Topping slab installation methodology

Information

  • Patent Grant
  • 11578491
  • Patent Number
    11,578,491
  • Date Filed
    Friday, February 7, 2020
    4 years ago
  • Date Issued
    Tuesday, February 14, 2023
    a year ago
Abstract
A method of laying one or more concrete topping slabs over an existing concrete structure includes providing a concrete form defining an area on a surface of the concrete structure, drilling a hole into the surface of the concrete structure within the area, the hole being closer to a first border of the concrete form than to a second border of the concrete form opposite the first border, attaching first and second slip-dowel receiving sheaths respectively to the first and second borders, securing a first end portion of a bent metal bar in the hole with a second end portion of the bent metal bar extending parallel to the surface and the slip-dowel receiving sheaths toward the second border, and pouring a concrete mixture over the surface of the concrete structure and about the first and second slip-dowel receiving sheaths and the second end portion of the bent metal bar.
Description
CROSS-REFERENCE TO RELATED APPLICATIONS

Not Applicable


STATEMENT RE: FEDERALLY SPONSORED RESEARCH/DEVELOPMENT

Not Applicable


BACKGROUND
1. Technical Field

The present disclosure relates generally to laying concrete and, more particularly, to laying one or more concrete topping slabs over an existing concrete structure.


2. Related Art

In order to reduce costs associated with demolition, an existing concrete structure may be resurfaced with one or more concrete topping slabs. To this end, the existing concrete structure may be partially removed to a specified depth and a concrete mixture may be poured on top to form the concrete topping slabs. Conventionally, the resulting concrete topping slabs may be prevented from curling by bonding the topping slabs to the existing concrete structure. However, this may result in cracking due to the restriction of expansion and contraction caused by the bond. Also, any joints in the existing concrete structure may propagate through to the topping slab.


It is also possible to prevent curling while allowing the topping slabs to move independently from the existing concrete structure, e.g. by floating the topping slabs on a slip sheet. Curling may still be combatted, for example, by replacing conventional slip-dowels between the topping slabs with ninety-degree bars that extend between the topping slabs and into the existing concrete structure below. However, the placement of ninety-degree bars in this way prevents expansion and contraction as each topping slab is effectively anchored at either end by the ninety-degree bar, causing the topping slab to tear itself apart and crack.


BRIEF SUMMARY

The present disclosure contemplates various systems and methods for overcoming the above drawbacks accompanying the related art. One aspect of the embodiments of the present disclosure is a method of laying one or more concrete topping slabs over an existing concrete structure. The method may include providing a concrete form defining an area on a surface of the concrete structure, drilling a hole into the surface of the concrete structure within the area, the hole being closer to a first border of the concrete form than to a second border of the concrete form opposite the first border, attaching a first slip-dowel receiving sheath to the first border of the concrete form, the first slip-dowel receiving sheath extending parallel to the surface of the concrete structure toward the second border of the concrete form along an axis, attaching a second slip-dowel receiving sheath to the second border of the concrete form, the second slip-dowel receiving sheath extending parallel to the axis toward the first border of the concrete form, securing a first end portion of a bent metal bar in the hole with a second end portion of the bent metal bar extending parallel to the axis toward the second border of the concrete form, and pouring a concrete mixture over the surface of the concrete structure and about the first slip-dowel receiving sheath, the second slip-dowel receiving sheath, and the second end portion of the bent metal bar.


The method may include drilling a second hole into the surface of the concrete structure within the area, the second hole being closer to the first border of the concrete form than to the second border of the concrete form, and securing a first end portion of a second bent metal bar in the second hole with a second end portion of the second bent metal bar extending parallel to the axis toward the second border of the concrete form. The pouring of the concrete mixture may include pouring the concrete mixture about the second end portion of the second bent metal bar. The bent metal bar and the second bent metal bar may be on either side of the first slip-dowel receiving sheath in a direction orthogonal to the axis.


The method may include providing a slip sheet on the surface of the concrete structure prior to the pouring of the concrete mixture.


The second end portion of the bent metal bar may be bent ninety degrees relative to the first end portion of the bent metal bar.


Another aspect of the embodiments of the present disclosure is a method of laying one or more concrete topping slabs over an existing concrete structure. The method may include providing a concrete form defining an area on a surface of the concrete structure adjacent to an already-cured concrete topping slab, drilling a hole into the surface of the concrete structure within the area, the hole being closer to a border of the concrete form opposite the already-cured concrete topping slab than to the already-cured concrete topping slab, attaching a slip-dowel receiving sheath to the border of the concrete form, the slip-dowel receiving sheath extending parallel to the surface of the concrete structure toward the already-cured concrete topping slab along an axis, securing a first end portion of a bent metal bar in the hole with a second end portion of the bent metal bar extending parallel to the axis toward the already-cured concrete topping slab, and pouring a concrete mixture over the surface of the concrete structure and about the slip-dowel receiving sheath, the second end portion of the bent metal bar, and a slip-dowel protruding from the already-cured concrete topping slab.


The method may include drilling a second hole into the surface of the concrete structure within the area, the second hole being closer to the border of the concrete form than to the already-cured concrete topping slab, and securing a first end portion of a second bent metal bar in the second hole with a second end portion of the second bent metal bar extending parallel to the axis toward the already-cured concrete topping slab. The pouring of the concrete mixture may include pouring the concrete mixture about the second end portion of the second bent metal bar. The bent metal bar and the second bent metal bar may be on either side of the slip-dowel receiving sheath in a direction orthogonal to the axis.


The method may include providing a slip sheet on the surface of the concrete structure prior to the pouring of the concrete mixture.


The second end portion of the bent metal bar may be bent ninety degrees relative to the first end portion of the bent metal bar.


