This disclosure relates to determining and/or using an estimate of drilling efficiency (e.g., intrinsic energy of rock or wear on a drill bit) while a well is drilled.
This section is intended to introduce the reader to various aspects of art that may be related to various aspects of the present techniques, which are described and/or claimed below. This discussion is believed to be helpful in providing the reader with background information to facilitate a better understanding of the various aspects of the present disclosure. Accordingly, it should be understood that these statements are to be read in this light, and not as an admission of any kind.
To drill a well, a drill bit attached to a drill string is rotated and pressed into a geological formation. Drilling fluid may be pumped down into the drill string to mechanically power the rotation of the drill bit and to help remove rock cuttings out of the borehole. The drill bit may drill through portions of the geological formation having different intrinsic energies, also referred to as rock strengths. The higher the intrinsic energy of the portions of the geological formation, the more energy the drill bit may use to cut through the rock. Furthermore, over time, the drill bit will wear down from cutting through the rock. As wear on the drill bit increases, it may become less efficient to use that drill bit to drill the well.
In many cases, the intrinsic energy of the rock and the estimated wear of the drill bit may be determined using models based on steady-state measurements of weight-on-bit (WOB) and torque-on-bit (TOB) and other measurements such as Rate-of-penetration (ROP) and rotation speed (Rotation-Per-Minute or RPM). In this disclosure, the term WOB refers to an amount of downward force that is being applied to the drill bit to cause the drill bit to cut through the geological formation. The term TOB refers to an amount of torque that is being applied to the drill bit to cause the drill bit to cut through the geological formation. Once the steady-state values of WOB and TOB are obtained, estimates of intrinsic energy and drill bit wear may be computed. The estimates of intrinsic energy and drill bit wear may be presented in a well log, which may be used by drilling specialists to determine how to control certain aspects of drilling. The well logs currently in use, however, may not enable drilling specialists to identify or use certain useful aspects of this information. Moreover, estimates of intrinsic energy and drill bit wear obtained using steady-state measurements of WOB and TOB may not fully account for depths where drilling is not steady state.
A summary of certain embodiments disclosed herein is set forth below. It should be understood that these aspects are presented merely to provide the reader with a brief summary of these certain embodiments and that these aspects are not intended to limit the scope of this disclosure. Indeed, this disclosure may encompass a variety of aspects that may not be set forth below.
This disclosure relates to systems and methods for estimating and/or using drilling efficiency parameters of a drilling operation. In one example, a method for estimating drilling efficiency parameters may include using a borehole assembly that includes a drill bit to drill into a geological formation. A number of measurements of weight-on-bit and torque-on-bit may be obtained during a period in which weight-on-bit and torque-on-bit are non-steady-state. The plurality of measurements of weight-on-bit and torque-on-bit may be used to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.
In another example, a system includes a borehole assembly that includes a drill bit that drills into a geological formation as a weight-on-bit and a torque-on-bit is applied, a measuring assembly, and a data processing system. The drill bit may wear down as the drill bit drills through depths of the geological formation to a greater extent through parts of the geological formation having a greater intrinsic energy. The measuring assembly may obtain a number of measurements of weight-on-bit and torque-on-bit, at least during a period in which weight-on-bit and torque-on-bit are non-steady-state. The data processing system may use the measurements of weight-on-bit and torque-on-bit to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.
Various refinements of the features noted above may be undertaken in relation to various aspects of the present disclosure. Further features may also be incorporated in these various aspects as well. These refinements and additional features may exist individually or in any combination. For instance, various features discussed below in relation to one or more of the illustrated embodiments may be incorporated into any of the above-described aspects of the present disclosure alone or in any combination. The brief summary presented above is intended to familiarize the reader with certain aspects and contexts of embodiments of the present disclosure without limitation to the claimed subject matter.
