Systems and methods utilizing gas temperature as a power source

Information

  • Patent Grant
  • 11572849
  • Patent Number
    11,572,849
  • Date Filed
    Thursday, September 22, 2022
    2 years ago
  • Date Issued
    Tuesday, February 7, 2023
    a year ago
Abstract
Systems and generating power in an organic Rankine cycle (ORC) operation to supply electrical power. In embodiments, an inlet temperature of a flow of gas from a source to an ORC unit may be determined. The source may connect to a main pipeline. The main pipeline may connect to a supply pipeline. The supply pipeline may connect to the ORC unit thereby to allow gas to flow from the source to the ORC unit. Heat from the flow of gas may cause the ORC unit to generate electrical power. The outlet temperature of the flow of the gas from the ORC unit to a return pipe may be determined. A bypass valve, positioned on a bypass pipeline connecting the supply pipeline to the return pipeline, may be adjusted to a position sufficient to maintain temperature of the flow of gas above a threshold based on the inlet and outlet temperature.
Description
FIELD OF DISCLOSURE

Embodiments of this disclosure relate to generating electrical power from heat of a flow of gas, and more particularly, to systems and methods for generating electrical power in an organic Rankine cycle (ORC) operation in the vicinity of a pumping station during gas compression to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device.


BACKGROUND

Typically, an organic Rankine cycle (ORC) generator or unit includes a working fluid loop that flows to a heat source, such that the heat from the heat source causes the working fluid in the loop to change phases from a liquid to a vapor. The vaporous working fluid may then flow to a gas expander, causing the gas expander to rotate. The rotation of the gas expander may cause a generator to generate electrical power. The vaporous working fluid may then flow to a condenser or heat sink. The condenser or heat sink may cool the working fluid, causing the working fluid to change phase from the vapor to the liquid. The working fluid may circulate through the loop in such a continuous manner, thus the ORC generator or unit may generate electrical power.


SUMMARY

As noted organic Rankine cycle (ORC) generators or units may generate electrical power via an ORC operation based on heat transfer to a working fluid. While various types of sources of heat may be utilized, there is currently no system, method, or controller available to ensure that the source of the heat is maintained at a specified temperature after heat transfer via a heat exchanger, whether internal or external to the ORC unit. For example, when a flow of gas or process gas, such as a flow of compressed gas from a pumping station, is used as the source of heat for heat transfer to the working fluid or an intermediate working fluid, a specified or selected operating temperature range or a specified threshold temperature for the gas may be desired. For example, for some gasses, if the temperature drops below a particular threshold or operating range, volatiles may begin to condense in the flow of gas. Such condensed volatiles may cause issues such as damage to pipelines (e.g., via corrosion or otherwise), scaling, precipitates, potential leaks, potential equipment performance issues, and/or damage to equipment configured to operate with gases rather than liquids. While volatiles may condense in the flow of gas at a temperature below a threshold, pumps at a site may operate at a higher level or exhibit higher performance for a flow of gas that is at a reduced temperature higher than the temperature at which volatiles condense, but lower than a temperature defined by a compressor's (e.g., such as a pump) performance in relation to temperature of the flow of gas, the two temperatures, in some embodiments, defining the operating range.


Accordingly, Applicants have recognized a need for systems and methods to generate electrical power in the vicinity of a pumping station or other gas processing facility or site, while maintaining the temperature of a flow of gas, to thereby supply electrical power to one or more of operational equipment, a grid power structure, and an energy storage device. The present disclosure is directed to embodiments of such systems and methods.


As noted, the present disclosure is generally directed to systems and methods for generating electrical power in an organic Rankine cycle (ORC) operation in the vicinity of a pumping station or other facility or site where a gas is compressed and/or processed. As gas is compressed at the pumping station or other facility or site for further transport, processing, storage, or other purposes, the temperature of the gas may increase. Further, the equipment (e.g., an engine and pump) utilized for compression may generate heat (e.g., in the form of exhaust and/or a water jacket) during compression or operation. As such, one or more heat exchangers, included external or internal to an ORC unit, may be positioned at and/or near the equipment or pipelines associated with the flow of gas. The flow of gas may flow through one of the one or more heat exchangers. One or more temperature sensors associated with the input and output of the heat exchanger may measure the temperature of the gas. As the gas flows through the heat exchanger, the temperature of the gas entering and exiting the heat exchanger may be determined, e.g., via temperature sensors. Further, at pumping stations or other facilities or sites existing gas coolers (e.g., an air-cooler) may be included to cool the gas prior to transport, processing, storage, or other purposes.


However, as noted, if the temperature of the gas is lowered below an operating range, then volatiles may begin to condense and/or condensates may begin to form in the flow of gas. Further, if the gas is above the operating range, then a compressor may output lower than the maximum volume of gas. To ensure that the gas is not cooled below the operating range defined by a temperature at which volatiles condense and/or condensates form and/or above a temperature defined by higher compressor output, the systems and methods may include a bypass valve positioned on a bypass pipeline. The bypass pipeline may connect a supply pipeline to a return pipeline. The supply pipeline may connect to a main pipeline to divert the flow of gas to the heat exchanger. The return pipeline may connect the heat exchanger to the main pipeline downstream the supply pipeline/main pipeline connection point thereby allowing the flow of gas to flow from the heat exchanger back to the main pipeline. The heat exchanger may facilitate transfer of heat from the flow of gas to a working fluid or intermediate working fluid. In response to the temperature of the gas being above or below an operating range, the bypass valve may be adjusted thereby preventing diversion of or diverting a portion of the flow of gas and thus reducing or increasing, respectively, the temperature of the flow of gas exiting the heat exchanger and ensuring that volatiles do not condense in the flow of gas and that a compressor operates efficiently. Further, an amount or rate of working fluid flowing through the heat exchanger may be increased or decreased thereby to decrease or increase, respectively, the temperature of the flow of gas. The adjustment of the bypass valve and/or flow of working fluid through the heat exchanger may be based on the inlet temperature of the flow of gas into the heat exchanger, the outlet of the flow of gas from the heat exchanger, the temperature of the gas prior to entering the gas cooler, the temperature of the gas after exiting gas cooler, a predicted temperature of the gas exiting the gas cooler, the temperature of the working fluid or intermediate working fluid exiting the heat exchanger, the flow rate of the working fluid or intermediate working fluid exiting the heat exchanger, or electrical power output of an ORC unit, or some combination thereof, among other factors.


As noted, heat generated from the equipment on-site may be utilized to generate electricity. For example, an engine may produce exhaust. The exhaust may be at a high temperature. The exhaust may be supplied to another heat exchanger, external to the ORC unit or included in another ORC unit. the engine may include a water jacket. The heated water from the water jacket may be supplied to a third heat exchanger, external to the ORC unit or included in a third ORC unit.


Accordingly, an embodiment of the disclosure is directed to a method for generating power in an organic Rankine cycle (ORC) operation to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device. The method may include sensing, via an inlet temperature sensor, an inlet temperature of a flow of compressed gas from a source to a heat exchanger. The source may be connected to a main pipeline. The main pipeline may be connected to a supply pipeline. The supply pipeline may be connected to the heat exchanger thereby to allow compressed gas to flow from the source to the heat exchanger. The heat exchanger may be positioned to transfer heat from the flow of compressed gas to a flow of a working fluid thereby to cause an ORC unit to generate electrical power. The method may include sensing, via an outlet temperature sensor, an outlet temperature of the flow of the compressed gas from the heat exchanger to a return pipeline. The inlet temperature and the outlet temperature may be determined for a plurality of heat exchangers, each of the plurality of heat exchangers supplying heated working fluid to a supply manifold. The method may include adjusting a bypass valve to a position sufficient to maintain the temperature of the flow of compressed gas within a selected operating temperature range. The bypass valve may be positioned on a bypass pipeline. The bypass pipeline may be positioned to connect the supply pipeline to the return pipeline. The bypass pipeline may be positioned to allow or prevent, via the bypass valve, a portion of the flow of compressed gas therethrough, thereby to cause or prevent the flow of compressed gas to be diverted directly from the supply pipeline to the return pipeline to adjust temperature of the flow of compressed gas from the heat exchanger. In some examples, the supply manifold may supply aggregated heated working fluid to the ORC unit. The ORC unit may return cooled working fluid to a return manifold. The return manifold may transport an amount of cooled working fluid to each of the plurality of heat exchangers.


In an embodiment, the position of adjustment of the bypass valve may be based on one or more of (a) the selected operating temperature range, (b) a temperature drop of the flow of compressed gas, (c) the inlet temperature, or (d) the outlet temperature. The temperature drop of the flow of compressed gas may be the temperature drop of the flow of compressed gas after passage through exchanger gas cooler. The gas cooler may be an air-cooler. Further, the method may include sensing, via an ambient temperature sensor, the ambient temperature of an environment external to the main pipeline, the supply pipeline, the return pipeline, the heat exchanger, and the ORC unit. The method may also include determining the temperature drop of the flow of compressed gas after passage through the gas cooler based on the outlet temperature, the ambient temperature, and a predicted temperature drop differential. The temperature drop differential may be based on a type of the gas cooler and the ambient temperature.


In an embodiment, the heat exchanger may be included within the ORC unit. The heat exchanger may be an intermediate heat exchanger external from the ORC unit and the working fluid may be an intermediate working fluid. The source may include one or more compressors and wherein operation of the one or more compressors occurs via one or more engines. The method may include, during operation of the one or more compressors via one or more engines, transporting exhaust produced by one of the one or more engines to a second heat exchanger. The second heat exchanger may indirectly transfer heat from the exhaust to a flow of an intermediate working fluid, thereby to cause the ORC unit to generate electrical power. The method may include sensing, via an exhaust inlet sensor, an exhaust thermal mass of the exhaust produced by one of the one or more engines. The method may include, in response to the exhaust thermal mass being outside of an exhaust thermal mass range, adjusting an exhaust control valve to partially or fully prevent or allow flow of the exhaust from the one of the one or more engines to the second heat exchanger.


In another embodiment, the method may include, during operation of the one or more compressors via one or more engines, transporting a flow of heated coolant from a water jacket associated with one of the one or more engines to a second heat exchanger. The second heat exchanger may indirectly transfer heat from the heated coolant to a flow of an intermediate working fluid, thereby to cause the ORC unit to generate electrical power. The method may include, prior to transport of the heated coolant to the second heat exchanger: sensing, via a water jacket inlet temperature sensor, a heated coolant temperature of the flow of heated coolant from the water jacket; and, in response to the heated coolant temperature being outside of a water jacket temperature range, adjusting a water jacket control valve to prevent or allow flow of the heated coolant from the water jacket to the second heat exchanger.


In another embodiment, the operational equipment may include one or more of on-site (1) pumps, (2) heat exchanger, or (3) controllers. The compressed gas may include one or more of compressed (1) natural gas, (2) renewable natural gas, (3) landfill gas, and (4) organic waste gas.


Other embodiments of the disclosure are directed to a method for generating power in an organic Rankine cycle (ORC) operation in the vicinity of a pumping station during gas compression and transport thereby to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device. The operations of the method described may be performed during one or more stage gas compressions via one or more compressors located at a pumping station and for each of the one or more compressors associated with the pumping station. The method may include sensing, via an inlet temperature sensor, a first temperature of a flow of gas from a source to a first heat exchanger. The source may be connected to the first heat exchanger via a supply pipeline. The method may include, in response to a determination that the first temperature is at or above a threshold, maintaining a heat exchanger control valve position. The heat exchanger control valve may be positioned on the supply pipeline and control flow of gas to the first heat exchanger. The threshold may indicate that the gas is at a temperature to heat an intermediate working fluid. The first heat exchanger may indirectly transfer heat from the flow of gas to a flow of an intermediate working fluid thereby to cause an ORC unit to generate electrical power. The method may include sensing, via an outlet temperature sensor, a second temperature of a flow of the gas from the first heat exchanger to a return pipeline. The method may include, in response to a determination that the second temperature is within a selected operating temperature range, adjusting a bypass valve to a position sufficient to maintain temperature of the flow of gas within the selected operating temperature range, the bypass valve positioned on a bypass pipeline, the bypass pipeline connecting the supply pipeline to a return pipeline and being positioned prior to the heat exchanger control valve. The method may include, during operation of the one or more compressors via one or more engines and for each of the one or more engines, transporting exhaust produced by one of the one or more engines to a second heat exchanger, the second heat exchanger to indirectly transfer heat from the exhaust to a flow of an intermediate working fluid, thereby to cause the ORC unit to generate electrical power.


In an embodiment, the heat transferred from the exhaust to the intermediate working fluid of the second heat exchanger may be utilized in a hot fluid intake of the ORC unit. The heat transferred from the flow of gas to the intermediate working fluid of the first heat exchanger may be utilized in a warm fluid intake of the ORC unit.


Other embodiments of the disclosure are directed to a method for generating power in an organic Rankine cycle (ORC) operation to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device. The method may include determining an inlet temperature of a flow of compressed gas from a source to a heat exchanger. The source may be connected to a main pipeline. The main pipeline may be connected to a supply pipeline. The supply pipeline may be connected to the heat exchanger thereby to allow compressed gas to flow from the source to the heat exchanger. The heat exchanger may be positioned to transfer heat from the flow of compressed gas to a flow of a working fluid, thereby to cause an ORC unit to generate electrical power. The method may include determining an outlet temperature of the flow of the compressed gas from the heat exchanger to a return pipeline. The method may include, in response to a determination that the outlet temperature is within a selected operating temperature range, one or more of: adjusting a bypass valve to a position sufficient to maintain temperature of the flow of compressed gas within the selected operating temperature range, or adjusting the flow of working fluid to a percentage sufficient to maintain temperature of the flow of compressed gas within a selected operating temperature range. The flow of working fluid may be adjusted to the percentage via a control valve being adjusted to a particular opened/closed position. The bypass valve may be positioned on a bypass pipeline. The bypass pipeline may be positioned to connect the supply pipeline to the return pipeline. The bypass pipeline may be positioned to allow via the bypass valve a portion of the flow of compressed gas therethrough, thereby to cause the flow of compressed gas to be diverted directly from the supply pipeline to the return pipeline to increase temperature of the flow of compressed gas from the heat exchanger.


Other embodiments of the disclosure are directed to a method for generating power during gas compression to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device. The method may include sensing, via an inlet temperature sensor, an inlet temperature of a flow of compressed gas from a source to a heat exchanger. The source may be connected to a main pipeline. The main pipeline may be connected to a supply pipeline. The supply pipeline may be connected to the heat exchanger thereby to allow compressed gas to flow from the source to the heat exchanger. The heat exchanger positioned to transfer heat from the flow of compressed gas to a flow of a working fluid, thereby to generate electrical power. The method may include sensing, via an outlet temperature sensor, an outlet temperature of the flow of the compressed gas from the heat exchanger to a return pipeline. The method may include, in response to a determination that the outlet temperature is within a temperature range, adjusting a bypass valve to a position sufficient to maintain temperature of the flow of compressed gas within the temperature range. The bypass valve positioned on a bypass pipeline. The bypass pipeline positioned to connect the supply pipeline to the return pipeline. The bypass pipeline positioned to allow via the bypass valve a portion of the flow of compressed gas therethrough, thereby to cause the flow of compressed gas to be diverted directly from the supply pipeline to the return pipeline to increase temperature of the flow of compressed gas from the heat exchanger.


Still other aspects and advantages of these embodiments and other embodiments, are discussed in detail herein. Moreover, it is to be understood that both the foregoing information and the following detailed description provide merely illustrative examples of various aspects and embodiments, and are intended to provide an overview or framework for understanding the nature and character of the claimed aspects and embodiments. Accordingly, these and other objects, along with advantages and features of the present invention herein disclosed, will become apparent through reference to the following description and the accompanying drawings. Furthermore, it is to be understood that the features of the various embodiments described herein are not mutually exclusive and may exist in various combinations and permutations.





