The present disclosure relates to the technical field of power control, and in particular, to a test and control apparatus, system and method for a wind farm.
With the development of society and economy, electricity resources have become a necessity in people's lives. Besides traditional methods such as the thermal power generation and the hydroelectric power generation, there are emerging power generation methods for providing power resources such as the wind power generation and the nuclear power generation. Due to its advantages of being clean, renewable and not destroying the geographical environment, the wind power has drawn much attention from people.
The conventional wind power test and control methods mainly use the traditional thermal power generation control methods. Due to the unstable nature of the wind, the voltage output from the wind power generation unit in the wind farm is not stable. In addition, since the wind power generation units are distributed in the wind farm, the power generated by the wind power generation units is not synchronized. In order to improve the grid's ability to accept the distributed wind power, people try to use the virtual synchronous generator to synchronize the distributed wind power. As the virtual synchronous generator requires a strict sustained and stable voltage, the effect of the virtual synchronous generator is not satisfactory.
The conventional wind power generation unit and the virtual synchronous generator used in the wind farm can not provide continuous and stable voltage and can not effectively accomplish the task of frequency modulation and work.
In view of above one or more problems, a test and control apparatus, a test and control system, and a test and control method for a wind farm, are provided according to embodiments of the present disclosure.
In one aspect, a test and control apparatus for a wind farm is provided, where the wind farm includes a wind power generation unit, a first energy storage battery arranged at a direct current bus side of the wind power generation unit, a second energy storage battery arranged in the wind farm, and a reactive compensation device; and the test and control apparatus includes:
a first communication interface, a second communication interface, and a processor card, where
the first communication interface is configured to connect a grid scheduling server, the second communication interface is configured to connect the wind power generation unit, and the processor card is connected to the first communication interface and the second communication interface respectively;
the processor card receives a frequency modulation instruction issued by the grid scheduling server via the first communication interface, receives operation information of the wind power generation unit via the second communication interface, and calculates a first frequency modulation capability of the wind power generation unit without using the first energy storage battery based on the operation information of the wind power generation unit; and the processor card sends the frequency modulation instruction to the wind power generation unit and does not start the first energy storage battery, in a case that the first frequency modulation capability of the wind power generation unit satisfies the frequency modulation instruction.
In another aspect, a test and control system for a wind farm is provided, the test and control system including:
the above test and control apparatus for the wind farm.
In yet another aspect, a test and control method for a wind farm is provided, where the wind farm includes a wind power generation unit, a first energy storage battery arranged at a direct current bus side of the wind power generation unit, a second energy storage battery arranged in the wind farm, and a reactive compensation device; and the test and control method includes:
receiving a frequency modulation instruction;
receiving current wind speed information of the wind farm;
calculating a first frequency modulation capability of the wind power generation unit without using the first energy storage battery, based on the current wind speed information, and determining whether the first frequency modulation capability satisfies a requirement of the frequency modulation instruction; and
sending the frequency modulation instruction directly to the wind power generation unit without starting the first energy storage battery, in a case that the first frequency modulation capability satisfies the requirement of the frequency modulation instruction.
With the test and control apparatus for the wind farm, the test and control system for the wind farm, and the test and control method for the wind farm according to embodiments of the present disclosure, when the wind speed changes but can meet the requirement of the frequency modulation (that is, the wind power of the wind farm is large and the frequency modulation capability of the wind power generation is large), the wind farm can output a continuous and stable voltage only with the frequency modulation capability of the wind power generation unit, and can achieve a frequency modulation task successfully without starting the battery, thereby improving reliability of the frequency modulation and saving the energy of the battery.
The test and control apparatus for the wind farm and the test and control system for the wind farm according to embodiments of the present disclosure, can operate stably and efficiently to ensure that the test and control precision and time meet the requirement of the virtual synchronous generator. Therefore, external properties of a conventional wind power generation unit are matched, so that the entire power generation situation of the wind farm may be similar to that of the conventional thermal power generation unit, thereby meeting the national requirement for a grid using new energy and enabling the grid to operate stably with an increasing proportion of new energy.
To illustrate technical solutions according to embodiments of the disclosure more clearly, the following briefly describes the drawings according to embodiments of the disclosure. Apparently, the drawings are only some embodiments of the present disclosure, and other drawings may be obtained by those skilled in the art according to those drawings without creative efforts.
