This application is a U.S. national stage application of PCT International Application No. PCT/FI2010/050371, filed May 7, 2010, published as PCT Publication No. WO 2010/128213 A2, and which claims priority from Finnish patent application number 20095519, filed May 8, 2009.
The present invention relates to a thermal power boiler comprising a furnace having a rear wall, a flue gas channel connected to the furnace, the flue gas channel comprising a back pass arranged on the rear wall side of the furnace, and a pre-heater for combustion air provided with an inlet channel for flue gas, the upper portion of the inlet channel for flue gas being connected to the lower portion of the back pass, and a flow channel for combustion air arranged adjacent to the inlet channel for flue gas for leading pre-heated combustion air to the furnace.
There is a tendency to increase the capacity of thermal power boilers, such as circulating fluidized bed boilers, by shifting to larger and larger units. For example, the capacity of the largest manufactured circulating fluidized bed boiler is nowadays 460 MWe, but there are already plans for constructing 600 MWe and even 800 MWe plants. One of the essential problems with high capacity thermal power boilers is that the size of the plant grows significantly, which increases the construction costs and makes locating the plant in a particular location more difficult.
Pre-heating of the combustion air by means of the heat of the flue gas is one of the standard methods to improve the capacity of a thermal power boiler. The pre-heaters for preheating combustion air can be divided into recuperative and regenerative pre-heaters. In the recuperative pre-heaters, heat is conducted through heat surfaces directly from the flue gas to the combustion air, whereas in the regenerative pre-heaters, the flue gas first heats storage mass, usually a metal or a ceramic battery, which, in the second stage, emits heat to the combustion air.
The regenerative pre-heaters are common especially in the large thermal power boilers due to their relatively small size. In the so-called rotary plane pre-heaters that are most commonly used, the heat storage mass rotates slowly, usually, 3-5 rpm in such a way that it is alternately in contact with the flue gas flow and the combustion air. In the pre-heaters for combustion air with a stationary plane, the storage mass remains still, but the connecting conduits for flue gas and combustion air comprise a rotary member, by means of which, the gases are guided to flow alternately through different sectors of the storage mass.
For example, U.S. Pat. No. 5,915,340 discloses a regenerative pre-heater for combustion air with a four-sector rotary plane, in which the flue gas flows through one flow sector, and primary air and first and second secondary air through the three other flow sectors. The rotary axis of the regenerative pre-heater for combustion air can be either horizontal or vertical, but, especially, pre-heaters with a vertical rotary axis are discussed below. The present invention is especially related to pre-heaters for combustion air, in which the flue gas flows through a pre-heater downwards and the combustion air upwards, respectively.
According to the prior art, the furnace, back pass and pre-heater for combustion air of a thermal power boiler are located one after another in the direction of the normal of the rear wall or side wall of the furnace, as disclosed, for example, in FIG. 2 of U.S. Pat. No. 5,915,340. The back pass refers, in this connection, to a vertical portion of the first flue gas channel, which usually comprises heat exchangers, such as superheaters, reheaters and pre-heaters for feed water.
In the lower part of the back pass, there is usually a turn channel, from the farthest edge of which, with respect to the furnace, the flue gas channel extends towards the pre-heater for combustion air. There is actually, at the bottom of the turn channel, an ash hopper collecting flue gas particles. Usually, the flue gas channel comprises, after the turn channel, first, a horizontal or inclined channel portion, which is directed away from the furnace, and then, a vertical channel portion, which leads to the upper portion of the pre-heater for combustion air.
When the furnace of a large thermal power boiler, back pass and pre-heater for combustion air are arranged conventionally one after another, the channels connecting them to each other can become long, whereby the design and assembly thereof among the other equipment and parts related to the furnace is complicated. Each portion and bend of the flue gas channel requires space, which could otherwise be used for locating other parts, for example, fuel treatment equipment.
In order to have different flow sectors of the pre-heater for combustion air wide enough to keep the pressure losses reasonable, the diameter of a regenerative pre-heater for combustion air to be arranged in a large thermal power boiler can be very large. It is also known that the flue gas channel of a large thermal power boiler is divided into two portions, which lead into two adjacent pre-heaters for combustion air, whereby the size of an individual pre-heater remains reasonable and the assembly thereof is relatively easy.
