Claims
- 1. A method for optimizing resource plans across multiple networks, the multiple-networks including manufacturing, distribution, and supplier networks, the method comprising:
creating planning data, planning data containing information regarding constrained resources; creating planning rules based on user-defined strategies; generating a plan based on the planning data and the planning rules, wherein the plan optimally allocates the constrained resources according to the user-defined strategies; and revising the plan in real-time.
- 2. The method of claim 1, further comprising:
publishing the plan; and implementing the plan by issuing commands in the multiple networks.
- 3. The method of claim 2, wherein the commands include sell, purchase, make, and move commands.
- 4. The method of claim 2, wherein the publishing step further comprises:
issuing one or more alerts.
- 5. The method of claim 1, wherein the constrained resources include materials, capacities, inventories, transportation resources, and distribution resources.
- 6. The method of claim 1, wherein the revising step takes into account user inputs and real-time events including production breakdowns, distribution delays, and material shortages occurring within the multiple networks.
- 7. The method of claim 1, wherein the revising step further comprises:
comparing the plan with past plans; measuring plan quality; viewing performance issue details; analyzing causes of performance problems; and resolving exceptions and action messages.
- 8. The method of claim 7, wherein the performance issue details include delivery performance, inventory performance, resource performance, and cash-flow performance.
- 9. The method of claim 7, wherein the causes of performance problems include delivery causes, inventory cases, resource causes, and cash-flow causes.
- 10. The method of claim 1, wherein the revising step further comprises:
validating the plan; and repairing the plan.
- 11. The method of claim 1, wherein the generating step also considers one or more aggregate stock keeping units.
- 12. The method of claim 1, wherein the generating step uses one or more loading strategies.
- 13. The method of claim 12, wherein the one or more loading strategies include sequential loading, parallel loading, variable lead-time calculation, and just-in-time loading.
- 14. The method of claim 1, wherein the generating step considers one or more ship-complete orders.
- 15. The method of claim 1, wherein the generating step further comprises:
minimizing an excess, including an inventory excess and a supply excess.
- 16. The method of claim 1, wherein the information regarding constrained resources includes static factors and dynamic factors.
- 17. The method of claim 16, wherein the static factors include locations, items, stock keeping unites, resources, lanes, processes, bill of materials, and bill of routing.
- 18. The method of claim 16, wherein the dynamic factors include shipping calendars, receiving calendars, effectivity calendars, manufacturing availability calendars, and constraint settings.
- 19. A system for optimizing resource plans across multiple networks, the multiple-networks including manufacturing, distribution, and supplier networks, the system comprising:
means for creating planning data, planning data containing information regarding constrained resources; means for creating planning rules based on user-defined strategies; means for generating a plan based on the planning data and the planning rules, wherein the plan optimally allocates the constrained resources according to the user-defined strategies; and means for revising the plan in real-time.
- 20. A computer program product comprising a computer useable medium having computer readable code embodied therein for optimizing resource plans across multiple networks, the multiple networks including manufacturing, distribution, and supplier networks, the computer program product adapted when run on a computer to effect steps including:
creating planning data, planning data containing information regarding constrained resources; creating planning rules based on user-defined strategies; generating a plan based on the planning data and the planning rules, wherein the plan optimally allocates the constrained resources according to the user-defined strategies; and revising the plan in real-time.
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims benefit of U.S. Provisional Application No. 60/243,426 entitled SYSTEM AND METHOD FOR OPTIMIZING RESOURCE PLANS, filed Oct. 27, 2000, which is hereby incorporated by reference.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60243426 |
Oct 2000 |
US |