Various embodiments relate generally to fuel pellets, pins, bundles, and core loading for a pressurized heavy water nuclear reactor (“PHWR”), and specifically relate to a thorium-based fuel composition for such pellets, pins, bundles, and cores.
The 220 MWe PHWR is a heavy water moderated and heavy water cooled reactor with a reactor vessel 10. The reactor comprises 306 fuel channels in the form of horizontal pressure tubes with coolant flow at high pressure. Each channel contains 12 fuel bundles but only 10 are located in the active core. To isolate the hot fuel channels from the colder moderator, the pressure tubes are loaded in calandria tubes that are surrounded by heavy water moderator. The pressure tubes are arranged in square lattice with a lattice pitch of 22.84 cm. The geometry of the reactor core 20 including the heavy water moderator reflector and exemplary fuel bundles are shown in
The fuel bundle is a cluster of fuel pins with 19 pins per bundle. The overall length of the fuel bundle is 49.53 cm. The fuel is in the form of uranium dioxide pellets clad in zircaloy-4 pins. The fuel stack length is 48.1 cm and the fuel pins are sealed by end-caps welded to the ends of the fuel pin. To maintain the structural integrity of the fuel bundles, two end-plates are welded to the end-caps of the fuel pins.
In addition to the fuel channels, the reactor core comprises a number of reactivity control devices. All reactivity devices are perpendicular to the fuel channels and penetrate the reactor pressure vessel from top to bottom. Reactor power regulation is provided by the means of two power regulating rods that are normally 80% inserted. For the control of the power shape and for xenon override, 4 adjuster rods are installed which are normally fully inserted. Reactor shutdown is provided by the means of the primary shutdown system which comprises 14 shutdown rods normally parked out-of-core. In case of emergencies and failure of the primary shutdown system, the shutdown functionality can be provided independently by the secondary shutdown system that comprises 12 liquid poison compartments. The liquid compartments arenormally filled by helium gas, and when required, liquid neutron poisons are injected in short time to provide safe reactor shutdown. In addition, the reactor has two shim rods which are used to support shim mode operation when required; these are normally parked out-of-core.
Canadian Patent Application Publication No. 2 810 133 discloses a nuclear fuel bundle containing thorium and a nuclear reactor comprising the same. See also U.S. Patent Application Publication No. 2016/0035441.
One or more non-limiting embodiments provide thorium-based fuel (e.g., fuel pellet(s), fuel pin(s), and/or fuel bundle(s)) for a PHWR reactor, and a method of making and using the same, as disclosed and claimed herein.
One or more non-limiting embodiments provide a fresh fuel pellet configured to be used in a pressurized heavy water reactor. The fuel pellet includes thorium and uranium fuel. A fuel composition of the fuel pellet is between 55 and 90 wt % thorium, and between 10 and 45 wt % uranium. A 235U enrichment of the uranium is between 10.5% and 20%.
According to one or more of these embodiments, the pellet is annular in shape with a through-hole.
According to one or more of these embodiments, the through-hole has a diameter of between 0.3 and 1.0 cm.
According to one or more of these embodiments, the fuel composition is between 70 and 90 wt % thorium.
According to one or more of these embodiments, the 235U enrichment of the uranium is between 15% and 19%.
One or more non-limiting embodiments provides a fuel pin configured to be used in a pressurized heavy water reactor. The fuel pin includes a sealed tube, and a plurality of fuel pellets according to one or more of the embodiments disclosed herein. The plurality of fuel pellets are disposed inside the sealed tube.
According to one or more of these embodiments, a fuel composition of the fuel pin is between 70 and 85 wt % thorium.
According to one or more of these embodiments, each of the plurality of fuel pellets includes burnable poison.
One or more non-limiting embodiments provides a fuel bundle configured to be used in a pressurized heavy water reactor. The fuel bundle includes a plurality of fuel pins according to one of the embodiments disclosed herein. A fuel composition of at least one of the plurality of fuel pins differs from a fuel composition in at least one other of the plurality of fuel pins.
According to one or more of these embodiments, the fuel bundle is shaped and configured to be used in a 220 MWe PHWR; the plurality of fuel pins has exactly 19 fuel pins including one central fuel pin, six intermediate fuel pins disposed radially outwardly from the one central fuel pin, and twelve outer fuel pins disposed radially outwardly from the six intermediate fuel pins. A thorium weight percentage of the fuel composition of the central fuel pin is lower than a thorium weight percentage of the fuel composition of each of the twelve outer fuel pins.
According to one or more of these embodiments, the fuel composition of each of the central fuel pin and six intermediate fuel pins has a thorium content of between 55 and 75 wt %; the fuel composition of each of the twelve outer fuel pins has a thorium content of between 65 and 90 wt %; and each of the twelve outer fuel pins has a higher wt % thorium content than each of the central and six intermediate fuel pins.
According to one or more of these embodiments, the fuel composition of the central fuel pin has a lower wt % thorium content than in each of the six intermediate fuel pins; and the fuel composition of each of the six intermediate fuel pins has a lower wt % thorium content than in each of the twelve outer fuel pins.
According to one or more of these embodiments, the fuel composition of the central fuel pin has a thorium content of between 55 and 70 wt %; the fuel composition of each of the six intermediate fuel pins has a thorium content of between 60 and 80 wt %; and the fuel composition of each of the twelve outer fuel pins has a thorium content of between 65 and 90 wt %.
