Thermal recovery of shallow bitumen through increased permeability inclusions

Information

  • Patent Grant
  • 8863840
  • Patent Number
    8,863,840
  • Date Filed
    Saturday, March 3, 2012
    12 years ago
  • Date Issued
    Tuesday, October 21, 2014
    10 years ago
Abstract
Systems and methods for thermal recovery of shallow bitumen using increased permeability inclusions. A method of producing hydrocarbons from a subterranean formation includes the steps of: propagating at least one generally planar inclusion outward from a wellbore into the formation; injecting a fluid into the inclusion, thereby heating the hydrocarbons; and during the injecting step, producing the hydrocarbons from the wellbore. A well system includes at least one generally planar inclusion extending outward from a wellbore into a formation; a fluid injected into the inclusion, hydrocarbons being heated as a result of the injected fluid; and a tubular string through which the hydrocarbons are produced, the tubular string extending to a location in the wellbore below the inclusion, and the hydrocarbons being received into the tubular string at that location.
Description
BACKGROUND

The present disclosure relates generally to equipment utilized and operations performed in conjunction with a subterranean well and, in an embodiment described herein, more particularly provides for thermal recovery of shallow bitumen through increased permeability inclusions.


A need exists for an effective and economical method of thermally recovering relatively shallow bitumen, such as that found between depths of approximately 70 and 140 meters in the earth. Typically, bitumen can be recovered through surface mining processes down to depths of approximately 70 meters, and steam assisted gravity drainage (SAGD) thermal methods can effectively recover bitumen deposits deeper than approximately 140 meters.


However, recovery of bitumen between depths at which surface mining and SAGD are effective and profitable is not currently practiced. The 70 to 140 meters depth range is too deep for conventional surface mining and too shallow for conventional SAGD operations.


Therefore, it will be appreciated that improvements are needed in the art of thermally producing bitumen and other relatively heavy weight hydrocarbons from earth formations.


SUMMARY

In the present specification, apparatus and methods are provided which solve at least one problem in the art. One example is described below in which increased permeability inclusions are propagated into a formation and steam is injected into an upper portion of the inclusions while bitumen is produced from a lower portion of the inclusions. Another example is described below in which the steam injection is pulsed and a phase control valve permits production of the bitumen, but prevents production of the steam.


In one aspect, a method of producing hydrocarbons from a subterranean formation is provided by this disclosure.


The method includes the steps of: propagating at least one generally planar inclusion outward from a wellbore into the formation; injecting a fluid into the inclusion, thereby heating the hydrocarbons; and during the injecting step, producing the hydrocarbons from the wellbore.


In another aspect, a well system for producing hydrocarbons from a subterranean formation intersected by a wellbore is provided. The system includes at least one generally planar inclusion extending outward from the wellbore into the formation. A fluid is injected into the inclusion, with the hydrocarbons being heated as a result of the injected fluid. The hydrocarbons are produced through a tubular string, with the tubular string extending to a location in the wellbore below the inclusion. The hydrocarbons are received into the tubular string at that location.


In yet another aspect, a method of producing hydrocarbons from a subterranean formation includes the steps of: propagating at least one generally planar inclusion outward from a wellbore into the formation; injecting a fluid into the inclusion, thereby heating the hydrocarbons, the injecting step including varying a flow rate of the fluid into the inclusion while the fluid is continuously flowed into the inclusion; and during the injecting step, producing the hydrocarbons from the wellbore.


In a further aspect, a method of propagating at least one generally planar inclusion outward from a wellbore into a subterranean formation includes the steps of: providing an inclusion initiation tool which has at least one laterally outwardly extending projection, a lateral dimension of the inclusion initiation tool being larger than an internal lateral dimension of a portion of the wellbore; forcing the inclusion initiation tool into the wellbore portion, thereby forcing the projection into the formation to thereby initiate the inclusion; and then pumping a propagation fluid into the inclusion, thereby propagating the inclusion outward into the formation.


These and other features, advantages, benefits and objects will become apparent to one of ordinary skill in the art upon careful consideration of the detailed description of representative embodiments hereinbelow and the accompanying drawings, in which similar elements are indicated in the various figures using the same reference numbers.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a schematic cross-sectional view of representative earth formations in which a method embodying principles of the present disclosure may be practiced;



FIG. 2 is a schematic partially cross-sectional view showing production of bitumen from a formation using the method and associated apparatus;



FIG. 3 is an enlarged scale cross-sectional view of increased permeability inclusions propagated into the formation in the method;



FIG. 4 is a schematic partially cross-sectional view of a completed well system embodying principles of the present disclosure;



FIG. 5 is a schematic partially cross-sectional view of another completed well system embodying principles of the present disclosure;



FIG. 6 is a schematic partially cross-sectional view of yet another completed well system embodying principles of the present disclosure;



FIG. 7 is a schematic partially cross-sectional view of a further completed well system embodying principles of the present disclosure;



FIG. 8 is a schematic partially cross-sectional view of a still further completed well system embodying principles of the present disclosure;



FIG. 9 is a schematic partially cross-sectional view of another completed well system embodying principles of the present disclosure;



FIG. 10 is a schematic partially cross-sectional view of yet another completed well system embodying principles of the present disclosure;



FIG. 11 is a schematic cross-sectional view showing initial steps (e.g., installation of casing in a wellbore) in another method of producing bitumen from the formation.



FIG. 12 is a schematic cross-sectional view of the method after drilling of an open hole below the casing;



FIG. 13 is a schematic partially cross-sectional view of the method after installation of a work string;



FIG. 14 is a schematic cross-sectional view of a tool for initiating increased permeability inclusions in the formation;



FIG. 15 is a schematic partially cross-sectional view of the method following initiation of increased permeability inclusions in the formation;



FIG. 16 is a schematic partially cross-sectional view of the method after retrieval of the work string;



FIG. 17 is a partially cross-sectional view of the method after retrieval of the inclusion initiation tool;



FIG. 18 is a cross-sectional view of the method after enlargement of a sump portion of the wellbore;



FIG. 19 is a cross-sectional view of the method after installation of a liner string into the sump portion of the wellbore; and



FIG. 20 is a cross-sectional view of another completed well system embodying principles of the present disclosure.





DETAILED DESCRIPTION

It is to be understood that the various embodiments described herein may be utilized in various orientations, such as inclined, inverted, horizontal, vertical, etc., and in various configurations, without departing from the principles of the present disclosure. The embodiments are described merely as examples of useful applications of the principles of the disclosure, which are not limited to any specific details of these embodiments.


Representatively illustrated in FIGS. 1-10 are a well system 10 and associated methods which embody principles of the present disclosure. In this well system 10 as depicted in FIG. 1, an earth formation 12 contains a deposit of bitumen or other relatively heavy weight hydrocarbons 14.


