Embodiments of this disclosure relate to generating electrical power from heat of a flow of gas, and more particularly, to systems and methods for generating electrical power in an organic Rankine cycle (ORC) operation in the vicinity of a pumping station during gas compression to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device.
Typically, an organic Rankine cycle (ORC) generator or unit includes a working fluid loop that flows to a heat source, such that the heat from the heat source causes the working fluid in the loop to change phases from a liquid to a vapor. The vaporous working fluid may then flow to a gas expander, causing the gas expander to rotate. The rotation of the gas expander may cause a generator to generate electrical power. The vaporous working fluid may then flow to a condenser or heat sink. The condenser or heat sink may cool the working fluid, causing the working fluid to change phase from the vapor to the liquid. The working fluid may circulate through the loop in such a continuous manner, thus the ORC generator or unit may generate electrical power.
As noted organic Rankine cycle (ORC) generators or units may generate electrical power via an ORC operation based on heat transfer to a working fluid. While various types of sources of heat may be utilized, there is currently no system, method, or controller available to ensure that the source of the heat is maintained at a specified temperature after heat transfer via a heat exchanger, whether internal or external to the ORC unit. For example, when a flow of gas or process gas, such as a flow of compressed gas from a pumping station, is used as the source of heat for heat transfer to the working fluid or an intermediate working fluid, a specified or selected operating temperature range or a specified threshold temperature for the gas may be desired. For example, for some gasses, if the temperature drops below a particular threshold or operating range, volatiles may begin to condense in the flow of gas. Such condensed volatiles may cause issues such as damage to pipelines (e.g., via corrosion or otherwise), scaling, precipitates, potential leaks, potential equipment performance issues, and/or damage to equipment configured to operate with gases rather than liquids. While volatiles may condense in the flow of gas at a temperature below a threshold, pumps at a site may operate at a higher level or exhibit higher performance for a flow of gas that is at a reduced temperature higher than the temperature at which volatiles condense, but lower than a temperature defined by a compressor's (e.g., such as a pump) performance in relation to temperature of the flow of gas, the two temperatures, in some embodiments, defining the operating range.
Accordingly, Applicants have recognized a need for systems and methods to generate electrical power in the vicinity of a pumping station or other gas processing facility or site, while maintaining the temperature of a flow of gas, to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device. The present disclosure is directed to embodiments of such systems and methods.
As noted, the present disclosure is generally directed to systems and methods for generating electrical power in an organic Rankine cycle (ORC) operation in the vicinity of a pumping station or other facility or site where a gas is compressed and/or processed. As gas is compressed at the pumping station or other facility or site for further transport, processing, storage, or other purposes, the temperature of the gas may increase. Further, the equipment (e.g., an engine and pump) utilized for compression may generate heat (e.g., in the form of exhaust and/or a water jacket) during compression or operation. As such, one or more heat exchangers, included external or internal to an ORC unit, may be positioned at and/or near the equipment or pipelines associated with the flow of gas. The flow of gas may flow through one of the one or more heat exchangers. One or more temperature sensors associated with the input and output of the heat exchanger may measure the temperature of the gas. As the gas flows through the heat exchanger, the temperature of the gas entering and exiting the heat exchanger may be determined, e.g., via temperature sensors. Further, at pumping stations or other facilities or sites existing gas coolers (e.g., an air-cooler) may be included to cool the gas prior to transport, processing, storage, or other purposes.
However, as noted, if the temperature of the gas is lowered below an operating range, then volatiles may begin to condense and/or condensates may begin to form in the flow of gas. Further, if the gas is above the operating range, then a compressor may output lower than the maximum volume of gas. To ensure that the gas is not cooled below the operating range defined by a temperature at which volatiles condense and/or condensates form and/or above a temperature defined by higher compressor output, the systems and methods may include a bypass valve positioned on a bypass pipeline. The bypass pipeline may connect a supply pipeline to a return pipeline. The supply pipeline may connect to a main pipeline to divert the flow of gas to the heat exchanger. The return pipeline may connect the heat exchanger to the main pipeline downstream the supply pipeline/main pipeline connection point thereby allowing the flow of gas to flow from the heat exchanger back to the main pipeline. The heat exchanger may facilitate transfer of heat from the flow of gas to a working fluid or intermediate working fluid. In response to the temperature of the gas being above or below an operating range, the bypass valve may be adjusted thereby preventing diversion of or diverting a portion of the flow of gas and thus reducing or increasing, respectively, the temperature of the flow of gas exiting the heat exchanger and ensuring that volatiles do not condense in the flow of gas and that a compressor operates efficiently. Further, an amount or rate of working fluid flowing through the heat exchanger may be increased or decreased thereby to decrease or increase, respectively, the temperature of the flow of gas. The adjustment of the bypass valve and/or flow of working fluid through the heat exchanger may be based on the inlet temperature of the flow of gas into the heat exchanger, the outlet of the flow of gas from the heat exchanger, the temperature of the gas prior to entering the gas cooler, the temperature of the gas after exiting gas cooler, a predicted temperature of the gas exiting the gas cooler, the temperature of the working fluid or intermediate working fluid exiting the heat exchanger, the flow rate of the working fluid or intermediate working fluid exiting the heat exchanger, or electrical power output of an ORC unit, or some combination thereof, among other factors.
As noted, heat generated from the equipment on-site may be utilized to generate electricity. For example, an engine may produce exhaust. The exhaust may be at a high temperature. The exhaust may be supplied to another heat exchanger, external to the ORC unit or included in another ORC unit. the engine may include a water jacket. The heated water from the water jacket may be supplied to a third heat exchanger, external to the ORC unit or included in a third ORC unit.
Accordingly, an embodiment of the disclosure is directed to a system for generating electrical power in an organic Rankin cycle (ORC) operation in the vicinity of a pumping station during gas compression and transport to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device. The system may include one or more supply pipelines, each one of the one or more supply pipelines connected to a main pipeline. The system may include one or more heat exchanger valves, each one of the one or more heat exchanger valves positioned on an associated supply pipeline and associated with one of one or more gas compressors. Each one of the one or more heat exchanger valves may divert flow of compressed gas from an associated main pipeline. The system may include one or more heat exchanger inlet temperature sensors, each of the one or more heat exchanger inlet temperature sensors positioned on the supply pipeline prior to an associated heat exchanger valve and to provide a gas inlet temperature. The gas inlet temperature may be defined by a temperature of compressed gas flowing from one of one or more gas compressors. The system may include one or more heat exchangers, each of the one or more heat exchangers associated with one of the one or more heat exchanger valves and one of the one or more heat exchanger inlet temperature sensors. Each of the one or more heat exchangers may include a first fluid path to accept the flow of compressed gas from one of the one or more supply pipelines via one of the one or more heat exchanger valves and output the flow of compressed gas to a return pipeline connected to the associated main line and a second fluid path to accept and output a flow of an intermediate working fluid. Each of the one or more heat exchangers may indirectly transfer heat from the flow of compressed gas to the flow of the intermediate working fluid. The system may include one or more heat exchanger outlet temperature sensors, each of the one or more heat exchanger outlet temperature sensors associated with one of the one or more heat exchangers and to provide a gas outlet temperature. The gas outlet temperature may be defined by a temperature of compressed gas flowing from the associated one of one or more heat exchangers. The system may include one or more bypass pipelines, each of the one or more bypass pipelines connecting an associated supply line to an associated return line. The system may also include one or more gas bypass valves, each one of the one or more gas bypass valves positioned on an associated bypass pipeline and associated with one of the one or more heat exchangers and to divert a portion of flow of the compressed gas from one of the one or more heat exchangers based on associated gas inlet temperature and gas outlet temperature. The system may include an ORC unit including a generator, a gas expander, a condenser, an internal heat exchanger, and a loop for the flow of organic working fluid. The loop may be defined by a fluid path through the condenser, generator, and a first fluid path of the internal heat exchanger. The internal heat exchanger may include a second fluidic path to connect to the one or more heat exchangers and the intermediate working fluid flowing therethrough. The internal heat exchanger may indirectly transfer heat from the intermediate working fluid to the organic working fluid thereby causing the organic working fluid to change phases from a liquid to a vapor. The flow of the vapor may cause the generator to generate electrical power via rotation of a gas expander as defined by an ORC operation. The condenser may cool the flow of the organic working fluid, such cooling to cause the organic working fluid to change phases from the vapor to the liquid.
The system may additionally include a supply manifold positioned between and fluidically connected, via a supply manifold to ORC unit pipeline, to the ORC unit and fluidically connected, via one or more supply manifold to heat exchanger pipelines, to each of the one or more heat exchangers thereby allowing flow of intermediate working fluid from each of the one or more heat exchangers through the supply manifold to the ORC unit. The system may also include a return manifold positioned between and fluidically connected, via an ORC unit to return manifold pipeline, to the ORC unit and fluidically connected, via one or more return manifold to heat exchanger pipelines, to each of the one or more heat exchangers thereby allowing flow of intermediate working fluid from the ORC unit through the return manifold to each of the one or more heat exchangers. A flow control device may be positioned on the ORC unit to return manifold pipeline to thereby control the flow of intermediate working fluid from the ORC unit to the return manifold. The system may include one or more flow control devices, each one of the one or more flow control devices positioned on each one of the one or more return manifold to heat exchanger pipelines, and each of the one or more flow control devices to control flow of intermediate working fluid from the return manifold to the one or more heat exchangers thereby controlling the overall temperature of the intermediate working fluid flowing through the one or more heat exchangers. The one or more flow control devices include one or more of a fixed speed pump, a variable speed drive pump, a control valve, and an actuated valve.
In such embodiments, the system may include one or more working fluid outlet temperature sensors, each one of the one or more working fluid outlet temperature sensors positioned at or near a working fluid outlet of each one of the one or more heat exchangers, and each of the one or more working fluid outlet temperature sensors to determine temperature of working fluid output from one of the one or more heat exchangers. The system may also include one or more working fluid inlet temperature sensors, each one of the one or more working fluid inlet temperature sensors positioned at or near a working fluid inlet of each one of the one or more heat exchangers, and each of the one or more working fluid inlet temperature sensors to determine temperature of working fluid input into one of the one or more heat exchangers.
In an embodiment, the ORC unit may include an electrical power output sensor to provide an amount of electrical power generated by the ORC unit. The opened/closed position of each of the one or more flow control devices is based on one or more of each working fluid input temperature, each working fluid output temperature, and the amount of electrical power generated by the ORC unit.
Such systems may include one or more additional ORC units to connect to one or more of the heat exchangers. Finally, each one of the one or more gas bypass valves may divert a portion of flow of the compressed gas from one of the one or more heat exchangers based on a selected gas temperature operating range.
