The present disclosure relates to manipulating or handling tubulars on a drill rig. More particularly, the present application relates to robotically manipulating or handling tubulars between well center and a set back area. Still more particularly, the present application relates to robotically carrying drill pipe and/or drill collar between a well center and the set back area.
The background description provided herein is for the purpose of generally presenting the context of the disclosure. Work of the presently named inventors, to the extent it is described in this background section, as well as aspects of the description that may not otherwise qualify as prior art at the time of filing, are neither expressly nor impliedly admitted as prior art against the present disclosure.
Drilling of wells involves tripping of the drill string, during which drill pipes are lowered into (tripping in) or pulled out of (tripping out) a well. Drillers or well operators may perform tripping to change all or a portion of the bottom hole assembly, such as to change a drill bit. When tripping in, stands or lengths of drill pipe may be supplied from a storage position in a setback area of the drill rig and connected end-to-end to lengthen the drill string as the it is fed into the well. When tripping out, stands or lengths of drill pipe may be disconnected from the drill string and may be positioned in the setback area as the drill string is pulled out of the well.
Tripping has conventionally been performed with human operators. In particular, while an elevator or top drive may be used to carry the load of a stand of drill pipe during trip in and trip out operations, human operators may typically maneuver the drill pipe stands around the drill floor, such as between the well center and the setback area. For example, a first human operator may be positioned on the drill floor, at or near the well, to maneuver a lower end of drill pipe stands as they are tripped into or out of the well, while a second human operator may be positioned on or above the racking board to maneuver an upper end of drill pipe stands as the stands are moved between the well and the setback area. Operators often use ropes and/or other tools to maneuver the drill pipe stands on or above the drill floor. Such work is labor-intensive and can be dangerous. Moreover, tripping in and tripping out operations may be limited by the speed at which the human operators can maneuver the stands between well center and the setback area.
Still further, a drill string may be made up of a drill head arranged at the deepest tip of the string. A substantially heavy pipe, referred to as drill collar, may be arranged behind the drill head to create a weight on the deepest portions of the drill string. More conventional drill pipe may be arranged behind the drill collar and extending upward to the drill floor. When tripping in and/or out of a well, the handling of the drill collar can be much more labor intensive and potentially dangerous due to the very heavy nature of this portion of the drill string.
The following presents a simplified summary of one or more embodiments of the present disclosure in order to provide a basic understanding of such embodiments. This summary is not an extensive overview of all contemplated embodiments and is intended to neither identify key or critical elements of all embodiments, nor delineate the scope of any or all embodiments.
In one or more embodiments, a system for handling tubulars on a rig may include a top handling device configured for arrangement on the rig and for handling a top portion of a tubular to and from a setback area. The system may also include a lower handling device configured for arrangement on the rig and for handling a bottom portion of the tubular between well center and a release position. The system may also include a bottom handling device configured for arrangement on the rig and for handling the bottom portion of the tubular between the release position and the setback area.
In one or more embodiments, a tubular handling device for handling tubulars on a rig floor may include a rig floor lifting machine having a pipe lifting and carrying condition and a free condition, wherein, in the pipe lifting and carrying condition, the rig floor lifting machine is configured to engage a bottom portion of a tubular, lift the weight of the tubular, and carry the tubular to a setback area. The device may also include an articulable assembly configured to control the position of the rig floor lifting machine when the rig floor lifting machine is in a free condition.
In one or more embodiments, a method of handling tubulars on a rig may include decoupling a tubular from a pipe string, swinging the tubular from well center to a release area, and setting the tubular on the drill floor with a top drive elevator. The method may also include moving a rig floor lifting machine to the release area with an articulable assembly. The method may also include engaging the tubular with the rig floor lifting machine and carrying the tubular to a setback area with the rig floor lifting machine.
While multiple embodiments are disclosed, still other embodiments of the present disclosure will become apparent to those skilled in the art from the following detailed description, which shows and describes illustrative embodiments of the invention. As will be realized, the various embodiments of the present disclosure are capable of modifications in various obvious aspects, all without departing from the spirit and scope of the present disclosure. Accordingly, the drawings and detailed description are to be regarded as illustrative in nature and not restrictive.
