This disclosure relates generally to wind energy systems, and, more particularly, to a system and method for constructing a wind energy tower system.
Towers for wind energy systems exist in several forms. Generally, a wind tower includes a tower structure with a wind turbine affixed at the top of the tower structure. Thus, as the wind tower height increases, the wind turbine is placed at higher altitudes. Generally, wind velocity and consistency increase with altitude. As a result, a wind turbine can often produce more electrical energy, and more consistently, and thus generate more income, when placed at a higher altitude. However, the cost of these wind towers increases as the wind tower height increases. Moreover, for some tower types, the tower, transportation, and construction costs increase with tower height at a faster rate than the additional income generating potential. Therefore, at some tower height, the increasing cost of the tower is such that the net revenue from the generated electrical energy begins to decrease with increasing tower height. Additionally, for some tower types, there may be construction equipment limitations, such as crane height. That is, the height of the tower may be limited by the height of the crane used to construct the tower. Unfortunately, these constraints limit the practical altitude of wind turbines.
In an exemplary embodiment, a tower lifting system comprises a primary lifting system and a secondary lifting system. The primary lifting system includes a lift cap configured to support a tower section to be lifted, the lift cap having a first plurality of hoists, and a lift pole coupled to the lift cap, the lift pole having a lifting mechanism configured to lift the lift cap, the lift pole, and the tower section to be lifted from within a previously lifted tower section. The secondary lifting system comprises a second plurality of hoists configured to raise the tower section to be lifted to the lift cap from a tower foundation.
In another exemplary embodiment, a tower lifting system comprises a secondary lifting system configured to raise a tower section of a multi-section tower to a lifting position and a primary lifting system configured to raise the tower section and the secondary and primary lifting systems to an assembled position.
In a further embodiment, a method for erecting a tower includes nesting frusto-conical tower sections within one another and within a frusto-conical tower base and securing the frusto-conical tower base to a tower foundation. The method further includes lifting each frusto-conical tower section from within the frusto-conical tower base with a lifting apparatus and securing each frusto-conical tower section to the frusto-conical tower base or to a previously lifted frusto-conical tower section.
These and other features, aspects, and advantages of the present disclosure will become better understood when the following detailed description is read with reference to the accompanying drawings in which like characters represent like parts throughout the drawings, wherein:
The present disclosure describes a tower which can support large wind turbines, or other heavy components, and a system and method for erecting such a tower without the need for a large external lifting system, such as a crane. In certain embodiments, the tower includes multiple frusto-conical tower sections which, when lifted from within one another, fit together with a very tight clearance. Specifically, a bottom portion of the tower section being lifted overlaps within a top portion of a previously lifted tower section. In other words, the outside diameter and shape of the bottom portion of the tower section being lifted is designed to match the inside diameter and shape of the top portion of the previously erected tower section. The two tower sections mate with a small overlap, where there is essentially zero clearance between the outside surface of the upper tower section and the inside surface of the tower section below it. The two tower sections may be welded together at the top of the overlap and the bottom of the overlap.
As discussed in detail below, prior to the tower erection process, the tower sections are nested inside one another at the base of the tower. A lifting apparatus is used to individually lift each of the tower sections into place. Specifically, a primary lifting system is located inside the tower section being lifted and may extend at least one tower section length below the bottom of the tower section being lifted. The primary lifting system lifts the tower section and the entire lifting apparatus until the tower section emerges out of the top of the previously erected tower section. The primary lifting system holds the tower section in place while the tower section is secured (e.g., welded) to the tower section previously lifted. Once the tower section is welded in place, a secondary lifting system of the lifting apparatus raises the next tower section from its resting place at the base of the tower and holds the next tower section. Thereafter, the primary lifting system lifts the next tower section, which is being held by the secondary lifting system, and the entire lifting apparatus until the next tower section is in place for welding.
