In a Digital Subscriber Line (DSL) access network, the Distribution Point Unit (DPU) provides the interface where the DSL access network is coupled to one or more customer premises. As DSL technologies have advanced, the DSL access network has become increasingly fiber optic based in order to support faster data rates such that optical fibers now may be distributed from the DSL service provider's central office (CO) all the way to the DPU. This configuration has become known in the industry as Fiber-to-the-Distribution-Point (FTTdP). The remaining connection from the DPU to the customer premise is typically comprised of one or more twisted-pair electrical conductors such as twisted pair copper wires. In addition to data services, traditional Plain-Old-Telephone-Service (POTS) is very often provided to the customer premises using these same twisted-pair electrical conductors.
Because the DPU is coupled to the CO over non-electrically conducting optical fiber, electrical power to operate the DPU electronics must be delivered to the DPU via another path. Utilizing the electrical service provided to the customer premises is one option since electrical power can be sent back to the DPU over the twisted-pair electrical conductors that connect the DPU with the customer premises. However, a problem arises when the twisted-pair electrical conductors are currently connected to the POTS network via a central office exchange because the central office exchange places a −48 volt DC potential across the twisted-pair electrical conductors which it utilizes for both POTS signaling and voice communication purposes. Attempting to separately energize the twisted pair from the customer premises would conflict with the −48 volt DC potential already on the conductors. Further, the central office exchange power on the twisted-pair electrical conductors is itself inadequate for powering the DPU and attempting to utilize it for this purpose would otherwise interfere with operation of the central office exchange. While a technician could be sent to disconnect the connection with the central office exchange, such a process would need to be performed each time a new customer orders DSL service, thus defeating the various benefits of enabling customers to simply self-install a DSL modem in order to start the DSL service.
For the reasons stated above and for other reasons stated below which will become apparent to those skilled in the art upon reading and understanding the specification, there is a need in the art for alternate systems and methods for providing automated DSL distribution point unit powering.
Embodiments of the present invention can be more easily understood and further advantages and uses thereof more readily apparent, when considered in view of the description of the preferred embodiments and the following figures in which:
In accordance with common practice, the various described features are not drawn to scale but are drawn to emphasize features relevant to the present invention. Reference characters denote like elements throughout figures and text.
In the following detailed description, reference is made to the accompanying drawings that form a part hereof, and in which is shown by way of specific illustrative embodiments in which the invention may be practiced. These embodiments are described in sufficient detail to enable those skilled in the art to practice the invention, and it is to be understood that other embodiments may be utilized and that logical, mechanical and electrical changes may be made without departing from the scope of the present invention. The following detailed description is, therefore, not to be taken in a limiting sense.
As shown in
Initialization of DSL service through the DPU 112 begins with the activation of Upstream Service Disconnect Trigger Unit 157. As shown in
When Upstream Service Disconnect Trigger Unit 157 is initially powered, DC Voltage Detector 152 monitors the conductor span 106 for the existence of an upstream service delivery unit generated DC voltage signal. When a DC voltage signal is detected, processor 148 activates trigger signal modulator 150 to transfer a trigger signal onto the conductor span 106. In alternate embodiments and implementations, such as those described below, the trigger signal may comprise a voltage modulated signal or a current modulated signal, either of which is tailored not to interfere with the operation of the upstream service delivery unit 102.
Upstream Service Disconnect Unit 113 comprises a trigger signal detector 120 and a rectifier-energy storage device 122. At the Upstream Service Disconnect Unit 113, the trigger signal is received from the Upstream Service Disconnect Trigger Unit 157 over the conductor span 106. Rectifier-energy storage device 122 comprises both a DC rectifier and an energy storage component. In some implementations, the energy storage component may comprise, for example, a capacitive storage device that is charged by the output of the rectifier. That is, the rectifier rectifies the alternating voltage present on the conductor span 106 resulting from the trigger signal, and stores a portion of the energy obtained from the trigger signal in the energy storage component. Processor 116, Relay Control 118 and Trigger Signal Detector 120 are each powered by the charge stored in rectifier-energy storage device 122. When a sufficient charge is available, processor 116 becomes operable. Processor 116 also obtains an input from trigger signal detector 120 to confirm whether the trigger signal is present on conductor span 106. When the trigger signal is present, processor 116 activates relay control 118 to operate switching relay 114 (which may be implemented using a bistable relay). Operation of switching relay 114 electrically disconnects conductor span 106 from the conductor span 105 to the upstream service delivery unit 102 and re-connects conductor span 106 to the DPU 112. In one embodiment, DPU 112 comprises a DSL Access Multiplexer (DSLAM) that, once energized, connects one or more high-speed digital communications channels from the CO Optical Fiber Network 104 with a DSL data link established over conductor span 106.