While the specification concludes with claims particularly pointing out and distinctly claiming the subject matter that is regarded as forming the various embodiments of the present disclosure, it is believed that the invention will be better understood from the following description taken in conjunction with the accompanying Figures, in which:
The present disclosure, in one or more embodiments, relates to a system for handling tubulars on a drill rig. More particularly, the system relates to a robotic drill floor system for handling tubulars between well center and a setback area during tripping operations. More particularly, the system relates to a robotic drill floor system that has the capacity, not only to manipulate pipe in plan view, but, also to carry the weight of the pipe as it does so. As such, and in contrast to human operators, the system may have the ability to support the weight of the pipe during handling operations freeing up the top drive and/or top drive elevators to perform other operations.
Referring now to
This disclosure relates generally to methods and apparatus for handling the tubulars 6, 6′ on the rig 1. More specifically, this disclosure relates to a system for handling the tubular 6 from its location above the well 10 or at well center to a location in the setback area 7, and/or handling the tubular 6′ from its location on the setback area 7 to a location above the well 10.
In order to maintain a V-shaped guide for the tubulars 6, 6′ when the first catcher arm 20 and the second catcher arm 28 rotate horizontally under a force exerted respectively by the first actuator 22 and the second actuator 30, the lower handling device may include a control system. The control system may include a plurality of sensors configured to determine and/or monitor a position of the first catcher arm 20 and a position of the second catcher arm 28. The control system may include a controller driving the first actuator 22 and the second actuator 30 and the controller may be configured to mirror the position of the first catcher arm 20 with the position of the second catcher arm 28 and/or vice versa such that the position of the valley of the V-shaped guide may be generally centered between the crossbars 18/26. Where other positions of the tubular are desired, the control system may adjust the catcher arms relative to one another to move the position of the V-shaped guide along the length of one or both of the catcher arms. It is to be appreciated that the V-shaped guide may be maintained as the catcher arms rotated from the position shown in
When not in use, the first catcher arm 20 and the second catcher arm 28 may be stored out of the path along the well 10, the mouse hole 14, the setback area 7 and/or the V-door area by rotating the first catcher arm 20 and the second catcher arm 28 in the directions reverse from the arrows 16 and 24, respectively.
Still further, the bottom handling device may be adapted to accommodate misalignment of the upper section (with the “shoes”) and the lower section (with the wheels) by a pinned joint in between the sections. In one or more embodiments, the bottom handling device may include one actuated axis (controlled by the hydraulic cylinder or by the pipe when the caster wheel is lifted) and a second compliance axis which may be centered by a spring or other biasing mechanism 31 but may otherwise be uncontrolled. This system may allow for load in the shoes 34 to be balanced equally on both wheels 38 and may allow the bottom handling device to tip side to side to accommodate the angle of the tubular 6, 6′.
In order to control the movement of the rig-floor pipe lifting machine 32 on the rig floor 11, the lower handling device may include a navigation system. For example, the navigation system may include a link 40 attached between the rig-floor pipe lifting machine 32 and the rig floor 11. The navigation system may include a plurality of sensors mounted on the link 40. Each of the plurality of sensors may generate a signal indicative of a position or a movement of a portion of the link 40. The navigation system may include a controller programmed to drive at least one of the plurality of wheels 38 based on the signals generated by the sensors. The link 40 can also deliver power (e.g., hydraulic power, electric power, etc.) to the rig-floor pipe lifting machine 32 for rotating one or more of the plurality of wheels 38.
The three components of the system for handling the tubulars that have been illustrated in
As shown in
As shown in
In
As shown in
In
In
In
In
In
The cycle of steps illustrated in
The sequence of steps illustrated in
The system for handling the tubulars in accordance with the embodiment of the present application may be readily retrofittable on existing rigs. That is, for example, the top handling device may be mounted on the mast 2, below the fingerboard 2. Further, the crossbars 18/26 may be clamped, welded, or otherwise secured to the mast 2, and or additional beams 2′ may be connected between the mast 2 and the rig floor 11. Still further, because the rig-floor pipe lifting machine 32 is powered by a plurality of wheels 38, its implementation does not require the addition of rails or other guiding devices on the rig floor 11. Also, the sensors for controlling the position and/or movement of the rig-floor pipe lifting machine 32 and the power delivery to the rig-floor pipe lifting machine 32 can conveniently be provided by the link 40, therefore localizing the connections to the rig-floor pipe lifting machine 32 along a single path to avoid encumbering the setback area 7 and/or the V-door area with multiple wires and conduits.
