Systems and methods for installing pile structures in permafrost

Information

  • Patent Grant
  • 9957684
  • Patent Number
    9,957,684
  • Date Filed
    Wednesday, December 7, 2016
    8 years ago
  • Date Issued
    Tuesday, May 1, 2018
    6 years ago
Abstract
A pile system for permafrost comprising a pilot hole, at least one pile, and frozen slurry. The pilot hole is formed to a pilot hole depth. The at least one pile is arranged at least partly within the pilot hole and extends to a pile string depth. The frozen slurry is within the pilot hole and is at least partly around the at least one pile.
Description
TECHNICAL FIELD

The present invention relates to pile driving systems and methods and, in particular, to systems and methods for installing pile structures in permafrost ground.


BACKGROUND

In construction projects, the need often exists to support a structure relative to a desired location of the ground. Piles may be used to support the structure relative to the ground. In particular, a predetermined type of pile may be driven into the ground at the desired location to a predetermined pile depth. The type of pile and pile depth are typically predetermined based on conditions such as the nature of the structure (e.g., load) to be supported by the pile and the conditions of the ground at and below the desired location.


The term “permafrost” is typically used to refer to ground, including rock or soil, at or below the freezing point of water. While many of the techniques employed when driving piles in conventional (e.g., non-frozen) soil may be used in permafrost, the characteristics of permafrost present a unique set of considerations when a pile is to be driven into permafrost.


The need thus exists for pile driving systems and methods optimized for use in permafrost.


SUMMARY

The present invention is a pile system for permafrost comprising a pilot hole, at least one pile, and frozen slurry. The pilot hole is formed to a pilot hole depth. The at least one pile is arranged at least partly within the pilot hole and extending to a pile string depth. The frozen slurry is within the pilot hole and is at least partly around the at least one pile.


The present invention is a method of forming a pile system for permafrost comprising the following steps. A mandrel is displaced to form a pilot hole to a pilot hole depth and to create a slurry at least partly within the pilot hole. The mandrel is removed from the pilot hole. While the slurry is at least partly flowable, at least one pile is arranged at least partly within the pilot hole to a pile string depth. Slurry is allowed to freeze within the pilot hole at least partly around the at least one pile.


The present invention may also be embodied as a method of forming a pile system for permafrost comprising the following steps. A mandrel, a lead pile, and an extension pile are provided. A drive system is operated to rotate the mandrel to form a pilot hole to a pilot hole depth and to create a slurry at least partly within the pilot hole. The mandrel is removed from the pilot hole. While the slurry is at least partly flowable, the drive system is operated to rotate the lead such that the lead pile is arranged at least partly within the pilot hole. The extension pile is connected to the lead pile to form at least part of a pile string. While the slurry is at least partly flowable, the drive system is operated to rotate the extension pile such that the lead pile is arranged within the pile hole and the extension pile is arranged at least partly within the pilot hole. The slurry is allowed to freeze within the pilot hole at least partly around the lead pile and the extension pile.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a side elevation view illustrating a first point in time during a process of installing a pile structure in accordance with the principles of the present invention;



FIG. 2 is a side elevation view illustrating a second point in time during the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 3 is a side elevation view illustrating a third point in time during the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 4 is a side elevation view illustrating a third point in time during the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 5 is a side elevation view illustrating a fourth point in time during the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 6 is a side elevation view illustrating a fourth point in time during the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 7 is a side elevation view illustrating a fourth point in time during the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 8 is a side elevation view of a pile structure installed in accordance with the principles of the present invention;



FIG. 9 illustrates a side elevation view of a system that may be used to perform the process of installing a pile structure in accordance with the principles of the present invention;



FIG. 10 is a side elevation view of an example mandrel that may be used by a pile driving system of the present invention;



FIG. 11 is a side elevation view of an example lead pile that may be used by a pile driving system of the present invention; and



FIG. 12 is a side elevation of an example extension pile that may be used by a pile driving system of the present invention.