According to one or more of these embodiments, the fuel bundle further includes burnable poison disposed in the sealed tube of each of the six intermediate fuel pins.
According to one or more of these embodiments, burnable poison is not disposed in the sealed tube of any of the outer fuel pins.
According to one or more of these embodiments, the fuel bundle further includes burnable poison disposed in the sealed tube of each of the central and six intermediate fuel pins, wherein burnable poison is not disposed in the sealed tube of any of the outer fuel pins.
According to one or more of these embodiments, the burnable poison disposed in the sealed tube of each of the central and six intermediate fuel pins includes Europium.
According to one or more of these embodiments, the fuel bundle includes burnable poison disposed in the sealed tube of each of the twelve outer fuel pins.
According to one or more of these embodiments, burnable poison is not disposed in the sealed tube of the central fuel pin or any of the intermediate fuel pins.
According to one or more of these embodiments, burnable poison is not disposed in the sealed tube of any of the fuel pins of the fuel bundle.
According to one or more of these embodiments, a 235U enrichment of the uranium of each of the central, intermediate, and outer pins is at least 12%.
According to one or more of these embodiments, a 235U enrichment of the uranium of each of pellets of each of the central, intermediate, and outer pins is at least 15%.
According to one or more of these embodiments, a 235U enrichment of the uranium of each of the pellets of each of the twelve outer pins is lower than a 235U enrichment of the uranium of each of the pellets of each of the central and six intermediate pins.
According to one or more of these embodiments the fuel bundle is shaped and configured to be used in a CANDU PHWR; and the plurality of fuel pins include exactly 37 fuel pins including one central fuel pin, six first ring fuel pins disposed radially outwardly from the one central fuel pin, twelve second ring fuel pins disposed radially outwardly from the six first ring fuel pins, and eighteen outer fuel ring pins disposed radially outwardly from the twelve second ring fuel pins.
According to one or more of these embodiments, a thorium weight percentage of the fuel composition of the central fuel pin is lower than a thorium weight percentage of the fuel composition of the second ring pins and of the outer ring pins.
According to one or more of these embodiments: a thorium weight percentage of the fuel composition of the central fuel pin and of the first ring fuel pins is between 50 and 70 wt %; a thorium weight percentage of the fuel composition of the second ring fuel pins is between 60 and 90 wt %; and a thorium weight percentage of the fuel composition of the outer ring fuel pins is between 75 and 99 wt %.
According to one or more of these embodiments, a 235U enrichment of the uranium of the central fuel pin and first ring fuel pins is higher than a 235U enrichment of the uranium of the second ring pins or outer ring pins.
According to one or more of these embodiments, a 235U enrichment of the uranium of the second ring fuel pins is higher than a 235U enrichment of the uranium of the outer ring pins.
According to one or more of these embodiments, the central pin, first ring pins, and second ring pins each include burnable poison.
According to one or more of these embodiments, the burnable poison includes Europium Oxide.
According to one or more of these embodiments, the outer ring pins do not include burnable poison.
One or more embodiments provides a pressurized heavy water reactor including a reactor vessel, and a core disposed in the reactor vessel. The core includes a plurality of fuel bundles according to one or more of the embodiments disclosed herein. The plurality of fuel bundles include a first type of fuel bundle and a second type of fuel bundle. The first type of fuel bundle includes burnable poison. The second type of fuel bundle does not include burnable poison.
According to one or more of these embodiments, the first and second types of fuel bundles are identical to each other except for the inclusion of burnable poison in the second type of fuel bundle.
One or more embodiments provides a fuel pellet configured to be used in a pressurized heavy water reactor. The fuel pellet includes thorium and uranium fuel. A fuel composition of the fuel pellet is between 55 and 90 wt % thorium, and between 10 and 45 wt % uranium. A 235U enrichment of the uranium is between 5% and 20%. The pellet is annular in shape with a through-hole.
According to one or more of these embodiments after removing the bundle, pins, and/or pellets from the reactor, a total isotopic uranium concentration within the spent fuel pellets, pins, and/or bundles (as a weight percentage of the spent fuel pellet(s), pin(s), and bundle), is less than 12, 11, 10, 9, 8, and/or 7%.
One or more embodiments provides a fresh fuel bundle comprising a first ring of fuel pins and a second ring of fuel pins.
According to one or more of these embodiments, each of the first ring fuel pins and the second ring fuel pins have a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, a thorium wt % of the fuel composition of the first ring fuel pins differs from a thorium wt % of the fuel composition of the second ring fuel pins.
According to one or more of these embodiments, a uranium wt % of the fuel composition of the first ring fuel pins differs from a uranium wt % of the fuel composition of the second ring fuel pins
According to one or more of these embodiments, a 235U enrichment of the uranium of the first ring fuel pins differs from a 235U enrichment of the uranium of the second ring fuel pins.
According to one or more of these embodiments, the thorium wt % of the fuel composition of the first ring fuel pins and the second ring fuel pins is less than or equal to 90 wt %.
According to one or more of these embodiments, the uranium wt % of the fuel composition of the first ring fuel pins and the second ring fuel pins is at least 10 wt %.
