The present invention relates to a system for manufacturing an adaptable precast foundation structure for a wind turbine that is configured taking into account the wind turbine loads and soil conditions.
The object of the present invention is a system for manufacturing an adaptable precast foundation structure for a wind turbine which allows that a large part of the foundation structure is homogenized, despite the fact that the transition structure being manufactured with the system is dependent of the type of soil and that the size of said transition structure varies depending on the soil, making it easily adaptable to the geotechnical conditions of each wind turbine position of the windfarm which allows a significant reduction in time and cost.
The invention also relates to a method for manufacturing an adaptable precast foundation structure for a wind turbine and to a wind turbine manufactured with said method.
The invention also relates to a system for manufacturing a precast foundation structure for a wind turbine, to a method for manufacturing a precast foundation structure for a wind turbine and to a precast foundation structure for a wind turbine.
As wind turbines grow in height, rotor diameter and rated power, the foundation needed to support them also increases. The cost of the foundation is approximately 16% of the total cost of the wind farm, so any optimization in it has a great impact on the capital expenditure.
Large wind farms with a large number of wind turbines take up large areas of land so it is common that the mechanical properties of the ground in which they must be installed are different in different areas of a same wind farm. Each wind turbine has its own foundation design associated with it, which allows the loads to be transmitted from the tower to the ground but, when ground conditions change, the entire foundation must be redesigned.
It is known foundations for a tower structure having a central pedestal of the rib on a slab type comprising a prefabricated or cast-in-situ rib with a horizontal base having two sides and having a means along the length of the two sides of the horizontal base, or a means, under the base for connecting to and being structurally fixed to a cast-in-situ slab, wherein such means ensure structural continuity of the slab across or under the rib, and the rib has a proximal vertical end having a means thereon for connecting to and being structurally fixed to a cast-in-situ pedestal wherein such means ensure structural continuity of the pedestal to the rib, and post tensioning elements running through the ribs and the pedestal for connecting the ribs to the pedestal under post compression stress.
It is also known a foundation system for a tower, such as a wind turbine, that includes a central hub assembly, a plurality of post-tensioned concrete beams, and an anchoring system associated with each beam, wherein in use the foundation system is arranged so that the bottom surfaces of the concrete beams bear on ground and the anchoring is disposed within the ground.
However, in the above cited foundations the dimensions of the foundation structure do not take into account the soil conditions when the latter change. The system for manufacturing an adaptable precast foundation structure for a wind turbine of the present invention solves the aforementioned drawbacks.
The present invention relates to a system for manufacturing an adaptable precast foundation structure for a wind turbine which allows that a large part of the foundation structure is homogenized, despite the fact that the transition structure being manufactured with the system is dependent of the type of soil and that the size of said transition structure varies depending on the soil, making it easily adaptable to the geotechnical conditions of each wind turbine position of the windfarm which allows a significant reduction in time and cost.
The invention relates to a system for manufacturing an adaptable precast foundation structure for a wind turbine, wherein the adaptable precast foundation structure comprises:
Preferably, the representative dimension of the at least a first rib of the transition structure is the length of the at least a first rib of the transition structure.
Thus configured, the system uses the at least one mould to make possible to modify the dimensions of the at least the first rib of the transition structure in such a way that the size of the foundation structure can be adapted according to wind turbine loads and soil conditions. Furthermore, the at least one mould is reusable.
In this way, with the system of the present invention it is possible to homogenize a large part of the foundation structure for different wind turbines, despite the fact that the transition structure is dependent of the type of soil and that the size of the transition structure will change depending on the soil. In particular, the foundation structure is easily adaptable to the geotechnical conditions of each wind turbine location of the windfarm which allows a significant reduction in time and cost.
The system for manufacturing an adaptable precast foundation structure for a wind turbine so configured has additional advantages to those explained above:
Preferably, the system further comprises at least a second mould configured to cast at least a second rib of the transition structure, wherein the second mould comprises a main formwork and an auxiliary formwork, and wherein the auxiliary formwork is configured to adjust at least a representative dimension of the at least a second rib of the transition structure.