Other embodiments of the disclosure are directed to a system for generating electrical power in an organic Rankin cycle (ORC) operation in the vicinity of a pumping station during gas compression and transport to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device. The system may include one or more supply pipelines, each one of the one or more supply pipelines connected to a main pipeline. The system may include one or more heat exchanger valves, each one of the one or more heat exchanger valves positioned on an associated supply pipeline and associated with one of one or more gas compressors, each one of the one or more heat exchanger valves to divert flow of compressed gas from an associated main pipeline. The system may include one or more heat exchanger gas inlet temperature sensors, each of the one or more heat exchanger gas inlet temperature sensors positioned on the supply pipeline prior to an associated heat exchanger valve and to provide a gas inlet temperature, the gas inlet temperature defined by a temperature of compressed gas flowing from one of one or more gas compressors. The system may include one or more heat exchangers, each of the one or more heat exchangers associated with one of the one or more heat exchanger valves and one of the one or more heat exchanger inlet temperature sensors, each of the one or more heat exchangers including a first fluid path to accept the flow of compressed gas from one of the one or more supply pipelines via one of the one or more heat exchanger valves and output the flow of compressed gas to a return pipeline connected to the associated main line and a second fluid path to accept and output a flow of an intermediate working fluid, each of the one or more heat exchangers to indirectly transfer heat from the flow of compressed gas to the flow of the intermediate working fluid. The system may include one or more heat exchanger gas outlet temperature sensors, each of the one or more heat exchanger gas outlet temperature sensors associated with one of the one or more heat exchangers and to provide a gas outlet temperature, the gas outlet temperature defined by a temperature of compressed gas flowing from the associated one of one or more heat exchangers. The system may include one or more working fluid flow control devices, each one of the one or more working fluid flow control devices positioned on a working fluid inlet pipeline and associated with one of the one or more heat exchangers and to adjust the flow of the intermediate working fluid to one of the one or more heat exchangers based on associated gas inlet temperature and gas outlet temperature to thereby control temperature of the flow of compressed gas. The system may finally include an ORC unit including a generator, a gas expander, a condenser, an internal heat exchanger, and a loop for the flow of organic working fluid, the loop defined by a fluid path through the condenser, generator, and a first fluid path of the internal heat exchanger, the internal heat exchanger including a second fluidic path to connect to the one or more heat exchangers and the intermediate working fluid flowing therethrough, the internal heat exchanger to indirectly transfer heat from the intermediate working fluid to the organic working fluid thereby causing the organic working fluid to change phases from a liquid to a vapor, the flow of the vapor to cause the generator to generate electrical power via rotation of a gas expander as defined by an ORC operation, the condenser to cool the flow of the organic working fluid, and the cooling to cause the organic working fluid to change phases from the vapor to the liquid.
In an embodiment, the working fluid flow control devices may adjust the flow of the compressed gas from one of the one or more heat exchangers based on a selected gas temperature operating range. The working fluid flow control device may comprise one or more of a control valve, actuated valve, a fixed speed pump, or variable speed pump. The selected gas operating range may include a substantially low temperature at which compressed gas is transported from the pumping station.
Such a system may additionally include a supply manifold positioned between and fluidically connected, via a supply manifold to ORC unit pipeline, to the ORC unit and fluidically connected, via one or more supply manifold to heat exchanger pipelines, to each of the one or more heat exchangers thereby allowing flow of intermediate working fluid from each of the one or more heat exchangers through the supply manifold to the ORC unit. The system may further include a return manifold positioned between and fluidically connected, via an ORC unit to return manifold pipeline, to the ORC unit and fluidically connected, via one or more return manifold to heat exchanger pipelines, to each of the one or more heat exchangers thereby allowing flow of intermediate working fluid from the ORC unit through the return manifold to each of the one or more heat exchangers. Each of the one or more working fluid flow control device may be positioned on each one of the one or more return manifold to heat exchanger pipelines, and wherein each of the one or more working fluid flow control devices control flow of intermediate working fluid from the return manifold to the one or more heat exchangers thereby controlling the overall temperature of the intermediate working fluid flowing through the one or more heat exchangers.
In an embodiment, the system may include one or more working fluid outlet temperature sensors, each one of the one or more working fluid outlet temperature sensors positioned at or near a working fluid outlet of each one of the one or more heat exchangers, and each of the one or more working fluid outlet temperature sensors to determine temperature of working fluid output from one of the one or more heat exchangers. The system may include one or more heat exchanger working fluid inlet temperature sensors, each one of the one or more heat exchanger working fluid inlet temperature sensors positioned at or near a working fluid inlet of each one of the one or more heat exchangers, and each of the one or more working fluid inlet temperature sensors to determine temperature of intermediate working fluid input into one of the one or more heat exchangers. The ORC unit includes an electrical power output sensor to provide an amount of electrical power generated by the ORC unit. An opened/closed position of each of the one or more flow control devices may be based on one or more of each working fluid input temperature, each working fluid output temperature, and the amount of electrical power generated by the ORC unit.
Other embodiments of the disclosure are directed to a system for generating electrical power in an organic Rankin cycle (ORC) operation in the vicinity of a pumping station during gas compression and transport to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device. The system may include one or more supply pipelines, each one of the one or more supply pipelines connected to a main pipeline. The system may include one or more heat exchanger valves, each one of the one or more heat exchanger valves positioned on an associated supply pipeline and associated with one of one or more gas compressors, each one of the one or more heat exchanger valves to divert flow of compressed gas from an associated main pipeline. The system may include one or more heat exchanger gas inlet temperature sensors, each of the one or more heat exchanger gas inlet temperature sensors positioned on the supply pipeline prior to an associated heat exchanger valve and to provide a gas inlet temperature, the gas inlet temperature defined by a temperature of compressed gas flowing from one of one or more gas compressors. The system may include one or more heat exchangers, each of the one or more heat exchangers associated with one of the one or more heat exchanger valves and one of the one or more heat exchanger inlet temperature sensors, each of the one or more heat exchangers including a first fluid path to accept the flow of compressed gas from one of the one or more supply pipelines via one of the one or more heat exchanger valves and output the flow of compressed gas to a return pipeline connected to the associated main line and a second fluid path to accept and output a flow of an intermediate working fluid, each of the one or more heat exchangers to indirectly transfer heat from the flow of compressed gas to the flow of the intermediate working fluid. The system may include one or more heat exchanger gas outlet temperature sensors, each of the one or more heat exchanger gas outlet temperature sensors associated with one of the one or more heat exchangers and to provide a gas outlet temperature, the gas outlet temperature defined by a temperature of compressed gas flowing from the associated one of one or more heat exchangers. The system may include one or more heat exchanger working fluid outlet temperature sensors, each of the one or more heat exchanger working fluid outlet temperature sensors associated with one of the one or more heat exchangers and to provide an intermediate working fluid outlet temperature, the intermediate working fluid outlet temperature defined by a temperature of intermediate working fluid flowing from the associated one of one or more heat exchangers. The system may include one or more bypass pipelines, each of the one or more bypass pipelines connecting an associated supply line to an associated return line. The system may include one or more gas bypass valves, each one of the one or more gas bypass valves positioned on an associated bypass pipeline and associated with one of the one or more heat exchangers and to divert a portion of flow of the compressed gas from one of the one or more heat exchangers based on associated gas inlet temperature and gas outlet temperature to thereby control temperature of the flow of compressed gas. The system may additionally include one or more working fluid flow control devices, each one of the one or more working fluid flow control devices positioned on a working fluid inlet pipeline and associated with one of the one or more heat exchangers and to adjust the flow of the intermediate working fluid to one of the one or more heat exchangers based on one or more of associated gas inlet temperature, gas outlet temperature, or intermediate working fluid outlet temperature to thereby control temperature of the flow of compressed gas. The system may finally include an ORC unit including a generator, a gas expander, a condenser, an internal heat exchanger, and a loop for the flow of organic working fluid, the loop defined by a fluid path through the condenser, generator, and a first fluid path of the internal heat exchanger, the internal heat exchanger including a second fluidic path to connect to the one or more heat exchangers and the intermediate working fluid flowing therethrough, the internal heat exchanger to indirectly transfer heat from the intermediate working fluid to the organic working fluid thereby causing the organic working fluid to change phases from a liquid to a vapor, the flow of the vapor to cause the generator to generate electrical power via rotation of a gas expander as defined by an ORC operation, the condenser to cool the flow of the organic working fluid, and the cooling to cause the organic working fluid to change phases from the vapor to the liquid.
In an embodiment, the system may further include one or more engines, each of the one or more engines configured to drive a compressor to compress the compressed gas. The system may also include one or more engine exhaust conduits, each one or more engine exhaust conduits connected to an exhaust outlet of one of the one or more engines. The system may include one or more water jackets, each of the one or more water jackets corresponding to one of the one or more engines and to cool one of the one or more engines during engine operation. The system may include one or more exhaust heat exchangers in fluid communication with one of the one or more engine exhaust conduits, the one or more exhaust heat exchangers connected to the ORC unit and configured to facilitate heat transfer from exhaust to a second working fluid. An amount of the exhaust may be diverted based on a thermal mass of the exhaust exceeding a heat rating of the one or more exhaust heat exchanger. The system may include one or more water jacket heat exchangers in fluid communication with one of the one or more water jackets and configured to facilitate heat transfer from fluid within the water jacket to a third working fluid. The amount of the fluid flowing from each of the one or more water jackets may be diverted based on a temperature of the fluid exceeding a heat rating of the one or more water jacket heat exchangers.
Other embodiments of the disclosure are directed to a system for generating electrical power in an organic Rankin cycle (ORC) operation in the vicinity of a pumping station during gas compression and transport to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device. The system may include one or more supply pipelines, each one of the one or more supply pipelines connected to a main pipeline. The system may include one or more heat exchanger valves, each one of the one or more heat exchanger valves positioned on an associated supply pipeline and associated with one of one or more gas compressors, each one of the one or more heat exchanger valves to divert flow of compressed gas from an associated main pipeline. The system may include one or more heat exchanger inlet temperature sensors, each of the one or more heat exchanger inlet temperature sensors positioned on the supply pipeline prior to an associated heat exchanger valve and to provide a gas inlet temperature, the gas inlet temperature defined by a temperature of compressed gas flowing from one of one or more gas compressors. The system may include one or more heat exchangers, each of the one or more heat exchangers associated with one of the one or more heat exchanger valves and one of the one or more heat exchanger inlet temperature sensors, each of the one or more heat exchangers including a first fluid path to accept the flow of compressed gas from one of the one or more supply pipelines via one of the one or more heat exchanger valves and output the flow of compressed gas to a return pipeline connected to the associated main line and a second fluid path to accept and output a flow of an intermediate working fluid, each of the one or more heat exchangers to indirectly transfer heat from the flow of compressed gas to the flow of the intermediate working fluid. The system may include one or more heat exchanger outlet temperature sensors, each of the one or more heat exchanger outlet temperature sensors associated with one of the one or more heat exchangers and to provide a gas outlet temperature, the gas outlet temperature defined by a temperature of compressed gas flowing from the associated one of one or more heat exchangers. The system may include one or more bypass pipelines, each of the one or more bypass pipelines connecting an associated supply line to an associated return line. The system may include one or more gas bypass valves, each one of the one or more gas bypass valves positioned on an associated bypass pipeline and associated with one of the one or more heat exchangers and to divert a portion of flow of the compressed gas from one of the one or more heat exchangers based on associated gas inlet temperature, gas outlet temperature, and a gas temperature range. Finally, the system may include an ORC unit including a generator, a gas expander, a condenser, an internal heat exchanger, and a loop for the flow of organic working fluid, the loop defined by a fluid path through the condenser, generator, and a first fluid path of the internal heat exchanger, the internal heat exchanger including a second fluidic path to connect to the one or more heat exchangers and the intermediate working fluid flowing therethrough, the internal heat exchanger to indirectly transfer heat from the intermediate working fluid to the organic working fluid thereby causing the organic working fluid to change phases from a liquid to a vapor, the flow of the vapor to cause the generator to generate electrical power via rotation of a gas expander as defined by an ORC operation, the condenser to cool the flow of the organic working fluid, and the cooling to cause the organic working fluid to change phases from the vapor to the liquid.
