Systems, assemblies and processes for controlling tools in a well bore

Information

  • Patent Grant
  • 10107071
  • Patent Number
    10,107,071
  • Date Filed
    Wednesday, November 11, 2015
    9 years ago
  • Date Issued
    Tuesday, October 23, 2018
    6 years ago
Abstract
A dedicated hydraulic line for transmission of a signal device capable of generating one or more unique signals to one or more tools within a subterranean well. Each tool can be equipped with a reader device for receiving signals from and transmitting signals to the signal device. Each reader device can control operation of the tool associated therewith if the reader device is programmed to respond to signals received from the control device. Hydraulic fluid used to operate the tool can be conveyed via the dedicated hydraulic line or a separate hydraulic line. A separate hydraulic line can be used to reset the tool.
Description
BACKGROUND OF THE INVENTION

Field of the Invention


The present invention relates to systems, assemblies and processes for controlling equipment, tools and the like that are positioned in a subterranean well bore, and more particularly, to systems, assemblies and processes for controlling a plurality of equipment, tools and the like that are positioned in a subterranean well bore.


Description of Related Art


In the production of fluid from subterranean environs, a well bore is drilled so as to penetrate one or more subterranean zone(s), horizon(s) and/or formation(s). The well is typically completed by positioning casing which can be made up of tubular joints into the well bore and securing the casing therein by any suitable means, such as cement positioned between the casing and the walls of the well bore. Thereafter, the well is usually completed by conveying a perforating gun or other means of penetrating casing adjacent the zone(s), horizon(s) and/or formation(s) of interest and detonating explosive charges so as to perforate both the casing and the zone(s), horizon(s) and/or formation(s). In this manner, fluid communication is established between the zone(s), horizon(s) and/or formation(s) and the interior of the casing to permit the flow of fluid from the zone(s), horizon(s) and/or formation(s) into the well. The well is subsequently equipped with production tubing and convention associated equipment so as to produce fluid from the zone(s), horizon(s) and/or formation(s) of interest to the surface. The casing and/or tubing can also be used to inject fluid into the well to assist in production of fluid therefrom or into the zone(s), horizon(s) and/or formation(s) to assist in extracting fluid therefrom.


Often during the drilling and completion of a well or during production or injection of fluid from or into a well or subterranean environs, it can be desirable to control the operation of multiple tools, equipment, or the like, for example perforating guns, cutters, packers, valves, sleeves, etc., that can be positioned in a well. In the production of fluid from or injection of fluid into subterranean environs, multiple tools and equipment are often positioned and operated in a well bore. For example, a plurality of perforating guns can be deployed within a well bore to provide fluid communication between multiple zones, horizons and/or formations. Upon detonation, these guns file projectiles through casing cemented within the well bore to form perforations and establish fluid communication between the formation and the well bore. Often these perforating guns are detonated in sequence. A plurality of flapper valves can be used in conjunction with multiple perforating guns to isolate the zone, horizon or formation being completed from other zones, horizons and/or formations encountered by the well bore. As another example, packers can be deployed on a tubular and expanded into contact with casing to provide a fluid tight seal in the annulus defined between the tubular and the casing. Flow chokes can be used to produce the well from multiple zones with these chokes set at different openings to balance the pressure existing between multiple subterranean zones, horizons and/or formations so that a plurality of such zones, horizons and/or formations can be produced simultaneously.


Hydraulic systems have been used to control the operation of tools positioned in a well. Such systems have a control system and a down hole valve. The control system includes surface equipment, such as a hydraulic tank, pump, filtration, valves and instrumentation, control lines, clamps for the control lines, and one or more hydraulic controller units. The control lines run from the surface equipment to and through the wellhead and tubing hanger to desired equipment and tools in the well. These control lines are clamped usually along a tubular that is positioned within a well. The control lines can be connected to one or more hydraulic control units within a well for distributing hydraulic fluid to the down hole valves.


Several basic arrangements of hydraulic control lines are used in a well. In a direct hydraulic arrangement, each tool that is to be controlled will have two dedicated hydraulic lines. The “open” line extends from the surface equipment to the tool and is used for transporting hydraulic fluid to the downhole control valve to operate the tool, while the “close” line extends from the tool to the surface equipment and provides a path for returning hydraulic fluid to the surface of the earth. The practical limit to the number of tools that can be controlled using the direct hydraulic arrangement is three, i.e. six separate hydraulic lines, due to the physical restraints in positioning hydraulic lines in a well. The tubing hanger through which the hydraulic lines run also has to accommodate lines for a gauge system, at least one safety valve and often a chemical injection line, which limits the number of hydraulic lines the hanger can accommodate. When it is desirable to control more than three tools in a well, a common close arrangement can be employed in which an open line is run to each tool to be controlled and a common close line is connected to each tool to return hydraulic fluid to the surface. Again, the common close system has a practical limit of controlling five tools, i.e. six separate hydraulic lines.


In another arrangement, a single hydraulic line is dedicated to each tool and is connected to each tool via a separate, dedicated controller for each tool. To open the tool, the hydraulic fluid in the dedicated line is pressurized to a first level. Thereafter, the hydraulic fluid in the dedicated line is pressurized to a higher level so as to close the tool. In a digital hydraulics system, two hydraulic lines are run from the surface equipment to a downhole controller that is connected to each of the tools to be controlled. Each controller is programmed to operate upon receiving a distinct sequence of pressure pulses received through these two hydraulic lines. Each tool has another hydraulic line is connected thereto as a common return for hydraulic fluid to the surface. The controllers employed in the single line and the digital hydraulics arrangements are complex devices incorporating numerous elastomeric seals and springs which are subject to failure. In addition, these controllers use small, inline filters to remove particles from the hydraulic fluid that might otherwise contaminate the controllers. These filters are prone to clogging and collapsing. Further, the complex nature of the pressure sequences requires a computer operated pump and valve manifold which is expensive.


In accordance with the “distribution hub” arrangement, two hydraulic lines are run from the surface to one downhole controller to which each tool to be controlled is connected by its own set of two hydraulic lines. This controller can be ratcheted to any of a number of predetermined locations, each of which connects the control lines of a given tool to the control lines running from the surface to the controller. In this manner, each tool can be operated independently from the surface. By ratcheting the controller to another location, another tool can be operated. This arrangement is expensive due to the large number of components and complex arrangement of seals in the controller and unreliable as it is difficult to get feedback to the surface on the exact position of the controller, especially if the operator has lost track of the pulses previously applied. Thus, a need exists for hydraulic control systems, assemblies and processes for use in controlling multiple tools in a well which is relatively inexpensive, simple in construction and operation and reliable.


SUMMARY OF THE INVENTION

To achieve the foregoing and other objects, and in accordance with the purposes of the present invention, as embodied and broadly described herein, one characterization of the present invention is a hydraulic control system for use in a subterranean well is provided. The control system comprises a control line positioned in a subterranean well and extending adjacent at least one tool positioned within the subterranean well. The control line is sized to permit passage of a control signal device and each of the at least one tool has a reader device connected thereto.