Turning now to the drawings,
In certain embodiments, the wind power system 10 may have an inverter 34. Specifically, the electricity generated by the generator 20 may be routed to an inverter 34 coupled to the wind tower 12. The inverter 34 converts the electricity from direct current (DC) to alternating current (AC). From the inverter 34, the electricity is supplied to a power grid 36. From the power grid 36, the electricity may be distributed to homes, buildings, and other consumers of electricity.
In the illustrated embodiment, the wind tower 12 has a height 38. Additionally, the wind tower 12 is constructed from multiple tower sections 40. Each tower section 40 has a frusto-conical shape. As discussed in detail below, the wind tower 12 may be erected by lifting the tower sections 40 from within one another. More specifically, a lifting apparatus is used to individually lift each tower section 40 and hold the tower section 40 in place while the tower section 40 is secured (e.g., welded) to the previously erected tower section 40 below it. In certain embodiments, the wind tower 12 may include approximately 3 to 40 tower sections 40. Furthermore, the tower sections 40 each have a height 42, which may be approximately 40 to 100 feet or more. Consequently, the height 38 of the wind tower 12 may be approximately 150 to 1500 feet or more. Furthermore, as the height 38 of the wind tower 12 increases, the diameter of the tower sections 40 may increase, thereby increasing the load capacity of the wind tower 12. As a result, the wind tower 12 may be capable of supporting a nacelle 18 having a larger generator 20, such as a 1-10 million watt generator 20.
Each tower section 40 to be lifted is first raised from its resting position on the foundation 46 at the base of the wind tower 12. Specifically, the secondary lifting system 74 includes hoists 76 which raise the tower section 40 with cables 78. For example, the hoists 76 may be electric or hydraulic winches. The tower section 40 to be lifted is raised in the direction 80 until the tower section 40 is against the bottom of the lift cap 72. Once the tower section 40 has been raised up to the lift cap 72, the tower section 40 is coupled to the lift cap 72 using lugs and pins. For the duration of the lift and welding sequence, the tower section 40 is held in this position against the lift cap 72. As discussed in detail below, once the tower section 40 to be lifted is raised by the secondary lifting system 74 and coupled to the lift cap 72, a primary lifting system is used to lift the tower section 40, the lift cap 72, and the nacelle 18.
While the tower section 40 is being lifted into place by the primary lifting system, the tower section 40 may be subjected to undesired movement due to wind and other loads. To help reduce undesired lateral movement of the tower section 40 during the lifting and welding sequence, the lift cap 72 includes guide arms 82 which extend down a portion of the wind tower 12 that has already been erected and welded. For example, in certain embodiments, the lift cap 72 may include a plurality of structural members, such as I-beams, that extend from one side of the tower section 40 to the opposite side of the tower section 40, with each end of the structural members coupled to a respective guide arm 82. As such, because the guide arms 82 are positioned on opposite sides of the tower section 40, they generally pull against each other and maintain forces evenly amongst the opposite sides. Any even number of opposite guide arms 82 may be used. For example, in certain embodiments, six or twelve opposite guide arms 82 may be used. In general, the number of guide arms 82 may depend on the specific configuration of the tower 12 being erected.
The guide arms 82 rest against the erected and welded portion of the wind tower 12, thereby preventing horizontal motion of the guide arms 82, the lift cap 72, and the tower section 40 coupled to the lift cap 72. Additionally, each guide arm 82 includes a guide mechanism 84 which provides for relative vertical motion of the guide arms 82 and the lift cap 72 with respect to the welded portion of the wind tower 12. For example, the guide mechanism 84 may include wheels 86, as shown, a track mechanism, or other mechanism configured to allow vertical motion of the guide arms 82 with respect to the erected portion of the wind tower 12.
The cable lift system 90 includes a lift pole 104. In certain embodiments, the lift pole 104 may be approximately twice as long in length as the tower sections 40. For example, the lift pole 104 may be approximately 60, 70, 80, 90, 100, or more feet in length. Due to the length of the lift pole 104 being greater than the length of a single tower section 40, the first single or several tower sections 40 may be lifted and held in place for welding by a conventional crane or other external lifting apparatus, as discussed above. Similarly, while the illustrated embodiment does not show the blades 24 of the rotor 16 coupled to the hub 22, the blades 24 may also be raised and attached to the hub 22 with a conventional crane or other external lifting apparatus. For example, in certain embodiments, the blades 24 may be raised and attached to the hub 22 after 2, 3, 4, or 5 tower sections 40 have been lifted and welded in place.