Still other aspects and advantages of these embodiments and other embodiments, are discussed in detail herein. Moreover, it is to be understood that both the foregoing information and the following detailed description provide merely illustrative examples of various aspects and embodiments, and are intended to provide an overview or framework for understanding the nature and character of the claimed aspects and embodiments. Accordingly, these and other objects, along with advantages and features of the present invention herein disclosed, will become apparent through reference to the following description and the accompanying drawings. Furthermore, it is to be understood that the features of the various embodiments described herein are not mutually exclusive and may exist in various combinations and permutations.
These and other features, aspects, and advantages of the disclosure will become better understood with regard to the following descriptions, claims, and accompanying drawings. It is to be noted, however, that the drawings illustrate only several embodiments of the disclosure and, therefore, are not to be considered limiting of the scope of the disclosure.
So that the manner in which the features and advantages of the embodiments of the systems and methods disclosed herein, as well as others that will become apparent, may be understood in more detail, a more particular description of embodiments of systems and methods briefly summarized above may be had by reference to the following detailed description of embodiments thereof, in which one or more are further illustrated in the appended drawings, which form a part of this specification. It is to be noted, however, that the drawings illustrate only various embodiments of the systems and methods disclosed herein and are therefore not to be considered limiting of the scope of the systems and methods disclosed herein as it may include other effective embodiments as well.
The present disclosure is directed to systems and methods for generating electrical power (e.g., via an organic Rankine cycle (ORC) operation) based on heat from a flow of gas and other sources to thereby supply electrical power to one or more of equipment or operational equipment, a grid power structure, an energy storage device, and/or other devices. Transport or transfer of gas via pipeline typically includes compressing the gas one or more times prior to the transportation or transfer to ensure the gas is capable of flowing to the end destination. As the gas is compressed, the gas may become heated. Further, the equipment used to compress the gas may become heated or produce heat in various ways. In addition, prior to transport, the flow of gas is typically cooled. The flow of gas is cooled by a gas cooler (e.g., an on-site heat exchanger, such as an air-cooler). Such a gas cooler may operate at a set speed, while in other embodiments the gas cooler may operate at variable speeds, for example based on the temperature of the flow of gas entering the gas cooler and the desired temperature of the flow of gas exiting the air-cooler. The heat generated via the compression of the flow gas, as well as the heat produced by the equipment on-site may be utilized via either external and/or internal heat exchangers to produce electrical power (e.g., via one or more ORC units or other equipment configured to convert heat to electrical power).
In such examples, ORC generators or units typically use a pipeline in communication with heat sources to allow a working fluid to change phase from liquid to vapor. As the working fluid changes phase from a liquid to a vaporous state, the vaporous state working fluid may flow up the pipe or pipeline to a gas expander. The vaporous state working fluid may flow through and cause the gas expander to rotate. The rotation of the gas expander may cause a generator to generate electrical power, as will be described below. The vaporous state working fluid may flow through the gas expander to a heat sink, condenser, or other cooling apparatus. The heat sink, condenser, or other cooling apparatus may cool the working fluid thereby causing the working fluid to change phases from a vapor to a liquid.
In the present disclosure, a supply pipeline may be connected to a main pipeline to divert a flow of gas from the main pipeline. Downstream of the connection between the main pipeline and supply pipeline, a return pipeline may be connected to the main pipeline. The supply pipeline may connect to the inlet of a heat exchanger (e.g., the heat exchanger external or internal to an ORC unit) to allow the diverted gas to flow through the heat exchanger thereby facilitating transfer of heat from the flow of gas to a working fluid. The cooled gas may flow from the heat exchanger back to the main pipeline via the return pipeline. A supply control valve may be positioned on the supply pipeline and a return control valve may be positioned on the return pipeline, thereby to control flow to/from the heat exchanger. Temperature sensors and/or sensors or meters to measure other characteristics of the flow of gas may be disposed and/or positioned at various points at each of the pipelines. For example, a temperature sensor and/or the other sensors or meters may be disposed and/or positioned at or near the inlet and/or outlet of the heat exchanger and/or at varying other points along the main pipeline. Further, a bypass fluidic conduit, pipeline, section of pipeline, piping, or pipe may be positioned between and connect the supply pipeline to the return. A bypass valve may be positioned on the bypass fluidic conduit or pipeline thereby to divert a portion of the flow of gas from the heat exchanger. The portion of the flow of gas diverted from the heat exchanger may heat the remaining portion of the flow of gas from the heat exchanger. In addition to or rather than utilizing the bypass valve to maintain heat, the rate or amount of working fluid flowing through the heat exchanger may be adjusted (e.g., via a flow control device) to maintain or adjust a temperature of the flow of gas. The position or degree at which the bypass valve is opened/closed and/or the rate or amount of the flow of working fluid through the working fluid may be determined based on temperature measurements of the flow of gas, in addition to a threshold or operating range of the flow of gas and/or temperature and/or flow rate or amount of the flow of working fluid in the heat exchanger, among other factors. The threshold may be based on the temperature at which volatiles condense in a flow of gas (e.g., including, but not limited to, a dew point of the flow of gas). The operating range may be based, at least in part, on the same temperature of another selected temperature desired for the flow of gas. Thus, heat from the flow of gas may be utilized to generate electrical power in an ORC unit, while maintaining the temperature of the flow of gas above such a threshold or within such an operating range.
Additionally, and as noted, other equipment may produce heat in various ways. For example, one or more engines corresponding to and used to operate the compressors may produce exhaust. The exhaust produced may be output from one or more of the one or more engines at a high temperature. The exhaust produced by one or more of the one or more engines may be transported or transferred to a heat exchanger to transfer heat to a working fluid to produce electrical power in the ORC unit. In another embodiment, a water jacket may surround one of the one or more engines to cool that engine during operation. Heat emanating from or produced by the engine may be transferred to the fluid contained within the water jacket. The fluid within the water jacket may be transported or transferred to a heat exchanger to transfer heat to a working fluid to produce electrical power in the ORC unit.
Such systems may include various components, devices, or apparatuses, such as temperature sensors, pressure sensors or transducers, flow meters, control valves, smart valves, valves actuated via control signal, controllers, a master or supervisory controller, other computing devices, computing systems, user interfaces, in-field equipment, and/or other equipment. The controller may monitor and adjust various aspects of the system to ensure that a flow of gas does not drop below the threshold where volatiles may condense in the flow of gas, that the temperature of the flow of gas stays below the threshold where a compressor or pump provides a higher output, that the flow of gas remains within a selected operating range, that the working fluid remains within a selected operating range, and/or that electrical power is generated efficiently and economically.
If the main control valve 124 is closed or partially closed, the flow of gas or portion of the flow of gas may be diverted through the supply pipeline 113. The supply pipeline 113 may be connected to an inlet of a heat exchanger 117 (see
In an embodiment, a storage tank 166 may be positioned between the heat exchanger 117 and the ORC unit 174 store heated intermediate working fluid. If the intermediate working fluid is at a temperature above a high temperature threshold or below a low temperature threshold or within a working fluid operating range, then the intermediate working fluid may be stored in the storage tank 166, until the correct temperature is reached. Otherwise, an intermediate working fluid valve 168 may be opened, allowing the intermediate working fluid to flow into the ORC unit 174. In another embodiment, the intermediate working fluid valve's position may be determined based on the temperature and/or pressure of the intermediate working fluid, e.g., as measured by a heat exchanger outlet temperature sensor 164, a storage tank outlet temperature and/or pressure sensor 170, an ORC unit inlet temperature sensor 172, a heat exchanger inlet temperature sensor 178, a temperature measured in the ORC unit 174, and/or other pressure sensors positioned throughout. Additional temperature sensors, pressure sensors or transducers, or other suitable sensor or measurement devices may be disposed or positioned throughout the site 100. In an embodiment, the storage tank 166 may be an expansion tank, such as a bladder or diaphragm expansion tank. The expansion tank may accept a varying volume of the intermediate working fluid as the pressure within the working fluid pipeline varies, as will be understood by a person skilled in the art. Thus, the expansion tank may manage any pressure changes exhibited by the intermediate working fluid.
As noted, the flow of gas may be maintained at a temperature above a threshold to ensure that volatiles do not condense in the flow of gas, below a threshold to ensure that a downstream compressor or pump (e.g., compressor 138) outputs a higher rate of flow of the gas, or within a selected operating range to ensure a maximum amount of electrical power is generated (e.g., a temperature of the gas such that the working fluid is heated to about 60 degree Celsius to about 170 degrees Celsius or higher, while maintaining the lowest potential temperature of the gas). Such volatiles may include ethanes, propanes, butanes, heavier straight-chain alkanes having 7 to 12 carbon atoms, thiols or mercaptans, carbon dioxide, cyclohexane, other naphthenes, benzene, toluene, xylenes, ethylbenzene, and/or other high alkanes. In addition, the water may condense in the flow of gas at or below such a threshold. Such volatiles and condensates may lead to scaling, precipitates, corrosion, inefficient performance of operational equipment, and/or malfunction or other issues with operational equipment (e.g., pumps, valves, etc.). To maintain the temperature above and/or below a threshold or within a selected operating range, the site 100 may include a bypass fluidic conduit 119 or pipeline/section of pipeline connecting the supply pipeline 113 to the return pipeline 115. A bypass control valve 116 may be positioned on the bypass fluidic conduit 119 or pipeline/section of pipeline. The temperature of the flow of gas in the supply pipeline 113 (e.g., provided or sensed via temperature sensor 114) and the flow of gas in the return pipeline 115 (e.g., provided or sensed via temperature sensor 118 and/or temperature sensor 120) may be determined. Such measurements may indicate that the temperature of the flow of the gas is too low or below the threshold defined by the temperature at which volatiles begin to condense in the flow of gas, that the flow of gas is too high or above the threshold defined by the temperature at which the compressor or pump (e.g., compressor 138) does not output a higher rate of flow of gas, and/or that the temperature of the flow gas is not within a selected operating range. Based on such determinations, indications, and/or other factors, the bypass control valve 116, by opening to a specified position or degree, may divert a portion of the flow of gas from the heat exchanger 117. In other words, a portion of the flow of gas may flow directly from the supply pipeline 113 to the return pipeline 115 thereby increasing or decreasing the temperature of the flow of gas, such a temperature indicated or measured by temperature sensor 120. One or more adjustments of the bypass control valve 116 may occur until the temperature of the flow of gas is above the threshold or within the selected operating range. Other factors for determining the position of the bypass control valve 116 may include the temperature of flow of gas in the supply pipeline 113, the temperature of the flow of gas in the return pipeline 115, the temperature of the flow of gas after exiting a compressor 106 (e.g., as measured by temperature sensor 110), the temperature of the flow of gas prior to entry into a gas cooler 128 (e.g., as measured by temperature sensor 126), the temperature of the flow of gas after passing through the gas cooler 128 (e.g., as measured by temperature sensor 132), a predicted temperature drop of the flow of gas after passage through the gas cooler 128 (e.g., through a first fluidic channel 130), the temperature of the flow of gas further downstream (e.g., for example, at temperature sensor 136, prior to passage into the compressor 138), and/or the amount of electrical power output 199 or generated by the ORC unit 174. Based on these measurements, the bypass control valve 116 may open/close to a specified degree. Other valves may open/close to adjust the flow of the gas to increase/decrease various temperatures for different purposes (e.g., increasing a temperature of a working fluid, increasing/decreasing a temperature of the flow of gas, etc.).
