System and method for ongoing supporting a procurement and accounts payable system

Abstract
A system for deploying to a client accounting installation a general procurement and accounts payable application specifically configured for the client by an enterprise includes a database server for (1) maintaining on a storage device a database of templates describing procedures for assessing, preparing, developing, deploying and supporting the application, and for (2) serving these templates to team members operating web-enabled terminals for coordinating, recording and tracking team activities with respect to the application while generating a description for adapting a front end server and an accounting system server to the requirements of the client.
Description
BACKGROUND OF THE INVENTION

1. Technical Field of the Invention


This invention pertains to the implementation of a procurement and accounts payable system or application. More particularly, it relates to a system and method for assessing, preparing, designing and developing, deploying, and supporting a general procurement and accounts payable system using electronic requisitions.


2. Background Art


A services company may be very good at implementing information technology (IT) solutions. However, as customer engagements increase, the ability of company to execute numerous engagements on time and within budget with quality becomes more difficult.


Today there exist many different software packages that perform project management and classes that teach methodologies for implementing solutions that involve information technology and services. However, there is no process that combines these activities along with an evaluation of a client's general procurement (GP) and accounts payable (AP) system, or application, into one package while providing detailed implementation instructions along with templates for completing the major deliverables required over the course of the project. Templates, may be used herein as an equivalent term for page, form, or document as used in connection with Lotus Notes. In Lotus Notes, a page is a database design element that displays information; a form, like a page, displays information and also can be used to collect information; and documents are the elements that store information in the database. A user is presented a form including fields for entering information. When the user fills out the information and saves it, the information is saved in the data base as a document. When a user opens the document, the document uses the form as a template to provide the structure for displaying the data or information. Fields store data of various types, including text, dialog list, rich text, and so forth.


Scalability of engagements is a known problem, the most common solution to which is to increase the number of persons involved. Experience has shown that this increase results in customer dissatisfaction due to inadequate gathering of requirements, poorly trained implementation teams, missed schedules, increased costs, and lower quality.


It is characteristic of general procurement and accounts payable systems that no two are identical, and may differ even within wholly owned subsidiaries of a single corporation.


Consequently, there is a need in the art for a system and method for evaluating a potential client system and for adapting a general procurement and accounts payable system to the requirements of each of many potential clients. Further, there is a need for a system and method for evaluating a potential client system and for adapting a general procurement and accounts payable system to the requirements of each of many potential clients which can be licensed to third party providers together with a system and method for monitoring and assuring the quality of services provided by those service providers.


There is a need in the art for an integrated system for assessing, preparing, designing and developing, deploying, and supporting a procurement and accounts payable system using electronic requisitions.


During project assessment, typically potential customers are contacted and evaluated by a marketing team that then recommends a product solution from their menu. There is no integration of Technical Team Leaders and Transition Management as key components of the installation. There is also limited to no flexibility to customize the product for the customer.


There is a large body of work on project planning in industry. While they are all more or less adequate, they do not provide the comprehensive integration of the client and supplier teams, Transition Management, and Quality required to accomplish a particular customer's goals.


Like project planning, project design and development processes are well known in industry. They usually consist of a project manager or team leader that manages the implementation of a project plan and interfaces with the client.


Deployment or implementation of a project is, again, a very standard operation. As the project plan steps are completed, they are usually held in queue until all necessary activities reach a point where the solution can be “turned on”.


All projects have close out functions that wrap up the end of the project. However, they do not provide for continuing support across the multitude of functions that have been used to provide the customer with a solution.


It is an objective of the invention to provide a system and method for evaluating a client's general procurement and accounts payable (GP/AP) system.


It is an object of the invention to provide an optimized solution for out-sourcing procurement of goods and services.


It is an object of the invention to provide a system and method for training service providers.


It is an object of the invention to provide a system and method for managing service providers to assure quality of service.


It is an object of the invention to provide a system and method for managing a project.


It is an object of the invention to provide an optimized general procurement and accounts payable system characterized by lower costs, a paperless process, and more comprehensive service with a shorter cycle time.


SUMMARY OF THE INVENTION

A system for providing ongoing support for a general procurement and accounts payable application includes a server; a storage device connected to the server; a plurality of team terminals; and a communication link interconnecting the server and terminals. The server is operable for (1) maintaining a database of templates on the storage device describing procedures for supporting the application and (2) serving the templates to team members operating the terminals for coordinating, recording, and tracking team activities executing the procedures with respect to supporting the application. These procedures include user education, survey and quality auditing tasks.


A method for providing ongoing support for a general procurement and accounts payable application of a customer of an enterprise includes maintaining a database of templates describing procedures for supporting an operational general procurement and accounts payable system; and operating a plurality of web-enabled user terminals to access via a server the database for coordinating tasks by a plurality of enterprise teams implementing the procedures. The procedures include user education, survey and quality auditing tasks.


In accordance with an aspect of the invention, there is provided a computer program product configured to be operable for providing ongoing support for a general procurement and accounts payable application of a customer of an enterprise.


Other features and advantages of this invention will become apparent from the following detailed description of the presently preferred embodiment of the invention, taken in conjunction with the accompanying drawings.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a high level block diagram of a general procurement and accounts payable development and implementation system in accordance with a preferred embodiment of the invention.



FIG. 2 is a block diagram illustrating team relationships within the general procurement and accounts payable (GP/AP) development and implementation system of a preferred embodiment of the invention.



FIGS. 3A through 3H and 3J through 3M, arranged as shown in FIG. 3, are a flow diagram of the assessment, preparation, development, deployment and support phases of the method of a preferred embodiment of the invention.



FIG. 4 represents a terminal display of a playbook summary view.



FIG. 5 illustrates a terminal display of the template presented by the server at a user terminal of FIG. 1 in response to selection by a user of “create a summary task” from the playbook summary view.



FIG. 6 illustrates a terminal display of the template presented by the server at a user terminal of FIG. 1 in response to selection by a user of “create a detailed task” from the playbook summary view.



FIGS. 5 and 6 also illustrate fields collected in the database and selectively displayed at user terminals of FIG. 1 for each summary and detail task, respectively, of a GP/AP system for a particular customer or project.





BEST MODE FOR CARRYING OUT THE INVENTION

Referring to FIG. 1, in accordance with the preferred embodiment of the invention, intranet communication facilities interconnect a plurality of team member terminals 64, zero or more service provider terminals 66, and client (also referred to as customer) terminals 68, and a server 62, preferably a Lotus Notes server.


Server 62 references and maintains playbook database 70. Database (also referred to as the playbook, or playbook database) 70 is provided for implementing procurement and accounts payable systems. This playbook 70 defines implementation steps and templates for creating the many required deliverables and project management functions. These functions include start and end dates, effort, duration, and so forth. This playbook also provides the steps and templates for training service providers 66 and serves as the repository for completed templates and as a source for auditing the performance of the service providers. As used herein, unless otherwise apparent from the context, system and applications are used to refer to hardware, software, procedures, instructional materials, and so forth, for implementing a general procurement and accounts payable process.


Also attached to intranet 60 are requisition and catalog (Req/Cat) servers 80. Server 80 functions as a front end server to accounting system server 82, and is connected to a file of vendor catalogs and contracts 72, to a client (customer) host system 74, and through a firewall to SAP servers 82. SAP server 82 is an accounting driver for the procurement and accounts payable (A/P) system of the customer. SAP servers 82 are connected to supplier systems 84, to a customer data warehouse 78, and to customer ledger and accounts payable systems 86, 88.


During the operational phase of a completed and functioning system, a customer (aka end user, or client) 98 enters requisitions via the intranet to server 80. Server 80 accesses client host system 74 for pricing, reports, etc., and vendor catalogs and contracts 72 to gather information needed by SAP servers 82 to generate purchase orders or requests for quotes (RFQs) to supplier 84, to update data warehouse 78, client ledger 86, and client accounts payable 88 systems. Warehouse 78 stores client data maintained by the supplier of the Req/Cat and general procurement system, which supplier may be the primary enterprise (a primary services organization, such as the IBM Corporation) with control of the design and implementation of the system, or a contractor of the enterprise qualified as a third party service provider.


In operation, during presales, assessment, preparation, development, deployment and support stages, team members 64, access database 70 via intranet 60 and server 62 to create a playbook including a detailed description of an accounts payable and Req/Cat system for a particular customer (aka client). This description is then used to personalize Req/Cat servers 80 and SAP servers 82 for the customer installation. During operation, a user 98 accesses Req/Cat server 80 via intranet 60 to enter a requisition or to query the status of previously entered requisition. When entering a requisition, Req/Cat responds to end user 98 with a form to complete. Req/Cat 80 accesses SAP server 82 through the firewall with the requisition or request for status. SAP server 82, responsive to a requisition, issues a purchase order or request for quote to supplier 84, and updates accounts payable 88 and ledger 86, as required through the normal procurement and accounting process implemented on behalf of the customer.


Referring to FIG. 2, the various departments and individuals representing team members 64 include business office 120, architecture 122, education and training 124, project manager 126, Req/Cat development 128, business process design 112, electronic data interchange (EDI) 114, application development 116, information technology 130, business controls 132, procurement process 134, transition management 136, SAP development 138, marketing 118, general procurement operations 98, and support management 96. Each of these departments and individuals perform various rolls and functions during the life of the project from assessment through deployment and use, as will be more fully described hereafter in connection with FIG. 3.


