Systems, methods and apparatuses for monitoring and recovery of petroleum from earth formations

Information

  • Patent Grant
  • 8069919
  • Patent Number
    8,069,919
  • Date Filed
    Thursday, November 11, 2010
    14 years ago
  • Date Issued
    Tuesday, December 6, 2011
    13 years ago
Abstract
A system for monitoring a location of a borehole for production of petroleum from an earth formation is provided. The system includes: an assembly including at least one of an injection conduit for injecting a thermal source into the formation and a production conduit for recovering material including the petroleum from the formation; a guide conduit attached to at least a portion of the at least one of the injection conduit and the production conduit, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit; and a detection source conduit insertable through the guide conduit and configured to dispose therein a detection source for detecting a location of the assembly in the formation. A method of monitoring a location of a borehole for production of petroleum from an earth formation is also provided.
Description
BACKGROUND

Steam Assisted Gravity Drainage (SAGD) is a technique for recovering heavy crude oil and/or bitumen from geologic formations, and generally includes heating the bitumen through an injection borehole until it has a viscosity low enough to allow it to flow into a recovery borehole. As used herein, “bitumen” refers to any combination of petroleum and matter in the formation and/or any mixture or form of petroleum, specifically petroleum naturally occurring in a formation that is sufficiently viscous as to require some form of heating or diluting to permit removal from the formation.


SAGD techniques exhibit various problems that inhibit productivity and efficiency. For example, portions of a heat injector may overheat and warp causing difficulty in extracting an introducer string through the injection borehole. Also, difficulties in maintaining or controlling temperature of the liquid bitumen may pose difficulties in extracting the bitumen. Other problems include the requirement for large amounts of energy to deliver sufficient heat to the formation.


SUMMARY

Disclosed herein is a system for monitoring a location of a borehole for production of petroleum from an earth formation. The system includes: an assembly including at least one of an injection conduit for injecting a thermal source into the formation and a production conduit for recovering material including the petroleum from the formation; a guide conduit attached to at least a portion of the at least one of the injection conduit and the production conduit, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit; and a detection source conduit insertable through the guide conduit and configured to dispose therein a detection source for detecting a location of the assembly in the formation.


Also disclosed herein is a method of monitoring a location of a borehole for production of petroleum from an earth formation. The method includes: inserting a detection conduit through a guide conduit attached to at least a portion of at least one of an injection conduit and a production conduit in the borehole, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit; disposing at least one detection source in the borehole via the detection conduit; advancing the at least one detection source to a selected location; activating the at least one detection source to emit a detection signal; and detecting the detection signal to determine a location of the detection source.





BRIEF DESCRIPTION OF THE DRAWINGS

The following descriptions should not be considered limiting in any way. With reference to the accompanying drawings, like elements are numbered alike:



FIGS. 1A-1B (collectively referred to as FIG. 1) depict an exemplary embodiment of a formation production system;



FIGS. 2A-2B (collectively referred to as FIG. 2) depict an exemplary embodiment of an injection assembly of the system of FIG. 1;



FIG. 3 depicts a flow chart providing an exemplary method of monitoring a location of a borehole for production of petroleum from an earth formation



FIG. 4 depicts an exemplary embodiment of an injector and a monitoring device of the system of FIG. 1;



FIGS. 5A-5G (collectively referred to as FIG. 5) depict an exemplary embodiment of a ranging device of the monitoring device of FIG. 4;



FIG. 6 depicts a flow chart providing an exemplary method of monitoring a location of a borehole for production of petroleum from an earth formation.



FIG. 7 depicts an exemplary embodiment of a power supply circuit for the ranging device of FIG. 5;



FIGS. 8A-8D (collectively referred to as FIG. 8) depict an exemplary embodiment of a production assembly of the system of FIG. 1;



FIG. 9 depicts a flow chart providing an exemplary method of producing petroleum from an earth formation.



FIGS. 10A-10C (collectively referred to as FIG. 10) depict another exemplary embodiment of a formation production system;



FIG. 11 depicts a flow chart providing an exemplary method of producing petroleum from an earth formation;



FIGS. 12A-12B (collectively referred to as 12) depict yet another exemplary embodiment of a formation production system.



FIG. 13 depicts a flow chart providing an exemplary method of producing petroleum from an earth formation; and



FIG. 14 depicts a flow chart providing an exemplary method of creating a petroleum production system.





DETAILED DESCRIPTION

A detailed description of one or more embodiments of the disclosed system and method are presented herein by way of exemplification and not limitation with reference to the Figures.


Referring to FIG. 1, an exemplary embodiment of a formation production system 10 includes a first borehole 12 and a second borehole 14 extending into an earth formation 16. In one embodiment, the formation includes bitumen and/or heavy crude oil. As described herein, “borehole” or “wellbore” refers to a single hole that makes up all or part of a drilled borehole. As described herein, “formations” refer to the various features and materials that may be encountered in a subsurface environment. Accordingly, it should be considered that while the term “formation” generally refers to geologic formations of interest, that the term “formations,” as used herein, may, in some instances, include any geologic points or volumes of interest (such as a survey area).


The first borehole 12 includes an injection assembly 18 having an injection valve assembly 20 for introducing steam from a thermal source (not shown), an injection conduit 22 and an injector 24. The injector 24 receives steam from the conduit 22 and emits the steam through a plurality of openings such as slots 26 into a surrounding region 28. Bitumen 27 in region 28 is heated, decreases in viscosity, and flows substantially with gravity into a collector 30.


A production assembly 32 is disposed in second borehole 14, and includes a production valve assembly 34 connected to a production conduit 36. After region 28 is heated, the bitumen 27 flows into the collector 30 via a plurality of openings such as slots 38, and flows through the production conduit 36, into the production valve assembly 34 and to a suitable container or other location (not shown). In one embodiment, the bitumen 27 flows through the production conduit 36 and is recovered by one or more methods including natural steam lift, where some of the recovered hot water condensate flashes in the production conduit 36 and lifts the column of fluid to the surface, by gas lift where a gas is injected into the conduit 36 to lift the column of fluid, or by pumps such as progressive cavity pumps that work well for moving high-viscosity fluids with suspended solids.


In this embodiment, both the injection conduit 22 and the production conduit 36 are hollow cylindrical pipes, although they may take any suitable form sufficient to allow steam or bitumen to flow therethrough. Also in this embodiment, at least a portion of boreholes 12 and 14 are parallel horizontal boreholes. In other embodiments, the boreholes 12, 14 may advance in a vertical direction, a horizontal direction and/or an azimuthal direction, and may be positioned relative to one another as desired.