In an embodiment, rather than or in addition to controlling or maintaining temperature of the flow of gas via a bypass control valve, the temperature of the flow of gas may be controlled via the rate or amount of flow of working fluid flowing through the heat exchanger 117. The flow of working fluid through the heat exchanger 117 may be controlled via one or more flow control devices, such as pumps and/or control valves. As the rate or amount of flow of working fluid is increased or decreased, the amount of heat transferred from the flow of gas may increase or decrease, respectively. Thus, the temperature of the flow of gas may be decreased or increased in relation to the flow of working fluid.
In an embodiment, compression of the flow of gas may be performed one or more times. For each compression stage similar components may be included and may perform the same or similar operations for each different stage of compression. Further, the temperature at which a downstream compressor outputs higher rates of a flow of gas may be considered a threshold below or limit in the selected operating range which the temperature of the flow of gas is maintained in previous stages. For example, a flow of gas compressed via compressor 106 may be transported to storage tank 134 or directly to compressor 138 (e.g., a second compressor). The compressor 138 may be operated or driven by the same engine 108 or by a different engine. The compressor 138 may connect to a main pipeline 157. A supply pipeline 141 may connect to the main pipeline 157. Downstream of the supply line 141 and main pipeline 157 connection, the return pipeline 155 may connect to the main pipeline 157. A main control valve 154 may be positioned between the supply pipeline 141-main pipeline 157 connection and the return pipeline 155-main pipeline 157 connection. The main control valve 154 may be open when the ORC unit 174 is not operating and/or when the flow of compressed gas is not at a temperature (e.g., as measured via temperature sensor 140) sufficient to generate electrical power via the ORC unit. If the temperature of the flow of gas is sufficient to generate electrical power, the main control valve 154 may be closed and the flow of gas diverted to the supply pipeline 141.
The supply pipeline 141 and the return pipeline 155 may connect to the heat exchanger 117, to a separate heat exchanger, or directly to an ORC unit 174. A supply control valve 122 may be positioned on the supply pipeline 141 to control the flow of gas to the heat exchanger 117. A return control valve 152 may be positioned on the return pipeline 155 to control the flow of gas from the heat exchanger 117. The open/closed position of the supply control valve 122 and the return control valve 152 may be determined based on various characteristics of the flow of gas, such as the temperature of the flow of gas from the compressor 138 (e.g., as measured or sensed by the temperature sensor 140), the temperature of the flow of gas entering the heat exchanger 117 (e.g., as measured or sensed by the temperature sensor 144), the temperature of the flow of gas exiting the heat exchanger 117 (e.g., as measured or sensed by the temperature sensor 148 and/or temperature sensor 150), the temperature of the flow of gas before entering and/or exiting the on-site heat exchanger (e.g., as measured or sensed by the temperature sensor 156 and/or temperature sensor 162), and/or other characteristics measured or determined by other sensors disposed throughout the site 100. In an embodiment, the flow of gas may be comprised of one or more of natural gas, renewable natural gas, landfill gas, and organic waste gas.
Similar to the configuration described above, a bypass fluidic conduit 145 or pipeline may connect the supply pipeline 141 to the return pipeline 155. The flow of gas from the supply pipeline 141 to the return pipeline 155 may be controlled by a bypass control valve 146 positioned on the bypass fluidic conduit 145 or pipeline. The open/closed position of the bypass control valve 152 and/or the rate or amount of the flow of working fluid through the heat exchanger may be determined based on various characteristics of the flow of gas, such as the temperature of the flow of gas from the compressor 138 (e.g., as measured or sensed by the temperature sensor 140), the temperature of the flow of gas entering the heat exchanger 117 (e.g., as measured or sensed by the temperature sensor 144), the temperature of the flow of gas exiting the heat exchanger 117, (e.g., as measured or sensed by the temperature sensor 148 and/or temperature sensor 150), the ambient temperature of the site 100 (e.g., as measured or sensed by a temperature sensor 149 configured to measure ambient temperature) and/or other characteristics (flow, composition, density, pressure, etc.) measured, sensed, or determined by other sensors disposed throughout the site 100.
In an embodiment, the sensors and/or meters disposed throughout the site 100 may be temperature sensors, densitometers, density measuring sensors, pressure transducers, pressure sensors, flow meters, turbine flow meters, mass flow meters, Coriolis meters, spectrometers, other measurement sensors to determine a temperature, pressure, flow, composition, density, or other variables as will be understood by those skilled in the art, or some combination thereof. Further, the sensors and/or meters may be in fluid communication with a fluid to measure the temperature, pressure, or flow or may indirectly measure flow (e.g., an ultrasonic sensor). In other words, the sensors or meters may be a clamp-on device to measure flow indirectly (such as via ultrasound passed through the pipeline to the fluid).
As noted, the engine 108 or one or more engines may produce exhaust exhibiting high heat or temperature. The exhaust may be transported via an exhaust duct 185 or pipeline to a heat exchanger 186 or ORC unit 174. After the exhaust flows through the heat exchanger 186 or the ORC unit 174, the exhaust may be output to the atmosphere. In another embodiment, prior to output to the atmosphere, the exhaust may be filtered or passed through a catalyst to remove specific chemicals deemed harmful to the environment. In another embodiment, prior to input into the heat exchanger 186, the exhaust may be filtered or pass through a catalyst to prevent buildup within the heat exchanger 186. In an embodiment, the exhaust duct 185 or pipeline may include an exhaust valve 181. In an embodiment, the exhaust from the engine 108 may be at a high temperature or have a high thermal mass (e.g., temperature of the exhaust multiplied by the flow rate of the exhaust). If the temperature or thermal mass of the exhaust (e.g., as measured by temperature sensor 180) is outside of a range (e.g., defined by the operating temperature range of the heat exchanger 186, ORC unit 174, or other equipment or devices interacting with the exhaust and/or based on thermal mass) or above or below a threshold, the exhaust control valve 181 may close thereby partially or fully preventing the exhaust from flowing to the heat exchanger 186. If the exhaust control valve 181 is fully closed, the exhaust may be fully diverted to a typical exhaust output. If the exhaust control valve 181 is partially closed, the exhaust may be partially diverted to a typical exhaust output, while the remaining portion may flow to the heat exchanger 181. The partial or full prevention of the flow of exhaust to the heat exchanger 186 may prevent interruption of catalyst performance of the engine 108 and/or deposition of particulates in equipment.
In another embodiment, the flow of exhaust, prior to flowing through the heat exchanger 186, may pass through a filter 187, converter, or some other device to reduce particulates within the exhaust. As noted, the exhaust may cause scaling and/or deposition of such particulates. The filter 187 or other device may ensure that the heat exchanger 186 may not exhibit such scaling and/or deposition of particulates or may not exhibit the scaling and/or deposition at rates higher than if there were no filter 187 or other device.
The engine 108 or one or more engines may include a water jacket. As an engine 108 operates, the water or other coolant inside the water jacket may indirectly remove heat from the engine 108. Heat from the engine 108 may be transferred to the water or other coolant, thereby producing heated water or other coolant. The heated water or other coolant may pass through a radiator or other type of heat exchanger to reduce the temperature of heated water or coolant, the cooled water or coolant then flowing back to the water jacket to cool the engine 108. In an embodiment, the output of the water jacket may connect to a pipeline to divert the flow of water to the heat exchanger 189. A water jacket control valve 183 may be positioned on the pipeline to control the flow water or coolant from the water jacket. A pipeline may be connected to the input of the water jacket to return the water or other coolant to the water jacket. In such embodiments, rather than or in addition to the water or other coolant passing through the typical radiator or heat exchanger, the heated water or other coolant may pass through heat exchanger 189. In another embodiment, the engine's 108 water jacket may be configured to transport the water or other coolant directly to an ORC unit 174. In another embodiment, the water jacket control valve 183 may close if the water or other coolant is outside a selected operating range (e.g., if the water or other coolant is too cool, then, if utilized, water or other coolant may not be sufficient for the ORC unit 174 to generate electrical power, and/or if the water or coolant is too hot, then, if utilized, the heated water or other coolant may damage equipment not rated for a high temperature) thus preventing fluid from flowing to the heat exchanger 189 and/or the ORC unit 174. Temperature of the water or coolant may be determined or sensed via one or more temperature sensors (e.g., temperature sensors 182, 184). The temperature of the working fluid or intermediate working fluid may be determined or sensed via one or more temperature sensors (e.g., temperature sensors 193, 195).
In an embodiment, the heat may be transferred from the engine's 108 exhaust to an intermediate working fluid or a working fluid. The intermediate working fluid may be stored in another storage tank 192 or expansion tank. The temperature of the intermediate working fluid flowing from the heat exchanger 186 may be determined based on measurements from temperature sensors 190, 191. The temperature of the intermediate working fluid may be measured at various other points, such as after the storage tank or the storage tank control valve 194 (e.g., temperature sensor 196 and/or temperature sensor 198), or prior to entry into the heat exchanger 186. Based on these measurements, the storage tank control valve 194 may open or close to prevent or allow the storage tank 192 to fill up and/or to prevent over-filling the storage tank 192. In an embodiment, the storage tank 192 may be an expansion tank, such as a bladder or diaphragm expansion tank. The expansion tank may accept a varying volume of the intermediate working fluid as the pressure within the working fluid pipeline varies, as will be understood by a person skilled in the art. Thus, the expansion tank may manage any pressure changes exhibited by the intermediate working fluid.
In an embodiment, various temperature sensors and/or other sensors or meters may be disposed and/or positioned throughout the site 100, 101, 103. In another embodiment, the heat exchangers and/or ORC units may be added to the site as a kit. In such examples, and as illustrated in
In an embodiment, different types of heat exchangers may be utilized at the site 100, 101. As noted, the heat exchanger may be internal to the ORC unit 174 and/or external to the ORC unit 174. In an embodiment, the heat exchanger 117, 186 may be a shell and tube heat exchanger, a spiral plate or coil heat exchanger, a heliflow heat exchanger, or another heat exchanger configured to withstand high temperatures. To prevent damage or corrosion to the heat exchanger 117, 186 over a period of time, the fluid path for the flow of gas may be configured to withstand damage or corrosion by including a permanent, semi-permanent, or temporary anti-corrosive coating, an injection point for anti-corrosive chemical additive injections, and/or some combination thereof. Further, at least one fluid path of the heat exchanger 117, 186 may be comprised of an anti-corrosive material, e.g., anti-corrosive metals or polymers.
