The present disclosure relates generally to energy management, and more specifically to power load shedding management associated with a demand response program.
Demand response programs are programs designed to balance the demand of energy, such as electricity provided by a power provider, with available power supply. These programs attempt to incentivize consumers of electricity to shift their usage to more favorable time periods, which are often off-peak times where average power usage is lower than peak periods. Enrollment in such demand response programs may require a consumer to commit to a program operator, such as an aggregator or a utility provider, to shed a predetermined amount of power consumption, otherwise being used, when a power shedding event is called upon. Commitment to such curtailment is required at the enrollment stage. Inability to comply to a power shedding commitment may result in loss of the demand response revenue for the year, agreed upon penalties, and fines. In some cases the consumer may risk the loss of the entire demand response contract. This creates a difficulty in the sales process for such programs, as the consumer would like to have a high-level of confidence in their ability to commit to a certain amount of load reduction.
As consumers very often do not possess complete relevant data, and the commitment to such programs is done solely on the basis of prior utility bills and load speculations, commitment is typically much lower than what could successfully be committed to. Therefore, both the consumer and the aggregator lose out, as they are unable to realize full potential revenues. Moreover, the lack of data also complicates the process of planning what should be the optimal response in the case a power load shedding event is called for in terms of which loads should be turned off. Understandably, a consumer wishes to have the freedom to curtail loads which will on the one hand provide sufficient power to meet the commitment, and on the other hand maintain an as normal as possible operation of their business. These desires may include, but are not limited to, maintaining, in a landlord context, tenants' comfort when the curtailed load is taken from a heat, ventilation, and air-conditioning (HVAC) system and keeping, in a manufacturer context, production running at sufficient pace when the curtailed load is taken from machines of a production line.
There is currently no solution to easily enable consumers to increase their confidence when enrolling in such a demand response program, allowing commitment to the maximum curtailable load, as well as enabling planning a response to a power load shedding event in a way that allows the flexibility of meeting the commitment without negatively affecting the normal course of business. Current methods require intensive manual involvement in deciding what demand response plan may be used and tends to determine power load shedding either arbitrarily, risking not meeting the requirements of the demand response program, or not taking full advantage of the program by committing to lower power shedding levels than can be safely undertaken.
It would therefore be advantageous to provide a comprehensive solution, preferably automated, to overcome the challenges noted above.
A summary of several example embodiments of the disclosure follows. This summary is provided for the convenience of the reader to provide a basic understanding of such embodiments and does not wholly define the breadth of the disclosure. This summary is not an extensive overview of all contemplated embodiments, and is intended to neither identify key or critical elements of all embodiments nor to delineate the scope of any or all aspects. Its sole purpose is to present some concepts of one or more embodiments in a simplified form as a prelude to the more detailed description that is presented later. For convenience, the term “certain embodiments” may be used herein to refer to a single embodiment or multiple embodiments of the disclosure.
Certain embodiments disclosed herein include a method for power load shedding assessment associated with a demand response program, including: setting a power load shedding target; analyzing data related to power consumption of a system; determining a configuration of a plurality of virtual switches associated with a corresponding plurality of physical switches, where each of the plurality of physical switches is configured to control power consumption of at least one load of a plurality of loads of the system; simulating a power load shedding event based on the setup of a plurality of virtual switches and the analyzed data related to power consumption; and adjusting the configuration of the virtual switches when results of the simulating of a power load shedding event are not consistent with the power load shedding target.
Certain embodiments disclosed herein also include a system for assessment of power load shedding associated with a demand response program, the system including: a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: set a power load shedding target; analyze data related to power consumption of a system; determine a configuration of a plurality of virtual switches associated with a corresponding plurality of physical switches, where each of the plurality of physical switches is configured to control power consumption of at least one load of a plurality of loads of the system; simulate a power load shedding event based on the setup of a plurality of virtual switches and the analyzed data related to power consumption; and adjust the configuration of the virtual switches when results of the simulating of a power load shedding event are not consistent with the power load shedding target.