It is desired to produce the hydrocarbons 14, but they are located at a depth of between approximately 70 and 140 meters, where recovery by surface mining and SAGD methods are impractical. However, it should be clearly understood that the formation 12 and the hydrocarbons 14 could be at depths of other than 70-140 meters in keeping with the principles of this disclosure.


Preferably, the formation 12 is relatively unconsolidated or poorly cemented. However, in some circumstances the formation 12 may be able to bear substantial principal stresses.


An overburden layer 16 extends from the formation 12 to the surface, and a relatively impermeable layer 18 underlies the formation 12. Each of the layers 16, 18 may include multiple sub-layers or zones, whether relatively permeable or impermeable.


Referring specifically now to FIG. 2, the well system 10 is depicted after a wellbore 20 has been drilled into the formation 12. A casing string 22 has been installed and cemented in the wellbore 20. An open hole sump portion 24 of the wellbore 20 is then drilled downward from the lower end of the casing string 22.


As used herein, the term “casing” is used to indicate a protective lining for a wellbore. Casing can include tubular elements such as those known as casing, liner or tubing. Casing can be substantially rigid, flexible or expandable, and can be made of any material, including steels, other alloys, polymers, etc.


Included in the casing string 22 is a tool 26 for forming generally planar inclusions 28 outward from the wellbore 20 into the formation 12. Although only two inclusions 28 are visible in FIG. 2, any number of inclusions (including one) may be formed into the formation 12 in keeping with the principles of this disclosure.


The inclusions 28 may extend radially outward from the wellbore 20 in predetermined azimuthal directions. These inclusions 28 may be formed simultaneously, or in any order. The inclusions 28 may not be completely planar or flat in the geometric sense, in that they may include some curved portions, undulations, tortuosity, etc., but preferably the inclusions do extend in a generally planar manner outward from the wellbore 20.


The inclusions 28 may be merely inclusions of increased permeability relative to the remainder of the formation 12, for example, if the formation is relatively unconsolidated or poorly cemented. In some applications (such as in formations which can bear substantial principal stresses), the inclusions 28 may be of the type known to those skilled in the art as “fractures.”


The inclusions 28 may result from relative displacements in the material of the formation 12, from washing out, etc. Suitable methods of forming the inclusions 28 (some of which do not require use of a special tool 26) are described in U.S. patent application Ser. No. 11/966,212 filed on Dec. 28, 2007, now issued U.S. Pat. No. 7,832,477, Ser. Nos. 11/832,602, 11/832,620 and 11/832,615, all filed on Aug. 1, 2007, now issued U.S. Pat. Nos. 7,640,982, 7,647,966, and 7,640,975, respectively, and Ser. No. 11/610,819, filed on Dec.14, 2006 , now issued U.S. Pat. No. 7,814,978. The entire disclosures of these prior applications are incorporated herein by this reference.


The inclusions 28 may be azimuthally oriented in preselected directions relative to the wellbore 20, as representatively illustrated in FIG. 3. Although the wellbore 20 and inclusions 28 are vertically oriented as illustrated in FIG. 2, they may be oriented in any other direction in keeping with the principles of this disclosure.


As depicted in FIG. 2, a fluid 30 is injected into the formation 12. The fluid 30 is flowed downwardly via an annulus 32 formed radially between the casing string 22 and a tubular production string 34. The tubular string 34 extends downwardly to a location which is below the inclusions 28 (e.g., in the sump portion 24).


The fluid 30 flows outward into the formation 12 via the inclusions 28. As a result, the hydrocarbons 14 in the formation 12 are heated. For example, the fluid 30 may be steam or another liquid or gas which is capable of causing the heating of the hydrocarbons 14.


Suitably heated, the hydrocarbons 14 become mobile (or at least more mobile) in the formation 12 and can drain from the formation into the wellbore 20 via the inclusions 28. As shown in FIG. 2, the hydrocarbons 14 drain into the wellbore 20 and accumulate in the sump portion 24. The hydrocarbons 14 are, thus, able to be produced from the well via the production string 34.


The hydrocarbons 14 may flow upward through the production string 34 as a result of the pressure exerted by the fluid 30 in the annulus 32. Alternatively, or in addition, supplemental lift techniques may be employed to encourage the hydrocarbons 14 to flow upward through the production string 34.


In FIG. 4, a relatively less dense fluid 36 (i.e., less dense as compared to the hydrocarbons 14) is injected into the tubular string 34 via another tubular injection string 38 installed in the well alongside the production string 34. The fluid 36 may be steam, another gas such as methane, or any other relatively less dense fluid or combination of fluids. Conventional artificial lift equipment (such as a gas lift mandrel 39, etc.) may be used in this method.


In FIG. 5, the fluid 30 is injected into the wellbore 20 via another tubular injection string 40. A packer 42 set in the wellbore 20 above the inclusions 28 helps to contain the pressure exerted by the fluid 30, and thereby aids in forcing the hydrocarbons 14 to flow upward through the production string 34.


In FIG. 6, the techniques of FIGS. 4 & 5 are combined, i.e., the fluid 30 is injected into the formation 12 via the injection string 40, and the fluid 36 is injected into the production string 34 via the injection string 38. This demonstrates that any number and combination of the techniques described herein (as well as techniques not described herein) may be utilized in keeping with the principles of this disclosure.


In FIG. 7, a pulsing tool 44 is used with the Injection string 40 to continuously vary a flow rate of the fluid 30 as it is being injected into the formation 12. Suitable pulsing tools are described in U.S. Pat. No. 7,404,416, and in U.S. patent application Ser. No. 12/120,633, filed on May 14, 2008, now issued U.S. Pat. No. 7,909,094. The entire disclosures of the prior patent and application are incorporated herein by this reference.


This varying of the flow rate of the fluid 30 into the formation 12 is beneficial, in that it optimizes distribution of the fluid in the formation and thereby helps to heat and mobilize a greater proportion of the hydrocarbons 14 in the formation. Note that the flow rate of the fluid 30 as varied by the pulsing tool 44 preferably does not alternate between periods of flow and periods of no flow, or between periods of forward flow and periods of backward flow.


Instead, the flow of the fluid 30 is preferably maintained in a forward direction (i.e., flowing into the formation 12) while the flow rate varies or pulses. This may be considered as an “AC” component of the fluid 30 flow rate imposed on a positive base flow rate of the fluid.


In FIG. 8, the configuration of the well system 10 is similar in most respects to the system as depicted in FIG. 6. However, the production string 34 has a phase control valve 46 connected at a lower end of the production string.


The phase control valve 46 prevents steam or other Gases from being produced along with the hydrocarbons 14 from the sump portion 24. A suitable phase control valve for use in the system 10 is described in U.S. patent application Ser. No. 12/039,206, filed on Feb. 28, 2008. now issued U.S. Pat. No. 7,866,400. The entire disclosure of this prior application is incorporated herein by this reference.