Referring to FIG. 2, an embodiment of the injection assembly 18 is shown. In this embodiment, conduit 22 includes three concentric conduits or strings 40, 42 and 44, which are each separately injectable with steam from the valve assembly which has three separate input ports 46, 48 and 50. As shown in FIG. 2, a toe injector string 40 is connected to a toe injection port 46, a mid injector string 42 is connected to a mid injection port 48, and a heel injector string 44 is connected to a heel injection port 50. As used herein, “toe” refers to a selected point or location in the borehole 12, 14 away from the surface, “mid” refers to a point in the borehole 12, 14 that is closer to the surface of the borehole along the length of the borehole than the toe-point, and “heel” refers to a point in the borehole 12, 14 that is closer to the surface than the mid-point. In some instances, the heel is usually at the intersection of a more vertical length of the borehole and a more horizontal section of the borehole. The toe is usually at the end section of the borehole. The toe point may also be referred to as a “distal” point. A “proximal” point refers to a point in the borehole 12, 14 that is closer to the surface, along the path of the borehole 12, 14, than the distal point.


The heel injector string 44 has a first inner diameter and extends to a first point at a distal end of the borehole 12 when the injector 24 is located at a heel-point in the borehole 12. As referred to herein, “distal end” refers to an end of a component that is farthest from the surface of a borehole, along a direction extending along the length of the borehole, and “proximal end” refers to an end of the component that is closest to the surface of the borehole along the direction extending along the length of the borehole. The mid injector string 42 has a first outer diameter that is smaller than the first inner diameter, has a second inner diameter, and extends to a mid-point. The toe injector string 40 has a second outer diameter that is smaller than the second inner diameter and extends to a toe-point. Each string 40, 42, 44 has a plurality of openings 52 such as drilled holes or slots that regulate the flow of steam through and out of each string 40, 42, 44. The heel injector string 44 and the mid injector string 42 may also include a centralizing flow restrictor 54. Injecting steam independently to the interior of each string 40, 42, 44 allows a user to control the flow of steam through each string independently, such as by varying injection pressure and/or varying a distribution of openings 52. This allows the user to adjust each string to ensure that an even distribution of steam is provided along the injector 24, and no hot spots are formed that could potentially warp or damage portions thereof. Furthermore, this configuration allows a user to conserve energy, for example, by providing lower temperature or pressure steam into the toe injection port 46. This is possible due to the insulative properties of the surrounding strings 42, 44 that thereby reduce thermal loss while the steam is flowing to the toe. Losses in prior art configurations necessitate the introduction of steam at much higher temperatures in order to still have sufficient thermal energy left by the time the steam reaches the toe to effectively reduce viscosity of the bitumen.


Referring again to FIG. 2, the injector 24 includes one or more additional components, such as a thermal liner hanger 56, a liner straddle 58 for thermal expansion, and a thermal packer 60 for isolating a portion of the borehole 12. In one embodiment, the injector 24 includes a dual flapper valve 62 or other valve device to prevent back-flow of the steam. In one embodiment, a second packer 57 is included. Packer 57 may be incorporated with a parallel flow tube assembly 66 and/or the thermal liner hanger 56. The packers 57 and 60 may each be any suitable type of packer, such as an inflatable and/or elastomeric packer.


In one embodiment, the packer 60 does not include any slips, and is provided in conjunction with another packer, such as a packer 57. The packer 57 includes one or more slips for securing the packer 57 to the borehole 12 or to a well string 59. The well string 59 is thus attached to the packer 57, and is connected but not attached to the packer 60. The well string 59 is a tubular pipe or any suitable conduit through which components of the injection assembly 18 are disposed. In one embodiment, the well string 59 is a continuous conduit extending between packers 57 and 60. This configuration allows the well string to thermally expand without the need for an expansion joint. Use of an expansion joint can be problematic if expansion is excessive, and thus this configuration is advantageous in that an expansion joint is unnecessary.


In one embodiment, the injector 24 includes a monitoring/sensing assembly 64 that includes the parallel flow tube assembly 66 that may act as a packer and holds the strings 40, 42, 44 relative to a guide conduit 68. The guide conduit 68 is attached to an exterior housing 70. A monitoring/sensing conduit 72 is disposed in the guide conduit 68 for introduction of various monitoring or sensing devices, such as pressure and temperature sensors. In one embodiment, the monitoring/sensing conduit 72 is configured to allow the insertion of various detection sources such as magnetic sources, point of nuclear sources, electro-magnetic induction coils with resistors, acoustical devices, transmitting devices such as antennas, well logging tools and others. In one embodiment, the monitoring/sensing conduit is a coil tubing.


The systems described herein provide various advantages over existing processing methods and devices. The concentric injection strings provide for greater control of injection and assure a consistent distribution of steam relative to prior art injectors. Furthermore, no expansion joint is required, a flow back valve prevents steam from flowing back into the conduit 22 which improves efficiency. In addition, ease of installation is improved, a more effective and quicker pre-heat is accomplished as multiple steam conduits provide quicker heating, and greater thermal efficiency is achieved as the steam emission is precisely controllable and each conduit is more effectively insulated such as by sealed annulars with gas insulation. Furthermore, the assemblies described herein allow for improved monitoring and improved intervention ability relative to prior art assemblies. FIG. 3 illustrates a method 300 of monitoring a location of a borehole for production of petroleum from an earth formation. The method 300 includes one or more stages 301-304. In one embodiment, the method 300 includes the execution of all of stages 301-304 in the order described. However, certain stages may be omitted, stages may be added, or the order of the stages changed. Although the method 300 is described in conjunction with the injection and production assemblies described herein, the method 300 may be utilized in conjunction with any production system to regulate thermal characteristics of material produced from an earth formation.


In the first stage 301, a detection conduit such as the monitoring/sensing conduit 72 is inserted into the guide conduit 68.


In the second stage 302, at least one detection source is disposed in the borehole 12, 14 through the detection conduit and advanced to a selected location. In one embodiment, the detection source is advanced by hydraulically lowering the detection source through the detection conduit.


In the third stage 303, the detection source is activated to emit a detection signal.


In the fourth stage 304, the detection signal is detected by a detector to determine a location of the detection source. In one embodiment, the detector is located at the surface or an another borehole.