In another embodiment shown in
Referring to
The base may also include a pivoting control portion 154 configured to control the pivoting position of the inner boom relative to the base. As shown, the pivoting control portion may include a hydraulic ram offset from the pivot axis of the inner boom and adapted to extend to pivot the inner boom downward about the pivot point and retract to pivot the inner boom upward about the pivot point. The pivoting control portion may also include a motor for causing the same or similar motion.
The inner boom 144 of the articulable assembly may be configured to be pivoted and rotated about the base 142 and for lifting and controlling the position of the outer elements of the articulable assembly 140 and the rig floor lifting machine. The inner boom may extend away from the base to a knuckle or additional pivot point 156 about which an outer boom 146 may pivot. The inner boom 144 may be a substantially strong arm configured to carry the weight of the rig floor lifting machine 132 at relative long distances. The inner boom 144 may include a built-up or cast element or a more standard section such as a tube, pipe, or other structural member may be used.
The outer boom 146 of the articulable assembly may be configured to be pivoted about the knuckle 156 relative to the inner boom 144 and to control the position of the head 148 and rig floor lifting machine relative to the inner boom. The outer boom 146 may extend away from the knuckle 156 to the head 148 and may be a substantially strong arm configured to carry the weight of the rig floor lifting machine 132. The inner boom may include a built up or cast element or a more standard section such as a tube, pipe, or other structural member may be used.
The outer boom 146 may be pivoted relative to the inner boom 144 by way of a motor assembly driving a gear system. As shown, a gear assembly may be arranged at the knuckle where the inner and outer booms meet and powering of the motor may cause the outer boom to articulate relative to the inner boom.
The inner boom 144 may also include a head swivel control 158. The head swivel control 158 may be arranged to cause pivoting motion of the head about an axis extending along the longitudinal axis of the outer boom 146. For example, as shown, the head swivel control 158 may include a motor and gear box arranged on the back end of the outer boom near the knuckle. Powering of the motor may cause rotation of the gear box and rotation of the head relative to the outer boom and about the longitudinal axis of the outer boom.
The head 148 may be positioned on an outer most end of the outer boom 146 and may be adapted for swiveling motion relative to the outer boom and for pivotally engaging the rig floor lifting machine 132. That is, the head may include a jaw structure 160 with yet another pivoting component 162 arranged therein. The jaw component 160 may include a pair of opposing arms or plates extending away from the outer boom and forming a receiving space therebetween. A dual swivel mechanism 162 may be arranged on the top of the rig floor lifting machine 132 and the dual swivel mechanism may allow the rig floor lifting machine to pivot about a vertical axis relative to the jaw 160 and to pivot about a horizontal axis relative to the jaw where horizontal and vertical are relative to the drill floor (e.g., where the drill floor is arranged horizontally).
As shown in
With reference to
As shown in
The head 148 of the articulable assembly may secure the dual swivel mechanism 162 between its arms 160 and the dual swivel mechanism 162 may be swiveled in two directions causing the rig floor lifting machine 132 to be arranged vertically below the head 148 and pivoted relative to the plane of the inner and outer booms 144, 146.
In one or more embodiments, as shown, the articulable assembly 140 may include an ABB IRB 6660-205. However, still other options may be available and selections may be based on design factors including, for example, the potential payload and the potential reach of the system. The articulable assembly 140 may provide for many degrees of control and motion. The articulable assembly 140 may allow for positioning the head 148 at any position and at any angle and may further be able to float in situations where the bottom handling device 132 may control its own position and motion.
