“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 1, “F” Technology -the First Half-Million Operating Hours, H. E. Miller, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 2, “GE Heavy-Duty Gas Turbine Performance Characteristics”, F. J. Brooks, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 3, “9EC 50Hz 170-MW Class Gas Turbine”, A. S. Arrao, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 4, “MWS6001FA -An Advanced-Technology 70-MW Class 50/60 Hz Gas Turbine”, Ramachandran et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 5, “Turbomachinery Technology Advances at Nuovo Pignone”, Benvenuti et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 6, “GE Aeroderivative Gas Turbines -Design and Operating Features”, M. W. Horner, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 7, “Advance Gas Turbine Materials and Coating”, P. W. Schilke, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 8, “Dry Low Nox Combustion Systems for GE Heavy-Duty Turbines”, L. B. Davis, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 9, “GE Gas Turbine Combustion Flexibility”, M. A. Davi, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 10, “Gas Fuel Clean-Up System Design Considerations for GE Heavy-Duty Gas Turbines”, C. Wilkes, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 11, “Integrated Control Systems for Advanced Combined Cycles”, Chu et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 12, “Power Systems for the 21st Century “H”Gas Turbine Combined Cycles”, Paul et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 13, “Clean Coal and Heavy Oil Technologies for Gas Turbines”, D. M. Todd, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 14, “Gas Turbine Conversions, Modifications and Uprates Technology”, Stuck et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 15, “Performance and Reliabilty Improvements for Heavy-Duty Gas Turbines,” J. R. Johnston, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 16, “Gas Turbine Repair Technology”, Crimi et al, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 17, “Heavy Duty Turbine Operating & Maintenance Considerations”, R. F. Hoeft, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 18, “Gas Turbine Performance Monitoring and Testing”, Schmitt et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 19, “Monitoring Service Delivery System and Diagnostics”, Madej et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 20, “Steam Turbines for Large Power Applications”, Reinker et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 21, “Steam Turbines for Ultrasupercritical Power Plants”, Retzlaff et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 22, “Steam Turbine Sustained Efficiency”, P. Schofield, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 23, “Recent Advances in Steam Turbines for Industrial and Cogeneration Applications”, Leger et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 24, “Mechanical Drive Steam Turbines”, D. R. Leger, Aug. 1996. |
“Extensive Testing Program Validates High Efficiency, reliability of GE's Advanced “H ” Gas Turbine Technology”, Press Information, Press Release, 96-NR14, Jun. 26, 1996, H Technology TEsts/pp. 1-4. |
“Extensive Testing Program Validates High Efficiency, Reliability of GE's Advanced “H” Gas Turbine Technology”, GE Introduces Advanced Gas Turbine Technology Platform: First to Reach 60% Combined-Cycle Power Plant Efficiency, Press Information, Press Release, Power-Gen Europe '95, 95-NRR15, Advanced Tecnology Introduction pp. 1-6. |
“Gas, Steam Turbine Work as Single Unit in GE's Advanced H Technology Combined-Cycle System”, Press Information, Press Release, 95-NR18, May 16, 1995, Advanced Technology Introduction/pp. 1-3. |
“GE Breaks 60% Net Efficiency Barrier”paper, 4 pages, No Date. |
“GE Businesses Share Technologies and Experts to Develop State-Of-The-Art Products”, Press Information, Press Release 95-NR10, May 16, 1995, GE Technology Transfer/pp. 1-3. |
“General Electric ATS Program Technical Review, Phase 2 Activities”, T. Chance et al., pp. 1-4, No Date. |