Referring to FIG. 4, a monitoring and/or sensing device 74 is lowered into the monitoring/sensing conduit 72. In one embodiment, the monitoring and/or sensing device 74 is a submersible ranging tool 74. In one embodiment, the tool 74 is configured to be hydraulically lowered through the monitoring/sensing conduit, and is retrievable via a survey line 76 that is attached to the tool 74 via a line connector 78. Other components include friction reducers 80, a primary source and shear release 82, pump down cups 84 to respond to hydraulic pressure, a secondary source and spacer tool 86, and a bull nose 88. This configuration may be used to dispose a ranging device for location of a selected portion of the borehole 12. This configuration exhibits numerous advantages, in that it is simpler and less expensive than prior art systems, does not require a line tractor to retract the ranging device, does not require an electric line, is easily retrievable, and is faster and more effective than prior art systems. In one embodiment, the monitoring and/or sensing device 74 includes one or more detection sources such as magnetic sources, point of nuclear sources, electro-magnetic induction coils with resistors, acoustical devices, transmitting devices such as antennas, well logging tools and others. In one embodiment, the ranging tool 74 includes the rig survey line 76, which may be a slick line, an electric line or other device for moving the ranging tool along the length of the borehole 12.


Referring to FIG. 5, an embodiment of a ranging device 90 is provided that includes a magnetic source that is detectable in order to accurately measure the location of a borehole. This is important in locating existing boreholes to avoid unwanted interference with subsequently drilled boreholes. The ranging device 90, in one embodiment, is disposed within the ranging tool 74. The ranging device 90 and/or the ranging tool 74 are particularly useful during the drilling phase of petroleum production, in which injection, production and/or other wells are initially drilled. The ranging device 90 includes an elongated, electrically conductive member such as an electrically conductive cable or wire 92. In one embodiment, a selected length of the cable 92 is coiled within a housing 94. The cable 92 includes, in one embodiment, a material 96 disposed in the wire to provide a strengthening effect.


In one embodiment, the cable 92 includes an electrosensitive material 98 that changes shape based on the application of an electric current. In one embodiment, the electrosensitive material 98 is an electrosensitive shape memory alloy, which reacts to thermal or electrical application to change shape, and/or a electrically sensitive polymer. The electrosensitive material, in one embodiment, is disposed in one or more selected portions along the length of the cable 92.


In use, the cable 92 is uncoiled from the ranging device 90 after the ranging device 90 is advanced through the borehole 12, such as by retracting a retrieval head 100, or is otherwise extended along a selected length of the borehole 12 by any other suitable method. When an electric current or voltage is applied to the cable 92, the electrosensitive material changes shape, causing the cable 92 to form a coil at selected locations along the length of the cable 92. Each of these coils creates a magnetic field that is detectable by a detector to locate the corresponding location in the borehole 12. The voltage or current may be adjusted to cause the electrosensitive material to react accordingly, to change the length of the coil or location of the magnetic field along the cable 92. In one embodiment, resistors are positioned in and/or around the coils to permit a selected current to enter or bypass a specific coil or specific portion of a coil. In this way, the current or voltage may be adjusted to cause current to enter only selected coils. An exemplary configuration of the resistors is shown in FIG. 7, in which a first resistor “RL” is disposed in series with a coil “L”, and a second resistor “RC” is disposed in parallel with the coil L. Such connections, in one embodiment, is accomplished by disposing dual conductors in the cable 92, which are electrically connected by cross-filaments. In another embodiment, such resistors are configured so that a selected current can be applied to the cable 92 to energize all of the coils.


In one embodiment, the cable 92 and/or the housing 94 is incorporated in the ranging tool 74. For example, the rig survey line 76 is replaced with the cable 92, so that the ranging tool 74 need not be moved along the borehole 12 in order to move a magnetic field along the borehole 12. In this embodiment, the ranging tool 74 includes magnetic field sources in the form of the coils of cable 192, as well as any desired additional sources such as magnetic sources, point of nuclear sources, electro-magnetic induction coils with resistors, acoustical devices, transmitting devices such as antennas, and well logging tools.


In other embodiments, other components are disposed along the length of the cable 92, to provide ranging or other information. Examples of such components include point of nuclear sources, electro-magnetic induction coils with resistors, acoustical devices, transmitting devices such as antennas, well logging tools and others.



FIG. 6 illustrates a method 600 of monitoring a location of a borehole for production of petroleum from an earth formation. The method 600 includes one or more stages 601-604. In one embodiment, the method 600 includes the execution of all of stages 601-604 in the order described. However, certain stages may be omitted, stages may be added, or the order of the stages changed. Although the method 600 is described in conjunction with the injection and production assemblies described herein, the method 600 may be utilized in conjunction with any production system to regulate thermal characteristics of material produced from an earth formation.


In the first stage 601, the cable 92 is disposed in a detection source conduit such as the monitoring/sensing conduit 72 that extends at least substantially parallel to the borehole 12, 14.


In the second stage 602, an electric current is applied to the cable 92 to cause the electrosensitive material 98 to change shape and cause one or more portions of the cable 92 to form a coil.


In the third stage 603, an electromagnet is formed at the one or more portions responsive to the electric current


In the fourth stage 604, the magnetic field is detected by a detector to determine a location of the detection source. In one embodiment, the detector is located at the surface or an another borehole.


Referring to FIG. 7, a circuit 102 is coupled to the cable 92 to apply a voltage to the cable 92. In one embodiment, the circuit 102 is a resistor-inductor-capacitor (RLC) circuit, such as the parallel RLC circuit 102. The circuit 102 includes an alternating current source 104, a capacitor 106 (“C”) having a resistance RC, and an inductor 108 (“L”) having a resistance RL. The resonant frequency of the circuit 102 can be defined in three different ways, which converge on the same expression on the corresponding series RLC circuit if the resistance of the circuit 102 is small. Definitions of the resonant frequency ω0, which is approximately equal to 1/sqrt(LC), include i) the frequency at which ωL,=1/ωC, i.e., the resonant frequency of the equivalent series RLC circuit, ii) the frequency at which the parallel impedance is at a maximum, and iii) the frequency at which the current is in phase with the voltage, the circuit having a unity power factor.


