The present invention relates to an apparatus and method for intercepting and monitoring a satellite communication system.
There follows a brief description of the operation of a prior art network system 8 (that includes satellite 12) with reference to the schematic illustration of
Thus, the prior art network system 8 transmits and receives messages to and from the mobile devices (MES) 36 through e.g. the L-band link that includes spot-beams 32 and 34 that have been chosen by said mobile 36.
The downlink L-band link communication transmitted through the L band spot beam originates in most cases from the primary gateway station PGW 10 through C-band link 14 to the satellite 12, and then from the satellite 12 over a specific local spot beam 34 to the mobile 36.
The uplink communication of the MES 36 are transmitted to the satellite 12 over a specific local L-hand spot beam 32 and then, from the satellite 12 to the primary gateway (PGW) 10 via a wideband C-band link 16.
When a telephone 28 initiates a call to a MES 36, or being called by an MES 36, the call is conveyed by the public service telephone network 26 to the main switching center (MCS) 24 and then to the PGW 10.
Similarly, when a cellular phone 31 initiates a call to a MES 36, or being called by a MES 36, the call is conveyed by a local cellular transceiver 30 to the main switching center (MSC) 24 to the PGW 10.
When a MES 36 performs a call and asks for an immediate assignment, a procedure known in the art as “channel request” is commenced: the terminal 36 generates and transmits a message on a random access channel (RACH) of the L band link. Said message includes information such as called party number, location of the user terminal (e.g. GPS, MSISDN number), identification of the terminal, synchronization data etc. Said channel request is answered by the system with Access Grant AGCH message which is received in a downlink L band control channel (referred to as BCCH channel). This message includes identification of traffic channel to which the MES 36 switches. The MES 36 and the network establish communication link between them by sending on both sides, every 40 msec and all over eight times, the SABM link command in a time frame of 320 msec. The MES will continue to send messages to and receive messages from telephone 28 through the traffic channel.
The Satellite 12 maps the traffic channel of the L band link to appropriate traffic channel in the C band link. Accordingly, after mapping is accomplished, the communication between the MES 36 and the telephone unit (through the intermediary satellite 12) passes through the so mapped traffic channel in the L band link and the traffic channel in the C band link.
Note that the same mapped L band/C band traffic channels, can convey messages of up to 8 different telephone calls, using 8 Time-Slotes in a TDMA format.
This procedure is realized in respect of any telephone call between a MES that communicates through the illustrated prior art satellite (using the L band link) and another telephone (say MES or landline telephone) that communicates the satellite through the C band link. Accordingly, messages in respect of plurality of telephone calls are transmitted simultaneously to and from satellite 12, such that messages in respect of each distinct telephone call The satellite network is operable for changing from time to time the mapping scheme of the L-band channels to the C-band channels, such that a given traffic channel in the L band may be mapped to a different channel in the C-band. For a better understanding of the foregoing, assume that a given MES initiated a telephone call to a designated telephone. In accordance with the specified procedure an L band traffic channel is mapped by the satellite to a given C band traffic channel, and the communication between the telephones is transmitted through these channels. When the telephone call terminates and the MES initiates another call, the satellite may map the L-band traffic channel to another C band-traffic channel. Note that in the illustrated prior art network there are about 6000 channels in the C band link covering a bandwidth of about 225 MHz.
Intercepting communications transmitted through satellite mobile devices has many applications including, but not limited to, police surveillance applications. For instance in some countries there is a poor cellular or land telephone infrastructure, and accordingly voice and data communication is mainly implemented through satellite mobile communication. Obviously, intercepting and monitoring communications transmitted through the satellite may have important value, inter alia, in tracking conspiracies to commit criminal acts and applying pre-cautions to hamper the acts, to locate wanted individuals which committed criminal or other offenses, etc.
In order to intercept and monitor the specified communications, the actual mapping between L and C channels should be identified. This is not an easy task bearing in mind the large number of C and L channels and the proprietary dynamic mapping scheme (which is not open for public inspection) that is employed by satellite, such as the Illustrated prior art network. A naïve approach to map between the channels would be time consuming and inefficient, if applicable at all.