“General Electric DOE/ATS H Gas Turbine Development” Advanced Turbine Systems Annual Review Meeting, Nov. 7-8, 1996, Washington, D. C., Publication Release. |
“H Technology Commericialization”, 1998 MarComm Activity Recommendation, Mar., 1998. |
“H Technology”, Jon Ebacher, VP, Power Gen Technology, May 8, 1998. |
“H Testing Process”, Jon Ebacher, VP, Power Gen Technology, May, 1998. |
“Heavy-Duty & Aeroderivative Products”Gas Turbines, Brochure, 1998. |
“MS7001H/MS9001H Gas Turbine, gepower.com website for PowerGen Europe”Jun. 1-3 going public Jun. 15, (1995). |
“New Steam Cooling System is a Key to 60% Efficiency For GE“H” Technology Combined-Cycle Systems”, Press Information, Press Release, 95-NRR16, May 16, 1995 to Dec. 31, 1997. |
“Overview of GE's H Gas Turbine Combined Cycle”, Jul. 1, 1995, H Technology/pp. 1-3. |
“Power Systems for the 21stCentury -“H” Gas Turbine Combined Cycles”, Thomas C. Paul et al., Report, no date. |
“Power-Gen '96 Europe”, Conference Programme, Budapest, Hungary, Jun. 26-28, 1996. |
“Power-Gen International”, 1998 Show Guide, Dec. 9-11, 1998, Orange County Convention Center, Orlando, Florida. |
“Press Coverage following 1995 product announcement”; various newspaper clippings relating to improved generator. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Industrial Advanced Turbine Systems Program Overview”, D. W. Esbeck, pp. 3-13, Oct. , 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Overview of Westinghouse's Advanced Turbine Systems Program”, Bannister et al., pp. 22-10, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Allison Engine ATS Program Technical Review”, D. Mukavetz, pp. 31-42. Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Turbine Systems Program Industrial System Concept Development”, S. Gates, pp. 43-63, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “General Electric ATS Program Phase 2 Cycle Selection”, Latcovich, Jr., pp. 64-69, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “General Electric ATS Program Technical Review Phase 2 Activities”, Chance et al., pp. 70-74, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Technical Review of Westinghouse's Advanced Turbine Systems Program”, Diakunchak et al., pp. 75-86, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Combustion Turbines and Cycles: An EPRI Perspective”, Touchton et al., pp. 87-88, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Turbine Systems Annual Program Review”, William E. Koop, pp. 89-92, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “The AGTSR Consortium: An Update”, Fant et al., pp. 93-102, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Overview of Allison/AGTSR Interactions”, Sy A. Ali, pp. 103-106, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Design Factors for Stable Lean Premix Combustion”, Richards et al., p. 107-113, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Ceramic Stationary as Turbine”, M. van Roode, pp. 114-1147, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “DOE/Allison Ceramic Vane Effort”, Wenglarz et al., pp. 148-151, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Materials/Manufacturing Element of the Advanced Turbine Systems Program”, Karnitz et al., pp. 152-160, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Land-Based Turbine Casting Initiative”, Mueller et al., pp. 161-170, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Turbine Airfoil Manufacturing Technology”, Kortovich, pp. 171-181, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Pratt & Whitney Thermal Barrier Coatings”, Goedjen et al., pp. 194-199, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Westinhouse Thermal Barrier Coatings”, Goedjen et al., pp. 194-199, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “High Perofrmance Steam Development”, Duffy et al., pp. 200-220. Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Lean Premixed Combustion Stabilized by Radiation Feedback and heterogeneous Catalysis”, Dibble et al., pp. 221-232, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Rayleigh/Raman/LIF Measurements in a Turbulent Lean Premixed Combustor”, Nandula et al. pp. 233-248, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Lean Premixed Flames for Low NoxCombustors”, Sojka et al., pp. 249-275, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Functionally Gradient Materials for Thermal Barrier Coatings in Advanced Gas Turbine Systems”, Banovic et al., pp. 276-280, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Advanced Turbine Cooling, Heat Transfer, and Aerodynamic Studies”, Han et al., pp. 281-309, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Life Prediction of Advanced Materials for Gas Turbine Application”, Zamrik et al., pp. 310-327, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Advanced Combustion Technologies for Gas Turbine Power Plants”, Vandsburger et al., pp. 328-352, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Combustion Modeling in Advanced Gas Turbine Systems”, Smoot et al., pp. 353-370, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Heat Transfer in a Two-Pass Internally Ribbed Turbine Blade Coolant Channel with Cylindrical Vortex Generator”, Hibbs et al. pp. 371-390, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Rotational Effects on Turbine Blade Cooling”, Govatzidakia et al., pp. 391-392, Oct., 1995. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 25, “Steam Turbines for STAG™ Combined-Cycle Power Systems”, M. Boss, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 26, “Cogeneration Application Considerations”, Fisk et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 27, “Performance and Economic Considerations of Repowering Steam Power Plants”, Stoll et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 28, “High-Power-Density™ Steam Turbine Design Evolution”, J. H. Moore, Aug 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 29, “Advances in Steam Path Technologies”, Cofer, IV, et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 30, “Upgradable Opportunities for Steam Turbines”, D. R. Dreier, Jr., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 31, “Uprate Options for Industrial Turbines”, R. C. Beck, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 32, “Thermal Performance Evaluation and Assessment of Steam Turbine Units”, P. Albert, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 33, “Advances in Welding Repair Technology”J. F. Nolan, Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 34, “Operation and Maintenance Strategies to Enhance Plant Profitability”, MacGillivray et al. Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 35, “Generator Insitu Inspections”, D. Stanton, No Date. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 36, “Generator Upgrade and Rewind”, Halpern et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 37, “GE Combined Cycle Product Line and Performance”, Chase, et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 38, “GE Combined Cycle Experience”, Maslak et al., Aug. 1996. |
“39th GE Turbine State-of-the-Art Technology Seminar”, Tab 39, “Single-Shaft Combined Cycle Power Generation Systems”, Tomlinson et al., Aug. 1996. |
“Advanced Turbine System Program -Conceptual Design and Product Development”, Annual Report, Sep. 1, 1994 -Aug 31, 1995. |
“Advanced Turbine Systems (ATS Program) Conceptual Design and Product Development”, Final Technical Progress Report, vol. 2-Industrial Machine, Mar. 31, 1997, Morgantown, WV. |
“Advanced Turbine Systems (ATS Program), Conceptual Design and Product Development”, Final Technical Progress Report, Aug. 31, 1996, Morgantown, WV. |
“Advanced Turbine Systems (ATS) Program, Phase 2, Conceptual Design and Product Development”, Yearly Technical Progress Report, Reporting Period: Aug. 25, 1993 -Aug. 31, 1994. |
“Advanced Turbine Systems” Annual Program Review, Preprints, Nov. 2-4, 1998, Washington, D.C. U.S. Department of Energy, Office of Industrial Technologies Federal Energy Technology Center. |
“ATS Conference” Oct, 28, 1999, Slide Presentation. |
“Baglan Bay Launch Site”, various articles relating to Baglan Energy Park. |
“Baglan Energy Park”, Brochure, No Date. |
“Commercialization”, Del Williamson, Present, Global Sales, May 8, 1998. |