In an example, the working fluid may be a fluid with a low boiling point and/or high condensation point. In other words, a working fluid may boil at lower temperatures (for example, in relation to water), while condensing at higher temperatures (e.g., in relation to water) as will be understood by a person skilled in the art. The working fluid may be an organic working fluid. The working fluid may be one or more of pentafluoropropane, carbon dioxide, ammonia and water mixtures, tetrafluoroethane, isobutene, propane, pentane, perfluorocarbons, other hydrocarbons, a zeotropic mixture of pentafluoropentane and cyclopentane, other zeotropic mixtures, and/or other fluids or fluid mixtures. The working fluid's boiling point and condensation point may be different depending on the pressure within the working fluid pipelines e.g., the higher the pressure, the higher the boiling point. In another example, an intermediate working fluid may be a fluid with a higher boiling point. For example, the intermediate working fluid may be a water or water glycol mixture. In such examples, as heat is transferred from the flow of gas, the exhaust, the fluid from the water jacket, and/or from another source, the intermediate working fluid may, rather than exhibiting a vaporous phase change, remain in a liquid phase, while retaining the transferred heat. As a liquid, the higher boiling point intermediate working fluid may be more manageable and/or easier to transport through the pipelines.
In an embodiment, the ORC unit 174 may include a generator, a gas expander, a condenser, an internal heat exchanger, and a loop for the flow of working fluid. As an intermediate working fluid or other fluid flows into the ORC unit 174, the internal heat exchanger may facilitate transfer of heat in the intermediate working fluid or other fluid to a working fluid of the ORC unit 174. The heat may cause the working fluid of the ORC unit 174 to exhibit a phase change from a liquid to a vapor. The vaporous working fluid may flow into the gas expander. In an example, the gas expander may be a turbine expander, positive displacement expander, scroll expander, screw expander, twin-screw expander, vane expander, piston expander, other volumetric expander, and/or any other expander suitable for an ORC operation or cycle. As gas flows through the gas expander, a rotor or other component connected to the gas expander may begin to turn, spin, or rotate. The rotor may include an end with windings. The end with windings may correspond to a stator including windings and a magnetic field (e.g., the end with windings and stator with windings being a generator). As the rotor spins within the stator, electricity may be generated. Other generators may be utilized, as will be understood by those skilled in the art. The generator may produce DC power, AC power, single phase power, or three phase power. The vaporous working fluid may then flow from the gas expander to a condenser, where the vaporous working fluid may exhibit a phase change back to the liquid working fluid. The liquid working fluid may then flow back to the internal heat exchanger, the process repeating.
The site 100, as shown utilizes an ORC unit 174 to generate electrical power. In another embodiment, rather than or in addition to the ORC unit 174, other geothermal-based generators may be utilized to generate electrical power using the heat transferred to the working fluid from the flow of gas, engine exhaust, and/or fluid from a water jacket. For example, the geothermal-based generator may be another type of binary-cycle generator.
In an embodiment, the operational equipment may include equipment at the site. Operational equipment at the site may include pumps, fans (e.g., for gas cooler 128), one or more controllers, and/or other equipment at the site to either ensure proper operation or otherwise. Other equipment may include equipment to further process the flow of gas. In another embodiment, the electrical power generated may be used to power cryptographic currency and/or blockchain miners, hydrolyzers, carbon capture machines, nearby structures (e.g., residential or business structures or buildings), and/or other power destinations.
The controller 302 may include a set of inputs/outputs in signal communication with each of the control valves included in the site. The controller 302 may determine the current position of each valve (e.g., a degree at which control valve is open). Further, the controller 302 may adjust the position of each valve to a desired position, depending on different measured or determined characteristics of the site 300, 301, thus controlling the flow of gas or other fluids to different areas or equipment at the site 300, 301.
As noted, the equipment associated with the ORC unit 174 and/or each of the heat exchangers 117, 186 may be installed at a site 300, 301 as a kit. In an example, the controller 302 may connect to the equipment added at the site 301, rather than any temperature sensors or control valves already existing or installed at the site prior to installation of the kit.
As described, various valves and/or flow rates may be determined based on a threshold defined by a temperature at which volatiles may condense in the flow of gas, a threshold defined by a temperature where a compressor or pump provides a higher output of gas, and/or a selected operating temperature range or window defined by one or more temperatures (e.g., temperatures at which volatiles condense in the flow gas, where a compressor or pump provides a higher output of gas, the lowest potential temperature the flow of gas may be cooled to, and/or other temperatures of other fluids at the site). The controller 302 may determine such thresholds and/or temperature ranges. In another embodiment, the thresholds and/or operating ranges may be preset. In yet another embodiment, a user may enter the thresholds and/or operating ranges into the controller 302 via a user interface. The controller 302 may determine such thresholds and/or operating ranges based on the type of gas, the flow rate of the gas (e.g., determined by a flow meter positioned at the site), the density of the gas (e.g., determined by various sensors or meters positioned at the site), some other characteristics of the gas, the type of compressor or pump, and/or operating characteristics of the compressor or pump.
In an embodiment and as illustrated in
In another embodiment and as illustrated in
In
In
Finally, in
In such embodiments, the flow of working fluid to any of the heat exchangers (e.g., heat exchangers 602A, 602B, 602C, 602D, and up to 602N, warm water heat exchangers 610A, 610B, and up to 610N, and/or hot water heat exchangers 612A, 612B, and up to 612N) may be controlled via the flow control devices to manage, adjust, or maintain a temperature of the flow of gas, if a flow of gas flows therethrough. For example, the total percentage of working fluid flowing to each heat exchanger, for example heat exchangers 602A, 602B, 602C, 602D, and up to 602N, may initially be equal. As temperatures vary and the temperature of the flow of gas rises or falls, then the percentage or amount of working fluid to a particular heat exchanger may be increased or decreased to lower or raise, respectively, the temperature of the flow of gas flowing therethrough.
For example, to increase the temperature of a flow of gas flowing through heat exchanger 602A, flow control device 622A may decrease the percentage of working fluid flowing to heat exchanger 602A by about 5%, about 10%, about 15%, about 20%, or up to about 90%. Such a decrease in the rate of flow may inhibit the transfer of heat to the working fluid, allowing the overall temperature of the flow of gas to increase. In another example, to decrease the temperature of a flow of gas flowing through heat exchanger 602A, flow control device 622A may increase the percentage of working fluid flowing to heat exchanger 602A by about 5%, about 10%, about 15%, about 20%, or up to about 90%. Such an increase in the rate of flow may further facilitate the transfer of heat to the working fluid, allowing the overall temperature of the flow of gas to decrease. In either example, the percentage of increase/decrease of the flow of working fluid may be based on various factors or variables, such as the desired temperature or range of temperatures of the flow of gas, the amount of electrical power currently generated, the desired amount of electrical power to be generated, the total temperature and/or flow rate of the working fluid (e.g., the temperature and/or flow rate of the working fluid flowing between the supply manifold 604 and ORC unit 608), the temperature and/or flow rate of the working fluid flowing to and/or from a heat exchanger (e.g., heat exchangers 602A, 602B, 602C, 602D, and up to 602N), the total amount of working fluid, and/or the rate of flow of working fluid for each heat exchanger (e.g., heat exchangers 602A, 602B, 602C, 602D, and up to 602N). Such working fluid flow rate adjustments may be made intermittently or continuously. In a further example, an adjustment to a particular working fluid flow rate may be performed and then temperatures, flow rates, and/or other characteristics may be determined. Further adjustments may be performed and temperatures, flow rates, and/or other characteristics may be determined again. Such operations may be performed until the temperature of the flow of gas and/or the working fluid is at a desired temperature, with a selected operating range or window, and/or steady-state temperature.
As used herein, “signal communication” refers to electric communication such as hard wiring two components together or wireless communication for remote monitoring and control/operation, as understood by those skilled in the art. For example, wireless communication may be Wi-Fi®, Bluetooth®, ZigBee, cellular wireless communication, satellite communication, or forms of near field communications. In addition, signal communication may include one or more intermediate controllers or relays disposed between elements that are in signal communication with one another.
The master controller 702 may include instructions 708 to measure the temperature at various points in the facility or at the site. For example, the temperature at the inlet of one or more heat exchangers may be measured or sensed from one or more heat exchanger inlet temperature sensors 714A, 714B, and up to 714N. The temperature at the outlet of one or more heat exchangers may be measured from one or more heat exchanger outlet temperature sensors 716A, 716B, and up to 716N. The master controller 702 may further include instructions 712 to measure the amount of electrical power output from the ORC unit 722. In an embodiment, the facility or site may include one or more ORC units and, in such examples, each ORC unit may connect to the master controller 702 to provide, among other information, the amount of electrical power output over time.
The master controller 702 may further connect to one or more heat exchanger valves 720A, 720B, and up to 720N and gas bypass valves 718A, 718B, and up to 718N. The master controller 702 may include instructions 710 to adjust each of these valves based on various factors. For example, if the temperature measured from one of the heat exchangers is below a threshold or outside of a selected operating temperature range or window, then the master controller 702 may transmit a signal causing one or more of the heat exchanger valves 720A, 720B, up to 720N to close. Such a threshold may be defined by the temperature sufficient to ensure the ORC unit 722 generates an amount of electrical power. The operating temperature range or window may be defined by an operating temperature of the ORC unit 722 and/or by the lowest and highest potential temperature of the flow of gas. In another example, based on a heat exchanger inlet temperature and an outlet temperature, the master controller 702 may adjust, via a signal transmitted to, one of the one or more gas bypass valves 718A, 718B, up to 718N. The master controller 702 may consider other factors (e.g., temperature, pressure, density, composition, etc.) as described herein.
As shown in
In an embodiment, the master controller 702 may connect to a user interface 724. A user may interact with the master controller 702 via the user interface 724. The user may manually enter each of the thresholds and/or the operating temperature ranges or windows described herein and/or may manually adjust any of the control valves described herein.
Turning first to method 800, at block 802, the master controller 702 may determine a first temperature at the heat exchanger inlet based on a temperature sensor positioned at the heat exchanger inlet (e.g., the heat exchanger external or internal to an ORC unit). The heat exchanger inlet may be associated with a particular heat exchanger (e.g., the first heat exchanger).
At block 804, the master controller 702 may determine the second temperature of the fluid at the heat exchanger outlet. Other temperatures or characteristics of the fluid and/or other fluid may be determined, such as working fluid temperature and/or flow rates of the working fluid, pressure of the working fluid, flow rates of the fluid (e.g., the flow rate of the flow of gas), and/or density of the fluid.
At block 806, the master controller 702 may determine whether the temperature within an operating temperature range or window. Such an operating temperature range or window may be defined by one or more of the temperature at which volatiles condense in the fluid (e.g., in the flow of gas), the temperature of working fluid at which an ORC unit is able to generate electrical power, and/or other temperatures of other fluids used on site. In another embodiment, the operating temperature may further be defined by the condensation point or dew point of the flow of gas. At block 808, if the temperature is not within the operating temperature range or window, the master controller 702 may adjust a bypass valve. Adjustment of the bypass valve may, in other embodiments, be based on various thresholds of various fluids at the site (e.g., pressure of working fluid or flow of gas, temperature of working fluid or flow of gas, composition of the working fluid or flow of gas, etc.). The bypass valve may divert a portion of the fluid (e.g., flow of gas) away from the heat exchanger thereby increasing the temperature of the fluid (e.g., flow of gas). In other words, a portion of the fluid, prior to cooling in the heat exchanger may be introduced into the remaining portion of the fluid from the heat exchanger. If the bypass valve is at a position other than fully closed and the temperature is above the operating temperature range or window, the portion of the fluid (e.g., flow of gas) may be prevented by further closing the bypass valve to decrease the temperature of the fluid (e.g., flow of gas). Otherwise, if the temperature is within the operating temperature range or window, the method 800 may be executed again.
