This application is a U.S. National Stage Application of International Application No. PCT/US2013/027115 filed Feb. 21, 2013, and which is hereby incorporated by reference in its entirety.
The present disclosure relates generally to well drilling and hydrocarbon recovery operations and, more particularly, to systems and methods for optimized well creation in a shale formation.
Shale formations have become increasingly important in hydrocarbon recovery, as the global prices of oil and gas have increased. Hydrocarbon extraction from shale formations is typically expensive, however, and therefore has relatively small profit margins. In typical drilling operations, a borehole may be drilled separately from stimulation and completion operations. This increases the time and cost of the drilling operations generally. Additionally, by separating the drilling, stimulation and completion operations, it can be difficult to dynamically modify stimulation operations based on downhole conditions. This also increase the overall time and cost of the operations.
Some specific exemplary embodiments of the disclosure may be understood by referring, in part, to the following description and the accompanying drawings.
While embodiments of this disclosure have been depicted and described and are defined by reference to exemplary embodiments of the disclosure, such references do not imply a limitation on the disclosure, and no such limitation is to be inferred. The subject matter disclosed is capable of considerable modification, alteration, and equivalents in form and function, as will occur to those skilled in the pertinent art and having the benefit of this disclosure. The depicted and described embodiments of this disclosure are examples only, and not exhaustive of the scope of the disclosure.
The present disclosure relates generally to well drilling and hydrocarbon recovery operations and, more particularly, to systems and methods for optimized well creation in a shale formation.
Illustrative embodiments of the present disclosure are described in detail herein. In the interest of clarity, not all features of an actual implementation may be described in this specification. It will of course be appreciated that in the development of any such actual embodiment, numerous implementation-specific decisions must be made to achieve the specific implementation goals, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time-consuming, but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of the present disclosure.
To facilitate a better understanding of the present disclosure, the following examples of certain embodiments are given. In no way should the following examples be read to limit, or define, the scope of the disclosure. Embodiments of the present disclosure may be applicable to horizontal, vertical, deviated, multilateral, u-tube connection, intersection, bypass (drill around a mid-depth stuck fish and back into the well below), or otherwise nonlinear wellbores in any type of subterranean formation. Certain embodiments may be applicable, for example, to logging data acquired with wireline, slickline, and LWD. Embodiments described below with respect to one implementation are not intended to be limiting.
According to embodiments of the present disclosure, systems and methods for optimized well creation in a shale formation are described herein. The method may include determining a first planned stimulation location within the formation. The first planned stimulation location may be based, at least in part, on a pre-determined model of a formation. A borehole in the formation may be drilled with a downhole tool. The first planned stimulation location based, at least in part, on data received at the downhole tool. Additionally, the downhole tool may stimulate the formation at the adjusted first planned stimulation location. In certain other embodiments, a second stimulation location may be determined based on data received at the downhole tool after stimulation of the formation at the adjusted first planned stimulation location.
Once the well plan 100 is determined, the drilling, stimulation, and completion operations may be commenced. Typically, the drilling operations are completed first. Drilling operations may include introducing a drill string and drilling assembly into the formation. In certain embodiments, the drilling assembly may comprise a drill bit that is either driven by the drill string or is driven by a downhole motor. The drilling assembly may also comprise logging and measurement apparatuses which log the formation 102 and other strata 103, 104 and 105 while the well is being drilled. Once the drilling is completed, the drill string and drilling assembly may be retrieved to the surface, and the borehole may be completed by cementing a casing in place. A separate stimulation tool may then be lowered downhole to perforate the casing and fracture the formation.
The downhole tool 203 may comprise a bottom hole assembly (BHA) 204 and a stimulation assembly 205. The BHA 204 may comprise a drill bit 207 and a LWD/MWD section 206 that may log the formation 102 and strata 103-105 both while the borehole 202 is being drilled, and after the well is drilled to optimize the fracture locations, as will be described below. In certain embodiments, the drill string 208 may rotate and drive the drill bit 207. In certain other embodiments, the BHA 207 may further include a downhole mud motor that drives the drill bit 207. In such embodiments, the stimulation tool 205 and BHA 204 may be connected to the surface via a slickline. In either embodiment, the BHA 204 may communicate with the control unit 212 positioned at the surface. The control unit 212 may comprise a process and memory device that may contain a set of instructions that cause the processor to receive measurements and logging outputs from the LWD/MWD section 206 and output commands to downhole equipment. As will be described below, the control unit 212 may also contain instruction that cause the processor to alter the well plan, including the planned stimulation location 107, by comparing the real-time measurements and logging outputs of the LWD/MWD section 206 with the a-priori model.