BRIEF DESCRIPTION OF DRAWINGS

These and other features, aspects, and advantages of the disclosure will become better understood with regard to the following descriptions, claims, and accompanying drawings. It is to be noted, however, that the drawings illustrate only several embodiments of the disclosure and, therefore, are not to be considered limiting of the scope of the disclosure.



FIG. 1A, FIG. 1B, and FIG. 1C are block diagrams illustrating novel implementations of electrical power generation enabled facilities to provide electrical power to one or more of equipment, energy storage devices, and the grid power structure, according to one or more embodiments of the disclosure.



FIG. 2 is a block diagram illustrating a novel implementation of another electrical power generation enabled facility to provide electrical power to one or more of equipment, energy storage devices, and the grid power structure, according to one or more embodiments of the disclosure.



FIG. 3A and FIG. 3B are other block diagrams illustrating novel implementations of electrical power generation enabled facilities to provide electrical power to one or more of equipment, energy storage devices, and the grid power structure, according to one or more embodiments of the disclosure.



FIG. 4A and FIG. 4B are other block diagrams illustrating novel implementations of electrical power generation enabled facilities to provide electrical power to one or more of equipment, energy storage devices, and the grid power structure, according to one or more embodiments of the disclosure.



FIG. 5 is a block diagram illustrating novel implementations of one or more sites to provide heated fluid to an ORC unit to generate electrical power, according to one or more embodiments of the disclosure.



FIG. 6A, FIG. 6B, FIG. 6C, FIG. 6D, FIG. 6E, and FIG. 6F are block diagrams illustrating novel implementations of an organic Rankin cycle (ORC) unit receiving warm and/or hot fluid from one or more heat exchangers via a supply manifold and a return manifold, according to one or more embodiments of the disclosure.



FIG. 7A and FIG. 7B are simplified diagrams illustrating a control system for managing electrical power production at a facility, according to one or more embodiments of the disclosure.



FIG. 8A, FIG. 8B, FIG. 8C, and FIG. 8D are flow diagrams of electrical power generation in which, during gas compression, working fluid heated via the flow of gas facilitates ORC operations, according to one or more embodiments of the disclosure.



FIG. 9A and FIG. 9B are flow diagrams of electrical power generation in which, during gas compression, working fluid is heated via engine exhaust and/or water jacket fluid flow, according to one or more embodiments of the disclosure.





DETAILED DESCRIPTION

So that the manner in which the features and advantages of the embodiments of the systems and methods disclosed herein, as well as others that will become apparent, may be understood in more detail, a more particular description of embodiments of systems and methods briefly summarized above may be had by reference to the following detailed description of embodiments thereof, in which one or more are further illustrated in the appended drawings, which form a part of this specification. It is to be noted, however, that the drawings illustrate only various embodiments of the systems and methods disclosed herein and are therefore not to be considered limiting of the scope of the systems and methods disclosed herein as it may include other effective embodiments as well.


The present disclosure is directed to systems and methods for generating electrical power (e.g., via an organic Rankine cycle (ORC) operation) based on heat from a flow of gas and other sources to thereby supply electrical power to one or more of equipment or operational equipment, a grid power structure, an energy storage device, and/or other devices. Transport or transfer of gas via pipeline typically includes compressing the gas one or more times prior to the transportation or transfer to ensure the gas is capable of flowing to the end destination. As the gas is compressed, the gas may become heated. Further, the equipment used to compress the gas may become heated or produce heat in various ways. In addition, prior to transport, the flow of gas is typically cooled. The flow of gas is cooled by a gas cooler (e.g., an on-site heat exchanger, such as an air-cooler). Such a gas cooler may operate at a set speed, while in other embodiments the gas cooler may operate at variable speeds, for example based on the temperature of the flow of gas entering the gas cooler and the desired temperature of the flow of gas exiting the air-cooler. The heat generated via the compression of the flow gas, as well as the heat produced by the equipment on-site may be utilized via either external and/or internal heat exchangers to produce electrical power (e.g., via one or more ORC units or other equipment configured to convert heat to electrical power).


In such examples, ORC generators or units typically use a pipeline in communication with heat sources to allow a working fluid to change phase from liquid to vapor. As the working fluid changes phase from a liquid to a vaporous state, the vaporous state working fluid may flow up the pipe or pipeline to a gas expander. The vaporous state working fluid may flow through and cause the gas expander to rotate. The rotation of the gas expander may cause a generator to generate electrical power, as will be described below. The vaporous state working fluid may flow through the gas expander to a heat sink, condenser, or other cooling apparatus. The heat sink, condenser, or other cooling apparatus may cool the working fluid thereby causing the working fluid to change phases from a vapor to a liquid.


In the present disclosure, a supply pipeline may be connected to a main pipeline to divert a flow of gas from the main pipeline. Downstream of the connection between the main pipeline and supply pipeline, a return pipeline may be connected to the main pipeline. The supply pipeline may connect to the inlet of a heat exchanger (e.g., the heat exchanger external or internal to an ORC unit) to allow the diverted gas to flow through the heat exchanger thereby facilitating transfer of heat from the flow of gas to a working fluid. The cooled gas may flow from the heat exchanger back to the main pipeline via the return pipeline. A supply control valve may be positioned on the supply pipeline and a return control valve may be positioned on the return pipeline, thereby to control flow to/from the heat exchanger. Temperature sensors and/or sensors or meters to measure other characteristics of the flow of gas may be disposed and/or positioned at various points at each of the pipelines. For example, a temperature sensor and/or the other sensors or meters may be disposed and/or positioned at or near the inlet and/or outlet of the heat exchanger and/or at varying other points along the main pipeline. Further, a bypass fluidic conduit, pipeline, section of pipeline, piping, or pipe may be positioned between and connect the supply pipeline to the return. A bypass valve may be positioned on the bypass fluidic conduit or pipeline thereby to divert a portion of the flow of gas from the heat exchanger. The portion of the flow of gas diverted from the heat exchanger may heat the remaining portion of the flow of gas from the heat exchanger. In addition to or rather than utilizing the bypass valve to maintain heat, the rate or amount of working fluid flowing through the heat exchanger may be adjusted (e.g., via a flow control device) to maintain or adjust a temperature of the flow of gas. The position or degree at which the bypass valve is opened/closed and/or the rate or amount of the flow of working fluid through the working fluid may be determined based on temperature measurements of the flow of gas, in addition to a threshold or operating range of the flow of gas and/or temperature and/or flow rate or amount of the flow of working fluid in the heat exchanger, among other factors. The threshold may be based on the temperature at which volatiles condense in a flow of gas (e.g., including, but not limited to, a dew point of the flow of gas). The operating range may be based, at least in part, on the same temperature of another selected temperature desired for the flow of gas. Thus, heat from the flow of gas may be utilized to generate electrical power in an ORC unit, while maintaining the temperature of the flow of gas above such a threshold or within such an operating range.


Additionally, and as noted, other equipment may produce heat in various ways. For example, one or more engines corresponding to and used to operate the compressors may produce exhaust. The exhaust produced may be output from one or more of the one or more engines at a high temperature. The exhaust produced by one or more of the one or more engines may be transported or transferred to a heat exchanger to transfer heat to a working fluid to produce electrical power in the ORC unit. In another embodiment, a water jacket may surround one of the one or more engines to cool that engine during operation. Heat emanating from or produced by the engine may be transferred to the fluid contained within the water jacket. The fluid within the water jacket may be transported or transferred to a heat exchanger to transfer heat to a working fluid to produce electrical power in the ORC unit.


Such systems may include various components, devices, or apparatuses, such as temperature sensors, pressure sensors or transducers, flow meters, control valves, smart valves, valves actuated via control signal, controllers, a master or supervisory controller, other computing devices, computing systems, user interfaces, in-field equipment, and/or other equipment. The controller may monitor and adjust various aspects of the system to ensure that a flow of gas does not drop below the threshold where volatiles may condense in the flow of gas, that the temperature of the flow of gas stays below the threshold where a compressor or pump provides a higher output, that the flow of gas remains within a selected operating range, that the working fluid remains within a selected operating range, and/or that electrical power is generated efficiently and economically.



FIG. 1A, FIG. 1B, and FIG. 1C are block diagrams illustrating novel implementations of electrical power generation enabled facilities to provide electrical power to one or more of equipment, energy storage devices, and the grid power structure, according to one or more embodiments of the disclosure. As illustrated in FIG. 1A, a site 100, such as a pumping station, well, a landfill gas recovery facility, an agricultural gas recovery facility, a renewable natural gas facility, or other facility where gas is compressed prior to further transport or processing, may include an input pipeline for gas 102. The gas 102 may flow into a storage tank 104 or staging area. The gas 102 may flow directly to a compressor 106 or may flow from the storage tank 104 to the compressor 106. The compressor 106 may be driven or operated by an engine 108 or one or more engines. The compressor 106 may compress the flow of gas. A main pipeline 111 may be connected to or in fluid communication with the output of the compressor 106. In an embodiment, the main pipeline 111 may be an existing pipeline at the site 100. As an ORC kit or equipment is installed at the site, various other pipelines, sensors, valves, and/or other equipment may be added. For example, a supply pipeline 113 may be connected to the main pipeline 111 thereby creating fluid communication between the main pipeline 111 and the supply pipeline 113. A return pipeline 115 may be connected to the main pipeline 111 thereby creating fluid communication between the return pipeline 115 and the main pipeline 111. A main control valve 124 may be positioned on the main pipeline 111. The main control valve 124 may be positioned between the connection point between a supply pipeline 113 and the main pipeline 111 and a return pipeline 115 and the main pipeline 111. Further, a first main pipeline sensor 110 may be positioned prior to or before the main control valve 124 to measure the temperature of the flow of gas from the compressor 106. If the temperature of the flow of gas is at a temperature sufficient to cause the ORC unit 174 to generate electrical power, then the main control valve 124 may be fully or partially closed. Depending on the source of the gas and ambient temperature, among other factors, the temperature of the flow of gas after compression may be sufficient for use in, at least, a low temperature ORC operation to produce an amount of electrical power 199. The electrical power 199 may be transferred to the equipment at the site 100, to an energy storage device (e.g., if excess power is available), to equipment at other nearby sites, to the grid or grid power structure (e.g., via a transformer through power lines), to other types of equipment (e.g., cryptographic currency and/or blockchain miners, hydrolyzers, carbon capture machines, nearby structures such as residential or business structures or buildings, and/or other power destinations) or some combination thereof. In an embodiment, a low temperature or warm fluid ORC operation may include heat transfer (e.g., from the flow of gas or from an intermediate working fluid) to a working fluid of the ORC unit 174. The working fluid of the ORC unit 174 may be of a type that has a low vaporous phase change threshold. In other words, the working fluid may change from a liquid to a vapor at lower than typical temperatures.


If the main control valve 124 is closed or partially closed, the flow of gas or portion of the flow of gas may be diverted through the supply pipeline 113. The supply pipeline 113 may be connected to an inlet of a heat exchanger 117 (see FIGS. 1A and 1B) or directly connected to a warm fluid inlet or input of an ORC unit 174 (see FIG. 1C). Further, the heat exchanger 117 or ORC unit 174 may be connected to the supply pipeline 113 via a supply control valve 112. The heat exchanger 117 or a heat exchanger internal to the ORC unit 174 may include two or more fluidic paths. The flow of gas may travel through one of the fluidic paths in a first direction. A working fluid or intermediate working fluid may travel through a second fluidic path in an opposite direction. Such a configuration may facilitate transfer of heat from the flow of gas to the working fluid or intermediate working fluid. An intermediate working fluid may flow directly into an ORC unit 174 or into a storage tank 166. As noted, rather than an intermediate working fluid flowing into a heat exchanger (e.g., heat exchanger 117) external to the ORC unit 174, the flow of gas may flow directly into the ORC unit 174 (e.g., into a heat exchanger internal to the ORC unit 174). In such examples, the flow of gas, after compression, may be at a temperature of about 30° C. to about 150° C. The transfer of heat from the flow of gas to the working fluid may cause the working fluid to heat to temperatures of about 60° C. to about 150° C. In an embodiment, if the temperature of the flow of gas is below a threshold defined by a temperature sufficient to generate electrical power via the ORC unit, then one or more of the supply control valve 112, return control valve 142, and/or the main control valve 124 may close. In another embodiment, the amount of working fluid flowing through the heat exchanger 117 may be adjusted (e.g., via a flow control device). If the temperature of the flow of gas is lower than sufficient to cause generation of electrical power, the flow of working fluid may be increased for a selected amount of time. After the selected amount of time has passed, the temperature of the working fluid may be determined so that further adjustments may be made to ensure generation of electrical power.


In an embodiment, a storage tank 166 may be positioned between the heat exchanger 117 and the ORC unit 174 store heated intermediate working fluid. If the intermediate working fluid is at a temperature above a high temperature threshold or below a low temperature threshold or within a working fluid operating range, then the intermediate working fluid may be stored in the storage tank 166, until the correct temperature is reached. Otherwise, an intermediate working fluid valve 168 may be opened, allowing the intermediate working fluid to flow into the ORC unit 174. In another embodiment, the intermediate working fluid valve's position may be determined based on the temperature and/or pressure of the intermediate working fluid, e.g., as measured by a heat exchanger outlet temperature sensor 164, a storage tank outlet temperature and/or pressure sensor 170, an ORC unit inlet temperature sensor 172, a heat exchanger inlet temperature sensor 178, a temperature measured in the ORC unit 174, and/or other pressure sensors positioned throughout. Additional temperature sensors, pressure sensors or transducers, or other suitable sensor or measurement devices may be disposed or positioned throughout the site 100. In an embodiment, the storage tank 166 may be an expansion tank, such as a bladder or diaphragm expansion tank. The expansion tank may accept a varying volume of the intermediate working fluid as the pressure within the working fluid pipeline varies, as will be understood by a person skilled in the art. Thus, the expansion tank may manage any pressure changes exhibited by the intermediate working fluid.