In this way, the auxiliary formwork of the first mould and/or of the second mould comprises a plate that is displaceable along the representative dimension of at least a first rib and/or of the at least a second rib respectively, Thus, before the concreting means pours concrete into the first mould or the second mould, the representative dimension is adjusted.
Preferably, the representative dimension of the at least a second rib of the transition structure is the length of the at least a second rib of the transition structure.
Preferably, the auxiliary formwork of the first mould configured to adjust at least a representative dimension of the at least a first rib and the auxiliary formwork of the second mould configured to adjust at least a representative dimension of the at least a second rib are configured to adjust the same representative dimension for the at least a first rib and the at least a second rib, being preferably configured to adjust the same representative dimension to the same value for both the at least a first rib and the at least a second rib or being preferably configured to adjust the same representative dimension to a different value for the at least a first rib and the at least a second rib.
In this way, it is possible to adjust the at least a representative dimension of the at least a first rib in a dependent or independent manner of adjusting the at least a representative dimension of the at least a second rib depending of the type of soil and the necessary size of each rib of the transition structure.
Preferably, the at least a first mould and/or the at least a second mould are/is also configured to cast at least partially the plinth.
Preferably, the at least a representative dimension of the at least a first rib and/or of the at least a second rib, depends on a total diameter of the foundation, which in turn depends on the type of soil. Preferably, the at least a representative dimension of the at least a first rib and/or of the at least a second rib is the length of the at least a first rib and/or the length of the at least a second rib respectively, being half of the difference of the total diameter of the foundation minus an outer diameter of the plinth.
Optionally, the main formwork of the first mould and/or of the second mould further comprises a template configured to define at least a channel in a lower surface of the at least the first rib and/or of the second mould of the plurality of ribs of the transition structure. Thus configured, slippage between the transition structure and the footing is avoided when the adaptable precast foundation is manufactured.
Optionally, the main formwork of the first mould and/or of the second mould is an open formwork, thus defining at least one free surface wherein first reinforcement elements are intended to be attached. Preferably, the at least one free surface of the open formwork defines the lower surface of the at least the first rib and/or of the at least the second rib respectively, of the plurality of ribs of the transition structure. In this way, a structural connection between the transition structure and the footing is performed when the footing is casted in-situ, since the first reinforcement element of the at least the first rib and/or the at least the second rib of the plurality of ribs of the transition structure, being lower reinforcements elements, weaves together with the footing. This structural connection between the transition structure and the footing allows that the weight of the footing itself and the ground located on top of it contribute to guarantee the stability of the wind turbine.
Optionally, both options, the main formwork comprising a template and the main formwork being an open formwork can be combined.
Additionally, the main formwork of the first mould and/or the second mould comprises first lateral walls configured to define two lateral surfaces of the plinth wherein second reinforcement elements, being lateral reinforcements, are intended to be attached. The first lateral walls of the main formwork comprise side-opening gates which allow to attach the lateral reinforcements and open the gates once the concrete has completely set, so the first lateral walls are removed allowing the at least a first rib and/or the second rib to be removed with the lateral reinforcement elements already attached. In this way, a structural connection between all the elements forming the plinth is performed when the plinth is assembled. The structural connection between all elements forming the plinth allows that the plinth so formed works as a monolithic element.
Optionally, the system further comprises concreting means configured to pour concrete into the first mould and/or into the second mould.
Preferably, the system for manufacturing an adaptable precast foundation structure for a wind turbine further comprises transportation means configured to transport at least a first rib and/or at least a second rib of the plurality of ribs of the transition structure from the first mould and/or the second mould respectively, to the wind turbine location.
In case that the at least a first mould and/or the at least a second mould are/is also configured to cast at least partially the plinth, the transportation means are also configured to transport the at least a first rib together with at least partially the plinth and/or the at least a second rib together with at least partially the plinth.
Optionally, the system further comprises means for casting the footing.
Preferably, the means for casting the footing comprises an additional mould configured to precast at least partially the footing of the adaptable precast foundation structure. In this way, the footing is a precast concrete footing, preferably a slab.
Also preferably, the means for casting the footing are means for casting the footing in-situ. In this way, the footing is a cast-in-situ concrete footing, preferably a slab. This ensures a homogeneous soil-structure contact beneath the whole foundation structure.