In FIG. 9, both of the pulsing tool 44 and the phase control valve 46 are used with the respective injection string 40 and production string 34. Again, any of the features described herein may be combined in the well system 10 as desired, without departing from the principles of this disclosure.


In FIG. 10, multiple inclusion initiation tools 26a, 26b are used to propagate inclusions 28a, 28b at respective multiple depths in the formation 12. The fluid 30 is injected into each of the inclusions 28a, 28b and the hydrocarbons 14 are received into the wellbore 20 from each of the inclusions 28a, 28b.


Thus, it will be appreciated that inclusions 28 may be formed at multiple different depths in a formation, and in other embodiments inclusions may be formed in multiple formations, in keeping with the principles of this disclosure. For example, in the embodiment of FIG. 10, there could be a relatively impermeable lithology (e.g., a layer of shale, etc.) between the upper and lower sets of inclusions 28a, 28b.


As discussed above, the inclusion propagation tool 26 could be similar to any of the tools described in several previously filed patent applications. Most of these previously described tools involve expansion of a portion of a casing string to, for example, increase compressive stress in a radial direction relative to a wellbore.


However, it should be understood that it is not necessary to expand casing (or a tool interconnected in a casing string) in keeping with the principles of this disclosure. In FIGS. 11-19, a method is representatively illustrated for forming the inclusions 28 in the system 10 without expanding casing.



FIG. 11 depicts the method and system 10 after the wellbore 20 has been drilled into the formation 12, and the casing string 22 has been cemented in the wellbore. Note that, in this example, the casing string 22 does not extend across a portion of the formation 12 in which the inclusions 28 are to be initiated, and the casing string does not include an inclusion initiation tool 26.


In FIG. 12, an intermediate open hole wellbore portion 48 is drilled below the lower end of the casing string 22. A diameter of the wellbore portion 48 may be equivalent to (and in other embodiments could be somewhat smaller than or larger than) a body portion of an inclusion initiation tool 26 installed in the wellbore portion 48 as described below.


In FIG. 13, the inclusion initiation tool 26 is conveyed into the wellbore 20 on a tubular work string 50, and is installed in the wellbore portion 48. Force is used to drive the tool 26 through the earth surrounding the wellbore portion 48 below the casing string 22, since at least projections 52 extend outwardly from the body 54 of the tool and have a larger lateral dimension as compared to the diameter of the wellbore portion 48. The body 54 could also have a diameter greater than a diameter of the wellbore portion 48 if, for example, it is desired to increase radial compressive stress in the formation 12.


In FIG. 14, a cross-sectional view of the tool 26 driven into the formation 12 is representatively illustrated. In this view, it may be seen that the projections 52 extend outward into the formation 12 to thereby initiate the inclusions 28.


Although the tool 26 is depicted in FIG. 14 as having eight equally radially spaced apart projections 52, it should be understood that the tool could be constructed with any number of projections (including one), and that any number of inclusions 28 may be initiated using the tool. For example, the tool 26 could include two projections 52 spaced 180 degrees apart for initiation of two inclusions 28.


Such a tool 26 could then be raised, azimuthally rotated somewhat, and then driven into the formation 12 again in order to initiate two additional inclusions 28. This process could be repeated as many times as desired to initiate as many inclusions 28 as desired.


The inclusions 28 may be propagated outward into the formation 12 immediately after they are initiated or sometime thereafter, and the inclusions may be propagated sequentially, simultaneously or in any order in keeping with the principles of this disclosure. Any of the techniques described in the previous patent applications mentioned above (e.g., U.S. patent application Ser. Nos. 11/966,212, 11/832,602, 11/832,620, 11/832,615 and 11/610,819) for initiating and propagating the inclusions 28 may be used in the system 10 and associated methods described herein.


In FIG. 15, the inclusions 28 have been propagated outward into the formation 12. This may be accomplished by setting a packer 56 in the casing string 22 and pumping fluid 58 through the work string 50 and outward into the inclusions 28 via the projections 52 on the tool 26.


The tool 26 may or may not be expanded (e.g., using hydraulic actuators or any of the techniques described in the previous patent applications mentioned above) prior to or during the process of pumping the fluid 58 into the formation 12 to propagate the inclusions 28. In addition, the fluid 58 may be laden with sand or another proppant, so that after propagation of the inclusions 28, a high permeability flowpath will be defined by each of the inclusions for later injection of the fluid 30 and production of the hydrocarbons 14 from the formation 12.


Note that it is not necessary for the tool 26 to include the projections 52. The body 54 could be expanded radially outward (e.g., using hydraulic actuators, etc.), and the fluid 58 could be pumped out of the expanded body to form the inclusions 28.


In FIG. 16, the work string 50 has been retrieved from the well, leaving the tool 26 in the wellbore portion 48 after propagation of the inclusions 28. Alternatively, the tool 26 could be retrieved with the work string 50, if desired.


In FIG. 17, the wellbore portion 48 has been enlarged to form the sump portion 24 for eventual accumulation of the hydrocarbons 14 therein. In this embodiment, the wellbore portion 48 is enlarged when a washover tool (not shown) is used to retrieve the tool 26 from the wellbore portion.


However, if the tool 26 is retrieved along with the work string 50 as described above, then other techniques (such as use of an underreamer or a drill bit, etc.) may be used to enlarge the wellbore portion 48. Furthermore, in other embodiments, the wellbore portion 48 may itself serve as the sump portion 24 without being enlarged at all.


In FIG. 18, the sump portion 24 has been extended further downward in the formation 12. The sump portion 24 could extend into the layer 18, if desired, as depicted in FIGS. 2-10.


In FIG. 19, a tubular liner string 60 has been installed in the well, with a liner hanger 62 sealing and securing an upper end of the liner string in the casing string 22. A perforated or slotted section of liner 64 extends into the wellbore portion 24 opposite the inclusions 28, and an un-perforated or blank section of liner 66 extends into the wellbore portion below the inclusions.


The perforated section of liner 64 allows the fluid 30 to be injected from within the liner string 60 into the inclusions 28. The perforated section of liner 64 may also allow the hydrocarbons 14 to flow into the liner string 60 from the inclusions 28. If the un-perforated section of liner 66 is open at its lower end, then the hydrocarbons 14 may also be allowed to flow into the liner string 60 through the lower end of the liner.


The well may now be completed using any of the techniques described above and depicted in FIGS. 2-10. For example the production string 34 may be installed (with its lower end extending into the liner string 60), along with any of the injection strings 38, 40, the pulsing tool 44 and/or the phase control valve 46, as desired.


Another completion option is representatively illustrated in FIG. 20. In this completion configuration, the upper liner 64 is provided with a series of longitudinally distributed nozzles 68.