Various aspects of this disclosure may be better understood upon reading the following detailed description and upon reference to the drawings in which:
One or more specific embodiments of the present disclosure will be described below. These described embodiments are examples of the presently disclosed techniques. Additionally, in an effort to provide a concise description of these embodiments, features of an actual implementation may not be described in the specification. It should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which may vary from one implementation to another. Moreover, it should be appreciated that such a development effort might be complex and time consuming, but would be a routine undertaking of design, fabrication, and manufacture for those of ordinary skill having the benefit of this disclosure.
When introducing elements of various embodiments of the present disclosure, the articles “a,” “an,” and “the” are intended to mean that there are one or more of the elements. The terms “comprising,” “including,” and “having” are intended to be inclusive and mean that there may be additional elements other than the listed elements. Additionally, it should be understood that references to “one embodiment” or “an embodiment” of the present disclosure are not intended to be interpreted as excluding the existence of additional embodiments that also incorporate the recited features.
As noted above, a drill bit may drill through portions of the geological formation having different intrinsic energies, also referred to as rock strengths. The higher the intrinsic energy of the portions of the geological formation, the more energy the drill bit may use to cut through the rock. Furthermore, over time, the drill bit will wear down from cutting through the rock. The wear on the drill bit is also related to the intrinsic energy of the rock in the geological formation that the drill bit has cut through. As wear on the drill bit increases, it may become less efficient to use that drill bit to drill the well. In fact, at some point, it may be useful to take time to “trip” the drill bit—that is, pull out the drill string and replace the drill bit with one that has less wear—and resume drilling with the new drill bit. Tripping the bit, however, may take several hours to several days. Time not spent drilling may be expensive, but may be cost effective if the newly replaced drill bit allows the well to be completed sooner than otherwise.
In this disclosure, certain parameters associated with drilling efficiency may be determined and presented. In some examples of this disclosure, this drilling efficiency information may be provided in a well log that more easily allows a drilling specialist to identify the efficiency of ongoing, prior, or even future drilling operations. In fact, in some examples, the provided well log may enable a drilling specialist to more easily identify an optimal time to trip the drill bit given a possible future rate of penetration in the event that the drill bit is replaced.
This disclosure will also describe determining drilling efficiency parameters using weight-on-bit (WOB) and torque-on-bit (TOB) measurements obtained during non-steady-state periods of drilling when WOB and TOB are changing. Such non-steady-state periods may include drill-on and drill-off periods. During a drill-on period, drilling is resumed after inactivity. The WOB and TOB ramp up from lower values to higher values as drilling is resumed. During a drill-off period, WOB and TOB ramp down from higher values to lower as drilling pauses or ends.
As illustrated in
The downhole tools 36A and/or 36B may collect a variety of data 40A that may be stored and processed in the BHA 34 or, as illustrated in
The data processing system 44 may include a processor 46, memory 48, storage 50, and/or a display 52. The data processing system 44 may use the WOB and TOB information of the data 40A and/or 40B to determine certain drilling efficiency parameters. To process the data 40A and/or 40B, the processor 46 may execute instructions stored in the memory 48 and/or storage 50. As such, the memory 48 and/or the storage 50 of the data processing system 44 may be any suitable article of manufacture that can store the instructions. The memory 46 and/or the storage 50 may be ROM memory, random-access memory (RAM), flash memory, an optical storage medium, or a hard disk drive, to name a few examples. The display 52 may be any suitable electronic display that can display the well logs and/or other information relating to properties of the well as measured by the downhole tools 36A and/or 36B. It should be appreciated that, although the data processing system 44 is shown by way of example as being located at the surface, the data processing system 44 may be located in the downhole tools 36A and/or 36B. In such embodiments, some of the data 40A may be processed and stored downhole, while some of the data 40A may be sent to the surface (e.g., in real time). This may be the case particularly in LWD, where a limited amount of the data 40A may be transmitted to the surface during drilling operations.
A method for monitoring the efficiency of drilling and/or predicting future drilling performance appears in a flowchart 60 of
Using the drilling efficiency parameters obtained from the analysis of block 64 or from other calculations (e.g., from steady-state measurements of WOB and TOB at the surface), a rate-of-penetration (ROP) analysis may be performed (block 66). This may involve determining rock strength or bit wear using an estimate of rate of penetration (ROP), speed of bit rotation (RPM), and/or the drilling efficiency parameters. From this information, the future ROP may be estimated (block 68), as well as other parameters in relationship with drilling efficiency.