As the flue gas is usually guided from a pre-heater for combustion air further to the cleaning apparatuses for flue gas, for example, to a dust separator, it is natural to arrange the pre-heater in such a way that the inlet and outlet connections for the flue gas are in the portion of the pre-heater that is the farthest from the furnace. Thereby, the inlet and outlet connections for the combustion air are on the furnace side of the pre-heater, respectively. In the regenerative pre-heaters for combustion air with a rotary plane, the inlet and outlet connections for flue gas are, naturally, in the same portion of the pre-heater as the flow sector for flue gas, and the inlet and outlet connections for combustion air are in the same portion of the pre-heater as the flow sector for combustion air, respectively. In the regenerative pre-heaters with a stationary plane, the inlet and outlet connections for combustion air and flue gas are stationary, but the flow sectors for combustion air and flue gas rotate with the rotary members of the respective connecting conduits.
FIG. 1 of U.S. Pat. No. 7,438,876 discloses a conventional embodiment in accordance with the prior art, in which a regenerative pre-heater for combustion air with a rotary plane is arranged outwards from the furnace with respect to the back pass and the flow sector of combustion air in the pre-heater is in the furnace side of the pre-heater. A problem with such an arrangement is that the channel for combustion air must be bent in the next stage underneath the back pass, which, in practice, usually leads into a complicated channel structure. FIG. 9 of U.S. Pat. No. 7,438,876 discloses another possible alternative in which the flow sector of the pre-heater for combustion air is arranged away from the furnace. This arrangement is advantageous when there is a second, recuperative pre-heater for combustion air arranged above the regenerative pre-heater for combustion air, and connected in series therewith, through which pre-heater, the combustion air is guided to the side of the furnace.
An objective of the present invention is to provide a thermal power boiler, in which the problems of the prior art described above are minimized. It is, especially, an object to provide a large thermal power boiler, the size of which has been maintained to be reasonable.
In order to minimize the problems of the prior art described above, a thermal power boiler is provided. It is a characteristic feature of the present thermal power boiler that the inlet channel for flue gas comprises two adjacent channel portions, which adjacent channel portions are connected to the opposite sides of the back pass.
The cross section of the back pass is usually of rectangular shape in such a way that the side wall of the back pass facing the furnace and the side wall opposite thereto are broader than the side walls perpendicular to them. Especially, when such a rectangular back pass is considered to be divided into a front portion on the furnace side and a rear portion opposite thereto, one of the parallel channel portions is connected, according to an especially advantageous embodiment of the invention, to the front portion of the back pass and the other to the rear portion of the back pass.
According to the present invention, the inlet channel for the flue gas is, in other words, both of the channel portions of the inlet channel for flue gas are, connected to the lower portion of the back pass. The channel portions, preferably, can be connected to the side walls of the back pass immediately above an ash hopper in the lower portion of the back pass, but, most preferably, they are connected to the back pass in the area of the ash hopper thereof. Thereby, one of the adjacent channel portions is, preferably, connected to the front portion of the ash hopper and the other one to the rear portion thereof.
The pre-heater combustion air can be of any type, in which the pre-heater is connected to an inlet channel for flue gas, which inlet channel is connected at its other end to the lower portion of the back pass, and has a flow channel for combustion air, connected to the pre-heater, arranged adjacent to the inlet channel. The pre-heater for combustion air is, however, advantageously a regenerative pre-heater with a rotary plane and comprises a battery of storage mass. Preferably, the rotary axis of the rotary plane of the pre-heater for combustion air is vertical.
The portions of the inlet channels for flue gas connected to the opposite sides of the back pass, especially, to the front portion and rear portion thereof, render it possible to connect the pre-heater for combustion air to the back pass symmetrically, in a compact and operationally efficient way. The portions of the channel symmetrically connected to the back pass provide that the flow of the flue gas and the particles entrained therewith in the back pass are even and symmetric, which is why the lower portion of the back pass can easily be designed so that the wearing thereof is relatively mild. Furthermore, the ash hopper in the lower portion of the back pass can be designed in such a way that the separation of the particles from the flue gas flow to the ash hopper is especially efficient.
The arrangement in accordance with the conventional technique, in which the inlet channel for flue gas leading to the pre-heater for combustion air is connected merely to the rear portion of the back pass, almost inevitably results in the pre-heater for combustion air being relatively far from the furnace. The channels for the flue gas and the combustion air thereby become relatively long and complicated. The symmetrical arrangement of the channel portions of the back pass offers a possibility to such an embodiment of the present invention, in which the inlet channel for flue gas is, preferably, at least partially, more preferably, mainly, and most preferably, completely, underneath the back pass. The inlet channel for flue gas underneath the back pass can thereby be preferably realized in such a way that it is completely, or at least mainly, vertical. The absence of horizontal channel portions decreases the accumulation of ash in the inlet channel, whereby the dimensioning weight of the channel decreases, and the costs caused by the channel remain low.