“Environmental, Health and Safety Assessment: ATS 7H Program (Phase 3R) Test Activities at the GE Power Systems Gas Turbine Manufacturing Facility, Greenville, SC”, Document #1753, Feb. 1998, Publication Date: Nov. 17, 1998, Report Numbers DE-FC212-95MC31176--11. |
“Exhibit panels used at 1995 product introduction at PowerGen Europe”, No date. |
“Extensive Testing Program Validates High Efficiency, reliability of GE's Advanced “H” Gas Turbine Technology”, Press Information, Press Release, 96-NR14, Jun. 26, 1996, H Technology Tests/pp. 1-4. |
“Extensive Testing Program Validates High Efficiency, Reliability of GE's Advanced “H” Gas Turbine Technology”, GE Introduces Advanced Gas Turbine Technology Platform: First ot Reach 60% Combined-Cycle Power Plant Efficiency, Press Information, Press Release, Power-Gen Europe '95, 95-NRR15, Advanced Technology Introduction/pp. 1-6. |
“Gas, Steam Turbine Work as Single Unit in GE's Advanced H Technology Combined-Cycle System”, Press Information, Press Release, 95-NR18, May 16, 1995, Advanced Technology Introduction/pp. 1-3. |
“GE Breaks 60% Net Efficiency Barrier”paper, 4 pp., no date. |
“GE Businesses Share Technologies and Experts to Develop State-Of-The-Art Products”, Press Information, Press Release 95-NR10, May 16, 1995, GE Technology Transfer/pp. 1-3. |
“General Electric ATS Program Technical Review, Phase 2 Activities”, T. Chance et al., pp. 1-4, no date. |
“General Electric's DOE/ATS H Gas Turbine Development” Advanced Turbine Systems Annual Review Meeting, Nov. 7-8, 1996, Washington, D.C., Publication Release. |
“H Technology Commercialization”, 1998 MarComm Activity Recommendation, Mar., 1998. |
“H Technology”, Jon Ebacher, VP, Power Gen Technology, May 8, 1998. |
“H Testing Process”, Jon Ebacher, VP, Power Gen Technology, May 8, 1998. |
“Heavy-Duty & Aeroderivative Products” Gas Turbines, Brochure, 1998. |
“MS7001H/MS9001H Gas Turbine, gepower.com website for PowerGen Europe” Jun. 1-3 going public Jun. 15, (1995). |
“New Steam Cooling System is a Key to 60% Efficiency For GE “H” Technology Combined-Cycle Systems”, Press Information, Press Release, 95-NRR16, May 16, 1995, H Technology/pp. 1-3. |
“Overview of GE's H Gas Turbine Combined Cycle”, Jul. 1, 1995 to Dec. 31, 1997. |
“Power Systems for the 21st Century -“H” Gas Turbine Combined Cycles”, Thomas C. Paul et al., Report, no date. |
“Power-Gen '96 Europe”, Conference Programme, Budapest, Hungary, Jun. 26-28, 1996. |
“Power-Gen International”, 1998 Show Guide, Dec. 9-11, 1998, Orange County Convention Center, Orlando, Florida. |
“Press Coverage following 1995 product announcement”, various newspaper clippings relating to improved generator. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Industrial Advanced Turbine Systems Program Overview”, D. W. Esbeck, pp. 3-13, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “H Gas Turbine Combined Cycle”, J. Corman, pp. 14-21, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Overview of Westinghouse's Advanced Turbine Systems Program”, Bannister et al., pp. 22-30, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Allison Engine ATS Program Technical Review”, D. Mukavetz, pp. 31-42, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Turbine Systems Program Industrial System Concept Development”, S. Gates, pp. 43-63, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Turbine System Program Phase 2 Cycle Selection”, Latcovich, Jr., pp. 64-69, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “General Electric ATS Program Technical Review Phase 2 Activities”, Chance et al., pp. 70-74, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Technical Review of Westinghouse's Advanced Turbine Systems Program”, Diakunchak et al., pp. 75-86, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Combustion Turbines and Cycles: An EPRI Perspective”, Touchton et al., pp. 87-88, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Advanced Turbine Systems Annual Program Review”, William E. Koop, pp. 89-92, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “The AGTSR Consortium: An Update”, Fant et al., pp. 93-102, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Overview of Allison/AGTSR Interactions”, Sy