This application claims priority to U.S. Provisional Patent Application No. 60/050,290, filed Jun. 20, 1997. This application is related to the following commonly-owned, co-pending applications: “System and Method for Simulation and Modeling of Biopharmaceutical Batch Process Manufacturing Facilities”, by Brown, having application Ser. No. 09/019,777, filed Feb. 6, 1998; “System and Method for Simulation, Modeling and Scheduling of Solution Preparation in Biopharmaceutical Batch Process Manufacturing Facilities”, by Brown, having application Ser. No. 09/100,088, filed concurrently herewith; “System and Method for Simulation, Modeling and Scheduling of Equipment Preparation in Biopharmaceutical Batch Process Manufacturing Facilities”, by Brown, having application Ser. No. 09/100,024, filed concurrently herewith; and “System and Method for Simulation, Modeling and Scheduling of Quality Control Sampling in Biopharmaceutical Batch Process Manufacturing Facilities”, by Brown, having application Ser. No. 09/100,232, filed concurrently herewith. Each of the above applications are incorporated herein by reference in their entirety.
Number | Name | Date | Kind |
---|---|---|---|
4796194 | Atherton | Jan 1989 | |
4975865 | Carrette et al. | Dec 1990 | |
5006992 | Skeirik | Apr 1991 | |
5058043 | Skeirik | Oct 1991 | |
5148370 | Litt et al. | Sep 1992 | |
5157595 | Lovrenich | Oct 1992 | |
5164905 | Iwasaki et al. | Nov 1992 | |
5237508 | Furukawa et al. | Aug 1993 | |
5255197 | Iida | Oct 1993 | |
5343387 | Honma et al. | Aug 1994 | |
5375062 | Aoki | Dec 1994 | |
5402367 | Sullivan et al. | Mar 1995 | |
5402526 | Bauman et al. | Mar 1995 | |
5405452 | Anderson et al. | Apr 1995 | |
5408405 | Mozumder et al. | Apr 1995 | |
5427126 | Carney et al. | Jun 1995 | |
5428525 | Cappelaere et al. | Jun 1995 | |
5440478 | Fisher et al. | Aug 1995 | |
5442562 | Hopkins et al. | Aug 1995 | |
5450346 | Krummen et al. | Sep 1995 | |
5463555 | Ward et al. | Oct 1995 | |
5495417 | Fuduka et al. | Feb 1996 | |
5594639 | Atsumi | Jan 1997 | |
5666297 | Britt et al. | Sep 1997 | |
5666585 | Nagira et al. | Sep 1997 | |
5680877 | Edstrand et al. | Oct 1997 | |
5737581 | Keane | Apr 1998 | |
5757659 | Arai et al. | May 1998 | |
5774875 | Medeiros et al. | Jun 1998 | |
5841660 | Robinson et al. | Nov 1998 | |
5891260 | Streets et al. | Apr 1999 | |
5969973 | Bourne et al. | Oct 1999 | |
5980078 | Krivoshein et al. | Nov 1999 | |
6004025 | Kubiak wt al. | Dec 1999 | |
6038486 | Saitoh et al. | Mar 2000 | |
6063292 | Leung | May 2000 | |
6071356 | Olsen | Jun 2000 | |
6143092 | Straub et al. | Nov 2000 |
Entry |
---|
Daubas, P. et al., “Combined simulation of hybrid processes,” Systems, Man, and Cybernetics, IEEE, 1994, vol. 1, pp. 320-325. |
Dean, G., “Meeting the demands of batch control,” Control, IEEE, 1991, vol. 2, pp. 881-886. |
Hwang, Y. K. et al., “Motion planning for robotic spray cleaning with environmentally safe solvents,” Advanced Robotics, IEEE, 1993, pp. 49-54. |
Kasko, I. et al., “Integrated process control for cluster tools using an in-line anlytical,” Semiconductor Manufacturing Conference Proceedings, IEEE, 1997, pp. 41-44. |
Ober, O. N., “Automated pharmaceuticals manufacturing,” Innovations in Manufacturing Control Through Mechatronics, IEEE, 1995, pp. 1/1-1/2. |
Berstein et al., “A Simulation-based Decision Support System for a Specialty Chemicals Production Plant,” Proc. of the 1992 Winter Simulation Conference, 1992, pp. 1262-1270. |
Ehrlich et al., “Making Better Manufacturing Decisions with AIM,” Proc. of the 1996 Winter Simulation Conference, 1996, pp. 485-491. |
Faccenda et al., “A Combined Simulation/Optimization Approach to Process Plant Design,” Proc. of the 1992 Winter Simulation Conference, 1992, pp. 1256-1261. |
Ketcham et al., “A Generic Simulator for Continuous Flow Manufacturing,” Proc. of 1988 Winter Simulation Conference, 1988, pp. 609-615. |
Leitch et al., “A Real-Time Knowledge Based System for Product Quality Control,” International Conference on Control, 1988, pp. 281-286. |
Litt, J., “An Expert System to Perform On-Line Controller Tuning,” IEEE Control Systems Magazine, vol. 11, Issue 3, Apr. 1991, pp. 18-23. |
Sam G. Taylor et al., APICS, Process Flow Scheduling: A Scheduling Systems Framework for Flow Manufacturing, Copyright 1994 (168 Pages). |
Sam G. Taylor et al., APICS, Can Process Flow Scheduling Help You?, pp. 44-46, Mar. 1996. |
Copy of International Search Report from PCT Appl. No. PCT/US00/22104, 2 pages, mailed Jan. 25, 2001. |
Number | Date | Country | |
---|---|---|---|
60/050290 | Jun 1997 | US |