In another characterization of the present invention, a process is provided for conveying at least one signal device capable of generating one or more unique signals through a control line positioned in a subterranean well so as to control the operation of at least one tool positioned in the well outside of the control line.


In yet another characterization of the present invention, a process is provided for conveying hydraulic fluid via a first hydraulic line to at least one tool positioned in a subterranean well to control the operation of the tool. At least one signal device is conveyed through a control line positioned in the well and outside of the first hydraulic line and the at least one tool. Each of the at least one signal device is capable of generating one or more unique signals for controlling flow of hydraulic fluid from the first hydraulic line to the at least one tool.





BRIEF DESCRIPTION OF THE DRAWINGS

The accompanying drawings, which are incorporated in and form a part of the specification, illustrate the embodiments of the present invention and, together with the description, serve to explain the principles of the invention.


In the drawings:



FIG. 1A is a schematic view of one embodiment of the systems and assemblies of the present invention that utilizes a dedicated control line;



FIG. 1B is a sectional view of a hydraulic control line of FIG. 1A having a signal device therein;



FIG. 2A is a schematic view of another embodiment of the systems and assemblies of the present invention that utilizes three hydraulic lines that extend to the surface;



FIG. 2B is a sectional view of a hydraulic control line of FIG. 2A having a signal device therein;



FIG. 3A is a schematic view of a further embodiment of the systems and assemblies of the present invention that utilizes two hydraulic lines that extend to the surface;



FIG. 3B is a sectional view of a hydraulic control line of FIG. 3A having a signal device therein;



FIG. 4A is a schematic view of still further embodiment of systems and assemblies of the present invention that utilizes one hydraulic line that extends to the surface;



FIG. 4B is a sectional view of a hydraulic control line of FIG. 4A having a signal device therein;



FIG. 5A is a partially cross sectional illustration of the embodiment of the present invention that utilizes three hydraulic lines as deployed in a subterranean well; and



FIG. 5B is a sectional view of the hydraulic control lien of FIG. 5A having a signal device therein.





DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

As utilized throughout this description, the term “signal control line” refers to a continuous or jointed line, conduit, tubular or similar structure for conveying fluid and a signal device. The substantially axial bore through the control line is sufficient to permit passage of a signal device therethrough but the outside diameter of the control line is sufficiently small so as not to impede placement of other lines, tubulars, tools and equipment within the well. A nonlimiting example of suitable diameters for a signal control line are an outside diameter of from about 0.25 inch to about 0.50 inch and a substantially axial bore diameter of from about 0.15 inch to about 0.40 inch. The diameter of the substantially axial bore through the signal control line used in accordance with the present invention is not sufficient to allow commercial quantities of formation fluids to be produced therethrough. The signal control line can be constructed of any suitable material, for example stainless steel or a stainless steel alloy. A “signal device” refers to a device which is capable of generating one or more unique signals. Nonlimiting examples of a signal device are a radio frequency identification device (RFID), a device carrying a magnetic bar code, a radioactive device, an acoustic device, a surface acoustic wave (SAW) device, a low frequency magnetic transmitter and any other device that is capable of generating one or more unique signals. The signal device can have any suitable peripheral configuration and geometric shape, and is sized to permit conveyance through the signal control line. Some signal devices, for example RFID, can require a peripheral configuration and geometric shape to inhibit tumbling of the RFID during conveyance through the signal control line. A suitable RFID is commercially available from Sokymat SA, Switzerland under the trade name “Glass Tag 8 mm Q5”. A “reader device” refers to a device capable of transmitting signals to and receiving signals from a signal device.


In accordance with one embodiment of the present invention as illustrated in FIG. 1, a signal control line 14 can be positioned in a subterranean well and extend from the well head 10 to a position at least adjacent to the most remote tool from the well head that is desired to be controlled by the processes of the present invention. Signal control line 14 has a first end 16 at or near the well head 10 and a second end 18 located in the well. Although signal control line 14 can be supported from the well head and unattached as positioned in the well, it is preferably secured to tubulars and/or tools positioned in a well by any suitable means, for example by clamps, and can be armored as will be evident to a skilled artisan. Signal control line can be open at end 18 thereof to the well bore. One or more tools or equipment 30A, 30B and 30N can be positioned in a well and can be connected to reader devices 20A, 20B and 20N, respectively. Tools 30A, 30B and 30N can be connected to the associated reader devices 20A, 20B and 20N by any suitable means, such as via a hydraulic or electric line or acoustic connection 31A, 31B and 31N. Each reader device is connected to a suitable power source 24A, 24B, and 24N and antennas 22A, 22B and 22N, respectively. Nonlimiting examples of suitable power sources are batteries. As illustrated, antennas 22 can be coiled to surround control line 10 such that the orientation of signal device 12 within control line 10 is immaterial to the reception of a signal by antenna 22. An unlimited number of tools 30 can be controlled by the present invention, with the total number of tools that are positioned in a well and capable of being controlled by the present invention being designated by the letter “N”.


In operation, a suitable signal device 12 can be conveyed from the well head 10 through line 14, for example in suitable fluid, such as hydraulic oil or water, that can be pumped by equipment located at the surface. The signal device 12 is sized and configured to inhibit the signal device from tumbling in line 14 during conveyance (FIG. 1B). Each signal device 12 is programmed to generate a unique signal. Similarly, each reader device 20A, 20B and 20N is programmed to look for a unique code signal. As the signal device 12 passes in proximity to a reader device 20, the unique signal transmitted by signal device 12 can be received by an antenna 22. If a given reader device 20 is programmed to respond to the signal transmitted by the device 12 via the associated antenna 22, the reader device 20 transmits a corresponding control signal to the associated tool 30 to actuate the tool. Reader devices 20 can also transmit signals which in turn are received by and cause signal device 12 to generate the unique signal.


Each reader device 20 can be programmed to respond to its own unique signal or the same signal of at least one other reader device. As the signal device 12 is conveyed through line 14, the unique signal transmitted thereby can be received and read by each successive reader device. If the unique signal matches that programmed in the reader device, the reader device transmits a control signal to actuate the associated tool 30. Ultimately, the signal device 12 exits through the end of the control line 14 into the well. Thereafter, one or more additional signal devices can be conveyed via control line 14 to actuate one or more tools 30 in any sequence and manner desired. In this manner, an unlimited number of tools can be actuated by conveying one or more signal devices via control line 14. When line 14 is open at end 18 to the well bore, it is subject to hydrostatic fluid, and as such, the hydraulic pressure exerted in this line must be sufficient to overcome this pressure so as to convey signal device 12 through line 14.


In accordance with another embodiment of the present invention as illustrated in FIG. 2, three hydraulic lines 114, 154 and 164 can be positioned in a subterranean well and extend from the well head 110 to a position at least adjacent to the most remote tool from the well head that is desired to be controlled by means of this embodiment of the present invention. Each line 114, 154 and 164 has a first end 116, 156, 166, respectively, at or near the well head 110 and a second end 118, 158 and 168 located in the well. Second end 118 or line 114 can be open to the well and therefore the hydrostatic pressure of any fluid that is present in the well, while ends 158 and 168 of lines 156 and 166, respectively, can be capped or plugged as illustrated in FIG. 1 by any suitable means as will be evident to a skilled artisan. Alternatively, the end 116 of control line 114 can be connected to either end 158 of control line 154 or end 168 of control line 164 to permit the signal device 112 to be conveyed through line 114 and back to the surface through line 154 or line 164. Although lines 116, 156 and 166 can be supported from the well head and unattached as positioned in the well, each line is preferably secured to tubulars and/or tools positioned in a well by any suitable means, for example by clamps, and can be armored as will be evident to a skilled artisan.