Drilling mud 209 may be pumped downhole during drilling operations and may exit the drill string through ports in the drill bit 207, carrying cuttings to the surface in the annulus between the drill string 208 and the borehole 202. After the borehole 202 has been drilled to a particular location, drilling operations may cease. The borehole then may be optionally “cleaned” by circulating clean fluid within the drill string and through the drill bit to circulate the drilling mud to the surface. This may prevent the formation from being damaged by the drilling fluid.
According to aspects of the present disclosure, once the drilling has ceased, the BHA may be isolated from the stimulation assembly 205 within the downhole tool 203. In certain embodiments, the stimulation assembly 205 may be coupled to the BHA 204 through an isolation assembly 211. The BHA 204 may be isolated using a ball 210 that is dropped within a downward flowing fluid 209 and seats within the isolation assembly 211. By isolating the BHA 204, the pressure of the downward flowing fluid 209 may be increased and ejected through the stimulation assembly 205 for stimulation operations. Although a ball 210 and isolation assembly 211 are described herein as one mechanism by which to isolate the BHA 204, other mechanisms are possible, including a variety of electrically controlled valves.
As will be appreciate by one of ordinary skill in the art in view of this disclosure, by isolating the BHA 204 from the drill string 208, the downhole tool 203 may be converted from a drilling apparatus to a completion apparatus. In particular, with the BHA 204 isolated, the stimulation assembly 205 of the downhole tool 203 may be used to fracture the formation 102, including strata 105, immediately after drilling is completed, without having to run an additional tool downhole.
In certain embodiments, the formation 102 may be fractured as the downhole tool 203 is being withdrawn from the borehole 202, further reducing the operation time. Moreover, as will be described below, the LWD/MWD section 206 of the drilling and completion assembly 203 may continue to log the formation 102 after fracturing operations. Continuing to log the data in real-time, after a fracture operation has been completed, the logging data can be used to ensure that the fractures were successful, to either exclude fractures from the well plan, or to add additional fracture locations, depending on the real-time measurements.
As can be seen, the location of the fracture 301 is different from the planned stimulation location 107 from the well plan 100. Notably, as the borehole 202 was being drilled, the LWD/MWD section 206 may have logged and measured the formation 102 and transmitted the results to the control unit 212 via a telemetry system, for example. The control unit 212 may then have compared the results to the a-priori data described, and updated formation models with the results. The control unit 212 may then have determined an alternative location for the fracture instead of location 107, to optimize the formation response and hydrocarbon recovery.
In addition to altering the location 107 of the fracture from the well plan, the control unit 212 may also determine that another fracture is needed to optimize the recovery and identify a location for the additional fracture. Notably, this determination can be made on the results of the logging and measurements taken during drilling operations. Additionally, the determination may be made based on formation logs and measurements that are taken after fracture 301 has been created. Once the fracture 301 has been created, the drilling and completion assembly may be moved toward the surface 101. As the assembly is withdrawn, the LWD/MWD segment 206 may continue to log and measure the formation. These measurements may reflect the relative success of the fracture 301. Based on the relative success of the fracture 301, for example, an additional fracture may be created.
As can be seen in
As will be appreciated by one of ordinary skill in the art in view of this disclosure, the location of the swell packers and openings may be modified as needed before the completion string 500 is introduced into the borehole 202, depending on the location and configuration of the fractures. Likewise, in certain embodiments, the completion string 500 may include smart elements, such as inflow control devices and controllable sleeves that may prolong the useful like of the formation by limiting the flow of fluids.
According to certain embodiments of the present disclosure, an example system for optimized well creation in a shale formation may comprise a bottom hole assembly (BHA), wherein the BHA comprises a drill bit and a logging while drilling LWD apparatus. A stimulation assembly may be coupled to the BHA. A control unit may be in communication with the LWD apparatus. The control unit may comprises a processor and a memory device, wherein the memory device contains a set of instructions that, when executed by the processor, cause the processor to receive first data from the LWD apparatus during a drilling operation; adjust a first planned stimulation location based, at least in part, on the first data, wherein the first planned stimulation location is based, at least in part, on a pre-determined model of a formation; receive second data from the LWD apparatus after the formation has been stimulated at the first planned stimulation location; and determine a second stimulation location based, at least in part, on the second data. In certain embodiments, the instructions, when executed by the processor, may further cause the processor to determine a second planned stimulation location within the formation based, at least in part, on the pre-determined model of the formation; and determine not to stimulate the formation at the second planned stimulation location based, at least in part, on the second data.