Another aspect of the embodiments of the present disclosure is a method of laying one or more concrete topping slabs over an existing concrete structure. The method may include providing a concrete form defining an area on a surface of the concrete structure adjacent to an already-cured concrete topping slab, drilling a hole into the surface of the concrete structure within the area, the hole being closer to the already-cured concrete topping slab than to a border of the concrete form opposite the already-cured concrete topping slab, attaching a slip-dowel receiving sheath to the border of the concrete form, the slip-dowel receiving sheath extending parallel to the surface of the concrete structure toward the already-cured concrete topping slab along an axis, securing a first end portion of a bent metal bar in the hole with a second end portion of the bent metal bar extending parallel to the axis toward the border of the concrete form, and pouring a concrete mixture over the surface of the concrete structure and about the slip-dowel receiving sheath, the second end portion of the bent metal bar, and a slip-dowel protruding from the already-cured concrete topping slab parallel to the axis.


The method may include drilling a second hole into the surface of the concrete structure within the area, the second hole being closer to the already-cured concrete topping slab than to the border of the concrete form, and securing a first end portion of a second bent metal bar in the second hole with a second end portion of the second bent metal bar extending parallel to the axis toward the border of the concrete form. The pouring of the concrete mixture may include pouring the concrete mixture about the second end portion of the second bent metal bar. The bent metal bar and the second bent metal bar may be on either side of the slip-dowel in a direction orthogonal to the axis.


The method may include providing a slip sheet on the surface of the concrete structure prior to the pouring of the concrete mixture.


The second end portion of the bent metal bar may be bent ninety degrees relative to the first end portion of the bent metal bar.


Another aspect of the embodiments of the present disclosure is a method of laying one or more concrete topping slabs over an existing concrete structure. The method may include drilling a hole into a surface of the concrete structure within an area on the surface of the concrete structure defined at least in part by a plurality of adjacent already-cured concrete topping slabs, the hole being closer to a first one of the already-cured concrete topping slabs than to a second one of the already-cured concrete topping slabs opposite the first, securing a first end portion of a bent metal bar in the hole with a second end portion of the bent metal bar extending parallel to the surface of the concrete structure toward the second one of the already-cured concrete topping slabs along an axis, and pouring a concrete mixture over the surface of the concrete structure and about a first slip-dowel protruding from the first one of the already-cured concrete topping slabs parallel to the axis, a second slip-dowel protruding from the second one of the already-cured concrete topping slabs parallel to the axis, and the second end portion of the bent metal bar.


The method may include drilling a second hole into the surface of the concrete structure within the area, the second hole being closer to the first one of the already-cured concrete topping slabs than to the second one of the already-cured concrete topping slabs, and securing a first end portion of a second bent metal bar in the second hole with a second end portion of the second bent metal bar extending parallel to the axis toward the second one of the already-cured concrete topping slabs. The pouring of the concrete mixture may include pouring the concrete mixture about the second end portion of the second bent metal bar. The bent metal bar and the second bent metal bar may be on either side of the first slip-dowel in a direction orthogonal to the axis.


The method may include providing a slip sheet on the surface of the concrete structure prior to the pouring of the concrete mixture.


The second end portion of the bent metal bar may be bent ninety degrees relative to the first end portion of the bent metal bar.





BRIEF DESCRIPTION OF THE DRAWINGS

These and other features and advantages of the various embodiments disclosed herein will be better understood with respect to the following description and drawings, in which like numbers refer to like parts throughout, and in which:



FIG. 1 is an exploded perspective view of a concrete topping slab system according to an embodiment of the present disclosure;



FIG. 2 is a plan view of the concrete topping slab system;



FIG. 3 is a plan view of the concrete topping slab system showing a preparation step for forming a first set of concrete topping slabs;



FIG. 4 is a plan view of the concrete topping slab system showing a concrete pouring step for forming the first set of concrete topping slabs;



FIG. 5 is a plan view of the concrete topping slab system showing a removal of a concrete form;



FIG. 6 is a plan view of the concrete topping slab system showing a preparation step for forming a second set of concrete topping slabs;



FIG. 7 is a plan view of the concrete topping slab system showing a concrete pouring step for forming the second set of concrete topping slabs;



FIG. 8 is a cross-sectional view of the concrete topping slab system taken along line 8,9-8,9 in FIG. 2 showing an expanded state of the concrete topping slabs;



FIG. 9 is another cross-sectional view of the concrete topping slab system taken along line 8,9-8,9 in FIG. 2 showing a contracted state of the concrete topping slabs;



FIG. 10 is a cross-sectional view of the concrete topping slab system taken along line 10,11-10,11 in FIG. 2 showing an expanded state of the concrete topping slabs; and



FIG. 11 is another cross-sectional view of the concrete topping slab system taken along line 10,11-10,11 in FIG. 2 showing a contracted state of the concrete topping slabs.





DETAILED DESCRIPTION

The present disclosure encompasses various embodiments of systems and methods for laying one or more concrete topping slabs over an existing concrete structure. The detailed description set forth below in connection with the appended drawings is intended as a description of several currently contemplated embodiments, and is not intended to represent the only form in which the disclosed invention may be developed or utilized. The description sets forth the functions and features in connection with the illustrated embodiments. It is to be understood, however, that the same or equivalent functions may be accomplished by different embodiments that are also intended to be encompassed within the scope of the present disclosure. It is further understood that the use of relational terms such as first and second and the like are used solely to distinguish one from another entity without necessarily requiring or implying any actual such relationship or order between such entities.



