The present invention relates generally to a humidity control application for a cooling system. More specifically, the present invention relates to a method for performing humidity control using a hot gas reheat coil in a two stage cooling unit.
Some refrigeration systems use a hot gas re-heat control to perform humidity control for an interior space. A hot gas re-heat coil is placed immediately adjacent to an evaporator coil. Air passing over the evaporator coil is cooled and dehumidified. Then, as the dehumidified air passes over the reheat coil, it is reheated to a higher temperature. Once the system enters the humidity control mode, there is essentially no cooling of the air provided to the interior space because the air being cooled by the evaporator coil is then being heated by being passed over the re-heat coil. Some examples of systems for providing humidity control are provided below.
U.S. Pat. No. 6,553,778, hereafter the '778 patent, describes a multi-stage cooling system having a plurality of independent refrigeration circuits to provide a plurality of cooling capacities. The refrigeration circuits have different capacity compressors, typically a larger capacity compressor and a smaller capacity compressor, which can be controlled and cycled by a controller to obtain different cooling capacities. The controller is also used for humidity control. The control system operates in a temperature control mode and enters a dehumidification mode only if the temperature control mode is unsuccessful at maintaining a desired humidity level. When dehumidification is required, the control system first attempts to control humidity by engaging the larger capacity compressor. If that is unsuccessful, then the larger capacity compressor is operated continuously with re-heaters to maintain a desired temperature and, if necessary, the lower capacity compressor can be cycled for temperature control. For a smaller load requirement in the system, the larger capacity compressor is cycled “on” in response to a call for cooling and/or dehumidification, a re-heater is cycled “on” in response to a call for dehumidification without a call for cooling, and a hot gas by-pass is engaged when there is a call for cooling without a call for dehumidification. One disadvantage of the '778 patent is that a reheater (or heater circuit) separate from the refrigerant circuit is used in the dehumidification operation.
U.S. Pat. No. 4,813,474, hereafter the '474 patent, describes an air conditioner that provides dehumidification. The air conditioner includes a refrigerant circuit or cycle with a variable capacity compressor and a reheater arranged in association with the indoor heat exchanger. The variable capacity compressor and reheater are controlled based on a temperature differential to provide cooling and dehumidification. For a large temperature differential, e.g. >3° C., only the variable capacity compressor is operated under high capacity to provide cooling. As the temperature differential becomes smaller, both the compressor and reheater are operated at varying levels to provide the appropriate amounts of re-heat for a given temperature differential. One disadvantage of the '474 patent is that a reheater (or heater circuit) separate from the refrigerant circuit is used in the dehumidification operation.
U.S. Pat. No. 5,752,389, hereafter the '389 patent, describes a cooling and dehumidification system that uses refrigeration re-heat for temperature control. The system has a standard refrigeration circuit with a re-heat coil connected in parallel with the outdoor coil and positioned adjacent to the indoor coil. A portion of the refrigerant is diverted from the outdoor coil to the re-heat coil to re-heat the air during the dehumidification mode, while the remaining refrigerant flows according to the regular refrigerant circuit. The amount of re-heat provided by the re-heat coil is determined in response to a sensor measurement in the discharge air and a set-point value. One disadvantage of the '389 patent is that the amount of available humidity control is based on the discharge air temperature.
U.S. Pat. No. 5,345,776, hereafter the '776 patent, describes a heat pump system that has two indoor heat exchangers connected by an expansion device in a single refrigeration circuit. During heating and cooling modes, both indoor heat exchangers function as condensers and evaporators, respectively. During dehumidification mode operation, the first indoor heat exchanger cools and dehumidifies the air and the second indoor heat exchanger heats the cooled air before it is supplied to the room. One disadvantage of the '776 patent is that humidity control cannot be provided during a cooling operation.