The nozzles 68 serve to evenly distribute the injection of the fluid 30 into the inclusions 28, at least in part by maintaining a positive pressure differential from the interior to the exterior of the liner 64. The nozzles 68 may be appropriately configured (e.g., by diameter, length, flow restriction, etc.) to achieve a desired distribution of flow of the fluid 30, and it is not necessary for all of the nozzles to be the same configuration.


The lower liner 66 is perforated or slotted to allow the hydrocarbons 14 to flow into the liner string 60. A flow control device 70 (e.g., a check valve, pressure relief valve, etc.) provides one-way fluid communication between the upper and lower liners 64, 66.


In operation, injection of the fluid 30 heats the hydrocarbons 14, which flow into the wellbore 20 and accumulate in the sump portion 24, and enter the lower end of the production string 34 via the flow control device 70. The fluid 30 can periodically enter the lower end of the production string 34 (e.g., when a level of the hydrocarbons 14 in the sump portion drops sufficiently) and thereby aid in lifting the hydrocarbons 14 upward through the production string.


Alternatively, the flow control device 70 could also include a phase control valve (such as the valve 46 described above) to prevent steam or other gases from flowing into the upper liner 64 from the lower liner 66 through the flow control device. As another alternative, if a packer 72 is not provided for sealing between the production string 34 and the liner string 60, then the phase control valve 46 could be included at the lower end of the production string as depicted in FIGS. 8-10 and described above.


Any of the other completion options described above may also be included in the configuration of FIG. 20. For example, the fluid 30 could be injected via an injection string 40, a relatively less dense fluid 36 could be injected via another injection string 38 and mandrel 39, a pulsing tool 44 could be used to vary the flow rate of the fluid 30, etc.


It may now be fully appreciated that the above description of the well system 10 and associated methods provides significant advancements to the art of producing relatively heavy weight hydrocarbons from earth strata. The system 10 and methods are particularly useful where the strata are too deep for conventional surface mining and too shallow for conventional SAGD operations.


Some particularly useful features of the system 10 and methods are that only a single wellbore 20 is needed to both inject the fluid 30 and produce the hydrocarbons 14, the fluid may be injected simultaneously with production of the hydrocarbons, and production of the hydrocarbons is substantially immediate upon completion of the well. The system 10 and methods offer a very economical and effective way of producing large deposits of shallow bitumen which cannot currently be thermally produced using conventional completion techniques. Fewer wells are required, which reduces the environmental impact of such production.


The methods do not require a heat-up phase of 3 to 4 months as with conventional SAGD techniques, nor do the methods preferably involve a cyclic steaming process in which production ceases during the steam injection phase. Instead, the hydrocarbons 14 are preferably continuously heated by injection of the fluid 30, and continuously produced during the injection, providing substantially immediate return on investment.


The above disclosure provides to the art a method of producing hydrocarbons 14 from a subterranean formation 12. The method includes the steps of: propagating at least one generally planar inclusion 28 outward from a wellbore 20 into the formation 12; injecting a fluid 30 into the inclusion 28, thereby heating the hydrocarbons 14; and during the injecting step, producing the hydrocarbons 14 from the wellbore 20.


The hydrocarbons 14 may comprise bitumen. The hydrocarbons 14 producing step may include flowing the hydrocarbons into the wellbore 20 at a depth of between approximately 70 meters and approximately 140 meters in the earth.


The fluid 30 may comprise steam. The fluid 30 may be injected into the same inclusion 28 from which the hydrocarbons 14 are produced.


The fluid 30 may be injected into an upper portion of the inclusion 28 which is above a lower portion of the inclusion from which the hydrocarbons 14 are produced. The fluid 30 may be injected at a varying flow rate while the hydrocarbons 14 are being produced.


The hydrocarbons 14 may be produced through a tubular string 34 extending to a position in the wellbore 20 which is below the inclusion 28. A phase control valve 46 may prevent production of the fluid 30 with the hydrocarbons 14 through the tubular string 34.


The inclusion 28 propagating step may include propagating a plurality of the inclusions into the formation 12 at one depth. The propagating step may also include propagating a plurality of the inclusions 28 into the formation 12 at another depth. The producing step may include producing the hydrocarbons 14 from the inclusions 28 at both depths.


The inclusion 28 propagating step may be performed without expanding a casing in the wellbore 20.


Also provided by the above disclosure is a well system 10 for producing hydrocarbons 14 from a subterranean formation 12 intersected by a wellbore 20. The system 10 includes at least one generally planar inclusion 28 extending outward from the wellbore 20 into the formation 12.


A fluid 30 is injected into the inclusion 28. The hydrocarbons 14 are heated as a result of the injected fluid 30.


The hydrocarbons 14 are produced through a tubular string 34 which extends to a location in the wellbore 20 below the inclusion 28. The hydrocarbons 14 are received into the tubular string 34 at that location.


Only the single wellbore 20 may be used for injection of the fluid 30 and production of the hydrocarbons 14. A pulsing tool 44 may vary a flow rate of the fluid 30 as it is being injected.


The fluid 30 may be injected via an annulus 32 formed between the tubular string 34 and the wellbore 20. The fluid 30 may be injected via a tubular injection string 40.


A flow control device 70 may provide one-way flow of the hydrocarbons 14 into the tubular string 34 from a portion 24 of the wellbore 20 below the inclusion 28.


Also described above is a method of producing hydrocarbons 14 from a subterranean formation 12, with the method including the steps of: propagating at least one generally planar inclusion 28 outward from a wellbore 20 into the formation 12; injecting a fluid 30 into the inclusion 28, thereby heating the hydrocarbons 14, the injecting step including varying a flow rate of the fluid 30 into the inclusion 28 while the fluid 30 is continuously flowed into the inclusion 28; and during the injecting step, producing the hydrocarbons 14 from the wellbore 20.


The above disclosure also provides a method of propagating at least one generally planar inclusion 28 outward from a wellbore 20 into a subterranean formation 12. The method includes the steps of: providing an inclusion initiation tool 26 which has at least one laterally outwardly extending projection 52, a lateral dimension of the inclusion initiation tool 26 being larger than an internal lateral dimension of a portion 48 of the wellbore 20; forcing the inclusion initiation tool 26 into the wellbore portion 48, thereby forcing the projection 52 into the formation 12 to thereby initiate the inclusion 28; and then pumping a propagation fluid 58 into the inclusion 28, thereby propagating the inclusion 28 outward into the formation 12.


A body 54 of the inclusion initiation tool 26 may have a lateral dimension which is larger than the internal lateral dimension of the wellbore portion 48, whereby the tool forcing step further comprises forcing the body 54 into the wellbore portion 48, thereby increasing radial compressive stress in the formation 12.


The fluid pumping step may include pumping the fluid 58 through the projection 52.


The projection forcing step may be performed multiple times, with the inclusion initiation tool 26 being azimuthally rotated between the projection forcing steps.