To make the object, technical solutions and advantages of the present disclosure clearer, the technical solutions according to the embodiments of the present disclosure will be described clearly and completely as follows in conjunction with the drawings in the embodiments of the present disclosure. Those skilled in the art should understand that, in claims, the term “include” does not exclude other devices or steps, the indefinite article “a” does not exclude a plurality, and the terms “first” and “second” are used to indicate names and are not used to indicate a specific sequence.
In addition, it should be noted that, in the case of no conflict, the embodiments in the present disclosure and the features in the embodiments may be combined with each other, and the order of the steps may be adjusted mutually. For conciseness of description, the same or similar elements in the embodiments will not be further described, and the embodiments in the present disclosure may be referred to each other. The present disclosure will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in
According to the embodiment of the disclosure, the grid scheduling server 300 may monitor and schedule a grid scheduling automation system and an electricity marketing system. Generally, a grid scheduling server 300 is arranged in each province. The grid scheduling server 300 of each province exchanges electricity information with each power plant in the province, and sends a task such as a frequency modulation task or a work task to each power plant.
The wind farm apparatus 200 may include wind power generation units 201 and 202 (the wind power generation units may be connected via a gathering circuit), first energy storage batteries 203 and 204 respectively arranged at direct current bus sides of the wind power generation units 201 and 202, a reactive compensation device 205, and a second energy storage battery 206.
In some embodiments, the first energy storage battery 203 may be configured for a single wind power generation unit, and the second storage battery 206 may be configured for the whole wind farm. Generally, the second energy storage battery is a large-scale energy storage battery, whose volume is much greater than that of the first energy storage battery 203. The reactive compensation device 205 may be, for example, SVC (static var compensator) and SVG (static var generator).
It can be understood that the number of hardware devices in the above system is illustrative, and may be adjusted as needed, in other words, multiple hardware devices may be added into or omitted from the system 1000. For example, the system 1000 may only include the test and control apparatus 100 for the wind farm. For another example, the system 1000 may further include an auxiliary device for the wind farm, where the auxiliary device may include a cable, a switch, and a protection device, etc. Each of the following embodiments may be applied to the system 1000. For a concise description, the embodiments may refer to each other, and the same or similar content is not repeated.
As shown in
According to the embodiment of the disclosure, the first communication interface 110 and the second communication interface 120 may be, for example, Ethernet interfaces, and the processor card 130 may be, for example, a CPU card.
In the embodiment shown in
In the embodiment shown in
In the embodiment shown in
According to the embodiment shown in
in the embodiment shown in
In the embodiment shown in
The embodiment shown in
In the embodiment shown in
In the embodiment shown in
In the embodiment shown in
In the embodiment shown in
In the embodiment shown in
It should be noted that the implementation of the function card shown in
In the embodiment shown in
In the embodiment shown in
In some embodiments, the processor card 130 may include three types of interface: an Ethernet interface 1, an Ethernet interface 2, and a 485 communication interface. The processor card 130 may communicate with the grid scheduling server 300 via the Ethernet interface 1, so as to exchange the flow information (such as active power demand information and frequency modulation information). The Ethernet interface 2 of the processor card 130 communicates with an optical fiber network of the wind farm, so as to receive following information of all the wind power generation units of the wind farm: voltage, current, active power, reactive power, power factor, frequency, warning information, and error information. Then, the processor card 130 issues an active power demand, a reactive power demand, frequency modulation information, etc., to all the wind power generation units. Then, the processor card 130 communicates with SVC and SVG devices of the wind farm, via the 485 communication interfaces (two channels) and CAN communication interfaces (two channels), so as to issue a reactive power adjustment and control instruction.
In some embodiments, the ARM module 131 in the processor card 130 is configured to exchange information with the grid scheduling server 300, the wind power generation units 201 and 202, the reactive compensation device 205, and the DSP module 132, so as to send the frequency modulation instruction, the active power demand instruction, the reactive power demand instruction, and instructions to start the first energy storage batteries and the second energy storage battery.