A pre-heater for combustion air, arranged according to the invention can be arranged relatively close to the furnace, whereby an especially compact structure is provided, in which the channel for flue gas and combustion air remain relatively short. Owing to the compact structure, it is possible to provide a relatively small building for the thermal power boiler, whereby the costs remain low.
The pre-heater for combustion air comprises an inlet connection for flue gas, connecting to the inlet channel for flue gas to the pre-heater for combustion air. According to a preferred embodiment of the present invention, the pre-heater for combustion air is arranged in such a way that the inlet connection for flue gas is at least partially, most preferably, completely, underneath the back pass.
Respectively, the pre-heater for combustion air comprises an outlet connection for combustion air, which connects the flow channel for combustion air to the pre-heater for combustion air. In pre-heaters for combustion air comprising more than two sectors, there is, in practice, more than one outlet connection for combustion air, however, also, in case there are several outlet connections for combustion air, they are simply referred to as “an outlet connection for combustion air”.
According to a preferred embodiment of the present invention, the pre-heater for combustion air is arranged in such a way that the outlet connection for combustion air is at least partially, most preferably, complete, outside the area underneath the back pass. When the outlet connection for combustion air is outside the area underneath the back pass, the flow channel, or flow channels, of combustion air can be led to the furnace via a most advantageous route. It is not necessary to especially form extensions or special bends in the flow channel for combustion air leading to the furnace, so-called feed channels for combustion air, in order to pass the back pass or the flue gas channel. The shortness of the air channels and the simple geometry thereof diminish the pressure loss in the channels, whereby the power consumption of the blowers for combustion air diminishes or, alternatively, the cross section of the air channels can be diminished, thus, minimizing their costs.
When the thermal power boiler comprises only one pre-heater for combustion air, the outlet connection for combustion air of the pre-heater can preferably be located, with respect to the inlet connection for flue gas, either to the furnace side or opposite to the furnace, whereby the inlet connection for flue gas and the outlet connection for combustion air are arranged one after the other in the direction of the normal of the rear wall of the furnace. Most preferably, the outlet connection for combustion air and the inlet connection for flue gas are, however, arranged one after the other in the direction of the horizontal cross section of the rear wall of the furnace, whereby the inlet channel for combustion air can preferably be arranged as a whole beside the back pass, as seen from the furnace. Thereby, the inlet channel for combustion air can extend towards the furnace without the necessity of bends to pass the back pass.
According to a most preferred embodiment of the present invention, a thermal power boiler comprises two parallel connected pre-heaters for combustion air, which are arranged symmetrically side by side with respect to the center normal of the rear wall of the furnace. In other words, the thermal power boiler comprises two parallel connected pre-heaters for combustion air, which are arranged one after the other in the direction of the rear wall of the furnace. Thereby, both pre-heaters for combustion air are preferably connected to a separate inlet channel for flue gas, in other words, a branch of the inlet channel for flue gas, the other end of which being connected to the lower portion of the back pass, which both branches of the inlet channel for flue gas comprise two adjacent channel portions, of which adjacent channel portions, one is connected to a front portion of the back pass and the other to a rear portion of the back pass.
The adjacent pre-heaters for combustion air are preferably arranged in such a way that the inlet connections for flue gas, or both of them, are at least partially, more preferably, mainly, and most preferably, completely, underneath the back pass. Respectively, the outlet connections for combustion air are preferably at least partially, more preferably, mainly, and most preferably, completely outside the area underneath the back pass. The pre-heaters for combustion air are thereby preferably directed in such a way that the outlet connection for combustion air of both pre-heaters for combustion air is on the furnace side or opposite to the furnace with respect to the inlet connection for flue gas. Most preferably, the pre-heaters for combustion air are, however, directed in such a way that the outlet connections for combustion air are symmetrically to the opposite directions, so that the outlet connections for combustion air and the inlet connections for flue gas are one after another in the direction of the rear wall of the furnace.
According to a preferred embodiment of the present invention, a by-pass of the pre-heaters for combustion air is arranged between the branches of the flue gas channels leading to the adjacent pre-heaters for combustion air. Most preferably, the by-pass of the pre-heaters for combustion air comprises a pre-heater for feed water in a thermal power boiler.
