The present disclosure relates to a terminal apparatus, a base station apparatus, a retransmission method and a resource allocating method.
In recent years, attempts have been made to improve throughput by providing a plurality of antennas on both a base station apparatus (referred to simply as a base station hereinafter) and a terminal apparatus (referred to simply as a terminal hereinafter) to introduce the MIMO (multiple-input multiple-output) communication technology on uplink. In this MIMO communication technology, a study is made on data transmission using precoding control in a terminal. In the precoding control, the base station estimates a channel condition between the base station and the terminal, from a receiving condition of a reference signal (Sounding Reference Signal: SRS) independently transmitted from each antenna of the terminal, selects a precoder which is optimal for the estimated channel condition and applies the precoder to data transmission.
Particularly, precoding control based on a transmission rank is applied to LTE-Advanced (Long Term Evolution-Advanced: hereinafter, referred to as a LTE-A). Specifically, the base station selects the most suitable rank and precoder for the channel matrix formed by the values of observed SRSs transmitted from the terminal. Herein, a rank refers to the number of space multiplexing (the number of layers) in space division multiplexing (SDM) and is the number of independent data transmitted at the same time. To be more specific, code books having different sizes are employed for respective ranks. The base station receives a reference signal transmitted from the terminal, estimates a channel matrix from the received signal, and selects a rank and a precoder which is optimal for the estimated channel matrix.
In a communication path such as mobile communication, having a relatively large channel variation, a hybrid automatic repeat request (HARQ) is applied for an error controlling technique. HARQ is a technique whereby the transmitting side retransmits data, and the receiving side combines the received data and the retransmitted data to improve error correction performance and achieve high quality transmission. As a HARQ method, adaptive HARQ and non-adaptive HARQ are under study. Adaptive HARQ is a method for allocating retransmitted data to any resource. On the other hand, non-adaptive HARQ is a method for allocating retransmitted data to predetermined resources. In an uplink of LTE, the non-adaptive HARQ scheme is employed among HARQ schemes.
A non-adaptive HARQ scheme will be described with reference to
The base station receives the first data and reports, to the terminal, a NACK corresponding to data which could not be demodulated in the first data, through a HARQ reporting channel (PHICH: Physical Hybrid-ARQ Indicator Channel). The terminal receives the NACK and controls retransmission by using the transmission parameters reported through the PDCCH, the parameters including information resource allocation and the like. Specifically, the terminal generates and transmits retransmission data, using an allocation frequency resource, a precoder, a modulation scheme, and the like, which are the same as those in the first transmission. The terminal changes an RV (Redundancy Version) parameter depending on the number of retransmission requests. The RV parameter represents a reading position in a memory (referred to as a circular buffer) for storing Turbo-coded data. For example, when the memory is equally divided into approximately four regions and tops of the areas are assigned zero, one, two, and three respectively, the terminal changes an RV parameter (a reading position) in order of zero, two, one, three, and zero depending on the number of retransmission requests.
Non-adaptive HARQ is often used together with Synchronous HARQ employing the constant transmission interval. In LTE, retransmission data is retransmitted eight subframes after the report of the NACK.
Non-adaptive HARQ is performed on a per predetermined control unit basis, the control unit is referred to as a code word (CW). The CW is a control unit to which the same modulation scheme and coding rate are applied. As with the CW processed in a physical layer dealing with modulation and coding, the control unit may be referred to as a transport block (TB) since the control unit is processed in a MAC layer dealing with HARQ, and the CW may be distinguished from the TB. The present embodiment however employs uniform notation “CW” without a distinction therebetween hereafter.
In LTE, the transmission of one CW is generally applied to rank 1 (in transmission in a single rank) in the first transmission, and the transmission of two CWs is applied to ranks 2, 3, and 4 (in transmission in multiple ranks) in the first transmission. In the transmission in multiple ranks, CW0 is allocated to Layer 0 and CW1 is allocated to Layer 1 in rank 2. In rank 3, CW0 is allocated to Layer 0, and CW1 is allocated to Layer 1 and Layer 2. In rank 4, CW0 is allocated to Layer 0 and Layer 1, and CW1 is allocated to Layer 2 and Layer 3.
When retransmitting only CWs allocated to a plurality of layers, the terminal transmits one CW at a time in rank 2. To be more specific, when retransmitting CW1 in rank 3 and CW0 or CW1 in rank 4, the terminal transmits these CWs as one CW in rank 2.
Since the base station includes a larger number of antennas compared to the terminal, the base station is flexibly installed relatively. For this reason, a so-called multiuser MIMO, which assigns the same resource to a plurality of terminals, can be applied through an adequate process on a received signal in the base station. An example case will be described where the same resource is allocated to two terminals through the terminal having one transmitting antenna and the base station having two receiving antennas. This case can be equivalently treated as a MIMO channel with two transmitting antennas and two receiving antennas, and the base station can process a received signal. To be more specific, the base station performs a general MIMO received-signal process such as spatial filtering, canceller, and maximum likelihood estimation, thereby detecting respective signals transmitted from a plurality of terminals. With multiuser MIMO, the base station estimates interference values between terminals based on the channel condition between the base station and each terminal, and sets transmission parameters for the respective terminals by considering interference values, in order to more stably operate a communication system.
As described above, a MIMO operation for a single terminal (a single user) provided with a plurality of antennas is sometimes referred to as a single-user MIMO to distinguish it from the multiuser MIMO. An operation to allocate a plurality of terminals, each of which is capable of a single-user MIMO operation and has more than one transmission antennas provided thereon, to the same resource is also referred to as a multiuser MIMO.
The terminal transmits not only the SRS described above but also a demodulation reference signal (Demodulation RS or DMRS) to the base station, and the base station uses the received DMRS for demodulating data. In LTE-A, the DMRS is transmitted for each layer. The terminal transmits the DMRS using the same precoding vector as that of the signal transmitted for each layer. In order for a plurality of terminals to transmit the DMRSs for a plurality of layers in the same frequency resource, some multiplexing process is needed. In LTE-A, as a process of multiplexing the DMRSs, multiplexing using an orthogonal cover code (OCC) is used in addition to multiplexing using a cyclic shift sequence used in LTE to multiplex a plurality of terminals.