U.S. Pat. No. 5,129,234, hereafter the '234 patent, describes a humidity control for regulating compressor speed. The humidity control is used with a heat pump system having a two-speed compressor. The humidity control is a slave to the temperature control of the heat pump system in that the humidity control is non-functional when the temperature demand has been satisfied. The humidity control can override the temperature control to provide enhanced dehumidification. The humidity control will typically override a command for low speed compressor operation with a high speed command when certain predetermined humidity criteria are not satisfied. One disadvantage of the '234 patent is that humidity control cannot be provided without providing cooling to an interior space.
U.S. Pat. No. 6,644,049, hereafter the '049 patent, describes a space conditioning system having multi-stage cooling and dehumidification capability. The system includes plural refrigeration circuits operable in a cooling mode to provide cooled air to an indoor space. At least one of the refrigeration circuits is also operable in a reheat mode, wherein air is dehumidified by cooling it using an evaporator coil and then reheated using a reheat coil before the air is supplied to the space. Heated refrigerant gas or vapor discharged from the compressor may be routed directly to the condenser or can be routed to a reheat heat exchanger and then the condenser. One disadvantage of the '049 patent is that refrigerant has to be routed through the condenser before being provided to the evaporator.
Therefore, what is needed is a system and method that can provide both humidity control and some cooling to the interior space in response to demands for both humidity control and cooling.
The present invention is directed to a humidity control method for a multi-stage cooling system having two or more refrigerant circuits that balances humidity control and cooling demand. Each refrigerant circuit includes a compressor, a condenser and an evaporator. A hot gas re-heat circuit having a hot gas re-heat coil is connected to a compressor and an evaporator, which compressor and evaporator may be components of one of the refrigerant circuits. Air from the space requiring dehumidification is circulated over the evaporator of the hot-gas reheat circuit to provide dehumidification to the air when humidity control is requested. Refrigerant in the hot gas re-heat circuit bypasses a condenser of a refrigerant circuit during humidity control. Humidity control is only performed with cooling operations and ventilation operations. During a first stage cooling operation using only one refrigerant circuit and having a low cooling demand, the request for humidity control activates the hot gas re-heat circuit for dehumidification and activates a second refrigerant circuit to provide cooling capacity. During a second stage cooling operation using two or more refrigerant circuits and having a high cooling demand, the request for humidity control is suspended, the hot gas re-heat circuit is inactivated and is initiated only upon the completion of the second stage cooling demand.
One embodiment of the present invention is directed to a method of providing humidity control to air for an interior space. The method includes the steps of providing a first refrigerant circuit having a first compressor, a first condenser and a first evaporator, providing a second refrigerant circuit having a second compressor, a second condenser and a second evaporator and providing a hot gas re-heat circuit having an evaporator, a compressor and a re-heat coil. The evaporator and compressor of the hot gas re-heat circuit may be one of the existing evaporators and compressors, so long as suitable isolation valves are provided to isolate the operation of the compressor and the evaporator in the respective operational modes. The re-heat coil can be positioned adjacent to the first evaporator and the hot gas re-heat circuit is configured, when enabled, to bypass the first condenser to permit refrigerant to flow in the hot gas re-heat circuit from the first compressor through the re-heat coil to the first evaporator. The method also includes the steps of enabling the first refrigerant circuit and the second refrigerant circuit in response to a demand for humidity control and a demand for cooling, wherein the demand for cooling is one of a demand for stage one cooling and a demand for stage two cooling, and enabling the hot gas re-heat circuit in response to a demand for humidity control and a demand for stage one cooling.