Upon operating the switching relay 114, the loss of the Central Office DC potential from the upstream service delivery unit 102 is detected by DC Voltage detector 152. In response, processor 140 deactivates trigger signal modulator 150. PSE 156 also contains a DC Voltage Detector 147. Once the PSE Voltage Detector 147 detects the absence of DC voltage, the PSE 156 will start its startup protocol. After checking the conductor span 106 for possible fault conditions, PSE 156 provides DC power to conductor span 106 which is used to energize DPU 112. The now energized DPU 112 establishes the DSL data link over conductor span 106 with CPE DSL Modem 144 (which may, for example, be implemented using a VDSL or G.fast DSL modem) to provide data service to the customer premises. Although the DPU 112 and the Upstream Service Disconnect Unit 113 are illustrated as separate elements, it should be appreciated that in alternate implementations, the Upstream Service Disconnect Unit 113 may be integrated into the DPU 112.
In
In one embodiment, Upstream Service Disconnect Trigger Unit 157 may comprise or otherwise be coupled to optional switching relay 210 through which the conductor span 106 may be disconnected from the CPE network before the trigger signal current modulator 217 begins outputting the trigger signal. For example, in one embodiment, processor 218 outputs a signal to controller 220 to operate switching relay 210 (which may comprise a bistable relay device) to disconnect conductor span 106 from the CPE network and instead connect it to the trigger signal current modulator 217 and DC Voltage Detector 212 on activation of the Upstream Service Disconnect Trigger Unit 157 and then begin to monitor conductor span 106 for the existence of the upstream service delivery unit generated DC voltage signal.
In
As mentioned above, the Upstream Service Disconnect Trigger Units and Power Sourcing Equipment described herein, whether that are implemented separately or together as integrated units, may both be powered from the voltage mains 155 available at the customer premises, or in some implementations may be powered from an alternate source. In some embodiments, the circuitry described herein associated with Upstream Service Disconnect Trigger Units may optionally be powered using the −48 VDC POTS voltage drawn from the conductor span 106 by implementing the elements of the Upstream Service Disconnect Trigger Units using low power devices that cumulatively draw less than the current draw detection threshold of the upstream service delivery unit 102.
It should also be appreciated that the Upstream Service Disconnect Trigger Units and Upstream Service Disconnect Units may also be implemented utilizing Radio-frequency identification (RFID) components to generate, transmit and receive the trigger signal and to realize bidirectional communication and component monitoring. For example,
The PSE 156 may further comprise PSE Monitoring 418, which is a function that can monitor the operating status of unit 410 and the components thereof. For example, once DSL service is established, PSE Monitoring 418 can monitor the voltage and/or current of the power feed provided to DPU 112 over conductor span 106. PSE Monitoring 418 can monitor the voltage and/or current of the mains 155, whether there is any backup battery present and if so the state of the backup batter. Such information can be transmitted by signal transceivers 416 to signal transceiver 426 over the conductor span 106 on a scheduled basis. Alternatively, a request for such information may be similarly transmitted downstream by signal transceiver 426 to signal transceiver 416.
At Upstream Service Disconnect Unit 420, a coupler 428 provides electrical isolation between the Upstream Service Disconnect Unit 420 circuitry and a microprocessor 430 in the DPU 430. Coupler 428 can be inductive, capacitive or optical (for example, and optocoupler). Through Coupler 428 the information collected by Upstream Service Disconnect Unit 420 from the PSE Monitoring 418 can be transmitted by the DPU 112 upstream to network 104 (for example to a Network Management System).