Referring to FIG. 3, in accordance with the preferred embodiment of the method of the invention, assessment 101, preparation 102, development 103, deployment 104 and support 105 stages are executed to design, implement, and use a general procurement and accounts payable (GP/AP) system for a customer. Through these stages 101-105, procedures and methods are provided for seamlessly integrating all aspects of a total GP/AP system, including creating an electronic purchase requisition for goods and services with flexible approval functions, through invoicing and payment.


Further in accordance with the preferred embodiment of the invention, there is provided a web enabled delivery system.


Further in accordance with the preferred embodiment of the invention, there is provided a system and method for auditing service provider activities without being on site.


High level summary tasks implemented by playbook 70 database include business controls, information technology, SAP, communication, process, testing, configuration, project management, transition management, education and training, requisition and catalog (Req/Cat). Each of these summary tasks, as well as the drill-down (aka subsidiary) tasks implementing the details of each, may be accessed by team members 64 and service provider 66s within the playbook database 70.


Referring to FIG. 4, the playbook summary view 400 is illustrated. View 400 includes a title bar 402; pull down menu tabs file 404, edit 406, view 408, create 410, actions 412, window 414, help 416; create a summary task selection button 420, create a detailed task button 422, a folders and views section 424, and a task title display and selection area 426 which also includes a by column 436 and a status column 438 with an entry for each task displayed in area 426. With by category button 430 and all tasks button 432 selected, all tasks 434 is highlighted and display 426 presents a listing of tasks organized by category.


Referring to FIG. 5, the summary task template 440 presented to the user upon selection of create a summary task 420 is illustrated. As will be described hereafter, there are two flavors of template 440, one for major operations, and one for major steps within each major operation. Referring to FIG. 6, the detail task template 520 presented to the user upon selection of create a detailed task 422 is illustrated.


Selection of create summary task 420 presents a first summary task template 440 that used to design and describe a high level summary task for one of the playbook operations. In a preferred embodiment of the invention, there are thirteen such high level summary tasks, including assessment, business controls, configuration, education, image, information technology (I/T), marketing, process, project management, requisition and catalog (req/cat), SAP, testing, and transition management. The summary and detail tasks within these high level summary tasks are further organized into five major processing segments: assessment 101, project preparation 102, project design and development 103, deployment 104, and ongoing support 105. A high level summary task provides a summary of the inputs to the task, and of the output (deliverables) after all detailed tasks are completed. There two levels, or templates for summary tasks: one for major operations, the second for major steps within each operation.


Activation of create a detail task 422 presents to the user a third template 520 which is used to summarize the detailed tasks for each major step of a summary task.


The first and second templates 440 are almost identical. They include the fields set forth in Tables 1 and 2. Third template 520 contents are summarized in Table 3.









TABLE 1





SUMMARY TASK TEMPLATES PART 1


















SECTION 1:
CREATION STATUS



Category 444:
Categories include education,




req/cat development, SAP




development, transformation




management, architecture,




procurement process.



Team 446:
Specific project team responsible




for this task.



Offering type 448:
Kind of product being brought to




client: req/cat only, SAP only, and




req/cat and SAP.



Stage 450:
The stages are assessment 101,




project preparation 102, project




development 103, deployment 104,




and support 105.



Doc owned by 452:
Team 140 owner of document, the




designer of this one template. The




teams 140 are those illustrated in




FIG. 2.



Doc created by 454:
Author of this one template.



Dev status 456:
Approval status: first draft, final




edit, final approval, etc. Only




owner 452 can change this status.




Only the owner 452 can approve the




content of this template (task).



SECTION 2:
IMPORTANCE BUTTONS



Education 462:
Represents a combination of things,




including (1) does someone need to




be taught how to do this task, (2)




is it something that should be




included in the education package




to the customer.



Certification 464:
Indicates whether or not an




implementer of this task (ie,




service provider) must be




certified.



Auditable 466:
Indicates whether or not it is a




task that Enterprise would be able




to or needs to audit performance by




the implementer/service provider



Milestone 468:
Indicates if this task is a




critical accomplishment in the path




of completing the implementation of




the offering type.



Critical path 470:
Indicates if this is a task that




must be completed in order to




advance to the next task in order




to complete the offering type, and




can change during the course of the




project as tasks are completed and




the overall environment changes.



SECTION 3:
IMPLEMENTATION



Task order 472:
A number assigned to a detailed




task that shows its order under the




summary task.



% complete 474:
An estimate of how complete is this




task document in its development




for a particular customer.



Executed by 458:
Name of service provider (eg.,




Enterprise, or some Enterprise




partner).



Performed by 460:
Technical team responsible for




doing this task.



Priority 476:
High, medium, low priority, based




on whether this task is in critical




path, and whether or not it needs




to be done in support of some




subsequent task.



Work effort 478:
Estimated time required to complete




this task.







Sequence 480:
A number assigned to a summary task




that shows its order under a higher




level task.



Task status 482:
Represents how far the service




provider has progressed in its




implementation of this task. This




is rolled up to Lotus Notes




database 70 to enable the owner to




track progress of the service




providers during the audit phase.










Table 2 sets forth the template 440 fields which may vary between templates, including those for major operations and major steps within an operation.









TABLE 2





SUMMARY TASK TEMPLATES PART 2


















SECTION 4:
SUMMARY TASK DETAILS



Description 490:
High level summary description




of major operations or steps.



Assumptions 492:
What if any assumptions apply.



Prerequisites 494:
Tasks that must be completed




before this task can complete.



Critical success factors 496:
Description of tools,




techniques, relationships,




understandings, technical and




relationship skills and




commitments, knowledge base of




team and customer, and so




forth, needed to accomplish




this task.



Deliverables 498:
Expected output of this task.



SECTION 5:
APPROVALS



Task approver 500:
Identity of approvers.



Notification date 502:
Date approvers notified.



Request approval 504:
Electronic signature of




approval.



SECTION 6:
PROJECT REFERENCE



Comments and dialog 506:
General comments (open




season).



Deliverable checklist 408:
Checklist of deliverables.



Approval status 510:
List of approvers of this




document and status of their




approval.



Edit history 512:
Listing of persons who have




modified this document during




its preparation (service




provider is not allowed to




change these task




descriptions.)

















TABLE 3





DETAIL TASK TEMPLATE


















SECTION 1:
CREATION STATUS



SECTION 2:
IMPORTANCE BUTTONS



SECTION 3:
IMPLEMENTATION







Sections 1, 2 and 3 are the same as for templates 440, with


the addition of:










Support resources 524:
People needed to support




completion of this task.



Assigned to 526:
Person executing this task.



SECTION 4:
DETAIL TASK DETAILS



Description 490:
Description of this task.



Prerequisites 494:
Tasks that must be completed




before this task can complete.



Task steps 528:
Specific detailed steps that




need to be accomplished to




complete the task.



Analysis 540:
A description of what needs to




be analyzed to come up with




the right answer for the




customer. (The resulting




output will vary depending




upon the results of the




analysis - but this document




doesn't change as a result of




the analysis).



Deliverables 530:
Expected output of the task.



Methodology attachments 532:
Potential attachments, may be




blank: anything from




presentation charts, to




questionnaires, to




architecture charts - depends




upon the task.



SECTION 5:
PROJECT REFERENCE AREA



Comments & Dialog 506:
Comments.



Deliverable Checklist 508:
Checklist, attachment listing




(other than method




attachments, supra).



Approval status 510
List of approvers and the




status of their approval (with




respect to approval of this




document, not of the




implementation of the task,




which is handled by the audit




process).



Edit history 512:
Listing of persons who have




modified this document during




its preparation (service




provider is not allowed to




change these task




descriptions.)










Database 70 at server 62 includes all summary and detail tasks templates which have been completed in a set for a particular customer. An initial set of the tasks listed in Table 4 is provided for each customer, but during project implementation phases 101-105, these are configured or personalized to the customer.


While many summary and detailed tasks of Table 4 do not appear in the flow chart of FIGS. 3A-3M, those selected illustrate a flow from start to finish across the five major stages—and form a representative, if not critical, path through them. As shown in FIGS. 3, and 3A-3M, the transitions between stages 100-105 are, in some instances, blurred and a particular task may be allocated to either or both of two of these stages.


In each stage, the key to success is the integration through the use of the templates of the groups (FIG. 2) and activities (Table 4, both summary tasks and detail tasks.) Also, an important aspect of the invention is the method provided across the five stages (FIG. 3) for effecting a transition from a legacy process, including hardware, software, work procedures and human resources, to a new process.


Table 4 is a chart of summary and detail tasks, pursuant to a particular embodiment of the invention, available for presentation in display area 426 of playbook summary view 400 upon selection of button 432. Selection by a user in display area 426 of a task designated with two or three alpha-numeric reference numerals P1, P11, P12, . . . , results in display of a template 440 personalized to the summary task, and selection of a task designated with four or more alpha-numeric reference numerals P111, P112, . . . , result in display of a template 520 personalized to the detail task. A user with appropriate authority may then view, correct, update, approve or otherwise modify the displayed task. The names of the detail tasks set forth broadly the functions or method steps performed in implementing the superior summary task. In Table 4, each summary task is identified in the first column by the stage 100-105 to which it pertains, in the second column by a task identifier P11, P12, . . . , and, for selected tasks, in the third column by the process step (150, . . . , 354 in FIGS. 3A-3M) to which it pertains. In general (with very few exceptions), a detail task pertains to the same stage 100-105 as its summary task.