There is thus a need in the art to provide for a method and system for detecting map between L and C channels in an efficient manner.
There is a need in the art to provide for cost effective method and system for detecting map between L and C channels.
According to an embodiment of the invention, there is provided an apparatus and method for intercepting and monitoring communications between target mobiles and a main station of a satellite communication system, wherein communication between the mobiles and a satellite is achieved by using a first-band spot beams, chosen by the mobiles and wherein communication between the satellite and the main station is achieved by using a wideband second-band link, and wherein the satellite is operable to change the mapping scheme of the first-band frequencies to the second-band frequencies, said apparatus comprises:
According to another embodiment of the invention, there is provided an apparatus for intercepting and monitoring communications between at least one mobile device and a main station of communication system, wherein communication between the at least one mobile and a satellite is achieved by using L-band spot beams, chosen by the mobiles and wherein communication between the satellite and the main station is achieved by using a wideband C-band link, said apparatus comprises:
The present invention can be more easily understood and the further advantages and uses thereof more readily apparent, when considered in view of the description of specific embodiments and the following figures in which:
Note that the term mobile device embraces any device capable of communication of audio and or data and or video, through wireless communication medium, including but not limited to mobile telephone satellite device, PDA, etc.
Note the terms channels, frequencies and frequency channels are used interchangeably throughout the description and Claims.
Note also that the terms signal and message are used interchangeably.
According to an embodiment of the invention, intercepting and monitoring system 40 is shown in
Turning at first to
Another RF dish antenna 44 is used to receive the downlink L-band spot beams 34. By a specific embodiment of the Illustrated prior art network network, the RF antenna 44 is configured to receive transmissions from several spot beams, usually between 3-7 depending on the geographical area and reused disturbances. Each spot-beam accommodating at least one basic frequency channel unit that includes a control channel and 4 traffic channels. Note that by the specific embodiment of the Illustrated prior art network network, the channel groups of the spot beams that are received simultaneously by antenna 44 are only part of the 1087 channels that constitute the L band link. Depending on the physical location of the antenna 44 and its orientation different spot beams are received.
The L-band mapping scheme to the C-band is periodically reconfigured by the satellite as a result of the primary gateway station (PGW) 10 O&M commands which are sending from time to time to the satellite.
The L-band channels 34 are mapped to the C-band channels by the satellite according to a proprietary mapping scheme which is not open for public inspection. It is, therefore necessary to continuously re-detect the mapping between the C-band and L band channels in order to intercept both sides of the transmission and thereby being able to monitor the communications transmitted between the telephone unit 28 and the MES 36.
Note that the term communications includes data, and/or voice and/or video.
Reverting now to
Turning to
The C-band transmissions in downlink C band received by Antenna 42 are fed to C-band receiver 50 which transmits the signals to the intermediate frequency (IF) distributor 54.
The L-band transmissions in downlink L band received by Antenna 44 are fed to L-band receiver 52 which transmits the signals to the IF distributor 54.
As will be explained in greater detail below, the receiving process in the downlink L band, includes scanning of the channels of the received spot beams (out of the 1087 L-band channels) in order to find the spot beam's frequency control channel FCCH, the Broadcast Control Channel BCCH and the common control channel CCCH, being the uplink control channel.
As shown in
Also shown in
Also shown in
Supervisor stand 66 allows the operator to view the position of an active MES, its status identification and data pertains to it. It allows the supervisor to be involved in the mapping and scanning processes and to manually operate and control the system.
In operation, (in accordance with certain embodiment), the signals received from the C-band antenna are transferred from the IF distributor 54 to the Wide band Analysis Unit WAU 56 where the C-band spectrum is analyzed. The analysis includes energy measurement and analysis to find Random Access Control Channels (RACE) in the down link C channel that are prima facie mapped to the CCCH control channel. Based on the analyzed data, a set of demodulators is allocated to the found channels (in the C band) to apply a more fine tuned analysis in order to detect a RACE channel in the downlink C band (a control channel) that is mapped to the BCCR (control channel) in the downlink L band. Other operations of the system of
Those versed in the art will readily appreciate that the invention is not bound by the architecture of
The specified description referred to a non limiting realization that pertains to the illustrated prior art GSM satellite. The invention is not bound by the specified implementation. Moreover, the invention is likewise applicable to satellites other than the prior art network illustrated herein, such as the Aces. Accordingly, it is noted that the description below with reference to the Illustrated prior art network network is only an example and may refer to other satellite systems, mutatis mutandis.
