Disclosed herein is a test installation for testing control programs for a robot system, in particular for a painting installation. The test installation is suitable for all installations in the area of surface engineering, such as interior painting, external painting, handling robots (for example door openers, hood openers), sealing, gluing, seam sealing and underbody protection. A corresponding test method is further disclosed.
There are only three robots 1.1, 1.2, . . . , 1.n shown in the drawing but, in principle, the painting installation can have any number of robots.
Every robot 1.1, 1.2, . . . , 1.n is respectively actuated by a robot control 2.1, 2.2, . . . , 2.n, wherein the communication between the robot controls 2.1, 2.2, . . . , 2.n on the one hand and the robots 1.1, 1.2, . . . , 1.n on the other hand takes place bidirectionally. On the one hand, the robot controls 2.1, 2.2, . . . , 2.n send control commands to the robots 1.1, 1.2, . . . , 1.n in order to obtain the desired robot settings so that the TCP (Tool Center Point) of the robots 1.1, 1.2, . . . , 1.n moves on the programmed path. On the other hand, the robots 1.1, 1.2, . . . , 1.n include also sensors (for example, axial sensors which measure the position of the individual robot axes) and send corresponding measurement values to the robot controls 2.1, 2.2, . . . , 2.n.
The individual robot controls 2.1, 2.2, . . . , 2.n are connected to a field bus 3 which is connected with a central control unit 4 in the form of a Programmable Logic Controller (PLC: Programmable Logic Controller). The central control unit 4 coordinates the various robot controls 2.1, 2.2, . . . , 2.n in order, for example, to secure synchronous operation and to avoid collisions between the robots 1.1, 1.2, . . . , 1.n.
Furthermore, the painting installation also has peripheral components 5, which are only shown schematically in the drawing as an individual component and which are also connected to the field bus 3. The peripheral components 5 can, for example, be actors or sensors in the painting installation which influence operation of the painting installation. Examples of such peripheral components are components of the cabin and conveyor system, a compressed air supply or a fire protection system.
The painting installation also has an operator computer 6, which offers a graphical user interface and, therefore, allows simple operation of the painting installation. On the one hand, the operator computer 6 receives operator input from the personnel operating the painting installation which, for example, can occur using the touchscreen, through a keyboard or by using any other data entry devices. On the other hand, the operator computer 6 offers a graphical output on the screen in order to simplify operation. Visualization software can be installed on the operator computer 6 such as INTOUCH™, WINNCC™, ZENON™, or EcoScreenWEB™.
Furthermore, the painting installation is fitted with a graphics computer 7 on which a robot visualization system is installed, which correspondingly visualizes the respective robot position of robots 1.1, 1.2, . . . , 1.n and therefore displays these graphically.
The conventional painting installation has an Ethernet data bus 8, which connects the robot controls 2.1, 2.2, . . . , 2.n together and with the peripheral components 5, the central control unit 4 (PLC), the operator computer 6 and the graphics computer 7.
Operation of the painting installation is controlled by the control programs which are stored in the robot controls 2.1, 2.2, . . . , 2.n, in the central control unit 4, in the operator computer 6 and in the graphics computer 7. When developing a new painting installation according to customer-specific requirements, it is necessary for these control programs to be correspondingly adapted and tested, wherefore various options are used.
In a first test phase, the individual control programs are individually tested in the various sub-systems. This means, for example, that a control program for the robot control 2.1 is tested separately from the whole painting installation. The disadvantage of this first test phase is that the interaction of the control programs with the other sub-systems of the painting installation is not taken into account. One further disadvantage is that the control program can often only be tested statically and not dynamically. Particularly the safety-oriented parts of the program cannot be fully tested.
In a second test phase, there is testing of the control programs in the painting installation as part of the pre-commissioning work of the manufacturer. The disadvantage of this test phase is, on the one hand, the fact that only such operating conditions can be tested, which do not represent any kind of risk of damage for the painting installation, since the painting installation could otherwise be damaged during the testing. One further disadvantage of this test phase is that operation of the painting installation in the pre-commissioning phase for the manufacturer cannot totally reflect reality, which impairs the meaningfulness of this test phase.
Further, testing of the painting installation conventionally takes place as part of the commissioning at the customer's premises. The disadvantage of this test phase is, on the one hand, that testing of the control programs delays the plant commissioning work, that is the commissioning time is extended. On the one hand, software errors in this test phase can only still be removed by investing a great deal of effort. Furthermore, extreme operating conditions cannot be tested for in this test phase, since faults or damage may arise as a result.
From the prior art there is furthermore the so-called “Hardware in the Loop” test method known in which a mechatronic component is simulated in a overall system in order to be able also to test the whole system without the real mechatronic component being present. For example, one can refer in connection with this to the HiL test method at Hering/Modler: “Basic knowledge for engineers”, 14th Edition, Carl Hanser Verlag 2007, pages 860, 1014-1016; DE 100 37 396 A1, Ehrenstrasser/Pörnbacher/Wünsch: “Hardware-in-the-Loop Simulation of Machine Tools”, iwb Newsletter 2002, No. 4, pages 6-8 as well as DE 103 14 025 A1. This type of Hil test method was not, however, used until now in connection with painting installations.