Another embodiment of the present invention is directed to a heating, ventilation and air conditioning (HVAC) system for an interior space. The HVAC system includes a first refrigerant circuit having a first compressor, a first condenser and a first evaporator, a second refrigerant circuit having a second compressor, a second condenser and a second evaporator, and a hot gas re-heat circuit having a compressor, an evaporator and a re-heat coil. The compressor and evaporator may be, for example, the first compressor and the first evaporator when means are provided to isolate their operation from the refrigerant circuit when used in the reheat circuit and vice versa. The re-heat coil can be positioned adjacent to the first evaporator and the hot gas re-heat circuit is configured, when enabled, to bypass the first condenser and to permit refrigerant to flow from the first compressor through the reheat coil to the first evaporator. The HVAC system also includes a control system to control operation of the first refrigerant circuit, the second refrigerant circuit and the hot gas re-heat circuit. The control system enables the first refrigerant circuit, the second refrigerant circuit and the hot gas re-heat circuit in response to demands for humidity control and stage one cooling. The control system also enables the first refrigerant circuit and the second refrigerant circuit and disables the hot gas re-heat circuit in response to demands for humidity control and stage two cooling.
Still another embodiment of the present invention is directed to a method of providing humidity control to air for an interior space. The method includes the steps of providing a first refrigerant circuit having a first compressor, a first condenser and a first evaporator, providing a second refrigerant circuit having a second compressor, a second condenser and a second evaporator, and providing a hot gas re-heat circuit having a compressor, an evaporator and a re-heat coil. The compressor and evaporator may be, for example, the first compressor and the first evaporator when means are provided to isolate their operation from the refrigerant circuit when used in the reheat circuit and vice versa. The re-heat coil can be positioned adjacent to the first evaporator, and the hot gas re-heat circuit being configured, when enabled, to bypass the first condenser and to permit refrigerant to flow from the first compressor through the re-heat coil to the first evaporator. The method also includes the steps of enabling the first refrigerant circuit and the second refrigerant circuit in response to receiving only a demand for humidity control at a control panel and enabling the hot gas re-heat circuit in response to receiving only a demand for humidity control at the control panel.
Yet another embodiment of the present invention is directed to a heating, ventilation and air conditioning (HVAC) system for an interior space. The HVAC system having a first refrigerant circuit with a first compressor, a first condenser and a first evaporator, a second refrigerant circuit with a second compressor, a second condenser and a second evaporator, and a hot gas re-heat circuit with a compressor, an evaporator and a re-heat coil. The compressor and evaporator may be, for example, the first compressor and the first evaporator when means are provided to isolate their operation from the refrigerant circuit when used in the reheat circuit and vice versa. The re-heat coil can be positioned adjacent to the first evaporator, and the hot gas re-heat circuit being configured, when enabled, to be isolated from the first refrigerant circuit and to bypass the first condenser, to permit refrigerant to flow in the hot gas re-heat circuit from the first compressor through the reheat coil to the first evaporator. The HVAC also has a control system to control operation of the first refrigerant circuit, the second refrigerant circuit and the hot gas re-heat circuit. The control system is configured to enable the first refrigerant circuit and the second refrigerant circuit in response to receiving only a demand for humidity control and is configured to enable the hot gas re-heat circuit in response to receiving only a demand for humidity control.
A further embodiment of the present invention is directed to a heating, ventilation and air conditioning (HVAC) system for an interior space. The HVAC system includes a first refrigerant circuit having a first compressor, a first condenser, a first expansion device and a first evaporator, a second refrigerant circuit having a second compressor, a second condenser, a second expansion device and a second evaporator, and a hot gas re-heat circuit having a compressor, an evaporator and a re-heat coil. The compressor and evaporator may be, for example, the first compressor and the first evaporator when means are provided to isolate their operation from the refrigerant circuit when used in the reheat circuit and vice versa. The re-heat coil can be positioned adjacent to the first evaporator, and the hot gas re-heat circuit is configured, when enabled, to bypass the first condenser and to permit refrigerant to flow from the first compressor through the reheat coil to the first expansion device and first evaporator. The HVAC system also includes a control system to control operation of the first refrigerant circuit, the second refrigerant circuit and the hot gas re-heat circuit. The control system including two different control algorithms selectable by a user to control the HVAC system. The two different control algorithms include a first control algorithm being configured to enable the first refrigerant circuit, the second refrigerant circuit and the hot gas re-heat circuit in response to demands for humidity control and stage one cooling and a second control algorithm being configured to enable the first refrigerant circuit, the second refrigerant circuit and the hot gas re-heat circuit in response to a demand for only humidity control.