A plurality of tools or equipment 130A, 130B and 130N are positioned in a well and can have a piston or sleeve 132A, 132B and 132N, respectively, moveably secured therein. Each tool 130A, 130B and 130N can be connected to hydraulic line 154 by means of lines 134A, 134B and 134N, respectively, each of which has a corresponding valve 136A, 136B and 136N. Each tool 130A, 130B and 130N can also be connected to hydraulic line 164 by means of lines 138A, 138B and 138N, respectively. Reader devices 120A, 120B and 120N are electrically connected to a suitable power source 124A, 124B, and 124N and antennas 122A, 122B and 122N, respectively. Nonlimiting examples of suitable power sources are batteries. These power sources can be preprogrammed to be in a sleep mode except for certain predetermined periods of time so as to conserve power consumption and therefore extend the life of the power source. As illustrated antennas 122A, 122B and 122N are coiled to surround control line 114 such that the orientation of the signal device 112 within control line 114 is immaterial. Each reader device 120A, 120B and 120N can be electrically connected to corresponding motors 126A, 126B and 126N, respectively, which in turn drive shaft or stem 127A, 127B and 127N to open or close valves 136A, 136B and 136N as will be evident to a skilled artisan. An unlimited number of tools 130 can be controlled by this embodiment of the present invention, with the total number of tools that are positioned in a well and capable of being controlled being designated by the letter “N”. Hydraulic fluid, such as hydraulic oil or water, can be used in each of the three hydraulic lines and can be pressurized by any suitable means, such as a pump located at or near the well head, to a pressure sufficient to overcome the hydrostatic pressure of fluid present in the well to move from the well head through fluid and signal device 112 a hydraulic line and into the well.


As typically positioned in a well, valves 136A, 136B and 136N are in a closed positioned and pistons 132A, 132B and 132N are positioned to one end of the respective tool 130 as noted by the positions x or y in FIG. 2. While the tools 130 are illustrated in FIG. 2 as having a position generally on each end and in the center of the tool, the piston can be able to achieve several positions along the tool and have an associated mechanism, such as a collet, to allow this to be accomplished. A nonlimiting example of a tool utilizing a piston having variable positions is a variable choke installed in a tubular positioned in a well.


In operation, a suitable signal device 112 can be conveyed from the well head 110 through line 114, for example in fluid pumped by equipment located at the surface. Each signal device 112 is programmed to generate a unique signal. Similarly, each reader device 120A, 120B and 120N is programmed to look for a unique code signal. As the signal device 112 passes in proximity to a given reader device 120, the unique signal transmitted by signal device 112 can be received by an antenna 122. If a given reader device 120 is programmed to respond to the signal transmitted by the device 112 via the associated antenna 122, the reader device 120 transmits a corresponding control signal to the associated motor 126 which in turn causes valve 136 to open via shaft 127. Reader devices 120 can also transmit signals which in turn are received by and cause signal device 112 to generate the unique signal. As hydraulic fluid in line 154 is thereby permitted to flow through line 134 and valve 136, the pressure of the hydraulic fluid causes piston 132 in tool 130 to move to the desired position and thereby actuate the tool. Movement of the piston 132 in tool 130 causes the hydraulic fluid on the other side of piston 132 to flow back to the well head 110 via hydraulic line 164. To move piston 132 to a different position, pressure on the hydraulic fluid in line 154 or line 164 can be increased to move the piston with the associated mechanism, such as a collet, thereby permitting the piston to sequentially achieve several positions along the tool 130.


Each reader device 120 can be programmed to respond to its own unique signal or the same signal of at least one other reader device. As the signal device 112 is conveyed through line 114, the unique signal transmitted thereby can be received and read by each successive reader device. If the unique signal matches that programmed in the reader device, the reader device transmits a control signal to open the associated motor 126 and valve 136. Ultimately, the signal device 112 exits through the end of the control line 114 into the well. Thereafter, one or more additional motor(s) 126 and valve(s) 136 in any sequence and manner desired. In this manner, an unlimited number of tools 130 can be actuated by conveying one or more signal devices via control line 114. As line 114 is open at end 118 to the well bore, it is subject to hydrostatic fluid and as such the hydraulic pressure exerted in this line must be sufficient to overcome this pressure so as to convey signal device 112. Alternatively, line 114 can be connected to line 158 thereby permitting passage of signal device 112 to the surface. Signal device 112 can be configured to receive a signal from a given reader device that the unique signal conveyed by the signal device was received by the reader device. In this instance, the reader devices 120 are transceivers permitting each device to receive a unique signal from the signal device and to transmit another unique signal back to the signal device. Each signal device 112 can also be equipped with suitable gauges to measure well, formation, and/or fluid conditions which can then be recorded in signal device 112. Nonlimiting examples of suitable gauges are temperature and pressure gauges. Information contained in the signal device 112 can be read at the surface, erased from the signal device 112, if desired, and the signal device can be programmed to emit another unique signal for use in the same well or another well.


To close each valve 136, each associated reader device can be preprogrammed to actuate the appropriate motor 126 and shaft 127 after a period of time to close the associated valve 136. Alternatively, a signal device 112 can be conveyed via line 114 to transmit a unique signal to the appropriate reader device 120 via antenna 122 which in turn transmits a corresponding control signal to the associated motor 126 causing shaft 127 to close valve 136.


In accordance with another embodiment of the present invention as illustrated in FIG. 3, two hydraulic lines 214 and 264 are positioned in a subterranean well and extend from the well head 110 to a position at least adjacent to the most remote tool from the well head that is desired to be controlled by means of this embodiment of the present invention. Lines 214 and 264 have a first end 216 and 266, respectively, at or near the well head 210 and a second end 218 and 268 secured and in fluid communication with a line 270. Although lines 216 and 266 can be supported from the well head and unattached as positioned in the well, each line, including line 270, is preferably secured to tubulars and/or tools positioned in a well by any suitable means, for example by clamps, and can be armored as will be evident to a skilled artisan.