DETAILED DESCRIPTION


FIGS. 1-7 of the drawing illustrate various points during the process of installing an example pile system 20 as depicted in FIG. 8. FIGS. 1-7 also depict a drive system 22 capable of supporting an elongate member and rotating the elongate member that may be used as part of the method of forming the example pile system 20. The example drive system 22 may be or incorporate, for example, a pile driving system as disclosed in the Applicant's copending U.S. patent application Ser. No. 14/321,632. As shown in FIG. 9, the drive system 22 may be supported by a support system 24. In the example, depicted in FIG. 9, the support system 24 is a conventional excavator, but any other system capable of supporting a drive system such the example drive system 22 may be used in place of the excavator. Together, the support system 24 and drive system 22 allow an elongate member to be driven into the ground 26 at a desired location 28 as will be described in further detail below.


In FIGS. 1-3, the drive system 22 is shown rotating an elongate member in the form of a mandrel 30. In FIGS. 4-7, the drive system 22 is shown rotating an elongate member in the form of a lead pile 32 and one or more extension piles 34. In the example shown in FIGS. 1-8, only one extension pile 34 is used, but more extension piles may be used depending on the circumstances. For purposes of simplicity and clarity, FIG. 9 illustrates the drive system 30 supporting the mandrel 30, but the drive system 30 is also capable of supporting the lead pile 32 (see, e.g., FIGS. 4 and 5) or the extension piles 34 (see, e.g., FIGS. 6 and 7).



FIG. 10 depicts the example mandrel 30. The example mandrel assembly 30 comprises a drive portion 40, a shaft portion 42, and a bit portion 44. The drive portion 40 is or may be conventional and is adapted to engage the drive system 22 to allow the drive system to axially rotate of the mandrel 30. The example bit portion 44 is formed by a prefabricated insert 46 made of 4140 steel that houses replaceable teeth 48. The use of the insert 46 with replaceable teeth 48 allows the integrity of the bit portion 44 to be maintained as it is used and provides the ability for rapid rebuild if necessary. Other characteristics of the bit portion 44 will be described below.



FIG. 11 depicts the example lead pile 32. The example lead pile 32 comprises a drive portion 50, a shaft portion 52, and a cutter portion 54. Like the drive portion 40 of the mandrel 30, the drive portion 50 is or may be conventional and is adapted to engage the drive system 22 to allow the drive system to axially rotate of the lead pile 32. The example cutter portion 54 is formed by a Z-cut on the end of the lead pile 32 defining two or more integral cutting teeth 56. The integral cutting teeth 56 provide the lead piles 32 with limited short term cutting ability as will be described below, but without the durability or replaceability of the bit portion 44 of the lead pile 32. FIG. 11 further illustrate a trailing threaded portion 58 formed within the lead pile 32 at the upper end adjacent to the drive portion 50. The example trailing threaded portion 58 takes the form of internal threads.



FIG. 12 depicts the example extension piles 34. The example extension pile(s) 34 comprises a drive portion 60, a shaft portion 62, a leading threaded portion 64, and a trailing threaded portion 66. Like the drive portion 40 of the mandrel 30 and the drive portion 50 of the lead pile 32, the drive portion 60 is or may be conventional and is adapted to engage the drive system 22 to allow the drive system to axially rotate of the extension pile 34. The example leading threaded portion 64 is takes the form of external threads on the end of the pile 32. The internally threaded trailing threaded portion 58 of the lead pile 32 receives the externally threaded leading portion 64 of the extension pile 34. If more than one extension pile is used, the internally threaded trailing threaded portion 66 of the first extension pile receives the externally threaded leading portion 64 of the next extension pile 34. In this manner a string of one lead pile 32 and at least one extension pile 34 may be used to form a pile string. FIGS. 7 and 8 illustrate a pile string 70 comprising a single lead pile 32 and a single extension pile 34.


Additionally, an internally threaded trailing threaded portion (not shown) may be formed on the mandrel 30. One or more extension piles 34 may be coupled to the mandrel 30 to allow the mandrel 30 to be driven to a depth greater than its length.