Also preferably, the means for casting the footing are means for casting the footing partially in the factory and partially in-situ. Preferably, the footing comprises a framework and concrete, wherein the framework is casted in the factory and the concrete is poured in-situ.
For both of the additional mould or the means for casting the footing in-situ, the dimensions of the foundation structure, in particular the at least a representative dimension of the at least a first rib and/or at least a second rib of the transition structure, and optionally an inner and an outer diameter of the footing being a slab, depends on the wind turbine loads and also on the strength and the elastic properties of the soil.
Optionally, the system further comprises assembly means configured to carry out the assembly of at least the plurality of ribs of the transition structure and optionally at least partially the plinth in the case that the at least a first mould and/or the at least a second mould are/is also configured to cast at least partially the plinth together with the at least a first rib and/or the at least a second rib respectively.
Preferably, the assembly means are configured to carry out the assembly of the at least a second rib of the plurality of ribs and optionally of at least partially the plinth adjacent to the first rib of the plurality of ribs and optionally of at least partially the plinth. Preferably, the assembly means are configured to carry out the assembly of the at least a second rib of the plurality of ribs and optionally of at least partially the plinth adjacent to the first rib of the plurality of ribs and optionally of at least partially the plinth in an essentially vertical direction. Optionally, the assembly means are configured to carry out the assembly of the at least a second rib of the plurality of ribs and optionally of at least partially the plinth adjacent to the first rib of the plurality of ribs and optionally of at least partially the plinth in an inclined direction with regard to the vertical direction.
The invention also relates to a method for manufacturing an adaptable precast foundation structure for a wind turbine carried out with the system above described, wherein the adaptable precast foundation structure comprises:
Preferably, the step of adjusting a representative dimension of the at least a first rib of the transition structure is a step of adjusting the length of the at least a first rib of the transition structure.
According to this and taking into account the ground or soil at each wind farm location wherein the precast foundation is going to be disposed, the method further comprises a step of selection of a precast foundation structure from a set of predetermined precast foundation structures, this step of selection being carried out prior to the step of adjusting a representative dimension of the at least a first rib of the transition structure. This makes possible that does not exist uncertainties in the design reliability and its structural behaviour.
Preferably, the step of casting of at least a first rib of the transition structure further comprises a step of casting at least partially the plinth.
Optionally, the method further comprises a step of pouring concrete into the first mould.
Preferably, the method further method comprises:
Preferably, the step of adjusting a representative dimension of the at least a second rib of the transition structure is a step of adjusting the length of the at least a second rib of the transition structure.
Preferably, in the step of adjusting the at least a representative dimension of the at least a first rib and in the step of adjusting the at least a representative dimension of the at least a second rib, the same representative dimension is adjusted for the at least a first rib and the at least a second rib, being preferably adjusted the same representative dimension to the same value for both the at least a first rib and the at least a second rib or being preferably adjusted the same representative dimension to a different value for the at least a first rib and the at least a second rib.
Preferably, the method for manufacturing an adaptable precast foundation structure for a wind turbine further comprises a step of transporting of the at least a first rib of the plurality of ribs of the transition structure from the first mould to the wind turbine location, preferably once the concrete of the at least a first rib is hardened and the at least a first rib has been demoulded from the first mould. Optionally, the step of transporting of the at least a first rib of the plurality of ribs is carried out transporting the at least a first rib in its final vertical orientation at the wind turbine location. Also optionally, the step of transporting of the at least a first rib of the plurality of ribs is carried out transporting the at least a first rib in an orientation being opposite to its final vertical orientation at the wind turbine location. This step of transporting optionally comprises transporting at least partially the plinth in case that the at least a first mould is also configured to cast at least partially the plinth.
