System and method for synchronizing the phase angle for an AC power source in parallel operation with a grid

Information

  • Patent Grant
  • 6362988
  • Patent Number
    6,362,988
  • Date Filed
    Thursday, June 29, 2000
    24 years ago
  • Date Issued
    Tuesday, March 26, 2002
    22 years ago
Abstract
A system 10 for synchronizing the phase angle of an alternating current power source (“APS”) 12 with the phase angle of a power grid 14. The system 10 provides for reliable synchronization between the phase angle of the APS 12 and the phase angle of the power grid 14 during both normal and abnormal operating conditions.
Description




FIELD OF THE INVENTION




This invention relates to a system and a method for synchronizing the phase angle for an alternating current (“AC”) power source which operates in parallel with a power grid, and more particularly, to a system and a method which provides reliable synchronization of the phase angle for an AC power source operating in parallel with a grid in both normal and abnormal operating conditions.




BACKGROUND OF THE INVENTION




Alternating current power sources (“APS”), such as static power converters (“SPC”), are commonly used to provide electrical energy and power to electrical devices, networks or grids. One type of APS, commonly referred to as a three-phase AC power source, provides voltage in three separate phases. A requirement for this type of three-phase power delivery arrangement is that the voltage phase angle of the APS is synchronized with the voltage phase angle of the grid.




The phase synchronization of an APS and its associated grid is typically controlled through the use of one or more “phase lock loops” (“PLL”). While the PLL technique can maintain synchronization between the APS and grid during many operating conditions, it suffers from several drawbacks.




For example and without limitation, in abnormal operating conditions, if grid voltage is lost for a short duration of time (e.g., for 0.1 seconds, as a result of switch “bounce”), the PLL will not function properly, as it will not receive critical inputs from the grid. Under such fault conditions, the PLL will lose synchronization with the grid and abnormal current may undesirably occur (e.g., over current, distortion current and other forms of disruptive current). Furthermore, even very small errors in synchronization, if not properly corrected or compensated, will accumulate over time causing the creation of relatively large undesirable errors. Such errors and corresponding abnormal currents often prevent reliable parallel operation between the APS and grid and may damage devices or components within the system.




There is therefore a need for a system and a method for providing relatively precise synchronization between an APS and a power grid, and which is effective to reliably generate the synchronized phase angle for the APS to connect to the grid during both normal and abnormal operating conditions.




SUMMARY OF THE INVENTION




It is a first object of the invention to provide a system and a method for synchronizing the phase angle for an alternating current power source (“APS”) operating in parallel with a power grid which overcomes some or all of the previously delineated drawbacks associated with prior systems and methods.




It is a second object of the invention to provide a system and a method for synchronizing the phase angle for an APS operating in parallel with a power grid, which provides reliable synchronization during both normal and abnormal operating conditions.




It is a third object of the invention to provide a system and a method for precisely synchronizing the phase angle for a three-phase APS operating in parallel with a power grid.




According to a first aspect of the present invention, a system is provided for synchronizing a first phase angle of a power source with a second phase angle of a power grid. The system includes a first portion which receives a grid voltage and which uses the grid voltage to calculate the second phase angle; a second portion which is communicatively connected to the first portion, which receives the second phase angle, and which uses the second phase angle to calculate a grid voltage frequency; a third portion which is communicatively connected to the second portion, which receives the grid voltage frequency, and which uses the grid voltage frequency to generate an increment angle; a fourth portion which is communicatively connected to the first portion, which receives the second phase angle, and which generates an initial angle based upon the second phase angle; and a fifth portion which is communicatively connected to the third and fourth portions, which selectively receives the increment angle and the initial angle, and which uses the received increment and initial angles to generate the first phase angle having a value that is substantially identical to the second phase angle.




According to a second aspect of the present invention, a method is provided for synchronizing a first phase angle of a power source with a second phase angle of a power grid. The method includes the steps of receiving a grid voltage from the power grid; calculating the, second phase angle by use of the grid voltage; calculating a grid voltage frequency by use of the second phase angle; generating an increment angle by use of the grid voltage frequency; generating an initial angle based upon the second phase angle; and using the increment and initial angles to generate the first phase angle having a value that is substantially identical to the second phase angle.