It is to be appreciated that while the articulable assembly 140 may be adapted to more positively control the position of the rig floor lifting machine as compared to the link 40, the rig floor lifting machine may continue to do the work of lifting and handling of tubulars. That is, in an effort to avoid having the articulable assembly become overly heavy and bulky, the articulable assembly may be adapted to lift and carry the rig floor lifting machine so as to have the ability to reposition the machine and control the position of the machine, but may avoid being designed to carry the weight of drill pipe or tubulars. As such, the rig floor lifting machine may include at least two conditions; a lifting and carrying condition and a free condition. In the lifting and carrying condition, the rig floor lifting machine may be configured for engaging and lifting and carrying pipe to a setback area. In this condition, the articulable assembly may be configured to float and/or follow the rig floor lifting machine without inhibiting its motion. That is, the joints and controls of the articulable assembly may passively follow the rig floor lifting machine. More particularly, the x, y, and z positions of the articulable assembly may be allowed to float and allow the rig floor lifting machine to push both the tubular and the articulable assembly. However, the articulable assembly may remain in a monitoring state so that the position of the rig floor lifting machine may be monitored. In a free condition, the rig floor lifting machine may act passively. That is, the articulable assembly may guide, lift, push, or otherwise control the position of the rig floor lifting machine so as to more accurately, quickly, or suitably position the rig floor lifting machine. In still other embodiments, in the lifting and carrying condition, the rig floor lifting machine may lift and carry the weight of the tubular, but articulable assembly may continue to control the motion of the rig floor lifting machine about the rig floor. As such, the articulable assembly may push, pivot, and/or pull the rig floor lifting machine about the rig floor to move the tubular from the release position to the setback area and/or vice versa.
In one or more embodiments, the rig floor lifting machine may be hydraulically actuated and the articulable assembly may be electrically driven. In one or more embodiments, the opposite may be true or a combination of hydraulic and electric power may be provided.
It is to be appreciated that the bottom handling device described with respect to
As used herein, the terms “substantially” or “generally” refer to the complete or nearly complete extent or degree of an action, characteristic, property, state, structure, item, or result. For example, an object that is “substantially” or “generally” enclosed would mean that the object is either completely enclosed or nearly completely enclosed. The exact allowable degree of deviation from absolute completeness may in some cases depend on the specific context. However, generally speaking, the nearness of completion will be so as to have generally the same overall result as if absolute and total completion were obtained. The use of “substantially” or “generally” is equally applicable when used in a negative connotation to refer to the complete or near complete lack of an action, characteristic, property, state, structure, item, or result. For example, an element, combination, embodiment, or composition that is “substantially free of” or “generally free of” an element may still actually contain such element as long as there is generally no significant effect thereof.
In the foregoing description various embodiments of the present disclosure have been presented for the purpose of illustration and description. They are not intended to be exhaustive or to limit the invention to the precise form disclosed. Obvious modifications or variations are possible in light of the above teachings. The various embodiments were chosen and described to provide the best illustration of the principals of the disclosure and their practical application, and to enable one of ordinary skill in the art to utilize the various embodiments with various modifications as are suited to the particular use contemplated. All such modifications and variations are within the scope of the present disclosure as determined by the appended claims when interpreted in accordance with the breadth they are fairly, legally, and equitably entitled.
This application claims priority to U.S. Provisional Application Ser. No. 62/653,254, filed on Apr. 5, 2018, and entitled “SYSTEM FOR HANDLING TUBULARS ON A RIG.” This application is also related to U.S. Provisional Application Ser. No. 62/506,813, filed on May 16, 2017, and entitled “RIG-FLOOR PIPE LIFTING MACHINE.” The content of both of the above-mentioned applications are hereby incorporated by reference herein in their entireties.