Preferably, the method for manufacturing an adaptable precast foundation structure for a wind turbine further comprises a step of transporting of the at least a second rib of the plurality of ribs of the transition structure from the second mould to the wind turbine location, preferably once the concrete of the at least a second rib is hardened and the at least a second rib has been demoulded from the second mould. Optionally, the step of transporting of the at least a second rib of the plurality of ribs is carried out transporting the at least a second rib in its final vertical orientation at the wind turbine location. Also optionally, the step of transporting of the at least a second rib of the plurality of ribs is carried out transporting the at least a second rib in an orientation being opposite to its final vertical orientation at the wind turbine location. This step of transporting optionally comprises transporting at least partially the plinth in case that the at least a second mould is also configured to cast at least partially the plinth.
Optionally, the method further comprises a step of casting of the footing of the adaptable precast foundation structure.
Preferably, the step of casting of the footing of the adaptable precast foundation structure comprises a step of precasting of at least part of the footing of the adaptable precast foundation structure.
Also preferably, the step of casting of the footing of the adaptable precast foundation structure is a step of casting of the footing in-situ.
Also preferably, the step of casting of the footing is a step of casting the footing partially in the factory and partially in-situ. Preferably, the step of casting the footing comprises a step of casting a framework of the footing in the factory and a step of pouring concrete in-situ. The method further comprises a step of joining the at least a first rib of the plurality of ribs of the transition structure, and at least partially the framework of the footing, and/or a step of joining the at least a second rib of the plurality of ribs of the transition structure, and at least partially the framework of the footing. Once assembled, the spaces generated between the partial framework of the footing are completed with sectors of circular crown or triangular frameworks.
Optionally, the step of casting of at least a first rib of the transition structure further comprises a step of defining at least a channel in a lower surface of the at least a first rib of the plurality of ribs of the transition structure.
Optionally, the step of casting of at least a first rib of the transition structure further comprises a step of attaching first reinforcement elements to a free surface of the at least a first rib defined by the main formwork of the first mould, being an open formwork, preferably a step of attaching first reinforcement elements to a lower surface of the at least a first rib.
Optionally, the step of casting of at least a second rib of the transition structure further comprises a step of defining at least a channel in a lower surface of the at least a second rib of the plurality of ribs of the transition structure.
Optionally, the step of casting of at least a second rib of the transition structure further comprises a step of attaching reinforcement elements to a free surface of the at least a second rib defined by the main formwork of the second mould, being an open formwork, preferably a step of attaching first reinforcement elements to a lower surface of the at least a second rib.
Optionally, the method further comprises a step of assembling of at least the plurality of ribs of the transition structure, optionally by means of the plinth in case that the at least a first mould and/or the at least a second mould are/is also configured to cast at least partially the plinth.
Preferably, the step of assembling of at least the plurality of ribs of the transition structure is carried out assembling at least a second rib of the plurality of ribs adjacent to a first rib of the plurality of ribs. Optionally, the step of assembling of at least the plurality of ribs of the transition structure is carried out assembling at least a second rib of the plurality of ribs adjacent to the first rib of the plurality of ribs in an essentially vertical direction. Optionally, the step of assembling of at least the plurality of ribs of the transition structure is carried out assembling at least a second rib of the plurality of ribs adjacent to the first rib of the plurality of ribs in an inclined direction with regard to the vertical direction. In case that the at least a first mould and/or the at least a second mould are/is also configured to cast at least partially the plinth, the step of assembling is carried out assembling the at least partial plinth joined to the at least a second rib adjacent to the at least partial plinth joined to the at least a first rib.
Optionally, the step of assembling of at least the plurality of ribs of the transition structure further comprises assembling at least another first rib of the plurality of ribs adjacent to the second rib of the plurality of ribs, and so, alternately for the second and first ribs forming the transition structure until the transition structure is completed.
Optionally, the step of assembling of at least the plurality of ribs of the transition structure further comprises assembling at least another second rib of the plurality of ribs adjacent to the first rib of the plurality of ribs or to another first rib of the plurality the ribs after all the first ribs of the plurality of ribs have been assembled, and so, for all the second ribs forming the transition structure until the transition structure is completed.
For any of the above explained steps of assembling, when the at least a first mould and/or the at least a second mould are/is also configured to cast at least partially the plinth, the step of assembling is carried out assembling the at least partial plinth joined to the at least a second rib adjacent to the at least partial plinth joined to the at least a first rib.