Referring now back to FIG. 1-7, the process of forming the example pile system 20 comprising the example pile string 70 will now be described in further detail. Initially, it should be noted that pile string is particularly suited to be used when the ground 26 is formed by what is commonly referred to as permafrost. The ground 26 is thus very cold, and any moisture therein will be frozen.


The mandrel 30 is coupled to the drive system 22 and axially rotated while suspended above the desired location 28 in the ground 26 as shown in FIG. 1. The drive system 22 and mandrel 30 are then lowered or crowded into the ground 26 while the mandrel 30 is axially rotated such that the mandrel 30 penetrates the ground 26 and forms a pilot hole 80 in the ground 26 at the desired location 28 as shown in FIG. 2. As the mandrel 30 penetrates the ground 26, the teeth 46 cut into and abrade the dirt and rock of the ground 26 around the pilot hole 80, creating friction.


The friction created by the teeth 46 heats up the mandrel 30, and the mandrel 30 in turn heats up the ground 26. Liquids in the heated ground 26 melt, creating a slurry 82 within the pilot hole 80. The teeth 46, the material from which the teeth 46 are made, the diameter of the mandrel 30, and speed at which the mandrel 30 is rotated are all controlled such that melted liquids forming at least part of the slurry 82 heat up and expand such that at least a portion of the slurry 82 flows to the surface. Accordingly, at least a portion of the slurry 82 will typically be forced up the pilot hole 80 and form a pool 84 of the slurry 82 on the ground surface where the mandrel enters the ground 26.


After the mandrel 30 reaches a pilot hole target depth 90 predetermined based on factors such as characteristics of the ground 26 and characteristics of the load (not shown) to be supported by the pile string 70 as shown in FIG. 3, the mandrel 30 is removed and detached from the drive system 22. Extensions to the mandrel 30 may be used to allow the example mandrel to reach the pilot hole target depth 90.


At this point, while the slurry 82 is still melted and at least partly flowable, the lead pile 32 is connected to the drive system 22 and supported above the pilot hole 80 as shown in FIG. 4. The drive system 22 and lead pile 32 are then lowered and the lead pile 32 rotated such that the cutter portion 54 of the lead pile 32 enters the pilot hole 80. While the cutter portion 54 of the lead pile 32 does not have the cutting capacity of the bit portion 44 of the mandrel 30, the cutter portion 54 is sufficiently strong and durable to cut through the slurry 82 still in the flowable state. Further, the cutter portion 54 will create friction that will add heat to the slurry 82 as the lead pile 32 is axially rotated while being inserted into the pilot hole 80. The lead pile 32 is inserted to a depth at which the drive portion 50 thereof is still accessible as shown in FIG. 5, after which the drive system 22 is disconnected from the lead pile 32.


Again, while the slurry 82 is still melted and flowable, the extension pile 34 is connected to the drive system 22. The extension pile 34 is supported above the pilot hole 80 as shown in FIG. 6 and then rotated such that the threaded portion 58 on the lead pile 32 receives the threaded portion 64 on the extension pile 34 to connect the extension pile 34 to the lead pile 32 to form the pile string 70. The drive system 22 and pile string 70 are then lowered and the pile string 70 axially rotated such that the cutter portion 54 of the lead pile 32 continues through the slurry 82 within the pilot hole 80. Again, the cutter portion 54 is sufficiently strong and durable to cut through the slurry 82 still in the flowable state and will create friction that will add heat to the slurry 82 as the pile string 70 is axially rotated while being inserted into the pilot hole 80. Further, the cutter portion 54 of the lead pile 32 is sufficiently strong to penetrate beyond the pilot hole depth 90 as shown in FIG. 7.


Accordingly, additional rotation of the pile string 70 will continue to cut into the ground 26 beyond the pilot hole depth 90. When the drill string 70 reaches a target drill string depth 92 that is below the pilot hole depth 90 as shown in FIG. 7, the rotational and crowding forces are no longer applied to the drill string 70. Again, the target drill string depth 92, and possibly the distance between the pilot hole depth and the target string depth 92, will typically be predetermined based on requirements of the load and characteristics (e.g., soil conditions) of the ground 26 at the desired location 28. The drive system 22 is then removed from the drill string 70, and the slurry 82 is allowed to refreeze, securing the pile string 70 in a desired orientation at the desired location 28 as shown in FIG. 8.