Number | Name | Date | Kind |
---|---|---|---|
1818278 | Siler | Aug 1931 | A |
2531930 | Woolslayer et al. | Nov 1950 | A |
2615681 | True | Oct 1952 | A |
2735556 | Stone | Feb 1956 | A |
2885096 | De Jarnett | May 1959 | A |
2946464 | Guier | Jul 1960 | A |
3225949 | Erickson | Dec 1965 | A |
3272365 | Stevens | Sep 1966 | A |
3533516 | Guier | Oct 1970 | A |
3615027 | Ham | Oct 1971 | A |
3747789 | Shipley | Jul 1973 | A |
3768663 | Turner et al. | Oct 1973 | A |
3921823 | Bourree | Nov 1975 | A |
3976207 | Schultz | Aug 1976 | A |
3994350 | Smith et al. | Nov 1976 | A |
4042123 | Sheldon | Aug 1977 | A |
4117941 | McCleskey, Jr. | Oct 1978 | A |
4274778 | Putnam et al. | Jun 1981 | A |
4289442 | Stevens | Sep 1981 | A |
4348920 | Boyadjieff | Sep 1982 | A |
4397605 | Cowgill | Aug 1983 | A |
4531875 | Krueger | Jul 1985 | A |
4591006 | Hutchison et al. | May 1986 | A |
4621974 | Krueger | Nov 1986 | A |
4680519 | Chand | Jul 1987 | A |
4715761 | Berry | Dec 1987 | A |
4738321 | Olivier | Apr 1988 | A |
5038871 | Dinsdale | Aug 1991 | A |
5211251 | Woolslayer | May 1993 | A |
5813286 | Hansen | Sep 1998 | A |
5921329 | Armstrong | Jul 1999 | A |
6047771 | Røynestad | Apr 2000 | A |
6260646 | Fernandez | Jul 2001 | B1 |
6412576 | Meiners | Jul 2002 | B1 |
7137616 | Kysely | Nov 2006 | B2 |
7249639 | Belik | Jul 2007 | B2 |
7370707 | McDaniel | May 2008 | B2 |
7726929 | Orgeron | Jun 2010 | B1 |
7905311 | Brown | Mar 2011 | B2 |
7946795 | Orgeron | May 2011 | B2 |
7984757 | Keast et al. | Jul 2011 | B1 |
8191637 | Havinga | Jun 2012 | B2 |
8550761 | Belik | Oct 2013 | B2 |
8690508 | Orgeron | Apr 2014 | B1 |
9291010 | Barnes | Mar 2016 | B1 |
10384907 | Upmeier et al. | Aug 2019 | B2 |
20040057815 | Woolslayer et al. | Mar 2004 | A1 |
20050126792 | Berry | Jun 2005 | A1 |
20060081379 | Fehres et al. | Apr 2006 | A1 |
20060104747 | Zahn et al. | May 2006 | A1 |
20060124316 | Pietras | Jun 2006 | A1 |
20060231344 | Drzewiecki | Oct 2006 | A1 |
20060249292 | Guidry | Nov 2006 | A1 |
20070062705 | Schats et al. | Mar 2007 | A1 |
20070114069 | Hooper | May 2007 | A1 |
20080202812 | Childers et al. | Aug 2008 | A1 |
20080238095 | Yater et al. | Oct 2008 | A1 |
20080296065 | Standal | Dec 2008 | A1 |
20090283324 | Konduc et al. | Nov 2009 | A1 |
20100193198 | Murray et al. | Aug 2010 | A1 |
20100303586 | Hankins et al. | Dec 2010 | A1 |
20110079434 | Belik et al. | Apr 2011 | A1 |
20110120730 | Clasen | May 2011 | A1 |
20110226485 | Seneviratne et al. | Sep 2011 | A1 |
20120018222 | Hankins et al. | Jan 2012 | A1 |
20130075114 | Dekker et al. | Mar 2013 | A1 |
20130142607 | Ditzler | Jun 2013 | A1 |
20140054089 | Sondervik | Feb 2014 | A1 |
20140097027 | Marica et al. | Apr 2014 | A1 |
20140145408 | Midas | May 2014 | A1 |
20140202769 | Magnuson | Jul 2014 | A1 |
20150053424 | Wiens et al. | Feb 2015 | A1 |
20150232272 | Magnuson | Aug 2015 | A1 |
20150275596 | Hickie | Oct 2015 | A1 |
20160060979 | Magnuson | Mar 2016 | A1 |
20160115745 | Bisel | Apr 2016 | A1 |
20160145954 | Helms et al. | May 2016 | A1 |
20160160586 | Keogh et al. | Jun 2016 | A1 |
20160168929 | Magnuson et al. | Jun 2016 | A1 |
20170234088 | Orr et al. | Aug 2017 | A1 |
20180334865 | Miller et al. | Nov 2018 | A1 |
20190145197 | Callaghan | May 2019 | A1 |
20200040673 | Donnally et al. | Feb 2020 | A1 |
20200040674 | Mckenzie et al. | Feb 2020 | A1 |
Number | Date | Country |
---|---|---|
2911388 | Nov 2014 | CA |