For any of the above explained steps of assembling, when the step of casting of the footing of the adaptable precast foundation structure is a step of casting of the footing in-situ, during the step of assembling, the first reinforcement elements of the ribs, weaves together with the framework of the footing, comprising preferably the first reinforcement elements an opened lower end.
For any of the above explained steps of assembling, when the step of casting of the footing of the adaptable precast foundation structure is a step of casting the footing partially in the factory and partially in-situ, during the step of joining the ribs of the transition structure, and at least partially the framework of the footing, the first reinforcement elements of the ribs, weaves together with the partial framework of the footing, comprising preferably the first reinforcement elements a closed or looped lower end. Optionally, the method further comprises a step of post-tensioning the adaptable precast foundation structure after the step of assembling of at least the plurality of ribs of the transition structure by means of the plinth.
Preferably, the step of post-tensioning the adaptable precast foundation structure is carried out in a circumferential direction of the plinth and/or in a radial direction of at least one of the plurality of ribs of the transition structure.
The invention also relates to a system for manufacturing a precast foundation structure for a wind turbine, according to claims 1 to 9, here included by reference, to a method for manufacturing a precast foundation structure for a wind turbine according to claims 10 to 13, here included by reference and to a precast foundation structure for a wind turbine according to claims 14 to 18, here included by reference.
Optionally, each inclined surface of the sectors of the plinth is perpendicular to a radial plane containing the vertical axis, being the same or different radial planes for each inclined surface in each sector or for different sectors of the plinth. The same applies mutatis mutandis for the inclined surfaces of the moulds of the system.
The at least one first inclined wall of the first sector of the plinth inclined, in use, with regard to the vertical axis of the tower, and the at least one first inclined wall of the second sector of the plinth inclined, in use, with regard to the vertical axis of the tower, casted by the corresponding moulds, as defined in claim 1, allow that during assembly, all parts of the sealing means contact at the same time and that the sealing means are not dragged.
Preferably, the inclined walls form an angle between 10° and 30°, more preferably 20°, with the vertical, to avoid dragging the sealing means during assembly. The assembly can be carried out in an essentially vertical direction as claimed in claim 11, in an essentially horizontal direction as claimed in claim 12, or even in a combination of a vertical and horizontal direction, thus facilitating the assembly depending on the available assembly means, the space for carrying out the assembly and the kind of foundation to be manufactured.
A preferred embodiment of the invention relates to a system for manufacturing an adaptable precast foundation structure for a wind turbine, wherein the adaptable precast foundation structure comprises:
The plurality of ribs (4) of the transition structure may comprise a single rib design (with a single mould) or comprise at least two different designs, which when placed adjacent to each other are complementary, as explained hereunder.
The system further comprises at least a second mould (100′) configured to cast at least a second rib (4″) of the transition structure, wherein the second mould (100′) comprises a main formwork (101′) and an auxiliary formwork (102′), and wherein the auxiliary formwork (102′) is configured to adjust at least a representative dimension (D′) of the at least a second rib (4″) of the transition structure, wherein the representative dimension (D′) of the at least a second rib (4″) of the transition structure is preferably the length of the at least a second rib (4″) of the transition structure.
Preferably, the representative dimension (D, D′) of the at least a first rib (4′) and of the at least a second rib (4″) is the same. However, it can be different. For instance, in case of having at least a first rib (4′) and at least a second rib (4′), it is possible to adjust the at least a representative dimension (D) of the at least a first rib (4′) in a dependent or independent manner of adjusting the at least a representative dimension (D′) of the at least a second rib (4″) depending of the type of soil and the necessary size of each rib of the transition structure.
The system further comprises concreting means configured to pour concrete into the first mould (100) and/or the second mould (100′).
The auxiliary formwork (102, 102′) comprises a plate that is displaceable along the representative dimension (D, D′) of the rib (4′, 4″) before the concreting means pours concrete into the first mould (100) or the second mould (100′).