One advantage of the present invention is that comfort cooling in the interior space is not completely sacrificed when there is a demand for humidity control.
Another advantage of the present invention is that the use of the re-heat coil for additional dehumidification provides greater energy efficiency.
Other features and advantages of the present invention will be apparent from the following more detailed description of the preferred embodiment, taken in conjunction with the accompanying drawings which illustrate, by way of example, the principles of the invention.
Wherever possible, the same reference numbers will be used throughout the drawings to refer to the same or like parts.
The compressor used to provide the first level of cooling capacity can be referred to as the primary compressor or the stage one compressor and the compressor operated with the primary compressor to provide the second level of cooling capacity can be referred to as the secondary compressor or the stage two compressor. To simplify the explanation of the present invention and to correspond to the HVAC system 100 as shown in
The stage one compressor 102 is preferably operated during times when the cooling demand in the interior space is low. As the cooling demand in the interior space increases in response to a variety of factors such as the exterior temperature, the stage two or secondary compressor 104 is started. The operation of the two compressors 102 and 104 provides the maximum amount of cooling capacity from the HVAC system 100. A control program or algorithm executed by a microprocessor or control panel 150 is used to control operation of the HVAC system 100. The control program determines when the stage two compressor 104 is to be started in response to the higher cooling demand. The control program can receive a variety of possible inputs, such as temperature, pressure and/or flow measurements, in order to control operation of the HVAC system 100, e.g., for making the determination of when to start the stage two compressor 104. It is to be understood that the particular control program and control criteria for engaging and disengaging particular components of the HVAC system 100 can be selected and based on the particular performance requirements of the HVAC system 100 desired by a user of the HVAC system 100.
The compressors 102, 104 are each used with a separate refrigeration circuit. The compressors 102, 104 each compress a refrigerant vapor and deliver the compressed refrigerant vapor to a corresponding condenser 106, 108 by separate discharge lines. The condensers 106, 108 are separate and distinct from one another and can only receive refrigerant vapor from its corresponding compressor 102, 104. The condensers 106, 108 can be located in the same housing, can be positioned immediately adjacent to one another or alternatively, the condensers 106, 108 can be spaced a distance apart from one another. The positioning of the condensers 106, 108 can be varied so long as the separate refrigeration circuits are maintained. The refrigerant vapor delivered to the condensers 106, 108 enters into a heat exchange relationship with a fluid, preferably air, flowing over a heat-exchanger coil in the condenser 106, 108. To assist in the passage of the fluid over and around the heat exchanger coils of condensers 106, 108, fans 110 can be used to force air over the coils of the condensers 106, 108. The refrigerant vapor in the condensers 106, 108 undergoes a phase change to a refrigerant liquid as a result of the heat exchange relationship with the air flowing over the heat-exchanger coil. The condensed liquid refrigerant from condensers 106, 108 flows to a corresponding evaporator 112, 114 after passing through a corresponding expansion device 116. Similar to the condensers 106, 108, the evaporators 112, 114 are separate and distinct from one another and can only receive refrigerant from its corresponding condenser 106, 108. The evaporators 112, 114 can be located in the same housing, can be positioned immediately adjacent to one another or alternatively, the evaporators 112, 114 can be spaced a distance apart from one another. The positioning of the evaporators 112, 114 can be varied so long as the separate refrigeration circuits are maintained.