As illustrated in
The method begins at 710 where an Upstream Service Disconnect Trigger Unit that comprises part of broadband access network is powered up or otherwise initialized. If a voltage signal from the upstream service delivery unit 102 is detected, the method proceeds to 712 with initiating a trigger signal. In some embodiments, the trigger signal may be generated by a trigger signal module, trigger signal generator, trigger signal current modulator, signal transceiver, or any similar element discussed above. For example, in one embodiment, processor 148 utilizes DC voltage detector 152 to monitor for a voltage signal from the upstream service delivery unit 102, and when it is detected, processor 148 instructs Trigger Signal Modulator 150 to generate the trigger signal on span 106. Initiating the trigger signal at 712 may also further comprise disconnecting CPE equipment prior to transmitting the trigger signal. For example, in one embodiment at 712, processor 218 activates switching relay 210 prior to activating trigger signal generator 216. If after initiating the trigger signal at 712, the voltage signal from the upstream service delivery unit 102 is still detected, the method may retry initializing the trigger signal at 712. For example, a transient noise or other condition on span 106 may momentarily interfere with the first attempt at sending the trigger signal. In one embodiment, the method may retry initiating the trigger signal up to a limited number of times. If the retry limit is reached and the voltage signal is still detected, then the method proceeds to 718 with initiating reconnection of span 106 to the upstream service delivery unit 102. For example, in one embodiment, processor 148 instructs Trigger Signal Modulator 150 to generate a reconnect signal on span 106 which instructs the Upstream Service Disconnect Trigger Unit 113 to toggle switching relay 114 to reconnect span 106 to the to the upstream service delivery unit 102. The method then proceed to 730 where the method is terminated with the PSE not operational and not injecting power onto span 106.
When initiating the trigger signal does successfully result in disconnection of span 106 from the from the upstream service delivery unit 102, the method proceeds to 714 with initiating the Metallic Detection based Start-Up (MDSU) protocol for power injection. The MDSU protocol is well understood by those of skill in the art of telecommunications and for that reason, not further explained herein. If upon initiation of the MDSU protocol, power up and/or compatible class detection for the power supply unit (PSU) of DPU 112 is confirmed an the expected signature of DPU 112 is detected, then the method proceeds to 716 where Power Sourcing Equipment (PSE) begins operation of power injection into conductor span 106 in order to provide power to DPU 112. Signature detection may comprise, for example, placing a set of test voltages (3 volts and 10 volts) on span 106 and measuring whether and expected resistance is present (10 k or 15 k). If the expected signature is not detected, that could indicate that no DPU is connected. With respect to power supply classes, the class of the power supply unit (PSU) internal to the power receiving DPU should match or otherwise be compatible with the class of the power sending power supply of the PSE. It should be appreciated that class detection as discussed throughout this disclosure is an optional step based on operator preferences and practices. For example, some network operators may know that all their field installed equipment is of the same or compatible class so that class detection and class compatibility verification is not required. With respect to the class compatibility of the PSU and PSE, this is achieved when the power class of the PSE is equal or higher than that of the PSU in the DPU. When that is the case, the PSE can always supply enough power to the DPU. The case when the power class of the DPU is higher than that of the PSE is to be avoided because then the PSE may not be able to provide enough power to the DPU.
If one or both the expected signature or class detection fails, then the method proceeds to 718 with initiating reconnection of span 106 to the upstream service delivery unit 102 and to 730 where the method is terminated with the PSE not operational and not injecting power onto span 106.
In one embodiment, if after initialization of the Upstream Service Disconnect Trigger Unit at 710 a voltage signal from the upstream service delivery unit 102 is not detected, the method may proceed to 720 with initiating the Metallic Detection based Start-Up (MDSU) protocol for power injection. As before, the method looks for both a signature of the DPU and optionally for detection of the class of the power supply unit in the DPU. If the expected DPU signature is not detected, that may infer that DPU 112 has not been coupled to conductor span 106 even though a voltage from the upstream service delivery unit 102 is not present. Accordingly, the method proceeds to 724 with initiating a trigger signal and then to 726 with again attempting to initiate the MDSU protocol. If the expected DPU signature is still not detected, the Upstream Service Disconnect Trigger may retry a number of times. If the retry limit is reach, the method may proceed to 718 to with initiating reconnection of span 106 to the upstream service delivery unit 102 and to 730 where the method is terminated with the PSE not operational and not injecting power onto span 106. If the expected DPU signature is detected, but the detected class of the PDU in the PDU does not match or is otherwise not compatible with the class of the PSE, then the method will also proceed to 718 to with initiating reconnection of span 106 to the upstream service delivery unit 102 and to 730 where the method is terminated with the PSE not operational and not injecting power onto span 106.