This configuration is advantageous over prior art sources that use sources such as acoustical and magnetic sources, in that the ranging device 90 does not need to be moved through the borehole 12 to detect different portions of the borehole 12. The ranging device is advantageous in that it reduces costs, increases drilling efficiency, eliminates the need for line trucks to move the source, increases accuracy due to the built in resistors, allows for faster relocation of magnetic sources by increasing voltage, is fully retrievable and reusable, and is potentially unlimited in length.


Referring to FIG. 8, an embodiment of the collector 30 and the production conduit 36 is shown. In this embodiment, one or more of the concentric strings 40, 42 and 44 each receive fluid bitumen through openings 110, which proceeds into solid portions 112 which are connected in fluid communication with a production string 114 via the dual flapper valve 62. The solid portions 112 are impermeable to the bitumen. In one embodiment, a solid portions 112 is a portion of the surface of a string, such as string 40 and 42, that are surrounded by another string, such as string 42 and 44. In one embodiment, the concentric strings 40, 42 and 44 are coupled to the production string 114 via a triple connection bushing 116. Bitumen entering each solid portion for a respective string 40, 42, 44 will not migrate into a different string until the bitumen from each string are combined in a mixing chamber formed within the string 40 and/or the bushing 116. In one embodiment, the bushing 116 connects the concentric strings 40, 42 and 44 to a perforated stinger 118 and a pump stinger 120.


In one embodiment, the guide conduit 68 includes a stinger to attach the guide conduit 68 to the production string to aid in recovery of the bitumen. In this embodiment, the monitoring/sensing assembly includes a gas lift 121, which includes the stinger to introduce a gas in the pump stinger 120, paths formed by the solid portions 112 and/or the production string 114, to reduce viscosity and aid in recovering the bitumen. The gas lift may be utilized with or without a pump. In one embodiment, a one-way valve is disposed between the guide conduit 68 and the injector 24 to prevent flow of bitumen or other materials into the guide conduit 68.


In one embodiment, a steam shroud 122 is disposed around the production string 114 and a pump 124. In one embodiment, the pump 124 is an electric submersible pump (ESP). Other pumps may be utilized, such as rod pumps and hydraulic pumps.


The steam shroud includes at least one conduit 126 that is concentric with the production string 114 and is in fluid communication with the production string 114. As the pump 124 pumps the bitumen toward the surface, a portion of the bitumen is forced into the concentric conduit 126 and toward steam flash venting perforations 128, through which excess steam can escape. The bitumen, as a result, increases in viscosity, and accordingly travels downward (i.e., away from the surface) and continues through the production string 114. In one embodiment, an injection line 130 extends into the conduit 126 for introduction of monitoring devices or cooling materials, such as a liquid, a gas or a chemical agent.


In one embodiment, during the petroleum recovery process, steam is injected through one or more of the injector strings 40, 42, 44 and is recovered through any one or more of the production strings. In one example, steam is injected through 40, 42, and recovered through the heel production string. Utilizing any such desired combinations may require less energy, and may also allow faster pre-heating with less energy than prior art techniques.



FIG. 9 illustrates a method 900 of producing petroleum from an earth formation. The method 900 includes one or more stages 901-904. In one embodiment, the method 900 includes the execution of all of stages 901-904 in the order described. However, certain stages may be omitted, stages may be added, or the order of the stages changed. Although the method 900 is described in conjunction with the injection and production assemblies described herein, the method 900 may be utilized in conjunction with any production system to regulate thermal characteristics of material produced from an earth formation.


In the first stage 901, an injection assembly such as the injection assembly 18 is disposed in the first borehole 12, and advanced through the borehole 12 until the injector 24 is located at a selected location.


In the second stage 902, a production assembly such as the production assembly 32 is disposed in the second borehole 14, and advance through the borehole 14 until the collector 30 is positioned at a selected location. In one embodiment, the selected location is directly below, along the direction of gravity, the injector 24.


In the third stage 903, a thermal source such as steam is injected into the injector to introduce thermal energy to a portion of the formation 16 and reduce a viscosity of the material therein, such as bitumen. In one embodiment, the thermal source is injected through the openings 52 in one or more of the strings 40, 42, 44.


In the fourth stage 904, the material migrates with the force of gravity and is recovered through the production assembly. In one embodiment, the material is recovered through the openings 110 in one or more of the strings 40, 42, 44.


Referring to FIG. 10, an embodiment of the formation production system 10 includes the injection assembly 18 including the injector 24, and the production assembly 32 including the collector 30. In this embodiment, the production assembly includes a thermal injection conduit 132 disposed and extending through the production conduit 36 and extending through an interior of the collector 30. The thermal injection conduit 132 is connected to a surface source of thermal energy, such as steam, a heated gas or a fluid, and acts to maintain selected thermal characteristics of the bitumen 27 as it is recovered, such as maintaining a desired viscosity. In one embodiment, the thermal injection conduit 132 is a flexible tubing. The thermal injection conduit 132 is configured to exert thermal energy over an entirety or a selected portion of its length. In one embodiment, the thermal injection conduit 132 is impermeable to the source of thermal energy.


The embodiment of FIG. 10 provides numerous advantages relative to prior art production systems. Prior art production systems require high temperatures and pressures of injected steam to maintain the bitumen at a desired viscosity during recovery. Because a selected temperature of the bitumen 27 can be regulated in the production side in the embodiment described herein, less energy (i.e., lower temperatures and/or pressures) need be applied through the injection side, and thus the production system 10 can be successfully utilized more efficiently and with less energy than prior art systems. Furthermore, the flow characteristics of the bitumen can be increased relative to prior art systems.



FIG. 11 illustrates a method 1100 of producing petroleum from an earth formation. The method 1100 includes one or more stages 1101-1106. In one embodiment, the method 1100 includes the execution of all of stages 1101-1106 in the order described. However, certain stages may be omitted, stages may be added, or the order of the stages changed. Although the method 1100 is described in conjunction with the production assembly 32, the method 1100 may be utilized in conjunction with any production system to regulate thermal characteristics of material produced from an earth formation.


In the first stage 1101, an injection assembly such as the injection assembly 18 is disposed in the first borehole 12, and advanced through the borehole 12 until the injector 24 is located at a selected location.


In the second stage 1102, a production assembly such as the production assembly 32 is disposed in the second borehole 14, and advance through the borehole 14 until a collector such as collector 30 is positioned at a selected location. In one embodiment, the selected location is directly below, along the direction of gravity, the injector 24.