In general, a test installation effectively simulates the function and structure of the real robot installation, wherein, however, peripheral components of the robot installation can be simulated by modelling equipment. This offers the advantage that the simulated or modelled peripheral components do not have to be present in the test installation.
Note that the real robot installation does not necessarily have to be a painting installation as was described above.
The disclosed principle is also usable for other robot installations, which are controlled by control programs.
Simulated or modelled peripheral components can, for example, be a conveyor system, which transports components in a robot installation (for example a painting installation) (for example motor vehicle body components) through the robot installation. Furthermore, in the presently-disclosed context, there is the possibility that the modelling equipment simulates or models a fire protection system. Another example of a peripheral component, which can be modelled using the test installation is an air-conditioning system in a painting cabin for a painting installation. It is furthermore also possible for the compressed air supply for the robot installation to be simulated or modelled by the modelling equipment. For example, the test operation may take place also without the real robots of the robot installation, which are then also simulated or modelled as peripheral components by the modelling equipment. In general the simulated or modelled peripheral components can be sensors (for example position sensors which measure the axial positions of the robot members of the robots) or actors (for example axial motors). There is furthermore also the possibility that components which are housed in the real robot installation in a robot control cabinet (for example drive controllers, power supplies, fuses, data bus components and terminals) can be simulated or modelled as peripheral components by the modelling equipment. The present disclosure is not, however, limited to the example described above with regard to the simulated or modelled peripheral components. The term peripheral component as used herein is intended to include all components in a robot installation, which directly or indirectly influence operation of the robot installation and, therefore, must be either present in reality as part of a test or must at least be simulated or modelled.
The structure of the test installation may be very similar to that of the real robot installation. Therefore, the test installation may have a plurality of robot controls, which each contain a control program and correspond to the robot controls in the real robot installation. Furthermore, the test installation may have at least one control unit (for example a Programmable Logic Controller) in order to coordinate the various robot controls, wherein the central control unit also contains a control program and corresponds to a control unit in the real robot installation. Furthermore, the test installation may be fitted with a first data bus which connects the robot controls with each other and/or with the control unit, wherein the first data bus represents a data bus from the real robot installation. The modelling equipment may be connected to the first data bus and may simulate peripheral components of the real robot installation so that the control program can be tested without the real peripheral components.
Furthermore, the test installation may have a graphics computer, which serves to provide a visualization of the robots of the robot installation, wherein the graphics computer in the test installation represents a graphics computer in the real robot installation. The graphics computer in the test installation may be connected with the robot controls and receives axial values from the robot controls, wherein the axial values represent the position of the individual robot axes of really present or simulated or modelled robots so that the graphics computer can reproduce the simulated movements of the robots on a screen. Using a robot visualization software running on the graphics computer it is therefore possible to visualize all robots in the modelled installation fully graphically in a three-dimensional representation on a conventional Personal Computer (PC) with substantially all of their movements so that the robot visualization software can animate the movements of the individual robots fully graphically.
Furthermore, the test installation may have an operator computer for operating and monitoring the simulated robot installation or the test installation, wherein the operator computer is preferably connected with the control unit and the individual robot controls, for example, via the first data bus or another data bus. The operator computer preferably contains a visualization software such as INTOUCH™, WINNCC™, ZENON™ or EcoScreenWEB™, wherein the visualization software offers a graphical user interface.
The first data bus mentioned above may be a field bus, which may connect the robot controls together and with the modelling equipment as well as with the control unit (e.g. a PLC). Furthermore, there may be a second data bus provided (for example Ethernet), which connects the robot controls together and with the control unit as well as with the operator computer and the graphics computer.
It was already briefly mentioned above that the test installation may work without the robots, which are present in the real robot installation. This offers the advantage that the construction of the test installation may be significantly simplified. The influence of the real robots on operation of the painting installation must therefore be modelled or simulated in the test installation. One option for this is that the control program for the robot controls simulates sensors and actors which are contained in the robots. Another option is that the modelling equipment is connected in each case to the robot controls in the test installation, which modelling equipment simulates or models the respective robot.
In one variation, the test installation for each robot control on the real robot installation contains a corresponding robot control so that the structure of the test installation essentially corresponds to the structure of the real robot installation. In another variation the test installation includes only one robot control on which a multi-robotic software is running which can simulate a control for all robots in the real robot installation.
Apart from the test installation, further disclosed herein is a corresponding test method through which the peripheral components of the real robot installation are modelled so that the test method manages without the real peripheral components.
Furthermore, it is possible, as part of the test method, to prescribe test procedures, wherein a defined series of operator entries can be made one after the other over time as part of the prescribed test procedures and/or the resulting operating conditions can be run. In this way, it is also possible to discover any errors which would only occur for a particular sequence of operator entries made one after the other over time and/or for the resulting operating conditions.