The cyclic shift sequence is generated by cyclic shift of a predetermined one of CAZAC (constant amplitude zero auto-correlation) sequences having good auto-correlation characteristics and a constant amplitude. For example, twelve cyclic shift sequences each of which having a starting point at one of twelve points that equally divide a CAZAC sequence along the code length are used. In the following, the starting point will be expressed as ncs.
As for the OCC, spreading codes having a sequence length of 2 are formed using a DMRS, which includes two symbols per sub-frame, taking into consideration the transmission format of the uplink data. To be more specific, in LTE-A, as OCCs, two spreading codes having a sequence length of 2, {+1, +1} and {+1, −1}, are formed. In the following, a spreading code according to the OCC will be expressed as nocc. For example, the two spreading codes {+1, +1} and {+1, −1} are expressed as nocc=0 and 1, respectively.
Further, ncs and nocc are included in transmission parameters reported from the base station to the terminal through the PDCCH. A specific method of reporting the transmission parameters including ncs and nocc, in particular, a specific reporting method using the single-user MIMO, will be described later.
Next, interference between DMRSs multiplexed in the same frequency resource will be described.
As for nocc, on the other hand, if reference signals to be allocated (to be multiplexed) at the same time have the same code length, that is, the same bandwidth allocated thereto, the reference signals are expected to be orthogonal to each other if they have different values of nocc. The degree of the orthogonality (referred to simply as orthogonality) depends on the fading correlation between the two symbols in one sub-frame to which the reference signals (DMRSs) are allocated. For example, in a low-speed moving environment, which is a primary application of MIMO, high orthogonality is expected to be assured.
Next, a method of reporting a spreading code of a DMRS in the single-user MIMO will be described. According to a method of reporting a spreading code of a DMRS in LTE, the base station sets arbitrary spreading codes using a parameter nDMRS(1) set for each user in a higher layer assuming a relatively long period and a parameter nDMRS(2) that is a transmission parameter reported through the PDCCH and set for a relevant transmission sub-frame by decision of the scheduler, and indicates the spreading codes to the terminal. The terminal generates a DMRS using a prescribed ncs calculated from the indicated parameter (nDMRS(1) or nDMRS(2)).
In LTE-A, there is proposed a method of expanding the reporting method described above to the single-user MIMO (see Non-Patent Literature 1, for example). In Non-Patent Literature 1, the starting point of the cyclic shift sequence and the set value of OCC for the k-th layer (k=0 to 3) are set as nDMRS,k(2) (corresponding to ncs described above) and nocc,k, respectively. In Non-Patent Literature 1, information reported through higher layers or the PDCCH is only the set values (nDMRS,0(2) and nocc,0) for the 0-th layer (k=0, Layer 0), and the set values for the remaining layers (k=1 to 3, Layers 1 to 3) are determined by calculation from the set values for the 0-th layer (k=0, Layer 0). This is an attempt to minimize the overhead involved in reporting of the controlling signal.
To be more specific, Non-Patent Literature 1 discloses that each set value is set as follows in order to avoid the interference between the reference signals as far as possible in the single-user MIMO.
Specifically, nDMRS,0(2) is defined as (nDMRS,0(2)+Δk) mod 12 where
in transmission using two layers, Δk=0 for k=0, and Δk=6 for k=1,
in transmission using three layers, Δk=0 for k=0, Δk=6 for k=1, and Δk=3 for k=2, or
Δk=0 for k=0, Δk=4 for k=1, and Δk=8 for k=2, and
in transmission using four layers, Δk=0 for k=0, Δk =6 for k=1, Δk=3 for k=2, and Δk=9 for k=3.
Further, nocc,k is defined as nocc,0 or (1−nocc,0) where
nocc,k=nocc,0 for k=1, and nocc,k=(1−nocc,0) for k=2 or 3.
NPL 1
R1-104219, “Way Forward on CS and OCC signaling for UL DMRS”, Panasonic, Samsung, Motorola, NTT DOCOMO, NEC, Panatech.
A case where a terminal transmits data using the above-described conventional method for allocating spreading codes of a reference signal (DMRS), and a base station applies non-adaptive HARQ control using a PHICH will be described. In this case, the PHICH used for instructing data retransmission cannot carry information on transmission parameters. As a result, the same spreading codes for the reference signal as those used in the first transmission are used in retransmission of data, more specifically, retransmission of a CW in response to a NACK returned from the base station.
For example, in the case where the first transmission is transmission using three layers (rank 3 transmission) as shown in
As a result, only the resources of spreading codes (referred to as a spreading code resource, hereinafter) in the region enclosed by the dashed line in the right half (in retransmission) of
Thus, as shown in
As described above, when non-adaptive HARQ control is applied using the PHICH, there are restrictions on allocation of spreading codes to a new user by the scheduler.
An object of the present disclosure is to provide a terminal apparatus, a base station apparatus, a retransmitting method and a resource allocating method that allow a scheduler to perform a spreading code allocating operation by avoiding restrictions on allocation of a spreading code to a new user even in the case where non-adaptive HARQ control is applied using a PHICH.
A terminal apparatus reflecting an aspect of the present disclosure has: a code word generating section that generates a code word by encoding a data sequence; a mapping section that allocates each code word to one or a plurality of layers; a reference signal generating section that generates a reference signal for each of the layers to which the code word is allocated, using any of resources from among a plurality of resources defined by a plurality of codes orthogonal to each other; and a receiving section that receives a response signal indicating a retransmission request for the code word, and in a case where the received response signal is to request for retransmission of only a single code word allocated to the plurality of layers, the reference signal generating section uses resources having a same code from among the plurality of resources, for the reference signal generated for each of the plurality of layers.