In the third stage 1103, the thermal injection conduit 132 is disposed through at least a portion of the production string 114 and/or the collector 30. In one embodiment, the thermal injection conduit 132 is disposed in an interior of the production string 114 and the collector 30. In another embodiment, the thermal injection conduit 132 extends from a surface location to a distal end of the collector 30.


In the fourth stage 1104, a first thermal source such as steam is injected into the injector 24 to introduce thermal energy to a portion of the formation 16 and reduce a viscosity of the material therein, such as bitumen.


In the fifth stage 1105, the material migrates with the force of gravity and is recovered through the production string 114 and the collector 30.


In the sixth stage 1106, a second thermal source is injected into the thermal injection conduit 132 to regulate a thermal property of the material.


Referring to FIG. 12, an embodiment of a production system includes one or more injection boreholes 140 through which steam is introduced into the formation 16, one or more production boreholes 142 through which bitumen is recovered, and one or more drain boreholes 144. The numbers and configurations of boreholes 140, 142, 144 are exemplary, and may be adjusted as desired. In one embodiment, each production borehole 142 includes a pump such as an Electric Submersible Pump (ESP) pump. In one embodiment, each injection borehole 140 and production borehole 142 extends primarily in a vertical or azimuthal direction relative to the surface. In one embodiment, each drainage borehole 144 extends in a horizontal direction and at least partially intersects with the production boreholes. FIG. 13 illustrates a method 1300 of producing petroleum from an earth formation, which includes one or more stages 1301-1304. In one embodiment, the method 1300 includes the execution of all of stages 1301-1304 in the order described. However, certain stages may be omitted, stages may be added, or the order of the stages changed. Although the method 1300 is described in conjunction with the injection and production assemblies described herein, the method 1300 may be utilized in conjunction with any production system to regulate thermal characteristics of material produced from an earth formation.


In the first stage 1301, an injection assembly such as the injection assembly 18 is disposed in at least one injection borehole 140, and advanced through the injection borehole 140 until the injector 24 is located at a selected location.


In the second stage 1302, a production assembly such as the production assembly 32 is disposed in at least one production borehole 142, and advanced through the production borehole 142 until a collector such as collector 30 is positioned at a selected location. As discussed above, each production borehole 142 is at least partially intersected by the horizontal portion of the at least one drainage borehole 144, the at least one drainage borehole having a horizontal portion that at least partially intersects the production borehole;


In the third stage 1303, a first thermal source such as steam is injected into the injector 24 to introduce thermal energy to a portion of the formation 16 and reduce a viscosity of the material therein, such as bitumen.


In the fourth stage 1304, the material is recovered through the production assembly 32. In one embodiment, recovery is facilitated by pumping the material through the production assembly 32, for example, via an ESP, by gas lift, by natural steam lift and/or by any natural or artificial device for recovering the bitumen. In one embodiment, recovery includes inducing a flow of the material through the at least one drainage borehole 144 into the at least one production borehole 142 and/or exerting a pressure on the at least one production borehole 142. In one embodiment, recovery includes injecting additional materials such as steam, gas or liquid into the drainage boreholes 144 to facilitate recovery.



FIG. 14 illustrates a method for creating the production system of FIG. 12, that includes one or more stages 1401-1404. In one embodiment, the method 1400 includes the execution of all of stages 1401-1404 in the order described. However, certain stages may be omitted, stages may be added, or the order of the stages changed. Although the method 1400 is described in conjunction with the injection and production assemblies described herein, the method 1400 may be utilized in conjunction with any production system to regulate thermal characteristics of material produced from an earth formation.


In the first stage 1401, a location and path of at least one production borehole 142 is selected. In one embodiment, the path includes a vertical and/or azimuthal direction.


In the second stage 1402, one or more horizontal drainage boreholes 144 are drilled in a vertical or azimuthal array, in which at least a portion of each drainage borehole intersects an area to be defined by the production borehole(s) 142.


In the third stage 1403, the production borehole(s) 142 are drilled in a vertical and/or azimuthal direction. In one embodiment, the cross sectional area of each production borehole 142 is greater than a cross sectional area of drainage boreholes 144, and the production borehole(s) 142 are each drilled so that a portion of the production borehole 142 intersects with each drainage borehole 144.


In the fourth stage 1404, which may be performed at any time relative to the first and second stages, the injection borehole(s) 140 are drilled in a vertical and/or azimuthal direction at a selected location relative to the production borehole(s) 142 and the drainage boreholes 144. In one embodiment, the injection borehole(s) 140 are drilled in a path that does not intersect either the production borehole(s) 142 or the drainage borehole(s) 144. In addition, materials such as steam, gas or liquid, or monitoring devices, can be inserted into the drainage boreholes 144 to increase recovery efficiency and/or monitor the production borehole(s) 142.


The borehole configuration of FIG. 12 significantly increases the efficiency and performance of the production system, as thermal efficiency over a formation area is increased and a larger formation area can be heated. As a result, fewer injection boreholes 140 are required. In addition, sand containing bitumen is produced at the intersections of the production borehole(s) 142 and the drainage boreholes 144, and bitumen may flow toward each production borehole 142 through the drainage boreholes 144 which exerts a pressure and provides a column effect which aids in recovery of the bitumen through the production borehole(s) 142, which increases the recovery efficiency and reduces the number of pumps needed. In addition, observation wells are not required.


In support of the teachings herein, various analyses and/or analytical components may be used, including digital and/or analog systems. The system may have components such as a processor, storage media, memory, input, output, communications link (wired, wireless, pulsed mud, optical or other), user interfaces, software programs, signal processors (digital or analog) and other such components (such as resistors, capacitors, inductors and others) to provide for operation and analyses of the apparatus and methods disclosed herein in any of several manners well-appreciated in the art. It is considered that these teachings may be, but need not be, implemented in conjunction with a set of computer executable instructions stored on a computer readable medium, including memory (ROMs, RAMs), optical (CD-ROMs), or magnetic (disks, hard drives), or any other type that when executed causes a computer to implement the method of the present invention. These instructions may provide for equipment operation, control, data collection and analysis and other functions deemed relevant by a system designer, owner, user or other such personnel, in addition to the functions described in this disclosure.


Further, various other components may be included and called upon for providing aspects of the teachings herein. For example, a sample line, sample storage, sample chamber, sample exhaust, pump, piston, power supply (e.g., at least one of a generator, a remote supply and a battery), vacuum supply, pressure supply, refrigeration (i.e., cooling) unit or supply, heating component, motive force (such as a translational force, propulsional force or a rotational force), magnet, electromagnet, sensor, electrode, transmitter, receiver, transceiver, controller, optical unit, electrical unit or electromechanical unit may be included in support of the various aspects discussed herein or in support of other functions beyond this disclosure.