Before turning to explain a sequence of operation in accordance with an embodiment of the invention, attention is drawn to
. 401 DmC-Demodulation Unit Control:
402 WAC-Wideband Analysis Unit Control:
403 MaP-Mapping Process:
404 ATP-Acquisition and Timing Process:
Before turning to a description of a detailed flow chart, attention is drawn to
Bearing this in mind, attention is now drawn to
As shown, L band transmission (as received in antenna 52, see
In the downlink C band link, the RACH channels are traced. As may be recalled each MES that attempts to initiate a call submits a Random Access Control (RACH) request in an uplink L channel. Since communication in the uplink L band cannot be intercepted, there is a need to intercept the RACH requests in downlink C band channels. Once the candidates for RACH channels are found, and the rate of calls is measured (according to calculated number of RACH messages) a map can be established between the CCCH (control) channel in the uplink L band and a RACH channel in the downlink C band, based on identical or nearly identical rate of calls. In order to find the RACH channels in the downlink C band it would have been desired to allocate demodulators to each C band channel and to trace a RACH message pattern, which has known per se characteristics. Since, however, there are numerous C band channels and in accordance with certain embodiments of the invention considerably less number of available demodulators, a first coarse analysis is performed. To this end, a coarse mapping unit, such as Wideband Analysis Unit (WAU) (which, in accordance with one embodiment, is based on a collection of spectrum's energy pictures done by FFT technology, which is implemented inside the WAU unit is applied simultaneously to a plurality of downlink C band channels and is able to find RACH channels by measuring C band activity and more specifically energy of data transmitted through the channels. Based on the measured energy, pattern of RACH signals (requests) can be determined. For instance, a RACH signal has a duration of 15 msec and this can be determined in a known per se manner in response to the measured energy.
Reverting now to
Next, it would now be required to detect the exact control channel in the C band (from among the specified candidates RACH channels) that is mapped to the BCCH channel in the L band. Note that the latter procedure (for detecting candidate RACH channels) was applied within a short time interval substantially simultaneously to numerous C channels using the WAU (e.g. fast FFT units) whilst obviating the need to analyze explicitly the content of each C channel.
In accordance with certain embodiments of the invention, the unequivocally mapping between the L band and the C band control channels (from among the candidates RACH) is determined based on identical spot beam number (SB-MASK) extracted from the matched L band channel and C band channels. To this end, demodulators are allocated to the candidate RACH channels (57A) and the content of the data (such as, e.g. reason for the call, priority, service provider identity, UPS location etc.) transmitted through the channels is analyzed to extract SB_MASK (58A), being unique to each spot beam. Now, the SB_MASK extracted from the RACH (58A) and the SB_MASK extracted from the BCCH (see previous step 56A) are compered for identity (501A), and in the case of identical SB_MASK data extracted from the BCCH (56A) (in downlink L band) and from RACH (in downlink C band) (58A), the respective channels are announced as mapped control channels (59A). In the case of mis-match, another round of allocation of demodulators is effected (57A).
The control channel mapping described above will now be further described with reference
501 ATP (404 in
502. ATP Receives FCCH frequency and timing from WAU
503. ATP Requests allocation of demodulation board to BCCH frequency
504. DmC allocates demodulator to BCCH. BCCH allows to measure rate of telephone calls, which will later assist in identifying corresponding channel in the C band based among the other on estimated similar rate of telephone discussion.
