Claims
- 1. A method for scheduling and simulating solution equipment preparation in a batch process manufacturing facility, comprising the steps:
(1) determining equipment preparation procedures associated with solution preparation equipment; (2) generating a master list of soiled process components to be prepared by said equipment preparation procedures; (3) generating an equipment preparation load table based on tasks in a biopharmaceutical production process; and (4) generating an equipment preparation time line that schedules said solution equipment preparation in said equipment preparation procedures.
CROSS_REFERENCE TO RELATED APPLICATIONS
[0001] This application is a continuation-in-part of claims priority to U.S. patent application Ser. No. 09/100,024, filed Jun. 16, 1998, which claims priority to U.S. Patent Provisional Application No. 60/050,299, filed Jun. 20, 1997, the contents of both of which are incorporated herein by reference in their entirety.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60050299 |
Jun 1997 |
US |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
09100024 |
Jun 1998 |
US |
Child |
09373793 |
Aug 1999 |
US |