FIG. 1 is an exploded perspective view of a concrete topping slab system 10 according to an embodiment of the present disclosure. One or more concrete topping slabs 200 may be formed over an existing concrete structure 100 with a slip sheet 110 therebetween. Each of the concrete topping slab(s) 200 may be secured to adjacent concrete topping slab(s) 200 by slip-dowels 210 to prevent undesirable bucking or unevenness of the cold joint between the adjacent slabs 200 while also permitting linear expansion and contraction of the slabs 200 in the direction of the slip-dowels 210. In order to prevent curling, one or more bent metal bars 220 may secure each of the slab(s) 200 to the existing concrete structure 100 at one end of the slab 200 while extending parallel to the slip-dowels 210 toward an opposite end of the slab 200. Because each of the slab(s) 200 need only be anchored to the existing concrete structure 100 at one end, the slab(s) 200 are allowed to thermally expand and contract in the direction of the slip-dowels 210 without being prevented from doing so by the bent metal bar(s) 220.



FIG. 2 is a plan view of the concrete topping slab system 10. As shown, the concrete topping slab system 10 may comprise a grid of concrete topping slabs 200 secured to each other by slip-dowels 210 in a single direction (horizontal in FIG. 2). In this way, the slip-dowels 210 may be allowed to slide within corresponding slip-dowel receiving sheaths 230 as the slabs 200 expand and contract. By arranging the bent metal bars 220 to extend parallel to the slip-dowels 210, the interference of the bent metal bars 220 with this expansion and contraction may be minimized.


The grid of concrete topping slabs 200 shown in FIG. 2 may be efficiently produced by forming the slabs 200 in a checkerboard pattern as shown, with the concrete mixture for the slabs 200 marked “A” poured in a first pouring step and the concrete mixture for the slabs 200 marked “B” poured in a subsequent second pouring step. An example process for producing the concrete topping slab system 10 according to such a checkerboard pattern is shown and described in relation to FIGS. 3-7. However, it should be noted that non-checkerboard patterns for producing a grid of concrete topping slabs 200, as well as non-grid arrangements of concrete topping slabs 200, are also contemplated as being encompassed by the concrete topping slab system 10.



FIG. 3 is a plan view of the concrete topping slab system 10 showing a preparation step for forming a first set of concrete topping slabs 200 (marked “A”) according to a checkerboard pattern. With the existing concrete structure 100 having been partially removed to the desired depth and a slip sheet 110 (see FIGS. 1 and 2) having been provided on the newly revealed surface thereof, the process illustrated in FIGS. 3-7 may begin with a step of providing a concrete form 300. The concrete form 300 may be made of wood (e.g. two-by-fours) and may define one or more areas on the surface of the concrete structure 100 where the topping slab(s) 200 will be formed. Using any of the areas marked “A” as an example, the process may continue with drilling a hole 120 (see FIG. 1 for perspective view) into the surface of the concrete structure 100 within the area. If a slip sheet 110 is provided, the hole may be drilled through the slip sheet 110 as well. The hole 120 may be drilled at one end of the area that will define the slab 200. That is, the hole 120 may be closer to a first border 310 of the concrete form 300 than to a second border 320 of the concrete form 300 opposite the first border 310.


The process may continue with attaching slip-dowel receiving sheaths 230 to the first and second borders 310, 320 of the concrete form 300. Namely, a first slip-dowel receiving sheath 230-1a may be attached to the first border 310 and a second slip-dowel receiving sheath 230-2a may be attached to the second border 320 (though in some cases one of the slip-dowel receiving sheaths 230 may be omitted if there will be no further adjacent concrete). The first slip-dowel receiving sheath 230-1a may be attached so as to extend parallel to the surface of the concrete structure 100 toward the second border 320. The direction that the first slip-dowel receiving sheath 230-1a extends may define an axis along which expansion and contraction of the topping slab 200 will be permitted in the finished concrete topping slab system 10. The second slip-dowel receiving sheath 230-2a may extend parallel to this axis toward the first border 310 of the concrete form 300. As shown, the second slip-dowel receiving sheath 230-2a may extend along the same axis as the first slip-dowel receiving sheath 230-1a so as to be aligned with one another, but unaligned slip-dowel receiving sheaths 230-1a, 230-2a are contemplated as well. Note, for example, that opposite borders 310, 320 of a form 300 defining a non-rectangular area (e.g. a parallelogram) may not face each other, such that aligned slip-dowel receiving sheaths 230-1a, 230-2a may be infeasible or undesirable. Along the same lines, it should be noted that the opposite borders 310, 320 need not necessarily be parallel (e.g. in the case of a triangular area), as long as the slip-dowel receiving sheaths 230-1a, 230-2a may be attached to the borders 310, 320 in a way that allows them to extend parallel to each other and allow expansion/contraction of the slab 200 along an axis.


With the hole 120 having been drilled into the existing concrete structure 100 and through any intervening slip sheet 110, the process may continue with securing a bent metal bar 220 (e.g. the bent metal bar 220a shown in FIG. 3) in the hole 120. Referring briefly to FIG. 10, which is a cross-sectional view of the concrete topping slab system 10 taken along line 10,11-10,11 in FIG. 2, it can be seen that each bent metal bar 220 may have a first end portion 222 that is secured in the hole 120 (e.g. by an epoxy 130) and a second end portion 224 that extends parallel to the surface of the concrete topping slab system 10. The bent metal bars 220 may be made of steel and may be rebar for example. Referring back to the plan view of FIG. 3, in which only the second end portion 224 can be seen, it can be seen that the bent metal bar 220a may be secured in the hole 120 such that the second end portion 224 extends parallel to the same axis as the slip-dowel receiving sheaths 230-1a, 230-2a toward the second border 320 of the concrete form 300. Owing to this arrangement, the bent metal bar 220a may serve as an anchor to prevent curling of the topping slab 200 without unduly restricting thermal expansion and contraction along the axis.