One skilled in the art will recognize that the various components or technologies may provide certain necessary or beneficial functionality or features. Accordingly, these functions and features as may be needed in support of the appended claims and variations thereof, are recognized as being inherently included as a part of the teachings herein and a part of the invention disclosed.


While the invention has been described with reference to exemplary embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In addition, many modifications will be appreciated by those skilled in the art to adapt a particular instrument, situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, it is intended that the invention not be limited to the particular embodiment disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope of the appended claims.

Claims
  • 1. A system for monitoring a location of a borehole for production of petroleum from an earth formation, the system comprising: an assembly including at least one of an injection conduit for injecting a thermal source into the formation and a production conduit for recovering material including the petroleum from the formation;a guide conduit attached to at least a portion of the at least one of the injection conduit and the production conduit, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit; anda detection source conduit insertable through the guide conduit and configured to dispose therein a detection source for detecting a location of the assembly in the formation.
  • 2. The system of claim 1, wherein the detection source is a plurality of detection sources distributed at selected locations along a length of the detection source conduit.
  • 3. The system of claim 1, wherein the detection source is selected from at least one of a magnetic source, a point of nuclear source, an electro-magnetic induction coil, an acoustical device, a transmitting device, and a well logging tool.
  • 4. The system of claim 1, wherein the guide conduit is attached to the production conduit, and includes a stinger to connect the guide conduit to the production conduit, the guide conduit being connected to an energy source for injection into the guide conduit to facilitate flow of petroleum through the production conduit.
  • 5. The system of claim 4, wherein the energy source is selected from at least one of a steam and a gas source.
  • 6. The system of claim 4, further comprising a one-way valve disposed between the guide conduit and the production conduit.
  • 7. The system of claim 1, wherein the guide conduit is a coil tubing material.
  • 8. The system of claim 1, further comprising an exterior housing surrounding the portion of the at least one of the injection conduit and the production conduit and a portion of the guide conduit.
  • 9. The system of claim 8, wherein the exterior housing is configured to maintain the guide conduit and the at least one of the injection conduit and the production conduit in fixed position relative to each other.
  • 10. The system of claim 9, wherein the exterior housing is configured to function as a packer to attach the exterior housing to a first location in a string conduit disposed in the borehole.
  • 11. The system of claim 10, wherein the exterior housing is attached to the string conduit by a plurality of slips.
  • 12. The system of claim 11, further comprising a second packer disposed in the string conduit and connected to the string conduit at a second location, the second packer being unattached to the string conduit.
  • 13. The system of claim 1, wherein the detection source includes an elongated electrically conductive member extendable along at least a portion of the detection source conduit, and the detection source includes an electrosensitive material disposed in at least one portion of the elongated member, the electrosensitive material reactive to an electric current to change a shape of the electrosensitive material.
  • 14. The system of claim 13, wherein the electrosensitive material is configured to cause the elongated member to form a coil in response to the electric current, and the elongated member is configured to cause the coil to form a magnetic field in response to a selected electric current.
  • 15. The system of claim 13, wherein the elongated member is a conductive cable, and the electrosensitive material is selected from at least one of an electrosensitive shape memory alloy and an electrically sensitive polymer.
  • 16. A method of monitoring a location of a borehole for production of petroleum from an earth formation, the method comprising: inserting a detection conduit through a guide conduit attached to at least a portion of at least one of an injection conduit and a production conduit in the borehole, the guide conduit extending in a direction at least substantially parallel to the at least one of the injection conduit and the production conduit;disposing at least one detection source in the borehole via the detection conduit;advancing the at least one detection source to a selected location;activating the at least one detection source to emit a detection signal; anddetecting the detection signal to determine a location of the detection source.
  • 17. The method of claim 16, wherein disposing includes hydraulically lowering the at least one detection source.
  • 18. The method of claim 16, wherein the detection source is selected from at least one of a magnetic source, a point of nuclear source, an electro-magnetic induction coil, an acoustical device, a transmitting device, and a well logging tool.
  • 19. The method of claim 16, wherein the detection source includes an electrosensitive material disposed in at least one portion of the elongated member, the electro sensitive material reactive to an electric current to change a shape of the electro sensitive material.
  • 20. The method of claim 19, wherein activating the at least one detection source includes applying a current to the elongated member to cause the electrosensitive material to change shape and cause the elongated member to form a coil, and forming an electromagnet at the portion responsive to the electric current.
CROSS REFERENCE TO RELATED APPLICATION

The present application is a continuation of U.S. patent application Ser. No. 12/140,779, filed Jun. 17, 2008 and claims priority to U.S. Provisional Patent Application Ser. No. 61/052,919, filed May 13, 2008, each of which are specifically incorporated herein by reference in their entirety.