According to one or more of these embodiments, the 235U enrichment of the uranium of the first ring fuel pins and the second ring fuel pins is less than or equal to 20%.
According to one or more of these embodiments, the fuel bundle is shaped and configured to be used in a pressurized heavy water reactor.
According to one or more of these embodiments, the 235U enrichment of the uranium of the first ring fuel pins is at least 5%.
According to one or more of these embodiments, the 235U enrichment of the uranium of the second ring fuel pins is at least 5%.
According to one or more of these embodiments, the pressurized heavy water reactor is a conventional pressurized heavy water reactor.
According to one or more of these embodiments, the fuel bundle is shaped and configured to be usable in the conventional pressurized heavy water reactor in place of a conventional uranium-based fuel bundle.
According to one or more of these embodiments, the first ring fuel pins and the second ring fuel pins each comprise a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets form the fuel composition of the respective fuel pin.
According to one or more of these embodiments, each of the plurality of fuel pellets has an outer diameter of at least 1.1 cm.
According to one or more of these embodiments, each of the plurality of fuel pellets is annular in shape with a through-hole.
According to one or more of these embodiments, the second ring is disposed radially outward of the first ring.
According to one or more of these embodiments, the first ring fuel pins comprise burnable poison.
According to one or more of these embodiments, the second ring fuel pins do not comprise burnable poison.
According to one or more of these embodiments, the first ring is an innermost ring of fuel pins of the fuel bundle.
According to one or more of these embodiments, the first ring fuel pins comprise burnable poison.
According to one or more of these embodiments, the bundle further includes a central fuel pin disposed radially inward of the first and second rings.
According to one or more of these embodiments, the central fuel pin has a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, the central fuel pin comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets of the central fuel pin form the fuel composition of the central fuel pin.
According to one or more of these embodiments, the first ring is an innermost ring of fuel pins of the fuel bundle.
According to one or more of these embodiments, the central fuel pin and first ring fuel pins each comprise burnable poison.
According to one or more of these embodiments, the second ring fuel pins do not comprise burnable poison.
According to one or more of these embodiments, the plurality of rings further comprises a third ring of fuel pins disposed radially outwardly from the central fuel pin and first ring of fuel pins.
According to one or more of these embodiments, the second ring of fuel pins are disposed radially outwardly from the first ring of fuel pins.
According to one or more of these embodiments, each of the third ring fuel pins has a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, each of the third ring fuel pins comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins form the fuel composition of the third ring fuel pins.
According to one or more of these embodiments, the central fuel pin comprises burnable poison.
According to one or more of these embodiments, the first ring fuel pins each comprise burnable poison.
According to one or more of these embodiments, the second ring fuel pins each comprise burnable poison.
According to one or more of these embodiments, the third ring fuel pins do not comprise burnable poison.
According to one or more of these embodiments, the third ring of fuel pins is disposed radially outwardly from the second ring of fuel pins.
According to one or more of these embodiments, the plurality of rings further comprises a third ring of fuel pins disposed radially outwardly from the second ring of fuel pins.
According to one or more of these embodiments, the second ring of fuel pins is disposed radially outwardly from the first ring of fuel pins.
According to one or more of these embodiments, each of the third ring fuel pins has a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, each of the third ring fuel pins comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins form the fuel composition of the third ring fuel pins.
According to one or more of these embodiments, the central fuel pin comprises burnable poison.
According to one or more of these embodiments, the first ring fuel pins each comprise burnable poison.
According to one or more of these embodiments, the third ring fuel pins each comprise burnable poison.
According to one or more of these embodiments, the second ring of fuel pins comprises burnable poison.
According to one or more of these embodiments, the second ring is disposed radially outwardly of the first ring.
According to one or more of these embodiments, the plurality of rings further comprises a third ring of fuel pins disposed radially outwardly from the second ring.
According to one or more of these embodiments, each of the third ring fuel pins has a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, each of the third ring fuel pins comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins form the fuel composition of the third ring fuel pins.
According to one or more of these embodiments, a 235U enrichment of the uranium of the first ring fuel pins is higher than the 235U enrichment of the uranium of the second ring fuel pins.
According to one or more of these embodiments, the 235U enrichment of the uranium of the first ring fuel pins is higher than a 235U enrichment of the uranium of the third ring fuel pins.
According to one or more of these embodiments, the plurality of rings further comprises a third ring of fuel pins disposed radially outwardly from the second ring.
According to one or more of these embodiments, each of the third ring fuel pins has a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, each of the third ring fuel pins comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins form the fuel composition of the third ring fuel pins.
According to one or more of these embodiments, the thorium wt % of the fuel composition of the first ring fuel pins is between 50 and 70 wt %.
According to one or more of these embodiments, the thorium wt % of the fuel composition of the second ring fuel pins is between 60 and 90 wt %.
According to one or more of these embodiments, a thorium wt % of the fuel composition of the third ring fuel pins is between 75 and 99 wt %.
According to one or more of these embodiments, the second ring is disposed radially outwardly from the first ring.
According to one or more of these embodiments, the plurality of rings further comprises a third ring of fuel pins disposed radially outwardly from the second ring.
According to one or more of these embodiments, each of the third ring fuel pins has a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, each of the third ring fuel pins comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins form the fuel composition of the third ring fuel pins.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins differ in composition from the plurality of fuel pellets of the second ring fuel pins.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins differ in composition from the plurality of fuel pellets of the first ring fuel pins.