Before discussing the uses of drilling efficiency parameters such as friction parameters and bit wear, a discussion of a manner of analysis to determine these parameters using measurements during non-steady-state drilling is set. Specifically, as noted above with reference to blocks 62 and 64 of the flowchart 60 of
A flowchart 80 of
Any suitable model that describes the relationship between WOB and TOB during non-steady-state drilling periods may be used to identify the drilling efficiency parameters. One non-limiting example of such a model is shown below:
where
In EQ. 1 and EQ. 2, above, the function ƒ(.) defines the behaviour of the friction on the wear flats as the depth-of-cut is increased. The drilling efficiency parameters of this model are ε, Aw, ζ and μ, and these describe the state of the cutting process. The aim is to estimate these parameters from measurements of WOB, TOB, ROP, and RPM.
Using a model such as described by EQ. 1 and EQ. 2, the actions of block 64 of the flowchart 60 of
Using a crossplot of WOB and TOB such as the crossplot 90 of
of the steady-state portion of the crossplot 90 may be identified that corresponds to a point representing εAw(1−μζ). A line 98 may be identified that corresponds to a point representing εAw. By identifying these values in this way, the parameters εAw, ζ and μ may be estimated.
For this stage of the analysis, it is useful for the measurements of WOB and TOB to be taken while the weight is ramping up or decreasing, as this provides a sweep (a range) of data points on the cross-points and improves the robustness of fitting a model. When drilling, weight (and thus torque) may be held fairly constant (at the requested drilling weight) during steady-state periods; however, the sweeps of weight will occur whenever the bit is lowered to bottom during “drill-on,” when weight increases from zero to the requested drilling weight, and when the bit is raised off bottom during “drill-off,” when weight ramps down from the drilling weight to zero. These “drill-on” and “drill-off” periods may occur directly after and just prior to a connection (e.g., when a new section of drillpipe is added to the drill string 18).
Collecting the sweep of WOB and TOB data used for the analysis of block 84 may occur at the surface or downhole. In one example of a flowchart 110, illustrated in
As such, the measurements of WOB and TOB that are collected during the drill-on or drill-off period by the downhole tool 36 may be stored and transmitted uphole gradually as the data 40A during steady-state drilling or when drilling pauses or ends (block 114). When drilling a stand of drillpipe, the time taken to drill-on and drill-off may be small compared the time taken to drill the stand. That is, after a connection, when the weight is applied, the drill-on might occur over a period of time from a few seconds to maybe a minute. After that, when the desired drilling weight is reached, the remainder of the stand may take anything from, for example, 10 minutes to many hours to drill.
The manner of transmission of block 114 of
Once transmitted to the surface, the measurements of WOB and TOB may be used in the analysis mentioned above at block 64 to determine an estimate of the drilling efficiency parameters (block 116). Note that the analysis of drilling efficiency and bit wear may be desired when ROP is slow, when there is more time to transmit the data to the surface.
The method of the flowchart 110 of
The WOB and TOB data obtained during the drill-on period shown by the well log portion 132 may be used to generate a crossplot 140. In the manner mentioned above, TOB (ordinate 142) vs. WOB (abscissa 144) contains a variety of data points 146 from the well log portion 132. By fitting a curve 148 to the data points 146, a line 150 corresponding to the line 96 of the crossplot 90 may be obtained. This may allow values of εAw, ζ and μ to be identified from from the crossplot 140.
Likewise, the WOB and TOB data obtained during the drill-off period shown by the well log portion 134 may be used to generate a crossplot 160. In the manner mentioned above, TOB (ordinate 162) vs. WOB (abscissa 164) contains a variety of data points 166 from the well log portion 134. By fitting a curve 168 to the data points 166, a line 170 corresponding to the line 96 of the crossplot 90 may be obtained. This may allow values of εAw, ζ and μ to be identified from from the crossplot 160.