2855105 | Dec 2015 | CA |
108266139 | Jul 2018 | CN |
110792399 | Feb 2020 | CN |
1953334 | Aug 2008 | EP |
2091788 | Aug 1982 | GB |
2532267 | May 2016 | GB |
20151648 | Dec 2015 | NO |
WO-8800274 | Jan 1988 | WO |
WO-9958811 | Nov 1999 | WO |
0123701 | Apr 2001 | WO |
WO-2004018829 | Mar 2004 | WO |
WO-2013082172 | Jun 2013 | WO |
WO-2014179730 | Nov 2014 | WO |
WO-2016024859 | Feb 2016 | WO |
WO-2016197255 | Dec 2016 | WO |
WO-2017039996 | Mar 2017 | WO |
2017087595 | May 2017 | WO |
WO-2017190120 | Nov 2017 | WO |
WO-2017193204 | Nov 2017 | WO |
WO-2020028852 | Feb 2020 | WO |
WO-2020028853 | Feb 2020 | WO |
WO-2020028856 | Feb 2020 | WO |
WO-2020028858 | Feb 2020 | WO |
WO-2020151386 | Jul 2020 | WO |
WO-2020172407 | Aug 2020 | WO |
Entry |
---|
“International Application Serial No. PCT US2019 025942, International Search Report dated Jun. 27, 2019”, 4 pgs. |
“International Application Serial No. PCT US2019 025942, Written Opinion dated Jun. 27, 2019”, 9 pgs. |
U.S. Appl. No. 16/098,160, filed Nov. 1, 2018, System and Method for Offline Standbuilding. |
U.S. Appl. No. 16/431,533, filed Jun. 4, 2019, Devices, Systems, and Methods for Robotic Pipe Handling. |
U.S. Appl. No. 16/836,365, filed Mar. 31, 2020, Robotic Pipe Handling From Outside a Setback Area. |
U.S. Appl. No. 16/431,540, filed Jun. 4, 2019, Devices, Systems, and Methods for Top Drive Clearing. |
U.S. Appl. No. 16/786,345, filed Feb. 10, 2020, Quick Coupling Drill Pipe Connector. |
“U.S. Appl. No. 16/098,160, Advisory Action dated Jul. 22, 2020”, 5 pgs. |
“U.S. Appl. No. 16/098,160, Examiner Interview Summary dated Jun. 23, 2020”, 3 pgs. |
“U.S. Appl. No. 16/098,160, Final Office Action dated Apr. 30, 2020”, 7 pgs. |
“U.S. Appl. No. 16/098,160, Non Final Office Action dated Sep. 30, 2019”, 8 pgs. |
“U.S. Appl. No. 16/098,160, Preliminary Amendment filed Nov. 1, 2018”, 5 pgs. |
“U.S. Appl. No. 16/098,160, Response filed Jan. 30, 2020 to Non Final Office Action dated Sep. 30, 2019”, 8 pgs. |
“U.S. Appl. No. 16/098,160, Response filed Jun. 30, 2020 to Final Office Action dated Apr. 30, 2020”, 8 pgs. |
“U.S. Appl. No. 16/098,160, Response filed Aug. 24, 2020 to Advisory Action dated Jul. 22, 2020”, 9 pgs. |
“U.S. Appl. No. 16/431,540, Non Final Office Action dated Jun. 10, 2020”, 13 pgs. |
“U.S. Appl. No. 16/431,540, Response Filed Sep. 10, 2020 to Non Final Office Action dated Jun. 10, 2020”, 24 pgs. |
“Canadian Application Serial No. 3,022,888, Voluntary Amendment filed Jul. 12, 2019”, 10 pgs. |
“International Application Serial No. PCT/CA2017/000125, International Preliminary Report on Patentability dated Nov. 22, 2018”, 6 pgs. |
“International Application Serial No. PCT/CA2017/000125, International Search Report dated Aug. 14, 2017”, 3 pgs. |
“International Application Serial No. PCT/CA2017/000125, Written Opinion dated Aug. 14, 2017”, 4 pgs. |
“International Application Serial No. PCT/CN2019/124443, International Search Report dated Mar. 5, 2020”, 4 pgs. |
“International Application Serial No. PCT/CN2019/124443, Written Opinion dated Mar. 5, 2020”, 4 pgs. |
“International Application Serial No. PCT/US2019/025942, Response filed Feb. 5, 2020 to Written Opinion dated Feb. 27, 2019”, 14 pgs. |
“International Application Serial No. PCT/US2019/025942, Response filed Apr. 23, 2020 to Written Opinion dated Apr. 23, 2020”, 14 pgs. |
“International Application Serial No. PCT/US2019/025942, Written Opinion dated Feb. 24, 2020”, 8 pgs. |