In the embodiment of the present invention illustrated in FIG. 3, each tool 230A, 230B and 230N can be connected to hydraulic line 214 by means of lines 234A, 234B and 234N, respectively, each of which has a corresponding valve 236A, 236B and 236N. Each tool 230A, 230B and 230N can also be connected to hydraulic line 164 by means of lines 138A, 138B and 138N, respectively. Valves 236A, 236B and 236N are initially in the closed position as the system is deployed in a well, while valve 290 in line 270 connecting the lower ends of 218, 268 of lines 214 and 264 together is initially in the open position. To begin operation, a unique signal device 212 can be conveyed via line 214 by any suitable means, for example hydraulic oil. The unique signal transmitted by signal device 212 can be received by each antenna 222A, 222B and 222N and conveyed to each associated reader device 220A, 220B and 220N. If a given reader device has been preprogrammed to respond to the received signal, that reader device actuates at least one motor 226A, 226B or 226N to open the associated valve 236A, 236B or 236N via the appropriate shaft 227A, 227B or 227N. The signal device then passes through line 270 and conveys a signal to reader device 280 via antenna 282. Reader device 280, which can be powered by power source 284, in turn activates motor 296 to close valve 290 via shaft 297. Each signal device can be configured to receive a signal from a given reader device that the unique signal conveyed by the signal device was received by the reader device. In this instance, the reader devices 220 are transceivers permitting each device to receive a unique signal from the signal device and to transmit another unique signal back to the signal device. Each signal device 212 can also be equipped with suitable gauges to measure well, formation, and/or fluid conditions which can then be recorded in signal device 212. Nonlimiting examples of suitable gauges are temperature and pressure gauges. With valve 290 closed, hydraulic fluid can be directed via line 214 to that valve(s) 236 that was opened by the unique signal device 212 to move piston 232 to a desired position. Valves 236A, 236B and 236N are in a closed positioned and pistons 232A, 232B and 232N are positioned to one end of the respective tool 230A, 230B and 230N as noted by the positions x or y in FIG. 3. While the tools 230 are illustrated in FIG. 3 as having a position generally on each end and in the center of the tool, the piston can be able to achieve several positions along the tool and have an associated mechanism, such as a collet, to allow this to be achieved. Reader device 280 can be programmed to cause valve 290 to open a predetermined time after being closed or the unique signal(s) from signal device 212 can contain instructions to cause the reader device to open valve 290 in a predetermined amount of time. Once valve 290 is open, signal device 212 can be conveyed to the well head 210 via line 264 by pressurizing hydraulic fluid in line 214. Information contained in the signal device 212 can be read at the surface, erased from the signal device 212, if desired, and the signal device can be programmed to emit another unique signal for use in the same well or another well.


In the embodiment of the present invention illustrated in FIG. 4, one hydraulic line 314 can be positioned in a subterranean well and extends from the well head 310 to a position at least adjacent to the most remote tool from the well head that is desired to be controlled by means of this embodiment of the present invention. Line 314 has a first end 316 at or near the well head 310 and a second end 318 open to the well. Hydraulic line 314 is also equipped with a valve 390 which is initially in an open position. Although line 314 can be supported from the well head and unattached as positioned in the well, line 314 is preferably secured to tubulars and/or tools positioned in a well by any suitable means, for example by clamps, and can be armored as will be evident to a skilled artisan. One or more tools 330 are positioned in the well by means of continuous or jointed tubulars or wireline. The letter “N” represents the total number of tools and associated equipment that are positioned in the well and assembled as capable of being controlled in accordance with the system and process of this embodiment of the present invention. Tools 330 are connected to hydraulic line 314 by means of associated hydraulic lines 334 and have pistons 332 positioned therein. Pistons 332A, 332B and 332N are positioned to one end of the respective tool 330 as noted by the positions x or y in FIG. 4. While the tools 330 are illustrated in FIG. 4 as having a position generally on each end and in the center of the tool, the piston can be able to achieve several positions along the tool and have an associated mechanism, such as a collet, to allow this to be achieved. A nonlimiting example of a tool utilizing a piston having variable positions is a variable choke installed in a tubular positioned in a well.


Change-over valves 336 are positioned in hydraulic lines 334 and are connected to and controlled by motors 326 and shafts 327. Reader devices 320A, 320B and 320N are electrically connected to a suitable power source 324A, 324B, and 324N and antennas 322A, 322B and 322N, respectively. Nonlimiting examples of suitable power sources are batteries. These power sources can be preprogrammed to be in a sleep mode except for certain predetermined periods of time so as to conserve power consumption and therefore extend the life of the power source. As illustrated, antennas 322A, 322B and 322N are coiled to surround control line 314 such that the orientation of the signal device 312 within control line 314 is immaterial. Each reader device 320A, 320B and 320N is electrically connected to corresponding motors 326A, 326B and 326N, respectively, which in turn drive shaft or stem 327A, 327B and 327N to open or close valves 336A, 336B and 336N as will be evident to a skilled artisan.


Another reader device 380 is electrically connected to a suitable power source 384 and antenna 382 which is configured to surround hydraulic line 314. Reader device 380 is also electrically connected to motors 396 which drives shaft or stem 397 to open or close valve 390 as will be evident to a skilled artisan.


In operation, a signal device 312 can be conveyed via line 314, through open valve 390 and open end 318 into the well for example in fluid pumped by equipment located at the surface. Each signal device 312 is programmed to generate a unique signal. Similarly, each reader device 320A, 320B and 320N is programmed to look for a unique code signal. As the signal device 312 passes in proximity to a given reader device 320, the unique signal transmitted by signal device 312 can be received by an antenna 322. If a given reader device 320 is programmed to respond to the signal transmitted by the device 312 via the associated antenna 322, the reader device 320 transmits a corresponding control signal to the associated motor 326 which in turn causes valve 336 to open via shaft 327. Reader devices 320 can also transmit signals which in turn are received by and cause signal device 312 to generate the unique signal. Antenna 382 conveys a signal received from signal device 312 to actuate motor 396 and shaft 397 to close valve 390. Thereafter, hydraulic fluid in line 314 is thereby permitted to flow through line 334 and valve 336 thereby causing piston 332 in tool 330 to move to the desired position and thereby actuate the tool. Hydraulic fluid flowing around a given piston 332 is permitted to flow back into the well via hydraulic line 338. Reader device 380 can be programmed to cause valve 390 to open a predetermined time after being closed or the unique signal from signal device 312 can contain instructions to cause the reader device to open valve 390 in a predetermined amount of time.



FIG. 5 illustrates substantially the embodiment of the present invention depicted schematically in FIG. 2 as deployed in a subterranean well. In FIG. 5 a subterranean well 502 extends from the surface of the earth 503 and penetrates one or more subterranean formation(s), zone(s) and/or reservoir(s) 508 of interest. Although the well 502 can have any suitable subterranean configuration as will be evident to a skilled artisan, the well is illustrated in FIG. 5 as having a generally horizontal configuration through the subterranean formation(s), zone(s) and/or reservoir(s) 508 of interest. The well can be provided with intermediate casing 504 which can be secured within the well 502 by any suitable means, for example cement (not illustrated), as will be evident to a skilled artisan. The intermediate casing is illustrated in FIG. 5 as extending from the surface of the earth to a point near the subterranean formation(s), zone(s) and/or reservoir(s) 508 of interest so as to provide an open hole completion through a substantial portion of the subterranean formation(s), zone(s) and/or reservoir(s) 508 of interest that are penetrated by well 502. Production casing 506 is also positioned within the well and is sized to extend through the casing and into the open hole of well 502 with the subterranean formation(s), zone(s) and/or reservoir(s) 508. Production casing 506 is further provided with a one or more tools 530A-F which are sliding sleeves as illustrated in FIG. 5 to selectively provide a fluid communication between the formation(s), zone(s) and/or reservoir(s) 508 and the interior of production casing 506. A control line 114 has a first end 116 at or near the well head 110 and extends in the annulus between the intermediate casing 504 and production casing 506 to each of the tools 530 A-F. The other end of 118 of the control line 114 extends into the open hole of well 502 outside of production casing 506. Hydraulic lines 154 and 164 each extend from the surface of the earth at or near the wellbore to at least to a point in the well adjacent to the distal tool 530 F so as to allow hydraulic connection thereto in a manner is illustrate in FIG. 2. Although lines 116, 156 and 166 can be supported from the well head and unattached as positioned in the well, each line is preferably secured to the exterior of production casing 506 by any suitable means, for example by clamps, and can be armored as will be evident to a skilled artisan. Thereafter, a signal device 112 can be conveyed through control line 114 to selectively, hydraulically operate the sliding sleeves in tools 530 A-F in a manner as described above with reference to FIG. 2. The arrangement of sliding sleeves depicted in FIG. 5 can be employed to selectively and sequentially fracture the subterranean formation(s), zone(s) and/or reservoir(s) 508 of interest adjacent the open sleeve.