As noted by a flowchart 180 of
The analysis discussed in this section of the disclosure generally corresponds to blocks 66 and 68 of the flowchart 60 of
Separating the estimation of current and/or future drilling efficiency described in this section of the disclosure from the solving of the model parameters estimated in the previous section of the disclosure may allow for more precise and/or more accurate estimates than otherwise. Specifically, since ROP is measured at surface (from block motion), the measurement of ROP during the drill-on and drill-off periods may be of comparatively low quality, while the depth-averaged ROP may be far more trustworthy. Moreover, the manner of estimating the remaining parameters can incorporate a depth-based constraint (e.g., bit wear must remain steady or decrease with increasing depth). Other information may also be considered. For instance, estimating the remaining parameters can incorporate any other suitable depth-based information, such as logs of rock strength gained from offset wells (e.g., from wireline tools).
One example of estimating the remaining model parameters and/or current or future drilling efficiency may take place as shown in a flowchart 190 of
A matrix of likelihoods of bit wear may be generated in any suitable way. In one example, at any depth, it is possible to propose a value of bit wear to test. For example, a suitable range of possible values of bit wear that could reasonably be expected to represent the actual value of drill bit wear may be used. For each selected proposed value of bit wear, it is then possible to use the model to predict some of the measurements, and to compare these modeled values to the true measurements. The model discussed above may be used for this purpose, but it should be appreciated that any other suitable model may be used that can be used to estimate bit wear and, accordingly, a likelihood of bit wear given the currently known parameters. Thus, the process may be repeated at different depths and for different proposed values of bit wear. In one example, the following relationship may be used:
where
The result is a matrix of likelihoods, L, which gives the likelihood of a given bit wear Aw at a given depth.
Solving for the best path through a matrix of likelihoods may be done using any suitable technique. In one example, a Dynamic Time Warping (DTW) algorithm may be used. Note also that other techniques may be employed, for example, to weakly constrain the bit wear. Moreover, the algorithm could be have any other pattern; for instance, it may allow small decreases in bit wear if the resulting total likelihood is improved beyond some threshold amount of overall likelihood (e.g., above some threshold value of a sum of the likelihoods along the determined path or average value of the likelihood along the determined path).
Having determined a likely value of bit wear, a likely value of rock strength may be estimated. That is, for a given estimate of bit wear, it may be possible to estimate the rock strength ε (as all other variables of the model now may be known). For example, using the model model previously proposed above, the rock strength ε can be estimated one of two ways:
Values of rock strength ε may also be calculated using both equations and averaged together to make the estimate of rock strength ε more robust.
Additionally or alternatively, the method may also estimate the bit wear Aw from the drilling efficiency parameters obtained from the measurements taken from non-steady state period in combination with the rock strength obtained from a log such as a sonic log, directly via the estimation of εAw or with via other measurements of WOB, TOB, ROP and RPM taken as explained above.
The refined estimates of rock strength and bit wear may be presented in a way that allows a drilling specialist to easily identify the drilling efficiency of the drilling operation. One example appears in a well log 220 of
The well log 220 may be notable not only for providing the estimates of rock strength and bit wear alongside one another, to easily identify the relationship between them, but also for providing rock strength and MSE in the same track (here, the fourth track 234). Because the rock strength and the MSE share the same track, a difference between them may be identified (and/or shaded, as shown). The estimate of rock strength is thus easily compared to Mechanical Specific Energy (MSE), which is a measure of the energy used in the drilling process. Accordingly, inefficient drilling can be identified as when the rock strength (which is a measure of the energy necessary to break the rock) deviates from the MSE. Indeed, the gap between rock strength and MSE of the fourth track 234 noticeably grows as the bit wear of the fifth track 238 increases.