When the pile string 70 is secured in the desired orientation at the desired location 28 as shown in FIG. 8, the example pile system 20 is formed by the pile string 70, the ground 26 around the pile string 70, and the frozen slurry 82 adjacent to the pile string 70. At this point, a structure or load may be supported by the pile string 70 in a conventional manner. The Applicant's copending U.S. Provisional patent application Ser. No. 15/174,724 discloses Systems and Methods for Connecting a Structural Member to a Pile that may be used on the uppermost extension pile 34 of the pile string 70 depicted in FIG. 8. However, other systems and methods may be used to secure a structure to the pile string 70.


In this specification, the use of a letter suffix with any reference character does not necessarily indicate that an element generically identified by that reference character is different from an element specifically identified by the reference character with a letter suffix. Accordingly, any reference character used without a letter suffix in the specification may generally refer to the same reference character used with a letter suffix in the drawing.

Claims
  • 1. A method of forming a pile system for permafrost comprising the steps of: rotating a mandrel to form a pilot hole to a pilot hole depth, where friction created by engagement with the mandrel and the permafrost melts liquids in the permafrost, thereby creating a flowable slurry at least partly within the pilot hole;removing the mandrel from the pilot hole;while the slurry is at least partly flowable, arranging at least one pile at least partly within the pilot hole to a pile string depth; andallowing slurry to freeze within the pilot hole at least partly around the at least one pile.
  • 2. The method as recited in claim 1, in which the at least one pile comprises a lead pile.
  • 3. The method as recited in claim 1, in which the at least one pile comprises an extension pile.
  • 4. The method as recited in claim 1, in which the step of arranging the at least one pile at least partly within the pilot hole comprises the steps of: providing a plurality of piles; andforming a pile string comprising a plurality of piles.
  • 5. The method as recited in claim 4, in which the step of providing a plurality of piles comprises the step of providing a lead pile and at least one extension pile.
  • 6. The method as recited in claim 4, in which the step of forming the pile string further comprises the steps of: arranging the lead pile at least partly within the pilot hole;connecting a first extension pile to the lead pile to form at least part of the pile string; anddisplacing the at least part of the pile string formed by the lead pile and the first extension pile such that the first extension pile is arranged at least partly within the pilot hole.
  • 7. The method as recited in claim 6, in which the step of forming the pile string further comprises the steps of: connecting a second extension pile to the first extension pile to form at least part of the pile string; anddisplacing the at least part of the pile string formed by the lead pile and the first and second extension piles such that the second extension pile is arranged at least partly within the pilot hole.
  • 8. The method as recited in claim 1, in which the pile string depth extends beyond the pilot hole depth.
  • 9. The method as recited in claim 1, further comprising the step of predetermining the pile string depth based on at least one of: ground characteristics at a desired location at which the pilot hole is to be formed; anda load to be supported by the pile string after the slurry has been allowed to freeze.
  • 10. A method of forming a pile system for permafrost comprising the steps of: providing a mandrel;providing a lead pile;providing at least one extension pile;operating a drive system to rotate the mandrel to form a pilot hole to a pilot hole depth, where friction created by engagement with the mandrel and the permafrost melts liquids in the permafrost, thereby creating a flowable slurry at least partly within the pilot hole;removing the mandrel from the pilot hole;while the slurry is at least partly flowable, operating the drive system to rotate the lead pile such that the lead pile is arranged at least partly within the pilot hole;connecting the at least one extension pile to the lead pile to form at least part of a pile string;while the slurry is at least partly flowable, operating the drive system to rotate the at least one extension pile such that the lead pile is arranged within the pile hole and the at least one extension pile is arranged at least partly within the pilot hole; andallowing slurry to freeze within the pilot hole at least partly around the lead pile and the at least one extension pile.
  • 11. The method as recited in claim 10, in which the step of arranging the lead pile and the at least one extension pile at least partly within the pilot hole comprises the steps of: providing a plurality of extension piles; andforming the pile string by connecting one of the plurality of extension piles to the lead pile and one of the plurality of extension pile to the extension pile connected to the lead pile.
  • 12. The method as recited in claim 11, further comprising the step of rotating at least a portion of the pile string such that the pile string extends to a pile string depth.
  • 13. The method as recited in claim 12, in which the pile string depth extends beyond the pilot hole depth.
  • 14. The method as recited in claim 12, further comprising the step of predetermining the pile string depth based on at least one of: ground characteristics at a desired location at which the pilot hole is to be formed; anda load to be supported by the pile string after the slurry has been allowed to freeze.
RELATED APPLICATIONS