One or more embodiments provides a fresh fuel bundle comprising a first ring of fuel pins, a second ring of fuel pins, and a third ring of fuel pins.
According to one or more of these embodiments, each of the first, second, and third ring fuel pins comprises a sealed tube and a plurality of fuel pellets disposed in the sealed tube
According to one or more of these embodiments, each of the plurality of fuel pellets of the first, second, and third ring fuel pins have a fuel composition comprising uranium and thorium.
According to one or more of these embodiments, the plurality of fuel pellets of the first ring fuel pins differ in composition from the plurality of fuel pellets of the second ring fuel pins.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins differ in composition from the plurality of fuel pellets of the second ring fuel pins.
According to one or more of these embodiments, the plurality of fuel pellets of the third ring fuel pins differ in composition from the plurality of fuel pellets of the first ring fuel pins.
According to one or more of these embodiments, a 235U enrichment of the uranium of the plurality of fuel pellets of the first ring fuel pins differs from a 235U enrichment of the uranium of the plurality of fuel pellets of the second ring fuel pins.
According to one or more of these embodiments, a uranium weight percentage of the fuel composition of each the plurality of fuel pellets of each of the first ring fuel pins differs from a uranium weight percentage of the fuel composition of each of the plurality of fuel pellets of each the second ring fuel pins.
According to one or more of these embodiments, a thorium weight percentage of the fuel composition of each the plurality of fuel pellets of each of the first ring fuel pins differs from a thorium weight percentage of the fuel composition of each of the plurality of fuel pellets of each the second ring fuel pins.
According to one or more of these embodiments, the first ring of fuel pins is disposed radially inwardly of the second ring of fuel pins and the third ring of fuel pins.
According to one or more of these embodiments, each of the fuel pellets of each of the first ring pins comprises burnable poison.
According to one or more of these embodiments, each of the fuel pellets of each of the second ring pins comprises burnable poison.
According to one or more of these embodiments, each of the fuel pellets of each of the third ring pins do not comprise burnable poison.
According to one or more of these embodiments, the second ring of fuel pins is disposed radially inwardly from the third ring of fuel pins.
One or more of these and/or other aspects of various embodiments of the present invention, as well as the methods of operation and functions of the related elements of structure and the combination of parts and economies of manufacture, will become more apparent upon consideration of the following description and the appended claims with reference to the accompanying drawings, all of which form a part of this specification, wherein like reference numerals designate corresponding parts in the various figures. In one embodiment, the structural components illustrated herein are drawn to scale. It is to be expressly understood, however, that the drawings are for the purpose of illustration and description only and are not intended as a definition of the limits of the invention. In addition, it should be appreciated that structural features shown or described in any one embodiment herein can be used in other embodiments as well. As used in the specification and in the claims, the singular form of “a”, “an”, and “the” include plural referents unless the context clearly dictates otherwise.
All closed-ended (e.g., between A and B) and open-ended (greater than C) ranges of values disclosed herein explicitly include all ranges that fall within or nest within such ranges. For example, a disclosed range of 1-10 is understood as also disclosing, among other ranges, 2-10, 1-9, 3-9, etc. Similarly, where multiple parameters (e.g., parameter C, parameter D) are separately disclosed as having ranges, the embodiments disclosed herein explicitly include embodiments that combine any value within the disclosed range of one parameter (e.g., parameter C) with any value within the disclosed range of any other parameter (e.g., parameter D).
For a better understanding of various embodiments as well as other objects and further features thereof, reference is made to the following description which is to be used in conjunction with the accompanying drawings, where:
The 220 MWe PHWR is a standarised PHWR design developed and operated in India. This well known type of reactor will hereinafter be referred to as an “220 MWe PHWR,” even if the reactor is not physically located in India.
The Indian 220 MWe PHWR uses natural uranium (i.e., non-enriched uranium) in a low burnup open fuel cycle. Due to the use of natural uranium and the potential of exploitation for plutonium production as well as the concerns with nuclear waste produced, the current design is not favoured for export and its utilisation is limited to domestic electricity production. With the 220 MWe PHWR, spent fuel has a low burnup. Various non-limiting embodiments of the present invention provide an alternative fuel cycle for use in the 220 MWe PHWR to address the proliferation and nuclear waste concerns. Various non-limiting embodiments of the present invention are based on the adaptation of the 220 MWe design for a high burnup once-through fuel cycle based on thorium, providing a 220 MWe ThPHWR 5 with a reactor 10 housing a core 200 that comprises thorium-LEU fuel bundles 100.
As shown in
According to various embodiments, a thorium based fuel cycle reduces or eliminates any proliferation risks given that fissile plutonium breeding is insignificant and uranium-233, because of associated uranium-232 contamination, is not practical for use in nuclear weapons. On the other hand, a high burnup fuel cycle is favoured as the amount of radioactive waste generated is significantly reduced. According to various non-limiting embodiments, a thorium-LEU fuel in PHWR may provide the best proliferation resistance among all water reactor types.
According to various non-limiting embodiments of the present invention, the overall systems and plant design of the 220 Mwe PHWR (see
According to various non-limiting embodiments of the present invention, the impacts of the design changes (converting a 220 Mwe PHWR into a 220 Mwe ThPHWR 5, 10) are limited to the core 20 characteristics rather than the overall plant 5, which reduces the effort required to implement and license the modified design.