US Referenced Citations (273)
Number Name Date Kind
1362552 Alexander et al. Dec 1920 A
1488753 Kelly Apr 1924 A
1580325 Leroy Apr 1926 A
1649524 Hammond Nov 1927 A
1915867 Penick Jun 1933 A
1984741 Harrington Dec 1934 A
2089477 Halbert Aug 1937 A
2119563 Wells Jun 1938 A
2214064 Niles Sep 1940 A
2257523 Combs Sep 1941 A
2391609 Wright Dec 1945 A
2412841 Spangler Dec 1946 A
2762437 Egan et al. Sep 1956 A
2804926 Zublin Sep 1957 A
2810352 Tumlison Oct 1957 A
2814947 Stegemeier et al. Dec 1957 A
2942668 Maly et al. Jun 1960 A
2945541 Maly et al. Jul 1960 A
3103789 McDuff Sep 1963 A
3216503 Fisher et al. Nov 1965 A
3240274 Solum Mar 1966 A
3273641 Bourne Sep 1966 A
3302408 Schmid Feb 1967 A
3322199 Van Note, Jr. May 1967 A
3326291 Zandmer Jun 1967 A
3333635 Crawford Aug 1967 A
3385367 Kollsman May 1968 A
3386508 Bielstein et al. Jun 1968 A
3399548 Burns Sep 1968 A
3419089 Venghiattis Dec 1968 A
3451477 Kelley Jun 1969 A
3468375 States Sep 1969 A
RE27252 Sklar et al. Dec 1971 E
3675714 Thompson Jul 1972 A
3692064 Hohnerlein et al. Sep 1972 A
3739845 Berry et al. Jun 1973 A
3791444 Hickey Feb 1974 A
3876471 Jones Apr 1975 A
3918523 Stuber Nov 1975 A
3951338 Genna Apr 1976 A
3958649 Bull et al. May 1976 A
3975651 Griffiths Aug 1976 A
4153757 Clark, III May 1979 A
4173255 Kramer Nov 1979 A
4180132 Young Dec 1979 A
4186100 Mott Jan 1980 A
4187909 Erbstoesser Feb 1980 A
4245701 Chambers Jan 1981 A
4248302 Churchman Feb 1981 A
4250907 Struckman et al. Feb 1981 A
4257650 Allen Mar 1981 A
4265485 Boxerman et al. May 1981 A
4278277 Krijgsman Jul 1981 A
4283088 Tabakov et al. Aug 1981 A
4287952 Erbstoesser Sep 1981 A
4390067 Willman Jun 1983 A
4398600 Vazquez Aug 1983 A
4398898 Odom Aug 1983 A
4410216 Allen Oct 1983 A
4415205 Rehm et al. Nov 1983 A
4434849 Allen Mar 1984 A
4463988 Bouck et al. Aug 1984 A
4484641 Dismukes Nov 1984 A
4491186 Alder Jan 1985 A
4497714 Harris Feb 1985 A
4512403 Santangelo et al. Apr 1985 A
4552218 Ross et al. Nov 1985 A
4552230 Anderson et al. Nov 1985 A
4572295 Walley Feb 1986 A
4576404 Weber Mar 1986 A
4577691 Huang et al. Mar 1986 A
4614303 Moseley, Jr. et al. Sep 1986 A
4649996 Kojicic et al. Mar 1987 A
4817710 Edwards et al. Apr 1989 A
4821800 Scott et al. Apr 1989 A
4856590 Caillier Aug 1989 A
4899835 Cherrington Feb 1990 A
4917183 Gaidry et al. Apr 1990 A
4944349 Von Gonten, Jr. Jul 1990 A
4974674 Wells Dec 1990 A
4997037 Coston Mar 1991 A
4998585 Newcomer et al. Mar 1991 A
5004049 Arterbury Apr 1991 A
5016710 Renard et al. May 1991 A
5040283 Pelgrom Aug 1991 A
5060737 Mohn Oct 1991 A
5107927 Whiteley et al. Apr 1992 A
5132903 Sinclair Jul 1992 A
5156811 White Oct 1992 A
5188191 Tomek Feb 1993 A
5217076 Masek Jun 1993 A
5333684 Walter et al. Aug 1994 A
5337821 Peterson Aug 1994 A
5339895 Arterbury et al. Aug 1994 A
5339897 Leaute Aug 1994 A
5355956 Restarick Oct 1994 A
5377750 Arterbury et al. Jan 1995 A
5381864 Nguyen et al. Jan 1995 A
5384046 Lotter et al. Jan 1995 A
5431346 Sinaisky Jul 1995 A
5435393 Brekke et al. Jul 1995 A
5435395 Connell Jul 1995 A
5439966 Graham et al. Aug 1995 A
5511616 Bert Apr 1996 A
5551513 Surles et al. Sep 1996 A
5586213 Bridges et al. Dec 1996 A
5597042 Tubel et al. Jan 1997 A
5609204 Rebardi et al. Mar 1997 A
5673751 Head et al. Oct 1997 A
5803179 Echols et al. Sep 1998 A
5829520 Johnson Nov 1998 A
5831156 Mullins Nov 1998 A
5839508 Tubel et al. Nov 1998 A
5873410 Iato et al. Feb 1999 A
5881809 Gillespie et al. Mar 1999 A
5896928 Coon Apr 1999 A
5944446 Hocking Aug 1999 A
5982801 Deak Nov 1999 A
6044869 Koob Apr 2000 A
6068015 Pringle May 2000 A
6098020 Den Boer Aug 2000 A
6112815 Boe et al. Sep 2000 A
6112817 Voll et al. Sep 2000 A
6119780 Christmas Sep 2000 A
6228812 Dawson et al. May 2001 B1
6253847 Stephenson Jul 2001 B1
6253861 Carmichael et al. Jul 2001 B1
6273194 Hiron et al. Aug 2001 B1
6301959 Hrametz et al. Oct 2001 B1
6305470 Woie Oct 2001 B1
6325152 Kelley et al. Dec 2001 B1
6338363 Chen et al. Jan 2002 B1
6367547 Towers et al. Apr 2002 B1
6371210 Bode et al. Apr 2002 B1
6372678 Youngman et al. Apr 2002 B1
6419021 George et al. Jul 2002 B1
6474413 Barbosa et al. Nov 2002 B1
6505682 Brockman Jan 2003 B2
6516888 Gunnarson et al. Feb 2003 B1
6530431 Castano-Mears et al. Mar 2003 B1
6561732 Bloomfield et al. May 2003 B1
6581681 Zimmerman et al. Jun 2003 B1
6581682 Parent et al. Jun 2003 B1
6622794 Zisk, Jr. Sep 2003 B2
6632527 McDaniel et al. Oct 2003 B1
6635732 Mentak Oct 2003 B2
6667029 Zhong et al. Dec 2003 B2
6679324 Den Boer et al. Jan 2004 B2
6692766 Rubinstein et al. Feb 2004 B1
6699503 Sako et al. Mar 2004 B1
6699611 Kim et al. Mar 2004 B2
6712154 Cook et al. Mar 2004 B2
6722437 Vercaemer et al. Apr 2004 B2
6786285 Johnson et al. Sep 2004 B2
6817416 Wilson et al. Nov 2004 B2