As noted, the flow of gas may be maintained at a temperature above a threshold to ensure that volatiles do not condense in the flow of gas, below a threshold to ensure that a downstream compressor or pump (e.g., compressor 138) outputs a higher rate of flow of the gas, or within a selected operating range to ensure a maximum amount of electrical power is generated (e.g., a temperature of the gas such that the working fluid is heated to about 60 degree Celsius to about 170 degrees Celsius or higher, while maintaining the lowest potential temperature of the gas). Such volatiles may include ethanes, propanes, butanes, heavier straight-chain alkanes having 7 to 12 carbon atoms, thiols or mercaptans, carbon dioxide, cyclohexane, other naphthenes, benzene, toluene, xylenes, ethylbenzene, and/or other high alkanes. In addition, the water may condense in the flow of gas at or below such a threshold. Such volatiles and condensates may lead to scaling, precipitates, corrosion, inefficient performance of operational equipment, and/or malfunction or other issues with operational equipment (e.g., pumps, valves, etc.). To maintain the temperature above and/or below a threshold or within a selected operating range, the site 100 may include a bypass fluidic conduit 119 or pipeline/section of pipeline connecting the supply pipeline 113 to the return pipeline 115. A bypass control valve 116 may be positioned on the bypass fluidic conduit 119 or pipeline/section of pipeline. The temperature of the flow of gas in the supply pipeline 113 (e.g., provided or sensed via temperature sensor 114) and the flow of gas in the return pipeline 115 (e.g., provided or sensed via temperature sensor 118 and/or temperature sensor 120) may be determined. Such measurements may indicate that the temperature of the flow of the gas is too low or below the threshold defined by the temperature at which volatiles begin to condense in the flow of gas, that the flow of gas is too high or above the threshold defined by the temperature at which the compressor or pump (e.g., compressor 138) does not output a higher rate of flow of gas, and/or that the temperature of the flow gas is not within a selected operating range. Based on such determinations, indications, and/or other factors, the bypass control valve 116, by opening to a specified position or degree, may divert a portion of the flow of gas from the heat exchanger 117. In other words, a portion of the flow of gas may flow directly from the supply pipeline 113 to the return pipeline 115 thereby increasing or decreasing the temperature of the flow of gas, such a temperature indicated or measured by temperature sensor 120. One or more adjustments of the bypass control valve 116 may occur until the temperature of the flow of gas is above the threshold or within the selected operating range. Other factors for determining the position of the bypass control valve 116 may include the temperature of flow of gas in the supply pipeline 113, the temperature of the flow of gas in the return pipeline 115, the temperature of the flow of gas after exiting a compressor 106 (e.g., as measured by temperature sensor 110), the temperature of the flow of gas prior to entry into a gas cooler 128 (e.g., as measured by temperature sensor 126), the temperature of the flow of gas after passing through the gas cooler 128 (e.g., as measured by temperature sensor 132), a predicted temperature drop of the flow of gas after passage through the gas cooler 128 (e.g., through a first fluidic channel 130), the temperature of the flow of gas further downstream (e.g., for example, at temperature sensor 136, prior to passage into the compressor 138), and/or the amount of electrical power output 199 or generated by the ORC unit 174. Based on these measurements, the bypass control valve 116 may open/close to a specified degree. Other valves may open/close to adjust the flow of the gas to increase/decrease various temperatures for different purposes (e.g., increasing a temperature of a working fluid, increasing/decreasing a temperature of the flow of gas, etc.).


In an embodiment, rather than or in addition to controlling or maintaining temperature of the flow of gas via a bypass control valve, the temperature of the flow of gas may be controlled via the rate or amount of flow of working fluid flowing through the heat exchanger 117. The flow of working fluid through the heat exchanger 117 may be controlled via one or more flow control devices, such as pumps and/or control valves. As the rate or amount of flow of working fluid is increased or decreased, the amount of heat transferred from the flow of gas may increase or decrease, respectively. Thus, the temperature of the flow of gas may be decreased or increased in relation to the flow of working fluid.


In an embodiment, compression of the flow of gas may be performed one or more times. For each compression stage similar components may be included and may perform the same or similar operations for each different stage of compression. Further, the temperature at which a downstream compressor outputs higher rates of a flow of gas may be considered a threshold below or limit in the selected operating range which the temperature of the flow of gas is maintained in previous stages. For example, a flow of gas compressed via compressor 106 may be transported to storage tank 134 or directly to compressor 138 (e.g., a second compressor). The compressor 138 may be operated or driven by the same engine 108 or by a different engine. The compressor 138 may connect to a main pipeline 157. A supply pipeline 141 may connect to the main pipeline 157. Downstream of the supply line 141 and main pipeline 157 connection, the return pipeline 155 may connect to the main pipeline 157. A main control valve 154 may be positioned between the supply pipeline 141-main pipeline 157 connection and the return pipeline 155-main pipeline 157 connection. The main control valve 154 may be open when the ORC unit 174 is not operating and/or when the flow of compressed gas is not at a temperature (e.g., as measured via temperature sensor 140) sufficient to generate electrical power via the ORC unit. If the temperature of the flow of gas is sufficient to generate electrical power, the main control valve 154 may be closed and the flow of gas diverted to the supply pipeline 141.


The supply pipeline 141 and the return pipeline 155 may connect to the heat exchanger 117, to a separate heat exchanger, or directly to an ORC unit 174. A supply control valve 122 may be positioned on the supply pipeline 141 to control the flow of gas to the heat exchanger 117. A return control valve 152 may be positioned on the return pipeline 155 to control the flow of gas from the heat exchanger 117. The open/closed position of the supply control valve 122 and the return control valve 152 may be determined based on various characteristics of the flow of gas, such as the temperature of the flow of gas from the compressor 138 (e.g., as measured or sensed by the temperature sensor 140), the temperature of the flow of gas entering the heat exchanger 117 (e.g., as measured or sensed by the temperature sensor 144), the temperature of the flow of gas exiting the heat exchanger 117 (e.g., as measured or sensed by the temperature sensor 148 and/or temperature sensor 150), the temperature of the flow of gas before entering and/or exiting the on-site heat exchanger (e.g., as measured or sensed by the temperature sensor 156 and/or temperature sensor 162), and/or other characteristics measured or determined by other sensors disposed throughout the site 100. In an embodiment, the flow of gas may be comprised of one or more of natural gas, renewable natural gas, landfill gas, and organic waste gas.


Similar to the configuration described above, a bypass fluidic conduit 145 or pipeline may connect the supply pipeline 141 to the return pipeline 155. The flow of gas from the supply pipeline 141 to the return pipeline 155 may be controlled by a bypass control valve 146 positioned on the bypass fluidic conduit 145 or pipeline. The open/closed position of the bypass control valve 152 and/or the rate or amount of the flow of working fluid through the heat exchanger may be determined based on various characteristics of the flow of gas, such as the temperature of the flow of gas from the compressor 138 (e.g., as measured or sensed by the temperature sensor 140), the temperature of the flow of gas entering the heat exchanger 117 (e.g., as measured or sensed by the temperature sensor 144), the temperature of the flow of gas exiting the heat exchanger 117, (e.g., as measured or sensed by the temperature sensor 148 and/or temperature sensor 150), the ambient temperature of the site 100 (e.g., as measured or sensed by a temperature sensor 149 configured to measure ambient temperature) and/or other characteristics (flow, composition, density, pressure, etc.) measured, sensed, or determined by other sensors disposed throughout the site 100. FIGS. 1A through 1C illustrate a two-stage compression operation. In such operations, as the flow of gas passes through the fluidic channel 158 of the gas cooler 128, the compressed and cooled gas 165 may be output for transport to another pumping station, to further processing equipment, or for other uses/processing.


In an embodiment, the sensors and/or meters disposed throughout the site 100 may be temperature sensors, densitometers, density measuring sensors, pressure transducers, pressure sensors, flow meters, turbine flow meters, mass flow meters, Coriolis meters, spectrometers, other measurement sensors to determine a temperature, pressure, flow, composition, density, or other variables as will be understood by those skilled in the art, or some combination thereof. Further, the sensors and/or meters may be in fluid communication with a fluid to measure the temperature, pressure, or flow or may indirectly measure flow (e.g., an ultrasonic sensor). In other words, the sensors or meters may be a clamp-on device to measure flow indirectly (such as via ultrasound passed through the pipeline to the fluid).


As noted, the engine 108 or one or more engines may produce exhaust exhibiting high heat or temperature. The exhaust may be transported via an exhaust duct 185 or pipeline to a heat exchanger 186 or ORC unit 174. After the exhaust flows through the heat exchanger 186 or the ORC unit 174, the exhaust may be output to the atmosphere. In another embodiment, prior to output to the atmosphere, the exhaust may be filtered or passed through a catalyst to remove specific chemicals deemed harmful to the environment. In another embodiment, prior to input into the heat exchanger 186, the exhaust may be filtered or pass through a catalyst to prevent buildup within the heat exchanger 186. In an embodiment, the exhaust duct 185 or pipeline may include an exhaust valve 181. In an embodiment, the exhaust from the engine 108 may be at a high temperature or have a high thermal mass (e.g., temperature of the exhaust multiplied by the flow rate of the exhaust). If the temperature or thermal mass of the exhaust (e.g., as measured by temperature sensor 180) is outside of a range (e.g., defined by the operating temperature range of the heat exchanger 186, ORC unit 174, or other equipment or devices interacting with the exhaust and/or based on thermal mass) or above or below a threshold, the exhaust control valve 181 may close thereby partially or fully preventing the exhaust from flowing to the heat exchanger 186. If the exhaust control valve 181 is fully closed, the exhaust may be fully diverted to a typical exhaust output. If the exhaust control valve 181 is partially closed, the exhaust may be partially diverted to a typical exhaust output, while the remaining portion may flow to the heat exchanger 181. The partial or full prevention of the flow of exhaust to the heat exchanger 186 may prevent interruption of catalyst performance of the engine 108 and/or deposition of particulates in equipment.


In another embodiment, the flow of exhaust, prior to flowing through the heat exchanger 186, may pass through a filter 187, converter, or some other device to reduce particulates within the exhaust. As noted, the exhaust may cause scaling and/or deposition of such particulates. The filter 187 or other device may ensure that the heat exchanger 186 may not exhibit such scaling and/or deposition of particulates or may not exhibit the scaling and/or deposition at rates higher than if there were no filter 187 or other device.


The engine 108 or one or more engines may include a water jacket. As an engine 108 operates, the water or other coolant inside the water jacket may indirectly remove heat from the engine 108. Heat from the engine 108 may be transferred to the water or other coolant, thereby producing heated water or other coolant. The heated water or other coolant may pass through a radiator or other type of heat exchanger to reduce the temperature of heated water or coolant, the cooled water or coolant then flowing back to the water jacket to cool the engine 108. In an embodiment, the output of the water jacket may connect to a pipeline to divert the flow of water to the heat exchanger 189. A water jacket control valve 183 may be positioned on the pipeline to control the flow water or coolant from the water jacket. A pipeline may be connected to the input of the water jacket to return the water or other coolant to the water jacket. In such embodiments, rather than or in addition to the water or other coolant passing through the typical radiator or heat exchanger, the heated water or other coolant may pass through heat exchanger 189. In another embodiment, the engine's 108 water jacket may be configured to transport the water or other coolant directly to an ORC unit 174. In another embodiment, the water jacket control valve 183 may close if the water or other coolant is outside a selected operating range (e.g., if the water or other coolant is too cool, then, if utilized, water or other coolant may not be sufficient for the ORC unit 174 to generate electrical power, and/or if the water or coolant is too hot, then, if utilized, the heated water or other coolant may damage equipment not rated for a high temperature) thus preventing fluid from flowing to the heat exchanger 189 and/or the ORC unit 174. Temperature of the water or coolant may be determined or sensed via one or more temperature sensors (e.g., temperature sensors 182, 184). The temperature of the working fluid or intermediate working fluid may be determined or sensed via one or more temperature sensors (e.g., temperature sensors 193, 195).


In an embodiment, the heat may be transferred from the engine's 108 exhaust to an intermediate working fluid or a working fluid. The intermediate working fluid may be stored in another storage tank 192 or expansion tank. The temperature of the intermediate working fluid flowing from the heat exchanger 186 may be determined based on measurements from temperature sensors 190, 191. The temperature of the intermediate working fluid may be measured at various other points, such as after the storage tank or the storage tank control valve 194 (e.g., temperature sensor 196 and/or temperature sensor 198), or prior to entry into the heat exchanger 186. Based on these measurements, the storage tank control valve 194 may open or close to prevent or allow the storage tank 192 to fill up and/or to prevent over-filling the storage tank 192. In an embodiment, the storage tank 192 may be an expansion tank, such as a bladder or diaphragm expansion tank. The expansion tank may accept a varying volume of the intermediate working fluid as the pressure within the working fluid pipeline varies, as will be understood by a person skilled in the art. Thus, the expansion tank may manage any pressure changes exhibited by the intermediate working fluid.


In an embodiment, various temperature sensors and/or other sensors or meters may be disposed and/or positioned throughout the site 100, 101, 103. In another embodiment, the heat exchangers and/or ORC units may be added to the site as a kit. In such examples, and as illustrated in FIG. 1B, temperature sensors and/or other sensors or meters may be included in the added kit (e.g., along added or installed conduits or pipelines) installed at a site 101, rather than in existing equipment. As such, temperature drops of gas passing through gas coolers 128 may be predicted, rather than measured. Such predictions may be based on the temperature of the flow of gas from the heat exchanger 117, the temperature of the flow of gas entering the heat exchanger 117, the type of gas coolers 128, the type or types of gas in the flow of gas, the ambient temperature (e.g., as measured by temperature sensor 149, and/or temperatures of the flow of gas after further compression as measured by other temperature sensors. In an embodiment, the gas cooler 128 may be an air-cooler. The air-cooler may include one or more fans 160 to cool fluid flowing therethrough.


In an embodiment, different types of heat exchangers may be utilized at the site 100, 101. As noted, the heat exchanger may be internal to the ORC unit 174 and/or external to the ORC unit 174. In an embodiment, the heat exchanger 117, 186 may be a shell and tube heat exchanger, a spiral plate or coil heat exchanger, a heliflow heat exchanger, or another heat exchanger configured to withstand high temperatures. To prevent damage or corrosion to the heat exchanger 117, 186 over a period of time, the fluid path for the flow of gas may be configured to withstand damage or corrosion by including a permanent, semi-permanent, or temporary anti-corrosive coating, an injection point for anti-corrosive chemical additive injections, and/or some combination thereof. Further, at least one fluid path of the heat exchanger 117, 186 may be comprised of an anti-corrosive material, e.g., anti-corrosive metals or polymers.


In an example, the working fluid may be a fluid with a low boiling point and/or high condensation point. In other words, a working fluid may boil at lower temperatures (for example, in relation to water), while condensing at higher temperatures (e.g., in relation to water) as will be understood by a person skilled in the art. The working fluid may be an organic working fluid. The working fluid may be one or more of pentafluoropropane, carbon dioxide, ammonia and water mixtures, tetrafluoroethane, isobutene, propane, pentane, perfluorocarbons, other hydrocarbons, a zeotropic mixture of pentafluoropentane and cyclopentane, other zeotropic mixtures, and/or other fluids or fluid mixtures. The working fluid's boiling point and condensation point may be different depending on the pressure within the working fluid pipelines e.g., the higher the pressure, the higher the boiling point. In another example, an intermediate working fluid may be a fluid with a higher boiling point. For example, the intermediate working fluid may be a water or water glycol mixture. In such examples, as heat is transferred from the flow of gas, the exhaust, the fluid from the water jacket, and/or from another source, the intermediate working fluid may, rather than exhibiting a vaporous phase change, remain in a liquid phase, while retaining the transferred heat. As a liquid, the higher boiling point intermediate working fluid may be more manageable and/or easier to transport through the pipelines.


In an embodiment, the ORC unit 174 may include a generator, a gas expander, a condenser, an internal heat exchanger, and a loop for the flow of working fluid. As an intermediate working fluid or other fluid flows into the ORC unit 174, the internal heat exchanger may facilitate transfer of heat in the intermediate working fluid or other fluid to a working fluid of the ORC unit 174. The heat may cause the working fluid of the ORC unit 174 to exhibit a phase change from a liquid to a vapor. The vaporous working fluid may flow into the gas expander. In an example, the gas expander may be a turbine expander, positive displacement expander, scroll expander, screw expander, twin-screw expander, vane expander, piston expander, other volumetric expander, and/or any other expander suitable for an ORC operation or cycle. As gas flows through the gas expander, a rotor or other component connected to the gas expander may begin to turn, spin, or rotate. The rotor may include an end with windings. The end with windings may correspond to a stator including windings and a magnetic field (e.g., the end with windings and stator with windings being a generator). As the rotor spins within the stator, electricity may be generated. Other generators may be utilized, as will be understood by those skilled in the art. The generator may produce DC power, AC power, single phase power, or three phase power. The vaporous working fluid may then flow from the gas expander to a condenser, where the vaporous working fluid may exhibit a phase change back to the liquid working fluid. The liquid working fluid may then flow back to the internal heat exchanger, the process repeating.