A. Ali, pp. 103-106, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Design Factors for Stable Lean Premix Combustion”, Richards et al., pp. 107-113, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”vol. I, “Ceramic Stationary as Turbine”, M. van Roode, pp. 114-147, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “DOE/Allison Ceramic Vane Effort”, Wenglarz et al., pp. 148-151, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Materials/Manufacturing Element of the Advanced Turbine Systems Program”, Karnitz et al., pp. 152-160, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Land-Based Turbine Castings Initiative”, Mueller et al., pp. 161-170, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Turbine Airfoil Manufacturing Technology”, Kortovich, pp. 171-181, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Pratt & Whitney Thermal Barrier Coatings”, Bornstein et al., pp. 182-193, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “Westinhouse Thermal Barrier Coatings”, Goedjen et al., pp. 194-199, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. I, “High Performance Steam Development”, Duffy et al., pp. 200-220, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Lean Premixed Combustion Stabilized by Radiation Feedback and heterogeneous Catalysis”, Dibble et al., pp. 221-232, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, Rayleigh/Raman/LIF Measurements in a Turbulent Lean Premixed Combustor, Nandula et al. pp. 233-248, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Lean Premixed Flames for Low Nox Combustors”, Sojka et al., pp. 249-275, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Functionally Gradient Materials for Thermal Barrier Coatings in Advanced Gas Turbine Systems”, Banovic et al., pp. 276-280, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Advanced Turbine Cooling, Heat Transfer, and Aerodynamic Studies”, Han et al., pp. 281-309, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Life Prediction of Advanced Materials for Gas Turbine Application”, Zamrik et al., pp. 310-327, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Advanced Combustion Technologies for Gas Turbine Power Plants”, Vandsburger et al., pp. 328-352, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Combustion Modeling in Advanced Gas Turbine Systems”, Smoot et al., pp. 353-370, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Heat Transfer in a Two-Pass Internally Ribbed Turbine Blade Coolant Channel with Cylindrical Vortex Generators”, Hibbs et al. pp. 371-390, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, vol. II, “Rotational Effects on Turbine Blade Cooling”, Govatzidakia et al., pp. 391-392, Oct., 1995. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Heat Transfer in a Two-Pass Internally Ribbed Turbine Blade CoolantChannel with Vortex Generators”, A. Acharya, pp.427-446. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Experimental and Computational Studies of Film Cooling with Compound Angle Injection”, R. Goldstein, pp.447-460, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Study of Endwall Film Cooling with a Gap Leakage Using a Thermographic Phosphor Fluorescence Imaging System”, Mingking K. Chyu, pp. 461-470 Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Steam as a Turbine Blade Coolant: External Side Heat Transfer”, Abraham engeda, pp. 471-482, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Flow and Heat Transfer in Gas Turbine Disk Cavities Subject to Nonuniform External Pressure Filed”, Ramendra Roy, pp. 483-498, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Heat Pipe Turbine Vane Cooling”, Langston et al., pp. 513-534, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review dMeeting”, “EPRI's Combustion Turbine Proggram: Status and Future Directions”, Arthur Cohn, pp. 535-552 Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “ATS Materials Support”, Michael Karnitz, pp. 553-576, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meetin”, “Land Based Turbine Casting Initiative”, Boyd A. Mueller, pp. 577-592, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Turbine Airfoil Manufacturing Technology”, Charles S. Kortovich, pp. 503-622, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Hot Corrosion Testing of TBS's”, Norman Bornstein, pp.623-631, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Ceramic Stationary Gas Turbine”, Mark van Roode, pp. 633-658, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Western European Status of Ceramics for Gas Turbines”, Tibor Bornemisza, pp. 659-670, Nov., 1996. |