The invention is described in more detail below with reference to the accompany drawings, in which
The pre-heaters 22, 22′ for combustion air are preferably arranged according to the invention partially underneath the back pass 20. The pre-heaters 22, 22′ for combustion air in the thermal power boiler 10 of
Inlet channels for flue gas 26, 26′ leading from the lower portion of the back pass 20 to the pre-heaters 22, 22′ for combustion air comprise two adjacent channel portions 28, 28′, which are connected to the opposite sides of the back pass 20. In the thermal power boiler 10 of
As can be seen from
As can be seen in
This arrangement provides that the inlet channels 26 for flue gas are as short and simple as possible, whereby the back pass 20 and the pre-heaters 22, 22′ for combustion air form a compact entity and the size of the thermal power boiler 10 remains as small as possible. When the pre-heaters 22, 22′ for combustion air are arranged underneath the back pass 20, the inlet channels for flue gas are, at least mainly, vertical. Thereby, the accumulation of ash in the inlet channels is considerably less than, for example, in an inlet channel of the prior art, including horizontal channel portions.
Moreover, the route of the flow channels 24, 24′ for combustion air can be designed as advantageously as possible so that it is not necessary to include extra transfer channels or bends therein to pass the back pass 20 or the flue gas channel 14. Thereby, the pressure loss taking place in the flow channel for combustion air is as small as possible, which saves in the power consumption of the blower (not shown in
The exemplary thermal power boiler 10, disclosed in
A by-pass channel 46 of the pre-heaters for combustion air is arranged between the inlet channels 26, 26′ for flue gas leading to the pre-heaters 22, 22′ for combustion air, which by-pass channel 46 advantageously comprises a pre-heater 48 for feedwater of the thermal power boiler 10. The by-pass channel 46 preferably comprises a means, for example, a control valve 50, for controlling the amount of flue gas to be led to the by-pass channel 46. Preferably, the flue gases cooled in the pre-heaters 22, 22′ for combustion air and in the pre-heater 48 for feed water of the by-pass channel 46 are gathered to a common turn channel 52 arranged underneath the pre-heaters 22, 22′ for combustion air before they are guided further through the outlet channel 54 for flue gas, for example, through a dust separator, to a stack (not shown in
The invention has been described above with reference to some exemplary embodiments, but the invention also covers various combinations or modifications of the disclosed embodiments. Thus, it is obvious that the invention is not intended to be limited only to the embodiments disclosed above, but it includes numerous other embodiments, which are limited merely by the appended claims and their definitions.
Number | Date | Country | Kind |
---|---|---|---|
20095519 | May 2009 | FI | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/FI2010/050371 | 5/7/2010 | WO | 00 | 12/15/2011 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2010/128213 | 11/11/2010 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
2480277 | Yerrick | Aug 1949 | A |
2582830 | Hawley | Jan 1952 | A |
2594471 | Marshall | Apr 1952 | A |
2688466 | Baver | Sep 1954 | A |
2795213 | Cooper | Jun 1957 | A |
2821366 | Karlsson | Jan 1958 | A |
2863723 | Tigges | Dec 1958 | A |
2985152 | Paulison, Jr. | May 1961 | A |
2990791 | Busquet | Jul 1961 | A |
3057165 | Hawley | Oct 1962 | A |
3060906 | Rawdon | Oct 1962 | A |
3063431 | Miller | Nov 1962 | A |
3095863 | Parmakian | Jul 1963 | A |
3126945 | Kuhner | Mar 1964 | A |
3146762 | Blodgett | Sep 1964 | A |
3150643 | Parmakian | Sep 1964 | A |
3160146 | Kuhner | Dec 1964 | A |
3182640 | Miller | May 1965 | A |
3246635 | Powell et al. | Apr 1966 | A |
3321011 | Kalbfleisch et al. | May 1967 | A |
3324837 | Gorzegno et al. | Jun 1967 | A |
3345975 | Stevens et al. | Oct 1967 | A |
3368534 | Gorzegno et al. | Feb 1968 | A |
