The following relates to a control system configured to control the switching of taps of an electronic on-load tap changer provided on an electric power transformer, in particular on a wind turbine transformer. The following further relates to a respective electronic on-load tap changer and to a wind turbine electrical power system including such tap changer. A method of operating an electronic on-load tap changer is further provided.
A wind turbine is generally connected to a power grid, which can be a local wind farm grid or a utility grid, via a respective wind turbine transformer. The electrical power system of the wind turbine, which for example comprises for a variable speed wind turbine a generator and a power converter, e.g. in a full converter topology or a DFIG topology, experiences voltage variations on the power grid which are transmitted through the transformer. Undesirable over-voltage or under-voltage conditions may thus be experienced by the wind turbine electrical power system.
To solve this problem, document WO 2020/239425 A1 describes the use of an electronic on-load tap changer, on the primary winding of the wind turbine transformer. By changing the tap setting, voltage variations on the power grid can thus be compensated. An exemplary configuration is shown in
Accordingly, there is a need to mitigate at least some of the drawbacks mentioned above and to provide an improved switching for such on-load tap changer, for example for a wind turbine transformer.
According to an embodiment of the invention, a control system configured to control the switching of taps of an on-load tap changer of an electronic power transformer is provided. The electronic on-load tap changer comprises switches that are controllable to switch between transformer taps. The control system comprises a detector configured to detect an indication of a zero crossing of a transformer voltage of the transformer and a control signal generator configured to generate a control signal that controls a switching of the switches for performing a tap change to a new transformer tap. The control signal generator is configured to determine the timing of the control signal for changing the transformer tap based on the detected indication of the zero crossing of the transformer voltage such that the switching of a switch for performing the tap change (in particular of each switch of the new tap required for performing the tap change) occurs a predetermined time prior to a zero-crossing of a tap voltage at the new transformer tap. The predetermined time is less than 40% of the duration of an electrical period of the tap voltage.
As the respective switch of the new tap is closed prior to the zero-crossing of the voltage, short circuit currents that occur during the tap changing process can be minimized. At the zero-crossing of the voltage, all taps connected to the same transformer winding have substantially the same low voltage value, so that short circuiting two taps during the tap changing process only results in currents that are significantly lower than the peak currents of a conventional tap changing process. Further, if switching occurs shortly after the zero crossing of the voltage, the short circuit current through the new tap and the ‘old’ tap (i.e. the tap to be disconnected) may keep the switch of the old tap closed, which can result in high short circuit currents even if switching occurs very close to the voltage zero crossing. This is avoided by performing the switching prior to the zero crossing.
It should be clear that for a transformer, if the zero crossing of one of the transformer voltages is known, be it on the primary or the secondary side, or of only one phase of a three-phase system, the zero crossing at each of the transformer terminals and at each tap can generally be derived due to the known phase relationships. Accordingly, if one zero crossing is detected, e.g. by measuring the phase, the voltage zero crossing at each transformer tap may be determined. Therefore, the transformer voltage used to detect the zero crossing does not need to be the same as the tap voltage (for example, measuring at a secondary side of the transformer and switching a tap on a primary side of the transformer). Also, the transformer voltage does not need to be measured directly at the transformer, but can be for example measured on an electrical connection towards the transformer at another electric component connected to the transformer, since the phase will generally be the same. Should any elements or intervening components be present in such connection which cause a shift of the phase, such phase shift can then be taken into account for determining the zero-crossing of the tap voltage. Such phase shifts are either known or may be determined in a calibration. The zero crossing of the tap voltage may accordingly be derived by the control signal generator from the indication of the zero crossing of the transformer voltage.
In particular, the control signal may be generated such that the switching of at least one switch for connecting the new tap is performed at the predetermined time prior to the zero crossing. The switching of the at least one switch may thus comprise a closing of the at least one switch, in particular of a switching valve, that is connected to the new tap.
The control signal may further cause a switching of one or more switches for disconnecting the old tap after the switching for connecting the new tap, in particular by opening or allowing an opening of a respective switch connected to the old tap (e.g. by removing a trigger or triggering order that keeps the switch closed, or by actively driving a switch into a blocking state), e.g. a switching valve. The switching for disconnecting the old tap may be performed within a second predetermined time before or after the zero crossing of the tap voltage, wherein the second predetermined time is smaller than the predetermined time prior to the zero crossing at which the new tap is connected. In other words, the switching for the old tap may occur closer to the zero crossing than the switching of the new tap.