The evaporators 112, 114 can each include a heat-exchanger, such as a coil having a plurality of tube bundles within the evaporator 112, 114. A fluid, preferably air, travels or passes over and around the heat-exchanger coil of the evaporators 112, 114. Once the air passes through the evaporators 112, 114, it is blown by blower 118 to the interior space via supply duct 120. The liquid refrigerant in the evaporators 112, 114 enters into a heat exchange relationship with the air passing through and over the evaporators 112, 114 to chill or lower the temperature of the air before it is provided to the interior space by the blower 118 and the supply duct 120. The refrigerant liquid in the evaporators 112, 114 undergoes a phase change to a refrigerant vapor as a result of the heat exchange relationship with the air passing through the evaporators 112, 114. In addition to cooling the air, the evaporators 112, 114 also operate to remove moisture from the air passing through the evaporators 112, 114. Moisture in the air condenses on the coils of the evaporators 112, 114 as a result of the heat exchange relationship entered into with the refrigerant in the heat-exchanger coil. The vapor refrigerant in the evaporators 112, 114 then returns to the corresponding compressor 102, 104 by separate suction lines to complete the cycle. The conventional HVAC system 100 includes many other features that are not shown in
In addition, the HVAC system 100 can include one or more sensors 122 for detecting and measuring operating parameters of the HVAC system 100. The signals from the sensors 122 can be provided to a microprocessor or control panel 150 that controls the operation of the HVAC system 100 using the control programs discussed above. Sensors 122 can include pressure sensors, temperature sensors, flow sensors, or any other suitable type of sensor for evaluating the performance of the HVAC system 100.
The HVAC system 100 shown in
As mentioned above, the HVAC system 100 of
When HVAC system 100 is in a cooling mode, the valve arrangements 128, 130 are configured such that refrigerant is isolated from flowing in the hot gas re-heat circuit 126. The first valve arrangement 128 is configured or positioned to permit refrigerant to flow from the compressor 102 to the condenser 106 and the second valve arrangement 130 is configured or positioned to permit refrigerant to flow from the condenser 106 to the expansion device 116 and the evaporator 112. In contrast, when the HVAC system 100 is in a humidity control mode, the valve arrangements 128, 130 are configured such that refrigerant is isolated from flowing in the refrigerant circuit. The first valve arrangement 128 is configured or positioned to permit refrigerant to flow from the compressor 102 to the re-heat coil 132 and the second valve arrangement 130 is configured or positioned to permit refrigerant to flow from the re-heat coil 132 to the expansion device 116 and the evaporator 112. The re-heat coil 132 then performs heat exchange functions to condense the refrigerant gas when the HVAC system 100 is in humidity control mode. The first and second valve arrangements 128, 130 can be any type of valve or valve configuration that can permit and prevent the flow of refrigerant as described in detail above, including an arrangement that uses check valves and “T” fittings in the refrigerant lines.
The humidity control operation of the HVAC system 100 is also controlled by the microprocessor or control panel 150. The control panel 150 receives input signals from a controller(s), such as a thermostat or humidistat, indicating a demand for cooling, heating, ventilation and/or humidity control. More specifically, the control panel 150 can receive input signals indicating a demand for stage one cooling, stage two cooling, humidity control, heating, and ventilation. In another embodiment of the present invention, the control panel 150 can receive inputs signals indicating a demand for stage one heating and/or stage two heating instead of a general signal indicating a heating demand. The control panel 150 also receives signals from sensors 122 indicating the performance of the HVAC system 100. The control panel 150 then processes these input signals using the control method of the present invention and generates the appropriate control signals to the components of the HVAC system 100 to obtain the desired control response to the received input signals.
If a humidity control signal has been received, the process continues to step 206 to determine if the HVAC system 100 has received a heating mode signal. If the HVAC system 100 has received a heating mode signal in step 206, then primary and secondary compressors 102, 104 are disabled and/or shut down in step 208 and the hot gas re-heat circuit 126 is disabled as described above in step 204. The process then returns to step 202 to determine if a humidity control signal is present. When the HVAC system 100 is in the heating mode in response to receiving a heating mode signal, the compressors 102, 104 and the hot gas re-heat circuit 126 are disabled because the heating of the air by the heater 124 provides adequate lowering of the relative humidity of the air provided to the interior space. If the HVAC system is not in the heating mode in step 206, the process advances to step 210 to determine if the HVAC system 100 has received a cooling mode signal.