According to various non-limiting embodiments of the present invention, the impacts of the design modification may include one or more of the following:
According to various non-limiting embodiments of the present invention, a thorium fuel cycle is based on the following restrictions:
According to various non-limiting embodiments of the present invention, a thorium fueled once-through high burnup nuclear reactor cycle is provided.
One or more non-limiting embodiments retains, to the extent possible, all design features of the 220 Mwe PHWR. Such an approach may lead to minimising the effort required to establish the safety case of the reactor and allows implementation of one or more non-limiting embodiments in the near future. On the reactor core side, the geometry of the core, the number of fuel channels and the size of the core are not changed. On the fuel bundle side, the external dimensions of fuel pins and the shape of the fuel bundle are not changed. That is, one or more non-limiting embodiments provide a fuel bundle 100 that contains 19 fuel pins with overall length of 49.53 cm. The changes in the fuel bundle 100 design according to various non-limiting embodiments may be limited to:
As explained in greater detail below, a ThPHWR 5 includes a reactor and reactor vessel 10 (shown as a circle in
The fuel composition of each pellet 300 according to one or more embodiments is a thorium-uranium mixed oxide with low enrichment uranium (LEU). In the initial design studies, the fuel composition was specified to 80% by weight thorium with 20% uranium enrichment.
As used herein, the terms “thorium” and “thorium oxide” are used interchangeably, and both refer to thorium oxide (ThO2). Similarly, as used herein, the terms “uranium” and “uranium oxide” are used interchangeably, and both refer to uranium oxide (UO2).
Fuel performance analyses show that large fission gas release and fuel pin internal pressure are expected under high burnup conditions if the current design was to be used. In addition, excessive cladding damage was predicted. To address these two issues, the fuel bundle 100 design was modified as follows:
As shown in
As shown in
According to various embodiments, the fuel composition (on a weight percentage basis) of each pellet 300 (and, by extension, each fuel pin 200 made up of such pellets 300) comprises:
As explained in further detail below, some fuel pellets 300 omit uranium entirely, such that the fuel composition of the resulting pellet 300c is 100% thorium. As explained below the pellets 300c are used in thorium fuel pins 200d that are used in thorium bundles 100c.
According to various embodiments, fuel pellets 300 of differing fuel composition may be used within a single pin 200 or different pins 200a, 200b, 200c, 200d. For example, as shown in
According to various embodiments, the LEU of the fuel pellets 300 has a 235U enrichment of at least 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, and/or 16%, a 235U enrichment of less than or equal to 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, and/or 6%, and or any value between any two such values (e.g., a 235U enrichment of between 5 and 20%, between 10 and 18%, between 12 and 16%, about 13%, about 15%). According to various embodiments, the 235U enrichment of the LEU differs between different fuel pellets 300 within a single pin 200. According to various embodiments, as shown in
As shown in
As illustrated in
As shown in
As with conventional fuel bundles, circular end plates with openings for coolant to pass there through are welded or otherwise attached to the axial ends of the fuel pins 200a, 200b, 200c to maintain the pins 200 in the locations shown in
With these considerations, as shown in
The fuel composition of the fuel bundle 100 is summarised in
According to various alternative embodiments, the fuel composition of any of the fuel pins 200, 200a, 200b may be varied by using fuel pellets 300 having any of the above-discussed fuel compositions (or further alternative fuel compositions) without deviating from the scope of the present invention.
As a result of these various combinations:
The composition of the fuel bundles 100a, 100b, pins 200a, 200b, 200c, and pellets 300a, 300a′, 300b described herein may be modified in a variety of ways according to a variety of alternative embodiments.
According to one or more alternative embodiments of the fuel bundles 100a, 100b, and/or fuel pins 200a, 200b, 200c, the fuel pellets 300a, 300a′, 300b may utilize more highly enriched uranium than in one or more of the above described embodiments (e.g., (a) at least 15, 16, 17, and/or 18% 235U enrichment, (b) less than or equal to 19.95, 19, and/or 18% 235U enrichment, and/or (c) between any two such upper and lower values (e.g., between 15 and 19.95% 235U enrichment, between 16 and 19% 235U enrichment, about 17.8% 235U enrichment).
According to one or more of these embodiments, the 235U enrichment level of the uranium in each of the pellets 300a, 300a′, 300b may be standardized across many or all of the fuel bundles 100a, 100b, fuel pins 200a, 200b, 200c, and/or fuel pellets 300a, 300a′, 300b.
According to one or more of these embodiments, burnable poison may be provided in the outer ring pins 200c and pellets 300b, rather than in the middle ring fuel pins 200b and pellets 300a′. According to various embodiments, the burnable poison used in the outer ring pins 200c and pellets 300b comprises Erbium Oxide at a concentration of (a) at least 0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1.0, 1.1, 1.2, and/or 1.3 wt % of the pellet, (b) less than or equal to 3.0, 2.5, 2.4, 2.3, 2.2, 2.1, 2.0, 1.9, 1.8, 1.7, 1.6, 1.5, 1.4, and/or 1.3 wt % of the pellet, and/or (c) between any two such values (e.g., between 0.1 and 3.0 wt % of the pellet, between 1.0 and 2.0 wt % of the pellet, about 1.3 wt % of the pellet).