Once the tower section 94 is coupled to the lift cap 72, cables 106 are coupled to lifting lugs 108 located at the bottom of the previously erected tower section 40. The cables 106 are then directed down to lower pulleys 110 at the bottom of the lift pole 104. The cables 106 are routed upwards to upper pulleys 112 at the top of the lift pole 104 and are then connected to hoists 114. In the illustrated embodiment, the hoists 114 are disposed on the outside of the arms 82 of the lift cap 72. In other embodiments, the hoists 114 may be located on the inside of the arms 82 or on another portion of the lift cap 72. For example, the hoists 114 may be electric or hydraulic winches. Moreover, the cable lift system 90 may include 3 to 20 hoists 114, with each hoist 114 connected to a respective cable 106. Once the cables 106 are connected to the hoists 114, the cables 106 are pulled by the hoists 114 (i.e., reeled in) until tight, at which point the lift pole 104, the lift cap 72, the nacelle 18, and the tower section 94 are supported by the cables 106. In this manner, the hoists 114 and the cables 106 raise the lift pole 104, the lift cap 72, the nacelle 18, and the tower section 94 in the direction 92.
The lifting apparatus 70 further includes a control system 116 coupled to the hoists 114 and coupled to a leveling sensor 118. As shown, the leveling sensor 118 is coupled to the lift cap 72. Certain embodiments may include multiple leveling sensors 118. The leveling sensor 118 is configured to monitor an angle of the lift cap 72. More specifically, the leveling sensor 118 monitors whether the lift cap 72 is level or tilted. Using feedback from the leveling sensor 118, the control system 116 coordinates the rate of pull of the hoists 114 to lift the tower section 94 and the nacelle 18. Specifically, the control system 116 operates the hoists 114 to reel in the cables 106 to lift the lift pole 104, thereby raising the nacelle 18 and the tower section 94. As will be appreciated, the weight and position of the generator 20 within the nacelle 18 may cause an uneven weight distribution on the lift cap 72. As a result, some hoists 114 may need to have a greater lifting capacity than other hoists 114, depending on the location of the respective hoist 114 relative to the generator 20. Additionally, as the hoists 114 reel in the cables 106, the uneven weight distribution may cause the certain hoists 114 to reel in cables faster than others. The leveling sensor 118 detects the uneven raising of the lift cap 72 and communicates the unevenness to the control system 116. In response, the control system 116 sends control signals to some or all of the hoists 114 to adjust the operation of each hoist 114 accordingly. For example, the control system 116 may stop the operation of some hoists 114 while continuing the operation of other hoists 114, as necessary, to bring the lift cap 72 back to a level orientation.
As mentioned above, the lift pole 104 may have a length approximately twice the length of the tower section 40. As will be appreciated, as the cables 106 are reeled in by the hoists 114, an angle 120 formed by each cable 106 extending from the lifting lugs 108, around the lower pulleys 110, and up to the upper pulleys 112 will increase. However, the angle 120 may be reduced by increasing the length of the lift pole 104. For example, during the lifting process with a lift pole 104 having a length approximately twice as great as the length of the tower section 94, the angle 120 may not increase beyond 15, 20, 25, or 30 degrees. As a result, the force applied to the lifting lugs 108 by the cables 106 in the horizontal direction as the cables 106 are reeled in by the hoists 114 may be reduced.