In some embodiment, an ARM calculation unit (namely, the ARM module 131) may perform a transient response, and communicate with the grid scheduling server, the wind power generation units, and the large-scale energy storage battery. In the embodiment shown in
In some embodiments, the DSP module 132 of the processor card 130 may issue switch-out instructions to the wind power generation units, the reactive compensation device, the first energy storage batteries, and the second energy storage battery, based on the frequency modulation instruction, the active power demand instruction, the reactive power demand instruction, and the instruction for starting the first energy storage batteries and the second energy storage battery (which may be achieved via the switch-in card 170 and the switch-out card 180).
In some embodiments, the DSP calculation unit (i.e., the DSP module 132) may perform a transient response. In performing the transient response, the DSP calculation unit can switch the energy storage batteries quickly, to achieve the frequency modulation, the power quality management, etc. For an emergency task (the transient response), the device in the wind farm can be timely and quickly adjusted to achieve the frequency modulation instruction, with the DSP calculation unit (i.e., the DSP module) and the fast switch-out instructions.
In some embodiments, when it is required to switch the large-scale energy storage battery for the frequency modulation, the DSP module outputs via an interface quickly, so as to meet a requirement of switching the battery quickly. Specifically, the DSP module may communicate with the SVC/SVG of the wind farm via the 485 communication interface and the CAN (controller area network) communication interface of the DSP module, and may cooperate with the SVC/SVG in real time to control a voltage of the wind farm, to ensure a stable output voltage.
In a case that there is a fluctuation or an abnormity of the grid, and the power quality of the whole wind farm exceeds a specified power quality threshold (for example, second harmonic, third harmonic, fifth harmonic, seventh harmonic and ninth harmonic voltages and currents exceed a preset software threshold), the power quality can meet a requirement of the specified software threshold (such as 20%) by switching a corresponding battery unit.
In the embodiment shown in
(1) Test Precision:
for the test, voltage level is 100V and 0.2S grade, current level is 5 A (1 A optional) and 0.2S grade, power is 0.5S grade, frequency is 0.01 Hz, and power factor is 0.01; and
for the control, voltage is 35 kV>0.5 kV, 110 kV>2 kV, 220 kV>3 kV, reactive power is 1.0 M.Var, and power factor is 0.01.
(2) Response speed (for a task execution, a switching task, a DSP emergency task, and an ARM communication and routine task, etc.):
steady response time of the system to the grid: <6S; and
transient response time of the system to the grid: <30 ms (for voltage and current and <100 ms (for frequency).
For an emergency task (the transient response), the device of the wind farm can be adjusted timely and quickly via the DSP calculation unit and the quick switch-out instructions, thereby achieving a scheduling instruction of the grid scheduling server.
For a routine task (the steady response), a voltage stabilization strategy and a frequency modulation strategy can be given through the ARM calculation unit.
In step S210, a frequency modulation instruction is received.
The frequency modulation instruction may be issued from the grid scheduling server 300 shown in
In step S220, current wind speed information of a wind power generation unit is received.
The current wind speed information of the wind power generation unit may be information for current speeds of winds around the wind power generation units, an average value of wind speed values collected from blades of the wind power generation units, or an average value of wind speed values collected from any places around the wind power generation units. The specific current wind speed information of the wind power generation unit may be collected actively or received passively as needed, which is not limited.
In step S230, a first frequency modulation capability of the wind power generation unit which perform the frequency modulation without using a first energy storage battery is calculated, based on the current wind speed information, and whether the first frequency modulation capability satisfies a requirement of the frequency modulation instruction is determined. Specific implementation of this step is described in detail hereinafter.
In step S240, the frequency modulation instruction is sent to the wind power generation unit without starting the first energy storage battery, in a case that the first frequency modulation capability satisfies the requirement of the frequency modulation instruction.
Specifically, the frequency modulation capability of the wind power generation unit may be selected based on a principle that the frequency modulation capability is equal to the requirement of the frequency modulation instruction, or is higher than the requirement of the frequency modulation instruction and gets close to the requirement of the frequency modulation instruction as much as possible, so that the requirement of the frequency modulation instruction can be met without wasting power.
Therefore, the frequency modulation capability of the wind power generation unit which performs the frequency modulation without using the battery is calculated based on the current wind speed information, so that in case of abnormal variation of the wind speed, a frequency modulation task can be achieved accurately and reliably without starting the battery.