TABLE 4







CHART OF SUMMARY AND DETAIL TASKS













Summary Tasks


Stage
Task ID
Step
  Detail Tasks










FOLDERS AND VIEWS


BY CATEGORY











ALL





TASKS



P1

ASSESSMENT


101
P11

Perform customer service offering





assessment


101
P111
174
  Perform customer business





  assessment


101
P112

  Perform customer business





  assessment e-Req/Cat


101
P113

  Develop workshop management plan


101
P114

  Develop workshop management plan e-





  Req/Cat


101
P115

  Review findings from marketing





  procurement consulting engagement


101
P116

  Review findings from marketing





  procurement consulting engagement





  e-Req/Cat


101
P117
176
  Formulate workshop approach


101
P118

  Formulate workshop approach e-





  Req/Cat


101
P119

  Prepare for workshop


101
P11A

  Prepare for workshop e-req/Cat


101
P12
178
Introduce recommend service offering to





customer


101
P121

  Present service offering to





  customer (perform workshop)


101
P122

  Present service offering to





  customer (perform workshop) e-





  Req/Cat


101
P123

  Formulate proposal approach


101
P124

  Formulate proposal approach e-





  Req/Cat


101
P13

Create proposal and contract


101
P131

  Develop and cost proposal


101
P132

  Develop and cost proposal e-Req/Cat


101
P133

  Draft and price customer contract


101
P134

  Draft and price customer contract





  e-Req/Cat










P2
BUSINESS CONTROLS










103
P21

Business control requirements


103
P211
290
  Confirm business controls





  requirements


103
P212

  Confirm separation of duties (SOD)





  requirements


104
P213
292
  Conduct ASCA self-assessment


104
P214

  Risk assessment


104
P215
224, 294
  Conduct ASCA/business controls





  review


102
P2151

  Confirm image production system





  management strategy










P3
CONFIGURATION










103
P31
320
Conduct Req/Cat functional detailed fit





gap analysis


103
P311

  Confirm Req/Cat organizational





  hierarchy


103
P312

  Define the Req/Cat functional





  detailed fit


103
P313

  Resolve functional gaps for Req/Cat


103
P32
324
Configure Req/Cat offering


103
P321

  Confirm and refine “Ives Team





  Studio” for code tracking


103
P322

  Confirm and refine Req/Cat initial





  settings and organizational





  structure


103
P323

  Confirm and refine Req/Cat





  authorizations


103
P324

  Refine and validate final Req/Cat





  configuration


103
P33

Customize Req/Cat offering


103
P331

  Validate and customize Req/Cat core





  application change request


103
P332

  Refine and validate final





  customization for Req/Cat


103
P34

Produce custom Req/Cat programs


103
P341
276
  Validate and code bridge change





  requests (SAP and Req/Cat)










P4
EDUCATION AND TRAINING










102
P41

Develop customer education and training





strategy


102
P411

  Validate customer education &





  training objectives


102
P412
190
  Define the training requirements





  and approach


102
P413

  Confirm the education & training





  strategy


102
P42

Define system management processes


102
P421

  Define SAP correction and transport





  process


102
P422

  Define and agree on service level





  agreement SLA


102
P423

  Define and administer SAP release





  control process


102
P424

  Define Req/Cat transport process


102
P425

  Define and administer version





  control process


103
P43
192
Define user documentation and training





requirements


103
P431

  Define customer user audiences and





  requirements


103
P432

  Confirm user documentation





  requirements and standards


103
P433

  Conduct detailed end-user task





  analysis


103
P434

  Assess user skills and training





  needs


103
P435

  Validate end-user courses and





  content


103
P436

  Identify users and course attendees


103
P437

  Define and notify training





  attendees


103
P44

Develop user training documentation


103
P441

  Produce customer specific end-user





  documentation


103
P442

  Confirm training evaluation





  materials/approach with customer


103
P443
194
  Setup training system environment


103
P444

  Validate training logistics


103
P445
198
  Conduct pilot training with super





  users


103
P446
196
  Arrange documentation and training





  material production


103
P45

Internal (Enterprise, service provider)





training requirements


103
P451

  Identify and organize appropriate





  internal training


104
P46

Conduct end-user training


104
P461

  Conduct train-the-trainer sessions


104
P462
214, 230
  Perform training


104
P463
212
  Conduct new buyer training










P5
IMAGE










103
P51

Conduct image functional detailed fit





gap analysis


103
P511

  Define the image functional





  detailed fit


103
P512

  Resolve image functional gaps


103
P52

Configure image offering


103
P521

  Refine and validate final image





  configuration


103
P522

  Confirm and refine image initial





  settings



P6
I/T


103
P61

Establish customer network/computing





infrastructure


103
P611

  Confirm component delivery


103
P612

  Establish network/computing





  hardware/software architecture





  infrastructure


103
P613

  Ready network/computing environment


103
P62

Establish EDI infrastructure


103
P621

  Establish EDI infrastructure


103
P622

  Conduct trading partner testing





  (IT)


102
P623

  Confirm EDI strategy


102
P6231

  Setup image system environments


103
P6232

  Establish cutover checklist and





  perform pre-cutover activities for





  image production environment


104
P6233

  Validate image production support





  for system management


103
P63

Develop reporting infrastructure


103
P631

  Develop reporting infrastructure





  (LIS/EIS)


103
P632

  Develop DataMart extracts


103
P633
232
  Develop additional reports





  (customer/operations)


102
P64

Perform bridge architecture assessment


102
P641

  Perform bridge architecture





  integration point interfaces work





  session


102
P642
158
  Define bridge architecture project





  objectives document


102
P65

Validate bridge, EDI, vendor reporting





requirements


102
P651
270
  Develop and manage bridge





  architecture implementation work





  plan


102
P652

  Analyze EDI requirements


102
P653

  Determine EDI communication





  environment


102
P654

  Analyze vendor master data load


102
P655

  Analyze operational reporting





  requirements


102
P656

  Analyze customer requirements for





  DataMart implementation


102
P657

  Schedule and conduct weekly





  interlock meeting


102
P658

  Vendor lead client analysis


102
P66

Set up development/integration





environment


102
P661

  Set up SAP development/integration





  environment


102
P662

  Set up Req/Cat system environments


103
P67

Set up consolidation/test environment


103
P671

  Set up SAP consolidation/test





  environment


104
P68
218
Set up production environment


104
P681

  Convert vendor master into





  production environment


104
P682

  Determine EDI tasks for production





  environment set up


104
P683

  Execute SAP cutover checklist


104
P684

  Set up SAP production environment


104
P685

  Establish SAP batch schedule


104
P686

  Set up trading partners in





  production environment


104
P687

  Vendor lead client deployment


103
P688

  Establish cutover checklist and





  perform pre-cutover activities for





  SAP production environment


103
P689

  Establish cutover checklist and





  perform pre-cutover activities for





  e-Req/Cat production environment


105
P69

Refine/execute production support for





system management


105
P691
234
  Perform on-going support activities





  for Req/Cat


105
P692

  Post deployment reporting support


105
P693

  Develop new bridges and application





  extensions post go live


105
P694
236
  Support new EDI transactions post





  go live


105
P695

  Execute system management security





  support procedures


105
P696

  Execute data management support





  procedures


105
P697
236
  Execute EDI support procedures


105
P698

  Execute system management





  operational support desk procedures


105
P699

  Execute system management batch





  support desk procedures


105
P69A

  Execute system management SAPBI





  support procedures


105
P69B

  Execute system management master





  data support procedures


105
P69C

  Execute production support for





  system management


103
P6A

  Establish vendor master environment


103
P6A1

  Establish vendor master


103
P6A2

  Confirm vendor master


103
P6A3

  ALE configuration for VLC


103
P6B

Establish bridge architecture





infrastructure environment


103
P6B1
272
  Develop detail architecture





  requirements definition


102
P6C
274
Validate system infrastructure





requirements


102
P6C1
280
  Analyze current network/computing





  infrastructure


102
P6C2

  Determine network/computing





  requirements for project


102
P6C3

  Confirm and begin network/computing





  component acquisition


102
P6C4

  Order and delivery of





  infrastructure components










P7
MARKETING










100
P71

Participate in marketing procurement





consulting engagement


100
P711
170
  Qualify potential client


100
P712

  Qualify potential client e-Req/Cat


100
P713

  Develop assessment statement of





  work (SOW) e-Req/Cat


100
P714

  Develop assessment statement of





  work (SOW)