A base station reflecting an aspect of the present disclosure has: a receiving section that receives a code word allocated to one or a plurality of layers; a detecting section that detects an error of the received code word; a response signal generating section that generates a response signal indicating a result of error detection of the code word; and a scheduling section that allocates any of resources from among a plurality of resources defined by a plurality of codes orthogonal to each other, to the reference signal to be transmitted from each terminal apparatus and to be generated for each of the layers to which the code word is allocated, and in a case where only the result of error detection of a single code word allocated to the plurality of layers shows a NACK, the scheduling section identifies resources used for the reference signal for each of the plurality of layers transmitted from a terminal apparatus to retransmit the single code word, as resources having a same code from among the plurality of resources, and allocates a resource having a different code than the same code from among the plurality of resources, to the reference signal transmitted from another terminal apparatus different from the terminal apparatus to perform the retransmission.
A retransmitting method reflecting an aspect of the present disclosure includes: generating a code word by encoding a data sequence; allocating each code word to one or a plurality of layers; generating a reference signal for each of the layers to which the code word is allocated, using any of resources from among a plurality of resources defined by a plurality of codes orthogonal to each other; and receiving a response signal indicating a retransmission request for the code word, and in a case where the received response signal is to request for retransmission of only a single code word allocated to the plurality of layers, resources having a same code from among the plurality of resources are used for the reference signal generated for each of the plurality of layers.
A resource allocating method reflecting an aspect of the present disclosure includes: receiving a code word allocated to one or a plurality of layers; detecting an error of the received code word; generating a response signal indicating a result of error detection of the code word; and allocating any of resources from among a plurality of resources defined by a plurality of codes orthogonal to each other, to the reference signal to be transmitted from each terminal apparatus and to be generated for each of the layers to which the code word is allocated, and in a case where only the result of error detection of a single code word allocated to the plurality of layers shows a NACK, resources used for the reference signal for each of the plurality of layers transmitted from a terminal apparatus to retransmit the single code word are identified as resources having a same code from among the plurality of resources, and a resource having a different code than the same code from among the plurality of resources is allocated to the reference signal transmitted from another terminal apparatus different from the terminal apparatus to perform the retransmission.
According to the present disclosure, even in the case where non-adaptive HARQ control is applied using a PHICH, it is possible for a scheduler to perform a spreading code allocating operation by avoiding restrictions on allocation of a spreading code to a new user.
Embodiments of the present disclosure will now be described in detail with reference to the drawings.
PDCCH demodulating section 101 demodulates transmission parameters (parameters associated with data transmission) determined in a base station, from a PDCCH included in a signal transmitted from the base station (a receiving apparatus described later). The transmission parameters include information such as allocated frequency resources (allocated resource blocks (RBs), for example), a transmission rank number, a precoder, a modulation scheme, a coding rate, RV parameters used in retransmission, or spreading codes for the reference signal (DMRS) associated with a 0-th layer (k=0, Layer 0) (ncs,0 (or nDMRS,0(2)) and nocc,0 described above, for example). PDCCH demodulating section 101 outputs the demodulated transmission parameters to rate matching section 105, modulating section 107, layer mapping section 108, DMRS generating section 110 and SC-FDMA signal generating section 113.
ACK/NACK demodulating section 102 demodulates, for each CW, ACK/NACK information indicating the result of error detection of the received signal at the base station, from a PHICH included in the signal transmitted from the base station (the receiving apparatus described later). Then, ACK/NACK demodulating section 102 outputs the demodulated ACK/NACK information to rate matching section 105, layer mapping section 108 and DMRS generating section 110.
The number of code word generating sections 103 depends on the number of code words (CW), and code word generating section 103 generates a CW by encoding input transmission data (a data sequence). Each code word generating section 103 includes coding section 104, rate matching section 105, interleaving/scrambling section 106 and modulating section 107.
Coding section 104 receives transmission data, provides CRC (Cyclic Redundancy Checking) to the transmission data, encodes the data to generate coded data, and outputs the generated coded data to rate matching section 105.
Rate matching section 105 includes a buffer and stores the coded data in the buffer. Rate matching section 105 then performs a rate matching process on the coded data based on the transmission parameters outputted from PDCCH demodulating section 101 to adaptively adjust an M-ary modulation value or a coding rate. Rate matching section 105 then outputs the coded data subjected to the rate matching process to interleaving/scrambling section 106. In retransmission (if the ACK/NACK information from ACK/NACK demodulating section 102 shows a NACK), rate matching section 105 reads a predetermined amount of coded data depending on the M-ary modulation value and the coding rate as retransmission data, from the starting position in the buffer indicated by the RV parameter outputted from PDCCH demodulating section 101. Rate matching section 105 then outputs the read retransmission data to interleaving/scrambling section 106.
Interleaving/scrambling section 106 performs an interleaving/scrambling process on the coded data received from rate matching section 105 and outputs the coded data subjected to the interleaving/scrambling process to modulating section 107.
Modulating section 107 performs an M-ary modulation on the coded data based on the transmission parameters received from PDCCH demodulating section 101 to generate modulated signals and outputs the modulated signals to layer mapping section 108.
Layer mapping section 108 maps, to each layer on a CW basis, the modulated signals received from modulating section 107 in each code word generating section 103 based on the transmission parameters received from PDCCH demodulating section 101 and the ACK/NACK information received from ACK/NACK demodulating section 102. Herein, layer mapping section 108 maps (allocates) each CW to one or more layers depending on the transmission rank number included in the transmission parameters, as described above. Layer mapping section 108 then outputs the mapped CWs to precoding section 109.
Precoding section 109 performs precoding process on the DMRS received from DMRS generating section 110 or the CWs received from layer mapping section 108 to apply a weight to each DMRS or CW. Precoding section 109 then outputs precoded CWs and DMRS to SC-FDMA (Single Carrier Frequency Division Multiple Access) signal generating section 113.
DMRS generating section 110 generates a DMRS for each of the layers, which depends on the transmission rank number, based on the transmission parameters received from PDCCH demodulating section 101 and the ACK/NACK information received from ACK/NACK demodulating section 102. In the present embodiment, a plurality of spreading code resources for DMRSs are defined based on cyclic shift sequences that can be separated from each other using different amounts of cyclic shift (ncs,k=0 to 11, for example) and OCCs that are orthogonal to each other (nocc,k=0, 1, for example). DMRS generating section 110 generates a DMRS for each layer to which a CW is allocated, using any of the plurality of spreading code resources for DMRSs.