Certain embodiments disclosed herein also include a system for assessment of power load shedding associated with a demand response program, the system including: at least one power sensor configured to determine power consumption; a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: set a power load shedding target; analyze data related to power consumption of a system; determine a configuration of a plurality of virtual switches associated with a corresponding plurality of physical switches, where each of the plurality of physical switches is configured to control power consumption of at least one load of a plurality of loads of the system; simulate a power load shedding event based on the setup of a plurality of virtual switches and the analyzed data related to power consumption; and adjust the configuration of the virtual switches when results of the simulating of a power load shedding event are not consistent with the power load shedding target.
The subject matter disclosed herein is particularly pointed out and distinctly claimed in the claims at the conclusion of the specification. The foregoing and other objects, features, and advantages of the disclosed embodiments will be apparent from the following detailed description taken in conjunction with the accompanying drawings.
It is important to note that the embodiments disclosed herein are only examples of the many advantageous uses of the innovative teachings herein. In general, statements made in the specification of the present application do not necessarily limit any of the various claimed embodiments. Moreover, some statements may apply to some inventive features but not to others. In general, unless otherwise indicated, singular elements may be in plural and vice versa with no loss of generality. In the drawings, like numerals refer to like parts through several views.
The various disclosed embodiments include a method and system for power load shedding in the context of a demand response program. The system includes a plurality of power sensors that sense power consumed by a plurality of power consumers. Information from the power sensors is gathered and collected, providing data for the behavior of power consumption over determined periods of time. The total power consumption by the consumers is measured, and may be displayed, along with a plurality of virtual switches corresponding to each of the power sensors, where each switch includes an ‘on’ position, ‘off’ position, and various positions therebetween to allow for adjustment of the amount of power drawn by a particular load circuit. A target load shedding amount is set and the system performs, for example by machine learning, a process of switch control to simulate temporal power consumption that may meet the desired load shedding figure and determine a commitment level. The position of one or more plans for a load shedding amount may be used for actual load shedding when necessary by invoking physical switches associated with the plurality of power consumers.
Without limiting the scope of the present disclosure, it is noted that the system described herein is applicable to any demand management program operated by a program operator, whether the operator is a utility, a regulatory body, an aggregator, a grid operator or self-managed by the company itself. It is further noted that the term and definition of ‘demand response’ may vary in different regions and geographies and therefore it should be clarified that the system described herein is applicable to any demand management program operated by any demand management program operator designed to shed loads in order to reduce peak demand for electrical power, generate revenues or save costs. All such programs shall be referred to herein as ‘demand response’ programs.
Each power sensor 160 senses the power provided to one or more power consuming loads. For example, power sensor 160-1 measures the power consumption by loads 175-1 through 175-J, where J is equal to or greater than 1, while power sensor 160-N measures the power consumption by loads 195-1 through 195-K where K is equal to or greater than 1. A power sensor 167 may also be connected to the main power line 165 in order to measure the total power consumed from the grid. In another embodiment, the total power consumed from the grid can be calculated as an aggregate of all the sensor data measuring individual loads, assuming all loads are measured.
In yet another embodiment, the main power or any of the individual loads' power can be measured by a utility meter and provided to the system via a data logger or bridge associated with the above utility meter using, for example but not by way of limitation, a physical connection to the utility meter or another physical connection such as Modbus® (trademark of Schneider Electric USA, Inc,) serial communication protocol. Other types of meters or sensors may also be used. Measuring the mains' power is used to compare the actual total consumption with the demand response program target. In some embodiments, the main power data is collected directly from the utility server 150 or via utility bills.
Each load may be further connected to a switch, for example, load 175-1 may be connected to switch 170-1 while load 195-1 may be connected to switch 190-1. While the switches 170 and 190 are shown as ON/OFF switches in
The SC 125 is communicatively connected to a network 110 through which the SC 125 is controlled. The network 110 may be a local area network (LAN), a wide area network (WAN), a metro area network (MAN), the Internet, the worldwide web (WWW), and any other suitable network, as well as any combination thereof. The network itself may be wireless, wired, or a combination of both. The network 110 is further connected to a database 140 configured to store measurements sampled by the power sensors 160, where each sample provides information related to power consumed and the time of such consumption.