The site 100, as shown utilizes an ORC unit 174 to generate electrical power. In another embodiment, rather than or in addition to the ORC unit 174, other geothermal-based generators may be utilized to generate electrical power using the heat transferred to the working fluid from the flow of gas, engine exhaust, and/or fluid from a water jacket. For example, the geothermal-based generator may be another type of binary-cycle generator.



FIG. 2 is a block diagram illustrating a novel implementation of another electrical power generation enabled facility to provide electrical power to one or more of equipment, operational equipment, energy storage devices, and the grid power structure, according to one or more embodiment of the disclosure. In an embodiment, at site 200, the intermediate working fluid may be pumped back from the ORC unit 174 to each heat exchanger 117, 186, 189. In such examples, the working fluid return pipeline 206 may include a pump 202 or variable speed pump. The working fluid return pipeline 208 may include a pump 204 or variable speed pump. In another embodiment, rather than or in addition to a pump 202, 204, control valves may be disposed along the working fluid return pipeline 206 to control or further control the working fluid or intermediate working fluid flow. In another embodiment, and as will be described in further detail below, a supply manifold and a return manifold may be positioned between each heat exchanger 117, 186 and the ORC unit 174. In such examples, the intermediate working fluid flowing from each of the heat exchangers 117, 186 may be consolidated via the supply manifold, creating a single flow to the ORC unit 174. The intermediate working fluid may flow from the ORC unit 174 to the return manifold. From the return manifold, the intermediate working fluid may be controlled via flow control device to ensure that an amount of working fluid sufficient to maximize electrical output of the ORC unit and/or sufficient to maintain the temperature of the flow of gas flows to each heat exchanger 117, 186.


In an embodiment, the operational equipment may include equipment at the site. Operational equipment at the site may include pumps, fans (e.g., for gas cooler 128), one or more controllers, and/or other equipment at the site to either ensure proper operation or otherwise. Other equipment may include equipment to further process the flow of gas. In another embodiment, the electrical power generated may be used to power cryptographic currency and/or blockchain miners, hydrolyzers, carbon capture machines, nearby structures (e.g., residential or business structures or buildings), and/or other power destinations.



FIG. 3A and FIG. 3B are other block diagrams illustrating novel implementations of electrical power generation enabled facilities to provide electrical power to one or more of equipment, operational equipment, energy storage devices, and the grid power structure, according to one or more embodiment of the disclosure. As illustrated in FIG. 3A and FIG. 3B, the site 300, 301 may include a controller 302 to control operations of the control valves and other aspects of components or equipment at the site 300, 301 as described herein. In such examples, the controller 302 may include various inputs/outputs in signal communication with different components. For example, a set of inputs of the controller 302 may be in signal communication with the various temperature sensors disposed or positioned throughout the site 300, 301. The site 300, 301 may further include various other sensors in signal communication with the controller, such as flow meters, pressure sensors, pressure transducers, density meters, and/or other characteristics to measure various properties of the site 300, 301.


The controller 302 may include a set of inputs/outputs in signal communication with each of the control valves included in the site. The controller 302 may determine the current position of each valve (e.g., a degree at which control valve is open). Further, the controller 302 may adjust the position of each valve to a desired position, depending on different measured or determined characteristics of the site 300, 301, thus controlling the flow of gas or other fluids to different areas or equipment at the site 300, 301.


As noted, the equipment associated with the ORC unit 174 and/or each of the heat exchangers 117, 186 may be installed at a site 300, 301 as a kit. In an example, the controller 302 may connect to the equipment added at the site 301, rather than any temperature sensors or control valves already existing or installed at the site prior to installation of the kit.


As described, various valves and/or flow rates may be determined based on a threshold defined by a temperature at which volatiles may condense in the flow of gas, a threshold defined by a temperature where a compressor or pump provides a higher output of gas, and/or a selected operating temperature range or window defined by one or more temperatures (e.g., temperatures at which volatiles condense in the flow gas, where a compressor or pump provides a higher output of gas, the lowest potential temperature the flow of gas may be cooled to, and/or other temperatures of other fluids at the site). The controller 302 may determine such thresholds and/or temperature ranges. In another embodiment, the thresholds and/or operating ranges may be preset. In yet another embodiment, a user may enter the thresholds and/or operating ranges into the controller 302 via a user interface. The controller 302 may determine such thresholds and/or operating ranges based on the type of gas, the flow rate of the gas (e.g., determined by a flow meter positioned at the site), the density of the gas (e.g., determined by various sensors or meters positioned at the site), some other characteristics of the gas, the type of compressor or pump, and/or operating characteristics of the compressor or pump.



FIG. 4A and FIG. 4B are other block diagrams illustrating novel implementations of electrical power generation enabled facilities to provide electrical power to one or more of equipment, energy storage devices, and the grid power structure, according to one or more embodiment of the disclosure. In an embodiment, the ORC unit 174 may include a single water or other fluid intake/outtake 406 (see FIG. 4A) or may include a warm fluid intake/outtake 176 and/or a hot fluid intake/outtake 177 (see FIG. 4B). However, as the equipment at the site 400, 401 operates, if different equipment is utilized (e.g., types of engines or other equipment), if different gasses at different temperatures are compressed, and/or as the ambient temperature fluctuates. working fluid flowing through a particular heat exchanger (e.g., heat exchanger 117, heat exchanger 186, and/or another heat exchanger) may fluctuate from warm to hot or hot to warm. As such, if the ORC unit 174 includes a warm fluid intake/outtake 176 and a hot fluid intake/outtake 177 (e.g., as shown in FIG. 4B), then as temperatures fluctuate different working fluids may be diverted or redirected to the proper intake (e.g., warm or hot water intake). As illustrated, the heat exchanger 117, 186 may accept two different fluids (e.g., a first compressed and a second compressed gas or exhaust and water jacket fluid). In other embodiments, each heat source (e.g., flow of gas, engine exhaust, etc.) may pass through a single heat exchanger. Further, each heat exchanger 117, 186 may be brought to the site via a transportation vehicle, such as a truck. The heat exchanger 117, 186 may remain on the transportation vehicle during operation or may be installed or fixed to the site, for example on a skid.


In an embodiment and as illustrated in FIG. 4A, each heat exchanger, 117, 186, 189 may connect to a supply valve 402 or manifold to transport the flow of intermediate working fluid to the intake of an ORC unit 174. Further, each heat exchanger 117, 186, 189 may connect to a return valve 404 or manifold to receive the intermediate fluid from the ORC unit 174. In another embodiment, the supply valve 402 or manifold and/or return valve 404 or manifold may control, either directly or indirectly (e.g., via another flow control device), the amount or rate of flow of intermediate working fluid flowing to the ORC unit 174 and/or to each heat exchanger 117, 186, 189.


In another embodiment and as illustrated in FIG. 4B, the site 401 may include a separate supply valve 408 or manifold and return valve 410 or manifold for hot intermediate fluid supply/return. In such examples, the separate supply valve 408 or manifold and return valve 410 or manifold may control the flow of intermediate working fluid based on temperature of the intermediate working fluid.



FIG. 5 is a block diagram illustrating novel implementations of one or more sites to provide heated fluid to an ORC unit to generate electrical power, according to one or more embodiments of the disclosure. In an embodiment, the flow of gas at a site 500 may be compressed more than two times, as shown previously. For example, a site 500 may include many small compressors, one or more large compressors, or some combination thereof. Further, the site 500 may include one or more engines for one or more of the compressors. The one or more engines may include various types of engines, such as a reciprocating engine, a turbine engine, a fossil fuel based engine, an electric engine, or other type of engine suitable for use with a compressor. Depending on the type of engine utilized, the engine may or may not be utilized as a type of heat source. For example, a turbine engine may not include a water jacket, but produce exhaust, while an electric engine may not produce exhaust. In another example, other equipment at the site may generate heat. In such examples, the other sources of heat may be utilized in conjunction with a heat exchanger or directly with the ORC unit. In yet another example, the gas cooler may be utilized or reconfigured to heat a working fluid. For example, typical gas coolers may be air coolers or another type of heat exchanger. The air cooler may be reconfigured such that a working fluid is utilized to cool the flow of gas or new heat exchanger installed. In another example, the gas cooler may not be utilized in lieu of the additional heat exchangers (e.g., the gas cooler may be shut down, as the flow of gas may be sufficiently cooled prior to the gas cooler).



FIG. 6A, FIG. 6B, FIG. 6C, FIG. 6D, FIG. 6E, and FIG. 6F are block diagrams illustrating novel implementations of an organic Rankin cycle (ORC) unit receiving warm and/or hot fluid from one or more heat exchangers via a supply manifold and a return manifold, according to one or more embodiment of the disclosure. As illustrated in FIG. 6A, the site may include a supply manifold 604 and a return manifold 606. In such examples, an intermediate working fluid may coalesce or combine at each manifold (e.g., the supply manifold 604 and the return manifold 606). For example, the intermediate working fluid may flow from each of the heat exchangers 602A, 602B, 602C, 062D, and up to 602N and combine at the supply manifold. The intermediate working fluid may then flow through the ORC unit 608 then back to the return manifold 606, where the intermediate working fluid may then flow back to each of the heat exchangers 602A, 602B, 602C, 062D, and up to 602N. As noted and described herein, a flow of gas 102, exhaust 646, and/or fluid from a water jacket 648 may flow to one of the one or more exchangers 602A, 602B, 602C, 062D, and up to 602N via various valves and pipeline. The supply manifold 604, return manifold 606, the flow control devices, the sensors, and/or any other devices described in FIGS. 6A-6F may be positioned or disposed at various points in between the ORC units and heat exchangers in FIG. 1A through FIG. 5.


In FIG. 6B, each pipeline from the heat exchangers 602A, 602B, 602C, 602D, and up to 602N to the supply manifold 604 may include a sensor 642A, 642B, 642C, 642D, and up to 642N, such as a temperature sensor, flow meter, or other sensor to measure some characteristic of the intermediate working fluid. Each pipeline from the return manifold 606 to the heat exchangers 602A, 602B, 602C, 602D, and up to 602N may include a sensor 644A, 644B, 644C, 644D, and up to 644N, such as a temperature sensor, flow meter, or other sensor to measure some characteristic of the intermediate working fluid. Further, the pipeline positioned between the return manifold 606 and the ORC unit 608 may include one or more flow control devices 624, 626, in addition to one or more sensors 638, 640 (e.g., temperature sensors or some other suitable sensor), thereby controlling the flow of intermediate working fluid from the ORC unit 608 to the return manifold 606. Each pipeline from the return manifold 606 to the heat exchangers 602A, 602B, 602C, 602D, and up to 602N may further include a flow control device 622A, 622B, 622C, 622D, and up to 622N thereby controlling the flow of the intermediate working fluid from the return manifold 606 to each of the heat exchangers 602A, 602B, 602C, 602D, and up to 602N. Utilizing various combinations of each sensor and each flow control device, the temperature and flow of the intermediate working fluid may be concisely controlled. The pipeline from the supply manifold 604 to the ORC unit 608 can include a sensor 636 to measure temperature or some other characteristic of the working fluid. Based on the measurements or determinations of the temperature or other characteristic of the working fluid (e.g., flow, pressure, density, etc.), the flow control devices may adjust the amount of working fluid flowing to each of the one or more heat exchangers ensuring that the proper amount of working fluid flows to each of the one or more exchangers. For example, one of the heat exchangers may not be producing heat for use in the ORC unit 608. In such examples, the flow control device associated with that particular heat exchanger may prevent further flow of working fluid to the that heat exchanger.


In FIG. 6C, the flow control devices positioned between the return manifold 606 and each of the one or more heat exchangers 602A, 602B, 602C, 602D, and up to 602N may be control valves 628A, 628B, 628C, 628D, and up to 628N. The flow control devices between the return manifold 606 and the ORC unit 608 may be a pump 630, while the flow control device within the ORC unit 608 may be a pump 632. In FIG. 6D, the flow control devices used throughout the site may be pumps 634A, 634B, 634C, 634D, and up to 634N or variable speed pumps. In FIG. 6E, the flow control devices may include some combination of one or more control valves 628A, 628B, 628C, 628D, and up to 628N and/or one or more pumps 634A, 634B, 634C, 634D, and up to 634N. In an embodiment, the one or more flow control devices 624, 626, 622A, 622B, 622C, 622D, and up to 622N may include one or more of a fixed speed pump, a variable speed drive pump, a control valve, an actuated valve, or other suitable device to control flow of a fluid.


Finally, in FIG. 6F, the site may include a warm supply manifold 614 and a warm return manifold 616, for controlling the flow of warm working fluid from warm water heat exchangers 610A, 610B, and up to 610N to a warm fluid intake/outtake of the ORC unit 608. The site may also include a hot supply manifold 618 and a hot return manifold 620, for controlling the flow of hot working fluid from hot water heat exchangers 612A, 612B, and up to 612N to a hot fluid intake/outtake of the ORC unit 608.


In such embodiments, the flow of working fluid to any of the heat exchangers (e.g., heat exchangers 602A, 602B, 602C, 602D, and up to 602N, warm water heat exchangers 610A, 610B, and up to 610N, and/or hot water heat exchangers 612A, 612B, and up to 612N) may be controlled via the flow control devices to manage, adjust, or maintain a temperature of the flow of gas, if a flow of gas flows therethrough. For example, the total percentage of working fluid flowing to each heat exchanger, for example heat exchangers 602A, 602B, 602C, 602D, and up to 602N, may initially be equal. As temperatures vary and the temperature of the flow of gas rises or falls, then the percentage or amount of working fluid to a particular heat exchanger may be increased or decreased to lower or raise, respectively, the temperature of the flow of gas flowing therethrough.


For example, to increase the temperature of a flow of gas flowing through heat exchanger 602A, flow control device 622A may decrease the percentage of working fluid flowing to heat exchanger 602A by about 5%, about 10%, about 15%, about 20%, or up to about 90%. Such a decrease in the rate of flow may inhibit the transfer of heat to the working fluid, allowing the overall temperature of the flow of gas to increase. In another example, to decrease the temperature of a flow of gas flowing through heat exchanger 602A, flow control device 622A may increase the percentage of working fluid flowing to heat exchanger 602A by about 5%, about 10%, about 15%, about 20%, or up to about 90%. Such an increase in the rate of flow may further facilitate the transfer of heat to the working fluid, allowing the overall temperature of the flow of gas to decrease. In either example, the percentage of increase/decrease of the flow of working fluid may be based on various factors or variables, such as the desired temperature or range of temperatures of the flow of gas, the amount of electrical power currently generated, the desired amount of electrical power to be generated, the total temperature and/or flow rate of the working fluid (e.g., the temperature and/or flow rate of the working fluid flowing between the supply manifold 604 and ORC unit 608), the temperature and/or flow rate of the working fluid flowing to and/or from a heat exchanger (e.g., heat exchangers 602A, 602B, 602C, 602D, and up to 602N), the total amount of working fluid, and/or the rate of flow of working fluid for each heat exchanger (e.g., heat exchangers 602A, 602B, 602C, 602D, and up to 602N). Such working fluid flow rate adjustments may be made intermittently or continuously. In a further example, an adjustment to a particular working fluid flow rate may be performed and then temperatures, flow rates, and/or other characteristics may be determined. Further adjustments may be performed and temperatures, flow rates, and/or other characteristics may be determined again. Such operations may be performed until the temperature of the flow of gas and/or the working fluid is at a desired temperature, with a selected operating range or window, and/or steady-state temperature.