If the HVAC system 100 has received a cooling mode signal in step 210, the compressors 102, 104 are enabled and/or started in step 214. Next, the control advances to step 212 to determine if the HVAC system 100 has received a stage one cooling mode signal. If the HVAC system 100 has received a stage one cooling mode signal, the hot gas re-heat circuit 126 is enabled in step 216 to provide additional humidity control to the air provided to the interior space. The hot gas re-heat circuit 126 is enabled by positioning valves 128, 130 to prevent operation of the refrigerant circuit by preventing the flow of refrigerant to the condenser 106 and to enable operation of the hot gas re-heat circuit 126 by permitting the flow of refrigerant through the re-heat coil 132 to heat and possibly further dehumidify the air from the evaporator 112. The starting of the secondary compressor 104 in step 214 enables evaporator 114 to provide cooling to a portion of the air provided to the interior space to satisfy the cooling demand. In this mode, the HVAC system 100 can provide both cooling and dehumidification to the air to satisfy both cooling demands and humidity control demands.
If the HVAC system 100 has not received a stage one cooling mode signal in step 212, then the HVAC system 100 is requiring stage two cooling mode operation and both primary and secondary compressors 102, 104 are to be operated to provide cooling to the interior space. The hot gas re-heat circuit 126 is disabled in step 204 after the determination in step 212 indicates the need for stage two cooling and the process proceeds to the start to check for a humidity control signal in step 202. Humidity control using the hot gas re-heat circuit 126 is not provided when the HVAC system 100 is providing stage two cooling. The operation of the evaporators 112, 114 to cool the air, provides some dehumidification of the air to the interior space. Once the demand for stage two cooling is lowered or reduced to only require stage one cooling, the hot gas re-heat circuit 126 can be enabled to provide dehumidification as discussed in greater detail above with regard to steps 212-216.
Referring back to step 210, if the HVAC system 100 has not received a cooling mode signal, then the HVAC system 100 requires only humidity control. To provide humidity control, the primary compressor is enabled and/or started in step 222 and the hot gas re-heat circuit 126 is enabled in step 216 to provide humidity control to the air for the interior space. In another embodiment of the present invention, the control process can engage the blower 118 in conjunction with one or more of the operational modes of the HVAC system 100, i.e., the humidity control mode, cooling modes and heating mode.
Humidity control using the hot gas re-heat circuit 126 and re-heat coil 132 can be provided when the HVAC system 100 receives a humidity control signal and receives a stage one cooling mode signal, a ventilation demand signal for the ventilation mode discussed in detail above or is not in operation. By not engaging the hot gas re-heat circuit 126 for humidity control except for the above mentioned modes, the humidity control method of the present invention can balance the need for cooling with the need for humidity control.
If a heating demand signal has not been received in step 302 then a determination of whether a humidity control signal has been received by the microprocessor or control panel of the HVAC system 100 is completed in step 308. The humidity control signal indicating that humidity control is required in the interior space is generated by a controller such as a humidistat and provided to the control panel of the HVAC system 100. If a humidity control signal is not received in step 308, then the hot gas re-heat circuit 126 is disabled in step 310 and the compressors 102, 104 and fan 118 can be operated as described in detail below. Otherwise, the process continues to step 312 to determine if the control panel of the HVAC system 100 has received a stage one cooling demand signal.
If a stage one cooling demand signal has not been received in step 312 then the HVAC system 100 requires only humidity control. In step 214, the hot gas re-heat circuit 126 is enabled or opened. The hot gas re-heat circuit 126 is enabled by positioning valves 128, 130 to prevent the flow of refrigerant in the refrigerant circuit by isolating the flow of refrigerant to the condenser 106 and to permit the flow of refrigerant through the re-heat coil 132 to dehumidify the air flowing through the evaporator 112. Both compressors 102, 104 are enabled or started in step 316 and the fan 118 is enabled or started in step 318. The process then returns to step 302 to start again.