To be more specific, DMRS generating section 110 calculates, based on the spreading codes (ncs,0 and nocc,0, for example) used in the DMRS associated with the 0-th layer (k=0, Layer 0), included in the transmission parameters, as described above, the spreading codes used in the DMRS associated with each of the other layers (k=1, 2 and 3, Layers 1, 2 and 3). DMRS generating section 110 outputs the spreading codes generated based on the transmission parameters received from PDCCH demodulating section 101 (that is, the spreading codes used in the DMRS indicated by the base station through the PDCCH) to retransmission spreading code storage section 111. If the ACK/NACK information received from ACK/NACK demodulating section 102 shows a NACK (that is, if retransmission is required), DMRS generating section 110 sets spreading codes used in the DMRS in CW retransmission based on the CW associated with the NACK and the spreading codes stored in retransmission spreading code storage section 111. A DMRS generating process conducted by DMRS generating section 110 in retransmission will be described later.
Retransmission spreading code storage section 111 stores the spreading codes received from DMRS generating section 110 (that is, the spreading code resource used for the DMRS generated for each layer in the first transmission and indicated through the PDCCH). Retransmission spreading code storage section 111 outputs the spreading codes stored therein to DMRS generating section 110 in response to a request from DMRS generating section 110.
SRS (Sounding Reference Signal) generating section 112 generates reference signal for measuring channel quality (SRS) and outputs the generated SRS to SC-FDMA signal generating section 113.
SC-FDMA signal generating section 113 performs SC-FDMA modulation on the reference signal (SRS) received from SRS generating section 112 or the precoded CW and DMRS to generate an SC-FDMA signal. SC-FDMA signal generating section 113 then performs a radio transmitting process (S/P (Serial/Parallel) transform, inverse Fourier transform, upconvert, amplification, and the like) on the generated SC-FDMA signal and transmits the signal subjected to the radio transmitting process through transmitting antennas. In view of the above, the first transmission data or retransmission data is transmitted to the receiving apparatus.
The number of receiving RF section 201 depends on the number of antennas. Each receiving RF section 201 receives a signal transmitted from a terminal (transmitting apparatus 100 shown in
The number of sections for each of the sections from channel estimating sections 202 to PDCCH generating sections 211 depends on the number of terminals which the base station (receiving apparatus 200) can communicate with at the same time.
Channel estimating section 202 performs channel estimation based on a reference signal (DMRS) included in the baseband signal and calculates a channel estimation value. In this process, channel estimating section 202 identifies the spreading codes used in the DMRS in accordance with an instruction from scheduling section 212. Channel estimating section 202 then outputs the calculated channel estimation value to PDCCH generating section 211 and spatial demultiplexing synchronization detecting section 203.
Spatial demultiplexing synchronization detecting section 203 demultiplexes the baseband signals mapped to a plurality of layers, using the channel estimation value and outputs the demultiplexed baseband signals to layer demapping section 204.
Layer demapping section 204 combines the demultiplexed baseband signals for each CW and outputs the combined CW to likelihood generating section 206.
The number of error detecting sections 205 depends on the number of CWs. Each of error detecting section 205 includes likelihood generating section 206, retransmission combining section 207, decoding section 208, and CRC detecting section 209.
Likelihood generating section 206 calculates a likelihood for each CW and outputs the calculated likelihood to retransmission combining section 207.
Retransmission combining section 207 stores past likelihoods for each CW and performs a retransmission-combining process on the retransmission data, based on the RV parameter and outputs the combining-processed likelihood to decoding section 208.
Decoding section 208 decodes a likelihood obtained through the retransmission-combining process to generate decoded data and outputs the generated decoded data to CRC detecting section 209.
CRC detecting section 209 performs an error detecting process by CRC on the decoded data outputted from decoding section 208 and outputs the result of error detection for each CW to PHICH generating section 210 and scheduling section 212. CRC detecting section 209 outputs the decoded data as received data.
PHICH generating section 210 allocates ACK/NACK information indicating the result of error detection received from CRC detecting section 209 associated with each CW to a PHICH for each CW. The PHICH is provided with an ACK/NACK resource as a response resource for each CW. For example, PHICH generating section 210 allocates an ACK to the ACK/NACK resource for the CW0 when the result of error detection for the CW0 indicates the absence of an error, and allocates a NACK to the ACK/NACK resource for the CW0 when the result of error detection for the CW0 indicates the presence of an error. Similarly, PHICH generating section 210 allocates an ACK to an ACK/NACK resource corresponding to CW1 when the result of error detection with respect to CW1 indicates the absence of an error, and allocates a NACK to the ACK/NACK resource corresponding to CW1 when the result of error detection with respect to CW1 indicates the presence of an error. In view of the above, PHICH generating section 210, as a response signal generating section, allocates an ACK or a NACK to a response resource provided in the PHICH for each CW. In this way, the ACK/NACK information indicating the result of error detection for each CW is allocated to the PHICH and transmitted to the terminal (transmitting apparatus 100) (not shown).
PDCCH generating section 211 estimates the channel condition based on the channel estimation value calculated by channel estimating section 202. Then, PDCCH generating section 211 determines transmission parameters for a plurality of terminals based on the estimated channel condition. In this process, PDCCH generating section 211 sets a spreading code resource used for the DMRS allocated to each terminal in accordance with an instruction from scheduling section 212. PDCCH generating section 211 allocates the set transmission parameters to the PDCCH. In this way, the transmission parameters for each terminal are allocated to the PDCCH and transmitted to each terminal (not shown).
Scheduling section 212 allocates any of a plurality of spreading code resources to the DMRS transmitted from each terminal and generated for each layer to which the CW transmitted by the terminal is allocated, based on the result of error detection inputted from CRC detecting section 209 associated with each CW. Then, scheduling section 212 indicates the spreading code resource allocated to each terminal to PDCCH generating section 211 associated with that terminal. Furthermore, scheduling section 212 indicates the spreading code resource allocated to each terminal to channel estimating section 202 associated with that terminal.