Having estimated the bit wear, rock strength, and other model parameters, a calibrated model of the bit-rock interaction is available. This can be used to predict, for example, the change in rate of penetration (ROP) that may occur if weight-on-bit (WOB) or torque-on-bit (TOB) were changed. It may also be used to predict what the ROP would be if the bit wear were zero—that is, what would be the ROP if a fresh bit was in the hole (using the same WOB and RPM). An example well log 250 shown in
The well log 250 illustrates several tracks provided over a range of depths 252. A first track 254 illustrates lithology; a second track 256 illustrates torque-on-bit (TOB) (dashed line 258) and weight-on-bit (WOB) (solid line 260); a third track 262 illustrates actual rate of penetration (ROP) (solid line) alongside an estimate of the best available ROP (dashed line); a fourth track 266 illustrates rock strength (dashed line) and mechanical specific energy (MSE) (solid line) in the manner of the well log 220 of
Estimates of the model parameters may be extrapolated to depths ahead of the bit or to new wells. This gives the ability to predict the ROP ahead of the bit or in a future well. This is presented in an example well log 280 of
The fourth track 288 compares drilled depths to time 318. A portion 320 shows the amount of time that has passed to drill down through the depths 292 and a predicted portion 322 showing time that is predicted to pass to drill down through the future depths 294. Also shown in the fourth track 288 is the predicted amount of time 324 that may be used to drill through the future depths 294 if the bit were changed for a new bit (assuming a day is used to trip to change the bit, as indicated by portion 326). In this example, it is predicted that by changing the bit at 3700 m, the remaining section would be completed about two days sooner (e.g., at a point 328 rather than 330). This analysis may be done at any depth, so that at any time while drilling, one could determine whether there would be any benefit to tripping to change the bit.
Accordingly, some aspects of the disclosure include:
A method for estimating drilling efficiency parameters, the method comprising:
using a borehole assembly comprising a drill bit to drill into a geological formation;
obtaining a plurality of measurements of weight-on-bit and torque-on-bit during a period in which weight-on-bit and torque-on-bit are non-steady-state; and
using the plurality of measurements of weight-on-bit and torque-on-bit to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.
In the method, the period in which weight-on-bit and torque-on-bit are non-steady-state may comprise:
a drill-on period in which in which weight-on-bit and torque-on-bit increase from an off state to a steady state; or
a drill-off period in which weight-on-bit and torque-on-bit decrease from the steady state to the off state.
The one or more drilling efficiency parameters may comprise a friction parameter of the drill bit, a friction parameter of the geological formation, or an approximation of a wear state of the drill bit, or a rock strength or any combination thereof.
Using the plurality of measurements of weight-on-bit and torque-on-bit to estimate the one or more drilling efficiency parameters may comprise generating a crossplot of the plurality of the measurements of weight-on-bit and torque-on-bit over the period and identifying a best-fit curve relating to a predetermined drilling model, wherein the one or at least one of the drilling efficiency parameters are estimated based on one or more properties of the best-fit curve.
The drilling efficiency parameters may be estimated on the crossplot by identifying a steady-state point in the best-fit curve, wherein, beyond the steady-state point, values of weight-on-bit and torque-on-bit increase substantially linearly with respect to one another at a first slope, and using the steady-state point and the first slope to estimate values of the one or more drilling efficiency parameters.
The drilling model may accord with the following relationships:
where
In some embodiments, at least part of the plurality of measurements of weight-on-bit and/or torque-on-bit are obtained by a downhole tool of the bottom hole assembly.
In some embodiments, at least part of the plurality of measurements of weight-on-bit and/or torque-on-bit are obtained at the surface.
When the plurality of measurements of weight-on-bit and torque-on-bit are obtained by the downhole tool, the measurements may be obtained at a sampling rate higher than an immediately available data transfer rate of a telemetry system associated with the downhole tool, and wherein the plurality of measurements of weight-on-bit and torque-on-bit are transferred to a data processing system by the telemetry system at least partly during a steady-state period of drilling over a longer time than was taken to obtain the plurality of measurements of weight-on-bit and torque-on-bit.