The test method is also very suitable for training and documentation purposes.
As part of a training session, operating personnel of the robot installation can, for example, be familiarized with the robot installation and its operating behavior without the simulated or modelled peripheral components (for example the robots) having to be really there. This advantageously also offers the option that extreme operating conditions can be simulated, which would be associated in real operation of the robot installation with an excessively high operating risk. Furthermore, a trainer can activate defined fault conditions of the robot installation in a targeted manner and can then observe the reaction of the operating personnel. In this way, future operating personnel can also be prepared in a targeted manner for fault scenarios.
The test method is also very suitable for documentation purposes if, for example, a technical editor creates an operating manual for the painting installation. The technical editor can then set up certain conditions for the robot installation in a targeted manner and then produce screenshots, which will be adopted in the operating manual for the robot installation.
Other advantageous developments explained in more detail below together with the description of the figures. The figures show as follows:
One particularity of the test installation is that a modelling equipment 9 is provided instead of the peripheral components 5, wherein the modelling equipment 9 simulates or models the real peripheral components 5 and therefore replaces them within the context of the test installation. This offers the advantage that the real peripheral components 5 do not have to be present in the test installation. New peripheral components can be integrated into the test installation as the real components for testing purposes. In this way, the control software can be tested at the same time with both real and simulated or modelled peripheral components.
One further particularity of the test installation compared to the real painting installation is that the robot controls 2.1, 2.2, . . . , 2.n are not connected with the real robots 1.1, 1.2, . . . , 1.n. Instead, the control software simulates the behavior of the real robots 1.1, 1.2, . . . , 1.n in the robot controls 2.1, 2.2, . . . , 2.n. This offers the advantage that the test installation can manage without the real robots 1.1, 1.2, . . . 1.n.
One particularity of this exemplary embodiment is that the robot controls 2.1, 2.2, . . . , 2.n are each connected with a modelling equipment 10.1, 10.2, . . . , 10.n, wherein the individual items of modelling equipment 10.1, 10.2, . . . , 10.n each model or simulate one of the real robots 1.1, 1.2, . . . , 1.n in the painting installation.
One particularity of this exemplary embodiment is that the robot control 2 is the only robot control, wherein a Multi-Robotic software is running on the robot control 2, which simulates the behavior of the various robots 1.1, 1.2, . . . , 1.n in the painting installation.
In a first step S1, the control programs for the robot controls 2.1, 2.2, . . . , 2.n and for the central control unit 4 (for example a PLC), are initially developed according to order-specific requirements of the respective customer. The visualization on the operator computer 6 usually also includes an order-specific adapted software, which must be created and tested.
In a step S2, the developed control programs are then installed on the program memory unit of the robot controls 2.1, 2.2, . . . , 2.n and the central control unit 4 (for example a PLC) in order for the control programs to be subsequently tested in the test installation, which occurs in a step S3.
The testers then check, in a step S4, as part of the test method, whether the test result is OK. It is preferable that the testers are not the program developers.
If this is the case, then the control programs are ready to be worked with, and they are transferred in a step S5 into the real robot installation.
In all other cases, the test programs are further optimized in a step S6 by the developers and—from step S3 on—tested again.
In a step S10, a trainer then selects a fault condition and activates the fault condition in the test installation. It is necessary to mention here that this description only comprises testing of the operating personnel but not the prior training on the test installation, which also takes place.
In a subsequent step S20, the trainer observes the reaction of the operating personnel to the behavior of the test installation.
In a step S30, there is then checking as to whether the reaction of the operating personnel to the fault condition was correct.
If this was the case, then the trainer gives the future operating personnel positive feedback in a step S40.
Otherwise, the trainer gives the future operating personnel negative feedback in a step S50 in order to improve the reaction of the future operating personnel.
In a step S60, checks are made to see whether the training should be terminated. The training operation is terminated if this is the case. The training operation will otherwise be continued with step S10.
Finally,
In a step S11, a technical editor creates a certain operating condition of the test installation to document this.
In a step S21, the technical editor then creates a screenshot of the test installation in the desired operating condition in order to be able to adopt the screenshot into a technical documentation (for example an operating manual for the painting installation).
In a step S31, checks are made to see whether the documentation is complete. If this is not the case, then the steps S11 and S21 are repeated in a loop.
The invention is not limited to the exemplary embodiments described above. Instead, a plurality of variations and modifications is possible. The invention is intended to be limited only by the following claims.
Number | Date | Country | Kind |
---|---|---|---|
10 2010 005 308.2 | Jan 2010 | DE | national |
This application is a National Stage application which claims the benefit of International Application No. PCT/EP2011/000169 filed Jan. 17, 2011, which claims priority based on German Application No. DE 10 2010 005 308.2, filed Jan. 21, 2010, both of which are hereby incorporated by reference in their entireties.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/EP2011/000169 | 1/17/2011 | WO | 00 | 10/31/2012 |