P8
PROCESS










102
P81
156
Customer process introduction


102
P811

  Conduct customer introduction to





  Golden procurement and A/P





  processes


102
P82

Process reviews with customer -





procurement and A/P


102
P821
344
  Review procurement processes with





  customer


102
P822
342
  Review A/P processes with customer


102
P83

Assess customer impact on internal





Enterprise workload


102
P831

  Identify current and potential





  supplier catalogs for customer


102
P832
340
  Perform assessment of customer





  purchasing business


103
P84

Process alignment customer/Golden


103
P841

  Determine GAPs between customer and





  golden processes


103
P842

  Perform process GAP resolution


103
P85

BMP process and procedures management


103
P851

  Codes and procedures


103
P852
348
  Update and review process





  management & procedures manual


103
P86

Supplier readiness


103
P861
210
  General supplier introduction


103
P862

  Manage trading partner - EDI





  suppliers


103
P863
346
  Establish ASAP suppliers for





  customer (ASAP = a SAP supplier not





  requiring a buyer)


103
P864

  Manage customer supplier outline





  agreements


103
P865

  Customer freight procedures


104
P866

  Supplier memo mailing










P9
PROJECT MANAGEMENT










102
P91
180
Initiate project planning


102
P911
160
  Confirm project scope and





  implementation strategy


102
P912

  Confirm project organization and





  assign resources to roles


102
P913

  Prepare and validate project plan





  and procedures


102
P914

  Establish project team working





  environment


102
P915

  Orient project team


102
P92
150
Confirm and refine project management





standards and procedures


102
P921

  Confirm and refine issue management





  plan


102
P922

  Confirm and refine project





  documentation


102
P923
152
  Confirm and refine quality





  assurance standards


102
P924

  Create team building plan


102
P93

Confirm implementation strategies


102
P931

  Confirm system configuration





  standards


103
P9311

   Customize image offering


103
P9312

   Validate and customize image core





   application change request


103
P93121

    Refine and validate final





    customization for image


102
P932

  Confirm CR/PTR process


102
P933

  Confirm testing strategy


102
P934

  Confirm production support &





  operations strategy


102
P935

  Confirm SAP production system





  management strategy


102
P936

  Confirm e-Req/Cat production system





  management stategy


102
P937
282
  Confirm network/computing strategy


102
P938

  Confirm vendor conversion strategy


102
P94
162
Prepare project team


102
P941

  Conduct kick-off meeting


102
P942

  Conduct project team standards





  meeting


102
P943

  Conduct project team training


102
P95
352
Define production support plans


102
P951

  Define system management SAP





  resource requirements


102
P952

  Define system management e-Req/Cat





  resource requirements


102
P953

  Define production support accounts





  payable plan


102
P954

  Define production support CSC plan


102
P955

  Define production support general





  procurement plan


102
P956

  Confirm SAP system authorizations





  for project team


102
P957

  Confirm Req/Cat access control list





  (ACL)


102
P958

  Define system management image





  resource requirements


102
P96

Initial quality assurance review


102
P961

  Initial QA review


103


&104
P97

Review project status and refine project





plan


103,


&104
P971

  Conduct project team status





  meetings


103


&104
P972

  Conduct steering committee meetings


101
P98

Obtain customer approval


102
P981

  Won bid analysis/transition to





  implementation team


102
P982

  Won bid analysis/transition to





  implementation team e-Req/Cat


101
P983

  Conduct lost bid analysis


101
P984

  Conduct lost bid analysis e-Req/Cat


104
P99

Validate production support


104
P991

  Validate SAP production support for





  system management


104
P992

  Validate production support for





  accounts payable


104
P993

  Validate production support for CSC


104
P994

  Validate production support for





  general procurement


104
P995

  Validate Req/Cat production support





  for system managment


105
P996

  Validate education & training





  production support activities


104
P9A

Perform go live project office





activities


104
P9A1

  Ensure go live check lists





  activities


104
P9A2

  Go/no-go decision for go live


103


&104
P9B

Interim quality assurance reviews


103


&104
P9B1

  Interim QA reviews


105
P9C
244
Post-implementation quality assurance





review


105
P9C1

  Post-implementation QA review


105
P9D

Production support review


105
P9D1

  Confirm production environment










PA
REQ/CAT










102
PA1

Identify customer responsibilities for





Req/Cat


102
PA11

  Identify country/global





  administrators & neg. con person


102
PA12

  Perform country administrator





  education


103
PA2

Prepare and load Req/Cat catalog data


103
PA21

  Perform Req/Cat catalogue tasks


104
PA3

Req/Cat production readiness


104
PA31

  Confirm Req/Cat for production





  environment


104
PA32

  Set up Req/Cat tables in production


104
PA33

  Prepare Req/Cat production copy


104
PA34

  Execute Req/Cat go live checklist



PB
SAP


103
PB1
254
Conduct SAP functional detailed fit gap





analysis


103
PB11
250
  Confirm SAP organizational





  hierarchy


103
PB12

  Define the SAP functional detailed





  fit


103
PB13

  Resolve SAP functional gaps


103
PB2

Produce custom SAP programs


103
PB21

  Develop and validate SAP custom





  programs


103
PB3
252
Configure SAP offering


103
PB31

  Confirm and refine implementation





  guide


103
PB32

  Confirm and refine SAP initial





  settings and organizational





  structure


103
PB33

  Confirm and refine SAP end user





  authorization profiles


103
PB34

  Refine and validate final SAP





  configuration


103
PB4

Customize SAP offering


103
PB41

  Validate and customize SAP core





  application change request


103
PB42

  Refine and validate final





  customization for SAP










PC
TESTING










103
PC1
256, 260,
Perform preparation activities for




322
testing (both Req/Cat and SAP)


103
PC11

  Confirm and refine test case





  templates


103
PC12
258, 326
  Build comprehensive test plan


103
PC13

  Develop test environment plan


103
PC14

  Create test case specifications


103
PC15

  Build/reuse test cases


103
PC16

  Determine testing tools


103
PC17

  Review and validate comprehensive





  test plan


103
PC2
216
Perform comprehensive testing


103
PC21

  Perform unit test


103
PC22
262
  Perform component test


103
PC23
264, 328
  Perform integration test


103
PC24

  Administer network/computing





  performance monitoring


103
PC25
266, 330
  Perform system test


103
PC26
220
  Perform user acceptance test


103
PC27

  Perform other required testing


103
PC271

  Support comprehensive image testing


103
PC28

  Support comprehensive e-Req/Cat





  testing


103
PC29

  Support comprehensive SAP testing


103
PC2A

  Support comprehensive image testing










PD
TRANSITION MANAGEMENT










101
PD1
172
Introduce transition management





(assessment)


101
PD11
172
  Develop initial assessment of





  client


101
PD12

  Provide transition management





  workshop presentation


102
PD2
154
Model transition management (project





preparation)


102
PD21

  Provide transition management





  strategy


102
PD22

  Evaluate cultural impact of





  solution


102
PD23
300
  Develop/confirm transition





  management plan


102
PD3

Develop communication plan (project





preparation)


102
PD31
304
  Build/confirm campaign plan


102
PD32
302
  Update communications trategy


102
PD33

  Deliver announcement/kickoff





  communication


103
PD4

Initialize transition management (design





and development)


103
PD41

  Create incentive/reward program


103
PD42

  Assess supplier impacts related to





  transition management


103
PD43

  Assess Enterprise support impacts





  related to transition management


103
PD44

  Design detail go live





  material/activities


103
PD45
308
  Create policy changes


103
PD46

  Identify/plan for security


103
PD47

  Detail process transition plan


103
PD48
306
  Detail human resources plan


103
PD49

  Detail employee relations plan


104
PD5

Ensure transition management activities





(deploy)


104
PD51
350
  Ensure new process management





  system in place


104
PD52
222
  Perform client readiness assessment


104
PD53

  Perform transition management go





  live activities


104
PD54
240
  Manage human resources activities


105
PD6

Communication (support)


105
PD61

  Thanks to users/suppliers


105
PD7

Validate transition management (support)


105
PD71

  Monitor human resource issues


105
PD72

  Assess effectiveness of transition





  management program


105
PD8

Perform post implementation survey





(support)


105
PD81
242
  Administer post go live survey


105
PD82

  Present and act upon survey





  findings










PE
NOT CATEGORIZED










104
PE1
200
Perform go live process activities


104
PE11

  Allocate buyer codes to commodities


104
PE12

  Enter blanket orders


. . .
PE2

Table template document


. . .
PE21

  Table template document









Project Assessment 101

Referring to FIG. 3 in connection with FIG. 2, project assessment phase 101 follows pre-sales phase 100, during which marketing makes its initial contact with the prospective client, or customer.


After initial contact from marketing 118, the main thrust of Assessment Project 101 is to provide an integrated, cross-functional customer solution to the client. An assessment team is led by the Business Office 120, but requires input and participation from the project leaders of Architecture 122, Transformation Management 136, Business Process 112, EDI 114, and Application Development 116.


Assessment 101 begins with a complete review of the client's current general procurement and accounts payable processes. This includes debriefing the initial marketing team 118, instructing the project leaders 126, and accumulating all other relevant data available about the client's processes, tools, and organizational structures. The Assessment Team then defines an integrated customer solution that covers technical, educational, and Human Resource issues.