In some embodiments, the step S230 (the first frequency modulation capability of the wind power generation unit which performs the frequency modulation without using the first energy storage battery is calculated, based on the current wind speed information, and whether the first frequency modulation capability satisfies the requirement of the frequency modulation instruction is determined) may include sub-steps S231 and S232.
In S231, the first frequency modulation. capabilities of multiple wind power generation units which perform frequency modulation without using the first energy storage batteries are calculated.
For simple calculation and clear illustration, in following embodiments, calculation methods of various frequency modulation capabilities are illustratively described as the wind farm includes only three wind power generation units (a wind power generation unit 201, a wind power generation unit 202, and a wind power generation unit 203).
For example, the respective frequency modulation capabilities N1, N2 and N3 of the wind power generation unit 201, the wind power generation unit 202, and the wind power generation unit 203 which perform the frequency modulation without using the first energy storage batteries are calculated.
In S232, the calculated first frequency modulation capabilities of the multiple wind power generation units which perform the frequency modulation without using the first energy storage batteries are combined in multiple ways for calculation, to acquire first combination frequency modulation capacities.
For example, the frequency modulation capabilities of the wind power generation unit 201 and the wind power generation unit 202 which perform the frequency modulation without using the first energy storage batteries are combined, and a first one of first combination frequency modulation capabilities which has a frequency modulation capability of N1+N2 is acquired.
For another example, the frequency modulation capabilities of the wind power generation unit 201 and the wind power generation unit 203 which perform the frequency modulation without using the first energy storage batteries are combined, and a second one of first combination frequency modulation capabilities which has a frequency modulation capability of N1+N3 is acquired.
For another example, the frequency modulation capabilities of the wind power generation unit 202 and the wind power generation unit 203 which perform the frequency modulation without using the first energy storage batteries are combined, and a third one of first combination frequency modulation capabilities which has a frequency modulation capability of N2+N3 is acquired.
For another example, the frequency modulation capabilities of the wind power generation unit 201, the wind power generation unit 202 and the wind power generation unit 203 which perform the frequency modulation without using the first energy storage batteries are combined, and a fourth one of first combination frequency modulation capabilities which has a frequency modulation capability of N1+N2+N3 is acquired.
Specifically, without starting the first energy storage batteries, a data table of the first combination frequency modulation capabilities may be shown as following Table (1).
In the above table, information about units of specific numerical values is omitted. It can be appreciated that the number of the wind power generation units may not be limited, and the calculation method may change flexibly. For example, multiple frequency modulation capability values may be combined in different manners as needed.
Therefore, the frequency modulation capability of the wind power generation unit which perform the frequency modulation without using the battery is calculated based on the current wind speed information, so that in case of abnormity of wind speed variation, the wind farm can output a continuous and stable voltage with the frequency modulation capability of the wind power generation unit, and achieve the frequency modulation task successfully without starting the battery, which not only improves the reliability of the frequency modulation, but also saves the battery energy.
As a first variation of the embodiment shown in
In step S250, a second frequency modulation capability of the wind power generation unit which perform the frequency modulation using the first energy storage battery is further calculated and whether the second frequency modulation capability satisfies the requirement of the frequency modulation instruction is determined, in a case that the first frequency modulation capability does not meet the requirement of the frequency modulation instruction. Specific implementation of the step is described in detail hereinafter.
In step S260, the frequency modulation instruction is sent to the wind power generation unit and the first energy storage battery is started, in a case that the second frequency modulation capability satisfies the requirement of the frequency modulation instruction.
In the embodiment shown in
Therefore, it can be seen that, in case of small wind power, the wind farm can also output the continuous and stable voltage, by timely starting the first energy storage battery to assist the frequency modulation when the wind power generation unit cannot meet the requirement of the frequency modulation.
In some embodiments, the step S250 (the second frequency modulation capability of the wind power generation unit which perform the frequency modulation using the first energy storage battery is further calculated and whether the second frequency modulation capability satisfies the requirement of the frequency modulation instruction is determined, in a case that the first frequency modulation capability does not meet the requirement of the frequency modulation instruction) may include sub-steps S251 and S252.
In S251, the second frequency modulation capabilities of multiple wind power generation units which perform the frequency modulation using the first energy storage battery are calculated.