The method may comprise:
repeating the method during a plurality of additional periods of drilling in which weight-on-bit and torque-on-bit are non-steady-state to estimate the one or more drilling efficiency parameters at a plurality of depths; and
interpolating interim values of the one or more drilling efficiency parameters for depths between the plurality of depths to obtain a depth log of the one or more drilling efficiency parameters.
The method may comprise:
obtaining an estimation of a rock strength ε via a log performed downhole, such as a sonic log; and
estimating the drill bit wear via the drilling model and the drilling efficiency parameters determined during the non-steady state period and the rock strength determined by the downhole log.
The drill bit wear may be determined on the basis of the parameters identified thanks to the drilling model or by taking additional WOB, TOB, RPM and ROP measurements.
The method may comprise:
taking additional measurements of weight on bit and/or torque on bit, and further measurements of rate of penetration (ROP) and rotation speed (RPM) during periods of drilling in which weight-on-bit and torque-on-bit are in a steady state;
comparing, at a plurality of depths and for a plurality of predetermined drill bit wear values, a value of weight on bit and/or torque on bit estimated via the drilling efficiency model with the already determined drilling efficiency parameters and measured ROP and RPM and a measured value of the weight on bit and/or torque on bit during a steady state period; and
determining an estimated drill bit wear at the plurality of depths based on the comparison.
The measurements may be averaged over intervals of depth.
The measurements may be obtained by a downhole tool.
The measurements may be obtained at the surface.
The method may comprise:
determining a matrix of likelihoods of possible drill bit wear at a plurality of depths of the geological formation based on the comparison;
wherein determining an estimated drill bit wear at the plurality of depths is based on the matrix, and takes into account, for determining the drill bit wear at at least one depth, the drill bit wear at at least one other depth.
The method may include determining the estimated bit wear by determining a best-fit path through the matrix of likelihoods in which drill bit wear does not decrease with increasing depth.
Determining the estimated bit wear may comprise using a dynamic time warping approach.
The matrix of likelihoods may be determined in accordance with the following relationship:
where:
WOB(d) and TOB(d) represent measurements of weight-on-bit and torque-on-bit at depth d; d;
(d,Aw) and (d,Aw) represent modelled values of weight-on-bit and torque-on-bit at bit at depth d and bit wear Aw; and
σW2 and σT2 represent a measurement uncertainty on weight-on-bit and torque-on-bit.
A system may comprise:
a borehole assembly comprising a drill bit configured to drill into a geological formation as a weight-on-bit and a torque-on-bit is applied, wherein the drill bit wears down as the drill bit drills through depths of the geological formation to a greater extent through parts of the geological formation having a greater intrinsic energy;
a measuring assembly for obtaining a plurality of measurements of weight-on-bit and torque-on-bit, at least during a period in which weight-on-bit and torque-on-bit are non-steady-state; and
a data processing system configured to use the plurality of measurements of weight-on-bit and torque-on-bit to estimate one or more drilling efficiency parameters relating to the drilling of the geological formation during the period.
The measurement assembly may comprise a component of a downhole tool.
The component of the downhole tool may comprise a strain gauge.
The measurement assembly may comprise a component at the surface.
The data processing system may be situated downhole and/or at the surface.
The data processing system may estimate the one or more drilling efficiency parameters using any of the disclosed methods.
At least part of the measuring assembly may be situated in the borehole assembly, wherein the borehole assembly also comprises a telemetry system for transferring the measurements to the data processing system, wherein the telemetry system is configured to send the measurements at least partly during a steady-state period of drilling over a longer time than was taken to obtain the plurality of measurements of weight-on-bit and torque-on-bit.
At least part of the measuring assembly may be located at the surface.
A method for determining drilling efficiency parameters of a drilling operation comprising:
using a drill bit of a borehole assembly comprising a drill bit to drill into a geological formation;
using a downhole tool of the borehole assembly to obtain measurements of weight-on-bit and torque-on-bit during a drill-on or a drill-off period, wherein the measurements are obtained at a sampling rate higher than an available data transfer rate of a telemetry system associated with the downhole tool; and
using the telemetry system to transfer the measurements to a data processing system at the surface at least partly after the drill-on or the drill-off period.