The following example demonstrates the practice and utility of the present invention, but is not to be construed as limiting the scope thereof.


EXAMPLE 1

A well is drilled to total depth (TD) so as to penetrate a subterranean formation of interest and the drilling assembly is removed from the well. A 7 inch outer diameter intermediate casing is positioned in the well to extend substantially from the surface of the earth to a point above the subterranean formation of interest. The intermediate casing is cemented to the well bore by circulating cement. Excess cement is drilled from the intermediate casing and well bore extending below the intermediate casing through the subterranean zone of interest.


A 3.5 inch outer diameter production casing is equipped with 6 sliding sleeves and has 3 hydraulic lines attached to the outside of the production casing. The sliding sleeves are arranged in series and referred to hereafter as sliding sleeves 1-6, with sliding sleeve 1 being proximal and sliding sleeve 6 being distal the intermediate casing. The hydraulic lines are a control line, a hydraulic power open line and a hydraulic power close line. The end of the production casing has a cementing shoe and a check valve assembly. The production casing and associated equipment and lines is lowered into the well until all sleeves which are in the closed position are in the open hole (portion of the well without intermediate casing).


Water-based, cross-linked fluids are pumped down the production casing and placed in annulus between the production casing and the open hole from TD to above sliding sleeve 1. The fluids are displaced with wiper plug that is conveyed through the production casing and latches in place at the bottom thereof so as to prevent flow of well fluids into the production casing. The fluids are allowed to thicken and create zonal isolation barriers.


A radio frequency identification device (RFID) encoded with specific code is pumped down the control line to actuate the shuttle valve in distal sliding sleeve from the intermediate casing (sleeve 6). Actuation is achieved by means of a radio frequency transceiver associated with the sliding sleeve. Approximately 7 gallons of hydraulic fluid are required to pump the RFID through the control line and into the well. Approximately 3,000 psi pressure is applied via hydraulic fluid in the power open line to open sliding sleeve 6. No pressure should be applied to the power close line so that minor fluid returns can occur as the piston in the sliding sleeve moves positions. After some time period, the shuttle valve in sliding sleeve 6 should close, locking the sleeve in the open position. Thereafter, approximately 3,000 barrels of fluid are pumped through the production casing, open sleeve 6 and into the formation adjacent sliding sleeve 6 so as to fracture and stimulate production of fluids from this adjoining formation. Sand can be incorporated into the stimulation fluid if desired.


Another RFID chip encoded with a specific code down is pumped down control line to actuate the shuttle valve in sliding sleeve 6. Approximately 3,000 psi pressure is applied via hydraulic fluid in the power close line to close sliding sleeve 6. No pressure should be applied to the power open line so that minor fluid returns can occur as the piston in the sliding sleeve moves positions. After some time period the shuttle valve in sliding sleeve 6 should close, locking the sleeve in the closed position. Thereafter, the production casing is pressure tested to confirm integrity. A RFID encoded with a specific code is pumped down the control line to actuate the shuttle valve in sliding sleeve 5. Approximately 3,000 psi pressure is applied to the hydraulic fluid in power open line to open sliding sleeve 5. No pressure should be applied to the power close line so that minor fluid returns can occur as the piston in the sliding sleeve moves positions. After some time period the shuttle valve in sliding sleeve 5 should close, locking the sleeve in the open position.


Thereafter, approximately 3,000 barrels of fluid are pumped through the production casing, open sleeve 5 and into the formation adjacent sliding sleeve 5 so as to fracture and stimulate production of fluids from this adjoining formation. Sand can be incorporated into the stimulation fluid if desired.


Another RFID chip encoded with a specific code down is pumped down control line to actuate the shuttle valve in sliding sleeve 5. Approximately 3,000 psi pressure is applied via hydraulic fluid in the power close line to close sliding sleeve 5. No pressure should be applied to the power open line so that minor fluid returns can occur as the piston in the sliding sleeve moves positions. After some time period the shuttle valve in sliding sleeve 5 should close, locking the sleeve in the closed position. Thereafter, the production casing is pressure tested to confirm integrity. This process is repeated for sliding sleeves 4, 3, 2, and 1 respectively.


After the formation adjacent each of sleeves 1-6 has been stimulated, the cross-linked fluids are permitted to break down thereby removing the isolation barriers. Separate RFIDs are pumped down the control line to open and allow the well to be flow tested sequentially open sleeves 1, 2, 3, 4, 5, and 6 in order, while applying pressure to power open line and holding no back pressure on the power close line. The production casing and associated sleeves and lines can then be retrieved from the well, after circulating fluid down the production casing and up annulus. Thereafter, the well completion operations are continued.


Although the antennae of the present invention has been illustrated in FIGS. 1-4 as being coiled around the control line employed in accordance with the present invention, certain signal devices, such as SAW, may not require a coiled antenna for the signal transmitted thereby to be received by the associated reader device(s). In such instances, the reader device(s) 20, 120, 220, and 320 can have an antenna that is proximate to control line 14, 114, 214, and 314, respectively. Further, in those embodiments of the present invention where the signal device can be conveyed into the well from the control line, the signal device can be equipped with suitable gauges, such as temperature and pressure, and conveyed into a subterranean formation surrounding the well. Subsequently, the signal device can be produced with formation fluid into the well and the surface of the earth where the information recorded in the signal device can be read. The systems, assemblies and processes of the present invention allow a plurality of tools in a well to be controlled via a limited number of hydraulic lines. Nonlimiting examples of tools useful in the systems, assemblies and processes of the present invention are sliding sleeves, packers, perforating guns, flow control devices, such as chokes, and cutters.


While the foregoing preferred embodiments of the invention have been described and shown, it is understood that the alternatives and modifications, such as those suggested and others, can be made thereto and fall within the scope of the invention.