This application, U.S. patent application Ser. No. 15/372,196 filed Dec. 7, 2016 claims benefit of U.S. Provisional Application Ser. No. 62/266,379 filed Dec. 11, 2015, the contents of which are incorporated herein by reference.

US Referenced Citations (185)
Number Name Date Kind
48515 Campbell et al. Jul 1865 A
500780 Simon Jul 1893 A
628962 Speer Jul 1899 A
910421 Schlueter Jan 1909 A
999334 Pearson Aug 1911 A
1288989 Rees Dec 1918 A
1294154 Payne Feb 1919 A
1322470 Schenk Nov 1919 A
1464231 Yezek Aug 1923 A
1654093 Reid Dec 1927 A
1684816 Arden Sep 1928 A
1787000 Hunt Dec 1930 A
1903555 Robertson Apr 1933 A
2101285 Stevens Dec 1937 A
2128428 Murray, Jr. Aug 1938 A
2232845 Fieroh Feb 1941 A
2239024 Vance Apr 1941 A
2350921 Pinazza Jun 1944 A
2436251 Dobie et al. Feb 1948 A
2439219 O'Connor Apr 1948 A
2577252 Kjellman Dec 1951 A
2760747 Mordarski Aug 1956 A
2952132 Urban Sep 1960 A
2975846 Bodine Mar 1961 A
3004389 Muller Oct 1961 A
3059436 Hermann, Jr. Oct 1962 A
3106258 Muller Oct 1963 A
3115198 Kuss Dec 1963 A
3172485 Spannhake et al. Mar 1965 A
3175630 Hein et al. Mar 1965 A
3278235 Bergstrom Oct 1966 A
3280924 Tatamikov Oct 1966 A
3287983 Austin et al. Nov 1966 A
3300987 Maeda Jan 1967 A
3313376 Holland Apr 1967 A
3371727 Belousov et al. Mar 1968 A
3381422 Olson May 1968 A
3391435 Lebelle Jul 1968 A
3394766 Lebelle Jul 1968 A
3396805 Muller Aug 1968 A
3411305 Cella Nov 1968 A
3412813 Johnson Nov 1968 A
3460637 Schulin Aug 1969 A
3513587 Artur May 1970 A
3528302 Kinnan Sep 1970 A
3530947 Gendron Sep 1970 A
3577645 Zurawski May 1971 A
3583497 Kossowski et al. Jun 1971 A
3684037 Bodine Aug 1972 A
3686877 Bodin Aug 1972 A
3711161 Proctor et al. Jan 1973 A
3786874 Demichelis et al. Jan 1974 A
3808820 Bodine May 1974 A
3828864 Haverkamp et al. Aug 1974 A
3865501 Kniep Feb 1975 A
3871617 Majima Mar 1975 A
3874244 Rasmussen et al. Apr 1975 A
3891186 Thorsell Jun 1975 A
3907042 Halwas et al. Sep 1975 A
3909149 Century Sep 1975 A
3952796 Larson Apr 1976 A
3999392 Fukushima et al. Dec 1976 A
4033419 Pennington Jul 1977 A
4067369 Harmon Jan 1978 A
4082361 Lanfermann Apr 1978 A
4100974 Pepe Jul 1978 A
4113034 Carlson Sep 1978 A
4143985 Axelsson et al. Mar 1979 A
4144939 Knothe Mar 1979 A
4155600 Lanfermann et al. May 1979 A
4166508 van den Berg Sep 1979 A
4195698 Nakagawasai Apr 1980 A
4274761 Boguth Jun 1981 A
4285405 Weir Aug 1981 A
4297056 Nottingham Oct 1981 A
4312413 Loftis Jan 1982 A
4351624 Barber Sep 1982 A
4375927 Kniep Mar 1983 A
4397199 Jahn Aug 1983 A
4428699 Juhola Jan 1984 A
4455105 Juhola Jun 1984 A
4519729 Clarke et al. May 1985 A
4522304 Walter Jun 1985 A