The method may include the step of expanding the inclusion initiation tool 26 in the wellbore portion 48. The expanding step may be performed prior to, or during, the pumping step.


The method may include the step of retrieving the inclusion initiation tool 26 from the wellbore 20.


The method may include the steps of injecting a heating fluid 30 into the inclusion 28, thereby heating hydrocarbons 14 in the formation 12; and during the injecting step, producing the hydrocarbons 14 from the wellbore 20.


Of course, a person skilled in the art would, upon a careful consideration of the above description of representative embodiments, readily appreciate that many modifications, additions, substitutions, deletions, and other changes may be made to these specific embodiments, and such changes are within the scope of the principles of the present disclosure. Accordingly, the foregoing detailed description is to be clearly understood as being given by way of illustration and example only, the spirit and scope of the present invention being limited solely by the appended claims and their equivalents.

Claims
  • 1. A method of producing hydrocarbons from a subterranean formation, the method comprising: propagating at least one generally planar inclusion outward from a wellbore into the formation, wherein the inclusion is azimuthally oriented in a preselected direction relative to the wellbore;injecting a fluid into the at least one inclusion via an annulus formed between a casing string and a production string, thereby heating the hydrocarbons; andduring the injecting, flowing the hydrocarbons into the wellbore from the at least one inclusion and producing the hydrocarbons from the wellbore via the production string.
  • 2. The method of claim 1, wherein the hydrocarbons comprise bitumen.
  • 3. The method of claim 1, wherein the flowing further comprises flowing the hydrocarbons into the wellbore at a depth of between approximately 70 meters and approximately 140 meters in the earth.
  • 4. The method of claim 1, wherein the fluid comprises steam.
  • 5. The method of claim 1, wherein the fluid is injected into an upper portion of the at least one inclusion which is above a lower portion of the at least one inclusion from which the hydrocarbons flow into the wellbore.
  • 6. The method of claim 1, wherein the fluid is injected at a varying flow rate while the hydrocarbons are being produced.
  • 7. The method of claim 1, wherein the production string extends to a position in the wellbore which is below the at least one inclusion, and wherein a phase control valve prevents production of the fluid with the hydrocarbons through the production string.
  • 8. The method of claim 1, wherein the propagating is performed without expanding a tool in the wellbore.
  • 9. A method of producing hydrocarbons from a subterranean formation, the method comprising: propagating a plurality of generally planar inclusions outward from a wellbore into the formation at a first depth;injecting a fluid into the inclusions via an annulus formed between a casing string and a production string, thereby heating the hydrocarbons; andduring the injecting, flowing the hydrocarbons into the wellbore from the inclusions and producing the hydrocarbons from the wellbore via the production string.
  • 10. The method of claim 9, wherein the propagating further comprises propagating a plurality of generally planar inclusions into the formation at a second depth, and wherein the flowing further comprises flowing the hydrocarbons into the wellbore from the inclusions at the first and second depths.
  • 11. A well system for producing hydrocarbons from a subterranean formation intersected by a single wellbore, the system comprising: at least one planar inclusion extending outward from the single wellbore into the formation, wherein the inclusion is azimuthally oriented in a preselected direction relative to the wellbore, and wherein the planar inclusion includes at least one selected from the group consisting of curved portions, undulations, tortuosity, indentions, and protrusions;a fluid injected via the single wellbore into an upper portion of the at least one inclusion, the hydrocarbons being heated as a result of the injected fluid; anda tubular string through which the hydrocarbons are produced, the tubular string extending through the single wellbore to a location below the at least one inclusion, wherein during fluid injection the hydrocarbons flow into the single wellbore from a lower portion of the at least one inclusion and then flow to the location below the at least one inclusion.
  • 12. The system of claim 11, wherein the hydrocarbons comprise bitumen.
  • 13. The system of claim 11, wherein the at least one inclusion is positioned at a depth of between approximately 70 meters and approximately 140 meters in the earth.
  • 14. The system of claim 11, wherein the fluid comprises steam.
  • 15. The system of claim 11, further comprising a pulsing tool which varies a flow rate of the fluid.
  • 16. The system of claim 11, wherein a phase control valve prevents production of the fluid with the hydrocarbons through the tubular string.
  • 17. The system of claim 11, wherein the fluid is injected via an annulus formed between the tubular string and the wellbore.
  • 18. The system of claim 11, wherein the fluid is injected via a tubular injection string.
  • 19. The system of claim 11, further comprising a flow control device which provides one-way flow of the hydrocarbons into the tubular string from the location in the wellbore below the at least one inclusion.
  • 20. A well system for producing hydrocarbons from a subterranean formation intersected by a wellbore, the system comprising: a plurality of generally planar inclusions extending outward from the wellbore into the formation at a first depth;a fluid injected into an upper portion of the inclusions, the hydrocarbons being heated as a result of the injected fluid; anda tubular string through which the hydrocarbons are produced, the tubular string extending through the wellbore to a location below the inclusions, wherein during fluid injection the hydrocarbons flow into the wellbore from a lower portion of the inclusions and then flow to the location below the inclusions.
  • 21. The system of claim 20, wherein a plurality of generally planar inclusions extend into the formation at a second depth, and wherein the hydrocarbons flow into the wellbore from the inclusions at the first and second depths.
  • 22. A method of producing hydrocarbons from a subterranean formation, the method comprising: propagating at least one generally planar inclusion outward from a wellbore into the formation, wherein the inclusion is azimuthally oriented in a preselected direction relative to the wellbore;injecting a fluid into the at least one inclusion, thereby heating the hydrocarbons, the injecting including varying a flow rate of the fluid into the at least one inclusion while the fluid is continuously flowed into the at least one inclusion; andduring the injecting, flowing the hydrocarbons into the wellbore from the at least one inclusion.
  • 23. The method of claim 22, wherein the hydrocarbons comprise bitumen.
  • 24. The method of claim 22, wherein the flowing further comprises flowing the hydrocarbons into the wellbore at a depth of between approximately 70 meters and approximately 140 meters in the earth.
  • 25. The method of claim 22, wherein the fluid comprises steam.
  • 26. The method of claim 22, wherein the fluid is injected into an upper portion of the at least one inclusion which is above a lower portion of the at least one inclusion from which the hydrocarbons flow into the wellbore.
  • 27. The method of claim 22, wherein the fluid is injected via a pulsing tool interconnected in an injection string in the well.
  • 28. The method of claim 22, wherein the hydrocarbons are produced through a tubular string extending to a position in the wellbore which is below the at least one inclusion, and wherein a phase control valve prevents production of the fluid with the hydrocarbons through the tubular string.
  • 29. The method of claim 22, wherein the propagating is performed without expanding a casing in the wellbore.
  • 30. A method of producing hydrocarbons from a subterranean formation, the method comprising: propagating a plurality of generally planar inclusions outward from a wellbore into the formation at a first depth;injecting a fluid into the inclusions, thereby heating the hydrocarbons, the injecting including varying a flow rate of the fluid into the inclusions while the fluid is continuously flowed into the inclusions; andduring the injecting, flowing the hydrocarbons into the wellbore from the inclusions.
  • 31. The method of claim 30, wherein the propagating further comprises propagating a plurality of generally planar inclusions into the formation at a second depth, and wherein the flowing further comprises flowing the hydrocarbons into the wellbore from the inclusions at the first and second depths.
CROSS-REFERENCE TO RELATED APPLICATIONS