In operation, the tower section 40 to be lifted is raised up by the secondary lifting system 74 and secured to the bottom of the lift cap 72, in the manner described above. The floatation lifting system 156 lifts the lift cap 72, the nacelle 18, and the tower section 40 when water or other suitable liquid is pumped into the tank 162. The water or liquid creates an upward buoyant force on the floatation device 160, which pushes the lift pole 158, lift cap 72, the nacelle 18, and the tower section 40 upward. In order to maintain an even lifting rate of the lift cap 72, cables 168 are coupled to the lift cap 72 and lowered to the tower foundation 46 where the cables 168 are attached to hoists 170 secured to the tower foundation 46. More specifically, as water is pumped into the tank 162 and the upward buoyant force of the flotation device 160 pushes the lift pole 158 and the lift cap 72 upwards, a balanced tension is maintained in the cables 168 so that the lift cap 72 does not tilt, thereby providing a level platform for the nacelle 18. In certain embodiments, the floatation lifting system 156 may include the control system 116 and the leveling sensor 118. As will be appreciated, using feedback from the leveling sensor 118, the control system 116 may control the operation of the hoists 170 to maintain a balanced tension between the cables 168.
Once the tower section 40 attached to the lift cap 72 is lifted and in place for welding, the pumping of water into the tank 162 may be stopped and/or the hoists 170 may hold the cables 168 in place, thereby holding the lift cap 72 and the tower section 40 in place. With the lift cap 72 and the tower section 40 in place, the tower section 40 is welded to the previously erected tower section 40 with two lap welds 126, in the manner described above. After the tower section 40 is welded in place, the next tower section 40 to be lifted may be raised up to the lift cap 72 using the secondary lifting system 74. Additionally, a valve 172 of the floatation device 160 may be opened and the tank 162 may be raised up. Specifically, the cables 166 may be coupled to the lifting lugs 108 of the previously erected tower section (i.e., the tower section that has just been welded in place). As the tank 162 is raised, the water within the tank 162 will enter the floatation device 160 through the valve 172, thereby causing the floatation device 160 to sink to the bottom of the tank 162. Thereafter, the valve 172 is closed and a pump 174 within the floatation device 160 may pump the water out of the floatation device 160 and into the tank 162, as indicated by arrows 176. As the water is pumped out of the floatation device 160 and into the tank 162, the displaced water will create an upward buoyant force on the floatation device 160, as described above, thereby pushing the lift pole 158, lift cap 72, the nacelle 18, and the tower section 40 upward.
As discussed above, embodiments of the present disclosure include a lifting apparatus 70 for a wind tower 12. Specifically, the lifting apparatus 70 is configured to erect the wind tower 12 by raising frusto-conical, hollow tower sections 40 from within the other assembled tower sections 40. In this manner, the wind tower 12 may be erected without the use of an external lifting apparatus, such as a conventional crane. This enables the construction of larger and taller wind towers 12 because the erection of the wind tower 12 is not limited by the availability or height of a crane used to erect the wind tower 12. For example, using the lifting apparatus 70, the wind tower 12 may be constructed and erected to stand approximately 400, 500, 600, 700, 800, 900, or more feet high. As a result, the wind turbine 14 located at the top of the wind tower 12 is placed at a higher altitude where both wind velocity and wind consistency may be higher, thereby enabling the wind power system 10 to generate more electrical energy.
As described above, the sides 68 of the tower sections 40 may have a circular, oval, polygonal, corrugated, or fluted cross-section that both facilitates assembly at the site as well as provides added strength to the tower sections 40.
While only certain features of the disclosure have been illustrated and described herein, many modifications and changes will occur to those skilled in the art. It is, therefore, to be understood that the appended claims are intended to cover all such modifications and changes as fall within the scope of the claims.
