Claims
- 1. A template for drilling and completing multiple subterranean wells from a first casing, said template comprising:
- first means for guiding a drill string during drilling and casing during completion of multiply subterranean wells from said first casing, said first means comprising a body having a first end face and at least one second end face and a plurality of axially extending bores therethrough, each of said bores intersecting said first end face and said second end face; and
- second means for securing said body to said first casing.
- 2. The template of claim 1 wherein said bores are divergent.
- 3. The template of claim 1 wherein each of said bores has a first section and a second section which has a smaller diameter than said first section, said first and second sections defining an annular shoulder therebetween.
- 4. The template of claim 3 wherein each of said bores has a third section which has a smaller diameter than said second section, said second and third sections defining a second annular shoulder therebetween.
- 5. The template of claim 1 wherein said first end face is inclined with respect to a plane perpendicular to the axis of said first casing to assist in positioning a well bore tubular in one of said bores.
- 6. The template of claim 1 wherein said body has two axially extending, bores therethrough.
- 7. The template of claim 6 wherein said two axially extending bores are divergent.
- 8. The template of claim 6 wherein one of said two bores is longer than the other bore.
- 9. The template of claim 3 wherein said second section of each of said bores is provided with a profile into which a liner hanger may be expanded so as to secure production casing thereto.
- 10. The template of claim 1 wherein said means for securing comprises screw threads.
- 11. The template of claim 1 wherein said means for securing comprises an packer assembly which is attached around the periphery of said body.
- 12. The template of claim 1 wherein said first casing is surface casing.
- 13. The template of claim 1 wherein said first casing is intermediate casing.
- 14. The template of claim 1 wherein said first casing is generally vertical.
- 15. The template of claim 1 wherein said first casing is deviated.
- 16. The template of claim 1 wherein said body has at least three axially extending bores therethrough.
- 17. The template of claim 16 wherein said at least three axially extending bores are divergent.
- 18. The template of claim 1 wherein said body is unitary.
- 19. The template of claim 1 wherein said body is comprised of multiple components.
- 20. The template of claim 19 wherein said body comprises a first section, at least one first tubular member secured to said first section, at least one second tubular member secured to said first section, and means for inhibiting movement of said first and second tubular members.
- 21. The template of claim 19 wherein said means comprises an elongated frame.
- 22. The template of claim 21 wherein at least one guide is secured to said frame through which said first or said secured tubular member is positioned.
- 23. The template of claim 1 wherein said body is generally cylindrical.
- 24. The template of claim 1 wherein said end faces are generally planar.
- 25. The template of claim 1 wherein said body has two second end faces, one of said axially extending bores intersecting one of said two second end faces while another of said axially extending bores intersects the other of said two end faces.
- 26. The template of claim 25 wherein said plurality of axially extending bores have different lengths.
- 27. A process for drilling and completing subterranean wells via a first casing which extends from the surface of the earth to a predetermined depth, said process comprising:
- securing a template having at least two bores therethrough to said first casing;
- drilling a first subterranean well bore through one of said bores and into a subterranean formation; and
- securing a first length of production casing to said template, said first length of production casing extending into said first well bore, said template supporting said first length of production casing.
- 28. The process of claim 27 further comprising:
- securing a second length of production casing to said template, said second length of production casing extending through the first casing to the surface of the earth so as to establish fluid communication between the subterranean formation penetrated by said first well bore and the surface via said first and second lengths of production casing.
- 29. The process of claim 28 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface of the earth via said first and second lengths of production casing.
- 30. The process of claim 28 further comprising:
- positioning production tubing through said first and second lengths of production casing; and
- sealing the annulus defined between said first length of production casing and said production tubing.
- 31. The process of claim 30 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface of the earth via said production tubing.
- 32. The process of claim 27 further comprising:
- drilling a second subterranean well bore through another of said bores into a subterranean formation; and
- securing a third length of production casing to said template, said third length of production casing extending into said second well bore.
- 33. The process of claim 32 further comprising:
- securing a fourth length of production casing to said template, said fourth length of production casing extending through the surface casing to the surface of the earth so as to establish fluid communication between the subterranean formation penetrated by said second well bore and the surface via said third and fourth lengths of production casing.
- 34. The process of claim 33 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said second well bore to said surface of earth via said third and fourth lengths of production casing.
- 35. The process of claim 33 further comprising:
- positioning production tubing through said third and fourth lengths of production casing; and
- sealing the annulus defined between said third length of production casing and said production tubing.
- 36. The process of claim 35 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said second well bore to said surface of the earth via said production tubing.
- 37. The process of claim 30 further comprising:
- drilling a second subterranean well bore through another of said bores into a subterranean formation; and
- securing a third length of production casing to said template, said third length of production casing extending into said second well bore.
- 38. The process of claim 37 further comprising:
- securing a fourth length of production casing to said template, said fourth length of production casing extending through the surface casing to the surface of the earth so as to establish fluid communication between the subterranean formation penetrated by said second well bore and the surface via said third and fourth lengths of production casing.
- 39. The process of claim 38 further comprising:
- producing hydrocarbons from said subterranean formation penetrated by said second well bore to said surface of the earth via said third and fourth lengths of production casing.
- 40. The process of claim 38 further comprising:
- positioning production tubing through said third and fourth lengths of production casing; and
- sealing the annulus defined between said third length of production casing and said production tubing.