Turning to
At block 812, the master controller 702 may open a first heat exchanger valve or any other heat exchanger valve. If the first heat exchanger valve is already open, then the master controller 702 may not adjust the first heat exchanger. In an embodiment, the master controller 702 may open and/or adjust a heat exchanger valve by transmitting a signal to the heat exchanger valve indicating the position that the heat exchanger valve should be adjusted to.
As described above, at block 802, the master controller 702 may determine a first temperature at the heat exchanger inlet based on a temperature sensor positioned at the heat exchanger inlet. At block 814, the master controller 702 may determine whether the fluid flowing into the heat exchanger within an input operating range, input operating range defined by the minimum temperature and a maximum temperature. The minimum temperature may be defined by the lowest temperature at which an ORC unit may generate electricity. The maximum temperature may be defined by a temperature at which an ORC generates a maximum amount of electricity. In other embodiments, the maximum temperature may be defined by a maximum operating temperature of the ORC unit. The maximum temperature may be utilized to determine, at least in part, the position of the bypass valve or how much working fluid may flow to the heat exchanger. Such a minimum temperature may be about 25° C., about 30° C., or a greater value which may be based on any temperature drop between heat transfer.
At block 816, if the fluid (e.g., a flow of gas) is not within the input operating range, master controller 702 may close or adjust the heat exchanger valve (e.g., the first heat exchanger valve).
At block 818, the master controller 702 may wait a specified period of time prior to re-opening the heat exchanger valve (e.g., the first heat exchanger valve). After the specified period of time the controller may re-open the first heat exchanger valve and check the temperature of the fluid again to determine whether the fluid is within the input operating range. In some examples, the rather than re-opening the first heat exchanger valve, the master controller 702 may determine the inlet temperature of the fluid and adjust the heat exchanger valve based on the inlet temperature.
As described above, at block 804, if the fluid is at a temperature within the input operating range, the master controller 702 may determine the second temperature of the fluid at the heat exchanger outlet. At block 806, the master controller 702 may determine whether the temperature is within an operating range. The operating range may be defined by the temperature at which volatiles condense in the fluid (e.g., in the flow of gas), the temperature of working fluid at which an ORC unit is able to generate electrical power, and/or other temperatures of other fluids used on site. At block 808, if the temperature is outside of the operating temperature, the master controller 702 may adjust a bypass valve. The bypass valve may divert more or less of a portion of the fluid (e.g., flow of gas) away from the heat exchanger thereby increasing or decreasing the temperature of the fluid (e.g., flow of gas). In other words, a portion of the fluid, prior to cooling in the heat exchanger may be introduced into the remaining portion of the fluid from the heat exchanger.
Turning to
Turning to
Turning to
At block 904, fluid (e.g., exhaust) produced by the engine may be transported to a first heat exchanger. The first heat exchanger may facilitate heat transfer from the fluid (e.g., exhaust) to a working fluid or intermediate work fluid. The heated working fluid or intermediate working fluid may be utilized by an ORC unit to generate electrical power during an ORC operation. The working fluid or intermediate working fluid may be considered warm or hot and may be utilized in a warm or low temperature ORC operation or a hot or high temperature ORC operation, respectively. Blocks 904 and 906 may be executed continuously as a gas compressor operates, the gas compressor being operated or driven by one or more engines.
At block 906, fluid from a water jacket may be transported to a second heat exchanger. The second heat exchanger may facilitate heat transfer from the fluid of the water jacket to a working fluid or intermediate work fluid. The heated working fluid or intermediate working fluid may be utilized by an ORC unit to generate electrical power during an ORC operation. The working fluid or intermediate working fluid may be considered warm or hot and may be utilized in a warm or low temperature ORC operation or a hot or high temperature ORC operation, respectively.
Turning to
At block 910, the master controller 702 may determine whether the temperature or thermal mass of the exhaust is within a range or window. The range or window may be defined by a maximum operating temperature or thermal mass of the first heat exchanger and a minimum temperature or thermal mass at which ORC equipment generates electricity.
At block 912, if the temperature is above or below the range or window, the master controller 702 may adjust an exhaust control valve. The exhaust control valve may partially or fully divert a portion of the exhaust produced by the engine. In another embodiment, the exhaust control valve may be adjusted to maintain the first heat exchanger. Over time, scaling or depositions of particulates in the exhaust may build. As such, the first heat exchanger may be cleaned or maintained to remove the buildup and, during such cleaning or maintenance, the exhaust control valve may be fully closed. Once the first heat exchanger has been maintained, the exhaust control valve may be adjusted to allow the exhaust to flow to the first heat exchanger. In another embodiment, a portion of the exhaust may be diverted (e.g., via the exhaust control valve) from the first heat exchanger to limit the amount of scaling and/or deposition of particulates. In yet another embodiment, the exhaust control valve may be adjusted to prevent interruption of catalyst performance.
This application is a continuation of U.S. Non-Provisional application Ser. No. 17/578,542, filed Jan. 19, 2022, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” which claims priority to and the benefit of U.S. Provisional Application No. 63/261,601, filed Sep. 24, 2021, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” and U.S. Provisional Application No. 63/200,908, filed Apr. 2, 2021, titled “SYSTEMS AND METHODS FOR GENERATING GEOTHERMAL POWER DURING HYDROCARBON PRODUCTION,” the disclosures of which are incorporated herein by reference in their entireties.
In the drawings and specification, several embodiments of systems and methods to provide electrical power from heat of a flow of gas and/or other source have been disclosed, and although specific terms are employed, the terms are used in a descriptive sense only and not for purposes of limitation. Embodiments of systems and methods have been described in considerable detail with specific reference to the illustrated embodiments. However, it will be apparent that various modifications and changes can be made within the spirit and scope of the embodiments of systems and methods as described in the foregoing specification, and such modifications and changes are to be considered equivalents and part of this disclosure.
This application is a continuation of U.S. Non-Provisional application Ser. No. 17/578,542, filed Jan. 19, 2022, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” which claims priority to and the benefit of U.S. Provisional Application No. 63/261,601, filed Sep. 24, 2021, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” and U.S. Provisional Application No. 63/200,908, filed Apr. 2, 2021, titled “SYSTEMS AND METHODS FOR GENERATING GEOTHERMAL POWER DURING HYDROCARBON PRODUCTION,” the disclosures of which are incorporated herein by reference in their entireties.
Number | Name | Date | Kind |
---|---|---|---|
3517208 | Williams et al. | Jun 1970 | A |
3757516 | McCabe | Sep 1973 | A |
3808794 | Wood | May 1974 | A |
3875749 | Baciu | Apr 1975 | A |
3908381 | Barber et al. | Sep 1975 | A |
3988895 | Sheinbaum | Nov 1976 | A |
4063417 | Shields | Dec 1977 | A |
4112687 | Dixon | Sep 1978 | A |
4112745 | McCabe | Sep 1978 | A |
4157730 | Despois et al. | Jun 1979 | A |
4228657 | Leo | Oct 1980 | A |
4356401 | Santi | Oct 1982 | A |
4369373 | Wiseman | Jan 1983 | A |
4484446 | Goldsberry | Nov 1984 | A |
4542625 | Bronicki | Sep 1985 | A |
4558568 | Hoshino et al. | Dec 1985 | A |
4982568 | Kalina | Jan 1991 | A |
4996846 | Bronicki | Mar 1991 | A |
5117908 | Hofmann | Jun 1992 | A |
5199507 | Westmoreland | Apr 1993 | A |
5440882 | Kalina | Aug 1995 | A |
5517822 | Haws et al. | May 1996 | A |
5526646 | Bronicki et al. | Jun 1996 | A |
5555731 | Rosenblatt | Sep 1996 | A |
5661977 | Shnell | Sep 1997 | A |
5685362 | Brown | Nov 1997 | A |
5816048 | Bronicki et al. | Oct 1998 | A |
RE36282 | Nitschke | Aug 1999 | E |
6536360 | O'Connor | Mar 2003 | B2 |
6585047 | Mcclung | Jul 2003 | B2 |
6695061 | Fripp et al. | Feb 2004 | B2 |
6724687 | Stephenson et al. | Apr 2004 | B1 |