The present application is a continuation of U.S. application Ser. No. 12/269,995 filed on 13 Nov. 2008, now issued U.S. Pat. No. 8,151,874, which is a continuation-in-part of prior application Ser. No. 11/626,112 filed on Jan. 23, 2007, now issued U.S. Pat. No. 7,591,306, which is a continuation-in-part of prior application Ser. No. 11/379,828 filed on Apr. 24, 2006 now abandoned, now U.S. Publication No. 2007/0199697, which is a continuation-in-part of prior application Ser. No. 11/277,815 filed on Mar. 29, 2006 now abandoned, now U.S. Publication No. 2007/0199712, which is a continuation-in-part of prior application Ser. No. 11/363,540 filed on Feb. 27, 2006, now issued U.S. Pat. No. 7,748,458. The entire disclosures of these prior applications are incorporated herein by this reference.

US Referenced Citations (209)
Number Name Date Kind
1789993 Switzer Jan 1931 A
2178554 Bowie Nov 1937 A
2548360 Germain Apr 1951 A
2634961 Ljungstrom Apr 1953 A
2642142 Clark Jun 1953 A
2687179 Dismukes Aug 1954 A
2732195 Ljungstrom Jan 1956 A
2780450 Ljungstrom Feb 1957 A
2862564 Bostock Dec 1958 A
2870843 Rodgers, Jr. Jan 1959 A
3058730 Bays Oct 1962 A
3059909 Wise Oct 1962 A
3062286 Wylie Nov 1962 A
3071481 Beach et al. Jan 1963 A
3225828 Wisenbaker et al. Dec 1965 A
3270816 Staadt Sep 1966 A
3280913 Smith Oct 1966 A
3284281 Thomas Nov 1966 A
3301723 Chrisp Jan 1967 A
3338317 Shore Aug 1967 A
3349847 Smith et al. Oct 1967 A
3353599 Swift Nov 1967 A
3690380 Grable Sep 1972 A
3695354 Dilgren et al. Oct 1972 A
3727688 Clampitt Apr 1973 A
3739852 Woods et al. Jun 1973 A
3779915 Kucera Dec 1973 A
3884303 Closmann May 1975 A
3888312 Tiner et al. Jun 1975 A
3913671 Redford et al. Oct 1975 A
3948325 Winston et al. Apr 1976 A
3994340 Anderson et al. Nov 1976 A
4005750 Shuck Feb 1977 A
4018293 Keller Apr 1977 A
4066127 Harnsberger Jan 1978 A
4085803 Butler Apr 1978 A
4099570 Vandergrift Jul 1978 A
4109722 Widmyer et al. Aug 1978 A
4114687 Payton Sep 1978 A
4116275 Butler et al. Sep 1978 A
4119151 Smith Oct 1978 A
4271696 Wood Jun 1981 A
4280559 Best Jul 1981 A
4311194 White Jan 1982 A
4344485 Butler Aug 1982 A
4362213 Tabor Dec 1982 A
4450913 Allen et al. May 1984 A
4454916 Shu Jun 1984 A
4474237 Shu Oct 1984 A
4491179 Pirson et al. Jan 1985 A
4513819 Islip et al. Apr 1985 A
4519454 McMillen May 1985 A
4566536 Holmes Jan 1986 A
4597441 Ware et al. Jul 1986 A
4598770 Shu et al. Jul 1986 A
4625800 Venkatesan Dec 1986 A
4678037 Smith Jul 1987 A
4696345 Hsueh Sep 1987 A
4697642 Vogel Oct 1987 A
4706751 Gondouin Nov 1987 A
4716960 Eastlund et al. Jan 1988 A
4834181 Uhri et al. May 1989 A
4926941 Glandt et al. May 1990 A
4977961 Avasthi Dec 1990 A
4993490 Stephens et al. Feb 1991 A
5002431 Heymans et al. Mar 1991 A
5010964 Cornette Apr 1991 A
5036918 Jennings, Jr. et al. Aug 1991 A
5046559 Glandt Sep 1991 A
5054551 Duerksen Oct 1991 A
5060287 Van Egmond Oct 1991 A
5060726 Glandt et al. Oct 1991 A
5065818 Van Egmond Nov 1991 A
5103911 Heijnen Apr 1992 A
5105886 Strubhar et al. Apr 1992 A
5111881 Soliman et al. May 1992 A
5123487 Harris et al. Jun 1992 A
5131471 Duerksen et al. Jul 1992 A
5145003 Duerksen Sep 1992 A
5148869 Sanchez Sep 1992 A
5211230 Ostapovich et al. May 1993 A
5211714 Jordan et al. May 1993 A
5215146 Sanchez Jun 1993 A
5255742 Mikus Oct 1993 A
5273111 Brannan et al. Dec 1993 A
5297626 Vinegar et al. Mar 1994 A
5318123 Venditto et al. Jun 1994 A
5325923 Surjaatmadja et al. Jul 1994 A
5335724 Venditto et al. Aug 1994 A
5339897 Leaute Aug 1994 A
5372195 Swanson et al. Dec 1994 A
5386875 Venditto et al. Feb 1995 A
5392854 Vinegar et al. Feb 1995 A
5394941 Venditto et al. Mar 1995 A
5396957 Surjaatmadja et al. Mar 1995 A
5404952 Vinegar et al. Apr 1995 A
5407009 Butler et al. Apr 1995 A
5411094 Northrop May 1995 A
5431224 Laali Jul 1995 A
5431225 Abass et al. Jul 1995 A
5472049 Chaffee et al. Dec 1995 A
5494103 Surjaatmadja et al. Feb 1996 A
5547023 McDaniel et al. Aug 1996 A
5564499 Willis et al. Oct 1996 A
5607016 Butler Mar 1997 A
5626191 Greaves et al. May 1997 A
5667011 Gill et al. Sep 1997 A
5743334 Nelson Apr 1998 A
5765642 Surjaatmadja Jun 1998 A
5771973 Jensen et al. Jun 1998 A
5824214 Paul et al. Oct 1998 A
5829520 Johnson Nov 1998 A
5862858 Wellington et al. Jan 1999 A
5871637 Brons Feb 1999 A
5899269 Wellington et al. May 1999 A
5899274 Frauenfeld et al. May 1999 A
5931230 Lesage et al. Aug 1999 A
5944446 Hocking Aug 1999 A
5954946 Klazinga et al. Sep 1999 A
5981447 Chang et al. Nov 1999 A
6003599 Huber et al. Dec 1999 A
6023554 Vinegar et al. Feb 2000 A
6056057 Vinegar et al. May 2000 A
6076046 Vasudevan Jun 2000 A
6079499 Mikus et al. Jun 2000 A
6116343 Van Petegem et al. Sep 2000 A
6119776 Graham et al. Sep 2000 A
6142229 Branson, Jr. et al. Nov 2000 A
6176313 Coenen et al. Jan 2001 B1
6216783 Hocking et al. Apr 2001 B1
6283216 Ohmer Sep 2001 B1
6318464 Mokrys Nov 2001 B1
