This application is a nationalization under 35 U.S.C. 371 of PCT/CN2011/000528, filed Mar. 28, 2011, and published as WO 2011/143923 A1, on Nov. 24, 2011, which claims priority to Chinese patent Application Serial No. 201010185308.X, filed May 19, 2010, which applications and publications are incorporated herein by reference in their entirety.
This invention relates to a special launching carrier with variable position platform and a method for bridge erection using the same.
Currently, the existing special launching carrier with under-bridge, such as the one disclosed in Chinese patent document No. ZL200420115944.4, may have the problem with erection for first span at the entrance and exit of a tunnel or erection for a short bridge (less than three spans) between two tunnels. It is due to the fact that the size overlaid is larger than the size of cross section of the tunnel and the horizontal height of a under-bridge differs from that of a bridge abutment when a special carrier for erecting beam and an under-bridge machine with platform are utilized for bridge erection, which makes it difficult to erect the first or the last span of an entire bridge, and also affect the stability of operation of the system and the safety of construction. This invention will provide a special launching carrier with variable position platform for solving the above problems.
In order to solve one problem mentioned, the invention provides a special launching carrier with variable position platform that may facilitate the erection of the first span of an entire bridge at the entrance and exit of a tunnel or a short bridge between two tunnels, in the circumstance that an entire bridge comprises less than three spans, which may realize high stability of operation and high effectiveness of erection. The invention further provides a method for bridge erection using the system.
In this invention, a special launching carrier with variable position platform, comprising:
a special carrier for erecting beam and an under-bridge machine with platform;
wherein, the special carrier for erecting beam comprises a main beam, on which a lifting device is disposed; a front wheel group and a rear wheel group respectively connected with and disposed under the main beam;
the under-bridge machine with platform comprises a under-bridge, and also comprises a front roller, a middle roller and a rear roller, disposed for supporting the under-bridge and operable to move along the under-bridge through the rollers, and the under-bridge machine with platform further comprises an erecting trolley;
the system further comprises a rotatable rear leg connected with and disposed under the under-bridge, the rotatable rear leg and the under-bridge are operable to be on the same line or perpendicular with each other by rotating rotatable rear leg backward and outward; and the rotatable rear leg, the front roller, the middle roller, and the rear roller respectively has a height regulating device installed thereon, in order to ensure an appropriate horizontal height of the under-bridge; and a set of foldable and elevatable variable position platforms installed on both sides of the tail portion of the under-bridge, which allow the front wheel group to move from abutment or bridge onto the under-bridge smoothly.
The horizontal height of the under-bridge is regulated by altering the lengths of the rotatable rear leg, the front roller, the middle roller and the rear roller with the height regulating device.
The height of a connection part of the erecting trolley, which is for connecting with and the special carrier for erecting beam, is regulatable, in order to ensure a smooth movement of the special carrier for erecting beam when the under-bridge position on height is changed; when the erecting trolley moves onto the under-bridge, the erecting trolley is operable to be connected with the leg(s) fixed on a pier using a wirerope, the under-bridge is operable to be driven forward and backward by the erecting trolley through sprocket translation.
The system further comprises a rotatable rear leg connected with and disposed under the under-bridge; the rotatable rear leg and the under-bridge are operable to be on the same line or perpendicular with each other by rotating the rotatable rear leg backward and outward.
The under-bridge further comprises a raising/lowering device, through which a set of the foldable variable position platforms installed on both sides of the under-bridge are elevatable; the foldable and variable position platforms can be folded to be parallel with the both sides respectively, and also can be unfolded to be perpendicular to the both sides respectively.