505. BCCH Information received from L-band
506. ATP processes BCCH information, and requests resource allocations for additional BCCH and CCCH frequencies, according to coverage priorities. This is required since it may be the case that there may be more than one basic channel unit, (each consisting of control channel and few traffic channels) in the same spot beam. In the latter case, additional BCCH are searched. For instance, in a busy spot beam, there may be two or more control channels (BCCH). Note that all BCCH within the same spot beam have the same spot-beam number (SB-MASK).
507. ATP processes BCCH information to extract timing information (frame number) for each spot beam
ATP continuously monitors BCCH information (channel configuration and timing). This is required inter alia for the reason that it serves for detecting access grant AGCH signals (which serves, inter alia, for measuring call rates).
The net effect would be that on the basis of the so detected BCCH signals the rate of telephone calls in the downlink L band channels is known.
It may be recalled that by this embodiment the MES transmits a RACH signal in the uplink L band, which signal is detected in downlink C band. Thus,
701. MaP initiates C-band mapping, by requesting allocation of demodulation boards to C-band RACH frequencies.
702. MaP receives RACH activity statistics from WAU, and thus determines mapping priority for various RACH frequencies (based on measured energy and consequently RACH pattern. The MaP allocates demodulator boards for those frequency channels that the
RACH activity rate is similar to the AGCH activity at the L-band target spot beams. It may happen that several C-band RACH frequencies will be at the same rate and therefore the MaP will allocate multiple demodulators simultaneously to these channels.
703. MaP requests deallocation and reallocation of demodulation boards to RACH frequencies, according to timeout parameters, repeatedly scanning all unmapped RACH frequencies. Note that unmapped (rather than mapped) RACH data is of interest, since, obviously, RACH (in the downlink C band channel) that is already mapped to BCCH (in the downlink L band channel) does not require further processing for determining C/L mapping. Note also that the Map module is already aware of the rates of calls as derived from the BCCH signals (and provided to the Map module by the ATP module—see
This enable to determine first coarse mapping between RACH and BCCH. The stages below illustrate how to determine the exact mapping based on SB-Mask data.
704. BCCH messages are received from the L-band and passed from the DmC to the ATP
705. ATP extracts spot beam center location and SB_Mask parameters from the BCCH, and passes them to MaP. In other words, the ATP extracts the SB_Mask signal from the BCCH and delivers them to the Map module.
706. RACH message (channel request) is received from each of the unmapped RACH frequencies in the C-band and passed from the DmC to the MaP
707. MaP extracts GPS position and SB_Mask parameters, and determines whether RACH belongs to a target spot beam by comparing them to the data received from the ATP. In other words, the SB-Mask from the BCCH is compared to the SB-Mask of the candidate RACHs, and in the case of match the RACH/BCCH mapping (indicative of control channels corresponding downlink C band and downlink L band) is determined.
708. If RACH is relevant (i.e. for the matching RACH), MaP extracts and records data from RACH such as Random Reference, Establishment Cause, which enables to relate the specific RACH (The user specific request in the C band) to the specific user AGCH (in AGCH there are messages for all the active users and there is a need to identify what is the request and response for every specific user). The GPS data indicates on the precise geographic location of the MES and as such may have significant surveillance value, e.g. for tracking purposes (for instance tracking a wanted person who uses MES for communication).
In other words, in accordance with the embodiment as described with reference to
The next step would be to wait for AGCH that corresponds to the RACH. This is required since the satellite will “approve” the RACH request (as submitted by the MES and intercepted in the downlink C channel [see
There is a need to verify that the AGCH is matched to a specific RACH message. For instance, there may be, say, three identified RACH messages in the same RACH channel, as intercepted in the downlink C channel. These three RACH messages are indicative of requests to establish three distinct telephone calls, respectively. It would be desired to identify the RACH message that matches the AGCH since the former would include details of the MES. The matching procedure is based on comparing the Request Reference data that is unique to each user RACH request. Establishment Cause provides the information to the reason for the request (for example Paging) and a GPS Discriminator (parameter that exists in the AGCH and is derived from the actual GPS with CRC operation) provides the location matching. In addition to this, the AGCH includes designation of the Traffic Channel (in the L band) that the MES would switch to (from the AGCH control channel). The traffic channel serves for conducting the actual transmissions between the MES and the satellite (both in uplink and downlink L directions). Corresponding RACH and AGCH have the same, so called, request reference data.
