The invention generally relates to a guideway structure for high-speed track-bound transportation and especially relates to a guideway structure suitable to the running of magnetic levitation (maglev) train. The guideway structure is composed of main load-bearing girders (steel structure girder or pretressed concrete girder, reinforced concrete girder and etc.) and guideway-surface structure (reinforced concrete plate girder).
Magnetic levitation train is a high-speed carrier system. An extremely high accuracy supporting structure, i.e. guideway structure, is required when the train is running with high-speed. Firstly, for the force-bearing characteristics of the guideway structure, the deformation and the deflection of the guideway structure must be controlled within a very small range under the action of train dynamic load as well as under the influence of external environment, such as the influence of temperature variation, wind force action and etc., at the same time the dynamical characteristics of guideway structure must also be strictly controlled, the magnetic levitation train requires the first-order frequency of free vibration of the guideway structure must be greater than 1.1 times the ratio of train running speed to guideway structure span. Secondly, the running systems for magnetic levitation train also requires the functional zones of the guideway structure having extremely strict accuracies; the functional zones are at both sides of the top portion of guideway structure, inclusive of top sliding surface, gliding surface at both sides and bottom stator pack surface. The accuracies of all the above three function surfaces are required to be 1 mm or within 1 mm (0.4 mm). The above guideway structural requirement for the magnetic levitation train system determines that the guideway structure for magnetic levitation train differs greatly from that of the conventional railway bridge and track of ordinary low-speed and medium-speed carrier system.
It is known by structural calculation and analysis that in comparing it with conventional railway structure, the structure rigidity of guideway, which is able to satisfy the technical requirement for the running of magnetic levitation train, will increase a lot. Therefore classifying the guideway structure according to materials used for it, no matter steel structure or prestressed concrete structure or the reinforced concrete structure is adopted, the height, the width and the section dimensions of guideway structure must be increased greatly. The weight of magnetic levitation structure will also increase synchronously. Classifying the guideway structure according to construction system, there are two main modes of guideway construction, namely the monolithic construction and the layer construction mode. In monolithic construction mode, i.e. in an integration of the load-bearing structure and track-surface structure, according to the fabrication and connection style the monolithic construction mode of track and girder may be further classified into two cases. In the first case the track-surface functional zones and girder body are fabricated and processed as an integration structure and in the second case they are fabricated and processed individually and then connected together to be an integration structure. After the steel structure of functional zones and the main load-bearing girder of the former are integrally fabricated and processed, advanced six-axis NC (Numerical Control) boring-milling machine tool is used for integral machining of the top gliding surface, the lateral guiding surface and the connecting slot of steel girder for fixing stator packs are machined with the advanced six-axis NC (Numerical Control) boring-milling machine tool, finally the stator packs are installed. In the latter case the steel structure of functional zones, the function surfaces and etc. are fabricated and machined individually, the main load-bearing girder, pre-embedded elements and the connecting surface of the connecting elements are machined integrally under condition of an integral girder body, finally the steel structure of functional zones and the main load-bearing girder are connected as an integration after the machining work is completed. In both cases of above construction mode, the machining work of a whole girder is unavoidable. It is known from the material, construction composition, fabrication and machining of monolithic construction mode that although such a construction mode may provide a good integrity and a great structure rigidity, yet there is very high requirement for the general layout of the girder factory, the fabrication of formwork and the equipment of machine tools. The arrangement of the girder fabricating workshop must satisfy the requirement for a many of working procedures able to be orderly carried out at same time and a large thermostatic workshop is demanded for the machining work of a whole guideway girder. In case that the pre-stressed concrete hybrid girder is adopted, the formwork must have sufficient rigidity, enough to ensure the pre-embedded elements to be disposed respectively at accurate positions and the machine tool must be with six-axis numerical control ability. Thus high technical contents of equipment and a big investment are required. Therefore, a big engineering quantity is required because the supporting platform for machining the whole girder must basically be without any deformation. As for the layer construction mode, the load-bearing structure and the guideway-surface structure are fabricated separately, arranged layer by layer, and then connected to form a guideway structure by means of supporting structures.