FIG. 7A and FIG. 7B are simplified diagrams illustrating a control system for managing electrical power production at a facility, according to one or more embodiment of the disclosure. A master controller 702 may manage the operations of electrical power generation at a facility during gas compression. The master controller 702 may be one or more controllers, a supervisory controller, programmable logic controller (PLC), a computing device (such as a laptop, desktop computing device, and/or a server), an edge server, a cloud based computing device, and/or other suitable devices. The master controller 702 may be located at or near the facility or site. The master controller 702 may be located remote from the facility. The master controller 702, as noted, may be more than one controller. In such cases, the master controller 702 may be located near or at various facilities and/or at other off-site locations. The master controller 702 may include a processor 704, or one or more processors, and memory 706. The memory 706 may include instructions. In an example, the memory 706 may be a non-transitory machine-readable storage medium. As used herein, a “non-transitory machine-readable storage medium” may be any electronic, magnetic, optical, or other physical storage apparatus to contain or store information such as executable instructions, data, and the like. For example, any machine-readable storage medium described herein may be any of random access memory (RAM), volatile memory, non-volatile memory, flash memory, a storage drive (e.g., hard drive), a solid state drive, any type of storage disc, and the like, or a combination thereof. As noted, the memory 706 may store or include instructions executable by the processor 704. As used herein, a “processor” may include, for example one processor or multiple processors included in a single device or distributed across multiple computing devices. The processor may be at least one of a central processing unit (CPU), a semiconductor-based microprocessor, a graphics processing unit (GPU), a field-programmable gate array (FPGA) to retrieve and execute instructions, a real time processor (RTP), other electronic circuitry suitable for the retrieval and execution instructions stored on a machine-readable storage medium, or a combination thereof.


As used herein, “signal communication” refers to electric communication such as hard wiring two components together or wireless communication for remote monitoring and control/operation, as understood by those skilled in the art. For example, wireless communication may be Wi-Fi®, Bluetooth®, ZigBee, cellular wireless communication, satellite communication, or forms of near field communications. In addition, signal communication may include one or more intermediate controllers or relays disposed between elements that are in signal communication with one another.


The master controller 702 may include instructions 708 to measure the temperature at various points in the facility or at the site. For example, the temperature at the inlet of one or more heat exchangers may be measured or sensed from one or more heat exchanger inlet temperature sensors 714A, 714B, and up to 714N. The temperature at the outlet of one or more heat exchangers may be measured from one or more heat exchanger outlet temperature sensors 716A, 716B, and up to 716N. The master controller 702 may further include instructions 712 to measure the amount of electrical power output from the ORC unit 722. In an embodiment, the facility or site may include one or more ORC units and, in such examples, each ORC unit may connect to the master controller 702 to provide, among other information, the amount of electrical power output over time.


The master controller 702 may further connect to one or more heat exchanger valves 720A, 720B, and up to 720N and gas bypass valves 718A, 718B, and up to 718N. The master controller 702 may include instructions 710 to adjust each of these valves based on various factors. For example, if the temperature measured from one of the heat exchangers is below a threshold or outside of a selected operating temperature range or window, then the master controller 702 may transmit a signal causing one or more of the heat exchanger valves 720A, 720B, up to 720N to close. Such a threshold may be defined by the temperature sufficient to ensure the ORC unit 722 generates an amount of electrical power. The operating temperature range or window may be defined by an operating temperature of the ORC unit 722 and/or by the lowest and highest potential temperature of the flow of gas. In another example, based on a heat exchanger inlet temperature and an outlet temperature, the master controller 702 may adjust, via a signal transmitted to, one of the one or more gas bypass valves 718A, 718B, up to 718N. The master controller 702 may consider other factors (e.g., temperature, pressure, density, composition, etc.) as described herein.


As shown in FIG. 7B, the master controller 702 may include instructions 726 to measure the working fluid temperature via one or more heat exchanger working fluid inlet temperature sensor 730A, 730B, up to 730N and/or one or more heat exchanger working fluid inlet temperature sensor 732A, 732B, up to 732N. The master controller 702 may include instructions 728 to adjust the flow of working fluid to any one of the one or more heat exchangers based on the measured temperatures. The flow of the working fluid may be adjusted by the master controller 702, as noted, based on various temperature measurements of the working fluid, via one or more working fluid flow control devices 734A, 734B, up to 734N and/or a master flow control device 736. In an embodiment, the adjustment of the flow of working fluid may occur to adjust the temperature of the flow of gas through a corresponding heat exchanger. Thus, instructions 726 and instructions 728 may be included in or with or may be a sub-routine or sub-module of instructions 710.


In an embodiment, the master controller 702 may connect to a user interface 724. A user may interact with the master controller 702 via the user interface 724. The user may manually enter each of the thresholds and/or the operating temperature ranges or windows described herein and/or may manually adjust any of the control valves described herein.



FIGS. 8A through 8D are flow diagrams of electrical power generation in which, during gas compression, working fluid heated via the flow of gas facilitates ORC operations, according to one or more embodiment of the disclosure. The method is detailed with reference to the master controller 702 and system 700 of FIG. 7A. Unless otherwise specified, the actions of method 800 may be completed within the master controller 702. Specifically, methods 800, 801, 803, and 805 may be included in one or more programs, protocols, or instructions loaded into the memory of the master controller 702 and executed on the processor or one or more processors of the master controller 702. The order in which the operations are described is not intended to be construed as a limitation, and any number of the described blocks may be combined in any order and/or in parallel to implement the methods.


Turning first to method 800, at block 802, the master controller 702 may determine a first temperature at the heat exchanger inlet based on a temperature sensor positioned at the heat exchanger inlet (e.g., the heat exchanger external or internal to an ORC unit). The heat exchanger inlet may be associated with a particular heat exchanger (e.g., the first heat exchanger).


At block 804, the master controller 702 may determine the second temperature of the fluid at the heat exchanger outlet. Other temperatures or characteristics of the fluid and/or other fluid may be determined, such as working fluid temperature and/or flow rates of the working fluid, pressure of the working fluid, flow rates of the fluid (e.g., the flow rate of the flow of gas), and/or density of the fluid.


At block 806, the master controller 702 may determine whether the temperature within an operating temperature range or window. Such an operating temperature range or window may be defined by one or more of the temperature at which volatiles condense in the fluid (e.g., in the flow of gas), the temperature of working fluid at which an ORC unit is able to generate electrical power, and/or other temperatures of other fluids used on site. In another embodiment, the operating temperature may further be defined by the condensation point or dew point of the flow of gas. At block 808, if the temperature is not within the operating temperature range or window, the master controller 702 may adjust a bypass valve. Adjustment of the bypass valve may, in other embodiments, be based on various thresholds of various fluids at the site (e.g., pressure of working fluid or flow of gas, temperature of working fluid or flow of gas, composition of the working fluid or flow of gas, etc.). The bypass valve may divert a portion of the fluid (e.g., flow of gas) away from the heat exchanger thereby increasing the temperature of the fluid (e.g., flow of gas). In other words, a portion of the fluid, prior to cooling in the heat exchanger may be introduced into the remaining portion of the fluid from the heat exchanger. If the bypass valve is at a position other than fully closed and the temperature is above the operating temperature range or window, the portion of the fluid (e.g., flow of gas) may be prevented by further closing the bypass valve to decrease the temperature of the fluid (e.g., flow of gas). Otherwise, if the temperature is within the operating temperature range or window, the method 800 may be executed again.


Turning to FIG. 8B, method 801 includes additional processes or operations to the processes or operations described for method 800. At block 810, the master controller 702 may determine whether one or more gas compressors are operating. If a gas compressor is not operating, the master controller 702 may wait a specified amount of time and determine again whether any of the one or more gas compressors are operating. In another embodiment, a user may indicate, for example, via the user interface 724, whether gas compression has begun. If any of the one or more gas compressors are operating, the master controller 702 may proceed to perform the next operation.


At block 812, the master controller 702 may open a first heat exchanger valve or any other heat exchanger valve. If the first heat exchanger valve is already open, then the master controller 702 may not adjust the first heat exchanger. In an embodiment, the master controller 702 may open and/or adjust a heat exchanger valve by transmitting a signal to the heat exchanger valve indicating the position that the heat exchanger valve should be adjusted to.


As described above, at block 802, the master controller 702 may determine a first temperature at the heat exchanger inlet based on a temperature sensor positioned at the heat exchanger inlet. At block 814, the master controller 702 may determine whether the fluid flowing into the heat exchanger within an input operating range, input operating range defined by the minimum temperature and a maximum temperature. The minimum temperature may be defined by the lowest temperature at which an ORC unit may generate electricity. The maximum temperature may be defined by a temperature at which an ORC generates a maximum amount of electricity. In other embodiments, the maximum temperature may be defined by a maximum operating temperature of the ORC unit. The maximum temperature may be utilized to determine, at least in part, the position of the bypass valve or how much working fluid may flow to the heat exchanger. Such a minimum temperature may be about 25° C., about 30° C., or a greater value which may be based on any temperature drop between heat transfer.


At block 816, if the fluid (e.g., a flow of gas) is not within the input operating range, master controller 702 may close or adjust the heat exchanger valve (e.g., the first heat exchanger valve).


At block 818, the master controller 702 may wait a specified period of time prior to re-opening the heat exchanger valve (e.g., the first heat exchanger valve). After the specified period of time the controller may re-open the first heat exchanger valve and check the temperature of the fluid again to determine whether the fluid is within the input operating range. In some examples, the rather than re-opening the first heat exchanger valve, the master controller 702 may determine the inlet temperature of the fluid and adjust the heat exchanger valve based on the inlet temperature.


As described above, at block 804, if the fluid is at a temperature within the input operating range, the master controller 702 may determine the second temperature of the fluid at the heat exchanger outlet. At block 806, the master controller 702 may determine whether the temperature is within an operating range. The operating range may be defined by the temperature at which volatiles condense in the fluid (e.g., in the flow of gas), the temperature of working fluid at which an ORC unit is able to generate electrical power, and/or other temperatures of other fluids used on site. At block 808, if the temperature is outside of the operating temperature, the master controller 702 may adjust a bypass valve. The bypass valve may divert more or less of a portion of the fluid (e.g., flow of gas) away from the heat exchanger thereby increasing or decreasing the temperature of the fluid (e.g., flow of gas). In other words, a portion of the fluid, prior to cooling in the heat exchanger may be introduced into the remaining portion of the fluid from the heat exchanger.


Turning to FIG. 8C, the method 803 may include the same or similar operations as method 801 with the addition of block 820. At block 820, the temperature of the flow of gas may further be maintained based on an adjusted working fluid flow. In other words, the working fluid flowing through the heat exchanger may be increased or decreased depending on whether the temperature of the flow of gas is to be decreased or increased. For example, if the temperature of the flow of gas is too low or below the operating range or window at block 806, the master controller 702 may decrease the flow of working fluid to the heat exchanger. In such examples, rather than following such a step with adjustment of the bypass valve, the master controller 702 may wait a specified period of time for the temperature to stabilize, determine the temperature again, and then adjust the bypass valve or re-adjust the amount of working fluid flow to further adjust the temperature of the flow of gas.


Turning to FIG. 8D, the method 805 may include the same or similar operations as method 803 with the addition of block 822. At block 822, the master controller 702 may determine if the temperature of the flow of gas is within a second operating range defined by a compressor or pump efficiency (e.g., the range of temperatures at which the compressor or pump operates to output higher amounts of gas). If the temperature is above or below the second operating range, the master controller 702 may further adjust working fluid flow and/or bypass valve position. In an embodiment, the second operating range may be defined by a compressor or pump efficiency. The second operating range may be based on various and varying other factors related to a compressor and/or pump. Such factors may include the type of gas and/or the density of the gas. For example, for a specific type of gas, the condensation or dew point may be a particular temperature. The compressor or pump may output the highest rate of gas at another temperature for gasses of that particular density. As such, the operating range may include the other temperature and the condensation or dew point temperature, based on a measurement of the density of the gas and a determination of the condensation or dew point of the gas.



FIGS. 9A and 9B are flow diagrams of electrical power generation in which, during gas compression, working fluid is heated via engine exhaust and/or water jacket fluid flow, according to one or more embodiment of the disclosure. The method is detailed with reference to the master controller 702 and system 900 of FIG. 9. Unless otherwise specified, the actions of method 900 may be completed within the master controller 702. Specifically, method 900 may be included in one or more programs, protocols, or instructions loaded into the memory of the master controller 702 and executed on the processor or one or more processors of the master controller 702. The order in which the operations are described is not intended to be construed as a limitation, and any number of the described blocks may be combined in any order and/or in parallel to implement the methods.


Turning to FIG. 9A, at block 902, the master controller 702 may determine whether the gas compressor is operating. If the gas compressor is not operating, the master controller 702 may wait and perform the determination again. If the gas compressor is operating, the master controller 702 may proceed to perform the next operation.


At block 904, fluid (e.g., exhaust) produced by the engine may be transported to a first heat exchanger. The first heat exchanger may facilitate heat transfer from the fluid (e.g., exhaust) to a working fluid or intermediate work fluid. The heated working fluid or intermediate working fluid may be utilized by an ORC unit to generate electrical power during an ORC operation. The working fluid or intermediate working fluid may be considered warm or hot and may be utilized in a warm or low temperature ORC operation or a hot or high temperature ORC operation, respectively. Blocks 904 and 906 may be executed continuously as a gas compressor operates, the gas compressor being operated or driven by one or more engines.


At block 906, fluid from a water jacket may be transported to a second heat exchanger. The second heat exchanger may facilitate heat transfer from the fluid of the water jacket to a working fluid or intermediate work fluid. The heated working fluid or intermediate working fluid may be utilized by an ORC unit to generate electrical power during an ORC operation. The working fluid or intermediate working fluid may be considered warm or hot and may be utilized in a warm or low temperature ORC operation or a hot or high temperature ORC operation, respectively.


Turning to FIG. 9B, the method 901 may include blocks 902 and 904. After block 904 is executed, at block 906 the master controller 702 may determine the temperature and/or thermal mass of the exhaust. The master controller 702 may determine the temperature based on feedback from a temperature sensor associated with the exhaust. Thermal mass may be determined further, in addition to temperature, based on a flow rate of the exhaust measured or sensed by an additional sensor.


At block 910, the master controller 702 may determine whether the temperature or thermal mass of the exhaust is within a range or window. The range or window may be defined by a maximum operating temperature or thermal mass of the first heat exchanger and a minimum temperature or thermal mass at which ORC equipment generates electricity.


At block 912, if the temperature is above or below the range or window, the master controller 702 may adjust an exhaust control valve. The exhaust control valve may partially or fully divert a portion of the exhaust produced by the engine. In another embodiment, the exhaust control valve may be adjusted to maintain the first heat exchanger. Over time, scaling or depositions of particulates in the exhaust may build. As such, the first heat exchanger may be cleaned or maintained to remove the buildup and, during such cleaning or maintenance, the exhaust control valve may be fully closed. Once the first heat exchanger has been maintained, the exhaust control valve may be adjusted to allow the exhaust to flow to the first heat exchanger. In another embodiment, a portion of the exhaust may be diverted (e.g., via the exhaust control valve) from the first heat exchanger to limit the amount of scaling and/or deposition of particulates. In yet another embodiment, the exhaust control valve may be adjusted to prevent interruption of catalyst performance.


This application is a continuation of U.S. Non-Provisional application Ser. No. 17/715,400, filed Apr. 7, 2022, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” which is a continuation of U.S. Non-Provisional application Ser. No. 17/578,520, filed Jan. 19, 2022, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” now U.S. Pat. No. 11,326,550, issued May 10, 2022, which claims priority to and the benefit of U.S. Provisional Application No. 63/261,601, filed Sep. 24, 2021, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” and U.S. Provisional Application No. 63/200,908, filed Apr. 2, 2021, titled “SYSTEMS AND METHODS FOR GENERATING GEOTHERMAL POWER DURING HYDROCARBON PRODUCTION,” the disclosures of which are incorporated herein by reference in their entireties.