The procedure in accordance with an embodiment of the invention as illustrated in
Now that control channel are mapped, i.e. the mapped C and L channels that are associated with the identified RACH and the AGCH signal, as described above). Next, the characteristics of the IVIES are available, based on RACH extracted data, such as GPS.
Having mapped the control channels, it would be possible to detect mapping between corresponding traffic channels through which the actual communication is transmitted between the mobile device and the other communication device (say, telephone 28 and MES 36).
The detection of the mapping between the traffic channels will now be described in accordance with certain embodiment and with reference to
Next, it would be desired to detect the corresponding traffic channel in the downlink C band. Note that whilst the control channel in the C band has been detected (based on analysis of the RACH signal, as described above) it is not guaranteed that the satellite would allocate a traffic channel that forms part of the same basic channel unit as that of the RACH control channel. Accordingly, the proprietary mapping scheme of the satellite may map any traffic channel from among the numerous C traffic channels.
As specified above, once the MES 36 establishes communication (in response to receipt of AGCH and switching to the L band traffic channel), the procedure of TCH link establishment between the MES and the Primary Gateway is started. The MES sends 8 times, every 40 mSec, asynchronous balanced mode (SABM) message in a time frame of 320 mSec. For each message it gets SABM message response from the Primary Gateway. This message is used to find the appropriate C band TCH channel.
Thus, in order to detect mapped traffic channel it would be desired to identify the SABM transmissions that originated from the MES (in response to the AGCH) and to apply a criterion in order to determine whether the SABM corresponds to the AGCH.
In accordance with certain embodiment, there are not sufficient demodulators to allocate to each and every possible traffic channel in the downlink C band in order to identify the sought SABM signal and accordingly a first coarse analysis is performed. To this end, a coarse mapping unit, such as the Wideband Analysis Unit (WAU), which, in accordance with one embodiment, provides wideband energy picture (of every transponder in the C band), based on its high resolution FFT technology. These energy picture is applied simultaneously to a plurality of down link C band channels , in a rate that enable to identify bursts activities. Thus the WAU provides us a precise energy picture of the C band link. The criterion of finding the appropriate TCH channels includes identifying at least one channel in which the respective energy burst is at a timing substantially identical to the timing of the (AGCH) signal.
Reverting now to
Next, the timing of the bursts is compared to that of the AGCH. All those channels having energy burst timing that is substantially identical (close within predefined timeslot) are candidates (hereinafter candidate SABM channels) for conveying the sought SABM message. (58B). Note that the latter process is rapid and does not require explicit analysis of the contents of the data transmitted through the channels. Now, it would be possible to allocate demodulators to the candidate SABM channels (59B) in order to analyze the contents (con restaurant—as will be explained in greater detail below) and identify the appropriate SABM message and consequently identify the corresponding traffic channel in the downlink C channel. As may be recalled, according to the protocol, in response to receipt of AGCH, an SABM is transmitted 8 times. It is accordingly appreciated that the timing of the AGCH and the subsequent SABM is very close and this exactly what was checked in the stage 58B.
The appropriate SABM message is identified based on “Con Restaurant” parameter that actually identifies the user in the SABM procedure and exists in both sides messages (the SABM message from the MES and the SABM message from the Gateway). This test requires analyzing of the content of the SABM candidate channels, mainly the Con Restaurant parameter, which is feasible after having been allocated the demodulators to the candidate SABM channels. Note, incidentally, that whilst the latter fine analysis of the content of the channels is considerably more tedious than the preliminary coarse analysis of the energy bursts using the WAU (57B), it is applied to only few channels (the candidate SABM channels) and, accordingly, a fine mapping unit (e.g. limited number of demodulators) can be used. In this connection, it is noteworthy that in accordance with certain embodiments up to 70 demodulators are used, considerably smaller than the few thousands available C band channels.