The operations of transmitting apparatus 100 (hereinafter, referred to as “a terminal”) and receiving apparatus 200 (hereinafter, referred to as “a base station”) configured as described above will now be described.
The terminal transmits a reference signal (SRS: Sounding Reference Signal) for estimating a channel condition (for measuring channel quality) in accordance with an instruction from the base station.
The base station receives the reference signal (SRS) and, based on the result of observation of the received signal, determines transmission parameters including allocated frequency resources (allocated RBs), a transmission rank number, a precoder, a modulation scheme, a coding rate, RV parameters used in retransmission, or spreading codes used in the reference signal (DMRS) associated with the 0-th layer (k=0, Layer 0). The base station reports the determined transmission parameters to the terminal through PDCCH. The terminal needs time corresponding to about four subframes to generate transmission data in LTE, for example. Thus, the base station needs to report resource allocation in the (n-4)-th subframe in order to generate transmission data transmitted in the n-th subframe. Therefore, the base station determines and reports transmission parameters based on a channel condition in the (n-4)-th subframe.
Then, the terminal extracts the transmission parameters from the PDCCH, generates the DMRS and a data signal for each layer based on the extracted transmission parameters, and performs a precoding on the DMRS and the data signal, thereby forming a transmission signal to be transmitted from each transmission antenna. The terminal transmits the generated transmission signal to the base station.
The spreading codes used in the DMRS associated with each layer (k=1, 2 or 3, Layer 1, 2 or 3) is determined based on the value for that layer relative to the value for the 0-th layer (k=0, Layer 0) which is included in the transmission parameters, as described above. In other words, the spreading codes for each of Layers 1, 2 and 3 is determined based on the spreading codes for Layer 0 (the spreading code included in the transmission parameters). The terminal also retains the spreading codes of the DMRS indicated through the PDCCH.
The base station performs a receiving process on the transmission signal transmitted from the terminal in the n-th subframe and generates the PHICH based on the result of error detection for each CW. In LTE, the base station can issue a retransmission instruction through the PDCCH as well as through the PHICH. However, such a situation is not closely related to the present disclosure and thus will not be described in detail.
The terminal refers to the PDCCH and the PHICH at a timing when the result of error detection is reported from the base station (in this case, the (n+4)-th subframe in LTE). The PHICH includes an instruction for HARQ.
When detecting an ACK from the PHICH, the terminal determines that the base station could successfully demodulate the corresponding CW and stops retransmission of the CW. On the other hand, when not detecting an ACK in the PHICH, the terminal determines that the base station could not demodulate the corresponding CW and instructs the CW to be retransmitted, and retransmits the CW at predetermined timing.
According to the aforementioned example, when not detecting an ACK corresponding to a CW transmitted in the n-th subframe, the terminal transmits retransmission data of the CW in the n+8-th subframe. For this transmission, as described above, the terminal uses the same transmission parameters (precoder, for example) as those indicated through the PDCCH in the (n−4)-th subframe, except that a predetermined value depending on the number of retransmission requests is used as the RV parameter, and values (spreading code resources) set in accordance with values (spreading code resources) stored in retransmission spreading code storage section 111 and the occurrences of ACKs and NACKs are used for the spreading codes of the DMRSs. A method of setting the spreading codes used in the DMRS in retransmission will be described hereinafter.
When the result of error detection of a CW indicates the absence of an error, the base station reports an ACK to the terminal, through a PHICH and instructs the transmission of the corresponding CW to be stopped. When the result of error detection of a CW indicates the presence of an error, the base station reports a NACK to the terminal through the PHICH. The base station performs a retransmission combining process and repeats a demodulating process. The base station performs demodulation of the retransmission data and resource allocation to another terminal based on the spreading code resources set in accordance with the spreading code resources indicated to the terminal in the first transmission and the result of error detection of the CW.
Next, a method of setting the spreading codes used in the DMRS in retransmission will be described.
In the following, as shown in
In retransmission of CW1 shown in
Thus, when DMRS generating section 110 receives a response signal requesting for retransmission of only a single CW allocated to a plurality of layers, DMRS generating section 110 uses, for the DMRS generated for the plurality of layers, spreading code resources having the same OCC from among the plurality of spreading code resources defined by the plurality of OCCs (nocc,k=0, 1, in this example). That is, in a situation where different OCCs are applied to a plurality of layers to which the CW to be retransmitted is allocated when the spreading code resources for the DMRSs used in the first transmission are used in the retransmission, the terminal adjusts the spreading code resources for the DMRSs so that the spreading code resources having the same OCC for the plurality of layers to which the CW to be retransmitted is allocated are applied to the DMRSs.
To be more specific, the terminal uses spreading code resources having the same OCC from among the spreading code resources used for the DMRSs generated for a plurality of layers in the first transmission (that is, set values stored in retransmission spreading code storage section 111), for the DMRSs generated for the plurality of layers to which the CW to be retransmitted is allocated. For example, in
As a result, as spreading code resources that are other than those occupied by Layers 1 and 2 to which CW1 to be retransmitted is allocated and that do not interfere with the spreading code resources used for CW1, the spreading code resources in the region enclosed by the dashed line in
On the other hand, in a situation where different OCCs are applied to a plurality of layers to which the CW to be retransmitted is allocated when the spreading code resources for the DMRSs allocated to the terminal in the first transmission are used in the retransmission, the base station recognizes that the CW (DMRS) is to be retransmitted using the spreading code resources having the same OCC from among the spreading code resources for the DMRSs allocated to the terminal in the first transmission. And the base station demodulates the retransmitted CW using the spreading codes having the same OCC described above from among the spreading code resources for the DMRS allocated to the terminal in the first transmission. Furthermore, the base station performs resource allocation to another terminal (a new user) taking into consideration that, from among the spreading code resources for the DMRS allocated in the first transmission, the spreading codes having the same OCC are used for the CW retransmitted.