In the drawings and specification, several embodiments of systems and methods to provide electrical power from heat of a flow of gas and/or other source have been disclosed, and although specific terms are employed, the terms are used in a descriptive sense only and not for purposes of limitation. Embodiments of systems and methods have been described in considerable detail with specific reference to the illustrated embodiments. However, it will be apparent that various modifications and changes can be made within the spirit and scope of the embodiments of systems and methods as described in the foregoing specification, and such modifications and changes are to be considered equivalents and part of this disclosure.

Claims
  • 1. A method for generating power to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device, the method comprising: sensing inlet temperature of a flow of compressed gas from a source to a first heat exchanger, the source including one or more compressors respectively being operated by one or more engines, the source connected to one or more pipelines connected to the first heat exchanger thereby to allow compressed gas to flow from the source to the first heat exchanger, the first heat exchanger positioned to transfer heat from the flow of compressed gas to a flow of a working fluid, thereby to cause a generator to generate electrical power;sensing an outlet temperature of the flow of the compressed gas from the first heat exchanger to the one or more pipelines;adjusting a bypass valve to a position sufficient to maintain the temperature of the flow of compressed gas within a selected operating temperature range, the bypass valve positioned on the one or more pipelines and positioned to allow or prevent, via the bypass valve, a portion of the flow of compressed gas therethrough, thereby to cause or prevent the flow of compressed gas to be diverted directly from the one or more pipelines; andtransporting exhaust produced by one of the one or more engines during operation to a second heat exchanger, the second heat exchanger positioned to indirectly transfer heat from the exhaust to a flow of an intermediate working fluid, thereby to cause the generator to generate electrical power to one or more of operational equipment, a grid power structure, or an energy storage device.
  • 2. The method of claim 1, wherein the position of adjustment of the bypass valve is based on one or more of (a) the selected operating temperature range, (b) a temperature drop of the flow of compressed gas, (c) the inlet temperature, or (d) the outlet temperature.
  • 3. The method of claim 2, wherein the temperature drop of the flow of compressed gas is the temperature drop of the flow of compressed gas after passage through a gas cooler.
  • 4. The method of claim 3, wherein the gas cooler is an air-cooler.
  • 5. The method of claim 3, further comprising: sensing, via an ambient temperature sensor, the ambient temperature of an environment external to the one or more pipelines and the generator; anddetermining the temperature drop of the flow of compressed gas after passage through the gas cooler based on the outlet temperature, the ambient temperature, and a predicted temperature drop differential.
  • 6. The method of claim 5, wherein the predicted temperature drop differential is based on a type of the gas cooler and the ambient temperature.
  • 7. The method of claim 1, wherein one or more of the first heat exchanger or the second heat exchanger is included within the generator.
  • 8. The method of claim 1, wherein the second heat exchanger is an intermediate heat exchanger external from the generator, and wherein the working fluid is an intermediate working fluid.
  • 9. The method of claim 1, wherein prior to transport of the exhaust to the second heat exchanger: sensing an exhaust thermal mass of the exhaust produced by one of the one or more engines; andin response to the exhaust thermal mass being outside of a selected thermal mass range, adjusting an exhaust control valve to partially or fully prevent or allow flow of the exhaust from the one of the one or more engines to the second heat exchanger.
  • 10. The method of claim 9, further comprising, during operation of the one or more compressors via one or more engines, transporting a flow of heated coolant from a water jacket associated with one of the one or more engines to the second heat exchanger.
  • 11. The method of claim 10, further comprising transporting heated coolant to the second heat exchanger, and prior to the transporting: sensing a heated coolant temperature of flow of the heated coolant from a water jacket; andin response to the heated coolant temperature being outside of a selected water jacket temperature range, adjusting a water jacket control valve to prevent or allow flow of the heated coolant from the water jacket to the second heat exchanger.
  • 12. The method of claim 1, wherein the operational equipment includes one or more of on-site (1) pumps, (2) heat exchanger, or (3) controllers.
  • 13. The method of claim 1, wherein the compressed gas includes one or more of compressed (1) natural gas, (2) renewable natural gas, (3) landfill gas, or (4) organic waste gas.
  • 14. The method of claim 1, wherein inlet temperature and outlet temperature are determined for a plurality of heat exchangers, wherein the plurality of heat exchangers includes the first heat exchanger and the second heat exchangers, and wherein each of the plurality of heat exchangers supplies heated working fluid to a supply manifold.
  • 15. The method of claim 14, wherein the supply manifold supplies aggregated heated working fluid to the generator, and wherein the generator returns cooled working fluid to a return manifold.
  • 16. The method of claim 15, wherein the return manifold transports an amount of cooled working fluid to each of the plurality of heat exchangers.
  • 17. A method for generating power to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device, the method comprising: during one or more stage gas compressions via one or more compressors located adjacent a pumping station and for each of the one or more compressors associated with the pumping station: sensing a first temperature of a flow of gas from a source to a first heat exchanger, the source connected to the first heat exchanger via a supply pipeline,in response to a determination that the first temperature is at or above a threshold, maintaining a heat exchanger control valve position, the heat exchanger control valve positioned on the supply pipeline and to control flow of gas to the first heat exchanger, the first heat exchanger positioned to indirectly transfer heat from the flow of gas to a flow of an intermediate working fluid, thereby to cause a generator to generate electrical power,sensing a second temperature of a flow of the gas from the first heat exchanger to a return pipeline, andin response to a determination that the second temperature is within a selected operating temperature range, adjusting a bypass valve to a position sufficient to maintain temperature of the flow of gas within the selected operating temperature range, the bypass valve positioned on a bypass pipeline, the bypass pipeline positioned to connect the supply pipeline to a return pipeline and being positioned prior to the heat exchanger control valve; andduring operation of the one or more compressors, transporting exhaust produced by one or more engines to a second heat exchanger positioned to indirectly transfer heat from the exhaust to a flow of an intermediate working fluid, thereby to cause the generator to generate electrical power to one or more of operational equipment, a grid power structure, or an energy storage device.
  • 18. The method of claim 17, wherein heat transferred from the exhaust to the intermediate working fluid of the second heat exchanger is utilized in a hot fluid intake of the generator.
  • 19. The method of claim 17, wherein heat transferred from the flow of gas to the intermediate working fluid of the first heat exchanger is utilized in a warm fluid intake of the generator.
  • 20. A method for generating power to supply electrical power to one or more of operational equipment, a grid power structure, or an energy storage device, the method comprising: determining an inlet temperature of a flow of compressed gas from a source to a heat exchanger, the source connected to a main pipeline, the main pipeline connected to a supply pipeline, and the supply pipeline connected to the heat exchanger thereby to allow compressed gas to flow from the source to the heat exchanger, the heat exchanger positioned to transfer heat from the flow of compressed gas to a flow of a working fluid, thereby to cause a generator to generate electrical power;determining an outlet temperature of the flow of the compressed gas from the heat exchanger to a return pipeline;in response to a determination that the outlet temperature is within a selected operating temperature range, adjusting one or more of: a bypass valve to a position sufficient to maintain temperature of the flow of compressed gas within the selected operating temperature range, the bypass valve positioned on a bypass pipeline, the bypass pipeline positioned to connect the supply pipeline to the return pipeline, the bypass pipeline positioned to allow via the bypass valve a portion of the flow of compressed gas therethrough, thereby to cause the flow of compressed gas to be diverted directly from the supply pipeline to the return pipeline to increase temperature of the flow of compressed gas from the heat exchanger, orthe flow of working fluid to a percentage sufficient to maintain temperature of the flow of compressed gas within a selected operating temperature range; andtransporting exhaust produced by one or more engines to another heat exchanger positioned to indirectly transfer heat from the exhaust to a flow of an intermediate working fluid, thereby to cause the generator to generate electrical power to one or more of operational equipment, a grid power structure, or an energy storage device.
  • 21. The method of claim 20, wherein the flow of working fluid is adjusted to the percentage via a control valve being adjusted to a particular opened/closed position.
  • 22. A method for generating power during gas compression to supply electrical power therefrom, the method comprising: sensing an inlet temperature of a flow of compressed gas from a source to a heat exchanger, the source connected to a main pipeline, the main pipeline connected to a supply pipeline, and the supply pipeline connected to the heat exchanger thereby to allow compressed gas to flow from the source to the heat exchanger, the heat exchanger positioned to transfer heat from the flow of compressed gas to a flow of a working fluid, thereby to generate electrical power;sensing an outlet temperature of the flow of the compressed gas from the heat exchanger to a return pipeline; andin response to a determination that the outlet temperature is within a selected temperature range, adjusting a bypass valve to a position sufficient to maintain temperature of the flow of compressed gas within the selected temperature range, the bypass valve positioned on a bypass pipeline, the bypass pipeline positioned to connect the supply pipeline to the return pipeline, the bypass pipeline positioned to allow via the bypass valve a portion of the flow of compressed gas therethrough, thereby to cause the flow of compressed gas to be diverted directly from the supply pipeline to the return pipeline and to increase temperature of the flow of compressed gas from the heat exchanger.
  • 23. The method of claim 22, wherein the position of adjustment of the bypass valve is based on one or more of (a) the threshold, (b) a temperature drop of the flow of compressed gas, (c) the inlet temperature, or (d) the outlet temperature.
  • 24. The method of claim 22, wherein a minimum temperature of the selected temperature range is based on a temperature at which volatiles condense in the flow of gas.
  • 25. The method of claim 22, wherein inlet temperature and outlet temperature are determined for a plurality of heat exchangers, the plurality of heat exchangers including the heat exchanger, and wherein each of the plurality of heat exchangers supplies heated working fluid to a supply manifold.
  • 26. The method of claim 25, wherein the supply manifold supplies aggregated heated working fluid to a generator, and wherein the generator returns cooled working fluid to a return manifold.
  • 27. The method of claim 26, wherein the return manifold transports an amount of cooled working fluid to each of the plurality of heat exchangers.
  • 28. The method of claim 27, further comprising, in response to one of the outlet temperatures being at or below a minimum temperature of the selected temperature range, adjusting the amount of cooled working fluid flowing to a heat exchanger corresponding to the one of the outlet temperatures.
CROSS REFERENCE TO RELATED APPLICATIONS

This application is a continuation of U.S. Non-Provisional application Ser. No. 17/715,400, filed Apr. 7, 2022, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” which is a continuation of U.S. Non-Provisional application Ser. No. 17/578,520, filed Jan. 19, 2022, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” now U.S. Pat. No. 11,326,550, issued May 10, 2022, which claims priority to and the benefit of U.S. Provisional Application No. 63/261,601, filed Sep. 24, 2021, titled “SYSTEMS AND METHODS UTILIZING GAS TEMPERATURE AS A POWER SOURCE,” and U.S. Provisional Application No. 63/200,908, filed Apr. 2, 2021, titled “SYSTEMS AND METHODS FOR GENERATING GEOTHERMAL POWER DURING HYDROCARBON PRODUCTION,” the disclosures of which are incorporated herein by reference in their entireties.