If after initiation of the MDSU protocol at 720, the expected signature of DPU 112 is detected and the power supply class compatibly between the power supply unit (PSU) of DPU 112 and the PSE is confirmed, then the method proceeds to 716 where Power Sourcing Equipment (PSE) begins operation of power injection into conductor span 106 in order to provide power to DPU 112.
It should be noted that in one embodiment, once initialized, the Upstream Service Disconnect Trigger Unit executes a looping off hook detection process 705 that continuously looks for an off-hook condition on the conductor span 106. If an off-hook condition occurs, that indicates the upstream service line (for example, a POTS service) may be in use and method 700 is reinitialized and jumps to 710. One method 700 is completed and arrives at 716, the off-hook detection loop at 705 may be terminated.
It is intended that the disconnect trigger signal produced by the Upstream Service Disconnect Trigger Unit described in this disclosure can be used on lines that have upstream services enabled (such as POTS service for example) as well as on lines without enabled upstream services (for example, lines with a “dry DSL service”). This means that it cannot be assumed that power scavenging from the upstream service delivery unit is necessarily available. Also, the trigger signal may also need to work for the first line being powered, so it cannot be assumed that the DPU has power. Therefore the disconnect trigger signal described herein is able to perform two functions. First, the trigger signal is able to provide power to energize the upstream service disconnect unit, and it carries a communication to trigger disconnection from the upstream service delivery unit and connection of the conductor span to the DPU. The same may be said of the reconnect signal which may be needed to energize and instruct the upstream service delivery unit to reconnect the conductor span to the upstream service delivery unit in the event that an attempted reverse powering of the DPU fails or for other possible circumstances.
With respect to initiating a trigger signal, the method in
The method proceeds to 812 with transmitting the trigger signal. In one embodiment, such as shown at 812, the trigger signal comprises a pre-charge AC signal, followed by a command code (which may comprise a simple on-off keying of the AC signal, for example), followed by a relay charge AC signal.
In order not to interfere with POTS or other upstream service, an out-of-band AC signal may be utilized at each step (pre-charge, command code, and relay charge) in 812. In order to reduce the size of passive coupling components, a higher frequency is preferred. On the other hand the frequency should not be too high to be attenuated too much on a copper conductor pair. As the CPE will be disconnected, an AC signal of higher frequency can be used. In order to minimize influence on DSL services in adjacent pairs in the same cable due to crosstalk, it is preferable to select a frequency in the cross-over band between upstream and downstream PSDs of the DSL service, e.g. 138 kHz or 276 kHz. Use of these frequencies will minimize the effect of cross-talk affecting adjacent conductor spans.
At the DPU end the receiving circuit needs to be relatively high impedance in order not to affect existing DSL services on the span 106. Therefore, in one embodiment, a trigger signal level of around 20 dBm may be used to power up the upstream service disconnect unit 113. For example, in one embodiment, the pre-charge AC signal may be generated and transmitted onto conductor span 106 for about 6 seconds to charge up an energy storage component such as the rectifier energy storage unit 122. Processor 116, Relay Control 118 and Trigger Signal Detector 120 are each powered by the charge stored in rectifier-energy storage device 122. The intent of the pre-charge AC signal is to provide enough energy in energy storage unit 122 so that the upstream service disconnect unit become sufficiently energized that it can receive and decode the command code.
When a sufficient charge is available, processor 116 becomes operable and may then receive and decode the command code. For the command code, simple on-off keying of the AC signal may be utilized. In one embodiment, the keying may be performed at a baudrate of 9600 bps. For example, the command code may comprise a 4 byte command with a 50-100 msec pause between each byte so that the receiving circuit keeps receiving enough power from the AC signal. Sending 1 byte will take less than 1 msec. In other implementations, other byte lengths, baudrates or pause durations may be used. The command code may include error checking, CRC or parity bits, for example. At the receiving end, the low power trigger signal detector and/or processor 116 can decode this modulation. After the command code's bytes are transmitted, a relay charge AC signal is sent that is sufficient to charge up energy storage 122 with enough energy to switch relay 114. For example, the relay charge AC signal may have a duration of 4 seconds. After the command code's bytes are decoded by processor 116, the relay charge AC signal will provide sufficient energy so that relay control 118 can switch the relay 114 that will disconnect the copper pair 105 coming from upstream service delivery unit 102 and connect conductor span 106 it to the DPU 112. In one alternate implementation, instead of the pre-charge , command code, and relay charge sequence shown at 812, the pre-charge and relay charge may proceed the command code such as shown at 812′. In this case, the pre-charge and relay charge may have a sufficient combined duration (10 seconds for example) to store enough of an initial charge in energy storage 122 to power-up disconnect unit 112, decode the command code and switch the relay 114. The CPE disconnected at 810 may then be reconnected at 814. It should be appreciated that the 6 second pre-charge and 4 second relay charge are provided for example purposes and that other durations may be used.