‘Old tap’ may refer to the tap that is to be disconnected during the tap change, wherein ‘new tap’ may refer to the tap that is to be connected into the circuit during the tap change. In particular, the current through the respective transformer winding is changed from flowing through the old tap to flowing through the new tap by the tap change.
The control signal generator may be configured to generate the control signal such that a switch connected to the old tap (e.g. a switching valve) is allowed to open a changeover period of time after the connecting of the new tap, i.e. the closing of the switch connected to the new tap. The changeover period of time may lie in the range of 0.01 ms to 12 ms, 0.1 to 8 ms, or 0.1 to 6 ms. In an example, the changeover period lies in the range of 0.1 to 4 ms or 0.2 to 1.5 ms, it may for example be about 1 ms.
The control signal generator may generate the control signal so as to open or allow to open the at least one switch connected to the old tap at a zero crossing of a current (in particular the short circuit current) through the old tap (e.g. by sending a respective trigger or ceasing to send a respective trigger to the switch, depending on the type of switch). While some switches, such as a thryistor, may open upon the short circuit current dropping below a holding current, other switches (e.g. IGBT) may be opened actively at such zero crossing by a respective control signal (e.g. by ceasing to supply a trigger order to the switch at the occurrence of the zero crossing). The expression ‘at the zero crossing’ may naturally include a short time period before and after the current zero crossing, e.g. 1 ms, 0.5 ms or 0.25 ms before and after the current zero crossing.
The control system may further be configured to monitor a current through a tap to be changed (in particular the old tap and/or the new tap). Based on such monitoring, the zero crossing of the current can be detected so that the old tap may be disconnected at such zero crossing of the current.
The one or more switches connected to the old tap may be allowed to open by the control signal causing that a respective driving signal is no longer supplied to the one or more switches (e.g. a switching valve), in particular by causing that no trigger (e.g. gate voltage/current or light signal) is applied to a gate of such switch. The control signal may cause the switch to open by not sending a respective pulse or signal that keeps the semiconductor switch in a closed state. For example in case of a thyristor, the switch may open upon a current through the closed switch falling below a holding current (which is close to a zero crossing of the current) in the absence of a gate current. It should be clear that the switch may not immediately open after ceasing to supply a gate voltage/current or triggering light signal, but may only open after the current through the switch has dropped sufficiently. Accordingly, a short circuit current through the old tap and the new tap during the tap change may last longer than the changeover period. The changeover period in particular lasts from the trigger for closing the switch associated with the new tap to the trigger for opening the switch associated with the old tap during the tap change.
In an exemplary implementation, the predetermined time at which the switching of at least one of said switches for performing the tap change (in particular for connecting the new tap) occurs is selected from a range of 30%, preferably 25%, 15%, 10% or 7%, of the electrical period of the tap voltage prior to the zero crossing (e.g. 5% for a 50 Hz grid and 6% for a 60 Hz grid). The range may extend up to the time of the zero crossing but may not include the zero crossing (as the switching occurs prior to the zero crossing). For a 50 Hz voltage signal, the electrical period is 20 ms, and for a 60 Hz voltage signal, the electrical period is 16.7 ms. For example, the predetermined time at which the switching occurs may lie within a range of 8 ms to 0.01 ms prior the zero crossing, preferably 5 ms to 0.01 ms or 3 ms to 0.1 ms, more preferably 2ms to 0.2 ms. For example, the switching for the at least one switch may occur within the range of 1.5 ms to 0.5 ms prior to the zero crossing, e.g. at about 1 ms. By such timing of the switching of the at least one switch, it can be ensured that peak short circuit currents are sufficiently low.
The detector may comprise or may be a phase detector. It may include a phase-locked loop (PLL) that detects the phase of the transformer voltage. Such PLL is a proven technology that provides a precise phase determination and that can be implemented cost-efficiently. It is however also conceivable to detect an indication of a zero crossing of the transformer voltage in a different way, for example by detecting a certain rate of change of the transformer voltage signal, detecting a dropping of the transformer voltage signal below a value and the like, for example by sampling the voltage signal sufficiently fast and predicting the zero crossing based on a known waveform of the voltage. However, a higher accuracy and simpler implementation may be achieved by employing a phase detector.
The indication of the zero crossing, in particular the phase, may be detected by measuring a voltage on a higher voltage side (primary side) of the transformer or a lower voltage side (secondary side) of the transformer, and/or on any winding on the transformer, e.g. on a tap winding. It is measured on the lower voltage side. The detector may comprise a measurement unit that is configured to measure the transformer voltage on the respective transformer side. It may in particular measure a phase to ground voltage or a line-line voltage.