“Proceedings of the Advanced Turbine Systems Annual Program Review Meeting”, “Status of Ceramic Gas Turbines in Russia”, Mark van Roode, p. 671, Nov., 1996. |
“Stauts Reprot: The U.S. Department of Energy's Advanced Turbine systems Program”, facsimile dated Nov. 7, 1996. |
“Testing Program Results Validate GE's H Gas Turbine -High Efficiency, Low Cost of Electricity and Low Emissions”, Roger Schonewald and Patrick Marolda (no date available). |
“Testing Program Results Validate GE's H Gas Turbine -High Efficiency, Low Cost of Electricity and Low Emissions”, Slide Presentation -working draft, (no date available). |
“The Next Step in H . . . For Low Cost Per kW-Hour Power Generation”, LP-1 PGE '98. |
“Utility Advanced Turbine System (ATS) Technology Readiness Testing and Pre-Commericialization Demonstration ”, Document #486040, Oct. 1-Dec. 31, 1996, Publication Date, Jun. 1, 1997, Report Numbers: DOE/MC/31176-5628. |
“Utility Advanced Turbine System(ATS) Technology Readiness Testing —Phase 3”, Document #666274, Oct. 1, 1996-Sep. 30, 1997, Publication Date, Dec. 31, 1997, Report Numbers: DOE/MC/31176-10. |
“Utility Advanced Turbine System (ATS) Technology Readiness Testing and Pre-Commercial Demonstration, Phase 3”, Document #486029, Oct. 1 -Dec. 31, 1995, Publication Date, May 1, 1997, Report Numbers: DOE/MC/31176—5340. |
“Utility Advanced Turbine System (ATS) Technology Readiness Testing and Pre-Commercial Demonstration -Phase 3”, Document #486132, Apr. 1 -Jun. 30, 1976, Publication Date, Dec. 31, 1996, Report Numbers: DOE/MC/31176—5660. |
“Utility Advanced Turbine System (ATS) Technology Readiness Testing and Pre-Commercial Demonstration—Phase 3”, Document #587906, Jul. 1 -Sep. 30, 1995, Publication Date, Dec. 31, 1995, Report Numbers: DOE/MC/31176—5339. |
“Utility Advanced Turbine System (ATS) Technology Readiness Testing and Pre-Commercial Demonstration” Document ·666277, Apr. 1 -Jun. 30, 1997, Publication Date, Dec. 31, 1997, Report Numbers: DOE/MC/31176—8. |
“Utility Advanced Turbine System (ATS)Technology Readiness Testing and Pre-Commercialization Demonstration” Jan. 1 -Mar. 31, 1996, DOE/MC/31176—5338. |
“Utility Advanced Turbine System (ATS) Technology Readiness Testing: Phase 3R”, Document #756552, Apr. 1 -Jun. 30, 1999, Publication Date, Sep. 1, 1999, Report Numbers: DE—FC21-29MC31176-23. |
“Utility Advanced Turbine System (ATS)Technology Readiness Testing”, Document #656823, Jan. 1 -Mar. 31, 1998, Publication Date, Aug. 1, 1998, Report Numbers: DOE/MC/31176-17. |
“Utility Advanced Turbine Systems (ATS) Technology Readiness Testing and Pre-Commercial Demonstration”, Annual Technical Progress Report, Reporting Period: Jul. 1, 1995-Sep. 30, 1996. |
“Utility Advanced Turbine Systems (ATS) Technology Readiness Testing”, Phase 3R, Annual Technical Progress Report, Reporting Period: Oct. 1, 1997 -Sep. 30, 1998. |
“Utility Advanced Turbine Systems (ATS) Technology Readiness Testing”, Document #750405, Oct. 1 -Dec. 30, 1998, Publication Date: May, 1, 1999, Report Numbers: DE-FC21-95MC31176-20. |
“Utility Advanced Turbine Systems (ATS) Technology Readiness Testing”, Document #1348, Apr. 1 -Jun. 29, 2998, Publication Date Oct. 29, 1998, Report Numbers DE-FC21-95MC31176—18. |
“Utility Advanced Turbine Systems (ATS) Technology Readiness Testing -Phase3”, Annual Technical Progress Report, Reporting Period: Oct. 1, 1996 -Sep. 30, 1997. |
“Utility Advanced Turbine Systems (ATS) Technology Readiness Testing and Pre-Commercial Demonstration”, Quarterly Report, Jan. 1 -March 31, 1997, Document #666275, Report Numbers: DOE/MC/31176-07. |
“Proceedings of the 1997 Advanced Turbine Systems”, Annual Program Review Meeting, Oct. 28-29, 1997. |