With respect to initiating a reconnect signal, the method at
The method proceeds to 832 with transmitting the reconnect signal. In one embodiment, such as shown at 8322, the trigger signal comprises a pre-charge AC signal, followed by a command code (which may comprise a simple on-off keying of the AC signal, for example), followed by a relay charge AC signal, each of which may be as described in
Example 1 includes an upstream service disconnect unit, the upstream service disconnect unit comprising: a processor; a relay control; and a switching relay coupled to a upstream service delivery unit, a first end of an electrical conductor span, and a access network distribution point unit that is coupled to an optical fiber network, wherein a second end of the electrical conductor span is coupled to a customer premises equipment DSL modem; wherein the upstream service disconnect unit is configured to energize the processor, the relay control, and the switching relay and to operate the switching relay to couple the electrical conductor span with the access network distribution point unit by tapping power of a trigger signal drawn from the electrical conductor span.
Example 2 includes the upstream service disconnect unit of example 1, further comprising a rectifier-energy storage device that is charged by an alternating voltage on the electrical conductor span resulting from the trigger signal; wherein the processor, the relay control, and the switching relay are powered from the rectifier-energy storage device.
Example 3 includes the upstream service disconnect unit of any of examples 1-2, further comprising a trigger signal detector, wherein the processor is configured to operate the switching relay to couple the electrical conductor span with the access network distribution point unit only when the trigger signal detector detects the trigger signal on the electrical conductor span.
Example 4 includes the upstream service disconnect unit of any of examples 1-3, wherein the upstream service disconnect trigger unit comprises a bidirectional transceiver that receives the trigger signal on the electrical conductor span.
Example 5 includes the upstream service disconnect unit of any of examples 1-4, wherein the upstream service disconnect unit is integrated into a cable assembly.
Example 6 includes the upstream service disconnect unit of example 5, wherein the upstream service disconnect unit is integrated into twisted-pair electrical conductor cable assembly.
Example 7 includes an upstream service disconnect trigger unit, the upstream service disconnect trigger unit comprising: a processor; a voltage detector configured to connect to an electrical conductor span; and wherein the processor is configured to detect the existence of a upstream service voltage signal on the electrical conductor span based on an input from the voltage detector and upon detection of the upstream service voltage signal, generate a trigger signal on the electrical conductor span.
Example 8 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the upstream service disconnect trigger unit is powered from a customer premises voltage mains.
Example 9 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the upstream service disconnect trigger unit is powered from the upstream service voltage signal.
Example 10 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the upstream service disconnect trigger unit is coupled to a switching relay, wherein the upstream service disconnect trigger unit is configured to operate the switching relay to disconnect the electrical conductor span from customer premises equipment before generating the trigger signal on the electrical conductor span.
Example 11 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the upstream service disconnect trigger unit comprises a trigger signal generator that generates the trigger signal by applying an alternating voltage signal to the electrical conductor span.
Example 12 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the upstream service disconnect trigger unit comprises a trigger signal current modulator that generates the trigger signal by current modulating the upstream service voltage signal on the electrical conductor span.
Example 13 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the trigger signal is generated at a frequency outside of a voice band used for voice transmissions.
Example 14 includes the upstream service disconnect trigger unit of any of examples 7-13, wherein the upstream service disconnect trigger unit comprises a bidirectional transceiver that generates the trigger signal on the electrical conductor span.
Example 15 includes a power sourcing equipment (PSE) device, the PSE device comprising: a upstream service disconnect trigger unit that includes a voltage detector configured to connect to an electrical conductor span, wherein the upstream service disconnect trigger unit is configured to detect the existence of a upstream service voltage signal on the electrical conductor span and upon detection of the upstream service voltage signal, generate a trigger signal on the electrical conductor span.
Example 16 includes the PSE device of example 15, wherein the upstream service disconnect trigger unit is powered from a customer premises voltage mains.
Example 17 includes the PSE device of any of examples 15-16, wherein the upstream service disconnect trigger unit is powered from the upstream service voltage signal.