A plurality of readings over time may provide data of the usage of power by the loads over a period of time, as well as the behavior when a particular load is operative or not. Such data may be used during a simulation phase to determine one or more optimal demand response plans based on various constraints. The network 110 is further connected to a utility server 150 that contains information regarding demand response programs that may be applicable and/or available. This information may be accessed for the purpose of determining the benefits that a utility company may provide as a result of adhering to a particular demand response plan. In an embodiment, the utility server may be accessed over the Internet.
For the purpose of receiving information from the plurality of power sensors 160, a receiver 120 is further connected to the network 110. The receiver 120, equipped with one or more antennas 122, is adapted to receive signals from each of the power sensors 160, the signals containing information regarding the power measurements made by each such power sensor 160 as well as the time when such a sample took place. One or more receivers 120 can be used in tandem. In an embodiment, the receiver is a wireless receiver, operating over radio waves. While the receiver 120 herein is described only as a receiver, in further embodiment, the receiver 120 may be replaced by a transceiver (not shown) that may both receive and transmit signals from and to the power sensors 160. Such a transceiver may enable the control of the power sensors 160, for example, but not by way of limitation, for synchronization, calibration, and other purposes.
The network 110 is further connected to a processor 130 that may be further connected directly or indirectly to a display 136. The processor 130 may further include a central processor (CPU) 132 communicatively connected to a memory 134, where the memory 134 may contain instructions to be executed by the CPU 132. In one embodiment the instructions, when executed by the CPU 132, configure the processor 130 to operate as a learning machine, as further explained herein. In one embodiment the receiver 120 may be an integrated within the processor 130. In one embodiment, the receiver 120 further includes a wired interface (such as pulse input or a Modbus®) to receive data from the sensors 160, and particularly, but not limited to, a utility meter that is measuring the power from the main powerline.
During the collection phase of the operation of system 100, data from the plurality of power sensors 160 are received by the receiver 120. This includes, e.g., power samples and timing information, and may be sent to the processor 130 according to one or more programs stored in the memory 134. Accordingly, calculation of power consumption may be made and then stored in, e.g., the database 140. Upon accumulation of sufficient data, such information may be graphically displayed on the display 136.
A calculation is performed on the historical consumption of the site stored, for example, in database 140. As an example calculation, an average of the power consumption in the last four highest similar days, e.g., weekdays, weekends, holidays, may be used. Based on the consumption curve 210 and specific rules set by each demand response program provided, for example by the utility server 150 of
Once sufficient data has been received, a simulation of one or more potential situations for power shedding may be simulated by the processor 130. Every switch, e.g., switches 170 and 190 of
In
A particular plan is shown in
Reference is now made to
At S410, a preliminary target demand response plan is set, where the target includes a power load shedding target. The preliminary target may be: a) manually set by the user of the system, based upon some availability of demand response load program by a program operator; b) provided as a target by an entity other than the user that provides such targets, for example but not by way of limitation, a regulator, a utility provider, and the like, by means of data available on the utility server 150; or, c) by machine learning performed, for example but not by way of limitation, by the processor 130 of
At S420, data of samples stored, for example in database 140, of measurements of power consumption that are relevant to the received target demand response plan is collected for the purpose of generating the power consumption over a predefined period of time, for example 24 hours, as shown in the screenshot of
At S430, a previously undetermined desired setup of virtual switches is determined. This may be done in various methods, including: a) manually by using a user interface on the display 136 showing the switches and sliding them, or setting them, to a desired setting, ON, OFF or any possible value in between if such possibility exists; b) automatically by applying various algorithms and/or machine learning and/or previous knowledge stored in the database 140; or, c) any combination between a manual and automatic setup, i.e., having a user setup some of the virtual switches and let the rest be setup by the machine.
At S440, the power consumption for the desired period of time may be calculated for the particular virtual switches setup. In one embodiment this may be displayed on the display 136. In an embodiment, a simulation of a power load shedding event is executed, based on the configuration of the virtual switches and the power consumption data.
At S450, it is checked whether the results are consistent with the demand response load shedding target and if so, execution continues with S460; otherwise, if the results are not consistent with the target, execution continues with S470.