The at least a first mould (100) and the at least a second mould (100′) are also configured to cast at least partially the plinth (3) as shown in
Preferably, the main formwork (101, 101′) of the first mould (100) and/or of the second mould (100′) further comprises a template (20, 20′) configured to define at least a channel (21, 21′) in a lower surface (6, 6′) of at least a first rib (4′) and/or of at least a second rib (4″) of the plurality of ribs (4) of the transition structure, the template (20, 20′) comprising windows (24, 24′) in such a way that the main formwork (101, 101′) of the first mould (100) and/or of the second mould (100′) is an open formwork, wherein the windows (24, 24′) define at least one free surface wherein first reinforcement elements (22, 22′) are intended to be attached. The first reinforcement elements (22, 22′) are disposed on the lower surface (6, 6′) of the at least a first rib (4′) and/or of the at least a second rib (4″) once the at least a first rib (4′) and/or the at least a second rib (4″) are/is turned over before the assembly.
The system for manufacturing an adaptable precast foundation structure for a wind turbine further comprises transportation means (110) configured to transport at least a first rib (4′) of the plurality of ribs of the transition structure and/or a first sector (3′) of the plinth (3) from the first mould (100) to the wind turbine location (120). As can be seen from
The transportation means (110) are also configured to transport at least a second rib (4″) of the plurality of ribs of the transition structure and a second sector (3″) of the plinth (3) from the second mould (100′) to the wind turbine location (120) in the same manner as explained above for the at least a first rib (4′) and the first sector (3′) of the plinth (3).
The system further comprises means for casting the footing (1). In a first preferred embodiment, the means for casting the footing (1) comprises an additional mould (not shown) configured to precast at least partially the footing (1) of the adaptable precast foundation structure. In this way, the footing (1) is a precast concrete footing, preferably a slab. In a second preferred embodiment, the means for casting the footing (1) are means for casting the footing in-situ. In this way, the footing is a cast-in-situ concrete footing, preferably a slab comprising a framework (31) as shown in
The system further comprises assembly means (30), preferably a crane, configured to carry out the assembly of at least the plurality of ribs (4) of the transition structure and the sectors of the plinth (3).
Preferably, the assembly means (30) are configured to carry out the assembly of the plurality of ribs (4) and/or their corresponding sectors of the plinth (3) adjacent one to each other, in an essentially vertical direction as can be seen in
In case of having first ribs (4′) and second ribs (4″), the assembly means (30) are configured to carry out the assembly of at least the plurality of ribs of the transition structure and the sectors (3′, 3″) of the plinth (3) assembling at least a first rib (4′) of the plurality of ribs and its corresponding first sector (3′) of the plinth (3) adjacent to a second rib (4″) of the plurality of ribs and its corresponding second sector (3″) of the plinth (3), and so, alternately until the transition structure and the plinth (3) are completed.
The adaptable precast foundation further comprises joining means (32) configured to join the at least a first rib (4′) of the plurality of ribs of the transition structure and at least partially the framework (31) of the footing (1) and/or the at least a second rib (4″) of the plurality of ribs of the transition structure and at least partially the framework (31) of the footing. In this way, it is not necessary to carry out the positioning of the framework (31) of the footing (1) in situ, thus avoiding additional steps in the assembly procedure.
Each sector (3′, 3″) of the precast plinth (3) comprises two lateral surfaces (23, 23′) wherein second reinforcement elements (25, 25′), being lateral reinforcement elements, are intended to be attached.
Optionally, the adaptable precast foundation further comprises radial post-tensioning elements (not shown) that run from each sector (3′, 3″) of the plinth (3) running through the ribs (4′, 4″) (first end (11), central beam (13) and second end (12)) until reach the second end (12) of the ribs (4′, 4″), connecting in this way the transition structure to the plinth (3).
Optionally, the adaptable precast foundation further comprises post-tensioning circumferential elements (not shown) that run through each sector (3′, 3″) of the plinth (3) in a circumferential direction for connecting all the sectors (3′, 3″) of the plinth (3), being preferably compression post-tensioning elements. In another embodiment, the plurality of ribs (4) comprises fins (16) disposed on both sides of the central beam (13) as can be seen in
The fins (16) transfer the weight of a filler soil located on the fins (16) to the adaptable precast foundation, making it more stable.