The downhole tool may identify when the drill-on or the drill-off period begins and begin obtaining the measurements when the drill-on or the drill-off period has been identified as beginning.
The downhole tool may be instructed that the drill-on or the drill-off period is about to begin by a data processing system at the surface and the downhole tool may begin obtaining the measurements upon receipt of the instructions.
The downhole tool may comprise a strain gauge.
The measurements may be obtained at approximately 1 per second or faster.
The measurements may be transferred to the surface by the telemetry system in an extra data point added to a plurality of data frames being transmitted during normal drilling after the drill-on or the drill-off period.
The measurements may be transferred to the surface by the telemetry system all at once after the drill-on or drill-off period.
The telemetry system may be an electromagnetic (EM) system, a mud pulse system, or an acoustic wave propagation system.
The disclosure also relates to a method for displaying drilling efficiency parameters, comprising:
providing a well log of a plurality of depths of a well, wherein the well log shows intrinsic energy of rock and mechanical specific energy (MSE) in the same track, thereby providing an indication of drilling efficiency to the extent that intrinsic energy of the rock deviates from MSE.
The area between the intrinsic energy of the rock and the MSE may be colored or shaded to make the difference between the intrinsic energy of the rock and the MSE stand out.
The disclosure also relates to a method for displaying drilling efficiency parameters while a well is being drilled, the method comprising:
drilling a well into a geological formation using a drill bit on a borehole assembly, wherein the drill bit is configured to wear down as the drill bit drills through depths of the geological formation to a greater extent through parts of the geological formation having a greater intrinsic energy;
providing a well log for a plurality of depths of the well, wherein the well log illustrates a measured rate of penetration (ROP) of the drill bit through the geological formation alongside an estimated best possible ROP if the drill bit were not worn.
The area between the measured ROP and the estimated best possible ROP may be colored or shaded to make the difference between the measured ROP and the estimated best possible ROP stand out.
The best possible ROP may be estimated based at least in part on a drill bit wear that is estimated to have occurred or that is estimated to occur at depths in the future based on a drilling efficiency model.
The drilling efficiency model may accord with the relationships of EQ. 1 and EQ. 2 above.
The disclosure also relates to a method for displaying drilling efficiency parameters while a well is being drilled, the method comprising:
drilling a well into a geological formation using a drill bit on a borehole assembly, wherein the drill bit is configured to wear down as the drill bit drills through depths of the geological formation to a greater extent through parts of the geological formation having a greater intrinsic energy;
providing a well log for a plurality of depths of the well, wherein the well log illustrates predicted values of drilling parameters for a first scenario in which the drill bit is not replaced and for a second scenario in which the drill bit is replaced with a fresh drill bit.
The drilling parameters may include an amount of drill bit wear that would be predicted to occur without replacing the drill bit and an amount of drill bit wear that would be predicted to occur if the drill bit were replaced with the fresh drill bit.
The drilling parameters may include a predicted rate of penetration (ROP) of the drill bit without replacement alongside a predicted ROP if the drill bit were replaced with the fresh drill bit.
The drilling parameters may include a predicted time of completion of the well without replacing the drill bit alongside a predicted time of completion if the drill bit were replaced with the fresh drill bit.
The drilling efficiency parameters may be predicted based at least in part on a drilling efficiency model.
The drilling efficiency model may accord with the relationships of EQ. 1 and EQ. 2 above.
The specific embodiments described throughout this disclosure have been shown by way of example, and it should be understood that these embodiments may be susceptible to various modifications and alternative forms. It should be further understood that the claims are not intended to be limited to the particular forms disclosed, but rather to cover modifications, equivalents, and alternatives falling within the spirit and scope of this disclosure.
Number | Date | Country | Kind |
---|---|---|---|
15290037.9 | Feb 2015 | EP | regional |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2016/053782 | 2/23/2016 | WO | 00 |