In an exemplary implementation, the control system further comprises a converter control unit that is configured to control a power converter coupled to the transformer. Such converter control unit (CCU) may for example control a converter coupled to a rotor of a doubly-fed induction generator, or a converter of a full converter solution that is for example connected to a permanent magnet synchronous generator.
The control signal generator may for example be configured to receive from the CCU a tap change signal and to generate the control signal based on the tap change signal. In a wind turbine, the CCU generally has available high-speed and high-precision voltage measurements, which are required to perform the converter control. Accordingly, such CCU can detect over-voltages or under-voltages fast and efficiently and can provide a respective tap change signal if a tap change is required to keep the voltage on the lower voltage side (i.e. the transformer secondary side) of the wind turbine power system stable. A fast and efficient implementation can thereby be achieved, in particular in view of the synergy obtained by such a way of generating a tap change signal. The CCU can take respective voltage measurements on the secondary side of the transformer, e.g. at the LV connection of the converter towards the transformer.
In an example, the control system may comprise a tap changer controller that is physically separate and distinct from the converter control unit, wherein the detector and the control signal generator form part of the tap changer controller. A relatively simply setup may thus be achieved, which may also be retrofitted to existing wind turbine power systems. Furthermore, a communication connection may be provided between the converter control unit and the tap changer controller to provide the above-mentioned tap change signal from the CCU to the control signal generator. No further modifications to the CCU would accordingly be necessary. Such communication connection may for example be implemented as a controller area network (CAN) bus connection, an Ethernet connection, or any other type of suitable communication connection.
The converter control unit may for example include a phase-locked loop (PLL) configured to detect the phase of the transformer voltage (e.g. of the low-voltage on the secondary side), wherein the converter control unit controls the power converter based on the detected phase. This may for example occur in accordance with any known scheme, such as vector control or direct torque control. The control system may be configured to compare the phase detected by the phase-locked loop of the converter controller with a phase detected by the detector of the tap changer controller. It should be clear that the detected indication of the zero crossing of the transformer voltage is indicative of the phase and that the detector may also be a PLL. Discrepancies in the phase detection may thereby be identified. For example, it can be confirmed that both, the PLL of the CCU and the detector of the control system operate synchronously. This may of course be performed for each phase of a three-phase voltage. An enhanced accuracy may thereby be achieved, and errors may be detected reliably.
In another example, the converter control unit may include a phase-locked loop configured to detect the phase of the transformer voltage (e.g. on the secondary side of the transformer), the converter control unit controlling the power converter based on the detected phase. The detector of the control system may be provided by or implemented by the phase-locked loop of the converter control unit. Accordingly, the same PLL may be used in the control of the power converter and in the generation of the control signal for the tap changer. A compact and cost-efficient solution may thereby be achieved. Also, hardware resources may be saved.
The control signal generator may also be implemented in the CCU. For example, the CCU including the detector in form of the PLL and the control signal generator, and possibly a driver unit, may be provided in the same cabinet in a wind turbine, for example in a converter cabinet of the power converter, or even on the same circuit board. It should be clear that other configurations are conceivable, such as for example providing the driver unit separately, e.g. at the on-load tap changer, or providing the control signal generator and the driving unit in a separate controller.
In general, the transformer may be a three-phase transformer, and the control system may be configured to provide the control signal such that the tap changing for each phase of the three-phase transformer is performed at the predetermined time prior to the zero-crossing of the voltage of the respective phase. As the three phases of a three-phase system are generally offset by 120°, the control signal for switching a semiconductor switch to effect the tap change for each phase may accordingly also be offset in time between each phase by ⅓ of the voltage period. The at least one semiconductor switch for each phase of the three-phase system may accordingly be switched prior to the zero-crossing of the tap voltage of the respective phase, thereby significantly reducing the short circuit currents for each phase during the tap change. It should be clear that the control of the switching for each phase may be independent from the other phases; the indication of the zero crossing may for example be detected independently for each phase of the transformer, for example by using a separate PLL for each phase.
The control signal generator may be configured to predict a future zero-crossing of the voltage at the new transformer tap based on the detected indication of the zero crossing and to generate the control signal such that it includes a trigger (e.g. switching pulse or signal) for switching the semiconductor switch to perform the tap change prior to the predicted zero-crossing. It should be clear that as the voltage signal is a periodic signal (e.g. 50 Hz or 60 Hz, depending on the power grid), the next zero-crossings can be predicted precisely once the phase of the voltage signal is detected by the detector.