Claims
  • 1. A hydraulic control system for use in a subterranean well comprising: at least one tool positioned along production casing within the subterranean well;a first hydraulic line positioned in the subterranean well outside of the production casing and connected to each of said at least one tool via separate hydraulic connections, said first hydraulic line sized to permit passage of both a signal device and hydraulic fluid therethrough;at least one first valve corresponding in number to said at least one tool, each of said at least one first valve being positioned in separate one of the hydraulic connections between said first hydraulic line and said at least one tool; andat least one reader device corresponding in number to said at least one first valve, each of said at least one reader device being connected to a separate one of said at least one first valve so as to control the actuation thereof.
  • 2. The hydraulic control system of claim 1 wherein said first hydraulic line has one end at or near the surface of the earth.
  • 3. The hydraulic control system of claim 2 wherein said first hydraulic line has another end that is open to the well.
  • 4. The hydraulic control system of claim 3 further comprising: a second valve positioned in said first hydraulic line at a position more distal from the surface of the earth than any of said hydraulic connections; anda second reader device for controlling the actuation of said second valve.
  • 5. The hydraulic control system of claim 1 wherein said signal device is capable of generating one or more unique signals.
  • 6. The hydraulic control system of claim 5 wherein said signal device is a radio frequency identification device, a device carrying a magnetic bar code, a radioactive device, an acoustic device, a surface acoustic wave device, or a low frequency magnetic transmitter.
  • 7. The hydraulic control system of claim 6 wherein said reader device is connected to a battery.
  • 8. The hydraulic control system of claim 6 wherein said reader device has an antenna.
  • 9. The hydraulic control system of claim 8 wherein said antenna substantially surrounds said first hydraulic line.
  • 10. The hydraulic control system of claim 9 wherein said antenna is configured substantially as a coil and said first hydraulic line extends through said coil.
  • 11. The hydraulic control system of claim 1 wherein said at least one tool is a plurality of tools.
  • 12. The hydraulic control system of claim 1 wherein said first hydraulic line extends in an annulus between the production casing and intermediate casing within the subterranean well.
  • 13. The hydraulic control system of claim 1 wherein said first hydraulic line has an inner diameter of from about 0.15 inch to about 0.40 inch.
  • 14. The hydraulic control system of claim 1 wherein said signal device is sized and configured to inhibit said signal device from tumbling during passage in said first hydraulic line.
  • 15. The hydraulic control system of claim 1 wherein said first hydraulic line is secured to said production casing.
  • 16. The hydraulic control system of claim 1 further comprising: a second hydraulic line positioned in a subterranean well and hydraulically connected to each of said at least one tool such that increasing hydraulic pressure in said first hydraulic line moves a component in said tool one direction while increasing pressure in said second hydraulic line moves said component in an opposite direction.
  • 17. The hydraulic control system of claim 16 wherein said first hydraulic line and said second hydraulic line are connected.
  • 18. The hydraulic control system of claim 17 further comprising: a third valve substantially at the connection of said first hydraulic line and said second hydraulic line.
  • 19. The hydraulic control system of claim 18 further comprising: a third reader device for controlling the actuation of said third valve.
  • 20. The hydraulic control system of claim 16 wherein said second hydraulic line is positioned in the subterranean well outside of the production casing.
  • 21. A process comprising: conveying at least one signal device capable of generating one or more unique signals from a well head through a first hydraulic line positioned in a subterranean well outside of production casing and extending adjacent each of at least one tool that is positioned along the production casing;conveying hydraulic fluid via said first hydraulic line that is positioned outside the production casing in a subterranean well and hydraulically connected to each of said at least one tool; andcontrolling flow of said hydraulic fluid to at least one of said at least one tool based upon said one or more unique signals.
  • 22. The process of claim 21 further comprising: discharging said at least one signal device from the first hydraulic line into the well.
  • 23. The process of claim 21 wherein said at least one signal device controls the operation of a plurality of tools.
  • 24. The process of claim 21 wherein each of said at least one tool has a reader device connected thereto that is capable of receiving one or more unique signals from each of said at least one signal device and controlling the operation of the tool connected thereto by controlling flow of said hydraulic fluid upon receipt of specific unique signal that the reader device is programmed to respond to.
  • 25. The process of claim 24 further comprising: transmitting a signal from said reader device to said at least one signal device.
  • 26. The process of claim 21 wherein said at least one signal device is a radio frequency identification device, a device carrying a magnetic bar code, a radioactive device, an acoustic device, a surface acoustic wave device, or a low frequency magnetic transmitter.
  • 27. The process of claim 21 wherein said at least one signal device is conveyed from the surface of the earth through said first hydraulic line.
  • 28. The process of claim 21 further comprising: conveying hydraulic fluid to said at least one tool via a second hydraulic line positioned in the well so as to reset said tool after hydraulic fluid is conveyed via said first hydraulic line.
  • 29. The process of claim 28 wherein said first hydraulic line is connected to said second hydraulic line in the well, the process further comprising: conveying said at least one signal device to the surface of the earth.
  • 30. The process of claim 28 further comprising: transmitting a signal from said reader device to said at least one signal device.
  • 31. The process of claim 30 further comprising: measuring well, formation, fluid conditions or combinations thereof by means of gauges that said at least one signal device is equipped with.