According to one or more of these embodiments, the thorium concentration of the fuel in the pellets 300a, 300a′ of the middle ring pins 200b may be higher than in one or more of the above-discussed embodiments, for example, (a) at least 71, 72, 73, 74, and/or 75 wt % of fuel, (b) less than or equal to 84, 83, 82, 81, 80, 79, 78, 77, 76, and/or 75 wt % of fuel, and/or (c) between any two such values (e.g., between 71 and 84 wt % of fuel, between 72 and 78 wt % of fuel, about 75 wt % of fuel).
According to various alternative embodiments, Th/U fuel bundles 100 may comprise:
According to various alternative embodiments, Th/U fuel bundles 100 may comprise:
In the illustrated embodiment, the reactor 1005, reactor vessel/housing 1010, calandria tubes 1030, and pressure tubes 1040 are well-known components of a CANDU type reactor to which one or more non-limiting embodiments are directed, so an exhaustive description of these conventional components of a CANDU reactor are omitted Similarly, the dimensions and configurations of the fuel bundles 1100 and pins 1200a, 1200b, 1200c, 1200d are likewise well-known in connection with the CANDU reactor to which various non-limiting embodiments are directed, so an exhaustive description of such dimensions and configurations is omitted.
As shown in
As shown in the non-limiting embodiment illustrated in
According to one or more embodiments of the fuel bundles 1100 and/or fuel pins 1200a, 1200b, 1200c, and/or 1200d, the fuel pellets 1300a, 1300b, and/or 1300c utilize uranium enriched to (a) at least 13, 14, 15, 16, 17, and/or 18% 235U enrichment, (b) less than or equal to 19.95, 19, 18, and/or 17% 235U enrichment, and/or (c) between any two such upper and lower values (e.g., between 13 and 19.95% 235U enrichment, between 16 and 19% 235U enrichment, about 16, 17, 18, or 19% 235U enrichment).
According to various non-limiting embodiments, the 235U enrichment of the fuel pellets 1300a in the central fuel pin 1200a and/or first ring fuel pins 1200b are equal to each other. However, according to one or more alternative embodiments, the enrichment level of the fuel pellets in the central pin 1200a may be higher or lower than the enrichment of the fuel pellets in the first ring fuel pins 1200b.
According to various non-limiting embodiments, the 235U enrichment of the fuel pellets 1300a in the central fuel pin 1200a and/or first ring fuel pins 1200b is higher than the 235U enrichment of the fuel pellets 1300b in the second ring pins 1200c and/or the fuel pellets 1300c in the outer ring pins 1200d by (a) at least 0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1.0, 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9, 2.0, 2.1, 2.2, 2.3, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9, 3.0, 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, 7.0, 7.5, and/or 8.0 absolute %, (b) less than or equal to 8.0, 7.5, 7.0, 6.5, 6.0, 5.5., 5.0, 4.5, 4.0, 3.9, 3.8, 3.7, 3.6, 3.5, 3.4, 3.3, 3.2, 3.1, 3.0, 2.9, 2.8, 2.7, 2.6, 2.5, 2.4, 2.3, 2.2, 2.1, 2.0, 1.9, 1.8, 1.7, 1.6, 1.5, 1.4, 1.3, 1.2, 1.1, 1.0, 0.9, 0.8, 0.7, 0.6, 0.5, 0.4, 0.3, and/or 0.2 absolute %, and/or (c) any value between such upper and lower limits (e.g., between 0.1 and 8.0 absolute %, between 0.5 and 1.5 absolute %, between 1.5 and 2.5 absolute %, about 1 absolute %, about 3 absolute %). As used herein, ‘absolute %” of enrichment means percentage of enrichment, not a percentage deviation from another enrichment value. As a result, a fuel pellet 1300a with a 19% enrichment has 2 absolute % higher enrichment than a pellet 1300b with a 17% enrichment.
According to various non-limiting embodiments, the 235U enrichment of the fuel pellets 1300b in the second ring pins 1200c is higher than the 235U enrichment of the fuel pellets 1300c in the outer ring pins 1200d by (a) at least 0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1.0, 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9, 2.0, 2.1, 2.2, 2.3, 2.4, 2.5, 2.6, 2.7, 2.8, 2.9, 3.0, 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, 3.9, 4.0, 4.5, 5.0, 5.5, 6.0, 6.5, and/or 7.0 absolute %, (b) less than or equal to 7.0, 6.5, 6.0, 5.5., 5.0, 4.5, 4.0, 3.9, 3.8, 3.7, 3.6, 3.5, 3.4, 3.3, 3.2, 3.1, 3.0, 2.9, 2.8, 2.7, 2.6, 2.5, 2.4, 2.3, 2.2, 2.1, 2.0, 1.9, 1.8, 1.7, 1.6, 1.5, 1.4, 1.3, 1.2, 1.1, 1.0, 0.9, 0.8, 0.7, 0.6, 0.5, 0.4, 0.3, and/or 0.2 absolute %, and/or (c) any value between such upper and lower limits (e.g., between 0.1 and 7.0 absolute %, between 0.5 and 1.5 absolute %, about 1 absolute %).