Example 18 includes the PSE device of any of examples 15-17, wherein the upstream service disconnect trigger unit is coupled to a switching relay, wherein the upstream service disconnect trigger unit is configured to operate the switching relay to disconnect the electrical conductor span from customer premises equipment before generating the trigger signal on the electrical conductor span.
Example 19 includes the PSE device of any of examples 15-18, wherein the upstream service disconnect trigger unit comprises a trigger signal generator that generates the trigger signal by applying an alternating voltage signal to the electrical conductor span.
Example 20 includes the PSE device of any of examples 15-19, wherein the upstream service disconnect trigger unit comprises a trigger signal current modulator that generates the trigger signal by current modulating the upstream service voltage signal on the electrical conductor span.
Example 21 includes the PSE device of any of examples 15-20, wherein the trigger signal is generated at a frequency outside of a voice band used for voice transmissions.
Example 22 includes the PSE device of any of examples 15-21, wherein the upstream service disconnect trigger unit comprises a bidirectional transceiver that generates the trigger signal on the electrical conductor span.
Example 23 includes the PSE device of example 22, further comprising a power sourcing equipment monitor; wherein the bidirectional transceiver transmits information generated by the power sourcing equipment monitor to one or more upstream devices via bidirectional transceiver.
Example 24 includes a broadband access network, the network comprising: an access network distribution point unit coupled to an optical fiber network; the upstream service disconnect unit of any of examples 1-6 coupled to the access network distribution point unit; a power sourcing equipment device coupled to a second end of the electrical conductor span; and the upstream service disconnect trigger unit of any of examples 7-14 coupled to a second end of the electrical conductor span; wherein the upstream service disconnect trigger unit is configured with the voltage detector to detect the existence of a voltage signal on the electrical conductor span from the upstream service delivery unit and upon detection of the voltage signal, generate the trigger signal on the electrical conductor span; wherein the upstream service disconnect unit is configured to energize its processor and operate the switching relay to couple the electrical conductor span with the access network distribution point unit by tapping power of the trigger signal drawn from the electrical conductor span; and wherein the upstream service disconnect trigger unit is configured to operate the power sourcing equipment device to provide power to the access network distribution point unit in response to the switching relay coupling the electrical conductor span with the access network distribution point unit.
Example 25 includes the network of example 24, wherein the upstream service disconnect trigger unit is integrated into the power sourcing equipment device.
Example 26 includes the network of any of examples 24-25, wherein the upstream service disconnect unit is integrated into the access network distribution point unit.
Example 27 includes a broadband access network, the network comprising: an access network distribution point unit coupled to an optical fiber network; an upstream service disconnect unit coupled to the access network distribution point unit, a upstream service delivery unit, and a first end of an electrical conductor span, wherein the disconnect unit comprises a switching relay that alternately switches either the access network distribution point unit or the upstream service delivery unit to the electrical conductor span; a power sourcing equipment device coupled to a second end of the electrical conductor span; and a upstream service disconnect trigger unit coupled to the coupled to a second end of the electrical conductor span; wherein the upstream service disconnect trigger unit is configured with a voltage detector to detect the existence of a voltage signal on the electrical conductor span from the upstream service delivery unit and upon detection of the voltage signal, generate a trigger signal on the electrical conductor span; wherein the upstream service disconnect unit is configured to energize a processor and operate the switching relay to couple the electrical conductor span with the access network distribution point unit by tapping power of the trigger signal drawn from the electrical conductor span; and wherein the upstream service disconnect trigger unit is configured to operate the power sourcing equipment device to provide power to the access network distribution point unit in response to the switching relay coupling the electrical conductor span with the access network distribution point unit.
Example 28 includes the network of example 27, wherein the upstream service disconnect trigger unit is configured to activate the power sourcing equipment device when the voltage detector detects a loss of the voltage signal.
Example 29 includes the network of any of examples 27-28, wherein the upstream service disconnect trigger unit is integrated into the power sourcing equipment device.
Example 30 includes the network of any of examples 27-29, wherein the upstream service disconnect trigger unit is coupled to a second switching relay, wherein the upstream service disconnect trigger unit is configured to operate the second switching relay to disconnect the electrical conductor span from customer premises equipment.
Example 31 includes the network of any of examples 27-30, wherein the upstream service disconnect trigger unit comprises a trigger signal generator that generates the trigger signal by applying an alternating voltage signal to the electrical conductor span.