At S460, it is reported that a desired setup for the virtual switches has been found that meets the target load shedding figure, and that the power load shedding plan is stored, for example in database 140, for the purpose of future activation, and as further discussed with respect of
At S470, it is checked if it is desirable to check another possible virtual switch setup, as it may be possible to find another set up that will meet the demand response load shedding target, and if so execution continues with S430; otherwise, execution continues with S480. Thus, at S470, the configuration of the virtual switches is adjusted to optimize power consumption within the power load shedding target.
At S480, it is checked whether another demand response load shedding target can be obtained, as it is possible that the user may be able to commit to shedding additional load, and if so execution continues with S410; otherwise, execution terminates.
At S510, the system, for example system 100, receives a notice that a particular demand response plan is to be activated. This is often referred to as a demand response event. The signal can be received from the utility server 150. The notice can be given ahead of time or in real time, depending on the type of program.
At S520, the switch setup for that particular demand response plan is retrieved, for example from database 140. At S530, it is checked if the plan may be activated and if so execution continues with S550; otherwise, execution continues with S540. At S540, it is checked whether the system should retry and if so execution continues with S530; otherwise, execution may continue with a notification at S545 to the program operator that the power load shedding request has been denied after which execution terminates. Such denial may have consequences on the power consumer that may result in losing the demand response revenue, fines or higher utility costs and therefore embodiments where additional checks and authorization for not meeting the demand response target during such an event may be added without departing from the scope of the present disclosure. Data is collected during the event and saved for settlement purposes after the event.
At S550, the plan is activated by setting the physical switches, for example switches 170 and 190 of system 100, to their planned position. At S560, it is checked whether a notice to deactivate the demand response event has been received and if so execution continues with S570; in a typical embodiment deactivation of an event is pre-determined by setting an event to a particular length of time, e.g., two hours, and thereafter the event automatically ends; otherwise, execution continues with S560.
At S570, the demand response plan is deactivated. For example, the physical switches, e.g., switches 170 and 190 of system 100, are returned to their position prior to the change. In one embodiment of the present disclosure a recovery setup plan may be also used before resuming normal operation and should be viewed to be within the scope of the present disclosure.
The various embodiments disclosed herein can be implemented as hardware, firmware, software, or any combination thereof. Moreover, the software is preferably implemented as an application program tangibly embodied on a program storage unit or computer readable medium consisting of parts, or of certain devices and/or a combination of devices. The application program may be uploaded to, and executed by, a machine comprising any suitable architecture. Preferably, the machine is implemented on a computer platform having hardware such as one or more central processors (“CPUs”), a memory, and input/output interfaces. The computer platform may also include an operating system and microinstruction code. The various processes and functions described herein may be either part of the microinstruction code or part of the application program, or any combination thereof, which may be executed by a CPU, whether or not such a computer or processor is explicitly shown. In addition, various other peripheral units may be connected to the computer platform such as an additional data storage unit and a printing unit. Furthermore, a non-transitory computer readable medium is any computer readable medium except for a transitory propagating signal.
As used herein, the phrase “at least one of” followed by a listing of items means that any of the listed items can be utilized individually, or any combination of two or more of the listed items can be utilized. For example, if a system is described as including “at least one of A, B, and C,” the system can include A alone; B alone; C alone; A and B in combination; B and C in combination; A and C in combination; or A, B, and C in combination.
All examples and conditional language recited herein are intended for pedagogical purposes to aid the reader in understanding the principles of the disclosed embodiment and the concepts contributed by the inventor to furthering the art, and are to be construed as being without limitation to such specifically recited examples and conditions. Moreover, all statements herein reciting principles, aspects, and embodiments of the disclosed embodiments, as well as specific examples thereof, are intended to encompass both structural and functional equivalents thereof. Additionally, it is intended that such equivalents include both currently known equivalents as well as equivalents developed in the future, i.e., any elements developed that perform the same function, regardless of structure.
This application claims the benefit of U.S. Provisional Application No. 62/569,510 filed on Oct. 7, 2017, the contents of which are hereby incorporated by reference.