If a stage one cooling demand signal has been received in step 312 then a determination is made in step 320 if a stage two cooling demand signal has been received by the microprocessor or control panel 150 of the HVAC system 100. If a stage two cooling demand signal has not been received in step 320, then the HVAC system 100 requires only stage one cooling and the process then returns to step 314 to enable the re-heat circuit 126. In addition and as described above, both compressors 102, 104 are enabled in step 316 and the fan 118 is enabled in step 318. The process then returns to step 302 to start again. As discussed above, in the stage one cooling mode there is a low cooling demand on the HVAC system 100 and the enabling of both compressors 102, 104 and the hot gas re-heat circuit 126 permits both humidity control from the hot gas re-heat circuit 126 and some cooling capacity from evaporator 114. In this mode, the HVAC system 100 can provide both cooling and dehumidification to the air to satisfy both cooling demands and humidity control demands.
If a stage two cooling demand signal has been received in step 320, then the HVAC system 100 requires stage two cooling. For stage two cooling the hot gas re-heat circuit 126 is disabled in step 322. The process then returns to step 316 to enable both compressors 102, 104 and to enable the fan 118 in step 318. The process then returns to step 302 to start again. Humidity control using the hot gas re-heat circuit 126 is not provided when the HVAC system is providing stage two cooling. The operation of the evaporators 112, 114 to cool the air provides some dehumidification of the air to the interior space. Once the demand for stage two cooling is lowered or reduced to only require stage one cooling, the hot gas re-heat circuit 126 can be enabled to provide dehumidification as discussed in greater detail above with regard to steps 314-318.
Referring back to step 308, if a humidity control signal is not received in step 308, then the hot gas re-heat circuit 126 is disabled in step 310. Next, in step 324 a determination is made if the control panel of the HVAC system 100 has received a stage one cooling demand signal. If a stage one cooling demand signal is not received in step 324, then a determination is made if the control panel of the HVAC system has received a ventilation demand signal in step 326. If a ventilation demand signal is not received in step 326, then the process ends. Otherwise, the blower 118 is enabled and/or started in step 328 and the process then returns to step 302 to start again.
Referring back to step 324, if a stage one cooling demand signal is received, then the primary compressor 102 is enabled and/or started in step 330. Next in step 332, a determination is made if the control panel for the HVAC system 100 has received a stage two cooling demand signal. If a stage two cooling demand signal is received, then the secondary compressor is enabled and/or started in step 334 and the process returns to step 328 to enable the fan or blower 118. Otherwise, the blower 118 is enabled and/or started in step 328 and the process then returns to step 302 to start again.
As can be seen in the control process of
In a preferred embodiment of the present invention, the control processes of
In another embodiment of the present invention, the user of HVAC system 100 can view the control panel 150 to determine the particular humidity control mode. For example, if an LED on the control panel is flashing two times, then the HVAC system 100 can be in humidity control mode without any demand for cooling. However, if the LED on the control panel is flashing three times, then the HVAC system 100 can be in a humidity control mode while there is a demand for comfort cooling. It is to be understood that the display method on the control panel 150 of the humidity control mode can be modified for the particular requirements or needs of the user.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims.
This application claims the benefit of U.S. Provisional Application No. 60/498,779 filed Aug. 29, 2003 and is a continuation-in-part of application Ser. No. 10/694,331, filed on Oct. 27, 2003, which claims the benefit of U.S. Provisional Application No. 60/424,929 filed Nov. 8, 2002.