  • 32. The process of claim 31 wherein said first hydraulic line is connected to said second hydraulic line in the well, the process further comprising: conveying said at least one signal device to the surface of the earth.
  • 33. The process of claim 21 wherein said first hydraulic line extends in an annulus between the production casing and intermediate casing within the subterranean well.
  • 34. The process of claim 21 wherein said first hydraulic line has an inner diameter of from about 0.15 inch to about 0.40 inch.
  • 35. A process comprising: conveying hydraulic fluid from a well head via a first hydraulic line that is positioned in a subterranean well outside of production casing and extends adjacent at least one tool that is positioned in the well along the production casing;conveying at least one signal device through said first hydraulic line positioned in the subterranean well, each of said at least one signal device capable of generating one or more unique signals; andtransmitting a control signal based upon receipt of said one or more unique signals by a reader device so as to control the flow of said hydraulic fluid from said first hydraulic line to said at least one tool to actuate the tool.
  • 36. The process of claim 35 wherein each of said at least one tool has a separate reader device connected thereto capable of receiving said one or more unique signals.
  • 37. The process of claim 36 further comprising: transmitting a signal from said reader device to said at least one signal device.
  • 38. The process of claim 35 wherein said first hydraulic line is connected to a second hydraulic line in the well, the process further comprising: conveying said at least one signal device to the surface of the earth via said second hydraulic line.
  • 39. The process of claim 35 further comprising: measuring well, formation, fluid conditions or combinations thereof by means of gauges that said at least one signal device is equipped with.
  • 40. The process of claim 39 wherein said first hydraulic line is connected to a second hydraulic line in the well, the process further comprising: conveying said at least one signal device to the surface of the earth via said second hydraulic line.
  • 41. The process of claim 35 further comprising: conveying hydraulic fluid to said at least one tool via a second hydraulic line positioned in the well so as to reset said tool after hydraulic fluid is conveyed via said first hydraulic line.
  • 42. The process of claim 35 wherein said well has a substantially horizontal portion and said first hydraulic line extends into said substantially horizontal portion.
  • 43. The process of claim 35 wherein said first hydraulic line extends in an annulus between the production casing and intermediate casing within the subterranean well.
  • 44. The process of claim 35 wherein said first hydraulic line has an inner diameter of from about 0.15 inch to about 0.40 inch.
US Referenced Citations (164)
Number Name Date Kind
3684008 Garrett Aug 1972 A
3706094 Cole et al. Dec 1972 A
4023167 Wahlstrom May 1977 A
4096477 Epstein et al. Jun 1978 A
4119146 Taylor Oct 1978 A
4166215 Anderson Aug 1979 A
4166216 Cubberly, Jr. Aug 1979 A
4271925 Burg Jun 1981 A
4372378 Powers, Jr. Feb 1983 A
4535430 Cochrane et al. Aug 1985 A
4572293 Wilson et al. Feb 1986 A
4599182 Young et al. Jul 1986 A
4622463 Hill Nov 1986 A
4630044 Polzer Dec 1986 A
4656463 Anders et al. Apr 1987 A
4656944 Gonzalez Apr 1987 A
4698631 Kelly, Jr. et al. Oct 1987 A
4808925 Baird Feb 1989 A
4827395 Anders et al. May 1989 A
4837515 Nishihara et al. Jun 1989 A
4977961 Avashti Dec 1990 A
5029644 Szarka Jul 1991 A
5047632 Hunt Sep 1991 A
5105742 Sumner Apr 1992 A
5130705 Allen et al. Jul 1992 A
5142128 Perkin et al. Aug 1992 A
5160925 Dailey et al. Nov 1992 A
5182939 Chien et al. Feb 1993 A
5191936 Edwards et al. Mar 1993 A
5202680 Savage Apr 1993 A
5206680 Dillow Apr 1993 A
5230387 Waters et al. Jul 1993 A
5279366 Scholes Jan 1994 A
5354956 Orban et al. Oct 1994 A
5355957 Burleson et al. Oct 1994 A
5361838 Kilgore Nov 1994 A
5394141 Soulier Feb 1995 A
5417284 Jones May 1995 A
5457447 Ghaem et al. Oct 1995 A
5467083 McDonald et al. Nov 1995 A
5479860 Ellis Jan 1996 A
5495237 Yuasa et al. Feb 1996 A
5497140 Tuttle Mar 1996 A
5505134 Brooks et al. Apr 1996 A
5530358 Wisler et al. Jun 1996 A
5608199 Clouse, III et al. Mar 1997 A
5621647 Kraemer et al. Apr 1997 A
5626192 Connell et al. May 1997 A
5629623 Sezginer et al. May 1997 A
5654693 Cocita Aug 1997 A
5660232 Reinhardt Aug 1997 A
5680459 Hook et al. Oct 1997 A
5680905 Green et al. Oct 1997 A
5682099 Thompson et al. Oct 1997 A
5682143 Brady et al. Oct 1997 A
5706896 Tubel et al. Jan 1998 A
5720345 Price et al. Feb 1998 A
5829538 Wesson et al. Nov 1998 A
5836406 Schuh Nov 1998 A
5864323 Berthon Jan 1999 A
5877996 Krokstad et al. Mar 1999 A
5911277 Hromas et al. Jun 1999 A
5923167 Chang et al. Jul 1999 A
5931239 Schuh Aug 1999 A
5939885 McClure et al. Aug 1999 A
5955666 Mullins Sep 1999 A
5991602 Sturm Nov 1999 A
5995449 Green et al. Nov 1999 A
6018501 Smith et al. Jan 2000 A
6025780 Bowers et al. Feb 2000 A
6078259 Brady et al. Jun 2000 A
6081729 Bauerschmidt et al. Jun 2000 A
6085805 Bates Jul 2000 A
6097301 Tuttle Aug 2000 A
6105688 Vaynshteyn et al. Aug 2000 A
6125934 Lenn et al. Oct 2000 A
6130602 O'Toole et al. Oct 2000 A
6135206 Gano et al. Oct 2000 A
6151961 Huber et al. Nov 2000 A
6158532 Logan et al. Dec 2000 A
6176318 Drakeley et al. Jan 2001 B1
6181138 Hagiwara et al. Jan 2001 B1
6184685 Paulk et al. Feb 2001 B1
6189621 Vail, III Feb 2001 B1
6243041 Mischenko et al. Jun 2001 B1
6249258 Bloch et al. Jun 2001 B1
6253842 Connell et al. Jul 2001 B1
6257338 Kilgore Jul 2001 B1
6288548 Thompson et al. Sep 2001 B1
6288685 Thomas Sep 2001 B1
6324904 Ishikawa et al. Dec 2001 B1
6333699 Zierolf Dec 2001 B1
6333700 Thomeer et al. Dec 2001 B1
6343649 Beck et al. Feb 2002 B1
6359569 Beck et al. Mar 2002 B2
6366089 Poitzsch et al. Apr 2002 B1
6426917 Tabanou et al. Jul 2002 B1
6429653 Kruspe et al. Aug 2002 B1
6443228 Aronstam et al. Sep 2002 B1
6450258 Green et al. Sep 2002 B2
6470970 Purkis et al. Oct 2002 B1
6476609 Bittar Nov 2002 B1
6481505 Beck et al. Nov 2002 B2
6497280 Beck et al. Dec 2002 B2
6515919 Lee Feb 2003 B1
6531871 Hay et al. Mar 2003 B1
6536524 Snider Mar 2003 B1
6575237 Purkis et al. Jun 2003 B2
6577244 Clark et al. Jun 2003 B1
6588505 Beck et al. Jul 2003 B2
6597175 Brisco Jul 2003 B1
6614229 Clark et al. Sep 2003 B1
6670880 Hall et al. Dec 2003 B1
6717501 Hall et al. Apr 2004 B2
6759968 Zierolf Jul 2004 B2
6761219 Snider et al. Jul 2004 B2
6766703 Kluth et al. Jul 2004 B1
6788263 Clark et al. Sep 2004 B2
6822579 Goswami et al. Nov 2004 B2
6915848 Thomeer et al. Jul 2005 B2
6943697 Ciglenec et al. Sep 2005 B2
6989764 Thomeer et al. Jan 2006 B2