It is contemplated that a plurality of bent metal bars 220 may be provided in a plurality of holes 120 drilled closer to the first border 310 than the second border 320 of the concrete form 300, with each of the bent metal bars 220 having a second end portion 224 extending parallel to the same axis as the slip-dowel receiving sheaths 230-1a, 230-2a toward the second border 320 of the concrete form 300. In this regard, the illustrated example depicts the bent metal bar 220a (the first bent metal bar 220a) and a second bent metal bar 220b on either side of the first slip-dowel receiving sheath 230-1a in a direction orthogonal to the expansion/contraction axis. Along the same lines, a plurality of slip dowels 210 may be used between each pair of adjacent slabs 300. As shown, for example, two first slip-dowel receiving sheaths 230-1a, 230-1b are attached to the first border 310 alternating with the plurality of bent metal bars 220a, 220b. Likewise, two second slip-dowel receiving sheaths 230-2a, 230-2b are shown attached to the second border 320 of the concrete form 300. Using greater numbers of alternating bent metal bars 220 and slip dowels 210 is also contemplated.



FIG. 4 is a plan view of the concrete topping slab system 10 showing a concrete pouring step for forming the first set of concrete topping slabs 200. With the areas for forming the first set of concrete topping slabs 200 (marked “A”) having been prepared as described in relation to FIG. 3, the method may continue with pouring a concrete mixture over the surface of the concrete structure 100 and about the first slip-dowel receiving sheath 230-1a, the second slip-dowel receiving sheath 230-2a, and the second end portion 224 (see FIG. 10) of the bent metal bar 220a. If additional bent metal bars 220 and slip dowels 210 are used as shown in FIG. 4, the concrete mixture may additionally be poured about the second end portion 224 of a second bent metal bar 220b, etc., as well as about additional slip-dowel receiving sheaths 230 as described above. As shown in FIG. 4, the concrete mixture may fill the area defined by the concrete form 300, namely each of the areas marked “A”, and thereafter cure to form concrete topping slabs 200 in a checkerboard pattern.



FIG. 5 is a plan view of the concrete topping slab system 10 showing a removal of the concrete form 300. Once the concrete topping slabs 200 corresponding to the areas marked “A” have cured, the concrete form 300 may be removed in those places where the slabs 200 will be used for the subsequent pour. In the example shown, only the outer perimeter of the concrete form 300 is left in place, with all of the borders between slabs 200 removed. The already-cured concrete topping slabs 200 may now be used in place of the form 300 to define the area for a subsequent pour.



FIG. 6 is a plan view of the concrete topping slab system 10 showing a preparation step for forming a second set of concrete topping slabs 200 (marked “B”). The preparation for forming the second set of slabs 200 (marked “B”) may be the same as the preparation for forming the first set of slabs (marked “A”) except that a slip-dowel 210 may be provided instead of a slip-dowel receiving sheath 230 wherever the area is bordered by an already-cured slab 200. Thus, referring by way of example to either of the two areas marked “B” along the left-hand side of the concrete form 300 shown in FIG. 6, the holes 120, bent metal bars 220a, 220b, and slip-dowel receiving sheaths 230-1a, 230-1b may be provided as described above in relation to the areas marked “A” (though in some cases the slip-dowel receiving sheaths 230-1a, 230-1b may be omitted here if there will be no further adjacent concrete). However, in place of a second border 320 opposite the first border 310 of the form 300, there is an already-cured concrete topping slab 200. Therefore, instead of attaching slip-dowel receiving sheaths 230-2a, 230-2b as described in relation to the “A” areas, slip-dowels 210-1a, 210-1b are inserted into the already-existing slip-dowel receiving sheaths 230-1a, 230-1b of the already-cured slab 200.


Referring, as another example, to either of the two areas marked “B” along the right-hand side of the concrete form 300 shown in FIG. 6, the holes 120, bent metal bars 220a, 220b, and slip-dowel receiving sheaths 230-2a, 230-2b may again be provided as described above in relation to the areas marked “A” (though in some cases the slip-dowel receiving sheaths 230-2a, 230-2b may be omitted here if there will be no further adjacent concrete). However, in place of a first border 310 opposite the second border 320 of the form 300, there is an already-cured concrete topping slab 200. Therefore, instead of attaching slip-dowel receiving sheaths 230-1a, 230-1b as described in relation to the “A” areas, slip-dowels 210-2a, 210-2b are inserted into the already-existing slip-dowel receiving sheaths 230-2a, 230-2b of the already-cured slab 200.


In the case of the four areas marked “B” down the middle of the concrete form 300 shown in FIG. 6 (i.e. neither on the left-hand side nor on the right-hand side of the concrete form 300), the holes 120 and bent metal bars 220a, 220b may be provided as described above in relation to the areas marked “A”. However, in place of the first and second borders 310, 320 of the form 300, there are already-cured concrete topping slabs 200. Therefore, instead of attaching slip-dowel receiving sheaths 230-1a, 230-1b, 230-2a, 230-2b as described in relation to the “A” areas, slip-dowels 210-1a, 210-1b, 210-2a, 210-2b are respectively inserted into the already-existing slip-dowel receiving sheaths 230-1a, 230-1b, 230-2a, 230-2b of the already-cured slabs 200.