- 41. The process of claim 40 further comprising:
- conducting a remedial operation via said third and fourth lengths of production casing; and concurrently,
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface via said production tubing positioned within said first and second lengths of production casing.
- 42. The process of claim 40 further comprising:
- injecting a fluid into the subterranean formation penetrated by said second well bore via said third and fourth lengths of production casing; and concurrently,
- producing hydrocarbons from said subterranean formation penetrated by said first well bore to said surface via said production tubing positioned within said first and second lengths of production casing.
- 43. The process of claim 40 wherein said subterranean formation penetrated by said first well bore and said subterranean formation penetrated by the second well bore are the same.
- 44. The process of claim 40 wherein said subterranean formation penetrated by said first well bore is distinct from said subterranean formation penetrated by the second well bore.
- 45. The process of claim 37 wherein said first casing is surface casing.
- 46. The process of claim 37 wherein said first casing is intermediate casing.
- 47. The process of claim 37 wherein said first casing is generally vertical.
- 48. The process of claim 37 wherein said first casing is deviated.
- 49. A method of inserting a generally tubular riser into a plurality of bores through a template which is secured to a casing positioned within a subterranean well bore, the method comprising:
- positioning within said casing a generally tubular riser which is releasably secured to an orienting cam;
- automatically aligning said riser with one of said plurality of bores through the template;
- releasing said riser from said cam; and
- inserting a portion of said riser within one of said plurality of bores.
- 50. The method of claim 49 wherein the step of automatically aligning comprises contacting said cam with a key which is secured to said casing, said key and said cam cooperating upon contact to align said riser with said one of said plurality of bores.
- 51. The method of claim 50 wherein said key is received within a slot in said cam upon contacting said cam and is temporarily received in a first position in said slot.
- 52. The method of claim 49 further comprising:
- releasably securing said portion of said riser within said one of said plurality of bores.
- 53. The method of claim 52 further comprising:
- providing a fluid tight seal between said riser and said one of said plurality of bores.
- 54. The method of claim 52 further comprising:
- removing said portion of said riser from said one of said plurality of bores; and
- releasably securing said riser to said cam.
- 55. The method of claim 54 further comprising:
- automatically aligning said riser with another of said plurality of bores through the template;
- releasing said riser from said cam; and
- inserting a portion of said riser within said another of said plurality of bores.
- 56. The method of claim 55 wherein the step of automatically aligning said riser with said another of said bores comprises contacting said cam with said key which is secured to said casing, said key and said cam cooperating upon contact to align said riser with said another of said plurality of bores.
- 57. The method of claim 56 wherein said key is received within a slot in said cam upon contacting said cam and is temporarily received in a second position in said slot.
- 58. The method of claim 57 further comprising:
- releasably securing said portion of said riser within said another of said plurality of bores.
- 59. The method of claim 58 further comprising:
- providing a fluid tight seal between said riser and said another of said plurality of bores.
- 60. The method of claim 58 further comprising:
- removing said portion of said riser from said another of said plurality of bores; and
- releasably securing said riser to said cam.
- 61. The method of claim 60 further comprising:
- removing said riser and said cam from said casing.
- 62. The process of claim 27 wherein said at least two bores through said template are divergent.
- 63. A subterranean well system comprising:
- a first well bore extending from the surface of the earth to a predetermined depth;
- a second well bore drilled from the first well bore into a first subterranean formation;
- a third well bore drilled from the first well bore into a second subterranean formation;
- a first length of production casing extending from the surface of the earth, through said first well bore and into said second well bore so as to establish fluid communication between said first subterranean formation and the surface; and
- a second length of production casing extending from the surface of the earth through said first well bore, and into said third well bore so as to establish fluid communication between said second subterranean formation and the surface.
- 64. The system of claim 63 further comprising:
- production tubing positioned within said first length of production casing and extending from the surface of the earth into said second well bore.
- 65. The system of claim 64 further comprising:
- means for sealing the annulus defined between said first length of production casing and said production tubing.
- 66. The system of claim 63 further comprising:
- production tubing positioned within said second length of production casing and extending from the surface of the earth into said third well bore.
- 67. The system of claim 66 further comprising:
- means for sealing the annulus defined between said second length of production casing and said production tubing.
- 68. The system of claim 63 wherein said first well bore is generally vertical.
- 69. The system of claim 63 wherein said first well bore is deviated.
- 70. The system of claim 63 wherein said first and said second subterranean formations are the same formation.
- 71. The system of claim 63 wherein said first subterranean formation is distinct from said second subterranean formation.
- 72. The system of claim 63 further comprising:
- a fourth well bore drilled from the first well bore into a third subterranean formation; and
- a third length of production casing extending from the surface of the earth, through said first well bore and into said fourth well bore so as to establish fluid communication between said third subterranean formation and the surface.
CROSS-REFERENCE TO RELATED APPLICATIONS
This application is a continuation-in-part of copending U.S. patent application, Ser. No. 07/936,972, filed Aug. 28, 1992.
US Referenced Citations (10)
Foreign Referenced Citations (4)
Number |
Date |
Country |
0136935A1 |
Apr 1985 |
EPX |
2229117 |
Jan 1974 |
DEX |
1254866 |
Jan 1961 |
FRX |
2220015A |
Dec 1989 |
GBX |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
936972 |
Aug 1992 |
|