6853798 | Weiss | Feb 2005 | B1 |
6857486 | Chitwood et al. | Feb 2005 | B2 |
6989989 | Brasz et al. | Jan 2006 | B2 |
7174716 | Brasz et al. | Feb 2007 | B2 |
7224080 | Smedstad | May 2007 | B2 |
7234314 | Wiggs | Jun 2007 | B1 |
7254949 | Brasz et al. | Aug 2007 | B2 |
7281379 | Brasz | Oct 2007 | B2 |
7289325 | Brasz et al. | Oct 2007 | B2 |
7313926 | Gurin | Jan 2008 | B2 |
7334410 | Creighton et al. | Feb 2008 | B2 |
7337842 | Roddy et al. | Mar 2008 | B2 |
7353653 | Bronicki | Apr 2008 | B2 |
7472548 | Meksvanh | Jan 2009 | B2 |
7753122 | Curlett | Jul 2010 | B2 |
7891187 | Mohr | Feb 2011 | B2 |
7900450 | Gurin | Mar 2011 | B2 |
7942001 | Radcliff et al. | May 2011 | B2 |
7950230 | Nishikawa et al. | May 2011 | B2 |
8096128 | Held et al. | Jan 2012 | B2 |
8099198 | Gurin | Jan 2012 | B2 |
3146360 | Myers et al. | Apr 2012 | A1 |
8166761 | Moghtaderi et al. | May 2012 | B2 |
8193659 | Bronicki et al. | Jun 2012 | B2 |
8309498 | Funkhouser et al. | Nov 2012 | B2 |
8381523 | Zadok | Feb 2013 | B2 |
8430166 | Danko | Apr 2013 | B2 |
8528333 | Juchymenko | Sep 2013 | B2 |
8534069 | Parrella | Sep 2013 | B2 |
8555643 | Kalina | Oct 2013 | B2 |
8555912 | Woolley et al. | Oct 2013 | B2 |
8572970 | Matteson et al. | Nov 2013 | B2 |
8616000 | Parrella | Dec 2013 | B2 |
8616001 | Held et al. | Dec 2013 | B2 |
8616323 | Gurin | Dec 2013 | B1 |
8680704 | Rooney | Mar 2014 | B1 |
8708046 | Montgomery et al. | Apr 2014 | B2 |
8720563 | Joseph et al. | May 2014 | B2 |
8756908 | Sheridan et al. | Jun 2014 | B2 |
8771603 | Harless et al. | Jul 2014 | B2 |
8783034 | Held | Jul 2014 | B2 |
8791054 | Deville | Jul 2014 | B2 |
8820075 | Kaminsky | Sep 2014 | B2 |
8839857 | Schultz et al. | Sep 2014 | B2 |
8857186 | Held | Oct 2014 | B2 |
8869531 | Held | Oct 2014 | B2 |
8881805 | Klemencic | Nov 2014 | B2 |
8959914 | Kasuya et al. | Feb 2015 | B2 |
8984883 | Riley | Mar 2015 | B2 |
9003798 | Yanagi | Apr 2015 | B2 |
9014791 | Held | Apr 2015 | B2 |
9062898 | Held | Jun 2015 | B2 |
9077220 | Kyle et al. | Jul 2015 | B2 |
9080789 | Hamstra et al. | Jul 2015 | B2 |
9091278 | Vermeersch | Jul 2015 | B2 |
9109398 | Harris et al. | Aug 2015 | B2 |
9118226 | Kacludis et al. | Aug 2015 | B2 |
9121259 | Bryant et al. | Sep 2015 | B2 |
9150774 | Reddy et al. | Oct 2015 | B2 |
9234522 | Jonsson et al. | Jan 2016 | B2 |
9243616 | Lee et al. | Jan 2016 | B2 |
9297367 | Ramaswamy et al. | Mar 2016 | B2 |
9316404 | Gurin | Apr 2016 | B2 |
9331547 | Bronicki | May 2016 | B2 |
9341084 | Xie et al. | May 2016 | B2 |
9376937 | Goswami et al. | Jun 2016 | B2 |
9394764 | Favilli et al. | Jul 2016 | B2 |
9394771 | Wiggs | Jul 2016 | B2 |
9403102 | Wu et al. | Aug 2016 | B2 |
9441504 | Held | Sep 2016 | B2 |
9458738 | Held | Oct 2016 | B2 |
9499732 | Reddy et al. | Nov 2016 | B2 |
9512348 | Reyes et al. | Dec 2016 | B2 |
9512741 | Myogan et al. | Dec 2016 | B2 |
9574551 | Parrella, Sr. et al. | Feb 2017 | B2 |
9587161 | Fisk, Jr. | Mar 2017 | B2 |
9587162 | Fisk, Jr. | Mar 2017 | B2 |
9638065 | Vermeersch et al. | May 2017 | B2 |
9649582 | Shnell | May 2017 | B2 |
9683463 | Juchymenko | Jun 2017 | B2 |
9726157 | Sweatman et al. | Aug 2017 | B2 |
9759096 | Vermeersch | Sep 2017 | B2 |
9762460 | Pawlowski et al. | Sep 2017 | B2 |
9777602 | Juchymenko | Oct 2017 | B2 |
9784140 | Huntington | Oct 2017 | B2 |
9816443 | Sheridan et al. | Nov 2017 | B2 |
9829194 | Aumann et al. | Nov 2017 | B2 |
9840662 | Pascarella et al. | Dec 2017 | B2 |
9845423 | Frantz et al. | Dec 2017 | B2 |
9863282 | Hart | Jan 2018 | B2 |
9874112 | Giegel | Jan 2018 | B2 |
9932861 | Preuss et al. | Apr 2018 | B2 |
9957432 | Galindo et al. | May 2018 | B2 |
10005950 | Smith et al. | Jun 2018 | B2 |
10024198 | Held et al. | Jul 2018 | B2 |
10059870 | Joseph et al. | Aug 2018 | B2 |
10060302 | Weng et al. | Aug 2018 | B2 |
10060652 | Tahara | Aug 2018 | B2 |
10077683 | Close | Sep 2018 | B2 |
10113389 | Pandey et al. | Oct 2018 | B2 |
10113535 | Conlon | Oct 2018 | B2 |
10138405 | Kulkarni et al. | Nov 2018 | B2 |
10138560 | Reyes et al. | Nov 2018 | B2 |
10221770 | Sheridan | Mar 2019 | B2 |
10227893 | McCune et al. | Mar 2019 | B2 |
10267184 | Bowan et al. | Apr 2019 | B2 |
10357726 | Qin et al. | Jul 2019 | B2 |
10458206 | Al-Dossary et al. | Oct 2019 | B2 |
10465104 | Ravi et al. | Nov 2019 | B2 |
10465491 | Moore | Nov 2019 | B2 |
10472994 | Avadhanula et al. | Nov 2019 | B2 |
10494897 | Pandey et al. | Dec 2019 | B2 |
10495098 | Preuss et al. | Dec 2019 | B2 |
10570777 | Bowan | Feb 2020 | B2 |
10584660 | Sheridan et al. | Mar 2020 | B2 |
10590324 | Kulkarni et al. | Mar 2020 | B2 |
10590802 | McCune et al. | Mar 2020 | B2 |
10598160 | Sumrall | Mar 2020 | B2 |
10619520 | Juchymenko | Apr 2020 | B2 |
10767904 | von Düring | Sep 2020 | B2 |
10794292 | Kupratis et al. | Oct 2020 | B2 |
10883388 | Held | Jan 2021 | B2 |
10934895 | Held et al. | Mar 2021 | B2 |
10947626 | Pinder et al. | Mar 2021 | B2 |
10947839 | Cuthbert et al. | Mar 2021 | B2 |
11187212 | Bodishbaugh et al. | Nov 2021 | B1 |
11255315 | Bodishbaugh et al. | Feb 2022 | B1 |
11274663 | Bodishbaugh et al. | Mar 2022 | B1 |
11293414 | Bodishbaugh et al. | Apr 2022 | B1 |
11326550 | Bodishbaugh et al. | May 2022 | B1 |
11359612 | Bodishbaugh et al. | Jun 2022 | B1 |
20030010652 | Hunt | Jan 2003 | A1 |
20030029169 | Hanna et al. | Feb 2003 | A1 |
20040237890 | Bour | Dec 2004 | A1 |
20050034467 | Varney | Feb 2005 | A1 |
20050247059 | Cogswell et al. | Nov 2005 | A1 |
20060130480 | Lovelace | Jun 2006 | A1 |
20070025854 | Moore et al. | Feb 2007 | A1 |
20080168772 | Radcliff et al. | Jul 2008 | A1 |
20080217523 | O'Sullivan | Sep 2008 | A1 |
20090211253 | Radcliff et al. | Aug 2009 | A1 |
20090217664 | Rapp et al. | Sep 2009 | A1 |
20100077792 | Gurin | Apr 2010 | A1 |
20100187319 | Isom et al. | Jul 2010 | A1 |
20100218930 | Proeschel | Sep 2010 | A1 |
20110000210 | Miles | Jan 2011 | A1 |
20110030404 | Gurin et al. | Feb 2011 | A1 |
20110041505 | Kasuya et al. | Feb 2011 | A1 |
20110083620 | Yoon | Apr 2011 | A1 |
20110100003 | McLeod et al. | May 2011 | A1 |
20110126539 | Ramaswamy et al. | Jun 2011 | A1 |
20110138809 | Ramaswamy et al. | Jun 2011 | A1 |
20110272166 | Hunt | Nov 2011 | A1 |
20110314818 | Breen et al. | Dec 2011 | A1 |
20120042650 | Ernst et al. | Feb 2012 | A1 |
20120111004 | Conry | May 2012 | A1 |
20120131918 | Held | May 2012 | A1 |
20120145397 | Schultz et al. | Jun 2012 | A1 |
20120174581 | Vaughan et al. | Jul 2012 | A1 |
20120198844 | Kaminsky | Aug 2012 | A1 |
20120261092 | Heath et al. | Oct 2012 | A1 |
20120292112 | Lakic | Nov 2012 | A1 |
20120292909 | Erikson | Nov 2012 | A1 |
20120315158 | Klaus | Dec 2012 | A1 |
20130041068 | Reddy et al. | Feb 2013 | A1 |
20130067910 | Ishiguro et al. | Mar 2013 | A1 |
20130168089 | Berg et al. | Jul 2013 | A1 |
20130168964 | Xu et al. | Jul 2013 | A1 |
20130217604 | Fisk, Jr. | Aug 2013 | A1 |
20130247569 | Suter | Sep 2013 | A1 |
20130298568 | Pierson et al. | Nov 2013 | A1 |
20130299123 | Matula | Nov 2013 | A1 |
20130299170 | Joseph et al. | Nov 2013 | A1 |
20140011908 | Reddy et al. | Jan 2014 | A1 |
20140033713 | Juchymenko | Feb 2014 | A1 |
20140057810 | Fisk, Jr. | Feb 2014 | A1 |
20140087978 | Deville | Mar 2014 | A1 |
20140102098 | Bowan et al. | Apr 2014 | A1 |
20140123643 | Ming | May 2014 | A1 |
20140130498 | Randolph | May 2014 | A1 |
20140178180 | Sheridan | Jun 2014 | A1 |
20140224469 | Mirmobin et al. | Aug 2014 | A1 |
20140296113 | Reyes et al. | Oct 2014 | A1 |
20150021924 | Parella | Jan 2015 | A1 |
20150047351 | Ishikawa et al. | Feb 2015 | A1 |
20150135708 | Lutz et al. | May 2015 | A1 |
20150252653 | Shelton, Jr. | Sep 2015 | A1 |
20150300327 | Sweatman et al. | Oct 2015 | A1 |
20150330261 | Held | Nov 2015 | A1 |
20150345482 | Klitzing et al. | Dec 2015 | A1 |
20150361831 | Myers | Dec 2015 | A1 |
20160010512 | Close | Jan 2016 | A1 |
20160017758 | Vermeersch et al. | Jan 2016 | A1 |
20160017759 | Gayawal et al. | Jan 2016 | A1 |
20160040557 | Vermeersch et al. | Feb 2016 | A1 |
20160047540 | Aumann et al. | Feb 2016 | A1 |
20160061055 | Bowan | Mar 2016 | A1 |
20160076405 | Hashimoto | Mar 2016 | A1 |
20160084115 | Ludewig et al. | Mar 2016 | A1 |
20160130985 | O'Connor et al. | May 2016 | A1 |
20160160111 | Smith et al. | Jun 2016 | A1 |
20160222275 | Galindo et al. | Aug 2016 | A1 |
20160257869 | Kulkarni et al. | Sep 2016 | A1 |
20160312646 | Juano | Oct 2016 | A1 |
20160340572 | Pascarella et al. | Nov 2016 | A1 |
20160369408 | Reyes et al. | Dec 2016 | A1 |
20170058181 | Frantz et al. | Mar 2017 | A1 |
20170058722 | Noureldin et al. | Mar 2017 | A1 |
20170130614 | Held | May 2017 | A1 |
20170145815 | Cuthbert et al. | May 2017 | A1 |
20170175582 | McCune et al. | Jun 2017 | A1 |
20170175583 | McCune et al. | Jun 2017 | A1 |
20170226402 | Patil et al. | Aug 2017 | A1 |
20170233635 | Pandey et al. | Aug 2017 | A1 |
20170240794 | Iverson et al. | Aug 2017 | A1 |
20170254223 | Goethals et al. | Sep 2017 | A1 |
20170362963 | Hostler et al. | Sep 2017 | A1 |
20170314420 | Bowan | Nov 2017 | A1 |
20170321104 | Ravi et al. | Nov 2017 | A1 |
20170321107 | Joseph et al. | Nov 2017 | A1 |
20180224164 | Lakic | Aug 2018 | A1 |
20180274524 | Moncarz et al. | Sep 2018 | A1 |
