Claims
- 1. An improved joint edge assembly for the construction of jointed concrete slabs and protection of concrete slab joints, the concrete slabs shrinking during hardening, the assembly comprising:
a first elongated joint edge member; a second elongated joint edge member; connectors that connect the joint edge members to each other, said connectors also including release elements that release the joint edge members from each other under the force of the slabs shrinking during hardening; whereby the assembly of the joint edge members and connectors may be placed for the joint edge members to form and thereby protect edges of a concrete slab joint, and whereby the slabs may be poured, and the joint edge members may release from each other under action of the slabs shrinking after pouring, to allow the joint formed by the joint edge members to open and minimize slab cracking at and adjacent the joint during shrinkage.
- 2. A joint edge assembly as in claim 1, further comprising formwork mounting members connected to one of the joint edge members,
whereby the formwork mounting members may be mounted on temporary formwork and may support the assembly in position for the joint edge members to form the edges of the concrete slab joint.
- 3. An improved joint edge assembly as in claim 2 further comprising the temporary formwork and mounting members.
- 4. The apparatus of claim 3 further comprising a dowel aligner connected to the temporary formwork, extending into the region where the first concrete slab is to be poured,
whereby the dowel aligner permits the placement of dowels prior to the pouring of the adjacent concrete slab.
- 5. An improved joint edge assembly as in claim 1, wherein the elongated joint edge members is comprised of a steel angle section.
- 6. An improved joint edge assembly as in claim 1 further comprising a plurality of anchors extending from each side of the form assembly into the regions where the adjacent slabs are to be poured.
- 7. An improved joint edge assembly as in claim 6, wherein the plurality of anchors are comprised of at least one steel stud with an expanded head.
- 8. An improved form assembly for use in the construction of concrete slabs and protection of joints in said concrete slabs after construction, the assembly placed on a ground surface defining a generally flat reference plane, the assembly comprising:
a longitudinal joint rail, the longitudinal joint rail comprising a first steel bar and a second steel bar, the steel bars formed of cold rolled steel bar sections and each having a major latitudinal dimension and a minor latitudinal dimension, the major latitudinal dimension, when in situ, extending generally perpendicular to the reference plane and the minor latitudinal dimension, when in situ, extending generally parallel to the reference plane, the steel rails being oriented, when in situ, with the major latitudinal dimensions thereof adjacent each other; connectors that connect the joint rails in contact with one another, said connectors also including release elements that release the joint edge members from each other under the force of the slabs shrinking during hardening thereby forming releasable joint therebetween; a temporary formwork along the joint rail and supporting the joint rail above the ground surface; a plurality of mounting brackets connecting the joint rail to the temporary formwork, the mounting brackets secured to the formwork and secured to the joint rail; and a plurality of studs extending from each side of the form assembly into the regions where the adjacent slabs are to be poured.
- 9. The apparatus of claim 8, wherein the connectors that connect the joint rails are comprised of at least one steel nut.
- 10. The apparatus of claim 8, wherein the release element of the connector that connects the joint rails is comprised of at least one nylon nut.
- 11. The apparatus of claim 8, wherein the longitudinal joint rail is comprised of a first steel angle member and a second steel angle member, the angle members each having a first angle flange and a second angle flange, the first angle flanges of the angle members, when in situ, extending generally perpendicular to the reference plane and the second angle flanges of the angle members, when in situ, extending generally parallel to the reference plane, the angle members being oriented, when in situ, with the first angel flanges thereof adjacent each other.
- 12. The apparatus of claim 8, wherein the temporary formwork is comprised of wood.
- 13. The apparatus of claim 12, wherein the temporary formwork is a standard 2″ lumber section with a thickness chosen according to the desired concrete slab thickness.
- 14. The apparatus of claim 8, wherein the temporary formwork is comprised of steel.
- 15. The apparatus of claim 8, wherein at least one of the studs has an expanded head.
- 16. The apparatus of claim 8 further comprising a dowel aligner connected to the temporary formwork, extending into the region where the first concrete slab is to be poured,
whereby the dowel aligner permits the placement of dowels prior to the pouring of the adjacent concrete slab.
- 17. The apparatus of claim 16, wherein the dowel aligner is a base and a sleeve adapted to receive a load plate.
- 18. A method of forming an improved joint edge utilizing an improved joint edge assembly, for the construction of jointed concrete slabs and protection of concrete slab joints, the concrete slabs shrinking after pouring, the assembly comprising a first elongated joint edge member, a second elongated joint edge member, a plurality of anchors extending from each side of the form assembly into the regions where the adjacent slabs are to be poured, connectors that connect the joint edge members to each other, said connectors also including release elements that release the joint edge members from each other under action of the slabs shrinking during hardening, the method comprising:
placing the assembly of the joint edge members and connecting means for the joint edge members to form and thereby protect edges of a concrete slab joint, pouring the slabs to the joint edge members, and allowing the joint edge members to release from each other under action of the slabs shrinking during hardening with the anchors embedded therein and under action of the releasing elements of the connectors, allowing the joint formed by the joint edge members to open and minimize slab cracking at and adjacent to the joint during shrinkage and subsequently protecting the joint edge.
- 19. The method of claim 18 wherein the apparatus is further comprised of a dowel aligner connected to the temporary formwork, extending into the region where the first concrete slab is to be poured,
whereby the dowel aligner permits the placement of dowels prior to the pouring of the adjacent concrete slab.
- 20. An article made according to the method of claim 18.
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application is based on, and claims the benefit of, co-pending U.S. Provisional Application Serial No. 60/309,397, filed on Aug. 1, 2001, entitled “System of Protecting the Edges of Cast in Place Concrete Slab on Ground, Construction Joints,” and incorporated herein by reference.