4537527 Juhola et al. Aug 1985 A
4547110 Davidson Oct 1985 A
4553443 Rossfelder et al. Nov 1985 A
4601615 Cavalli Jul 1986 A
4603748 Rossfelder et al. Aug 1986 A
4606427 Beer Aug 1986 A
4616716 Bouplon Oct 1986 A
4625811 Tuenkers Dec 1986 A
4627768 Thomas et al. Dec 1986 A
4632602 Hovnanian Dec 1986 A
4637475 England et al. Jan 1987 A
4645017 Bodine Feb 1987 A
4650008 Simson Mar 1987 A
4735270 Fenyvesi Apr 1988 A
4755080 Cortlever et al. Jul 1988 A
4768900 Burland Sep 1988 A
4813814 Shibuta et al. Mar 1989 A
4819740 Warrington Apr 1989 A
4863312 Cavalli Sep 1989 A
4915180 Schisler Apr 1990 A
5004055 Porritt et al. Apr 1991 A
5088565 Evarts Feb 1992 A
5106233 Breaux Apr 1992 A
5117925 White Jun 1992 A
5213449 Morris May 1993 A
5240348 Breaux Aug 1993 A
5244316 Wright et al. Sep 1993 A
5253542 Houze Oct 1993 A
RE34460 Ishiguro et al. Nov 1993 E
5263544 White Nov 1993 A
5281775 Gremillion Jan 1994 A
5343002 Gremillion Aug 1994 A
5355964 White Oct 1994 A
5388931 Carlson Feb 1995 A
5410879 Houze May 1995 A
5439326 Goughnour et al. Aug 1995 A
5529132 Evarts Jun 1996 A
5540295 Serrette Jul 1996 A
5544979 White Aug 1996 A
5549168 Sadler et al. Aug 1996 A
5549170 Barrow Aug 1996 A
5562169 Barrow Oct 1996 A
5609380 White Mar 1997 A
5653556 White Aug 1997 A
5658091 Goughnour et al. Aug 1997 A
5794716 White Aug 1998 A
5800096 Barrow Sep 1998 A
5811741 Coast et al. Sep 1998 A
5860482 Gremillion et al. Jan 1999 A
6039508 White Mar 2000 A
6129159 Scott et al. Oct 2000 A
6179527 Goughnour Jan 2001 B1
6234260 Coast et al. May 2001 B1
6250426 Lombard Jun 2001 B1
6360829 Naber et al. Mar 2002 B1
6386295 Suver May 2002 B1
6394704 Saeki et al. May 2002 B1
6427402 White Aug 2002 B1
6431795 White Aug 2002 B2
6447036 White Sep 2002 B1
6543966 White Apr 2003 B2
6557647 White May 2003 B2
6582158 Van Stein Jun 2003 B1
6648556 White Nov 2003 B1
6672805 White Jan 2004 B1
6732483 White May 2004 B1
6736218 White May 2004 B1
6896448 White May 2005 B1
6908262 White Jun 2005 B1
6942430 Suver Sep 2005 B1
6988564 White Jan 2006 B2
7080958 Morris Jul 2006 B1
7168890 Evarts Jan 2007 B1
7392855 White Jul 2008 B1
7694747 White Apr 2010 B1
7708499 Evarts et al. May 2010 B1
7824132 White Nov 2010 B1
7854571 Evarts Dec 2010 B1
7914236 Neville Mar 2011 B2
7950877 Evarts May 2011 B2
8070391 White Dec 2011 B2
8181713 White May 2012 B2
8186452 White et al. May 2012 B1
8434969 White May 2013 B2
8496072 White Jul 2013 B2
8763719 White Jul 2014 B2
9249551 White Feb 2016 B1
9255375 Yingling et al. Feb 2016 B2
20010002230 White May 2001 A1
20050039952 Hill et al. Feb 2005 A1
20060198706 Neville Sep 2006 A1
20100266344 Plotkin et al. Oct 2010 A1