The delivery of the Workshop is intended to present an overview of the customer solution, initiate discussions on process analysis and strategic implementation, and confirmation of the solution fit. Specific goals of a workshop phase within assessment stage 101 include the following:

  • (1) Prepare and deliver a presentation to the customer defining the service offering, including any essential documentation on the offering, and a demonstration of the end-user tool(s), as applicable.
  • (2) Collect area specific information and customer requirements on network process sourcing, procurement, accounts payable, and finance; and EDI, I/T, and transition management.
  • (3) Identify high level gaps in each such area.
  • (4) Identify additional high level requirements for new process support, and for conversion requirements, including requirements for commodity structure, account structure, vendor, and contracts.
  • (5) Identify interface requirements, including requirements for HR, cost center, catalogs, ledger, information warehouse.
  • (6) Validate accounting for project, appropriation, contract, job, tax reporting, currency, and check reconciliation.
  • (7) Identify requirements for network, EDI, testing, and application development including new reports, new interfaces, and new features.
  • (8) Assemble a high-level gap analysis.
  • (9) Create a high-level Customer Scope Document.
  • (10) Confirm the recommended solution.


At the completion of the workshop phase, the assessment team 106 convenes to develop and cost the final customer solution and proposal. At this time, the members of assessment team 106 assemble, understand, and validate the collected data; review standard proposal options with assumptions and identify items that apply to this client; create a draft of the proposal including scope, risk, schedule, and resources; review the draft with team and other project members to obtain sizing and costing information for each area; compile costing information to add to the proposal; and perform QA review of the system integration, application development, managed operations (including service delivery center (SDC), application IT, and Process Operations) proposals, and of the overall proposal.


The resulting proposal is delivered or presented to the client. Final Assessment activities include follow up query responses and, should the proposal be declined, a loss analysis. This loss analysis feeds back into assessment process 101 to improve its overall effectiveness and efficiency.


Referring to Table 4, summary tasks pertaining to assessment stage 101 are listed, together with included detail tasks. For each task, a template 440 or 520 is maintained in data base 70, and accessed by team 108 members and others through summary view 400 to track progress (including viewing, updating, sharing, and approving) during this assessment stage 101.


Project Preparation 102

Referring further to FIG. 3, project preparation stage 102 sets up the project, initializes detail planning, and models the plan for making the transition from the client's legacy system and process to the new system and process (or, offering).


A critical element of this stage is to ensure resources are assigned to transition management 136, both from the project implementation team 126 as well as from the client. During this stage the transition activities required for a smooth migration from the old client process and system to the new service offering are modeled. The result is a detailed transition management plan that is specifically designed for the client. Stage 102 tasks and deliverables include the following:

  • (1) Perform analysis on the client HR environment, including organization structure and relationships, labor relations, management, administration, and end user roles and responsibilities, and the general HR environment.
  • (2) Develop and approve the detailed transition management and communication plan.
  • (3) Update the client specific transition management strategy.
  • (4) Define the quality assurance (QA) process required to assure that a project conforms to documented standards and meets documented requirements. The purpose of this task is to confirm the quality assurance standards between Enterprise and the client, and identifies the tasks that are to be audited by the Enterprise Technical Center.


    The QA review is a beneficial process for the project as it timely recognizes potential risk areas and reduces the possibility of project delays while achieving faster implementation, attaining low cost and increasing the customer's level of confidence. Deliverables of the QA review task include the following:
  • (1) Confirm and refine quality assurance standards with the customer.
  • (2) Confirm that technical requirements can be met.
  • (3) Confirm that business and financial measurements can be met.
  • (4) Confirm that the proposal is complete and the required processes have been followed.
  • (5) Establish QA schedule for the project.


Integration of all critical Enterprise and client team members provides the glue to assure a smooth project. By completing the detailed tasks within project preparation stage 102, the recommended implementation standards, procedures and strategies for the project are shared with the technical and business functional members of the project team as well as with the customer. All team members have input in this process, and understand the basic procedures, once they have been agreed to. These procedures, documented in summary and detail task templates listed in Table 4, include the following:


Configuration Standards


CR/PTR Process


Testing Strategy


Production Support and Operations Strategy


SAP System Management Strategy


Req/Cat System Management Strategy


Network Computing Strategy


Vendor Conversion Strategy


Project Design and Development 103

Referring further to FIG. 3, project design and development phase 103 provides and documents in a database of templates referred to as a Playbook, the business controls, transformation management, and SAP and Req/Cat customization required for an integrated approach to a complete customer solution.


During this stage 103, business controls 132 provides a comprehensive process that identifies key control points and establishes detailed procedures to assure a quality installation. The deliverables include documentation, separation of duties, sensitive programs, logical access control, logging (audit trail), change control for tables, change control for programs, system testing, input controls, processing controls, error handling controls, output controls, balancing and reconciliation, vital records and disaster recovery, records management, reports, local area network (LAN), and country specifics, as described below:

  • (1) Documentation: an assessment of the quality and completeness of existing program documentation and a determination of the degree to which programs could be efficiently reconstructed if they were destroyed.
  • (2) Separation of duties: the duties of the programmer, computer operations, and user groups are reviewed to ensure that separation of duties problems do not exist. No one individual can control activities within a process (or any event in a string of events) in a way that permits errors of omission, or commission of fraud, theft, etc., to go undetected.
  • (3) Sensitive programs: controls must be in place to prevent unauthorized modification and/or use of the application.
  • (4) Logical access control: while programs are generally controlled by a site procedure, application data has a formal access control mechanism.
  • (5) Logging (audit trail): a logging mechanism is established to ensure the audit trail is correct.
  • (6) Change control (tables): a change control system is put in place to evaluate, justify and control changes to tables.
  • (7) Change control (programs): a change control system is put in place to evaluate, justify and control changes to programs.
  • (8) System Testing: system testing procedures are effectively planned and carried out to ensure that controls are successfully tested and documented.
  • (9) Input controls: to insure accuracy and completeness of information entering an application.
  • (10) Processing controls: controls are applied for entry of data into the computer application system that ensure accuracy and completeness of data during computer processing.


    (11) Error handling controls: controls for error handling and reprocessing of transactions.
  • (12) Output controls: output controls ensure the integrity of the output data from conclusion of computer processing to delivery to the user.
  • (13) Balancing and reconciliation: verifies that procedures to reconcile output to input are effective.
  • (14) Vital records and disaster recovery: disaster recovery is designed to provide for the continuity or rapid system restoration of a business process immediately following a natural or man-made emergency or disaster.
  • (15) Records management: verify that information is managed with sound business practices and controls.
  • (16) Reports: verify that reports are distributed properly.
  • (17) Local Area Network (LAN): Refer to ITCS 201, “Security Standards for Local Area Networks and Distributed Computing.”
  • (18) Country specifics: verifies that any questions particular to this specific country are completed.


Req/Cat is a requisition and catalog product designed, developed, and maintained by Enterprise for use in systems such as those developed in this stage 103.


SAP is an financial and accounting package which an enterprise or company may license for its own use and for its customers. SAP configurators that customize package programs to fit the needs of the client are provided for use during design and development stage 103. All other installations of SAP are “off the shelf”, with the client changing its internal structures to fit SAP requirements.


Transition management is the most overlooked part of any implementation process. It is critical to address the corporate culture and personality at the earliest contact. Strategic and tactical plans may then be developed that guide the implementation through “Go Live” and for an agreed period thereafter. The purpose of transition management steps of the design and development stage 103 is to provide guidance to the development team members as they work with the client to institute policy changes that might be introduced as part of the implementation of the new process and system. Necessary changes to the legacy system are identified and a plan developed to announce and introduce changes in policy. Policy change includes key business rules that are part of the management system for purchasing and procurement. They may be associated with approval levels or procedural changes in the new system. The target is not the day to day operation but management decision and support systems that might be affected. The areas addressed include:


Measurements (old and new)


Management system


Approval levels


Supplier contacts and contracts


Reward systems


Incentive Plans


Security


Employee and user changes


All of these areas require strategic and tactical planning that includes the following steps:

  • (1) Identify the current (legacy) system or process and compare it to the new process or system to be implemented to identify gaps.
  • (2) Develop specific recommendations for gaps between the legacy and the new system or process, identifying the level of sensitivity and whether or not action is required as part of the transition.
  • (3) Determine the announcement and transition (or, cut over) date for each action identified.
  • (4) Design a communications plan to build the message and media for communicating the changes to affected parties.
  • (5) Design a process transition plan to ensure the elements of change are integrated into the overall plan for the process.
  • (6) Determine how the policies must be modified according to new standards and procedures
  • (7) Determine what new policies and procedures will be implemented as part of the process and system.


Finally, integration of the above design and development stage 103 process steps along with the technical teams involved allow the delivery of a cross-functional solution under one unified and managed plan.


Project Deployment 104

Referring again to FIG. 3, project deployment phase 104 uses the Playbook to improve deployment of (1) quality, or application systems control and auditability (ASCA), (2) transition management, and (3) integrated project management systems and procedures.