That is, when only the result of error detection of a single CW allocated to a plurality of layers shows a NACK, the base station identifies the spreading code resources used for the DMRS for the plurality of layers transmitted by the terminal that retransmits the single code word as spreading code resources having the same OCC from among the plurality of spreading code resources. Furthermore, the base station allocates, from among the plurality of spreading code resources, spreading code resources having different OCCs than the OCC used by the terminal that performs the retransmission (the identified OCC) to the DMRSs transmitted by another terminal apparatus (a new user) different from the terminal that performs the retransmission.
For example, in
Furthermore, as resources to be allocated to the DMRSs for another terminal (a new user) different from the terminal that retransmits CW1 shown in
Therefore, for example, even in the case where a scheduler is to multiplex a new user that performs transmission using two layers as a multiuser MIMO operation (that is, in the case where spreading codes having the same value of OCC and values of ncs,k that differ by 6 or so are used), spreading code resources whose values of ncs,k differ by 6 or so in the region enclosed by the dashed line in
As described above, on the side of the terminal (transmitting apparatus 100), in the case where a response signal that requests for retransmission of only a single code word allocated to a plurality of layers is received, DMRS generating section 110 uses spreading code resources having the same OCC from among a plurality of spreading code resources, for the DMRSs generated for the plurality of layers to which the code word to be retransmitted is allocated. As a result, a shortage of spreading code resources in retransmission can be prevented. In other words, even in the case where non-adaptive HARQ control is applied using the PHICH, it is possible to avoid restrictions on allocation of resources to a new user by the scheduler that would otherwise be imposed due to the continuation of use, for retransmission, of the spreading code resources for different OCCs set for DMRSs for a plurality of layers in the first transmission.
On the side of the base station (receiving apparatus 200), in the case where only the result of error detection of a single code word allocated to a plurality of layers shows a NACK, scheduling section 212 identifies that the spreading code resources used for the DMRSs for a plurality of layers transmitted by the terminal that retransmits the single code word are spreading code resources having the same OCC from among a plurality of spreading code resources. Furthermore, from among a plurality of spreading code resources, scheduling section 212 allocates, to DMRSs transmitted by another terminal (a new user) different from the terminal that performs the retransmission, spreading code resources having different OCCs than the OCC used by the terminal that performs the retransmission (the same OCC for the layers). Accordingly, resources are adequately allocated to each terminal in application of multiuser MIMO.
Therefore, according to the present embodiment, the scheduler can perform spreading code allocation by avoiding restrictions on allocation of resources to a new user even in the case where non-adaptive HARQ control is applied using the PHICH.
According to Embodiment 2, spreading code resources for the same OCC are used for DMRS generated for a plurality of layers to which one CW to be retransmitted is allocated, as in Embodiment 1. However, the present embodiment differs from Embodiment 1 in that the OCC used by the terminal (the same OCC for the layers) is changed each time retransmission occurs.
In the following, the present embodiment will be described in detail.
For each CW received from ACK/NACK demodulating section 102, if the ACK/NACK information shows a NACK, retransmission number counting section 301 increments the number of retransmissions for the CW and stores the number in the interior. In other words, retransmission number counting section 301 counts the number of retransmissions for each CW and stores the counted number of retransmissions for each CW. In addition, for each CW, if the ACK/NACK information shows an ACK, retransmission number counting section 301 resets the number of retransmissions for the CW. Then, retransmission number counting section 301 outputs the counted number of retransmissions for each CW to retransmission spreading code storage section 302.
Retransmission spreading code storage section 302 sets the OCC in accordance with the number of retransmissions received from retransmission number counting section 301 in accordance with a predetermined rule concerning the OCCs included in the spreading code resources. For example, in an odd-numbered retransmission, retransmission spreading code storage section 302 outputs the stored spreading code resources without change to DMRS generating section 110, as in Embodiment 1. On the other hand, in an even-numbered retransmission, retransmission spreading code storage section 302 outputs the stored spreading code resources with their OCCs inverted to DMRS generating section 110. Note that the operations of retransmission spreading code storage section 302 are not limited to the processes described above, and the operation in the odd-numbered retransmission and the operation in the even-numbered retransmission may be interchanged.
As in Embodiment 1, in retransmission of only a single CW allocated to a plurality of layers, DMRS generating section 110 uses spreading code resources having the same OCC for the DMRSs generated for the plurality of layers to which the CW to be retransmitted is allocated. However, for each retransmission, DMRS generating section 110 changes the OCC used for the DMRSs generated for the plurality of layers to which the single CW to be retransmitted is allocated (the same OCC for the layers).
For example, as shown in
Here, as shown in
On the other hand, in the even-numbered (second, fourth, sixth and so on) retransmissions, DMRS generating section 110 uses the spreading code resources (ncs,1=0 and nocc,1=1, and ncs,2=6 and nocc,2=1) obtained by inverting the OCC of the two spreading codes for the same OCC (nocc,k=0) (ncs,1=0 and nocc,1=0, and ncs,2=6 and nocc,2=0) (that is, the OCC is inverted from nocc,k=0 to nocc,k=1) (not shown).
As a result, the DMRSs generated for the plurality of layers to which the CW to be retransmitted is allocated occupy spreading code resources having different OCCs in each retransmission. For example, in
On the other hand, on the side of the base station (receiving apparatus 200 (
With such a configuration, according to the present embodiment, it is possible to avoid using a particular OCC (either one of nocc,k=0 or 1, for example) on the terminal that retransmits only the CW allocated to a plurality of layers. Therefore, the present embodiment not only achieves the same advantages as those of Embodiment 1 but also allows multiplexing of another terminal using different spreading codes for each retransmission of the CW.
In Embodiments 1 and 2, cases have been described in which spreading code resources used for DMRSs used in CW retransmission are adjusted in accordance with the spreading code resources used in the first transmission and the occurrences of ACKs and NACKs. According to the present embodiment, spreading code resources used for DMRSs used in CW transmissions (the first transmission and the subsequent retransmissions) are adjusted in accordance with the spreading code resources and the number of transmission layers (the transmission rank number) reported through the PDCCH.