According to one or more non-limiting embodiments, the fuel pellets 1300a and/or 1300b and/or the pins 1200a, 1200b, and/or 1200c include burnable poison. According to various embodiments, the burnable poison used in the pellets 1300a and/or 1300b and/or pins 1200a, 1200b, and/or 1200c comprises Europium Oxide at a concentration of (a) at least 0.05, 0.06, 0.07, 0.08, 0.09, 0.1, 0.11, 0.12, 0.13, 0.14, 0.15, 0.16, 0.17, 0.18, 0.19, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1.0, 1.1, 1.2, and/or 1.3 wt % of the pellet, (b) less than or equal to 3.0, 2.5, 2.4, 2.3, 2.2, 2.1, 2.0, 1.9, 1.8, 1.7, 1.6, 1.5, 1.4, 1.3, 1.2, 1.1, 1.0, 0.9, 0.8, 0.7, 0.6, 0.5, 0.4, 0.3, 0.2, 0.15, 0.14, 0.13, 0.12, 0.11, 0.1, 0.09, 0.08, 0.07, 0.06, and/or 0.05 wt % of the pellet, and/or (c) between any two such values (e.g., between 0.05 and 3.0 wt % of the pellet, between 1.0 and 2.0% of the pellet, about 1.2 wt % of the pellet, between 0.05 wt % and 0.2 wt %, between 0.05 and 0.15 wt %). According to various embodiments, a burnable poison concentration in the fuel pellets 1300a and/or central and first pins 1200a, 1200b is higher than the burnable poison (e.g., Europium Oxide) concentration in the fuel pellets 1300b and/or second ring pins 1200c by (a) at least 0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1.0, and/or 1.0 absolute wt %, (b) less than 2.0, 1.9, 1.8, 1.7, 1.6, 1.5, 1.4, 1.3, 1.2, 1.1, 1.0, 0.9, 0.8, 0.7, 0.6, 0.5, 0.4, 0.3, 0.2, and/or 0.1 absolute wt %, and/or (c) between any two such values (e.g., between 0.1 and 2.0 absolute wt %, between 0.5 and 1.7 absolute wt %, about 1.1 absolute wt %). According to one or more non-limiting embodiments, the fuel pellets 1300a have a Europium Oxide concentration of 1.2 wt %, and the fuel pellets 1300b have a Europium Oxide concentration of 0.1 wt % such that the pellets 1300a have a 1.1 absolute wt % higher Europium Oxide concentration than the pellets 1300b. According to one or more alternative embodiments, any other burnable poison (e.g., Erbium Oxide) may additionally and/or alternatively be used.
According to various alternative embodiments, burnable poison (e.g., Europium Oxide and/or Erbium Oxide in the concentrations discussed in any of the above embodiments) may additionally and/or alternatively be provided in the fuel pellets 1300c and/or pins 1200d.
According to one or more embodiments, the thorium fuel concentration (i.e., a wt % thorium as a portion of the overall fuel weight) in the fuel pellets 1300a of the central pin 1200a and/or first ring pins 1200b that is (a) at least 45, 50, 55, 57.5, 60, 62.5, and/or 65 wt %, (b) less than or equal to 90, 85, 80, 75, 70, 65, 62.5, and/or 60 wt %, and/or (c) between any two such values (e.g., between 45 and 90 wt %, between 50 and 70 wt %, between 55 and 65 wt %, between 57.5 and 62.5 wt %, about 65 wt %). According to various non-limiting embodiments, a balance of the pellet's fuel composition is uranium (e.g., 65 wt % thorium and 35 wt % uranium).
According to one or more embodiments, the thorium fuel concentration (i.e., a wt % thorium as a portion of the overall fuel weight) in the fuel pellets 1300b of the second ring pins 1200c is (a) at least 55, 60, 65, 70, 72.5, 75, and/or 77.5 wt %, (b) less than or equal to 95, 90, 85, 80, 77.5, 75, and/or 72.5 wt %, and/or (c) between any two such values (e.g., between 55 and 95 wt %, between 65 and 85 wt %, between 70 and 80 wt %, between 72.5 and 77.5 wt %, about 75 wt %). According to various non-limiting embodiments, a balance of the pellet's fuel composition is uranium (e.g., 75 wt % thorium and 25 wt % uranium).
According to one or more embodiments, the thorium fuel concentration (i.e., a wt % thorium as a portion of the overall fuel weight) in the fuel pellets 1300c of the outer ring pins 1200d is (a) at least 55, 60, 65, 70, 75, 80, 82.5, 85, and/or 87.5 wt %, (b) less than or equal to 99, 95, 90, 87.5 85, and/or 82.5 wt %, and/or (c) between any two such values (e.g., between 55 and 99 wt %, between 75 and 95 wt %, between 80 and 90 wt %, between 82.5 and 87.5 wt %, about 85 wt %). According to various non-limiting embodiments, a balance of the pellet's fuel composition is uranium (e.g., 85 wt % thorium and 15 wt % uranium).