The control signal generator may further be configured to generate the control signal so as to account for a delay, in particular for a delay introduced by generating the control signal and/or providing a driving signal by a driver unit to the at least one semiconductor switch. Considering a delay that may be due to the signal processing and signal transmission may ensure that the switching of the at least one semiconductor switch occurs at the predetermined time.
In another exemplary implementation, the control system may be configured to perform a measurement of the transformer voltage waveform for detecting an indication of a zero crossing, and to perform the switching of the at least one semiconductor switch for performing the tap change if the measured instantaneous transformer voltage drops to a voltage level smaller than 60% of a voltage peak amplitude of the transformer voltage waveform, smaller than 50%, 40%, or 35% of the voltage peak amplitude of the transformer voltage waveform. The voltage can for example be sampled by detector or by the CCU with sufficient sampling speed, e.g. at the lower voltage secondary side of the transformer. At 1 ms prior to the zero crossing, the voltage may for example have a value of about 30% of the voltage peak amplitude.
The on-load tap changer is an electronic on-load tap changer. Such tap changer may allow a fast switching of the taps.
The switches may be semiconductor switches. This allows a fast switching between taps. The switches may for example be thyristors. In other examples, the switches may be semiconductor switches such as IGBTs (insulated gate bipolar transistors), IGCTs (integrated gate-commutated thyristor), MOSFETs (metal-oxide-semiconductor field-effect transistors), or triacs. In other exemplary implementations, the switches may be electro-mechanical switches.
The switches are light-triggered thyristors (LTTs). Accordingly, a high degree of electrical isolation can be achieved between the transformer voltages and the control circuits.
The on-load tap changer may include a switching valve (also termed “power valve”) connected to each tap. Each switching valve may comprise or consist of one or a pair of the switches, which may be connected anti-parallel (e.g. thyristor) or in anti-series (e.g. IGBT, IGCT or MOSFET) in the switching valve, depending on the type of switch. Two anti-parallel connected thyristors are desired, as they allow a fast switching and can handle high currents. In other exemplary implementations, each switching valve may comprise or consist of a bidirectional switch or a triac.
The control system may include a driver unit configured to drive the switches in accordance with the control signal. Such driver unit may provide the control signal of the required properties (electrical or optical) to the switches.
The control signal that is generated by the control signal generator may in particular indicate which of the switches are to be closed and which are to be open. The drive signal of the driver unit may include the respective inputs to a control terminal (e.g. gate) of the switches to drive them into the respective state, e.g. into an on-state or off-state. It may for example apply respective gate pulses for triggering the on-state of a thyristor, or a respective light signal that drives the thyristor into an on-state.
The control signal generator may be implemented in digital form, for example as a DSP (digital signal processor) or ASIC (application specific integrated circuit), and the driver unit may include a respective digital-to-analogue converter for generating pulses or a continuous signal for driving the thyristors. It may also be implemented in hardware by means of field programmable gate arrays (FPGAs). When using light-triggered thyristors, the driver unit may comprise an optical driver unit that provides a respective optical drive signal to the light-triggered thyristors.
The transformer may have one or more primary windings and one or more secondary windings, wherein taps may be provided on either of such windings. The transformer may also be an autotransformer. Such types of transformers benefit from a respective on-load tap changer.
According to a further embodiment of the invention, an on-load tap changer is provided that comprises plural switches connected to transformer taps of an electric power transformer, wherein the switches are controllable to switch between transformer taps, a driver unit, and a control system having any of the configurations described herein, wherein the driver unit is connected to the switches and configured to drive the switches in accordance with a control signal received from the control signal generator. Such tap changer may provide an easier integration, as less components, such as changeover impedances, are required and as the lifetime of the switches and of the transformer can be improved without requiring an over-sizing or any special designs of the switches in view of the reduced short circuit currents occurring during the tap change.
The switches may for example provide plural switching valves, each switching valve having a first terminal connected to a transformer tap and a second terminal connected to another switching valve, wherein the connection between each switching valve and the transformer tap is a direct connection that does not comprise a changeover impedance. Further, the connection between the switching valve and the other switching valve may be a direct connection that does not comprise a changeover impedance. Accordingly, when closing the switches connected to two such taps, the resulting circuit may only include the intrinsic tap resistance and the inductance of the transformer winding section between the taps. However, in view of the control of the switches, the short circuit current can be kept small. It should be clear that the switching valve does also not include any additional impedance, i.e. no changeover impedance, and that no changeover impedance may be provided in the tap changer, i.e. for none of the taps.