6330914 Hocking et al. Dec 2001 B1
6360819 Vinegar Mar 2002 B1
6372678 Youngman et al. Apr 2002 B1
6412557 Ayasse et al. Jul 2002 B1
6443227 Hocking et al. Sep 2002 B1
6446727 Zemlak et al. Sep 2002 B1
6508307 Almaguer Jan 2003 B1
6543538 Tolman et al. Apr 2003 B2
6591908 Nasr Jul 2003 B2
6662874 Surjaatmadja et al. Dec 2003 B2
6708759 Leaute et al. Mar 2004 B2
6719054 Cheng et al. Apr 2004 B2
6722431 Karanikas et al. Apr 2004 B2
6722437 Vercaemer et al. Apr 2004 B2
6725933 Middaugh et al. Apr 2004 B2
6732800 Acock et al. May 2004 B2
6769486 Lim et al. Aug 2004 B2
6779607 Middaugh et al. Aug 2004 B2
6782953 Maguire et al. Aug 2004 B2
6792720 Hocking Sep 2004 B2
6883607 Nenniger et al. Apr 2005 B2
6883611 Smith et al. Apr 2005 B2
6991037 Hocking Jan 2006 B2
7044225 Haney et al. May 2006 B2
7055598 Ross et al. Jun 2006 B2
7059415 Bosma et al. Jun 2006 B2
7066284 Wylie et al. Jun 2006 B2
7069989 Marmorshteyn Jul 2006 B2
7228908 East, Jr. et al. Jun 2007 B2
7240728 Cook et al. Jul 2007 B2
7278484 Vella et al. Oct 2007 B2
7404416 Schultz Jul 2008 B2
7404441 Hocking Jul 2008 B2
7412331 Calhoun et al. Aug 2008 B2
7640975 Cavender et al. Jan 2010 B2
7640982 Schultz et al. Jan 2010 B2
7647966 Cavender et al. Jan 2010 B2
7814978 Steele et al. Oct 2010 B2
7832477 Cavender et al. Nov 2010 B2
7918269 Cavender et al. Apr 2011 B2
7950456 Cavender et al. May 2011 B2
8122953 Cavender et al. Feb 2012 B2
20020189818 Metcalfe Dec 2002 A1
20030192717 Smith et al. Oct 2003 A1
20030230408 Acock et al. Dec 2003 A1
20040118574 Cook et al. Jun 2004 A1
20040177951 Hoffman et al. Sep 2004 A1
20050145387 Hocking Jul 2005 A1
20050194143 Xu et al. Sep 2005 A1
20050263284 Justus Dec 2005 A1
20060131074 Calhoun et al. Jun 2006 A1
20060144593 Reddy Jul 2006 A1
20060149478 Calhoun et al. Jul 2006 A1
20060162923 Ware Jul 2006 A1
20070199695 Hocking Aug 2007 A1
20070199697 Hocking Aug 2007 A1
20070199698 Hocking Aug 2007 A1
20070199699 Hocking Aug 2007 A1
20070199700 Hocking Aug 2007 A1
20070199701 Hocking Aug 2007 A1
20070199702 Hocking Aug 2007 A1
20070199704 Hocking Aug 2007 A1
20070199705 Hocking Aug 2007 A1
20070199706 Hocking Aug 2007 A1
20070199707 Hocking Aug 2007 A1
20070199708 Hocking Aug 2007 A1
20070199710 Hocking Aug 2007 A1
20070199711 Hocking Aug 2007 A1
20070199712 Hocking Aug 2007 A1
20070199713 Hocking Aug 2007 A1
20080142219 Steele et al. Jun 2008 A1
20090008088 Schultz Jan 2009 A1
20090032251 Cavender et al. Feb 2009 A1
20090032260 Schultz et al. Feb 2009 A1
20090032267 Cavender et al. Feb 2009 A1
20090218089 Steele et al. Sep 2009 A1
20100252261 Cavender et al. Oct 2010 A1
Foreign Referenced Citations (19)
Number Date Country
2114456 Jul 1995 CA
2543886 Apr 2006 CA
1131534 Sep 2003 EP
8100016 Jan 1981 WO
0001926 Jan 2000 WO
0029716 May 2000 WO
2004092530 Oct 2004 WO
2005065334 Jul 2005 WO
2007100956 Sep 2007 WO
2007112175 Oct 2007 WO
2007112199 Oct 2007 WO
2007117787 Oct 2007 WO
2007117810 Oct 2007 WO
2007117865 Oct 2007 WO
2009009336 Jan 2009 WO
2009009412 Jan 2009 WO
2009009437 Jan 2009 WO
2009009445 Jan 2009 WO
2009009447 Jan 2009 WO
Non-Patent Literature Citations (62)
Entry
Chinese Office Action issued Jun. 5, 2012 for CN Patent Application No. 200880101404.2, 11 pages.
Office Action issued Jan. 26, 2011 for U.S. Appl. No. 12/269,995, 66 pages.
Office Action issued Aug. 12, 2011 for U.S. Appl. No. 12/269,995, 20 pages.
Canadian Office Action issued Mar. 28, 2012 for CA Patent Application No. 2,686,050, 3 pages.
Canadian Office Action issued May 5, 2011 for CA Patent Application No. 2,686,050, 2 pages.
English Translation of Russian Official Action issued Feb. 29, 2012 for Russian Patent Application No. 2011123874, 3 pages.
Russian Translation of Official Action issued Feb. 29, 2012 for Russian Patent Application No. 2011123874, 4 pages.
Office Action issued Oct. 1, 2010 for U.S. Appl. No. 12/797,256, 36 pages.
Office Action issued Jul. 21, 2010 for U.S. Appl. No. 12/625,302, 32 pages.
Invitation to Pay Additional Fees issued May 12, 2010 for PCT Patent Application No. PCT/US09/63588, 4 pages.
International Preliminary Report on Patentability issued Feb. 11, 2010 for PCT Patent Application No. PCT/US08/070780, 7 pages.
International Preliminary Report on Patentability issued Feb. 11, 2010 for PCT Patent Application No. PCT/US08/070756, 10 pages.
International Preliminary Report on Patentability issued Feb. 11, 2010 for PCT Patent Application No. PCT/US08/070776, 8 pages.
Office Action issued Jan. 21, 2010, for U.S. Appl. No. 11/610,819, 11 pages.
Russian Office Action issued Feb. 29, 2012 for RU Patent Application No. 2011123874, 3 pages.
International Search Report with Written Opinion issued Apr. 12, 2012 for PCT Patent Application No. PCT/US11/053403, 17 pages.
Patent Application and Drawings for Serial No. PCT/US11153403, filed Sep. 27, 2011, 50 pages.