3692096 | Pettersson et al. | Sep 1972 | A |
3872836 | Gorzegno et al. | Mar 1975 | A |
4018265 | Schluter | Apr 1977 | A |
4097252 | Kirchhoff et al. | Jun 1978 | A |
4114680 | Kritzler et al. | Sep 1978 | A |
4160009 | Hamabe | Jul 1979 | A |
4197905 | Gollnick et al. | Apr 1980 | A |
4403571 | Kochey, Jr. | Sep 1983 | A |
4442783 | Pajonas et al. | Apr 1984 | A |
4487252 | Natale | Dec 1984 | A |
4501204 | McCartney et al. | Feb 1985 | A |
4582122 | Fan | Apr 1986 | A |
4592293 | Toyama et al. | Jun 1986 | A |
4602573 | Tanca | Jul 1986 | A |
4738226 | Kashiwazaki et al. | Apr 1988 | A |
4756891 | Ohlmeyer et al. | Jul 1988 | A |
4940567 | Ohlmeyer et al. | Jul 1990 | A |
5220875 | Cox | Jun 1993 | A |
5241915 | Breen et al. | Sep 1993 | A |
5293841 | Suhr et al. | Mar 1994 | A |
5339755 | Smith | Aug 1994 | A |
5375538 | Goussu et al. | Dec 1994 | A |
5423272 | Dunn et al. | Jun 1995 | A |
5482027 | Stiller | Jan 1996 | A |
5488916 | Bozzuto | Feb 1996 | A |
5555849 | Wiechard et al. | Sep 1996 | A |
5814284 | Schluter | Sep 1998 | A |
5915340 | Cronin et al. | Jun 1999 | A |
5976224 | Durant et al. | Nov 1999 | A |
6039008 | Anderson et al. | Mar 2000 | A |
6105517 | Swithenbank | Aug 2000 | A |
6257155 | Greene | Jul 2001 | B1 |
6405791 | Lieb et al. | Jun 2002 | B1 |
6494255 | Lieb et al. | Dec 2002 | B2 |
6530209 | Kuwabara et al. | Mar 2003 | B2 |
7021248 | McNertney et al. | Apr 2006 | B2 |
7198769 | Cichanowicz | Apr 2007 | B2 |
7350471 | Kalina | Apr 2008 | B2 |
7438876 | Cichanowicz | Oct 2008 | B2 |
7475544 | Counterman | Jan 2009 | B2 |
7776297 | Cichanowicz | Aug 2010 | B2 |
8196532 | Andrus et al. | Jun 2012 | B2 |
8327809 | Alexander et al. | Dec 2012 | B2 |
8382470 | Kinnunen | Feb 2013 | B2 |
8955466 | Harrison | Feb 2015 | B2 |
20020096316 | Lieb et al. | Jul 2002 | A1 |
20040074814 | Baglione et al. | Apr 2004 | A1 |
20060090468 | Counterman | May 2006 | A1 |
20060199120 | Kalina | Sep 2006 | A1 |
20080142608 | Krogmann | Jun 2008 | A1 |
20090013941 | Alexander et al. | Jan 2009 | A1 |
20090095440 | Gietz et al. | Apr 2009 | A1 |
20090211500 | Andrus et al. | Aug 2009 | A1 |
20100212610 | Harrison | Aug 2010 | A1 |
20100257837 | Schroder et al. | Oct 2010 | A1 |
20110030235 | Brancuzsky et al. | Feb 2011 | A1 |
Number | Date | Country |
---|---|---|
976 167 | Apr 1963 | DE |
0 661 498 | Jul 1995 | EP |
61-107002 | May 1986 | JP |
62-141408 | Jun 1987 | JP |
03-070902 | Mar 1991 | JP |
5-17301 | Mar 1993 | JP |
09318005 | Dec 1997 | JP |
2000291947 | Oct 2000 | JP |
2002-139216 | May 2002 | JP |
2001-082735 | Mar 2011 | JP |
20040080217 | Sep 2004 | KR |
2083925 | Jul 1997 | RU |
2303198 | Jul 2007 | RU |
Entry |
---|
Chinese Official Action dated Sep. 6, 2013, issued in corresponding Chinese Patent Application No. 201080020222.X, with an English translation. |
Notification of and International Search Report issued in counterpart International Application No. PCT/FI2010/050371, mailed Jun. 28, 2011. |
Written Opinion of the International Searching Authority issued in counterpart International Application No. PCT/FI2010/050371, mailed Jun. 28, 2011. |
Finnish Office Action dated Feb. 22, 2010, issued in counterpart Finnish patent application No. 20095519. |
Japanese Office Action dated May 24, 2013, issued in corresponding Japanese Patent Application No. 2012-509070, with an English translation. |
Russian Decision on Grant issued Jan. 16, 2013, in counterpart Russian patent application No. 2011149782/06(074775), with an English translation. |
Korean Official Action dated Jan. 16, 2013, issued in counterpart Korean patent application No. 10-2011-7026227, with an English translation. |
Japanese Office Action dated Feb. 28, 2014, issued in counterpart Japanese Patent Application No. 2012-509070, with a English translation. |
Partial English translation of Japanese Patent Document No. 3-65002. |
Chinese Official Action dated Apr. 2, 2014, issued in counterpart Chinese Patent Application No. 201080020222.X, with an English translation. |
Number | Date | Country | |
---|---|---|---|
20120285439 A1 | Nov 2012 | US |