Such a layer construction is also called a special construction. Its lower-layer is a conventional bridge structure system, its upper-layer is a wide guideway-surface structure of 6.192 meters long and 2.8 meters wide. The construction is composed of the body structure reinforced concrete plate girder and the top sliding steel plate and the guiding steel plate at the side of functional zone, side guiding steel plate as well as the bracket for fixing stator packs. Three reinforced concrete supporting posts are used for supporting the guideway surface and the lower-layer structure. The supporting posts are connected with the upper-layer structure with cement mortar bed poured on-site and fastened with steel screw rods. In case that the lower-layer structure is a concrete structure, the supporting posts may be directly connected with the lower-layer structure. Two of these three posts respectively at each of the external sides are with necking at the bottom portion thereof in order to achieve an effect of binge jointing. The main drawbacks of the structure are as follows:
1. When the steel structure of functional zones and the reinforced concrete plate girder are as a monolithic construction to be fabricated, shrinkage gaps are liable to occur at the connecting surface between two different kinds of material with different material properties, and the fatigue cracks will easily occur to shorten the service life of guideway structure.
2. The connection mode of the upper-layer and the lower-layer structure is unreliable. Hinge-crack caused by longitudinal expansion and longitudinal contraction due to temperature variation may occur at the bottom of the fore and the aft supporting post. Repeated load actions will make the crack to be developed and the reinforcing bar in hinge joint to be damaged and reduce the safety of the structure. Furthermore, in the case that the tie rods are used for the connection between concrete plate girder and posts, the circumstances of applied force are undefined, then the force applied on the cement mortar bed is complex. Thus the connection between the concrete plate girder and the posts is easily damaged when the longitudinal, the lateral and the vertical load act at same time, it will imperil the safety of the structure.
3. The adjustability of such supporting mode is poor because a part of the tie rod, which is used as the connection between the concrete plate girder and the posts, had been poured into the concrete plate girder and firmly cohered together with the concrete plate girder. In the position adjustment of the concrete plate girder of guideway-surface structure, a part of cement of the structure have to be chiseled away, so that it is more difficult in construction process and poorer in operating ability.
4. For the lateral rigidity of lower-layer structure is small, the lateral dimensions of the lower-layer structure have to be designed with a very large size in order to satisfy the dynamic characteristics requirement of the system.
The technical problem to be solved by the invention is to overcome the said deficiencies of the prior art and then to provide a guideway structure suitable for the magnetic levitation and other modem high-speed track-bound transportation. The provided guideway structure must be easier in fabrication and installation, reliable in the connection between the upper-layer and the lower-layer structure, and adjustable in a certain degree.
Technical solution of the invention is:
A guideway structure for high-speed track-bound transportation is composed of the lower-layer main load-bearing girder and the upper-layer track surface structure. The track surface structure is a monolithic construction formed by connecting the steel structural elements of functional zones with the reinforced concrete plate girder of guideway body by means of connecting elements. The structure is characteristic of the following:
(1) The said reinforced plate girder is an element of small-size type. Many of the reinforced plate girders are longitudinally installed along guideway line on the lower-layer main load-bearing girder by connection-mechanism; between two adjacent reinforced plate girders is reserved a certain gap for expansion and contraction of girders;
(2) In the case of the parallel double-track guideway, between the lateral surfaces of both lower-layer main load-bearing girders are disposed a series of supporting transversal girders with certain spacing along guideway line;
(3) The said connection-mechanism is composed of supporting steel girders, welding nails, high strength bolts and steel bearing plates. The supporting steel girders are connected respectively with the lower-layer main load-bearing girders by high strength bolts, steel bearing plates and connecting steel plates. The said welding nails on the top of the supporting steel girder are deeply inserted into their respective post-poured hole of the reinforced concrete plate girder. The connection will be completed by concrete-pouring on site after the reinforced concrete plate girder has been accurately positioned.
Each of the said reinforced concrete plate girders is supported by several supporting steel girders, namely at the longitudinal intermediate portion are disposed the rigid supporting steel girders and at each end the flexible supporting steel girder.
The said rigid supporting steel girder has several pieces of longitudinal stiffening plates.
On the said flexible supporting steel girder is disposed the web plate.
The lower-layer main load-bearing girder may be of girder type structure or arch type structure.
At the lateral surface of the main load-bearing girder is disposed the supporting transversal girder.
At both sides of the respective lower-layer main load-bearing girder are disposed the cable supporting brackets and maintenance walkways.