1. Quality (ASCA)

A business controls team provides dedicated resources throughout the life cycle of the project. During the project development stage 103, this team has planned and executed an ASCA self-assessment that has covered an extensive list of technical, business, financial, and client issues. In this deployment stage 104, its members are responsible for managing an independent audit that will cover the same areas. The independent auditors then issue an acceptance position that is required before the client can “Go Live” with the new system and process. Deployment stage 104 activities include:

  • (1) Create the project plan for ASCA Review preparation activities.
  • (2) Determine which Enterprise organization will conduct the ASCA and business controls review.
  • (3) Prepare all ASCA documentation required for the review.
  • (4) Prepare all sub-process overviews and descriptions of process flow.
  • (5) Ensure the test plan includes those elements of the ASCA checks required to ensure business controls, separation of duties, and authorization matrices, data integrity and security.
  • (6) Create, update and complete all required documents of understanding (DOU's) & service level agreements (SLA's).
  • (7) Ensure the separation of duties matrix (SOD) is current at time of final review.
  • (8) Review all testing and obtain test approvals.
  • (9) Ensure all approvals have been obtained and signed approval forms available for ASCA Review. These include approvals for process ownership, ASCA requirements, self-assessment and system cutover.


2. Integrated Project Management

During this deployment stage 104, project manager 126 has the task to validate and confirm that all checklists and status are acceptable prior to Go-live. This includes the readiness of all aspects of the project, and once satisfied, a review is conducted and the customer's formal sign-off for Go-live is obtained. Status transition management and client readiness assessment and confirmation activities include verification that:

  • (1) No critical open issues exist in any area.
  • (2) All relevant aspects of readiness have been included in the status check.
  • (3) Network and computing performance testing is complete.
  • (4) System test is complete.
  • (5) User acceptance test is complete.
  • (6) System management production environment Go-live checklist is complete.
  • (7) Any needed CR's and PTR's have been generated.
  • (8) Production support is in place.
  • (9) Supplier readiness is reviewed and accepted.
  • (10) Service provider readiness is confirmed.
  • (11) Enterprise GP readiness is confirmed.
  • (12) Review of the compiled check information is completed.
  • (13) Customer sign-off on the Go-Live decision is obtained.


3. Transition Management

A transition management team prepares for the deployment, or “Go Live” of the client solution. During this deployment stage 104 in the project, virtually all technical problems are resolved and systems configured. The client is now ready to deploy and the human factors must be aggressively managed to assure a smooth transition from the legacy systems to the improved client solution. Transition management activities within deployment stage 104 ensure that organization, measurements, management, support, and labor relations functions are developed, explained, reviewed, understood, in place or on schedule, as appropriate.

  • (1) Organization: organizational changes for Go-Live, updated communications plans, feedback mechanism for persons displaced by changes in organization, and the new organization.
  • (2) Measurements: changes in measurement system, plan to cut over to the new measurements, and communications explaining the new measurements, including how they are derived, how they are used and their importance to the business.
  • (3) Management: changes in management or management responsibilities, communications explaining the changes in management structure, and why it is important to the clients' organization, the management chain and path for escalation of issues, normal business reports and their use.
  • (4) Support: support structure for both client and technical support.
  • (5) Labor Relations: activities associated with the loss of a job role, plan to notify the affected people, communication plan for providing information to remaining employees on the reasons for the changes and for fostering support for the new process.


Integration of the cross-functional teams to accomplish the deployment of the customer solution is facilitated by use of the system and data base structure of the preferred embodiment of the invention.


Ongoing Project Support 105

Referring further to FIG. 3, project support stage 105 enables project teams, all of which have continuing responsibilities with the client after “Go Live”, to provide the required ongoing support. As with all other stages, integration of the teams through the use of the systems and methods provided by the invention, including transition management systems and methods, is greatly facilitated. It is a characteristic of the preferred embodiment that each of these areas has specific predetermined plans, actions and responsibilities, and these are audited and tracked through a GP/AP development and deployment system.


During support stage 105, transition management 136 delivers an approved detailed questionnaire with quality questions in a logical format that allows end-users to express their opinion and provide information that meets the survey objective. Support stage 105 includes a plan for communicating the survey results to the participants and taking action in response to the survey results. This stage also incorporates a continuing education plan for training new employees as well as continually updating the material so that reflects the latest version of the application.


The survey in stage 105 is structured to determine the end users' perception of the new system, system ease of use, response time from both the system and CSC (Customer Service Center), and customer knowledge level of processes and product. Results of the survey are compiled and presented to the client and Enterprise Management Teams along with action plans, time tables, expected results for approval, and implementation. A Lessons Learned document is reviewed with the project team and appropriate adjustments made for future engagements.


Project Manager 126 provides a quality function task after “Go Live”. This task aims at checking the implementation of the EPS Offering to determine if anything needs special attention or focus. It is also the formal sign-off on the final delivery of the implementation by the customer. Its deliverables include:

  • (1) Customer accepts delivery of the EPS general procurement offering implementation and signs off.
  • (2) Action list on issues and CR/PTR's, if applicable.
  • (3) Formal transition of operational responsibility to operations 98 and support management 96.
  • (4) Preliminary business benefits evaluation.


The Req/Cat and SAP technical teams 128, 138 provide ongoing reviews and improvements to the client's process through the CR and PTR processes. These are formalized, documented processes with management controls to attain cost, schedule, and customer objectives.


As part of the new business process, support center 94 is established to provide long term assistance in any area of the application solution. This includes communication of feedback, real time application assistance, and special requests for problems concerning data.


It is the planned integration of these multi-functional teams that provides an innovative solution to the customer.


Representative Implementation of Ongoing Support Stage 105

Referring to FIG. 3E, a series of steps illustrating an exemplary selection of tasks in ongoing support stage 105 will be described.


While steps 230-244 represent a selection of key steps in stage 104, other summary and detail tasks designated in Table 4 as pertaining to stage 104 are typically included in the initial set of templates for this customer, and are also used as they are determined to be applicable. Some field entries are dynamic and changeable during the course of ongoing support stage 105. The templates are also editable for a particular project, and do not necessarily continue during use to conform to the original format.


In step 230, ongoing training, similar to that of step 214, is provided. Education material is supplied and maintained to the latest version of Req/Cat to the client. this is distributed using distance learning techniques.


In step 232, the data warehouse team accesses detail task template P633 in the course of developing additional reports. Task P633 is originally executed in stage 103, and is also applicable to on-going support stage 105. This task describes the steps necessary to complete in stage 103 the development required to support the Operational Reporting needs during on-going support stage 105. Template P633, Table 27, provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the data warehouse team.









TABLE 27





DETAIL TASK: DEVELOP ADDITIONAL REPORTS







CREATION STATUS








Category:
I/T


Team:
Data warehouse


Offering type:
Req/Cat, SAP, Req/Cat&SAP


Stage:
3. Design & Development







IMPORTANCE BUTTONS








Education:
No


Certification:
Yes


Auditable:
Yes


Critical path:
Yes







IMPLEMENTATION








Executed by:
Service provider


Performed by:
Customer, reporting analyst


Priority:
High


Work effort:
15 days


Sequence:
3 months prior







DETAIL TASK DETAILS







Description:


This task describes the steps necessary to complete development


required to support the Operational Reporting needs. This task


will use the CR's identified in the Analyze Operational Reporting


Requirements detail task from the Project Preparation stage.


Detail requirements will be realized and resolutions will be


researched, defined, documented and agreed on by the customer,


Operations team and the Reporting implementation team members.


Prerequisites:


Gaps must have been documented on a CR form(s) and initiated in


the Analyze Operational Reporting Requirements detail task in the


Project Preparation stage


Task steps:


1. Perform Required Development - Review the CR form, update the


form with additional development requirements (if required). For


the CR's assigned to the Reporting team, complete necessary


actions for development of these:


Develop Reports


Update Reporting Tree


Update Report List Document


2. Interlock with AD Team - For the CR's assigned to the SAP AD


team review requirements with team and discuss development


methods.


3. Interlock with Image Team - For the CR's assigned to the


Image AD team, review requirements with team and discuss


development methods.


4. Unit Test - All reports developed via CR must be unit tested


prior to transporting the code to the Test environment.


Unit test Reporting team development


 Document test results


 Obtain customer sign off on unit test


Participate in SAP AD team development


 Review documented test results


 Sign off on successful testing


Participate in Image AD team development


 Review documented test result


 Sign off on successful testing


5. Submit Transport - Once unit testing has been completed and


signed off, the code must be moved into the Test system for


formal System, User and Integration testing responsible for own


transports and coordinate any AD involvement).


Ensure all transports exist


Submit transport to target system


Verify transport successful


6. Support Testing Process - It is necessary to be available to


provide explanations of development or to answer questions


regarding any subsequent changes identified via a problem log


(PTR).


Obtain sign off from Test team


Ensure transport to Production system has been initiated


7. Update Reporting Document - Update all relevant documents.


Update the document with the changes and additions in fields,


values, reports, etc. (i.e. BPMGP)


Update the standard list/golden list of reports


8. Train Customer - If training is required for the operations


team on the additional reporting specifications the following


should be considered.


Update training material


Schedule training with Operations


Perform necessary training


9. Update Reporting Project Plan - The Reporting Team project


plan should be updated accordingly with new development work,


dates and detail required to complete this task.


Deliverables:


Development Documentation Supporting New/Changes to Reporting


Code


Updated CR Form


Unit Test Results


Transport Request to Test System


Test Team Sign Off


Updated Report Instruction Document (if required)


Reporting Team Project Plan


Methodology attachments:


The following document links contain the attachments necessary to


complete this task:


Sample Development Documentation Supporting New/Changes to


Reporting Code =>


Report Instruction Document =>


Sample DataMart Decision Point Matrix =>







PROJECT REFERENCE AREA







Comments & Dialog:


Step Checklist:


1. Perform required development - update CR form.


2. Interlock with SAP AD team - describe reporting


   requirements.