FIG. 7 is a plan view of the concrete topping slab system 10 showing a concrete pouring step for forming the second set of concrete topping slabs 200. With the areas for forming the second set of concrete topping slabs 200 (marked “B”) having been prepared as described in relation to FIG. 6, the method may continue with pouring a concrete mixture over the surface of the concrete structure 100 and about the slip-dowel receiving sheath(s) 230, slip-dowel(s) 210, and second end portion(s) 224 (see FIG. 10) of the bent metal bar(s) 220 as may variously be provided in each of the “B” areas as described in relation to FIG. 6. As shown in FIG. 7, the concrete mixture may fill the area defined by the concrete form 300, namely each of the areas marked “B”, and thereafter cure to complete the checkerboard pattern of concrete topping slabs 200. The remaining portion of the concrete form 300 may then be removed to produce the concrete topping slab system 10 shown in FIG. 2.


For ease of explanation, an example process is described above in relation to FIGS. 3-7. However, except where specifically indicated or logically required, the order of the steps is not critical. For example, the holes 120 may be drilled for both the “A” and “B” areas all at the same time, either before or after the concrete form 300 is built, the slip-dowel receiving sheaths 230 may be attached to the form 300 before or after the bent metal bars 220 are secured to the existing concrete structure 100 (and before or after the holes 120 are drilled), etc. Along the same lines, additional steps may occur before, after, or between the steps described. For example, reinforcing steel in the form of mesh, rods, and/or bars (e.g. rebar) may be disposed in the areas “A” and “B” prior to pouring the concrete mixture to produce a reinforced concrete topping slab 200 (see FIG. 1 cutaway). As another example, a moisture barrier made of felt or polyethylene plastic sheeting (e.g. Visqueen) may be provided, either between adjacent slabs 200 (e.g. applied prior to pouring the concrete mixture of the “B” areas) or at arbitrarily determined periodic locations (e.g. applied by saw-cutting the finished project). Along the same lines, expansion joints made of felt, wood (e.g. redwood), plastic, or other suitable material may be provided between adjacent slabs 200, having a thickness depending on the size of the slabs 200 (e.g. half-inch expansion joints).



FIG. 8 is a cross-sectional view of the concrete topping slab system 10 taken along line 8, 9-8, 9 in FIG. 2 showing an expanded state of the slabs 200. FIG. 9 is the same view showing a contracted state of the slabs 200. As illustrated in FIGS. 8 and 9, the slip-dowels 210 may allow thermal expansion and contraction parallel to the X-direction as the slip-dowels 210 are free to slide in the slip-dowel receiving sheaths 230. At the same time, the slip-dowels 210 may prevent undesirable bucking or unevenness of the cold joint between the adjacent slabs 200.



FIG. 10 is a cross-sectional view of the concrete topping slab system 10 taken along line 10, 11-10, 11 in FIG. 2 showing an expanded state of the slabs 200. FIG. 11 is the same view showing a contracted state of the slabs 200. As shown and discussed above, each of the bent metal bars 220 may include a first end portion 222 that is secured (e.g. by epoxy 130) in a hole 120 drilled in the existing concrete structure 100 and a second end portion 224 that extends parallel to the surface of the existing concrete structure 100. The second end portion 224 may be bent ninety degrees relative to the first end portion 222 as shown. However, other angles are possible as well, with the hole 120 being drilled at a corresponding angle such that the bend results in the second end portion 224 being parallel to the surface. As illustrated in FIGS. 10 and 11, the bent metal bars 220 provided only at one end of each slab 200 may anchor the slabs 200 to the existing concrete structure 100 while still allowing thermal expansion and contraction parallel to the X-direction. In particular, in FIG. 10 (and FIG. 8), the rightward facing arrows show the direction of expansion as the free end of each slab 200 that is not anchored by a bent metal bar 220 is allowed to expand. Likewise, in FIG. 11 (and FIG. 9), the leftward facing arrows show the direction of contraction as the free end of each slab 200 that is not anchored by a bent metal bar 220 is allowed to contract.


The slip-dowels 210 and slip-dowel receiving sheaths 230 described herein, as well as the method of attaching the slip-dowel receiving sheaths 230 to the concrete form 300, may be according to known slip-dowel systems and methods such as those described in any of U.S. Pat. No. 5,678,952, entitled “CONCRETE DOWEL PLACEMENT APPARATUS,” U.S. Pat. No. 5,934,821, entitled “CONCRETE DOWEL PLACEMENT APPARATUS,” and U.S. Pat. No. 9,617,694, entitled “CONCRETE DOWEL SYSTEM,” the entire disclosures of all of which are expressly incorporated herein by reference.


The above description is given by way of example, and not limitation. Given the above disclosure, one skilled in the art could devise variations that are within the scope and spirit of the invention disclosed herein. Further, the various features of the embodiments disclosed herein can be used alone, or in varying combinations with each other and are not intended to be limited to the specific combination described herein. Thus, the scope of the claims is not to be limited by the illustrated embodiments.