According to one or more of these embodiments, the thorium fuel concentration in the pellets 1300c of the outer ring pins 1200d is higher than the thorium fuel concentration in the fuel pellets 1300b and/or 1300c of the second ring pins 1200c, the first ring pins 1200b, and/or the central pin 1200a. According to various non-limiting examples, the thorium fuel concentration (i.e., a wt % thorium as a portion of the overall fuel weight) in the pellets 1300c is higher than the thorium fuel concentration in the pellets 1300b by (a) at least 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, and/or 15 absolute wt %, (b) less than 25, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, and/or 1 absolute wt %, and/or (c) a value between any two such values (e.g., between 1 and 25 absolute wt %, between 5 and 15 wt %, about 10 wt %). According to various non-limiting examples, the thorium fuel concentration in the pellets 1300c is higher than the thorium fuel concentration in the pellets 1300a by (a) at least 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, and/or 30 absolute wt %, (b) less than 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, and/or 1 absolute wt %, and/or (c) a value between any two such values (e.g., between 1 and 30 absolute wt %, between 20 and 30 wt %, about 25 wt %).
According to one or more embodiments, the thorium fuel concentration in the pellets 1300b of the second ring pins 1200c is higher than the thorium fuel concentration in the fuel pellets 1300a of the first ring pins 1200b and/or central pin 1200a. According to various non-limiting examples, the thorium fuel concentration in the pellets 1300b is higher than the thorium fuel concentration in the pellets 1300a by (a) at least 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, and/or 20 absolute wt %, (b) less than 30, 25, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, and/or 1 absolute wt %, and/or (c) a value between any two such values (e.g., between 1 and 30 absolute wt %, between 5 and 25 absolute wt %, between 10 and 20 absolute wt %, and/or about 15 absolute wt %).
As used herein, ‘absolute wt %” means percentage of the overall fuel content, not a percentage deviation from another value. As a result, a fuel pellet 1300a with a 60 wt % thorium fuel concentration has 15 absolute wt % less concentration than a fuel pellet 1300b with a 75 wt % thorium fuel concentration.
According to various non-limiting embodiments, the composition (e.g., 235U enrichment level, thorium/uranium concentration, poison concentration) of all fuel pellets 1300a in the central pin 1200a and/or the first ring pins 1200b may be the same. According to various non-limiting embodiments, the composition of all fuel pellets 1300b in the second ring pins 1200c may be the same. According to various non-limiting embodiments, the composition of all fuel pellets 1300c in the outer ring pins 1200d may be the same. According to various alternative embodiments, different pins within a given ring may utilize pellets with different compositions. According to various alternative embodiments, the fuel pellets within a given pin may have different compositions than each other.
According to various non-limiting embodiments, the fuel is utilized in an open fuel cycle where thorium is converted to U233 which is burned in-situ. According to various non-limiting embodiments, the fuel is burned to levels that are not achievable with current CANDU/PHWR fuels. According to various non-limiting embodiments, residual amounts of fissile material is not significant for use in non power reactor applications. The fuel is characterized by inherent safety features such as strongly negative fuel temperature reactivity coefficient and reduced coolant void reactivity.
The above described embodiments involve fuel 100, 200, 300 for a 220 MWe PHWR or fuel 1100, 1200, 1300 for a CANDU 600 MWe reactor. However, various embodiments can be used on other types of PHWRs without deviating from the scope of the invention. For example, various of the above-described embodiments can be applied to other Indian PHWRs (e.g., Indian 540 MWe PHWR, Indian 700 MWe PHWR) or other CANDU reactors (e.g., 300 or 900 MWe), and may use fuel bundles with greater or fewer pins than the 19-pin and 37-pin embodiments in the above-described embodiments.
Unless otherwise explicitly stated, the compositions (e.g., in terms of wt %, fuel, burnable poison, etc.) herein for pellets, pins, and fuel bundles refer to the composition for a fresh, non-irradiated pellet, pin, or fuel bundle before being used in the reactor, rather than the composition after irradiation within the reactor. A fresh pellet may comprise recycled uranium, depleted uranium, natural uranium, and/or uranium from any other source, including sources of previously irradiated uranium Similarly, a fresh pellet may comprise thorium from any source, including sources that have been previously irradiated.
The foregoing illustrated embodiments are provided to illustrate the structural and functional principles of various embodiments and are not intended to be limiting. To the contrary, the principles of the present invention are intended to encompass any and all changes, alterations and/or substitutions thereof (e.g., any alterations within the spirit and scope of the following claims).
This application is a divisional application of U.S. application Ser. No. 18/210,437 (filed Jun. 15, 2023), which is a divisional application of U.S. application Ser. No. 18/195,112 (filed May 9, 2023; now U.S. Pat. No. 11,929,183), which is a divisional application of U.S. application Ser. No. 17/838,928 (filed Jun. 13, 2022; now U.S. Pat. No. 11,705,249), which is a continuation of International Application No. PCT/US21/47719 (filed Aug. 26, 2021), and claims priority of U.S. Provisional Application No. 63/186,990 (filed May 11, 2021), all of which are titled “Thorium-Based Fuel Design For Pressurized Heavy Water Reactors,” the entire contents of each of which are hereby incorporated by reference herein.
Number | Date | Country | |
---|---|---|---|
63186990 | May 2021 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 18210437 | Jun 2023 | US |
Child | 18811843 | US | |
Parent | 18195112 | May 2023 | US |
Child | 18210437 | US | |
Parent | 17838928 | Jun 2022 | US |
Child | 18195112 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/US21/47719 | Aug 2021 | WO |
Child | 17838928 | US |