20100303552 Yingling et al. Dec 2010 A1
20110162859 White Jul 2011 A1
20120292062 White Nov 2012 A1
20130149040 Evarts Jun 2013 A1
20140056652 Suver Feb 2014 A1
20140377011 Yingling et al. Dec 2014 A1
20150016893 Suver et al. Jan 2015 A1
20160356294 Fenwick et al. Dec 2016 A1
20170101759 Suver Apr 2017 A1
20170138133 Fenwick May 2017 A1
Foreign Referenced Citations (43)
Number Date Country
2394894 Aug 2003 CA
2942801 Oct 2015 CA
102296608 Jul 2015 CN
4010357 Oct 1990 DE
0172960A1 Mar 1986 EP
362158 Apr 1990 EP
0526743 Aug 1995 EP
838717 Mar 1939 FR
2560247 Aug 1985 FR
2003769 Mar 1979 GB
2023496 Jan 1980 GB
2028902 Mar 1980 GB
2043755 Oct 1980 GB
2060742 May 1981 GB
2069659 Aug 1981 GB
5494703 Jul 1979 JP
355098526 Jul 1980 JP
356034828 Apr 1981 JP
57169130 Oct 1982 JP
59228529 Dec 1984 JP
61221416 Oct 1986 JP
0258627 Feb 1990 JP
473035 Feb 1992 JP
497015 Mar 1992 JP
6136751 May 1994 JP
2005256500 Sep 2005 JP
2005315050 Nov 2005 JP
2006089933 Apr 2006 JP
2006177125 Jul 2006 JP
2006312825 Nov 2006 JP
2009138487 Jun 2009 JP
42349 Jan 1938 NL
65252 Feb 1950 NL
7710385 Mar 1978 NL
7707303 Jan 1979 NL
7805153 Nov 1979 NL
46428 Apr 1929 NO
2109881 Apr 1998 RU
1027357 Jul 1983 SU
WO8707673 Dec 1987 WO
WO8805843 Aug 1988 WO
9600326 Jan 1996 WO
2012031108 Mar 2012 WO
Non-Patent Literature Citations (11)
Entry
USPTO, “Non-Final Office Action, U.S. Appl. No. 15/285,326,”, dated Apr. 25, 2017, 10 pages.
“Castle Board Drain Method”, Japanese brochure, Reference Nos. APE00857 through APE00863, Aug. 1976.
“Kony Drain Board,” undated, 1 page.
“The 1.sup.st Report on the Treatment of Soft Foundation of Juck Hyun Industrial Site”, Ref. Nos. APE00854 through APE00856, Mar. 1976.
A report identifying systems for driving mandrels carrying wick drain material into the earth, identified by Ref. Nos. APE0510 through APE0536, (undated).
A series of photographs identified by reference Nos. APE01147 through APE01159. 1990-1993.
International Construction Equipment, Inc “Hydraulic Vibratory Driver/Extractors for Piling and Caisson Work,” 10 pages.
International Construction Equipment, Inc “Hydraulic Vibratory Driver/Extractors for Piling and Caisson Work,” Ref. No. V7-0890-51, 1974, 3 pages.
Schematic drawings identified by Ref. Nos. APE01038, APE01039, (updated).
USPTO, “Non-Final Office Action, U.S. Appl. No. 15/285,326,” dated Dec. 28, 2017, 17 pages.
USPTO, “Final Office Action, U.S. Appl. No. 15/285,326,”, dated Aug. 14, 2017, 10 pages.
Related Publications (1)
Number Date Country
20170167102 A1 Jun 2017 US
Provisional Applications (1)
Number Date Country
62266379 Dec 2015 US