Bearing all this in mind, attention is drawn again to
Now, it would be possible to process the communication transmitted through the traffic channels (502B), such as decryption demodulation, and/or any content related processing (e.g. voice analysis context related analysis, analyzing data that pertains to certain topic or subject, etc.). This would allow to monitor the communication transmitted between the MES and the other communication device, for the desired application.
Attention is now drawn to
Turning now to
801. AGCH message is received from an L-band BCCH frequency and passed from the DmC to the ATP.
802. ATP requests allocation of demodulation board to the traffic channel frequency indicated by the Immediate Assignment message (i.e. request from the network). This means that the traffic channel data is extracted from the access grant (ACGH). The traffic channel indicates the channel in the basic channel unit to which the MES will be switch from the control channel. Note that the switch to the traffic channel is not as yet performed.
803. ATP extracts from the message the frame number. ATP then calculates the timestamp corresponding to that frame number.
804. ATP passes the AGCH message to the MaP, along with its timestamp), and along with request reference parameter of the AGCH.
805. MaP extracts the request reference parameters from the AGCH message, and correlates it to its stored RACH messages (based on request reference parameter of the RACH). If there is a match, MaP maps the RACH frequency to the AGCH frequency. Consequently, the mapping between the RACH and the AGCH has been accomplished (based on request reference parameter). In addition, the RACH messages are sorted according to the time stamps (see 806 below).
806. MaP passes both RACH and AGCH messages to ATP, with timestamp and uplink/downlink L-band frequency and timeslot number
807. ATP performs normal operation with RACH and AGCH messages (in that order): looks up corresponding frame number and originating downlink/uplink channel, and outputs the messages with these parameters. The data of the RACH and the corresponding ACGH is passed to the L3 module for further processing.
Note incidentally, that the L3 processing can process the data in the usual way, as it was intercepted directly from the downlink and uplink L band directions.
Having identified correspondence between RACH and AGCH messages, there follows a description of a mapping sequence, in accordance with an embodiment of the invention. Note in the description below, correspondence between the AGCH and SABM messages is identified and mapping between a traffic C band channel and traffic L band channel is detected.
The general idea is to trace the AGCH signal in downlink L band, extract there from the traffic channel data and map a corresponding traffic channel in the downlink C band, based on SABM signal that is transmitted at substantially the same timing as the one that the AGCH signal was detected. Note that this is performed in the case that the mapping between the traffic channels (in the downlink C and downlink L bands) is not a priori known. The description with reference to
901. When receiving an AGCH message, the MaP checks whether the allocated L-band traffic channel frequency is mapped (independently from RACH-AGCH mapping)
902. If it is mapped, the MaP requests allocation of a demodulation board to the corresponding C-band traffic channel frequency, and the mapping procedure is done. This means that the MES switched to the traffic channel in the L band and communication is processed in the downlink L channel. In addition, communication in the downlink C band is processed, thereby monitoring the communication between the MES and the other communication device (e.g. MES 36 and telephone device 28 of
903. If it is not mapped, the MaP examines the timestamp of the AGCH message, and requests from the WAC a list of all traffic frequencies (in the downlink C band) which were activated during a specific time-window since that timestamp, in the timeslot specified in the channel assignment.
904. WAC examines C-band activity (by identifying energy bursts within the specified timeslot), and logs and returns a list of activated frequencies.
905. MaP requests allocation of demodulation board to each frequency on the list (in groups or one-by-one), and stays on each frequency one frame period (40 msec)—just long enough to receive an SABM frame, if one was transmitted there. Note that by this embodiment the SABM is transmitted 8 times consecutively. Thus , at a first stage, candidate SABM traffic channels in the downlink C band are identified (see 903, 904, above) and to these candidate channels demodulators are assigned to intercept the SABM signal which is transmitted 8 times consecutively. Once the Con Reference parameter of both sides is identical in a given SABM traffic channel (from among the candidate SABM channels) the latter is mapped to the corresponding channel in the downlink L band.