The technical effects of the invention are as follows:
1. The layer construction mode of guideway structure is used in the invention. The main load-bearing girder is separated from the track-surface structure, it may be fabricated according to the accuracy requirement of the structure of conventional municipal engineering or the structure of conventional railway track. The track-surface structure, which has to be with very high accuracy and is separated from the main body of the structure, uses the minimized structural elements, thus the fabrication and machining will be greatly simplified. These minimized structural elements may be fabricated and machined with the conventional boring and milling machine tool, and do not need any heavy duty machining equipments. As for the large-scale maglev project, the investment can be saved, the fabrication progress also be quickened. The rigid and the flexible supporting mode may be combined for the utilization of the lower-layer and the upper-layer structure so as to achieve an effect that the load may be transferred between these two structures and the deformation may be accommodated to the temperature variation.
2. When the structure of the invention is in the case of double-track guideway, the lower-layer main load-bearing girders of their respective guideways are connected by supporting transversal girders disposed between the lateral surfaces of the said girders and with certain spacing along the direction of the guideway. Thus the lateral rigidity of the guideway structure may be greatly increased without enlarging its lateral dimensions and can satisfy the requirement of lateral rigidity for the train system.
3. The track-surface structure is divided into two parts. It means that the steel structure of functional zones and the reinforced concrete plate girders of the guideway body may be fabricated and processed individually, then they are connected together by connecting elements and high strength bolts to be a monolithic construction. A majority of the problems about second-order internal force and the internal force re-distribution of the integral structure, which are caused by the contraction and the creep of concrete, may be eliminated by such an arrangement mode of the guideway structure.
4. Between the track-surface structure and the lower-layer main load-bearing girder is the steel structure connection. The steel structure may be connected with lower-layer structure by high strength bolts. The welded shear-resisting (tension-resisting) welding nails are welded on the top of the steel structure. The holes poured in-situ are preserved on the plate girder of upper-layer track-surface structure. The connection will be completed by concrete-pouring in-situ after the plate girder has been accurately positioned. This connection mode is concise and the status of applied forces is definite. Furthermore, the position adjustment of the track-surface structure may be done as follows: loosening the high strength bolts, adjusting the plate girder to an accurate position, replacing the bearing plate and finally re-tightening the high strength bolts.
5. In the arrangement of the sectional construction of the invention, the track-surface structure, the cable supporting brackets and the maintenance walkway are arranged in different layers, namely the track-surface structure is arranged at upper layer and the walkway for maintenance and etc. are arranged at the second layer. The pre-requisite of the layer arrangement mainly is based on the strict requirement of the maglev train on the dynamic characteristics of the guideway structure. For satisfying the requirement of the dynamic characteristics, the load-bearing structure must have a great rigidity and the structure is positioned high. But in case that the track-surface structure and etc are arranged in different layers, the width of the load-bearing structure may be controlled within the range of the train clearance and no any requirement in height is needed for the supporting structure of the track-surface structure plate girder, thus a supporting system with small height may be used. Therefore in both aspects of the construction height and the delimitation, the layer arrangement in sectional construction of the invention is a more ideal construction mode for the small-span and medium-span load-bearing structure (such as a bridge across a medium-width or small-width river).
In these Figures:
1—main load-bearing girder;
11—supporting transversal girder;
12—cable supporting bracket;
13—maintenance walkway;
2—upper track-surface structure;
20—expansion gap;
21—reinforced concrete plate girder;
22—console (bracket);
23—steel elements of functional zone;
24—post-poured holes;
3—connection-mechanisms;
31—supporting steel girder;
311—rigid supporting steel girder;
3111—stiffening plate;
312—flexible supporting steel girder;
3121—web plate;
32—weld nail;
33—high-strength bolt;
34—steel bearing plate;
35—connecting steel plate;
36—gap of height;
37—nut socket.
As shown in
In the case that the upper-layer and the lower-layer structure are connected by steel girders 311 and 312 or by the connecting steel plate 35, according to the construction mode and the material used, the weld nails 32 may be substituted by other shear-resisting elements such as the shear-resisting shaped steel, the shear-resisting reinforced concrete block and etc.
The arrangement of the double-layer guideway structure of the invention is shown in
Number | Date | Country | Kind |
---|---|---|---|
01 1 26832 | Sep 2001 | CN | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/CN02/00465 | 7/1/2002 | WO | 00 | 3/5/2004 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO03/025285 | 3/27/2003 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
5850794 | Raschbichler et al. | Dec 1998 | A |
6554199 | Flessner et al. | Apr 2003 | B1 |
6571717 | Svensson | Jun 2003 | B2 |
Number | Date | Country |
---|---|---|
0433170 | Dec 1990 | EP |
1048784 | Nov 2000 | EP |
Number | Date | Country | |
---|---|---|---|
20040221761 A1 | Nov 2004 | US |