These and other features, advantages, and objects of the invention will become apparent by reference to the following specification and by reference to the following drawings.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a block diagram illustrating a three phase alternating current power source (“APS”) operating in parallel with a three-phase power grid in accordance with the teachings of the preferred embodiment of the invention.





FIG. 2

is a block diagram of a control system or strategy for synchronizing the voltage phase angle of the APS shown in

FIG. 1

with the power grid shown in FIG.


1


.





FIG. 3

is a block diagram illustrating the function of a time counter used within the system shown in FIG.


2


.





FIG. 4

is a graph illustrating the principles used to generate the voltage phase angle θ


0


at the initiation of each cycle.





FIG. 5

is a series of graphs illustrating the voltage phase angle generated by use of the present invention and by use of the prior art phase lock loop (“PLL”) method during a fault condition.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT OF THE INVENTION




Referring now to

FIG. 1

, there is shown an electrical system


10


including an alternating current power source (“APS”)


12


which is selectively and operatively coupled to and operates in parallel with a power grid


14


. In the preferred embodiment, APS


12


and grid


14


are selectively coupled together by way of a conventional circuit breaker


16


(e.g., Brk


1


). The system


10


utilizes a control system or strategy for synchronizing the phase angle of the APS


12


(“θ”) with the phase angle of the power grid


14


(“γ”) in accordance with the teaching of the preferred embodiment of the invention. While in the preferred embodiment APS


12


and grid


14


provide and/or utilize a conventional three-phase alternating current, it should be appreciated that the present invention may be utilized with other types of multi-phase alternating currents.




As shown in

FIG. 1

, APS


12


is operating in parallel with grid


14


. For purposes of this discussion, V


m













g


·Sin (γ) represents the phase “A” voltage (Va_g) of the grid


14


; V


m













g


·Sin (γ+120°) represents the phase “B” voltage (Vb_g) of the grid


14


; and V


m













g


·Sin (γ+240°) represents the phase “C” voltage (Vc_g) of the grid


14


. Furthermore, V


m













p


·Sin (θ) represents the phase “A” voltage (Va_p) of the APS


12


; V


m













p


·Sin (θ+120°) represents the phase “B” voltage (Vb_p) of the APS


12


; and V


m













p


·Sin (θ+240°) represents the phase “C” voltage (Vc_p) of the APS


12


.




As should be appreciated by one of ordinary skill in the art, when the APS


12


operates in parallel with the grid


14


, the voltage magnitude V


m













p


of the APS


12


should be equal to the voltage magnitude V


m













g


of the grid


14


. Furthermore, the phase angle θ of the APS


12


should be equal to the phase angle γ of the grid


14


. In

FIG. 1

, circuit breaker


16


can be “closed” when V


m













p


=V


m













g


and θ=γ, and the two conditions should be kept whenever breaker


16


is closed.




Phase angle synchronization between the APS


12


and the grid


14


is achieved when θ is made exactly equal to γ. As discussed more fully and completely below, the present invention substantially and reliably ensures that phase angles θ and γ remain substantially equal in value, and therefore reliably provides synchronization between the APS


12


and the grid


14


.




In the preferred embodiment, system


10


includes one or more microprocessors, controllers and/or integrated circuits which cooperatively perform the below-described calculations, algorithms, and/or control strategies. In the preferred embodiment, these microprocessors or controllers are at least partially contained within and/or are communicatively coupled to the APS


12


and/or the grid


14


and are effective to control and/or generate the phase angle θ, and to ensure that angle θ is substantially identical to phase angle γ. In the preferred embodiment, the grid frequency change rate is relatively low, and in one non-limiting embodiment, is less than 0.1 Hz per second. In the present invention, the microprocessor controller updates the phase angle θ once in every time step t


upd


. The time step t


upd


is much smaller than the cycle time (20,000/16,666 μs) corresponding to a 50/60 Hz voltage. In the preferred embodiment, t


upd


is 50-200 μs.