Example 32 includes the network of example 31, wherein the trigger signal is generated at a frequency outside of the voice band of the upstream service delivery unit.
Example 33 includes the network of any of examples 27-33, wherein the upstream service disconnect trigger unit comprises a trigger signal current modulator that generates the trigger signal by current modulating the voltage signal on the electrical conductor span.
Example 34 includes the network of any of examples 34, wherein the trigger signal is generated at a frequency outside of the voice band of the upstream service delivery unit.
Example 35 includes the network of any of examples 27-34, wherein the upstream service disconnect unit is configured with a rectifier-energy storage device that is charged by an alternating voltage on the electrical conductor span resulting from the trigger signal.
Example 36 includes the network of any of examples 27-35, wherein the upstream service disconnect unit is integrated into the access network distribution point unit.
Example 37 includes the network of any of examples 27-36, wherein the electrical conductor span comprises at least one set of twisted pair electrical conductors.
Example 38 includes the network of any of examples 27-37, wherein the second end of the electrical conductor span is further coupled to a customer premises equipment (CPE) network.
Example 39 includes the network of any of examples 27-38, wherein the upstream service disconnect trigger unit is powered from a customer premises voltage mains.
Example 40 includes the network of any of examples 27-39, wherein the upstream service disconnect trigger unit is powered from the voltage signal.
Example 41 includes the network of any of examples 27-40, wherein the upstream service disconnect trigger unit comprises a first bidirectional transceiver and the upstream service disconnect unit comprises a second bidirectional transceiver; wherein the first bidirectional transceiver generates the trigger signal and transmits the trigger signal onto the electrical conductor span to the second bidirectional transceiver.
Example 42 includes the network of example 41, wherein the power sourcing equipment device further comprises a power sourcing equipment monitor; wherein the first bidirectional transceiver transmits information generated by the power sourcing equipment monitor to the second bidirectional transceiver.
Example 43 includes the network of example 42, wherein the access network distribution point unit is configured to query the power sourcing equipment monitor for the information by instructing the second bidirectional transceiver to send a request for the information to the first bidirectional transceiver.
Example 44 includes a method for automated Broadband Network Distribution Point Unit Powering, the method comprising: monitoring for an existence of a upstream service delivery unit voltage signal on an electrical conductor span; when the upstream service delivery unit voltage signal is detected, generating a trigger signal on the electrical conductor span; energizing a processor and operating a switching relay to couple the electrical conductor span with an access network distribution point unit by tapping power of the trigger signal drawn from the electrical conductor span; and operating a power sourcing equipment device to provide power to the access network distribution point unit via the electrical conductor span in response to the switching relay coupling the electrical conductor span with the access network distribution point unit.
Example 45 includes the upstream service disconnect trigger unit of any of examples 7-14, wherein the trigger signal comprises: a pre-charge AC signal, a first command code; and a relay charge AC signal.
Example 46 includes the upstream service disconnect trigger unit of any of examples 7-14 and 45 wherein the processor is further configured to detect an activation of a Distribution Point Unit after generating the trigger signal; wherein when activation of the Distribution Point Unit is not detected, the upstream service disconnect trigger unit generates a reconnect signal that comprises: the pre-charge AC signal, a second command code different from the first command code; and the relay charge AC signal.
Example 47 includes the upstream service disconnect trigger unit of any of examples 7-14 and 44-46 wherein the pre-charge AC signal, the first command code, and the relay charge AC signal, comprise one or both of: a frequency of either 138 kHz or 276 kHz; and a signal level of around 20 dBm.
Example 48 includes the upstream service disconnect trigger unit of any of examples 7-14 and 44-47 wherein the first command code comprises a multi-byte on-off keying AC signal.
Example 49 includes the PSE device of any of examples 15-23, wherein the trigger signal comprises: a pre-charge AC signal, a first command code; and a relay charge AC signal.
Example 50 includes the PSE device of any of examples 15-23 and 49 wherein the upstream service disconnect trigger unit is further configured to detect an activation of a Distribution Point Unit after generating the trigger signal; wherein when activation of the Distribution Point Unit is not detected, the upstream service disconnect trigger unit generates a reconnect signal that comprises: the pre-charge AC signal, a second command code different from the first command code; and the relay charge AC signal.
Example 51 includes the PSE device of any of examples 15-23 and 48-50 wherein the first command code comprises a multi-byte on-off keying AC signal.