The switching valves may be connected to the transformer taps and to other switching valves such that when switching from a transformer tap to a neighboring transformer tap, the transformer tap is short circuited with the neighboring transformer tap via the respective switching valves during the tap change. Accordingly, there may be no additional intervening impedances, resistances, inductances or the like connected between the old tap and the new tap when performing a tap change (only intrinsic ones may be present). The transformer may thus operate more efficiently and less components are required. It should be clear that in other implementations, changeover impedances (e.g. connected to at least some taps, e.g. to every second or third tap) may be provided to further reduce the short circuit current during a tap change.
According to a further embodiment of the present invention, a wind turbine electrical power system is provided, which comprises a wind turbine transformer and an on-load tap changer provided on the wind turbine transformer. The on-load tap changer can have any of the configurations described herein. Such transformer does not need to be specially designed or reinforced to have a desired lifetime, e.g. 25 years or more, since with the switching performed by the tap changer, short circuit currents and thus loads on the electric components may be minimized.
According to a further embodiment of the invention, a method of operating an on-load tap changer provided on an electric power transformer is provided. The on-load tap changer comprises switches that are controllable to switch between transformer taps, wherein the method comprises the steps of detecting an indication of a zero crossing of a transformer voltage of the transformer, and generating a control signal that controls the switches for performing a tap change to a new transformer tap. When generating the control signal, the timing of the control signal for changing the transformer tap is determined based on the detected indication of the zero crossing of the transformer voltage such that the switching of at least one of the switches for performing the tap change occurs a predetermined time prior to a zero-crossing of a tap voltage at the new transformer tap. The predetermined time is less than 25% of the duration of a period of the tap voltage. By such method, advantages similar to the ones outlined further above may be achieved.
The method may further include driving the switches in accordance with the control signal, e.g. by means of a respective driving unit.
It should be clear that the method may be carried out with the control system in any of the configurations described herein. Further, the control system may be configured to perform any of the disclosed method steps.
It is to be understood that the features mentioned above and those yet to be explained below can be used not only in the respective combinations indicated, but also in other combinations or in isolation, without leaving the scope of embodiments of the present invention. In particular, the features of the different examples and embodiments of the invention can be combined with each other unless noted to the contrary.
Some of the embodiments will be described in detail, with reference to the following figures, wherein like designations denote like members, wherein:
In the following, embodiments of the invention will be described in detail with reference to the accompanying drawings. It is to be understood that the following description of the embodiments is given only for the purpose of illustration and is not to be taken in a limiting sense. It should be noted that the drawings are to be regarded as being schematic representations only, and elements in the drawings are not necessarily to scale with each other. Rather, the representation of the various elements is chosen such that their function and general purpose become apparent to a person skilled in the art. As used herein, the singular forms “a,” “an,” and “the” are intended to include the plural forms as well, unless the context clearly indicates otherwise. The terms “comprising,” “having,” “including,” and “containing” are to be construed as open-ended terms (i.e., meaning “including, but not limited to,”) unless otherwise noted.
Hereinafter, an exemplary implementation of the disclosed solutions in a wind turbine electrical power system is described for the purpose of illustration; it should however be clear that the disclosed solutions may also be implemented in other environments (e.g. distribution grids, substation transformers, photovoltaic applications, railway applications and the like), in which a fast and efficient tap changing is beneficial. Furthermore, the examples are provided for switches in form of semiconductor switches. The teachings disclosed herein may however also be applied to other types of switches, such as electro-mechanical switches.
A control system 10 is furthermore provided which in some implementations may include a converter control unit (CCU) that controls the power converter 40 (as shown in the example of
The control system 10 may measure a transformer voltage on the LV side and/or the MV/HV side of the transformer 20 to determine the occurrence of a voltage zero crossing, e.g. by measuring a phase of the transformer voltage, and may in accordance therewith control the operation of the tap changer 30, as explained in more detail further below.