Referring now to

FIG. 2

, there is shown one non-limiting embodiment of the control system, method or strategy


20


which is utilized and/or executed by system


10


(i.e., by one or more microprocessors and/or controllers resident within system


10


) to synchronize phase angles θ and γ. Control strategy


20


begins at functional block, portion or step


22


, where the grid voltages Va_g, Vb_g, and Vc_g are monitored or measured and entered or inputted into a grid voltage phase angle generator


22


. As shown, block


22


has three inputs Va_g, Vb_g, Vc_g, which are the three phase voltages of the grid


14


, and one output which represents the voltage phase angle γ of the grid


14


. Block


22


utilizes the basic theory of an AC electrical machine to calculate the voltage phase angle γ. Particularly, the voltage phase angle of a three-phase AC voltage system is calculated by the following equations:






V


α













grd













k


=V


a













g













k


  (Eq. 1)








V


β













grd













k


=2/{square root over (3)}(V


b













g













k


−V


c













g













k


)  (Eq. 2)








γ


k


=arctan 2 (V


β













grd













k


/V


α













grd













k


)  (Eq. 3)






where −π≦γ


k


≦π




In the above equations (i.e., Eq. 1-3), Va_g_k, Vb_g_k, and Vc_g_k are the sampled three-phase grid voltages of Va_g, Vb_g, Vc_g at the time step “k”; V


α













grd













k


and V


β













grd













k


are the converted two-phase voltages at time step “k” that are used to obtain the grid phase angle γ


k


in the algorithm; and γ


k


is the grid voltage phase angle at time step “k”. As should be appreciated by one of ordinary skill in the art, angle γ


k


has a value within −π to +π in the algorithm, and the angle γ


k


has a repeat frequency equal to the frequency of the grid voltage.




The calculated grid voltage phase angle γ


k


is then communicated to functional blocks, portions or steps


24


,


26


and


28


. Functional block, portion or step


28


represents and/or comprises a frequency calculator that is used to detect the frequency of the grid voltage ƒ


grd


. Block or portion


28


includes a time counter that counts the elapsed time for a cycle (−π to +π) of the grid voltage T


c













grd


. One non-limiting embodiment of a time counter


40


that may be used in block


28


is illustrated in FIG.


3


. As shown, counter


40


includes a trigger pulse generator


42


which receives the grid phase angle signal γ. Pulse generator


42


senses or detects the edges


44


of each cycle of the phase angle signal γ and emits a pulse in response thereto. These pulses are communicated to a counter


46


which further receives a clock signal and which utilizes the clock signal to determine the time between each pulse (i.e., the cycle time T


c













grd


). When the cycle time T


c













grd


of the grid voltage is obtained, the frequency of the grid voltage is calculated by following equation in functional block


28


:






ƒ


grd


=1/T


c













grd


  (Eq. 4)






The frequency of the grid voltage is communicated to functional blocks


30


and


32


. Functional block, portion or step


30


is communicatively connected to portion


28


and is effective to generate an increment angle Δθ that is used as an input for the synchronization angle generating block or step


38


. In block or portion


30


, angle Δθ is generated by use of the following equation:






Δθ=2π·(t


upd


/T


c













grd


)=2π·t


upd


·ƒ


grd


  (Eq. 5)






where ƒ


grd


is the frequency of the grid voltage; T


c













grd


is the cycle time of the grid voltage; and t


upd


is the updating period for the calculation of phase angles θ


k


and γ


k


. During normal operating conditions, the value of the increment angle Δθ is “updated” every cycle time T


c













grd


with the frequency f


grd


. However, if an abnormal operation is sensed or occurs, the increment angle Δθ of block


30


is not sent to block


38


. Rather, the increment angle Δθ used within block


30


remains equal to its previous value and is not updated.




In block or portion


32


, a detector is used to sense or detect abnormal operation within the grid frequency. When an abnormal grid frequency (as defined below) is sensed or detected, the output ER


2


of block


32


changes its logic level from “0” to “1”, effective to open the conventional switch or switching device


36


(“SW


2


”). When such a switch is made, the increment angle Δθ calculated in block


30


is not sent to block


38


. The following algorithms are used within block


32


in order to detect the abnormal operation of the grid frequency;




if f


grd













L


<f


grd


<f


grd













H


, ER


2


=0;




else ER


2


=1,




where the values f


grd













L


and f


grd













H


are pre-determined low and high limits of the grid frequency f


grd


in the normal operation range.