The footing (1) comprises a slab which in turn comprises an inner diameter (17) and an outer diameter (14). The dimensions of the inner diameter (17) and the outer diameter (14) depend on the wind turbine loads and also on the strength and the elastic properties of the ground (2). In a first preferred embodiment, the inner diameter (17) of the footing (1) is the same that an inner diameter (15) of the plinth (3) and the outer diameter (14) of the footing (1) reaches the second end (12) of the ribs (1) once assembled the adaptable precast foundation structure. In a second preferred embodiment, the inner diameter (17) of the footing (1) is larger than the inner diameter (15) of the plinth (3) and the outer diameter (14) of the footing (1) reaches the second end (12) of the ribs (1). In a third preferred embodiment, the inner diameter (17) of the footing (1) is larger than the inner diameter (15) of the plinth (3) and the outer diameter (14) of the footing (1) does not reach the second end (12) of the ribs (1).
Additionally, depending on the features of the ground (2), the adaptable precast foundation could be combined with rock anchors, a pile cap of micropiles, or an alluvial-anker, but the adaptable precast foundation would not be modified.
The first sectors (3′) of the plinth (3) comprise first wings (9), preferably disposed at the inner diameter (15) of the plinth (3), and the second sectors (3″) of the plinth (3) comprise second wings (9′), preferably disposed at an outer diameter (19) of the plinth, wherein the first wings (9) are adjacent in a circumferential direction to the second sectors (3″) of the plinth (3) and the second wings (9′) are adjacent in a circumferential direction to the first sectors (3′) of the plinth (3), thus generating a gap (26) between adjacent sectors (3′, 3″) of the plinth (3) wherein the second reinforcement elements (25, 25′) of each one of the sectors (3′, 3″) intersect once assembled adjacent sectors (3′, 3″) of the plinth (3). Additional transversal bars (34) run through said intersection of the second reinforcement elements (25, 25′), reinforcing the union between adjacent sectors (3′, 3″) of the plinth (3) and therefore indirectly reinforcing the union between adjacent ribs (4, 4″) configuring a passive framework, nor being post-tensioned. These transversal (34) bars are entered through holes disposed in the second wings (9′) of the second sectors (3″) of the plinth (3).
The first wings (9) and/or the second wings (9′) comprise/s sealing means (7, 7′), preferably rubber sealing strips, configured to seal the assembly between adjacent sectors (3′, 3″) of the plinth (3) and to retain the concrete.
Optionally, the first wings (9) and the second wings (9′) are disposed inclined with respect to the vertical. Preferably, the inclined wings form 20° with the vertical (see
After this, the plinth (3) can be post-tensioned, by means of circumferential post-tensioning elements.
Additionally, each sector (3′, 3″) of the plinth (3) comprises a corbel (8) that in turn comprises at least a hole (27, 27′) wherein tensioning cables of the tower are anchored.
The adaptable precast foundation structure may comprise an upper slab (18), optionally comprising two semi slabs supported on a socket (33) disposed on the corbel (8) of the plinth (3), the upper slab (18) being at the same level than the surface (5) of the plinth (3) wherein a tower of the wind turbine is intended to be coupled.
Next table shows different values of the total diameter of the foundation depending on the type of soil which serves as a basis for carrying out the step of selection of a precast foundation structure of the method for manufacturing an adaptable precast foundation structure for a wind turbine of the present invention.
In this case the table would be valid for a N155 4.8MW wind turbine with a TC120N tower (concrete tower with hub at a height of 120 m).
So, the at least a representative dimension (D, D′) of the at least a first rib and/or of the at least a second rib, depends on a total diameter of the foundation, which in turn depends on the type of soil. In this case, the at least a representative dimension (D, D′) of the at least a first rib and/or of the at least a second rib is the length of the at least a first rib and/or the length of the at least a second rib respectively, being this length half of the difference of the total diameter of the foundation minus an outer diameter of the plinth (3).
In this case, the design has been conceived so that the diameter of the plinth (3) is always the same, regardless of the type of tower and machine, being the outer diameter of the plinth (3) in an interval of 9-13 m.
Number | Date | Country | Kind |
---|---|---|---|
20383117.7 | Dec 2020 | EP | regional |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2021/086548 | 12/17/2021 | WO |