“International Application Serial No. PCT/US2019/025942, Written Opinion dated Jul. 23, 2020”, 5 pgs. |
“International Application Serial No. PCT/US2019/044974, International Search Report dated Oct. 24, 2019”, 6 pgs. |
“International Application Serial No. PCT/US2019/044974, Response filed Jun. 2, 2020 to Written Opinion dated Oct. 24, 2019”, 13 pgs. |
“International Application Serial No. PCT/US2019/044974, Response filed Aug. 18, 2020 to Written Opinion dated Jun. 19, 2020”, 4 pgs. |
“International Application Serial No. PCT/US2019/044974, Written Opinion dated Jun. 19, 2020”, 7 pgs. |
“International Application Serial No. PCT/US2019/044974, Written Opinion dated Oct. 24, 2019”, 6 pgs. |
“International Application Serial No. PCT/US2019/044976, International Search Report dated Oct. 18, 2019”, 5 pgs. |
“International Application Serial No. PCT/US2019/044976, Response filed Jun. 30, 2020 to Written Opinion dated Oct. 18, 2019”, 11 pgs. |
“International Application Serial No. PCT/US2019/044976, Response filed Aug. 25, 2020 to Written Opinion dated Jun. 26, 2020”, 3 pgs. |
“International Application Serial No. PCT/US2019/044976, Written Opinion dated Jun. 26, 2020”, 4 pgs. |
“International Application Serial No. PCT/US2019/044976, Written Opinion dated Oct. 18, 2019”, 8 pgs. |
“International Application Serial No. PCT/US2019/044979, International Search Report dated Oct. 22, 2019”, 6 pgs. |
“International Application Serial No. PCT/US2019/044979, Response filed Jun. 3, 2020 to Written Opinion dated Oct. 22, 2019”, 12 pgs. |
“International Application Serial No. PCT/US2019/044979, Response filed Aug. 25, 2020 to Written Opinion dated Jun. 26, 2020”, 3 pgs. |
“International Application Serial No. PCT/US2019/044979, Written Opinion dated Jun. 26, 2020”, 4 pgs. |
“International Application Serial No. PCT/US2019/044979, Written Opinion dated Oct. 22, 2019”, 7 pgs. |
“International Application Serial No. PCT/US2019/044983, International Search Report dated Oct. 22, 2019”, 5 pgs. |
“International Application Serial No. PCT/US2019/044983, Written Opinion dated Oct. 22, 2019”, 6 pgs. |
“International Application Serial No. PCT/US2020/019039, International Search Report dated May 15, 2020”, 2 pgs. |
“International Application Serial No. PCT/US2020/019039, Written Opinion dated May 15, 2020”, 4 pgs. |
“U.S. Appl. No. 16/098,160, Non Final Office Action dated Oct. 6, 2020”, 8 pgs. |
“U.S. Appl. No. 16/431,540, Final Office Action dated Nov. 19, 2020”, 10 pgs. |
“International Application Serial No. PCT/US2019/025942, International Preliminary Report on Patentability dated Oct. 30, 2020”, 7 pgs. |
“International Application Serial No. PCT/US2019/025942, Response filed Sep. 22, 2020 to Written Opinion dated Jul. 23, 2020”, 4 pgs. |
“International Application Serial No. PCT/US2019/044974, International Preliminary Report on Patentability dated Nov. 11, 2020”, 7 pgs. |
“International Application Serial No. PCT/US2019/044976, Written Opinion dated Nov. 6, 2020”, 6 pgs. |
“International Application Serial No. PCT/US2019/044979, International Preliminary Report on Patentability dated Nov. 18, 2020”, 7 pgs. |
“International Application Serial No. PCT/US2019/124443, Response filed Nov. 24, 2020 to Written Opinion dated Mar. 5, 2020”, 10 pgs. |
Number | Date | Country | |
---|---|---|---|
20190309585 A1 | Oct 2019 | US |
Number | Date | Country | |
---|---|---|---|
62653254 | Apr 2018 | US |