Having identified correspondence between the AGCH and the SABM messages, there follows a description with reference to
1001. SABM frame is received from the previously allocated L-band traffic channel
1002. ATP passes the SABM frame to the MaP, along with timestamp and originating frequency (in the L band) and timeslot.
1003. SABM (candidate) frames are received from some of the scanned C-band frequencies.
1004. MaP compares the information field (Con restaurant) of each received SABM to the information field of the SABM provided by the ATP. If there is a match, the C-band traffic channel frequency is mapped to the L-band traffic channel frequency.
1005. MaP passes both SABM frames to ATP, with timestamp and uplink/downlink L-band frequency and timeslot number
1006. ATP performs normal operation with both SABM frames (first uplink SABM [i.e. downlink C] and then downlink L SABM): looks up corresponding frame number and originating downlink/uplink channel, and outputs the messages with these parameters.
After having described how to detect mapping of traffic channels it is recalled that, the satellite re-maps C/L channels in accordance with proprietary switching scheme.
Thus, when RACH channel is found in the downlink C channel (in the manner describe above), it is likely that a RACH message that stems from subsequent call (issued by the same MES telephone) will be transmitted through the same RACH channel, allowing the system, (using the demodulator allocated to this channel), to apply the identification of RACH/AGCH and subsequently the detection of mapped traffic channels in the manner described above.
However, it is likely that at a certain unpredictable timing, the satellite will re-map the C/L channels (using the dynamic mapping scheme) and accordingly new RACH messages initiated from the same MES (indicative of initiating new calls) will be transmitted through different downlink C channel than the one currently monitored by the demodulator. Since there are only few demodulators allocated to channels in the C band (compared to the total number of channels in the C band), there is high likelihood that there is no demodulator allocated to the C band channel through which the new RACH message is transmitted. The net effect would be the next call may be missed since the triggering RACH message will not be spotted. This loss of call (and possibly other future calls) may have undesired consequences. For instance, if the MES under consideration is used by an individual who is under close surveillance, it would be highly desirable to intercept monitor also his future calls (as long as required).
In accordance with certain embodiments, this situation may be avoided. Thus, as may be recalled, the RACH message is followed by AGCH. The latter is transmitted through the same BCCH frequency channel in the downlink L band, and the likelihood of “losing” the BCCH channel is negligible. Accordingly, when an AGCH message is found and corresponding RACH signal has not been identified in the currently monitored C band channel, it is assumed that the lost of the RACH is due re-map procedure of the satellite.
Based on this understanding, the processing described with reference to
The description above, referred to a scenario where notwithstanding the lost of RACH message, the system is capable to detect mapped traffic channels and monitor the communications transmitted there through. (using in accordance with certain embodiments correspondence between AGCH/SABM signals.)
It is, however, desirable in accordance with certain embodiments to trace also the “lost” RACH message since, it will allow to identify subsequent RACH messages initiated by the same MES (and obtain from the new RACH, important information such as MES location). Once the new RACH channel is found, it will allow to intercept the RACH messages until next re-mapping occurs.
Bearing this in mind, attention is drawn to
Thus, in accordance with one embodiment:
1101. If an AGCH message was received by the MaP, and there is no matching RACH message received earlier, the MaP attempts to trace the corresponding RACH frequency.
1102. MaP examines the additional parameter derived from and added to the AGCH message by the ATP—the timestamp in which the corresponding RACH message was received by the network
1103. MaP requests from the WAC a list of RACH frequencies, which were activated at (or near) the specified timestamp
1104. WAC examines C-band activity log and returns list of activated RACH frequencies
1105. MaP sets high mapping priority to the RACH frequencies received from the WAC (including allocating demodulators thereto). These channels are likely to have in the future RACH signal that corresponds to the AGCH signal.
The present invention has been described with a certain degree of particularity, but those versed in the art will readily appreciate that various alterations and modifications may be carried out without departing from the scope of the following Claims.
Number | Date | Country | Kind |
---|---|---|---|
168149 | Apr 2005 | IL | national |
Number | Date | Country | |
---|---|---|---|
Parent | 11912065 | Jun 2008 | US |
Child | 13113535 | US |