Claims
  • 1. A method of laying one or more concrete topping slabs over an existing concrete structure, the method comprising: providing a concrete form defining an area on a surface of the concrete structure;drilling a plurality of holes into the surface of the concrete structure within the area, the plurality of holes being closer to a first border of the concrete form than to a second border of the concrete form opposite the first border;attaching a first slip-dowel receiving sheath to the first border of the concrete form, the first slip-dowel receiving sheath extending parallel to the surface of the concrete structure toward the second border of the concrete form along an axis;attaching a second slip-dowel receiving sheath to the second border of the concrete form, the second slip-dowel receiving sheath extending parallel to the axis toward the first border of the concrete form;inserting a plurality of bent metal bars into respective ones of the plurality of holes such that a first end portion of each bent metal bar is received in the respective one of the plurality of holes and a second end portion of each bent metal bar extends in a common direction parallel to the axis toward the second border of the concrete form; andpouring a concrete mixture over the surface of the concrete structure and about the first slip-dowel receiving sheath, the second slip-dowel receiving sheath, and the second end portions of the plurality of bent metal bars.
  • 2. The method of claim 1, wherein the plurality of bent metal bars includes a pair of bent metal bars on either side of the first slip-dowel receiving sheath in a direction orthogonal to the axis.
  • 3. The method of claim 1, further comprising providing a slip sheet on the surface of the concrete structure prior to said pouring the concrete mixture.
  • 4. The method of claim 1, wherein the second end portion of each bent metal bar is bent ninety degrees relative to the first end portion of the corresponding bent metal bar.
  • 5. The method of claim 1, wherein the one or more concrete topping slabs are formed independent of any bent metal bars having second end portions extending in opposite directions.
  • 6. A method of laying one or more concrete topping slabs over an existing concrete structure, the method comprising: providing a concrete form defining an area on a surface of the concrete structure adjacent to an already-cured concrete topping slab;drilling at least two holes into the surface of the concrete structure within the area, the at least two holes being closer to a border of the concrete form opposite the already-cured concrete topping slab than to the already-cured concrete topping slab;attaching a slip-dowel receiving sheath to the border of the concrete form, the slip-dowel receiving sheath extending parallel to the surface of the concrete structure toward the already-cured concrete topping slab along an axis;securing a first end portion of at least two bent metal bars in respective ones of the at least two holes with a second end portion of each bent metal bar extending in a common direction parallel to the axis toward the already-cured concrete topping slab; andpouring a concrete mixture over the surface of the concrete structure and about the slip-dowel receiving sheath, the second end portions of the at least two bent metal bars, and a slip-dowel protruding from the already-cured concrete topping slab.
  • 7. The method of claim 6, wherein the at least two bent metal bars include a pair of bent metal bars on either side of the slip-dowel receiving sheath in a direction orthogonal to the axis.
  • 8. The method of claim 6, further comprising providing a slip sheet on the surface of the concrete structure prior to said pouring the concrete mixture.
  • 9. The method of claim 6, wherein the second end portion of each bent metal bar is bent ninety degrees relative to the first end portion of the corresponding bent metal bar.
  • 10. The method of claim 6, wherein the one or more concrete topping slabs are formed independent of any bent metal bars having second end portions extending in opposite directions.
  • 11. A method of laying one or more concrete topping slabs over an existing concrete structure, the method comprising: providing a concrete form defining an area on a surface of the concrete structure adjacent to an already-cured concrete topping slab;drilling a plurality of holes into the surface of the concrete structure within the area, the plurality of holes being closer to the already-cured concrete topping slab than to a border of the concrete form opposite the already-cured concrete topping slab;attaching a slip-dowel receiving sheath to the border of the concrete form, the slip-dowel receiving sheath extending parallel to the surface of the concrete structure toward the already-cured concrete topping slab along an axis;inserting a plurality of bent metal bars into respective ones of the plurality of holes such that a first end portion of each bent metal bar is received in a respective one of the plurality holes with a second end portion of each bent metal bar extending in a common direction parallel to the axis toward the border of the concrete form; andpouring a concrete mixture over the surface of the concrete structure and about the slip-dowel receiving sheath, the second end portions of the plurality of bent metal bars, and a slip-dowel protruding from the already-cured concrete topping slab parallel to the axis.