In the following, the present embodiment will be described in detail.
In transmitting apparatus 400 (terminal) shown in
Spreading code adjusting section 401 adjusts the spreading codes received from DMRS generating section 110 based on the transmission rank number received from DMRS generating section 110. To be more specific, spreading code adjusting section 401 adjusts (resets) the spreading codes used for the respective number of transmission layers so that spreading code resources having the same OCC are allocated to the DMRSs generated for each of the plurality of layers to which the same CW is allocated, by referring to the relationship between the layers determined by the value of the transmission rank number (the number of transmission layers) and the CWs.
Then, DMRS generating section 110 generates DMRSs using the spreading codes (adjusted spreading codes) received from spreading code adjusting section 401 and outputs the generated DMRSs to precoding section 109. If the ACK/NACK information received from ACK/NACK demodulating section 102 shows a NACK (that is, if a retransmission is required), DMRS generating section 110 uses the same spreading codes used in the first transmission (adjusted spreading codes) without change.
Next, a spreading code adjusting process performed by spreading code adjusting section 401 will be described in detail.
Spreading code adjusting section 401 receives spreading code resources used for the DMRS for each layer (Layer 0 to 3), from DMRS generating section 110. To be more specific, as shown in the left half of
As described above, in transmission using three layers, as the relationship between the layers and the CWs, CW0 is allocated to Layer 0 (k=0), and CW1 is allocated to Layers 1 and 2 (k=1, 2). Accordingly, as shown in the left half of
In view of this, spreading code adjusting section 401 adjusts the spreading code resource used in each layer for the respective number of transmission layers so that spreading code resources for the same OCC are used for the DMRSs generated for the plurality of layers to which the same CW is allocated.
To be more specific, as shown in the right half of
As a result, as shown in the left half of
In other words, spreading code resources for the same OCC (nocc,k=1) are used for the DMRSs generated for the two layers, Layers 1 and 2, to which CW1 is allocated.
In the case where the terminal (transmitting apparatus 400) detects no ACK for a CW transmitted therefrom, the terminal is to transmit retransmission data for the CW. In the retransmission, DMRS generating section 110 uses the spread code resources used for the DMRSs in the first transmission (that is, the adjusted spreading code resources shown in the right half of
As a result, as shown in the right half of
On the other hand, on the side of the base station (receiving apparatus 200 (
Therefore, for example, in
As described above, according to the present embodiment, in preparation for occurrence of retransmission, the terminal (transmitting apparatus 400) uses, in the first transmission, spreading code resources having the same OCC from among a plurality of spreading codes for DMRSs generated for a plurality of layers to which the same CW, which is a unit of retransmission, is allocated. As a result, a shortage of spreading code resources in retransmission can be prevented. In other words, even in the case where non-adaptive HARQ control is applied using the PHICH (even in the case where the spreading codes for the DMRS cannot be reported through the PHICH), it is possible to avoid restrictions on allocation of resources to a new user by the scheduler that would otherwise be imposed due to the use, for retransmission, of spreading code resources for different OCCs.
Therefore, according to the present embodiment, as in Embodiment 1, the scheduler can perform spreading code allocation by avoiding restrictions on allocation of resources to a new user even in the case where non-adaptive HARQ control is applied using the PHICH.
Embodiments of the present disclosure have been described above.
Although the present disclosure has been described above with embodiments using antennas, the present disclosure is equally applicable to antenna ports.
An antenna port refers to a theoretical antenna comprised of one or a plurality of physical antennas. In other words, “antenna port” does not necessarily refer to one physical antenna, but may refer to an array antenna and so forth composed of a plurality of antennas.
For example, 3 GPP LTE does not define how many physical antennas an antenna port is formed with, but defines that an antenna port is the minimum unit for transmitting different reference signals in a base station.
In addition, an antenna port may be defined as a minimum unit for multiplying a precoding vector as weighting.
Although an example of the present disclosure configured as hardware has been described in the present embodiments, the present disclosure may also implement software in collaboration with hardware.
Furthermore, each function block employed in the above descriptions of embodiments may typically be implemented as an LSI constituted by an integrated circuit. These may be implemented individually as single chips, or a single chip may incorporate some or all of the function blocks. “LSI” is adopted here but this may also be referred to as “IC,” “system LSI,” “super LSI,” or “ultra LSI” depending on differing extents of integration.
Further, the method of circuit integration is not limited to LSI's, and implementation using dedicated circuitry or general purpose processors is also possible. After LSI production, utilization of an FPGA (Field Programmable Gate Array) or a reconfigurable processor where connections and settings of circuit cells in an LSI can be reconfigured may also be possible.
In the event of the introduction of a circuit implementation technology whereby LSI is replaced by a different technology, which is advanced in or derived from semiconductor technology, integration of the function blocks may of course be performed using technology therefrom. An application to biotechnology and/or the like is also possible.
The disclosure of Japanese patent application No. 2010-181344, filed on Aug. 13, 2010, including the specifications, drawings and abstracts, is incorporated herein by reference in its entirety.
A terminal apparatus, a base station apparatus, a retransmission method, and a resource allocation method according to the present disclosure are suitable for performing a method of controlling retransmission using non-adaptive HARQ in a radio communication system using a MIMO communication technique.
The various embodiments described above can be combined to provide further embodiments. All of the U.S. patents, U.S. patent application publications, U.S. patent applications, foreign patents, foreign patent applications and non-patent publications referred to in this specification and/or listed in the Application Data Sheet are incorporated herein by reference, in their entirety. Aspects of the embodiments can be modified, if necessary to employ concepts of the various patents, applications and publications to provide yet further embodiments.
These and other changes can be made to the embodiments in light of the above-detailed description. In general, in the following claims, the terms used should not be construed to limit the claims to the specific embodiments disclosed in the specification and the claims, but should be construed to include all possible embodiments along with the full scope of equivalents to which such claims are entitled. Accordingly, the claims are not limited by the disclosure.