Number | Name | Date | Kind |
---|---|---|---|
3139735 | Malkoff et al. | Jul 1964 | A |
3316730 | Lauer | May 1967 | A |
3402564 | Nussbaum | Sep 1968 | A |
3779031 | Akiyama et al. | Dec 1973 | A |
3786859 | Day | Jan 1974 | A |
4018584 | Mullen | Apr 1977 | A |
4173125 | Bradshaw | Nov 1979 | A |
4173924 | Bradshaw | Nov 1979 | A |
4182133 | Haas et al. | Jan 1980 | A |
4189929 | Russell | Feb 1980 | A |
4270362 | Lancia et al. | Jun 1981 | A |
4271678 | Liebert | Jun 1981 | A |
4271898 | Freeman | Jun 1981 | A |
4290480 | Sulkowski | Sep 1981 | A |
4350023 | Kuwabara et al. | Sep 1982 | A |
4367631 | Johnson et al. | Jan 1983 | A |
4367787 | Bradshaw | Jan 1983 | A |
4398452 | Bradshaw | Aug 1983 | A |
4432147 | Chen et al. | Feb 1984 | A |
4442049 | Bloomer | Apr 1984 | A |
4494596 | Bradshaw | Jan 1985 | A |
4527247 | Kaiser et al. | Jul 1985 | A |
4813474 | Umezu | Mar 1989 | A |
4869073 | Kawai et al. | Sep 1989 | A |
4941325 | Nuding | Jul 1990 | A |
4942740 | Shaw et al. | Jul 1990 | A |
4974665 | Zillner, Jr. | Dec 1990 | A |
5062276 | Dudley | Nov 1991 | A |
5065586 | Shapiro-Baruch | Nov 1991 | A |
5129234 | Alford | Jul 1992 | A |
5265433 | Beckwith | Nov 1993 | A |
5345776 | Komazaki et al. | Sep 1994 | A |
5346128 | Wacker | Sep 1994 | A |
5390505 | Smith et al. | Feb 1995 | A |
5400607 | Cayce | Mar 1995 | A |
5450893 | Galba et al. | Sep 1995 | A |
5622057 | Bussjager et al. | Apr 1997 | A |
5752389 | Harper | May 1998 | A |
5887651 | Meyer | Mar 1999 | A |
5915473 | Ganesh et al. | Jun 1999 | A |
5984002 | Kido et al. | Nov 1999 | A |
5992160 | Bussjager et al. | Nov 1999 | A |
6012296 | Shah | Jan 2000 | A |
6055818 | Valle et al. | May 2000 | A |
6059016 | Rafalovich et al. | May 2000 | A |
6079483 | Morooka et al. | Jun 2000 | A |
6123147 | Pittman | Sep 2000 | A |
6131653 | Larsson | Oct 2000 | A |
6170271 | Sullivan | Jan 2001 | B1 |
6355091 | Felber et al. | Mar 2002 | B1 |
6381970 | Eber et al. | May 2002 | B1 |
6427454 | West | Aug 2002 | B1 |
6427461 | Whinery et al. | Aug 2002 | B1 |
6491094 | Rayburn et al. | Dec 2002 | B2 |
6553778 | Tipton et al. | Apr 2003 | B2 |
6644049 | Alford | Nov 2003 | B2 |
6705093 | Taras et al. | Mar 2004 | B1 |
6792767 | Pargeter et al. | Sep 2004 | B1 |
6826921 | Uselton | Dec 2004 | B1 |
7062930 | Rayburn | Jun 2006 | B2 |
20030029924 | Kloster | Feb 2003 | A1 |
Number | Date | Country |
---|---|---|
58-117935 | Jul 1983 | JP |
60-57142 | Apr 1985 | JP |
WO 8203269 | Sep 1982 | WO |
WO 0075742 | Dec 2000 | WO |
Number | Date | Country | |
---|---|---|---|
20050022541 A1 | Feb 2005 | US |
Number | Date | Country | |
---|---|---|---|
60498779 | Aug 2003 | US | |
60424929 | Nov 2002 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 10694331 | Oct 2003 | US |
Child | 10929757 | US |