US Referenced Citations (409)
Number Name Date Kind
3517208 Williams et al. Jun 1970 A
3757516 McCabe Sep 1973 A
3808794 Wood May 1974 A
3875749 Baciu Apr 1975 A
3908381 Barber et al. Sep 1975 A
3988895 Sheinbaum Nov 1976 A
4063417 Shields Dec 1977 A
4079590 Sheinbaum Mar 1978 A
4112687 Dixon Sep 1978 A
4112745 McCabe Sep 1978 A
4149385 Sheinbaum Apr 1979 A
4157730 Despois et al. Jun 1979 A
4224796 Stiel et al. Sep 1980 A
4228657 Leo Oct 1980 A
4356401 Santi Oct 1982 A
4369373 Wiseman Jan 1983 A
4484446 Goldsberry Nov 1984 A
4542625 Bronicki Sep 1985 A
4558568 Hoshino et al. Dec 1985 A
4576005 Force Mar 1986 A
4590384 Bronicki May 1986 A
4982568 Kalina Jan 1991 A
4996846 Bronicki Mar 1991 A
5038567 Mortiz Aug 1991 A
5117908 Hofmann Jun 1992 A
5199507 Westmoreland Apr 1993 A
5311741 Blaize May 1994 A
5421157 Rosenblatt Jun 1995 A
5440882 Kalina Aug 1995 A
5483797 Rigal et al. Jan 1996 A
5497624 Amir et al. Mar 1996 A
5517822 Haws et al. May 1996 A
5526646 Bronicki et al. Jun 1996 A
5555731 Rosenblatt Sep 1996 A
5570579 Larjola Nov 1996 A
5598706 Bronicki et al. Feb 1997 A
5660042 Bronicki et al. Aug 1997 A
5661977 Shnell Sep 1997 A
5671601 Bronicki et al. Sep 1997 A
5685362 Brown Nov 1997 A
5816048 Bronicki et al. Oct 1998 A
5839282 Bronicki et al. Nov 1998 A
5860279 Bronicki et al. Jan 1999 A
RE36282 Nitschke Aug 1999 E
5970714 Bronicki et al. Oct 1999 A
5974804 Sterling Nov 1999 A
6212890 Amir Apr 2001 B1
6536360 O'Connor Mar 2003 B2
6585047 McClung Jul 2003 B2
6695061 Fripp et al. Feb 2004 B2
6724687 Stephenson et al. Apr 2004 B1
6853798 Weiss Feb 2005 B1
6857268 Stinger et al. Feb 2005 B2
6857486 Chitwood et al. Feb 2005 B2
6989989 Brasz et al. Jan 2006 B2
7096665 Stinger et al. Aug 2006 B2
7174716 Brasz et al. Feb 2007 B2
7224080 Smedstad May 2007 B2
7225621 Zimron et al. Jun 2007 B2
7234314 Wiggs Jun 2007 B1
7237383 Ahrens-Botzong et al. Jul 2007 B2
7254949 Brasz et al. Aug 2007 B2
7281379 Brasz Oct 2007 B2
7287381 Pierson et al. Oct 2007 B1
7289325 Brasz et al. Oct 2007 B2
7313926 Gurin Jan 2008 B2
7320221 Bronicki Jan 2008 B2
7334410 Creighton et al. Feb 2008 B2
7337842 Roddy et al. Mar 2008 B2
7353653 Bronicki Apr 2008 B2
7428816 Singh et al. Sep 2008 B2
7472548 Meksvanh Jan 2009 B2
7493768 Klaus et al. Feb 2009 B2
7753122 Curlett Jul 2010 B2
7823386 Zimron et al. Nov 2010 B2
7891187 Mohr Feb 2011 B2
7891189 Bottger et al. Feb 2011 B2
7900450 Gurin Mar 2011 B2
7934383 Gutierrez et al. May 2011 B2
7942001 Radcliff et al. May 2011 B2
7950230 Nishikawa et al. May 2011 B2
8046999 Doty Nov 2011 B2
8096128 Held et al. Jan 2012 B2
8099198 Gurin Jan 2012 B2
8146360 Myers et al. Apr 2012 B2
8166761 Moghtaderi et al. May 2012 B2
8193659 Bronicki et al. Jun 2012 B2
8272217 Lengert Sep 2012 B2
8309498 Funkhouser et al. Nov 2012 B2
8371099 Gutierrez et al. Feb 2013 B2
8381523 Zadok Feb 2013 B2
8430166 Danko Apr 2013 B2
8438849 Kaplan et al. May 2013 B2
8459029 Lehar Jun 2013 B2
8511085 Frey et al. Aug 2013 B2
8528333 Juchymenko Sep 2013 B2
8534069 Parrella Sep 2013 B2
8555643 Kalina Oct 2013 B2
8555912 Woolley et al. Oct 2013 B2
8572970 Matteson et al. Nov 2013 B2
8578714 Nagurny et al. Nov 2013 B2
8596066 Zimron et al. Dec 2013 B2
8616000 Parrella Dec 2013 B2
8616001 Held et al. Dec 2013 B2
8616323 Gurin Dec 2013 B1
8656720 Hardgrave Feb 2014 B1
8667799 Batscha Mar 2014 B2
8674525 Van den Bossche et al. Mar 2014 B2
8680704 Rooney Mar 2014 B1
8707697 Nitschke Apr 2014 B2
8707698 Conry Apr 2014 B2
8708046 Montgomery et al. Apr 2014 B2
8720563 Joseph et al. May 2014 B2
8752382 Lehar Jun 2014 B2
8756908 Sheridan et al. Jun 2014 B2
8771603 Harless et al. Jul 2014 B2
8783034 Held Jul 2014 B2
8791054 Deville Jul 2014 B2
8820075 Kaminsky Sep 2014 B2
8820079 Zyhowski et al. Sep 2014 B2
8839857 Schultz et al. Sep 2014 B2
8841041 Biederman et al. Sep 2014 B2
8850814 Kaplan et al. Oct 2014 B2
8857186 Held Oct 2014 B2
8869531 Held Oct 2014 B2
8881805 Klemencic Nov 2014 B2
8959914 Kasuya et al. Feb 2015 B2
8984883 Riley Mar 2015 B2
8984884 Xu et al. Mar 2015 B2
9003798 Yanagi Apr 2015 B2
9014791 Held Apr 2015 B2
9062898 Held Jun 2015 B2
9077220 Kyle et al. Jul 2015 B2
9080789 Hamstra et al. Jul 2015 B2
9091278 Vermeersch Jul 2015 B2
9109398 Harris et al. Aug 2015 B2
9115604 Bronicki Aug 2015 B2
9118226 Kacludis et al. Aug 2015 B2
9121259 Bryant et al. Sep 2015 B2
9150774 Reddy et al. Oct 2015 B2
9181930 Klemencic Nov 2015 B2
9217370 Wang et al. Dec 2015 B2
9234522 Jonsson et al. Jan 2016 B2
9243616 Lee et al. Jan 2016 B2
9297367 Ramaswamy et al. Mar 2016 B2
9316404 Gurin Apr 2016 B2
9322300 Mirmobin et al. Apr 2016 B2
9331547 Bronicki May 2016 B2
9341084 Xie et al. May 2016 B2
9341086 Batscha et al. May 2016 B2
9376937 Goswami et al. Jun 2016 B2
9394764 Favilli et al. Jul 2016 B2
9394771 Wiggs Jul 2016 B2
9403102 Wu et al. Aug 2016 B2
9441504 Held Sep 2016 B2
9458738 Held Oct 2016 B2
9488160 Fisher et al. Nov 2016 B2
9499732 Reddy et al. Nov 2016 B2
9512348 Reyes et al. Dec 2016 B2
9512741 Myogan et al. Dec 2016 B2
9574551 Parrella, Sr. et al. Feb 2017 B2
9587161 Fisk, Jr. Mar 2017 B2
9587162 Fisk, Jr. Mar 2017 B2
9638065 Vermeersch et al. May 2017 B2
9649582 Shnell May 2017 B2
9671138 Batscha et al. Jun 2017 B2
9683463 Juchymenko Jun 2017 B2
9726157 Sweatman et al. Aug 2017 B2
9726441 Reissner et al. Aug 2017 B2
9732634 Hikichi et al. Aug 2017 B2
9745870 Johnson et al. Aug 2017 B2
9759096 Vermeersch Sep 2017 B2
9762460 Pawlowski et al. Sep 2017 B2
9777602 Juchymenko Oct 2017 B2
9784140 Huntington et al. Oct 2017 B2
9784248 Batscha et al. Oct 2017 B2
9797273 Nishiguchi et al. Oct 2017 B2
9816402 Kauffman et al. Nov 2017 B2
9816443 Sheridan et al. Nov 2017 B2
9829194 Aumann et al. Nov 2017 B2
9840662 Pascarella et al. Dec 2017 B2
9845423 Frantz et al. Dec 2017 B2
9863282 Hart et al. Jan 2018 B2
9874112 Giegel Jan 2018 B2
9932861 Preuss et al. Apr 2018 B2
9932970 Jeter Apr 2018 B1
9957432 Galindo et al. May 2018 B2
9994751 Hulse et al. Jun 2018 B2
10005950 Smith et al. Jun 2018 B2
10024198 Held et al. Jul 2018 B2
10059870 Joseph et al. Aug 2018 B2
10060283 Tomigashi et al. Aug 2018 B2
10060302 Weng et al. Aug 2018 B2
10060652 Tahara Aug 2018 B2
10077683 Close Sep 2018 B2
10082030 Genrup et al. Sep 2018 B2
10113389 Pandey et al. Oct 2018 B2
10113535 Conlon Oct 2018 B2
10138405 Kulkarni et al. Nov 2018 B2
10138560 Reyes et al. Nov 2018 B2
10221770 Sheridan Mar 2019 B2
10227893 McCune et al. Mar 2019 B2
10247044 Barmeier et al. Apr 2019 B2
10247046 Schuster et al. Apr 2019 B2
10267184 Bowan et al. Apr 2019 B2
10323545 Johnson Jun 2019 B2
10352197 Grill et al. Jul 2019 B2
10357726 Qin et al. Jul 2019 B2
10400635 Johnson et al. Sep 2019 B2
10435604 Kontomaris et al. Oct 2019 B2
10458206 Al-Dossary et al. Oct 2019 B2
10465104 Ravi et al. Nov 2019 B2
10465491 Moore Nov 2019 B2
10472994 Avadhanula et al. Nov 2019 B2
10494897 Pandey et al. Dec 2019 B2
10495098 Preuss et al. Dec 2019 B2
10519814 Quoilin Dec 2019 B2
10527026 Muir et al. Jan 2020 B2
10563927 Papadopoulos et al. Feb 2020 B2
10570777 Bowan Feb 2020 B2
10570782 Lintl et al. Feb 2020 B2
10584660 Sheridan et al. Mar 2020 B2
10590324 Kulkarni et al. Mar 2020 B2
10590802 McCune et al. Mar 2020 B2
10598160 Sumrall Mar 2020 B2
10619520 Juchymenko Apr 2020 B2
10626709 Al-Dossary Apr 2020 B2
10670340 Batscha et al. Jun 2020 B2
10724805 Barmeier et al. Jul 2020 B2
10767904 von Düring Sep 2020 B2
10788267 Dokic et al. Sep 2020 B2
10794292 Kupratis et al. Oct 2020 B2
10883388 Held Jan 2021 B2
10934895 Held et al. Mar 2021 B2
10947626 Pinder et al. Mar 2021 B2
10947839 Cuthbert et al. Mar 2021 B2
10975279 Kontomaris et al. Apr 2021 B2
11022070 Aumann et al. Jun 2021 B2
11137169 Buscheck et al. Oct 2021 B2
11168673 Younes et al. Nov 2021 B2
11174715 Atisele Nov 2021 B2
11187112 Held Nov 2021 B2
11187212 Bodishbaugh et al. Nov 2021 B1
11220932 Kontomaris et al. Jan 2022 B2
11255315 Bodishbaugh et al. Feb 2022 B1
11255576 Higgins et al. Feb 2022 B2
11274660 Radke Mar 2022 B2
11274663 Bodishbaugh et al. Mar 2022 B1
11293414 Bodishbaugh et al. Apr 2022 B1
11326479 Radke May 2022 B2
11326550 Bodishbaugh et al. May 2022 B1
11359612 Bodishbaugh et al. Jun 2022 B1
11365652 Gaia et al. Jun 2022 B2
11396828 Chase Jul 2022 B2
11486330 Bodishbaugh Nov 2022 B2
11486370 Bodishbaugh et al. Nov 2022 B2
20030010652 Hunt Jan 2003 A1
20030029169 Hanna et al. Feb 2003 A1
20040237890 Bour Dec 2004 A1
20050034467 Varney Feb 2005 A1
20050247056 Cogswell et al. Nov 2005 A1
20050247059 Cogswell et al. Nov 2005 A1
20060026961 Bronicki Feb 2006 A1
20060130480 Lovelace Jun 2006 A1
20070025854 Moore et al. Feb 2007 A1
20080168772 Radcliff et al. Jul 2008 A1
20080217523 O'Sullivan Sep 2008 A1
20090211253 Radcliff et al. Aug 2009 A1
20090217664 Rapp et al. Sep 2009 A1
20090320477 Juchymenko Dec 2009 A1
20100018207 Juchymenko Jan 2010 A1
20100077752 Papile Apr 2010 A1
20100077792 Gurin Apr 2010 A1
20100187319 Isom et al. Jul 2010 A1
20100194111 Van den Bossche et al. Aug 2010 A1
20100218930 Proeschel Sep 2010 A1
20100300093 Doty Dec 2010 A1
20110000210 Miles Jan 2011 A1
20110030404 Gurin et al. Feb 2011 A1
20110041502 Zimron et al. Feb 2011 A1
20110041505 Kasuya et al. Feb 2011 A1
20110083620 Yoon Apr 2011 A1
20110100003 McLeod et al. May 2011 A1
20110126539 Ramaswamy et al. Jun 2011 A1
20110138809 Ramaswamy et al. Jun 2011 A1
20110272166 Hunt Nov 2011 A1
20110314818 Breen et al. Dec 2011 A1
20120001429 Saar et al. Jan 2012 A1
20120042650 Ernst et al. Feb 2012 A1
20120111004 Conry May 2012 A1
20120131918 Held May 2012 A1
20120145397 Schultz et al. Jun 2012 A1
20120174581 Vaughan et al. Jul 2012 A1
20120192560 Ernst et al. Aug 2012 A1
20120198844 Kaminsky Aug 2012 A1
20120261092 Heath et al. Oct 2012 A1
20120291433 Meng et al. Nov 2012 A1
20120292112 Lakic Nov 2012 A1
20120292909 Erikson Nov 2012 A1
20120315158 Klaus Dec 2012 A1
20130041068 Reddy et al. Feb 2013 A1
20130067910 Ishiguro et al. Mar 2013 A1
20130091843 Zyhowski et al. Apr 2013 A1
20130168089 Berg et al. Jul 2013 A1
20130168964 Xu et al. Jul 2013 A1
20130217604 Fisk, Jr. Aug 2013 A1
20130247569 Suter Sep 2013 A1
20130298568 Pierson et al. Nov 2013 A1
20130299123 Matula Nov 2013 A1
20130299170 Joseph et al. Nov 2013 A1
20140011908 Reddy et al. Jan 2014 A1
20140026574 Leibowitz et al. Jan 2014 A1
20140033713 Juchymenko Feb 2014 A1
20140057810 Fisk, Jr. Feb 2014 A1
20140087978 Deville Mar 2014 A1
20140102098 Bowan et al. Apr 2014 A1
20140123643 Ming May 2014 A1
20140130498 Randolph May 2014 A1
20140158429 Kader et al. Jun 2014 A1
20140178180 Sheridan Jun 2014 A1
20140206912 Iglesias Jul 2014 A1
20140224469 Mirmobin et al. Aug 2014 A1
20140296113 Reyes et al. Oct 2014 A1
20140305125 Wang et al. Oct 2014 A1
20140366540 Zyhowski et al. Dec 2014 A1
20150021924 Parella Jan 2015 A1
20150047351 Ishikawa et al. Feb 2015 A1
20150135708 Lutz et al. May 2015 A1
20150226500 Reissner et al. Aug 2015 A1
20150252653 Shelton, Jr. Sep 2015 A1
20150300327 Sweatman et al. Oct 2015 A1
20150330261 Held Nov 2015 A1
20150345341 Kacludis et al. Dec 2015 A1
20150345482 Klitzing et al. Dec 2015 A1
20150361831 Myers Dec 2015 A1
20160003108 Held et al. Jan 2016 A1
20160010512 Close Jan 2016 A1
20160017758 Vermeersch et al. Jan 2016 A1
20160017759 Gayawal et al. Jan 2016 A1
20160040557 Vermeersch et al. Feb 2016 A1
20160047540 Aumann et al. Feb 2016 A1
20160061055 Bowan Mar 2016 A1
20160076405 Hashimoto et al. Mar 2016 A1
20160084115 Ludewig et al. Mar 2016 A1
20160130985 O'Connor et al. May 2016 A1
20160160111 Smith et al. Jun 2016 A1
20160177887 Fischer Jun 2016 A1
20160201521 Karthauser Jul 2016 A1
20160222275 Galindo et al. Aug 2016 A1
20160257869 Kulkarni et al. Sep 2016 A1
20160312646 Juano Oct 2016 A1
20160340572 Pascarella et al. Nov 2016 A1
20160369408 Reyes et al. Dec 2016 A1
20170058181 Frantz et al. Mar 2017 A1
20170058722 Noureldin et al. Mar 2017 A1
20170130614 Held et al. May 2017 A1
20170145815 Cuthbert et al. May 2017 A1
20170159504 Ostrom et al. Jun 2017 A1
20170175582 McCune et al. Jun 2017 A1
20170175583 McCune et al. Jun 2017 A1
20170226402 Patil et al. Aug 2017 A1
20170233635 Pandey et al. Aug 2017 A1
20170240794 Iverson et al. Aug 2017 A1
20170254223 Goethals et al. Sep 2017 A1
20170254226 Heber et al. Sep 2017 A1
20170261268 Barmeier et al. Sep 2017 A1
20170276026 Barmeier et al. Sep 2017 A1
20170276435 Papadopoulos et al. Sep 2017 A1
20170362963 Hostler et al. Sep 2017 A1
20170284230 Juchymenko Oct 2017 A1
20170314420 Bowan et al. Nov 2017 A1
20170321104 Ravi et al. Nov 2017 A1
20170321107 Joseph et al. Nov 2017 A1
20180094548 Jeter Apr 2018 A1
20180128131 Zyhowski et al. May 2018 A1
20180224164 Lakic Aug 2018 A1
20180274524 Moncarz et al. Sep 2018 A1
20180313340 Spadacini et al. Nov 2018 A1
20180328138 Pandey et al. Nov 2018 A1
20180340450 Avadhanula et al. Nov 2018 A1
20180355703 Al-Dossary Dec 2018 A1