Functional block, portion or step


24


is communicatively connected to portion


22


and generates an “initial” angle θ


0


that is used as an input for block


38


. With γ


k


representing the angle γ at time step k, γ


k-1


representing the angle γ at time step k-1, and sign[γ] representing the sign change of γ from positive to negative, θ


0


is generated by use of the following algorithms:




if γ


k


changes its sign from positive to negative at time step k, i.e., if γ


k-1


>0, γ


k


<0,






sign[γ]=1  (Eq. 6)








and, at this time θ


0





k


  (Eq. 7)







FIG. 4

illustrates the principle of the above-delineated algorithms. In normal operating conditions, the initial angle θ


0


is updated every cycle time T


c













grd


with the frequency f


grd


. When abnormal operation occurs, a value “0” is sent to block


38


instead of the angle θ


0


.




Block or portion


26


is effective to detect the abnormal operation of the grid voltage phase angle γ. When an abnormal angle change is detected, block


26


changes its output ER


1


from a logic level “0” to a logic level “1”, thereby opening the switch or switching device


34


(“SW


1


”). When switch


34


is in an “open” position or state, the angle “0” is sent to block


38


(i.e., θ


0


is set equal to zero, which means there is no updating of θ


0


). Block


26


uses the following algorithms to detect the abnormal operation of the grid phase angle:






Δγ=γ


k


−γ


k-1


  (Eq. 8)






if Δγ_L<Δγ<Δγ_H, ER


1


=0;




else ER


1


=1.




where Δγ_L and Δγ_H are pre-determined low and high limits of the grid angle change step value Δγ in the normal operation.




Functional block, portion or step


38


represents a voltage phase angle generator and is selectively and communicatively connected to portions


24


and


30


. The APS phase angle θ


k


generated by block


38


is synchronized with the voltage phase angle γ of the grid


14


with which the APS


12


operates in parallel. Block


38


receives the “initial” angle θ


0


from block


24


and the angle increment Δθ from block


30


. The following equations are used for phase angle generation in block


38


:






θ


k





k-1


+Δθ  (Eq. 9)








when sign[γ]=0, and θ


k





0


  (Eq. 10)






when sign[γ]=1




where






−π≦θ


k


≦π






In Eqs. 9 and 10, θ


k


is the phase angle of the output voltage of the APS


12


at a certain time step “k”. Because alternating current type voltage has a sinusoidal waveform characteristic, angle θ


k


has 2π as its cycle and repeats its values within −π to +π in the algorithm. Also, in Eqs. 9 and 10, θ


k-1


is the previously calculated phase angle at time step k-1; θ


0


is the angle at the initiation in each cycle (−π to +π) which is generated in functional block or step


24


and which is used for phase angle synchronization; and Δθ is the angle increment in the time step t


upd


that is generated in functional block or step


30


.




As should be appreciated by one of ordinary skill in the art, system


10


and method


20


ensure synchronization between the APS


12


and the grid


14


in normal operation. Particularly, since the angle θ


0


is equal to the actual grid voltage phase angle γ at the initiation in every cycle, synchronization is guaranteed during normal operation. Furthermore, system


10


and method


20


ensure that the voltage phase angle is generated for the APS


12


even during abnormal operation. Moreover, the generated voltage phase angle for the APS is less sensitive to noise on the grid voltage than the angle generated by using a PLL, since θ


k


is updated by a constant increment Δθ in every cycle and only at the initiation of each cycle, a measured phase angle θ


0


of the actual grid voltage is used.




Referring now to

FIG. 5

, there is shown an example of the voltage phase angle generation of the proposed new method before and after a grid voltage fault compared to the phase angle generation of a PLL system. Particularly, graph


50


of

FIG. 5

illustrates grid voltage Va_g over a period of time including a fault voltage period. Graphs


60


and


70


respectively illustrate the APS phase angle θ


k


generated by the present system


10


and the APS phase angle θ


—PLL


generated by a phase lock loop type system over the same period of time. As illustrated by graph


60


, the present system provides a synchronized phase angle θ


k


before, during and after a fault or abnormal operating condition.




It should be understood that the inventions described herein are provided by way of example only and that numerous changes, alterations, modifications, and substitutions may be made without departing from the spirit and scope of the inventions as delineated within the following claims.