3. Unit test - document test results.


4. Submit transport to test system.


5. Support testing process - obtain sign off on successful


   test.


6. Update report instruction document.


7. Train operations team.


8. Develop reporting project plan.









In step 234, the Req/Cat team accesses detail task template P691, Table 28, in the course of providing ongoing Req/Cat support. After the Req/Cat system has Gone Live, the system is monitored any production problems that occurred solved. Template P691 provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the Req/Cat team through the task.









TABLE 28





DETAIL TASK: PERFORM ON-GOING SUPPORT ACTIVITIES


FOR REQ/CAT







CREATION STATUS










Category:
Req/Cat



Team:
Req/Cat



Offering type:
Req/Cat, SAP, Req/Cat&SAP



Stage:
5. Ongoing support







IMPORTANCE BUTTONS










Education:
Yes



Certification:
No



Auditable:
Yes



Critical path:
No







IMPLEMENTATION










Task order:
1



Executed by:
Service provider



Performed by:
Req/Cat Admin



Priority:
Medium



Sequence:
One day after







DETAIL TASK DETAILS









Description:



After the Req/Cat system has Gone Live, you will need to have



people allocated to monitor the System and solve any production



problems that occurred. Generally, the Global and Country



administrators will be responsible for the daily monitoring of



the Req/Cat table information and the feed of data through the



Req/Cat tables.



Prerequisites:



The Req/Cat system has Gone Live



The Post Production Support structure/process has been



implemented



Task steps:



Daily, the Country and Global administrators will need to monitor



the Req/Cat Production system to identify errors, analyze the



cause, and determine the resolution path. To monitor the system,



you will need to look in the systems logs and the bridge ID's e-



mail. There will be times when the CA or GA can fix the problems



themselves and other times when a CR or PTR will need to be



raised.



Refer to the attachment Req/Cat Production Support Procedures for



a complete description of the ongoing support procedures for



Req/cat.



Daily, the CA and GA will need to maintain the catalogs, HR



feeds, cost centers fields, and country table information.



Generally, the most errors will occur with the HR and Cost Center



feeds.



In additional the table monitoring tasks, the support people will



need to look at how the process are working and identify and



concerns or suggestions for improvements.



The CA and GA will also need to work closely with the Customer



Service Center (Help Desk) to answer questions they may have to



serve as the second point of contact for issues or questions that



are raised by callers. Obviously, the SCS/Help desk will



attempt to answer all questions first, but there will be problems



or questions where the will need assistance for resolution.



For the first few weeks after production cut over, there should



be daily support team meeting to identify major problems,



concerns, etc. The CA and GA should attends these meetings and



actively participate in the discussions and resolution process.



Any open issues or unresolved problems should be addressed to the



Production Support Leader and escalated if they are not solved



within a reasonable amount of time.



Deliverables:



A Req/Cat production support structure with defined procedures



and roles.



Methodology attachments:



Req/Cat Production Support Procedures ->










In step 236, the EDI team accesses detail task templates P694 (Table 29) and P697 (Table 30) in the course of supporting EDI transactions post go live. These tasks cover data management, help desk support procedures, report generation, and security. Templates P694 and P697 provide, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the EDI team through the steps of these tasks.









TABLE 29





DETAIL TASK: SUPPORT NEW EDI TRANSACTIONS POST GO


LIVE







CREATION STATUS








Category:
I/T


Team:
EDI


Offering type:
Req/Cat, SAP, Req/Cat&SAP


Stage:
5. Support







IMPORTANCE BUTTONS








Education:
Yes


Certification:
Yes


Auditable:
Yes


Critical path:
No







IMPLEMENTATION








Executed by:
Service provider


Performed by:
EDI specialist


Priority:
Medium


Work effort:
30 days


Sequence:
One month after







DETAIL TASK DETAILS







Description:


The customer may choose to add additional transactions once the


selected service offering has been implemented. The following


EDI transactions are standard and are most often added after the


customer goes live to meet additional requirements:


840 - RFQ


843 - Response to 840


832 - Price/Sales Catalog


856 - Ship Notice/Manifest


For non-standard transactions the same steps should be followed,


however a CR will need to be created, bid and approved through


the CR Process Flow before the additional work can be done.


Prerequisites:


Customer must be using EDI in a production environment for the


selected service offering.


Task steps:


1. Confirm customers current EDI Infrastructure - Review the


project documentation that specifies EDI infrastructure for


customer


2. Define New Requirements - Meet with the customer to define


new requirements and transaction needed for the Production


environment, compare requirements to Golden IDOC for transaction


Analyze customer requirements


 Transactions


 IDOC's


 Data Fields


  Required


  Optional


3. Create Trading Partner Transaction Map - For each ANSI X.12


transaction selected, independent of how many trading partners


exist


4. Interlock with Req/Cat and SAP units of measure - To ensure


integrity of order of data


ANSI standards


5. Interlock with Trading Partners - Communicate all customer


specific requirements for new transaction to trading partners


Define Media


 Letter


 Meeting/Forum


 Web Page


Convey business strategy for new transaction


6. Identify Trading Partner Issues - All issues from the


interlock with trading partners must be documented and presented


to the customer for a decision


7. Unit Test - Once system communication has been established


follow the test check list to complete the unit test


Verify Mapping


Test JCL


Add to Job Stream


Document Test Results


8. Move To Production Environment - Once all testing has been


completed successfully and customer sign off has been obtained


schedule move into Production, follow EDI Go Live Check List


Deliverables:


New Requirements for EDI Transactions documented


Communication to Trading Partners regarding new transaction


requirements


Trading Partner Transaction Map


Unit Test Results


New Transaction(s) Moved to Production Systems


Methodology attachments:


The following document links include all necessary attachments to


complete this task:


Web Page Link =>


EDI Checklist =>


EDI TP Package =>







PROJECT REFERENCE AREA







Comments & Dialog:


Step Completion Tracking Checklist:


1. Confirm customers current EDI infrastructure.


2. Define new requirements.


3. Create trading partner transaction map.


4. Interlock with Req/Cat and SAP units of measure.


5. Interlock with trading partners.


6. Identify trading partner issues.


7. Unit test.
















TABLE 30





DETAIL TASK: EXECUTE EDI SUPPORT PROCEDURES







CREATION STATUS










Category:
I/T



Team:
System Management



Offering type:
Req/Cat, SAP, Req/Cat&SAP



Stage:
5. Support







IMPORTANCE BUTTONS










Education:
Yes



Certification:
Yes



Auditable:
Yes



Critical path:
No







IMPLEMENTATION










Executed by:
Service provider



Performed by:
EDI specialist



Priority:
Medium



Sequence:
Ongoing support







DETAIL TASK DETAILS









Description:



This task provides the steps, attachments and desk procedures



required to support the EDI process in a Production environment.



Task steps:



1. Maintain and Follow EDI Setup Procedures (GP):



Inbound



Outbound



Test



CPS North Production



CPS Test



2. Maintain and Follow Web EDI Setup:



Analysis:



Deliverables:



EDI Support Maintenance Desk Procedures



Methodology attachments:



The following doclink will provide the attachments necessary to



complete this task =>



EDI Setup Procedures:



Inbound



Outbound



Test



CPS North Production



CPS Test



Web EDI Setup:







PROJECT REFERENCE AREA









Step Checklist:



Use the following table to track the completion of each step:



1. Maintain/follow EDI setup procedures.



2. Maintain/follow EDI web setup procedures.



Approval status:



Edit history:










In step 238, service delivery center (SDC) ongoing support, help desk functions that are supplied to the client through time. This covers problem reporting, new requests for reports, education questions, and so forth.


In step 240, the transition management team accesses detail task template PD54, Table 31, in the course of insuring that the human resources aspects of the transition plan are in place and in progress. Specifically, this step deals with organizational impacts, changes in roles and responsibilities, labor relations, bonuses and incentives, meetings, feedback and comments. During this step, the auditors check to see the plan is being executed properly. Template PD54 provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the transition management team through the steps of this task during deployment and ongoing support stages 104 and 105.









TABLE 31





DETAIL TASK: MANAGE HUMAN RESOURCES ACTIVITIES







CREATION STATUS










Category:
Transition Management



Team:
Transition Management



Offering type:
Req/Cat, SAP, Req/Cat&SAP



Stage:
4. Deploy







IMPORTANCE BUTTONS










Education:
Yes



Certification:
Yes



Auditable:
Yes



Critical path:
No







IMPLEMENTATION










Executed by:
Service provider



Performed by:
Transition manager







DETAIL TASK DETAILS









Description:



This step specifically focuses on the Human Resources aspects of



the transition and is intended to insure the elements of the



transition plan that focus on this area are in place and in



progress. During this detail task, you will be assessing and



ensuring the steps in the plan are being implemented and the



transition is moving forward from an HR perspective.



Specifically, this step will deal with the following areas.