International Search Report and Written Opinion issued Jan. 2, 2009 for PCT Patent Application No. PCT/US08/70776, 11 pages.
Halliburton Retrievable Service Tools, Cobra Frac® RR4-EV Packer, undated, 2 pages.
Hailiburton Production Optimization, Cobra Frac® Service, Aug. 2005, 2 pages.
Halliburton Drawing No. D00004932, Sep. 10, 1999, 2 pages.
Serata Geomechanics Corporation, “Stress/Property Measurements for Geomechanics,” www.serata.com, dated 2005-2007, 11 pages.
ISTT, “Trenchless Pipe Replacement,” Dec. 11, 2006, 1 page.
ISTT, “Rerounding,” Dec. 11, 2006, 1 page.
STAR Frac Completion System brochure, Winter/Spring 2006, 4 pages.
Wenlu Zhu, et al., “Shear-enhanced Compaction and Permeability Reduction; Triaxial Extension Tests on Porous Sandstone,” Mechanics of Materials, 1997, 16 pages.
S.L. Karner, “What Can Granular Media Teach Us about Deformation in Geothermal Systems?” ARMA, 2005, 12 pages.
M.R. Coop, “The Mechanics of Uncemented Carbonate Sands,” Geotechnique vol. 40, No. 4, 1990, pp. 607-626.
M.R. Coop and J.H. Atkinson, “The Mechanics of Cemented Carbonate Sands,” Geotechnique vol. 43, No. 1, 1993, pp. 53-67.
T. Cuccovillo and M.R. Coop, “Yielding and Pre-failure Deformation of Structure Sands,” Geotechnique vol. 47, No. 3, 1997, pp. 491-508.
Lockner and Stanchits, “Undrained Pore-elastic Response of Sandstones to Deviatoric Stress Change,” Porelastic Response of Sandstones, 2002, 30 pages.
Axel Kaselow and Serge Shapiro, “Stress Sensitivity of Elastic Moduli and Electrical Resistivity in Porous Rocks,” Journal of Geophysics and Engineering, Feb. 11, 2004, 11 pages.
Lockner and Beeler, “Stress-Induced Anisotropic Porelasticity Response in Sandstone,” Jul. 2003, 13 pages.
G.V. Rotta, et al., “Isotropic Yielding in an Artificially Cemented Soil Cured Under Stress;” Geotechnique vol. 53, No. 53, 2003, pp. 493-501.
T.F. Wong and P. Baud, “Mechanical Compaction of Porous Sandstone,” Oil and Gas Science and Technology, 1999, pp. 715-727.
U.S. Appl. No. 11/545,749, filed Oct. 10, 2006, 30 pages.
U.S. Appl. No. 11/753,314, filed May 24, 2007, 49 pages.
U.S. Appl. No. 11/977,772, filed Oct. 26, 2007, 24 pages.
Specification and Drawings for U.S. Appl. No. 11/832,602, filed Aug. 1, 2007, 56 pages.
Specification and Drawings for U.S. Appl. No. 11/832,620, filed Aug. 1, 2007, 46 pages.
Specification and Drawings for U.S. Appl. No. 11/832,615, filed Aug. 1, 2007, 38 pages.
Specification and Drawings for U.S. Appl. No. 11/610,819, filed Dec. 14, 2006, 104 pages.
Specification and Drawings for U.S. Appl. No. 11/966,212, filed Dec. 28, 2007, 42 pages.
International Search Report and Written Opinion issued Sep. 25, 2008, for International Patent Application Serial No. PCT/US07/87291, 11 pages.
International Search Report and Written Opinion issued Oct. 8, 2008, for International Patent Application Serial No. PCT/US8/70780, 8 pages.
International Search Report and Written Opinion issued Oct. 22, 2008, for International Patent Application Serial No. PCT/US08/70756, 11 pages.
Office Action issued Sep. 24, 2009, for U.S. Appl. No. 11/966,212, 37 pages.
Office Action issued Sep. 29, 2009, for U.S. Appl. No. 11/610,819, 12 pages.
Specification and drawings for U.S. Appl. No. 13/624,737, filed Sep. 21, 2012, 56 pages.
Office Action issued Sep. 12, 2012 for CN Application Serial No. 200880101472.9, 8 pages.
English translation of Office Action issued Sep. 12, 2012 for CN Application Serial No. 200880101472.9, 7 pages.
Office Action issued Jun. 16, 2011, for U.S. Appl. No. 13/036,090, 9 pages.
International Preliminary Report on Patentability issued May 26, 2011, for International Patent Application No. PCT/US09/063588, 11 pages.
Office Action issued Jun. 16, 2009, for U.S. Appl. No. 11/832,602, 37 pages.
Office Action issued Jun. 17, 2009, for U.S. Appl. No. 11/832,620, 37 pages.
Office Action issued May 15, 2009, for U.S. Appl. No. 11/610,819, 26 pages.
Canadian Office Action issued Feb. 2, 2009, for CA Patent Application Serial No. 2,596,201, 3 pages.
Office Action issued Jan. 26, 2009, for U.S. Appl. No. 11/832,615, 23 pages.
International Search Report and Written Opinion issued Jan. 2, 2009, for PCT Patent Application Serial No. PCT/US08/70776, 11 pages.
Office Action issued Jan. 2, 2013 for U.S. Appl. No. 13/624,737, 50 pages.
Chinese Office Action issued Jun. 20, 2013 for Chinese Patent Application No. 200980145476.1, 8 pages.
Office Action issued Jul. 5, 2013 for U.S. Appl. No. 13/624,737, 19 pages.
Related Publications (1)
Number Date Country
20120160495 A1 Jun 2012 US
Continuations (1)
Number Date Country
Parent 12269995 Nov 2008 US
Child 13411542 US
Continuation in Parts (4)
Number Date Country
Parent 11626112 Jan 2007 US
Child 12269995 US
Parent 11379828 Apr 2006 US
Child 11626112 US
Parent 11277815 Mar 2006 US
Child 11379828 US
Parent 11363540 Feb 2006 US
Child 11277815 US