  • 12. The method of claim 11, wherein a pair of the plurality of bent metal bars are on either side of the slip-dowel in a direction orthogonal to the axis.
  • 13. The method of claim 11, further comprising providing a slip sheet on the surface of the concrete structure prior to said pouring the concrete mixture.
  • 14. The method of claim 11, wherein the second end portion of the bent metal bar is bent ninety degrees relative to the first end portion of the bent metal bar.
  • 15. The method of claim 11, wherein the one or more concrete topping slabs are formed independent of any bent metal bars having second end portions extending in opposite directions.
  • 16. A method of laying one or more concrete topping slabs over an existing concrete structure, the method comprising: drilling a hole into a surface of the concrete structure within an area on the surface of the concrete structure defined at least in part by a plurality of adjacent already-cured concrete topping slabs, the hole being closer to a first one of the already-cured concrete topping slabs than to a second one of the already-cured concrete topping slabs opposite the first;securing a first end portion of a bent metal bar in the hole with a second end portion of the bent metal bar extending in a first direction parallel to the surface of the concrete structure toward the second one of the already-cured concrete topping slabs along an axis; andpouring a concrete mixture over the surface of the concrete structure to form the one or more concrete topping slabs, the concrete mixture being poured about a first slip-dowel protruding from the first one of the already-cured concrete topping slabs parallel to the axis, a second slip-dowel protruding from the second one of the already-cured concrete topping slabs parallel to the axis, and the second end portion of the bent metal bar;the one or more concrete topping slabs being formed independent of any bent metal bars having second end portions extending in a second direction opposite to the first direction.
  • 17. The method of claim 16, further comprising: drilling a second hole into the surface of the concrete structure within the area, the second hole being closer to the first one of the already-cured concrete topping slabs than to the second one of the already-cured concrete topping slabs; andsecuring a first end portion of a second bent metal bar in the second hole with a second end portion of the second bent metal bar extending parallel to the axis toward the second one of the already-cured concrete topping slabs,wherein said pouring includes pouring the concrete mixture about the second end portion of the second bent metal bar.
  • 18. The method of claim 17, wherein the bent metal bar and the second bent metal bar are on either side of the first slip-dowel in a direction orthogonal to the axis.
  • 19. The method of claim 16, further comprising providing a slip sheet on the surface of the concrete structure prior to said pouring the concrete mixture.
  • 20. The method of claim 16, wherein the second end portion of the bent metal bar is bent ninety degrees relative to the first end portion of the bent metal bar.
US Referenced Citations (201)
Number Name Date Kind
567895 Gaiennle Sep 1896 A
754215 Hayward Mar 1904 A
1045562 Kennedy Nov 1912 A
1545267 Marye Jul 1925 A
1592681 Grothe Jul 1926 A
1631576 Bowers Jun 1927 A
1699557 Yeager Jan 1929 A
1728936 Johnson Sep 1929 A
1755219 Knox Apr 1930 A
1767575 Bujack Jun 1930 A
1826062 Farmer Oct 1931 A
1838635 Pilj Dec 1931 A
1852673 Pilj Apr 1932 A
1939007 Heltzel Dec 1933 A
1942494 Robertson Jan 1934 A
1953846 Briggs Apr 1934 A
2039420 Isett May 1936 A
2066448 Bahr Jan 1937 A
2095060 Geyer Oct 1937 A
2096702 Yeoman Oct 1937 A
2108107 De Wees Feb 1938 A
2110738 Parker Mar 1938 A
2129568 De Biasi Sep 1938 A
2166220 Older Jul 1939 A
2181005 Westcott Nov 1939 A
2193129 Geyer et al. Mar 1940 A
2207168 Thomas et al. Jul 1940 A
2262704 Tompkins et al. Nov 1941 A
2269703 Bagwill Jan 1942 A
2275272 Scripture, Jr. Mar 1942 A
2277203 Boult Mar 1942 A
2296453 Saffert Sep 1942 A
2319526 Wearn May 1943 A
2327231 Westcott Aug 1943 A
2331949 Whiteman Oct 1943 A
2365550 Heltzel Dec 1944 A
2373284 Autrey Apr 1945 A
2508443 Carter May 1950 A
2551826 Cox, Sr. May 1951 A
2636426 Heltzel Apr 1953 A
2642789 Brickman Jun 1953 A
2746365 Darneille May 1956 A
2823539 Kersh et al. Feb 1958 A
2823573 Vasikonis et al. Feb 1958 A
2858749 Crone Nov 1958 A
2902742 Matich Sep 1959 A
2980215 Englund Apr 1961 A
3066448 Pinter Dec 1962 A
3124047 Graham Mar 1964 A
3205629 Rumley et al. Sep 1965 A
3233024 Jackson et al. Feb 1966 A
3279335 Garner Oct 1966 A
3284973 Ames et al. Nov 1966 A
3318224 Bohanon May 1967 A
3333380 Wolf Aug 1967 A
3437017 Walz et al. Apr 1969 A
3451179 Kendzia Jun 1969 A
3527486 Anton Sep 1970 A
3603055 Dale Sep 1971 A
D229538 Steffan Dec 1973 S
3896599 Werstein Jul 1975 A
3920221 Berry et al. Nov 1975 A
3921356 Hughes Nov 1975 A
4077177 Boothroyd et al. Mar 1978 A
4087072 Olsen May 1978 A
4115976 Rohrer Sep 1978 A
4146599 Lanzetta Mar 1979 A
4158937 Henry Jun 1979 A
D257503 McKee Nov 1980 S
4252767 Piazza et al. Feb 1981 A
4261496 Mareydt et al. Apr 1981 A