Organizational impacts



Changes in roles and responsibilities



Labor relations



Bonuses/Incentives



Meetings/Feedback/Comments



Earlier the client was assessed as to the impact of the



transition on these areas. A plan was developed to respond to



the issues related to HR and built in the transition plan.



During this step, you will check to see the plan is being



executed



While it is the responsibility of the Transition Management



coordinator at the Enterprise/Service Provider project to



ensure these tasks are completed, the client HR department must



play a strong role to ensure the actions required of the client



are carried out



In general, issues and concerns identified will be handled with



the right communications and training for those affected.



However, there may be cases where actions need to be taken that



is specific to a particular problem. This is particularly true



where jobs are either eliminated or added.



Prerequisites:



Ensure a clear understanding of the client various HR worksheets



and the analysis of the sheets as part of the development of the



transition plan.



Go-live is completed and the system/process has been



successfully implemented.



Deliverables:



Updated input to the client Transition Management Plan, only as



needed.



Any required announcement material



Customized Presentations for Meetings



Methodology attachments:



Organization Announcement Presentation ->







PROJECT REFERENCE AREA









Step Status Checklist:



Step Status



1. Ensure steps are in progress to move toward



any changes in organization that are part of the



transition.



2. Ensure any changes in organizational



communications or relationships are in progress.



3. Ensure changes in individual job roles and



responsibilities for managers/administration/



process end users



4. Ensure activities associated with the loss



of a job role are in place



For any activities directly related to labor



unions see next step document



5. Make sure the new measurements (if any) are



in place and understood by those affected by the



change. Ensure the transition to the new



measurement system is on tract and any



measurement that will affect peoples performance



evaluation are understood and working properly.



Ensure normal business reporting is working and



those receiving the reports understand each



report AND what they should be doing with each



report. Ensure the transition to the new



measurement system is on track and any reports



or measurements that will affect employee bonus



plans are understood and working properly.



6. Review the transition management plan for



all elements associated with HR and HR impacts



and ensure they are on track for completion by



general cut over date.



7. Ensure the action plans identified are



provided as input and are included as an



attachment that updates the final Transition



Management Plan for the client.



8. Ensure user meetings are scheduled. Review



initial communications plan to ensure that no



changes are necessary to the base plan. After



the meetings, provide a mechanism for feedback



and comments.



Approval status:



Edit history:










In step 242, the transition management team accesses detail task template PD81 in the course of distributing and analyzing a survey questionnaire and preparing action plans for implementation by management. Template PD81 provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the transition management team through the steps of the task.


In step 244, the project office team accesses summary task P9C and its subsidiary tasks in the course of providing post implementation QA review. Template P9C provides, either directly or by way of links to other documents, instructions, flow charts, sample questionnaires, report models and checklists for guiding, coordinating and documenting the work of the project office team through the steps of the task.


ADVANTAGES OVER THE PRIOR ART

It is an advantage of the invention that there is provided a system and method for evaluating a client's general procurement and accounts payable (GP/AP) system.


It is an advantage of the invention that there is provided an optimized solution for out-sourcing procurement of goods and services.


It is an advantage of the invention that there is provided a system and method for training service providers.


It is an advantage of the invention that there is provided a system and method for managing service providers to assure quality of service.


It is an advantage of the invention that there is provided a system and method for managing a project.


It is an advantage of the invention that there is provided an optimized general procurement and accounts payable system characterized by lower costs, a paperless process, and more comprehensive service with a shorter cycle time.


ALTERNATIVE EMBODIMENTS

It will be appreciated that, although specific embodiments of the invention have been described herein for purposes of illustration, various modifications may be made without departing from the spirit and scope of the invention. In particular, it is within the scope of the invention to provide a computer program product or program element, or a program storage or memory device such as a solid or fluid transmission medium, magnetic or optical wire, tape or disc, or the like, for storing signals readable by a machine, for controlling the operation of a computer according to the method of the invention and/or to structure its components in accordance with the system of the invention.


Further, each step of the method may be executed on any general computer, such as an IBM System 390, AS/400, PC or the like and pursuant to one or more, or a part of one or more, program elements, modules or objects generated from any programming language, such as C++, Java, Pl/1, Fortran or the like. And still further, each said step, or a file or object or the like implementing each said step, may be executed by special purpose hardware or a circuit module designed for that purpose.


Accordingly, the scope of protection of this invention is limited only by the following claims and their equivalents.

Claims
  • 1-28. (canceled)
  • 29. A program storage device readable by a machine, tangibly embodying a program of instructions executable by a machine to perform a method using an on-line data gathering tool for evaluating and on-going supporting a customer's general procurement and accounts payable system, said method comprising: maintaining a playbook database, said playbook database comprising a plurality of templates of information relating to said evaluating a general procurement and accounts payable system, said plurality of templates being particularized for said client;displaying a playbook summary view, said playbook summary view comprising a folders and views section, a task title display and selection area, a summary task creation button, and a detailed task creation button, said folders and views section including category buttons that, when selected, cause execution of tasks associated with said evaluating and on-going supporting said general procurement and accounts payable system for said client, said tasks including gathering data describing requirements of said customer for procurement and data describing currently used tools and processes for satisfying said requirements; andgathering data from said customer which describes a cost for future years of continuing with said currently used tools and processes;designing and deploying a new system including alternative tools and processes satisfying said requirements; and thereafterauditing the operation of said new system using said on-line data gathering tool to provide performance data to said customer;said task title display and selection area adapted to include buttons for selecting tasks pertinent to said categories of tasks,said buttons for selecting tasks identifying said tasks which may be so selected,said buttons for selecting tasks adapted to be displayed in said task title display and selection area in response to a selection of a button of the category buttons;displaying a summary task template of said plurality of templates for a selected first task of tasks identified in said task title display and selection area, said summary task template being displayed in response to a selection of said summary task creation button, said summary task template including summary parameters of said selected first task; anddisplaying a detailed task template of said plurality of templates for a selected second task of tasks identified in said task title display and selection area, said detailed task template being displayed in response to a selection of said detailed task creation button, said detailed task template including detailed parameters of said selected second task.
  • 30-32. (canceled)
  • 33. A program storage device readable by a machine, tangibly embodying a program of instructions executable by a machine to perform a method using an on-line data gathering tool by third party service providers for evaluating and on-going supporting a customer's general procurement and accounts payable system and for adapting a general procurement and accounts payable application to the requirements of each of many potential clients operable and for an enterprise to monitor the quality of services provided by said third party service providers, said method comprising: said enterprise maintaining a playbook database, said playbook database comprising a plurality of templates of information relating to said evaluating a general procurement and accounts payable system, said plurality of templates being particularized for said client by said third party service provider;displaying to said third party service provider a playbook summary view, said playbook summary view comprising a folders and views section, a task title display and selection area, a summary task creation button, and a detailed task creation button, said folders and views section including category buttons that, when selected, cause execution of tasks associated with said evaluating and on-going supporting said general procurement and accounts payable system for said client, said tasks including gathering data describing requirements of said customer for procurement and data describing currently used tools and processes for satisfying said requirements;gathering data from said customer which describes a cost for future years of continuing with said currently used tools and processes;designing and deploying a new system including alternative tools and processes satisfying said requirements; and thereafterauditing the operation of said new system using said on-line data gathering tool to provide performance data to said customer and to said enterprise;said task title display and selection area adapted to include buttons for selecting tasks pertinent to said categories of tasks,said buttons for selecting tasks identifying said tasks which may be so selected,said buttons for selecting tasks adapted to be displayed in said task title display and selection area in response to a selection of a button of the category buttons;displaying a summary task template of said plurality of templates for a selected first task of tasks identified in said task title display and selection area, said summary task template being displayed in response to a selection of said summary task creation button, said summary task template including summary parameters of said selected first task; anddisplaying a detailed task template of said plurality of templates for a selected second task of tasks identified in said task title display and selection area, said detailed task template being displayed in response to a selection of said detailed task creation button, said detailed task template including detailed parameters of said selected second task.
  • 34-36. (canceled)
CROSS REFERENCES TO RELATED APPLICATIONS

This application is a continuation of Ser. No. 11/496,698, filed 31 Jul. 2006, which is a divisional of U.S. patent application Ser. No. 10/727,443, filed 3 Dec. 2003, which is a divisional of U.S. patent application Ser. No. 09/444,256 filed 22 Nov. 1999, all by R. F. Barnard, et al. for System and Method for Ongoing Supporting a Procurement and Accounts Payable System. U.S. patent application Ser. Nos. 09/444,257, entitled “System and Method for Assessing a Procurement and Accounts Payable System”, 09/444,254, entitled “System and Method for Project Preparing a Procurement and Accounts Payable Process”, 09/444,255, entitled “System and Method for Project Designing and Developing a Procurement and Accounts Payable Process”, and 09/444,253, entitled “System and Method for Deploying a Procurement and Accounts Payable Process” filed concurrently herewith, are assigned to the same assignee hereof and contain subject matter related, in certain respect, to the subject matter of the present application. The above-identified patent applications are incorporated herein by reference.

Divisions (2)
Number Date Country
Parent 10727443 Dec 2003 US
Child 11496698 US
Parent 09444256 Nov 1999 US
Child 10727443 US
Continuations (1)
Number Date Country
Parent 11496698 Jul 2006 US
Child 12077042 US