It is desired that no changeover impedance, such as an additional resistor or inductance, is connected to any of the taps 25-27 to limit such short circuit current ICC. Rather, only the intrinsic tap resistance Rtap and inductance Ltap of the primary winding section between the taps is present in the circuit. The voltage induced across taps 25 and 26 is VP*nt, VP being the primary voltage and nt being the fraction of turns of the primary winding section between taps 25 and 26 (i.e. nt herein refers to the percentage of turns of the respective winding, i.e. the number of turns between the taps divided by the total number of turns Np of the primary winding). Accordingly, as the intrinsic tap resistance is rather low, ICC can become very large. The instantaneous short circuit current can be calculated from the equation
As described above with respect to
Control signal generator 13 uses the detected phase to generate a control signal for switching the semiconductor switches of switching valves 31 to effect a desired tap change. From the measured phase, the control signal generator 13 may derive the phase of the tap voltage at the taps of tap changer 30 (which may be the same as the measured phase). The tap changer is in the example of
The control signal is then provided to a driver unit 14 which drives the one or more semiconductor switches to perform the tap change. In the example of
After the changeover period (1 ms in the present example), the valve S2 connected to the old tap is allowed to open at a second predetermined time 72, which is close to the zero crossing. As indicated by control signal 82, this may occur by no further providing a respective signal to the valve S2, e.g. by not providing a trigger (e.g. voltage, current, or light) to the gate of the semiconductor switches of valve S2. The short circuit current is however not interrupted immediately, since the switching valve S2 remains closed (i.e. conducting) until the current through the valve S2 has a zero crossing. As soon as this occurs, the switching valve will open (i.e. not conducting) and the short circuit current ICC is interrupted, so that the old tap is no longer connected. As the level of ICC is thus symmetrical about the transformer voltage zero crossing, the time during which ICC is present and the ICC amplitude can be adjusted by setting the predetermined time 71 at which the switching valve connected to the new tap is closed prior to the zero crossing.
When implementing the valve 31 or switch 32 differently, for example by means of a triac, an electro-mechanical switch or an connection of two IGBTs, IGCTs, or MOSFETS, the situation might be different. For example, opening the switch may then directly interrupt the short circuit current. The second predetermined time 72 may then be chosen such that the switch is opened at a zero-crossing of the short circuit current through the old tap, i.e. the tap to be disconnected. The valve S2 or a respective switch may for example be opened at the zero crossing of curve 76, which occurs at about 0.011 s. The changeover period 73 may then last from the first predetermined time 71 prior to the voltage zero crossing to the second predetermined time 72 at the short circuit current zero crossing. A respective current measurement may be made, e.g. at the winding or at one or more taps, on a bus connecting the switches of the tap changer or the like. The current that needs to be interrupted when disconnecting the old tap may thus be reduced significantly. It should be clear that as this is a physical system, the switching will not occur exactly at the current zero crossing, but might occur slightly before or after the current zero crossing, e.g. within ±0.5 ms or ±0.25 ms or ±0.1 ms of the current zero crossing.
The diagram of
The closing of the one or more semiconductor switches of the new tap (e.g. the closing of the switching valve) occurs within 25% of the period of the voltage waveform prior to the zero crossing (which for the example of 50 Hz is within 5 ms prior to the zero crossing). At such switching time, the maximum ICC can already be reduced by almost 50%. More desirably, switching occurs within 15%, 10% or 7% of the period prior to the zero crossing, for example within 4 ms, 2 ms or even 1.5 ms prior to the zero-crossing of the tap voltage. As can be seen in
Turning back to
Communication connection 18 may for example be a CAN bus connection, an Ethernet connection, a serial bus connection, an optical fiber connection (in particular CAN optical fiber), or the like.
In some implementations, the CCU 15 may form part of the control system 10. In other implementations, CCU 15 may not be comprised in control system 10. The example of
By the solution described herein, several advantages may be achieved. For example, by switching the semiconductor switches for effecting the tap change less than 5 ms, or less than 2 ms prior to the zero-crossing of the tap voltage, a significant reduction of the short circuit current may be achieved, e.g. from 1.600 A to less than 100 A in the example of
Although the present invention has been disclosed in the form of preferred embodiments and variations thereon, it will be understood that numerous additional modifications and variations could be made thereto without departing from the scope of the invention.
For the sake of clarity, it is to be understood that the use of “a” or “an” throughout this application does not exclude a plurality, and “comprising” does not exclude other steps or elements.
Number | Date | Country | Kind |
---|---|---|---|
21382382.6 | Apr 2021 | EP | regional |
This application claims priority to PCT Application No. PCT/EP2022/060840, having a filing date of Apr. 25, 2022, which claims priority to EP application Ser. No. 21/382,382.6, having a filing date of Apr. 30, 2021, the entire contents both of which are hereby incorporated by reference.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2022/060840 | 4/25/2022 | WO |