4281496 Danielsson Aug 1981 A
4329080 Elley May 1982 A
D272517 Koehn Feb 1984 S
4437828 Egger Mar 1984 A
D273984 Vlock May 1984 S
4449844 Larsen May 1984 A
4493584 Guntert Jan 1985 A
4496504 Steenson et al. Jan 1985 A
4533112 Santos et al. Aug 1985 A
4578916 Witschi Apr 1986 A
4614070 Idland Sep 1986 A
4619096 Lancelot, III Oct 1986 A
4648739 Thomsen Mar 1987 A
4657430 Marionneaux Apr 1987 A
4726561 Worzala Feb 1988 A
4748788 Shaw et al. Jun 1988 A
4752153 Miller Jun 1988 A
4800702 Wheeler Jan 1989 A
4801425 Michel et al. Jan 1989 A
4821988 Jimenez Apr 1989 A
4883385 Kaier Nov 1989 A
4899497 Madl Feb 1990 A
4926593 Johnston May 1990 A
D309280 Balfanz-Lee Jul 1990 S
4938631 Maechtle et al. Jul 1990 A
4959940 Witschi Oct 1990 A
D314325 Ziaylek, Jr. et al. Feb 1991 S
4996816 Wiebe Mar 1991 A
5005331 Shaw et al. Apr 1991 A
5046898 McKinney Sep 1991 A
5096155 Fitzgerald Mar 1992 A
5097547 Tanaka et al. Mar 1992 A
5134828 Baur Aug 1992 A
5205942 Fitzgerald Apr 1993 A
5212919 Shaw et al. May 1993 A
5216862 Shaw et al. Jun 1993 A
5301485 Shaw et al. Apr 1994 A
5363619 McPhee Nov 1994 A
D363211 Noble Oct 1995 S
5487249 Shaw et al. Jan 1996 A
D375599 Hirano et al. Nov 1996 S
D375600 Hirano et al. Nov 1996 S
5618125 McPhee et al. Apr 1997 A
5678952 Shaw et al. Oct 1997 A
D387437 Heaton Dec 1997 S
5694730 Del Rincon et al. Dec 1997 A
5713174 Kramer Feb 1998 A
5797231 Kramer Aug 1998 A
5934821 Shaw et al. Aug 1999 A
5941045 Plehanoff et al. Aug 1999 A
D419700 Shaw et al. Jan 2000 S
D420752 Hiscock Feb 2000 S
6018833 Imm Feb 2000 A
6019546 Ruiz Feb 2000 A
6039503 Cathey Mar 2000 A
6092960 McCallion Jul 2000 A
6123485 Mirmiran et al. Sep 2000 A
6145262 Schrader et al. Nov 2000 A
6171016 Pauls et al. Jan 2001 B1
6185886 Gruen et al. Feb 2001 B1
6210070 Shaw et al. Apr 2001 B1
6243994 Bernini Jun 2001 B1
6354053 Kerrels Mar 2002 B1
6354760 Boxall et al. Mar 2002 B1
D459205 Shaw et al. Jun 2002 S
6447203 Ruiz et al. Sep 2002 B1
6502359 Rambo Jan 2003 B1
6517277 Hu et al. Feb 2003 B2
6598364 Pelles Jul 2003 B1
6655869 Deeb et al. Dec 2003 B1
6775952 Boxall et al. Aug 2004 B2
6926463 Shaw et al. Aug 2005 B2
7004443 Bennett Feb 2006 B2
7314333 Shaw et al. Jan 2008 B2
7314334 Bennett et al. Jan 2008 B1
7338230 Shaw et al. Mar 2008 B2
7381008 Shaw et al. Jun 2008 B2
7404691 Bennett et al. Jul 2008 B2
7481031 Boxall et al. Jan 2009 B2
7604432 Shaw et al. Oct 2009 B2
7637689 Boxall et al. Dec 2009 B2
7716890 Boxall et al. May 2010 B2
7736088 Boxall et al. Jun 2010 B2
D619885 Hansort Jul 2010 S
7874762 Shaw et al. Jan 2011 B2
D634168 Ghatikar et al. Mar 2011 S
7967528 Mercer et al. Jun 2011 B2
8007199 Shaw et al. Aug 2011 B2
8142104 Mercer et al. Mar 2012 B2
8302359 Boxall et al. Nov 2012 B2
8303210 Parkes et al. Nov 2012 B2
8356955 Nadler Jan 2013 B2
8381470 Boxall et al. Feb 2013 B2
8511935 Thomas Aug 2013 B1
8573884 Nadler Nov 2013 B2
D694725 Marq Dec 2013 S
8627626 Boxall et al. Jan 2014 B2
D699555 Yazich Feb 2014 S
8677712 Edmonds, Jr. Mar 2014 B1
8713877 Underwood et al. May 2014 B2
9255404 Willems Feb 2016 B2
9340969 Shaw May 2016 B1
9458638 Parkes et al. Oct 2016 B2
9541111 Galligan et al. Jan 2017 B1
9546456 Shaw Jan 2017 B2
9617694 Shaw Apr 2017 B2
9897124 Galligan et al. Feb 2018 B1
D850896 Shaw Jun 2019 S
20020066824 Floyd, Jr. et al. Jun 2002 A1
20030144071 Dodge et al. Jul 2003 A1
20050265802 Miller et al. Dec 2005 A1
20060075706 Boxall et al. Apr 2006 A1
20070134063 Shaw Jun 2007 A1
20080014018 Boxall Jan 2008 A1
20080085155 Bennett et al. Apr 2008 A1
20080307733 Rice et al. Dec 2008 A1
20090060657 Albritton et al. Mar 2009 A1
20100086351 Mercer et al. Apr 2010 A1
20100319295 Nelson Dec 2010 A1
20110085857 Shaw et al. Apr 2011 A1
20110302880 DiPietro Dec 2011 A1
20140248076 Shaw Sep 2014 A1
20150197898 Shaw Jul 2015 A1
20160060817 Collines Mar 2016 A1
20160083914 Shaw Mar 2016 A1
20160222599 Smith Aug 2016 A1
20160377472 Wech Dec 2016 A1
20170096810 Shaw Apr 2017 A1
20180087265 Boyd et al. Mar 2018 A1
20180195280 Pratt Jul 2018 A1
Foreign Referenced Citations (13)
Number Date Country
568457 Oct 1975 CH
52370 Nov 1936 DK
79813 Sep 1955 DK
1123443 Aug 2001 EP
1389648 Jan 2007 EP
1094449 May 1955 FR
1389648 Feb 2004 GB
2507071 Apr 2014 GB
2007297802 Nov 2007 JP
3211680 Jul 2017 JP
0023653 Apr 2000 WO
WO-0042265 Jul 2000 WO
WO-2014111712 Jul 2014 WO
Non-Patent Literature Citations (8)
Entry
Basham, Kim, Reduce Random Cracking with Plate Dowels, Dec. 31, 2008, obtained from https://www.forconstructionpros.com/concrete/equipment-products/article/10117261/plate-dowels-in-concrete-slabs (Year: 2008).
Danley Systems, Slab-on-Ground Industrial, Residential and Pavement Systems Product Catalogue, 2017 (obtained from https://danley.com.au/upload/modules/document_loader/Danley_Catalogue_2017.pdf (Year: 2017).
www.pna-inc.com, “The Diamond Dowel System”, May 22, 2003, 2 pgs.
www.pavement.com, “Load Transfer”, May 27, 2003, 2 pgs.
www.danley.com.au, “Danley Diamond Dowel System”, Mar. 24, 2005, 2 pgs.
Wayne W. Walker & Jerry A. Holland, “Plate Dowels for Slabs on Ground”, 4 pgs.
Patent Cooperation Treaty, International Search Report and Written Opinion for International Application No. PCT/US2018/065803, dated Jan. 28, 2019, 8 pages.
John P. Broomfield, “Corrosion of Steel in Concrete”, 3 pages, 1997.
Related Publications (1)
Number Date Country
20210246657 A1 Aug 2021 US