparation, development, deployment, and support stages for a general procurement and accounts payable system using electronic requisitions, the computer readable program means in said article of manufacture comprising: computer readable program code means for causing a computer to effect maintaining a database of templates describing procedures for assessing, preparing, developing, deploying and supporting said general procurement and accounts payable system; and computer readable program code means for causing a computer to effect operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of teams implementing said procedures.
  • 26. A computer program product or computer program element for integrating assessment, preparation, development, deployment, and support stages for a general procurement and accounts payable system using electronic requisitions according to the steps of: maintaining a database of templates describing procedures for assessing, preparing, developing, deploying and supporting said general procurement and accounts payable system; operating a plurality of web-enabled user terminals to access via a server said database for coordinating tasks by a plurality of teams implementing said procedures.
CROSS REFERENCES TO RELATED APPLICATIONS

[0001] U.S. patent applications Ser. No. 09/______, entitled “System and Method for Assessing a Procurement and Accounts Payable System”, Ser. No. 09/______, entitled “System and Method for Project Preparing a Procurement and Accounts Payable Process”, Ser. No. 09/______, entitled “System and Method for Project Designing and Developing a Procurement and Accounts Payable Process”, and Ser. No. 09/______, entitled “System and Method for Deploying a Procurement and Accounts Payable Process” filed concurrently herewith, assignee docket numbers EN999043, EN999116, EN999117, and EN999118, respectively, are assigned to the same assignee hereof and contain subject matter related, in certain respect, to the subject matter of the present application. The above-identified patent applications are incorporated herein by reference.

Divisions (1)
Number Date Country
Parent 09444256 Nov 1999 US
Child 10727443 Dec 2003 US