6820690 Vercaemer et al. Nov 2004 B2
6830104 Nguyen et al. Dec 2004 B2
6831044 Constien Dec 2004 B2
6840321 Restarick et al. Jan 2005 B2
6857476 Richards Feb 2005 B2
6863126 McGlothen et al. Mar 2005 B2
6896049 Moyes May 2005 B2
6913079 Tubel Jul 2005 B2
6938698 Coronado Sep 2005 B2
6951252 Restarick et al. Oct 2005 B2
6959764 Preston Nov 2005 B2
6976542 Henriksen et al. Dec 2005 B2
7011076 Weldon et al. Mar 2006 B1
7032675 Steele et al. Apr 2006 B2
7059410 Bousche et al. Jun 2006 B2
7084094 Gunn et al. Aug 2006 B2
7159656 Eoff et al. Jan 2007 B2
7185706 Freyer Mar 2007 B2
7207385 Smith et al. Apr 2007 B2
7252162 Akinlade et al. Aug 2007 B2
7258166 Russell Aug 2007 B2
7264047 Brezinski et al. Sep 2007 B2
7290606 Coronado et al. Nov 2007 B2
7290610 Corbette et al. Nov 2007 B2
7318472 Smith Jan 2008 B2
7322412 Badalamenti et al. Jan 2008 B2
7325616 Lopez de Cardenas et al. Feb 2008 B2
7360593 Constien Apr 2008 B2
7367399 Steele et al. May 2008 B2
7395858 Barbosa et al. Jul 2008 B2
7398822 Meijer et al. Jul 2008 B2
7409999 Henriksen et al. Aug 2008 B2
7413022 Broome et al. Aug 2008 B2
7451814 Graham et al. Nov 2008 B2
7469743 Richards Dec 2008 B2
7581593 Pankratz et al. Sep 2009 B2
7621326 Crichlow Nov 2009 B2
7644854 Holmes et al. Jan 2010 B1
7647966 Cavender et al. Jan 2010 B2
7673678 MacDougall et al. Mar 2010 B2
7757757 Vroblesky Jul 2010 B1
7931081 Sponchia Apr 2011 B2
20020020527 Kilaas Feb 2002 A1
20020125009 Wetzel et al. Sep 2002 A1
20020148610 Bussear et al. Oct 2002 A1
20020170717 Venning et al. Nov 2002 A1
20030221834 Hess et al. Dec 2003 A1
20040052689 Yao Mar 2004 A1
20040060705 Kelley Apr 2004 A1
20040094307 Daling et al. May 2004 A1
20040144544 Freyer Jul 2004 A1
20040159447 Bissonnette et al. Aug 2004 A1
20040194971 Thomson Oct 2004 A1
20040244988 Preston Dec 2004 A1
20050016732 Brannon et al. Jan 2005 A1
20050086807 Richard et al. Apr 2005 A1
20050126776 Russell Jun 2005 A1
20050178705 Broyles et al. Aug 2005 A1
20050189119 Gynz-Rekowski Sep 2005 A1
20050199298 Farrington Sep 2005 A1
20050207279 Chemali et al. Sep 2005 A1
20050241835 Burris et al. Nov 2005 A1
20050274515 Smith et al. Dec 2005 A1
20060032630 Heins Feb 2006 A1
20060042798 Badalamenti et al. Mar 2006 A1
20060048936 Fripp et al. Mar 2006 A1
20060048942 Moen et al. Mar 2006 A1
20060076150 Coronado et al. Apr 2006 A1
20060086498 Wetzel et al. Apr 2006 A1
20060108114 Johnson May 2006 A1
20060118296 Dybevik et al. Jun 2006 A1
20060124360 Lee et al. Jun 2006 A1
20060157242 Graham et al. Jul 2006 A1
20060175065 Ross Aug 2006 A1
20060185849 Edwards et al. Aug 2006 A1
20060250274 Mombourquette et al. Nov 2006 A1
20060272814 Broome et al. Dec 2006 A1
20060273876 Pachla et al. Dec 2006 A1
20070012444 Horgan et al. Jan 2007 A1
20070039741 Hailey, Jr. Feb 2007 A1
20070044962 Tibbles Mar 2007 A1
20070045266 Sandberg et al. Mar 2007 A1
20070056729 Pankratz et al. Mar 2007 A1
20070131434 MacDougall et al. Jun 2007 A1
20070181299 Chung et al. Aug 2007 A1
20070209799 Vinegar et al. Sep 2007 A1
20070246210 Richards Oct 2007 A1
20070246213 Hailey, Jr. Oct 2007 A1
20070246225 Hailey, Jr. et al. Oct 2007 A1
20070246407 Richards et al. Oct 2007 A1
20070272408 Zazaovsky et al. Nov 2007 A1
20070289749 Wood et al. Dec 2007 A1
20080035349 Richard Feb 2008 A1
20080035350 Henriksen et al. Feb 2008 A1
20080053662 Williamson et al. Mar 2008 A1
20080135249 Fripp et al. Jun 2008 A1
20080149323 O'Malley et al. Jun 2008 A1
20080149351 Marya et al. Jun 2008 A1
20080169099 Pensgaard Jul 2008 A1
20080236839 Oddie Oct 2008 A1
20080236843 Scott et al. Oct 2008 A1
20080251255 Forbes et al. Oct 2008 A1
20080283238 Richards et al. Nov 2008 A1
20080296023 Willauer Dec 2008 A1
20080314590 Patel Dec 2008 A1
20090056816 Arov et al. Mar 2009 A1
20090057014 Richard et al. Mar 2009 A1
20090071646 Pankratz et al. Mar 2009 A1
20090101330 Johnson Apr 2009 A1
20090101342 Gaudette et al. Apr 2009 A1
20090133869 Clem May 2009 A1
20090133874 Dale et al. May 2009 A1
20090139717 Richard et al. Jun 2009 A1
20090139727 Tanju et al. Jun 2009 A1
20090194282 Beer et al. Aug 2009 A1
20090205834 Garcia et al. Aug 2009 A1
20090301704 Dillett et al. Dec 2009 A1
20100126720 Kaiser et al. May 2010 A1
Foreign Referenced Citations (14)
Number Date Country
1385594 Dec 2002 CN
1492345 Jun 1976 GB
2341405 Mar 2000 GB
59089383 May 1984 JP
1335677 Aug 1985 SU
9403743 Feb 1994 WO
0079097 Dec 2000 WO
0165063 Sep 2001 WO
0177485 Oct 2001 WO
0192681 Dec 2001 WO
02075110 Sep 2002 WO
2004018833 Mar 2004 WO
2006015277 Feb 2006 WO
2008092241 Aug 2008 WO
Related Publications (1)
Number Date Country
20110056680 A1 Mar 2011 US
Provisional Applications (1)
Number Date Country
61052919 May 2008 US
Continuations (1)
Number Date Country
Parent 12140779 Jun 2008 US
Child 12944404 US