Claims
  • 1. A system for synchronizing a first phase angle of a power source with a second phase angle of a power grid, said system comprising:a first portion which receives a grid voltage from said power grid and which uses said grid voltage to calculate said second phase angle; a second portion which is communicatively connected to said first portion, which receives said calculated second phase angle, and which uses said second phase angle to calculate a grid voltage frequency; a third portion which is communicatively connected to said second portion, which receives said calculated grid voltage frequency, and which uses said grid voltage frequency to generate an increment angle; a fourth portion which is communicatively connected to said first portion, which receives said second phase angle, and which generates an initial angle based upon said second phase angle; and a fifth portion which is communicatively connected to said third and fourth portions, which selectively receives said increment angle and said initial angle, and which uses said received increment and initial angles to generate said first phase angle having a value that is substantially identical to said second phase angle.
  • 2. The system of claim 1 wherein said fifth portion causes said generated first phase angle to be equal to said initial angle when said second phase angle has changed from a positive value to a negative value, or otherwise equal to the sum of said increment angle and a previously calculated first phase angle.
  • 3. The system of claim 1 further comprising a grid voltage frequency fault detector which receives said generated grid voltage frequency and which causes said increment angle to be communicated to said fifth portion only if said grid voltage frequency falls within a predetermined range of values.
  • 4. The system of claim 3 wherein said third portion is selectively connected to said fifth portion by use of a switch which is selectively controlled by said grid voltage frequency fault detector.
  • 5. The system of claim 4 further comprising a grid angle fault detector which receives said second phase angle and calculates a grid angle change step value based upon said second phase angle, and which causes said generated initial angle to be communicated to said fifth portion only if said grid angle change step value falls within a predetermined range of values.
  • 6. The system of claim 5 wherein said fourth portion is selectively connected to said fifth portion by use of a switch which is selectively controlled by said grid angle fault detector.
  • 7. The system of claim 6 wherein said power source and said power grid each operate by use of a three-phase alternating current.
  • 8. A method for synchronizing a first phase angle of a power source with a second phase angle of a power grid, said method comprising the steps of:measuring a grid voltage from said power grid; calculating said second phase angle by use of said measured grid voltage; calculating a grid voltage frequency by use of said second phase angle; generating an increment angle by use of said grid voltage frequency; generating an initial angle based upon said second phase angle; and using said increment and initial angles to generate said first phase angle having a value that is substantially identical to said second phase angle.
  • 9. The method of claim 8 further comprising the steps of:determining whether said second phase angle has changed from a positive value to a negative value; and causing said generated first phase angle to be equal to said initial angle when said second phase angle has changed from a positive value to a negative value, or otherwise to be equal to the sum of said increment angle and a previously calculated first phase angle.
  • 10. The method of claim 9 wherein said power grid has a cycle time, said method further comprising the steps of:updating said initial angle and said increment angle every cycle time.
  • 11. The method of claim 10 further comprising the steps of:monitoring said grid voltage to detect abnormal operation in the frequency of said grid voltage; and updating said increment angle only if abnormal operation in the frequency of said grid voltage has not been detected.
  • 12. The method of claim 11 wherein said power source is a three-phase alternating current power source.
  • 13. A method for synchronizing a first phase angle of a power source and a second phase angle of a power grid, said method comprising the steps of:monitoring a voltage signal from said power grid; calculating said second phase angle by use of said voltage signal; determining when said voltage signal changes from a positive value to a negative value; and causing said first phase angle to equal said calculated second phase angle when said voltage signal changes from a positive value to a negative value, or otherwise, causing said first phase angle to equal a previous value of said second phase angle plus an increment angle.
  • 14. The method of claim 13 further comprising the steps of:determining a grid voltage frequency; and using said grid voltage frequency to determine said increment angle.
  • 15. The method of claim 14 wherein said grid has an associated cycle time and further comprising the step of:updating said increment angle every cycle time; and using said updated increment angle to calculate said first phase angle.
  • 16. The method of claim 15 further comprising the steps of:monitoring said voltage signal to detect abnormal operation in the frequency of said voltage signal; and using said updated increment angle to calculate said first phase angle only if abnormal operation in the frequency of the voltage signal has not been detected.
  • 17. The method of claim 16 wherein said power source comprises a three-phase alternating current power source.
  • 18. The method of claim 17 further comprising the step of:providing a circuit breaker; and selectively coupling said power source to said power grid by use of said circuit breaker.
US Referenced Citations (4)
Number Name Date Kind
5369564 Choi Nov 1994 A
5828253 Murayama Oct 1998 A
5856761 Jokura Jan 1999 A
6239997 Deng May 2001 B1