This application is a Continuation Application of U.S. patent application Ser. No. 14/860,281, entitled “Tower Erecting System,” filed Sep. 21, 2015, which is a Continuation Application of U.S. patent application Ser. No. 13/720,535 (now U.S. Pat. No. 9,140,029), entitled “Tower Erecting System,” filed Dec. 19, 2012, which is a Non-Provisional U.S. patent application of U.S. Provisional Application Ser. No. 61/589,170, entitled “Tower Erecting System,” filed Jan. 20, 2012. The entireties of U.S. patent application Ser. No. 14/860,281, U.S. patent application Ser. No. 13/720,535, and U.S. Provisional Application Ser. No. 61/589,170 are incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
2675211 | Regoord | Apr 1954 | A |
2952340 | Schiff | Sep 1960 | A |
3135363 | Bourassa | Jun 1964 | A |
3196991 | Johnson | Jul 1965 | A |
3213574 | Melbye | Oct 1965 | A |
3248831 | Jones | May 1966 | A |
3373473 | Keslin | Mar 1968 | A |
3952467 | Partlow | Apr 1976 | A |
4151534 | Bond | Apr 1979 | A |
4261931 | Rothrock | Apr 1981 | A |
4443707 | Scieri | Apr 1984 | A |
4478014 | Poock | Oct 1984 | A |
4580377 | Sundin | Apr 1986 | A |
4604844 | Mikulas, Jr. | Aug 1986 | A |
4696135 | Kallinger | Sep 1987 | A |
4785309 | Gremillion | Nov 1988 | A |
4832315 | Vanderklaauw | May 1989 | A |
5101215 | Creaser, Jr. | Mar 1992 | A |
6782667 | Henderson | Aug 2004 | B2 |
7642987 | Newman | Jan 2010 | B2 |
7966777 | Douglas | Jun 2011 | B2 |
7997876 | Nies | Aug 2011 | B2 |
8143740 | Simnacher | Mar 2012 | B1 |
8146219 | Monostory | Apr 2012 | B2 |
8443571 | Tadayon | May 2013 | B2 |
8492918 | Kamenov | Jul 2013 | B1 |
8919074 | Meyer | Dec 2014 | B2 |
8959870 | Schmidt | Feb 2015 | B2 |
9140029 | Jones | Sep 2015 | B2 |
20020095878 | Henderson | Jul 2002 | A1 |
20050005562 | Henderson | Jan 2005 | A1 |
20050201855 | Fan | Sep 2005 | A1 |
20060277843 | Livingston | Dec 2006 | A1 |
20080180349 | Newman | Jul 2008 | A1 |
20090087311 | Wyborn | Apr 2009 | A1 |
20090107567 | Crary | Apr 2009 | A1 |
20100095508 | Wahlen | Apr 2010 | A1 |
20100132299 | Sathian | Jun 2010 | A1 |
20100226785 | Livingston | Sep 2010 | A1 |
20110133466 | Kamenov | Jun 2011 | A1 |
20110154757 | Rosengren | Jun 2011 | A1 |
20110204645 | Jacobson | Aug 2011 | A1 |
20110315691 | Skovholt | Dec 2011 | A1 |
20130008097 | Margevicius | Jan 2013 | A1 |
20130091784 | Schmidt | Apr 2013 | A1 |
20130186013 | Jones | Jul 2013 | A1 |
20130239491 | Tadayon | Sep 2013 | A1 |
20160010356 | Jones | Jan 2016 | A1 |
Number | Date | Country |
---|---|---|
1656009 | Aug 2005 | CN |
101338726 | Jan 2009 | CN |
101410618 | Apr 2009 | CN |
101435415 | May 2009 | CN |
201560900 | Aug 2010 | CN |
19741988 | Apr 1999 | DE |
19647515 | Apr 2010 | DE |
102011050032 | Nov 2012 | DE |
202012011382 | Nov 2013 | DE |
1350953 | Oct 2003 | EP |
1857670 | Nov 2007 | EP |
2013092145 | Jan 2013 | WO |
Entry |
---|
International Search Report from PCT application No. PCT/US2013/021887, dated Apr. 22, 2013, 12 pages. |
International Search Report from PCT application No. PCT/US2015/016515, dated Apr. 16, 2015, 10 pgs. |
Korean Office Action Appln No. 10-2014-7022288 dated Nov. 21, 2018 (7 pgs.). |
Number | Date | Country | |
---|---|---|---|
20180112431 A1 | Apr 2018 | US |
Number | Date | Country | |
---|---|---|---|
61589170 | Jan 2012 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 14860281 | Sep 2015 | US |
Child | 15850714 | US | |
Parent | 13720535 | Dec 2012 | US |
Child | 14860281 | US |