Example 52 includes the PSE device of any of examples 15-23 and 48-51 wherein the pre-charge AC signal, the first command code, and the relay charge AC signal, comprise one or both of: a frequency of either 138 kHz or 276 kHz; and a signal level of around 20 dBm.
Example 53 includes the network of any of examples 27-44, wherein the trigger signal comprises: a pre-charge AC signal, a first command code; and a relay charge AC signal.
Example 54 includes the network of any of examples 27-44 and 53 wherein the upstream service disconnect trigger unit is further configured to detect an activation of a Distribution Point Unit after generating the trigger signal; wherein when activation of the Distribution Point Unit is not detected, the upstream service disconnect trigger unit generates a reconnect signal that comprises: the pre-charge AC signal, a second command code different from the first command code; and the relay charge AC signal.
Example 55 includes the network of any of examples 27-44 and 52-54 wherein the first command code comprises a multi-byte on-off keying AC signal.
Example 56 includes the network of any of examples 27-44 and 52-55 wherein the pre-charge AC signal, the first command code, and the relay charge AC signal, comprise one or both of: a frequency of either 138 kHz or 276 kHz; and a signal level of around 20 dBm.
Example 57 includes the network of any of examples 27-44 and 52-56 wherein the trigger signal comprises: a pre-charge AC signal, a first command code; and a relay charge AC signal.
Example 58 includes the network of any of examples 27-44 and 52-57 wherein the first command code comprises a multi-byte on-off keying AC signal.
Example 59 includes the network of any of examples 27-44 and 52-58 wherein the pre-charge AC signal, the first command code, and the relay charge AC signal, comprise one or both of: a frequency of either 138 kHz or 276 kHz; and a signal level of around 20 dBm.
In various alternative embodiments, system elements, method steps, or examples described throughout this disclosure (such as the Upstream Service Disconnect Units, Upstream Service Disconnect Trigger Units, Distribution Point Units, Power Sourcing Equipment, or sub-parts thereof, for example) may be implemented using one or more computer systems, field programmable gate arrays (FPGAs), or similar devices comprising a processor coupled to a memory and executing code to realize those elements, processes, or examples, said code stored on a non-transient data storage device. Therefore other embodiments of the present disclosure may include elements comprising program instructions resident on computer readable media which when implemented by such computer systems, enable them to implement the embodiments described herein. As used herein, the term “computer readable media” refers to tangible memory storage devices having non-transient physical forms. Such non-transient physical forms may include computer memory devices, such as but not limited to punch cards, magnetic disk or tape, any optical data storage system, flash read only memory (ROM), non-volatile ROM, programmable ROM (PROM), erasable-programmable ROM (E-PROM), random access memory (RAM), or any other form of permanent, semi-permanent, or temporary memory storage system or device having a physical, tangible form. Program instructions include, but are not limited to computer-executable instructions executed by computer system processors and hardware description languages such as Very High Speed Integrated Circuit (VHSIC) Hardware Description Language (VHDL).
Although specific embodiments have been illustrated and described herein, it will be appreciated by those of ordinary skill in the art that any arrangement, which is calculated to achieve the same purpose, may be substituted for the specific embodiment shown. This application is intended to cover any adaptations or variations of the present invention. Therefore, it is manifestly intended that this invention be limited only by the claims and the equivalents thereof.
The present application is a § 371 U.S. National Stage Application of International Application No. PCT/EP/2016/066595 titled “SYSTEMS AND METHODS FOR AUTOMATED BROADBAND DISTRIBUTION POINT UNIT POWERING”, filed on Jul. 13, 2016, which claims priority to and the benefit of U.S. Provisional Patent Application No. 62/194,140, entitled “SYSTEMS AND METHODS FOR AUTOMATED BROADBAND DISTRIBUTION POINT UNIT POWERING”, filed on Jul. 17, 2015, and which also claims priority to and the benefit of U.S. Provisional Patent Application No. 62/213,899, entitled “SYSTEMS AND METHODS FOR AUTOMATED BROADBAND DISTRIBUTION POINT UNIT POWERING”, filed on Sep. 3, 2015, all of which are incorporated herein by reference in their entirety.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2016/066595 | 7/13/2016 | WO | 00 |
Number | Date | Country | |
---|---|---|---|
62194140 | Jul 2015 | US | |
62213899 | Sep 2015 | US |