For example, the respective frequency modulation capabilities M1, M2 and M3 of the wind power generation unit 201, the wind power generation unit 202, and the wind power generation unit 203 which perform the frequency modulation using the first energy storage battery are calculated.
In S252, the calculated second frequency modulation capabilities of the multiple wind power generation units which perform the frequency modulation using the first energy storage battery are combined in multiple ways for calculation, to acquire multiple second combination frequency modulation capacities.
Similarly, after the combination, when the first energy storage batteries are used, a data table of the second combined frequency modulation capabilities may be shown as following Table (2).
As a second variation of the embodiment as shown in
In step S270, a second energy storage battery is further started besides starting the to first energy storage battery and the frequency modulation instruction is sent to the wind power generation unit, in a case that the second frequency modulation capability does not meet the requirement of the frequency modulation instruction.
In this way, the frequency modulation can be assisted by timely starting the energy storage battery in the extreme case that the overall wind power of the wind farm is small, so that the wind farm can also output a continuous and steady voltage in this extreme situation.
In some embodiments, the first energy storage battery may be a 200 KW energy storage battery at the direct current bus side of the wind power generation unit, and the second energy storage battery may be a large-scale energy storage battery in the wind farm. Specific configuration ways of the energy storage batteries may be flexibly adjusted as needed, which is not limited.
The embodiment shown in
In case of large wind, the torque of each wind power generation unit (excluding the 200 KW energy storage battery at the direct current bus side of the wind power generation unit) can support its own frequency modulation task. In such case, a converter of the wind power generation unit does not output the energy of the 200 KW energy storage battery, that is, the frequency modulation task is performed without using the energy storage battery of each wind power generation unit.
In case of small wind, the torque of each wind power generation unit (excluding the 200 KW energy storage battery at the direct current bus side of the single unit) cannot support its own frequency modulation task. The 200 KW energy storage battery provides energy at the direct current bus of the wind power generation unit, and serves as backup energy to support the frequency modulation torque. In other words, the frequency modulation task is performed using the energy storage battery of each wind power generation unit.
When the wind in the entire wind farm is small and the energy support of frequency modulation can not be completed, the large energy storage battery in the wind farm can be switched by the ARM (microprocessor) calculation unit to support the power system frequency modulation task.
It can be understood that, based on the actual situation, a variety of frequency modulation methods for combining the wind power generation units may also be used. For example, the wind power generation unit performing frequency modulation without the energy storage battery and the wind power generation unit performing frequency modulation with the energy storage battery may be combined in different manners, and details are not described herein for conciseness.
In step S310, a power demand instruction is received, where the power demand instruction includes an active power demand instruction and a reactive power demand instruction.
In step S320, a work capability value of each wind power generation unit is calculated based on current wind speed information.
In step S330, an active power and/or a reactive power required to be generated by each wind power generation unit are calculated based on the power demand instruction and the work capability value of each wind power generation unit, and an instruction for work based on the required active power and/or reactive power is sent to each wind power generation unit.
It can be understood that, the term “and/or” in the disclosure is merely an association relationship that describes an associated object, indicating that there may be three relationships, for example, A and/or B may indicate three cases that A exists alone, A and B, and B exists alone.
The embodiment mainly illustrates a voltage stabilization strategy. Specifically, the voltage stabilization strategy may be implemented as follows.
First, parameter information (voltage, current, active power, reactive power, power factor, frequency, warning information and error information, etc.) of the wind farm is received.
Then, the received parameter information of the wind farm is processed by an ARM module for calculation.
After that, the active power and the reactive power are distributed for the wind power generation units, and an active instruction or a reactive instruction is issued to all wind power generation units, thereby achieving a power demand task of the wind farm issued by a grid scheduling server.
More specifically, multiple tables may be designed for a power demand with reference to the above frequency modulation strategy, so as to provide a preferable work solution for selection, which is not further described in detail for concision.
Therefore, after receiving the power demand information, the precision calculation of the work ability of each wind power generation unit based on the current wind speed information can not only achieve precise work but also work gracefully, accurately and reliably in abnormal situations, thereby improving the power quality of the wind farm.
As a variation of the embodiment shown in
As a variation of the embodiment shown in
In step S401, imaginary part values of multiple vectors in a waveform of an alternating current generated by the wind power generation unit are collected consecutively.
