Endrenyi et al., “Probalistic evaluation of the effect of maintenance on reliability—an Application”, IEEE 1997.* |
Butler, “An expert system based framework for an incipient failure detection and predictive maintenance system”, IEEE 1996.* |
Okogbaa et al., “Time series intervention analysis for Preventive/Predictive maintenance management of multiunit systems”, IEEE 1998.* |
Yong Hwan Kim, “A Forecasting Methodology for Maintenance Cost of Long-Life Equipment”, A Dissertation, Tuscaloosa, AL, 1989, p. 1-221. |
Steve Vestal, “On the Accuracy of Predicting Rate Monotonic Scheduling Performance”, 1990 ACM 0-897-409-0/90/1200, pp. 244-253. |
Robb Newman, “Performance Analysis Case Study: Application of Experimental Design & Statistical Data Analysis Techniques”, 1991 ACM 089791-392-2/91/005/0214, pp. 214-215. |
R. Gatland, et al “Solving Engine Maintenance Capacity Problems With Simulation”, Proceedings of the 1997 Winter Simulation Conference, pp. 892-899. |
Aerospace Engineering/Dec. 1997, “Changes in Engine Maintenance Management”, pp. 7-9. |
Aircraft Technology Engineering & Maintenance Engine Yearbook 1996-1997,“Forecasting Engine Removals And Shop Visits”, pp 74-77. |
M. Kaminsky, et al, “A Monte Carlo Approach to Warranty Repair Predictions”, Reliability, Maintainability, Supportability & Logistics, Dallas, TX, 1997, pp. 1-5. |