According to certain embodiments of the present disclosure, an example method for optimized well creation in a shale formation may comprise drilling a borehole with a downhole tool. The downhole tool may comprise a drill bit, a logging-while-drilling (LWD) assembly, and a stimulation assembly. The drill bit may be isolated from the stimulation assembly. The formation may be stimulated at a first location using the stimulation assembly. After stimulating the formation at the first location, first measurements from the formation at the LWD assembly may be received. Additionally, it may be determined whether to stimulate the formation at another location based, at least in part, on the first measurements. In certain embodiments, determining whether to stimulate the formation at another location based, at least in part, on the first measurements may comprise determining a second planned stimulation location within the formation based, at least in part, on the pre-determined model of the formation; and determining not to stimulate the formation at the second planned stimulation location based, at least in part, on the first measurements. In certain other embodiments, determining whether to stimulate the formation at another location based, at least in part, on the first measurements may comprise determining a second stimulation location based, at least in part, on the first measurements
Therefore, the present disclosure is well adapted to attain the ends and advantages mentioned as well as those that are inherent therein. The particular embodiments disclosed above are illustrative only, as the present disclosure may be modified and practiced in different but equivalent manners apparent to those skilled in the art having the benefit of the teachings herein. Furthermore, no limitations are intended to the details of construction or design herein shown, other than as described in the claims below. It is therefore evident that the particular illustrative embodiments disclosed above may be altered or modified and all such variations are considered within the scope and spirit of the present disclosure. Also, the terms in the claims have their plain, ordinary meaning unless otherwise explicitly and clearly defined by the patentee. The indefinite articles “a” or “an,” as used in the claims, are defined herein to mean one or more than one of the element that it introduces. The term “gas” is used within the scope of the claims for the sake of convenience in representing the various equations. It should be appreciated that the term “gas” in the claims is used interchangeably with the term “oil” as the kerogen porosity calculation applies equally to a formation containing kerogen that produces gas, and a formation containing kerogen that produces oil.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/US2013/027115 | 2/21/2013 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/130036 | 8/28/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
2303090 | Pranger | Nov 1942 | A |
3648777 | Aterbury et al. | Mar 1972 | A |
4047569 | Tagirov et al. | Sep 1977 | A |
5394941 | Venditto et al. | Mar 1995 | A |
7234542 | Vail | Jun 2007 | B2 |
7475742 | Angman et al. | Jan 2009 | B2 |
7624820 | Angman et al. | Dec 2009 | B2 |
7845431 | Eriksen et al. | Dec 2010 | B2 |
8186457 | Boyle | May 2012 | B2 |
8714244 | Conkle et al. | May 2014 | B2 |
20040084189 | Hosie et al. | May 2004 | A1 |
20040118613 | Vail | Jun 2004 | A1 |
20040206494 | Stephenson et al. | Oct 2004 | A1 |
20050230107 | McDaniel et al. | Oct 2005 | A1 |
20070284106 | Kalman et al. | Dec 2007 | A1 |
20080202755 | Henke et al. | Aug 2008 | A1 |
20080264690 | Khan et al. | Oct 2008 | A1 |
20090151938 | Conkle et al. | Jun 2009 | A1 |
20100307755 | Xu et al. | Dec 2010 | A1 |
20110024121 | Skeates et al. | Feb 2011 | A1 |
20120043079 | Wassouf et al. | Feb 2012 | A1 |
20120179444 | Ganguly et al. | Jul 2012 | A1 |
20120186816 | Dirksen et al. | Jul 2012 | A1 |
20120199346 | Patel et al. | Aug 2012 | A1 |
20120211241 | Williamson et al. | Aug 2012 | A1 |
20120232872 | Nasreldin et al. | Sep 2012 | A1 |
20130140031 | Cohen et al. | Jun 2013 | A1 |
20130231910 | Kumar et al. | Sep 2013 | A1 |
20130304444 | Strobel et al. | Nov 2013 | A1 |
20140151035 | Cohen et al. | Jun 2014 | A1 |
20140222405 | Lecerf et al. | Aug 2014 | A1 |
20140262240 | Boone et al. | Sep 2014 | A1 |
20140299315 | Chuprakov et al. | Oct 2014 | A1 |
Number | Date | Country |
---|---|---|
2011044012 | Apr 2011 | WO |
Entry |
---|
International Search Report and Written Opinion issued in related International Application No. PCT/US2013/027115, mailed Nov. 18, 2013, 11 pages. |
International Preliminary Report on Patentability issued in related PCT Application No. PCT/US2013/027115, mailed Sep. 3, 2015 (8 pages). |
Number | Date | Country | |
---|---|---|---|
20150068735 A1 | Mar 2015 | US |