7014100 Zierolf Mar 2006 B2
7063148 Jabusch Jun 2006 B2
7159654 Ellison et al. Jan 2007 B2
7268688 Juds Sep 2007 B2
7283061 Snider et al. Oct 2007 B1
7306043 Toekje et al. Dec 2007 B2
7400263 Snider et al. Jul 2008 B2
7677439 Zierolf Mar 2010 B2
7688210 Staff Mar 2010 B2
7714741 Snider et al. May 2010 B2
8001858 Cogen et al. Aug 2011 B2
8044820 Snider et al. Oct 2011 B2
8091775 Zierolf Jan 2012 B2
8850899 Snider Oct 2014 B2
9140818 Zierolf Sep 2015 B2
9194227 Snider et al. Nov 2015 B2
20010013410 Beck et al. Aug 2001 A1
20010013411 Beck et al. Aug 2001 A1
20010042617 Beck et al. Nov 2001 A1
20010043146 Beck et al. Nov 2001 A1
20010054969 Thomeer et al. Dec 2001 A1
20020007949 Tolman et al. Jan 2002 A1
20020014966 Strassner et al. Feb 2002 A1
20020093431 Zierolf Jul 2002 A1
20020133942 Kenison et al. Sep 2002 A1
20020158120 Zierolf Oct 2002 A1
20030058125 Ciglenec et al. Mar 2003 A1
20030090390 Snider et al. May 2003 A1
20040211567 Aud Oct 2004 A1
20040239521 Zierolf Dec 2004 A1
20050115708 Jabusch Jun 2005 A1
20050237200 Bellum et al. Oct 2005 A1
20060175404 Zierolf Aug 2006 A1
20080271887 Snider et al. Nov 2008 A1
20090223663 Snider et al. Sep 2009 A1
20090223670 Snider Sep 2009 A1
20100013664 Zierolf Jan 2010 A1
20100171593 Zierolf Jul 2010 A1
20100193184 Dolman et al. Aug 2010 A1
20100219980 Snider et al. Sep 2010 A1
20110252878 Snider Oct 2011 A1
20120298243 Zierolf Nov 2012 A1
Foreign Referenced Citations (14)
Number Date Country
0013494 Jul 1980 EP
0412535 Feb 1991 EP
0651132 May 1995 EP
0730083 Sep 1996 EP
1152262 Nov 2001 EP
1033631 Jul 1953 FR
1657627 Jun 1991 SU
2000-045195 Aug 2000 WO
2001-18357 Mar 2001 WO
2001-061144 Aug 2001 WO
2001-73423 Oct 2001 WO
2006-101618 Sep 2006 WO
2009-114356 Sep 2009 WO
2011-130176 Oct 2011 WO
Non-Patent Literature Citations (64)
Entry
Den-Con Tool Co., General Catalog, 1994-95, pp. 1-3.
Varpakhovich G H; RU2057334C1: Method of Identification of Objects and Plant for its Realization; Mar. 27, 1996; pp. 1-2; Derwent Record.
U.S. Office Communication from U.S. Appl. No. 09/286,650 dated Jul. 3, 2000.
U.S. Office Communication from U.S. Appl. No. 09/286,650 dated Jan. 12, 2001.
U.S. Office Communication from U.S. Appl. No. 09/286,650 dated Oct. 12, 2001.
U.S. Office Communication from U.S. Appl. No. 09/586,648 dated Dec. 18, 2003.
U.S. Office Communication from U.S. Appl. No. 09/586,648 dated Aug. 26, 2004.
U.S. Office Communication from U.S. Appl. No. 09/586,648 dated Sep. 29, 2005.
U.S. Office Communication from U.S. Appl. No. 09/656,720 dated Feb. 26, 2002.
U.S. Office Communication from U.S. Appl. No. 09/843,998 dated Aug. 29, 2002.
U.S. Office Communication from U.S. Appl. No. 09/843,998 dated Mar. 28, 2003.
U.S. Office Communication from U.S. Appl. No. 09/843,998 dated Dec. 9, 2003.
U.S. Office Communication from U.S. Appl. No. 09/843,998 dated Jul. 28, 2004.
U.S. Office Communication from U.S. Appl. No. 09/843,998 dated Mar. 24, 2005.
U.S. Office Communication from U.S. Appl. No. 10/032,114 dated Aug. 13, 2003.
U.S. Office Communication from U.S. Appl. No. 10/032,114 dated Feb. 24, 2004.
U.S. Office Communication from U.S. Appl. No. 10/323,536 dated Dec. 27, 2006.
U.S. Office Communication from U.S. Appl. No. 10/323,536 dated May 14, 2007.
U.S. Office Communication from U.S. Appl. No. 10/323,536 dated Feb. 5, 2008.
U.S. Office Communication from U.S. Appl. No. 10/323,536 dated Apr. 11, 2008.
U.S. Office Communication from U.S. Appl. No. 10/726,027 dated Jul. 11, 2005.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated Dec. 5, 2006.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated May 17, 2007.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated Aug. 21, 2007.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated Nov. 23, 2007.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated Jun. 18, 2008.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated Nov. 10, 2008.
U.S. Office Communication from U.S. Appl. No. 10/887,366 dated Apr. 22, 2009.
U.S. Office Communication from U.S. Appl. No. 11/377,736 dated Oct. 18, 2006.
U.S. Office Communication from U.S. Appl. No. 11/377,736 dated May 7, 2007.
U.S. Office Communication from U.S. Appl. No. 11/377,736 dated Nov. 1, 2007.
U.S. Office Communication from U.S. Appl. No. 11/377,736 dated Jun. 12, 2008.
U.S. Office Communication from U.S. Appl. No. 11/377,736 dated Dec. 12, 2008.
U.S. Office Communication from U.S. Appl. No. 11/377,736 dated May 29, 2009.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Apr. 22, 2010.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Jul. 30, 2010.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Jan. 13, 2011.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated May 24, 2011.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Dec. 5, 2011.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Feb. 28, 2014.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Jun. 17, 2014.
U.S. Office Communication from U.S. Appl. No. 12/044,087 dated Oct. 27, 2014.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Aug. 2, 2010.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Nov. 5, 2010.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Apr. 6, 2011.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Oct. 20, 2011.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Jun. 19, 2012.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Aug. 1, 2013.
U.S. Office Communication from U.S. Appl. No. 12/102,687 dated Jan. 13, 2014.
U.S. Office Communication from U.S. Appl. No. 12/173,693 dated Feb. 25, 2009.
U.S. Office Communication from U.S. Appl. No. 12/173,693 dated Jun. 4, 2009.
U.S. Office Communication from U.S. Appl. No. 12/173,693 dated Aug. 21, 2009.
U.S. Office Communication from U.S. Appl. No. 12/564,780 dated Mar. 16, 2011.
U.S. Office Communication from U.S. Appl. No. 12/564,780 dated Aug. 24, 2011.
U.S. Office Communication from U.S. Appl. No. 12/725,254 dated Jun. 4, 2010.
U.S. Office Communication from U.S. Appl. No. 12/725,254 dated Nov. 2, 2010.
U.S. Office Communication from U.S. Appl. No. 12/725,254 dated Apr. 14, 2011.
U.S. Office Communication from U.S. Appl. No. 13/081,926 dated Sep. 10, 2013.
U.S. Office Communication from U.S. Appl. No. 13/081,926 dated Jan. 8, 2014.
U.S. Office Communication from U.S. Appl. No. 13/302,618 dated Jan. 10, 2013.
U.S. Office Communication from U.S. Appl. No. 13/302,618 dated Jun. 13, 2013.
U.S. Office Communication from U.S. Appl. No. 13/302,618 dated Sep. 9, 2013.
U.S. Office Communication from U.S. Appl. No. 13/302,618 dated Feb. 11, 2014.
U.S. Office Communication from U.S. Appl. No. 13/302,618 dated Feb. 4, 2015.
Related Publications (1)
Number Date Country
20160061005 A1 Mar 2016 US
Divisions (1)
Number Date Country
Parent 12044087 Mar 2008 US
Child 14938412 US