As shown in
In step S402, the imaginary part values of the multiple vectors are respectively compared with the zero value, to acquire at least two groups of comparison values, and the at least two groups of the comparison values each include two adjacent vectors for which the imaginary part value of one vector is positive, and the imaginary part value of the other vector is negative.
Specifically, the two groups of the comparison values may be comparison values of (B, D) and (E, F).
In step S403, instants corresponding to at least four vectors of the two groups of the comparison values are acquired.
Specifically, the instants corresponding to the four vectors may be instant T1 of B, instant T2 of D, instant T3 of E, and instant T4 of G.
In step S404, at least two zero-crossing instants of the alternating current are calculated based on the instants corresponding to the at least four vectors.
Specifically, the two zero-crossing instants may be zero-crossing instants of C and F.
In step S405, the frequency of the alternating current is calculated based on the at least two zero-crossing instants of the alternating current.
According to the embodiment, a signal can be quickly collected by the DSP calculation unit to precisely calculate voltage, current, power, and frequency. Specifically, the voltage and current collection method may be a method of directly performing a collection at a secondary side of a current transformer, to achieve quick collection and calculation. Collection data may be updated each 20 ms, so as to ensure timeliness of data of the whole system, and ensure a real-time control and the control precision.
With a software frequency measuring method, precision of frequency can reach 0.01 Hz, and when the wind farm is used in the secondary frequency modulation, the precision of the frequency modulation task can be ensured. Therefore, it can be seen that the method of frequency test by software can eliminate the influence of harmonics and direct current components, the calculated frequency values has a small dispersion and high precision, thereby ensuring the power quality of the wind farm.
The test and control methods according to above embodiments may also be applied to a virtual synchronous generator. Therefore, through above design, the entire power generation situation of the wind farm may be similar to that of the conventional thermal power generation unit, thereby meeting the national requirement for a grid using new energy and enabling the grid to operate stably with an increasing proportion of new energy.
In yet another embodiment, the processor card may be configured to measure the frequency of the alternating current generated by the work of the wind power generation unit. A specific measuring process includes: collecting consecutively imaginary part values of multiple vectors of a waveform of an alternating current generated by the work of the wind power generation unit; comparing the imaginary part values of the multiple vectors with the zero value respectively, and acquiring at least two groups of comparison values, where the at least two groups of the comparison values each include two adjacent vectors, for which the imaginary part value of one vector is positive, and the imaginary part value of the other vector is negative; acquitting instants corresponding to at least four vectors in the two groups of the comparison values; calculating at least two zero-crossing instants of the alternating current, based on the instants corresponding to the at least four vectors; and calculating the frequency of the alternating current, based on the at least two zero-crossing instants of the alternating current.
It should be noted that, the test and control apparatus in the foregoing embodiments may be used as an execution subject in the test and control methods according to the foregoing embodiments, which can achieve corresponding processing in each test and control method. Those skilled in the art may clearly understand that, for the specific working process of the foregoing hardware, such as a device, and a component, etc., reference may be made to a corresponding process in the foregoing method embodiments, and details are not described herein again.
The test and control apparatus according to above embodiments may also be applied to the virtual synchronous generator.
In the embodiments according to the present disclosure, it should be understood that the disclosed system, apparatus, and method may be implemented in other manners. For example, the apparatus embodiments described above are merely exemplary. For example, the unit division is merely logical function division and may be other division in actual implementation. For example, multiple units or components may be combined or can be integrated into another system, or some features can be omitted or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed may be indirect coupling or communication connection through some interfaces, and devices, and may also be electrical, mechanical or other forms of connection.
In addition, the hardware (for example, various calculators) in the embodiments of the present disclosure may be integrated in one processing unit, or each of the units may exist separately or physically, and two or more units may be integrated in one unit. The above integrated unit may be implemented in the form of hardware or in the form of software functional unit.
The foregoing descriptions are merely specific embodiments of the present disclosure, and the scope of the present disclosure is not limited thereto. Those skilled in the art may easily think of various equivalent modifications or replacements, and these modifications or replacements should fall within the scope of the present disclosure.
Number | Date | Country | Kind |
---|---|---|---|
201611217583.9 | Dec 2016 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2017/090542 | 6/28/2017 | WO | 00 |