20180356044 Monti et al. Dec 2018 A1
20190048759 Noureldin et al. Feb 2019 A1
20190055445 Kulkarni et al. Feb 2019 A1
20190128147 Liu et al. May 2019 A1
20190128567 Redfern May 2019 A1
20190390660 McBay Dec 2019 A1
20200011426 Juchymenko Jan 2020 A1
20200025032 McCune et al. Jan 2020 A1
20200095899 Merswolke et al. Mar 2020 A1
20200200123 Aumann et al. Jun 2020 A1
20200200483 Ahlbom Jun 2020 A1
20200217304 Sumrall Jul 2020 A1
20200232342 McCune et al. Jul 2020 A1
20200248063 Stone Aug 2020 A1
20200308992 Juchymenko Oct 2020 A1
20200309101 Muir et al. Oct 2020 A1
20200354839 Pinder et al. Nov 2020 A1
20200386212 Atisele Dec 2020 A1
20200399524 Pisklak et al. Dec 2020 A1
20210017439 Ramirez Angulo et al. Jan 2021 A1
20210062682 Higgins et al. Mar 2021 A1
20210071063 Stone Mar 2021 A1
20210140684 Younes et al. May 2021 A1
20210172344 Juchymenko Jun 2021 A1
20210205738 Blomqvist et al. Jul 2021 A1
20210372668 Buscheck et al. Dec 2021 A1
20220090521 Kontomaris et al. Mar 2022 A1
20220186984 Gaia et al. Jun 2022 A1
Foreign Referenced Citations (212)
Number Date Country
2007204830 Jul 2007 AU
2009238733 Aug 2013 AU
2011336831 Dec 2016 AU
2012306439 Mar 2017 AU
2014225990 Jul 2018 AU
2692629 Jan 2009 CA
2698334 Apr 2009 CA
2676502 Feb 2011 CA
2679612 May 2018 CA
2676502 Dec 2018 CA
29523790 Apr 2019 CA
204661610 Sep 2015 CN
103174473 Oct 2015 CN
102812212 Apr 2016 CN
103174475 Aug 2016 CN
106517718 Mar 2017 CN
107246550 Oct 2017 CN
108302946 Jul 2018 CN
108457609 Aug 2018 CN
207761721 Aug 2018 CN
209457990 Oct 2019 CN
111837006 Oct 2020 CN
111911255 Nov 2020 CN
113266815 Aug 2021 CN
113983844 Jan 2022 CN
10337240 Mar 2005 DE
102011006066 Sep 2012 DE
102012214907 Oct 2013 DE
102012014443 Jan 2014 DE
102013009351 Jan 2014 DE
102018201172 Jul 2019 DE
0652368 May 1995 EP
1507069 Feb 2005 EP
2530255 Dec 2012 EP
2201666 Mar 2013 EP
1573173 Apr 2013 EP
1713877 May 2013 EP
1869293 May 2013 EP
2222939 Nov 2013 EP
1706667 Oct 2014 EP
2167872 Feb 2016 EP
2446122 Aug 2017 EP
2478201 Aug 2017 EP
3102796 Jan 2018 EP
3514339 Jul 2019 EP
2550436 Aug 2019 EP
3464836 Apr 2020 EP
3631173 Apr 2020 EP
2948649 Dec 2020 EP
3540331 Dec 2020 EP
2738872 Mar 1997 FR
2336943 Jun 2003 GB
247090 Dec 2003 IN
256000 Jan 2005 IN
202111000822 Oct 2021 IN
08192150 Jul 1996 JP
2001183030 Jul 2001 JP
2009127627 Jun 2009 JP
2010166805 Jul 2010 JP
2010249501 Nov 2010 JP
2010249502 Nov 2010 JP
2011064451 Mar 2011 JP
4668189 Apr 2011 JP
2011069370 Apr 2011 JP
2011106459 Jun 2011 JP
2011137449 Jul 2011 JP
2013151931 Aug 2013 JP
2013238228 Nov 2013 JP
2014016124 Jan 2014 JP
2014080975 May 2014 JP
2014109279 Jun 2014 JP
2015149885 Aug 2015 JP
2016006323 Jan 2016 JP
2016105687 Jun 2016 JP
2016188640 Nov 2016 JP
2021167601 Oct 2021 JP
101126833 Mar 2012 KR
20120067710 Jun 2012 KR
20130023578 Mar 2013 KR
1691908 Jan 2017 KR
2075550 Feb 2020 KR
2185002 Dec 2020 KR
581457 Nov 2011 NZ
2006142350 Jun 2008 RU
191467 Jul 2013 SG
191468 Jul 2013 SG
192327 Aug 2013 SG
1993001397 Jan 1993 WO
1994028298 Dec 1994 WO
2005014981 Feb 2005 WO
2005019606 Mar 2005 WO
2005049975 Jun 2005 WO
2005100755 Oct 2005 WO
2006014609 Feb 2006 WO
2006027770 Mar 2006 WO
2006060253 Jun 2006 WO
2006092786 Sep 2006 WO
2006138459 Dec 2006 WO
2007048999 May 2007 WO
20070079245 Jul 2007 WO
2007137373 Dec 2007 WO
2008052809 May 2008 WO
2008106774 Sep 2008 WO
2009017471 Feb 2009 WO
2009017474 Feb 2009 WO
2009027302 Mar 2009 WO
2009030283 Mar 2009 WO
2009058112 May 2009 WO
2009095127 Aug 2009 WO
2009142608 Nov 2009 WO
2010021618 Feb 2010 WO
2010039448 Apr 2010 WO
2010065895 Jun 2010 WO
2009017473 Aug 2010 WO
2010106089 Sep 2010 WO
2010127932 Nov 2010 WO
2010143046 Dec 2010 WO
2010143049 Dec 2010 WO
2011012047 Feb 2011 WO
2011066032 Jun 2011 WO
2011073469 Jun 2011 WO
2011061601 Aug 2011 WO
2011103560 Aug 2011 WO
2011093854 Aug 2011 WO
2011137980 Nov 2011 WO
2012060510 May 2012 WO
2012079694 Jun 2012 WO
2012074940 Jun 2012 WO
2012112889 Aug 2012 WO
2012142765 Oct 2012 WO
2012151447 Nov 2012 WO
2013014509 Jan 2013 WO
2013059695 Apr 2013 WO
2013082575 Jun 2013 WO
2013103592 Jul 2013 WO
2013110375 Aug 2013 WO
2013115668 Aug 2013 WO
2013136131 Sep 2013 WO
2014019755 Feb 2014 WO
2014042580 Mar 2014 WO
2014053292 Apr 2014 WO
2014059235 Apr 2014 WO
2014065977 May 2014 WO
2014124061 Aug 2014 WO
2014167795 Oct 2014 WO
2014154405 Oct 2014 WO
2014159520 Oct 2014 WO
2014159587 Oct 2014 WO
2014160257 Oct 2014 WO
2014164620 Oct 2014 WO
2014164620 Oct 2014 WO
2014165053 Oct 2014 WO
2014165053 Oct 2014 WO
2014165144 Oct 2014 WO
2014191157 Dec 2014 WO
2015040279 Mar 2015 WO
2015034987 Mar 2015 WO
2015059069 Apr 2015 WO
2015078829 Jun 2015 WO
2015135796 Sep 2015 WO
2015131940 Sep 2015 WO
2015158600 Oct 2015 WO
2015192005 Dec 2015 WO
2016039655 Mar 2016 WO
2016049712 Apr 2016 WO
2016050365 Apr 2016 WO
2016050366 Apr 2016 WO
2016050367 Apr 2016 WO
2016050368 Apr 2016 WO
2016050369 Apr 2016 WO
2016069242 May 2016 WO
2013103631 May 2016 WO
2016073245 May 2016 WO
2016087920 Jun 2016 WO
2016099975 Jun 2016 WO
2016147419 Sep 2016 WO
2016196144 Dec 2016 WO
2016204287 Dec 2016 WO
2017041147 Mar 2017 WO
2017065683 Apr 2017 WO
2017123132 Jul 2017 WO
2017146712 Aug 2017 WO
2017147400 Aug 2017 WO
2017203447 Nov 2017 WO
2018044690 Mar 2018 WO
2018107279 Jun 2018 WO
2018106528 Jun 2018 WO
2018210528 Nov 2018 WO
2018217969 Nov 2018 WO
2018227068 Dec 2018 WO
2019004910 Jan 2019 WO
2019060844 Mar 2019 WO
2019067618 Apr 2019 WO
2019086960 May 2019 WO
2019157341 Aug 2019 WO
2019155240 Aug 2019 WO
2019178447 Sep 2019 WO
2020152485 Jul 2020 WO
2020153896 Jul 2020 WO
2020186044 Sep 2020 WO
2020201843 Oct 2020 WO
2020229901 Nov 2020 WO
2020097714 Dec 2020 WO
2020239067 Dec 2020 WO
2020239068 Dec 2020 WO
2020239069 Dec 2020 WO
2020251980 Dec 2020 WO
2021004882 Jan 2021 WO
20210134651 Jan 2021 WO
2021096696 May 2021 WO
2021107834 Jun 2021 WO
2022061320 Mar 2022 WO
Non-Patent Literature Citations (56)
Entry
“From Waste Heat To High Performance”, PBOG (Permian Basin Oil and Gas Magazine), Apr. 26, 2013.
“Turning Waste Heat Into Clean Power; GNP's Expander System”, Great Northern Power Corporation, 2022.
Ng et al., “Thermo-Economic Performance of an Organic Rankine Cycle System Recovering Waste Heat Onboard an Offshore Service Vessel”, Journal of Marine Science and Engineering, May 14, 2020.
“First Flare Elimination Demonstration”, ElectraTherm, 2022.
International Search Report and Written Opinion for PCT/US2022/071472, dated May 9, 2022.
International Search Report and Written Opinion for PCT/US2022/071475, dated May 17, 2022.
International Search Report and Written Opinion for PCT/US2022/071474, dated Jun. 10, 2022.
International Search Report and Written Opinion for PCT/US2022/071486, dated Jun. 14, 2022.
International Search Report and Written Opinion for PCT/US2022/071323, dated Jun. 28, 2022.
International Search Report and Written Opinion for PCT/US2022/071325, dated Jun. 28, 2022.
Invitation to Pay Additional Fees and Communication Relating to Results of Partial International Search for PCT/JS2022/071329, dated Jun. 27, 2022.
Invitation to Pay Additional Fees and Communication Relating to Results of Partial International Search for PCT/JS2022/071327, dated Jul. 4, 2022.
International Search Report and Written Opinion for PCT/US2022/071313, dated Jul. 5, 2022.
International Search Report and Written Opinion for PCT/US2022/071517, dated Jun. 27, 2022.
International Search Report and Written Opinion for PCT/US2022/071484, dated Jun. 27, 2022.
International Search Report and Written Opinion for PCT/US2022/071319, dated Jul. 12, 2022.
Richter, Alexander, GreenFire Energy and Mltsui Oil Exploration Co. are partnering on a closed-loop geothermal pilot project in Japan, Think GeoEnergy, Apr. 6, 2021.
Edwards, Alex, Dallas Innovates, Hunt Energy Network's New Venture Will Put 50 Batteries Across Texas, Giving ERCOT a Portfolio of Energy Generation, Apr. 1, 2021.
Guo, Boyun, Petroleum Enginnering, A Computer-Assisted Approach, Dec. 21, 2006.
Li, Tailu et al., Cascade utilization of low temperature geothermal water in oilfield combined power generation, gathering heat tracing and oil recovery, Applied Thermal Engineering 40 (2012).
Sherven, Bob, Automation Maximizes performance for shale wells, Oil&Gas Journal, 2013.
Hu, Kaiyong et al., A case study of an ORC geothermal power demonstration system under partial load conditions in Huabei Oilfield, China, ScientDirect, 2017.
Liu, Xiaolei et al., A systematic study of harnessing low-temperature geothermal energy from oil and gas reservoirs, Elsevier, ScienceDirect, Energy, 2017.
Wang, Kai, et al., A comprehensive review of geothermal energy extraction and utilization in oilfields, Elsevier, ScienceDirect, Journal of Petroleum Science and Engineering, 2017.
Cutright, Bruce L., The Transformation of Tight Shale Gas Reservoirs to Geothermal Energy Production, Bureau of Economic Geology University of Texas, Austin Texas, Jun. 14, 2011.
Khennich, Mohammed et al., Optimal Design of ORC Systems with a Low-Temperature Heat Source, Entropy 2012, 14, 370-389; doi:10.3390/e14020370.
Dambly, Benjamin W., et al., The Organic Rankine Cycle for Geothermal Power Generation, Geothermal Energy, 2007.
Obi, John Besong, State of art on ORC applications for waste heat recovery and micro-cogeneration for installations up to 100kWe, Elsevier, Energy Procedia 82 (2015 ) 994-1001.
Obafunmi, Jaiyejeje Sunday, Thermodynamic Analysis of Organic Rankine Cycles, Eastern Mediterranean University Jul. 2014, Gazima{hacek over (g)}usa, North Cyprus.
Dong, Bensi et al., Potential of low temperature organic Rankine cycle with zeotropic mixtures as working fluid, Elsevier, ScienceDirect, Energy Procedia 105 (2017 ) 1489-1494.
Iqbal, MdArbab et al., Trilateral Flash Cycle (TFC): a promising thermodynamic cycle for low grade heat to power generation, Elsevier, ScienceDirect, Energy Procedia 160 (2019) 208-214.
Bao, Junjiang et al., A review of working fluid and expander selections for organic Rankine cycle, Elsevier, ScienceDirect, Renewable and Sustainable Energy Reviews 24 (2013) 325-342.
Ajimotokan, Habeeb A. et al., Trilateral Flash Cycle for Recovery of Power from a Finite Low-Grade Heat Source, Proceedings of the 24th European Symposium on Computer Aided Process Engineering—ESCAPE Jun. 15-18, 24, 2014, Budapest, Hungary. Copyright © 2014 Elsevier B.V.
Hung Tzu-Chen, et al., The Development and Application of a Small-Scale Organic Rankine Cycle for Waste Heat Recovery, IntechOpen, 2019.
Kong, Rithy et al., Thermodynamic performance analysis of a R245fa organic Rankine cycle (ORC) with different kinds of heat sources at evaporator, Elsevier, ScienceDirect, Case Studies in Thermal Engineering 13 (2019) 100385.
Lukawski, Maciej Z. et al., Impact of molecular structure of working fluids on performance of organic Rankine cycles (ORCs), Sustainable Energy Fuels, 2017, 1, 1098.
Saleh, Bahaa et al., Working fluids for low-temperature organic Rankine cycles, Elsevier, ScienceDirect, Energy 32 (2007) 1210-1221.
Brasz, Lars J. et al., Ranking of Working Fluids for Organic Rankine Cycle Applications, Purdue University, Purdue e-Pubs, (2004). International Refrigeration and Air Conditioning Conference. Paper 722.
Miller, Patrick C., Research uses landfill gas tech for Bakken flaring solution, The Bakken magazine, Sep. 16, 2015.
ElectraTherm, Inc., Power+ Generator 4400B & 4400B+, Nov. 24, 2020.
ElectraTherm, Inc., Heat To Power Generation Base Load Renewable Energy, Mar. 2020.
ElectraTherm, Inc., Power+ Generator, Nov. 25, 2020.
ElectraTherm, Inc., Generating Clean Power From Waste Heat, Nov. 2020.
ElectraTherm, Inc., Power+ Generator, May 19, 2020.
Sneary, Loy et al., Gulf Coast Green Energy, Flare Gas Reduction Trial Using an Organic Rankine Cycle Generator, Jan. 11, 2016.
Enertime, ORC for Industrial Waste Heat Recovery, Aug. 2017.
Enogia, Generate power from your waste heat thanks to our ORC, 2019.
UTC Power, PureCycle, 200 Heat-to-Electricity Power System, 2004.
Rank, MT3 machine, Dec. 17, 2018.
Heat Recovery Solutions, Clean Cycle Containerized Solution, 2009.
Triogen BV, Specification: E-Box Engine Application, Feb. 15, 2019.
International Search Report and Written Opinion for PCT/US2022/071327, dated Aug. 29, 2022.
International Search Report and Written Opinion for PCT/US2022/071328, dated Sep. 9, 2022.
International Search Report and Written Opinion for PCT/US2022/071329, dated Aug. 25, 2022.
International Search Report and Written Opinion for PCT/US2022/071480, dated Aug. 3, 2022.
International Search Report and Written Opinion for PCT/US2022/071482, dated Aug. 2, 2022.
Provisional Applications (2)
Number Date Country
63261601 Sep 2021 US
63200908 Apr 2021 US
Continuations (2)
Number Date Country
Parent 17715400 Apr 2022 US
Child 17934339 US
Parent 17578520 Jan 2022 US
Child 17715400 US