Number | Date | Country | Kind |
---|---|---|---|
2010-181344 | Aug 2010 | JP | national |
This application claims priority to U.S. patent application Ser. No. 16/253,364, filed Jan. 22, 2019, entitled “TERMINAL DEVICE, BASE STATION DEVICE, RETRANSMISSION METHOD, AND RESOURCE ALLOCATION METHOD”; which is a continuation of U.S. patent application Ser. No. 15/637,237, filed Jun. 29, 2017, entitled “TERMINAL DEVICE, BASE STATION DEVICE, RETRANSMISSION METHOD, AND RESOURCE ALLOCATION METHOD”; which is a continuation of U.S. patent application Ser. No. 13/816,587, filed Feb. 12, 2013, entitled “TERMINAL DEVICE, BASE STATION DEVICE, RETRANSMISSION METHOD, AND RESOURCE ALLOCATION METHOD”; which is the National Stage Entry of International Application No. PCT/JP2011/004322, filed Jul. 29, 2011; which claims priority of Japanese Patent Application No. 2010-181344, filed Aug. 13, 2010. The contents of these applications are incorporated herein by reference in their entireties.
Number | Name | Date | Kind |
---|---|---|---|
8699426 | Gaal et al. | Apr 2014 | B2 |
8891476 | Gaal et al. | Nov 2014 | B2 |
20040123229 | Kim et al. | Jun 2004 | A1 |
20060056355 | Love et al. | Mar 2006 | A1 |
20080192718 | Jongren et al. | Aug 2008 | A1 |
20080225965 | Pi et al. | Sep 2008 | A1 |
20080311942 | Kim et al. | Dec 2008 | A1 |
20090196229 | Shen et al. | Aug 2009 | A1 |
20090279493 | Gaal et al. | Nov 2009 | A1 |
20090282310 | Seok et al. | Nov 2009 | A1 |
20100115358 | Kotecha et al. | May 2010 | A1 |
20100173625 | Noh et al. | Jul 2010 | A1 |
20100239040 | Beluri et al. | Sep 2010 | A1 |
20100284483 | Jõngren | Nov 2010 | A1 |
20110026622 | Luo et al. | Feb 2011 | A1 |
20110051824 | Kim | Mar 2011 | A1 |
20110185249 | Jongren et al. | Jul 2011 | A1 |
20110194536 | Kim et al. | Aug 2011 | A1 |
20120008556 | Noh | Jan 2012 | A1 |
20120230290 | Seo | Sep 2012 | A1 |
20120327880 | Ahn | Dec 2012 | A1 |
20130155982 | Gaal et al. | Jun 2013 | A1 |
20130156125 | Ko | Jun 2013 | A1 |
20150103796 | Chung | Apr 2015 | A1 |
Number | Date | Country |
---|---|---|
101611586 | Dec 2009 | CN |
101741462 | Jun 2010 | CN |
2010-521078 | Jun 2010 | JP |
2008-47649 | Dec 2008 | TW |
2009-04089 | Jan 2009 | TW |
2010-12280 | Mar 2010 | TW |
2009120843 | Jan 2009 | WO |
Entry |
---|
CATT, “Discussion on layer-to-DMRS port mapping”, 3GP TSG RAN WG1 Meeting #61, May 10-14, 2010, 4 pages, R1-102653, Montreal, Canada. |
Ericsson, ST-Ericsson, “Uplink MRS Resource Configuration for Rel-10”, 3GPP TSG WG1 Meeting #61-bis, R1-104112, Jun. 28, 2010, Figure 4. |
English translation of the Search Report for TW Application No. TW 100128705 dated Jul. 28, 2015. |
Extended European Search Report issued in Patent Application No. EP 11 81 6222 dated Aug. 9, 2017. |
International Search Report Issued in Patent Application No. PCT/JP2011/004322 dated Sep. 20, 2011. |
LG Electronics, “Remaining Issues on UL DM-RS for LTE-Advanced”, 3GPP RAN WG1 Meeting #62, R1-104775, Aug. 23, 2010, Figure 1. |
Motorola, “OCC and CS Configuration for Uplink DM-RS”, 3GPP TSG RAN WG1 Meeting #61bis, R1-103931, Jun. 28-Jul. 3, 2010, pp. 1-5, Dresden, Germany. |
Nokia, Nokia Siemens Networks, “DM-RS details for retransmission”, 3GPP TSG-RAN WG1 Meeting #61, May 10-14, 2010, 6 pages, R1-102953, Montreal, Canada. |
Office action for Corresponding Russian Patent Application No. 2013105781/07 dated Feb. 3, 2015. |
Panasonic, “OCC and CS for UL DMRS in SU/MU-MIMO”, 3GPP TAG RAN WG1 Meeting #62, R1-104906, Aug. 23, 2010, Figure 1. |
R1-104219, Way Forward on CS and OCC signaling for UL DMRS, 3GPP TSG WG1 Meeting #61-bis, Panasonic, Samsung, Motorola, NTT Docomo, NEC, Pantech. |
Samsung, “HARQ handling in UL MIMO”, 3GPP TSG RAN W1 Meeting #61bis, R1-102209, Apr. 12, 2010, Figure 4. |
Sharp, “Design of OCC / CS Mapping for UL DMRS”, 3GPP TSG RAN WG1 Meeting #61 bis, R1-103725, Jun. 28, 2010, Table 1. |
Samsung, “UL SU-MIMO Precoding in PHICH-triggered retransmissions”, 3GPP TSG RAN WG1 #61, May 10-14, 2010, 4 pages, R1-103035, Montreal, Canada. |
Texas Instruments, “UL DM RS Multiplexing for SU-MIMO”, 3GPP TSG RAN WG1 Meeting #59, R1-094763, Nov. 9, 2009, Table 1-Table 3. |
Number | Date | Country | |
---|---|---|---|
20200153595 A1 | May 2020 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 16253364 | Jan 2019 | US |
Child | 16738650 | US | |
Parent | 15637237 | Jun 2017 | US |
Child | 16253364 | US | |
Parent | 13816587 | US | |
Child | 15637237 | US |