20180313340 | Spadacini et al. | Nov 2018 | A1 |
20180328138 | Pandey et al. | Nov 2018 | A1 |
20180340450 | Avadhanula | Nov 2018 | A1 |
20190048759 | Noureldin et al. | Feb 2019 | A1 |
20190055445 | Kulkarni et al. | Feb 2019 | A1 |
20190128147 | Liu et al. | May 2019 | A1 |
20190128567 | Redfern | May 2019 | A1 |
20200011426 | Juchymenko | Jan 2020 | A1 |
20200025032 | McCune et al. | Jan 2020 | A1 |
20200200123 | Aumann et al. | Jun 2020 | A1 |
20200232342 | McCune et al. | Jul 2020 | A1 |
20200248063 | Stone | Aug 2020 | A1 |
20200308992 | Juchymenko | Oct 2020 | A1 |
20200309101 | Muir et al. | Oct 2020 | A1 |
20200354839 | Pinder et al. | Nov 2020 | A1 |
20200386212 | Atisele | Dec 2020 | A1 |
20200399524 | Pisklak et al. | Dec 2020 | A1 |
20210062682 | Higgins et al. | Mar 2021 | A1 |
20210071063 | Stone | Mar 2021 | A1 |
20210172344 | Juchymenko | Jun 2021 | A1 |
Number | Date | Country |
---|---|---|
2012306439 | Mar 2017 | AU |
2676502 | Dec 2018 | CA |
20466161 | Sep 2015 | CN |
103174473 | Oct 2015 | CN |
102812212 | Apr 2016 | CN |
103174475 | Aug 2016 | CN |
106517718 | Mar 2017 | CN |
107246550 | Oct 2017 | CN |
207761721 | Aug 2018 | CN |
209457990 | Oct 2019 | CN |
111837006 | Oct 2020 | CN |
111911255 | Nov 2020 | CN |
113266815 | Aug 2021 | CN |
102012014443 | Jan 2014 | DE |
102013009351 | Jan 2014 | DE |
0652368 | May 1995 | EP |
2201666 | Mar 2013 | EP |
1573173 | Apr 2013 | EP |
1713877 | May 2013 | EP |
1869293 | May 2013 | EP |
2222939 | Nov 2013 | EP |
2167872 | Feb 2016 | EP |
3464836 | Apr 2020 | EP |
2738872 | Mar 1997 | FR |
2336943 | Jun 2003 | GB |
247090 | Dec 2003 | IN |
256000 | Jan 2005 | IN |
08192150 | Jul 1996 | JP |
2001183030 | Jul 2001 | JP |
2014016124 | Jan 2014 | JP |
101126833 | Mar 2012 | KR |
20120067710 | Jun 2012 | KR |
20130023578 | Mar 2013 | KR |
581457 | Nov 2011 | NZ |
2006142350 | Jun 2008 | RU |
191467 | Jul 2013 | SG |
191468 | Jul 2013 | SG |
192327 | Aug 2013 | SG |
1994028298 | Dec 1994 | WO |
2005049975 | Jun 2005 | WO |
2006060253 | Jun 2006 | WO |
2006138459 | Dec 2006 | WO |
2007048999 | May 2007 | WO |
20070079245 | Jul 2007 | WO |
2008052809 | May 2008 | WO |
2009017471 | Feb 2009 | WO |
2009017474 | Feb 2009 | WO |
2010021618 | Feb 2010 | WO |
2009017473 | Aug 2010 | WO |
2011012047 | Feb 2011 | WO |
2011073469 | Jun 2011 | WO |
2011093854 | Aug 2011 | WO |
2012060510 | May 2012 | WO |
2013059695 | Apr 2013 | WO |
2013103592 | Jul 2013 | WO |
2014065977 | May 2014 | WO |
2014164620 | Oct 2014 | WO |
2014165053 | Oct 2014 | WO |
2013103631 | May 2016 | WO |
2016147419 | Sep 2016 | WO |
2016204287 | Dec 2016 | WO |
2017123132 | Jul 2017 | WO |
2017203447 | Nov 2017 | WO |
2019060844 | Mar 2019 | WO |
2019155240 | Aug 2019 | WO |
2020152485 | Jul 2020 | WO |
2020239067 | Dec 2020 | WO |
2020239068 | Dec 2020 | WO |
2020239069 | Dec 2020 | WO |
Entry |
---|
“From Waste Heat To High Performance”, PBOG (Permian Basin Oil and Gas Magazine), Apr. 26, 2013. |
“Turning Waste Heat Into Clean Power; GNP's Expander System”, Great Northern Power Corporation, 2022. |
Ng et al., “Thermo-Economic Performance of an Organic Rankine Cycle System Recovering Waste Heat Onboard an Offshore Service Vessel”, Journal of Marine Science and Engineering, May 14, 2020. |
“First Flare Elimination Demonstration”, ElectraTherm, 2022. |
International Search Report and Written Opinion for PCT/US2022/071486, dated Jun. 14, 2022. |
Richter, Alexander, GreenFire Energy and Mltsui Oil Exploration Co. are partnering on a closed-loop geothermal pilot project in Japan, Think GeoEnergy, Apr. 6, 2021. |
Edwards, Alex, Dallas Innovates, Hunt Energy Network's New Venture Will Put 50 Batteries Across Texas, Giving ERCOT a Portfolio of Energy Generation, Apr. 1, 2021. |
Guo, Boyun, Petroleum Enginnering, A Computer-Assisted Approach, Dec. 21, 2006. |
Li, Tailu et al., Cascade utilization of low temperature geothermal water in oilfield combined power generation, gathering heat tracing and oil recovery, Applied Thermal Engineering 40 (2012). |
Sherven, Bob, Automation Maximizes performance for shale wells, Oil&Gas Journal, 2013. |
Hu, Kaiyong et al., A case study of an ORC geothermal power demonstration system under partial load conditions in Huabei Oilfield, China, ScientDirect, 2017. |
Liu, Xiaolei et al., A systematic study of harnessing low-temperature geothermal energy from oil and gas reservoirs, Elsevier, ScienceDirect, Energy, 2017. |
Wang, Kai, et al., A comprehensive review of geothermal energy extraction and utilization in oilfields, Elsevier, ScienceDirect, Journal of Petroleum Science and Engineering, 2017. |
Cutright, Bruce L., The Transformation of Tight Shale Gas Reservoirs to Geothermal Energy Production, Bureau of Economic Geology University of Texas, Austin Texas, Jun. 14, 2011. |
Khennich, Mohammed et al., Optimal Design of ORC Systems with a Low-Temperature Heat Source, Entropy 2012, 14, 370-389; doi:10.3390/e14020370. |
Dambly, Benjamin W., et al., The Organic Rankine Cycle for Geothermal Power Generation, Geothermal Energy, 2007. |
Obi, John Besong, State of art on ORC applications for waste heat recovery and micro-cogeneration for installations up to 100kWe, Elsevier, Energy Procedia 82 ( 2015 ) 994-1001. |
Obafunmi, Jaiyejeje Sunday, Thermodynamic Analysis of Organic Rankine Cycles, Eastern Mediterranean University Jul. 2014, Gazima{hacek over (g)}usa, North Cyprus. |
Dong, Bensi et al., Potential of low temperature organic Rankine cycle with zeotropic mixtures as working fluid, Elsevier, ScienceDirect, Energy Procedia 105 ( 2017 ) 1489-1494. |
Iqbal, MdArbab et al., Trilateral Flash Cycle (TFC): a promising thermodynamic cycle for low grade heat to power generation, Elsevier, ScienceDirect, Energy Procedia 160 (2019) 208-214. |
Bao, Junjiang et al., A review of working fluid and expander selections for organic Rankine cycle, Elsevier, ScienceDirect, Renewable and Sustainable Energy Reviews 24 (2013) 325-342. |
Ajimotokan, Habeeb A. et al., Trilateral Flash Cycle for Recovery of Power from a Finite Low-Grade Heat Source, Proceedings of the 24th European Symposium on Computer Aided Process Engineering—ESCAPE 24 Jun. 15-18, 2014, Budapest, Hungary. Copyright ©2014 Elsevier B.V. |
Hung Tzu-Chen, et al., The Development and Application of a Small-Scale Organic Rankine Cycle for Waste Heat Recovery, IntechOpen, 2019. |
Kong, Rithy et al., Thermodynamic performance analysis of a R245fa organic Rankine cycle (ORC) with different kinds of heat sources at evaporator, Elsevier, ScienceDirect, Case Studies in Thermal Engineering 13 (2019) 100385. |
Lukawski, Maciej Z. et al., Impact of molecular structure of working fluids on performance of organic Rankine cycles (ORCs), Sustainable Energy Fuels, 2017, 1, 1098. |
Saleh, Bahaa et al., Working fluids for low-temperature organic Rankine cycles, Elsevier, ScienceDirect, Energy 32 (2007) 1210-1221. |
Brasz, Lars J. et al., Ranking of Working Fluids for Organic Rankine Cycle Applications, Purdue University, Purdue e-Pubs, (2004). International Refrigeration and Air Conditioning Conference. Paper 722. |
Miller, Patrick C., Research uses landfill gas tech for Bakken flaring solution, The Bakken magazine, Sep. 16, 2015. |
ElectraTherm, Inc., Power+ Generator 4400B & 4400B+, Nov. 24, 2020. |
ElectraTherm, Inc., Heat To Power Generation Base Load Renewable Energy, Mar. 2020. |
ElectraTherm, Inc., Power+ Generator, Nov. 25, 2020. |
ElectraTherm, Inc., Generating Clean Power From Waste Heat, Nov. 2020. |
ElectraTherm, Inc., Power+ Generator, May 19, 2020. |
Sneary, Loy et al., Gulf Coast Green Energy, Flare Gas Reduction Trial Using an Organic Rankine Cycle Generator, Jan. 11, 2016. |
Enertime, ORC for Industrial Waste Heat Recovery, Aug. 2017. |
Enogia, Generate power from your waste heat thanks to our ORC, 2019. |
UTC Power, PureCycle, 200 Heat-to-Electricity Power System, 2004. |
Rank, MT3 machine, Dec. 17, 2018. |
Heat Recovery Solutions, Clean Cycle Containerized Solution, 2009. |
Triogen BV, Specification: E-Box Engine Application, Feb. 15, 2019. |
International Search Report and Written Opinion for PCT/US2022/071475, dated May 17, 2022. |
International Search Report and Written Opinion for PCT/US2022/071474, dated Jun. 10, 2022. |
International Search Report and Written Opinion for PCT/US2022/071472, dated May 9, 2022. |
International Search Report and Written Opinion for PCT/US2022/071323, dated Jun. 28, 2022. |
International Search Report and Written Opinion for PCT/US2022/071325, dated Jun. 28, 2022. |
Invitation to Pay Additional Fees and Communication Relating to Results of Partial International Search for PCT/US2022/071329, dated Jun. 27, 2022. |
Invitation to Pay Additional Fees and Communication Relating to Results of Partial International Search for PCT/US2022/071327, dated Jul. 4, 2022. |
International Search Report and Written Opinion for PCT/US2022/071313, dated Jul. 5, 2022. |
International Search Report and Written Opinion for PCT/US2022/071517, dated Jun. 27, 2022. |
Number | Date | Country | |
---|---|---|---|
63261601 | Sep 2021 | US | |
63200908 | Apr 2021 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 17578542 | Jan 2022 | US |
Child | 17717085 | US |