In this invention, the method for bridge erection using the system of the present invention comprising:
placing a special launching carrier with variable position platform on a first bridge abutment or a bridge deck erected;
regulating the horizontal height of the under-bridge through the height regulating devices disposed on a rotatable rear leg, a front roller, a middle roller and a rear roller;
lowering the rear roller through a leg spreader disposed on front end of the under-bridge and fixing the rear roller on the first bridge abutment or a first bridge pier;
B. driving the under-bridge located on the rear roller forward until the leg spreader reaches a next bridge pier as second bridge pier;
C. placing and fixing the middle roller and the front roller respectively connected with the leg spreader on the second bridge pier;
driving the under-bridge forward and driving the special carrier for erecting beam backward to prefabrication yard to load a bridge beam;
D. driving the erecting trolley disposed on the under-bridge to a position over the middle roller, fixing the erecting trolley to the middle roller with a wirerope, and driving the under-bridge forward through sprocket translation until the leg spreader reaches a next bridge pier as third bridge pier;
E. releasing the fixation of the front roller disposed under the under-bridge, moving the front roller forward along the guider girder to the third bridge pier, and fixing the front roller on the third bridge pier;
releasing the fixation of the middle roller, moving the middle roller to a position on the second bridge pier, where the front roller was placed, and moving the erecting trolley to a position above the middle roller; then fixing the middle roller on the second bridge pier and connecting the middle roller with the erecting trolley using a wirerope;
F. driving the under-bridge forward via sprocket translation, and stopping the under-bridge when the rotatable rear leg disposed at tail portion of the under-bridge is apart from a distance to the first bridge abutment or the bridge deck erected, then operating the rotatable rear leg to be perpendicular to the under-bridge;
G. driving the under-bridge backward in order to form an appropriate space between the under-bridge and the first bridge abutment, making the rotatable rear leg stand on the first bridge abutment, fixing the under-bridge on the first bridge abutment or the bridge deck erected, disconnecting the wirerope from the erecting trolley and then driving the erecting trolley back to the tail portion of the under-bridge;
H. releasing the fixations of the middle roller and the rear roller on the second bridge pier and the first bridge pier respectively, moving the middle roller to the third bridge pier and fixing the same thereon, moving the rear roller to the second bridge pier and fixing the same thereon; unfolding a set of variable position platforms disposed on both sides of tail portion of the under-bridge in order to allow the variable position platforms to be perpendicular to the under-bridge; then regulating the height of the variable position platforms via a raising/lowering device in order to allow the top surface of the platforms to be at the same level with that of a bridge deck; after that, driving the special carrier for erecting beam to the first bridge abutment or the bridge deck erected;
I. regulating the height of the erecting trolley, moving the special carrier for erecting beam carrying a bridge beam towards the erecting trolley, moving partial wheels of a front wheel group smoothly onto the variable position platforms, and stopping the machine from moving when an connecting seat of the machine moves to a position above the erecting trolley; regulating the height of the front wheel group in order to set the connecting seat to the erecting trolley, then lifting the front wheel group up and driving both the machine carrying the bridge beam and the erecting trolley forward until the bridge beam moves to right erection position;
J. releasing the fixation of the under-bridge on the first bridge abutment or the bridge deck erected, braking a rear wheel group of the special carrier for erecting beam; driving the under-bridge forward using the erecting trolley through sprocket translation and allowing tail end of the under-bridge to reach the second bridge pier in order to vacate a position for bridge beam erection;
K. erecting bridge at the position, regulating the horizontal height of the front wheel group to place the front wheel group on the bridge deck erected and the variable position platforms, and driving the special carrier for erecting beam back to prefabrication yard to load a bridge beam for next erection;
L. re-implementing the steps of A-K for erecting next bridge beams except for first and last spans of an entire bridge.
In comparison with the existing special launching carrier with variable position platform, the system of this invention have some advantages as follows:
1. the adaptability of installing a under-bridge is improved, due to the fact that a rotatable rear leg is provided, which can be rotated outward to be on the same line with a under-bridge, and be rotated to be perpendicular with the under-bridge;
2. it may facilitate to erect a bridge deck with a particular size, due to the fact that the height of the under-bridge position can be regulated through a height regulating device installed on each legs.
3. it may improve the stability of erection, the safety of construction, simplify the working procedure, and improve the effectiveness of erection, due to the fact that a set of foldable and elevatable variable position platforms are installed on both sides of tail portion of the under-bridge, which can be perpendicular with the lateral face of the under-bridge and is elevatable to be at the same level as the bridge abutment, so as to allow the front wheel group to move onto the platform smoothly.
The system of this invention may solve the problem with the bridge erection at the entrance and exit of a tunnel or in a tunnel, or the bridge erection between two tunnels in the circumstance that the entire bridge comprises less than three spans. It also help to reasonably shorten the length of the under-bridge by retaining a short distance between the end of the under-bridge and the bridge abutment or the bridge deck erected, so as to improve the load condition of the under-bridge, simplify the procedure, improve the effectiveness of erection, safety and reliability.
The special launching carrier with variable position platform of this invention will be illustrated further with the accompanying drawings.
Referring to
the under-bridge machine with platform comprises a under-bridge 10, a rotatable rear leg 7, a front roller 13, a middle roller 12, a rear roller 11 and an erecting trolley 6; the front roller 13, the middle roller 12 and the rear roller 11 that are disposed for supporting the under-bridge 10 and operable to move along the under-bridge 10 through the rollers; the erecting trolley 6 is disposed on the under-bridge 10; and the rotatable rear leg 7 is connected with and disposed under the under-bridge 10, and the rotatable rear leg 7 and the under-bridge 10 are operable to be on the same line or perpendicular with each other by rotating the rotatable rear leg 7 backward and outward; height regulating devices 15 may be installed on the rotatable rear leg 7, the front roller 13, the middle roller 12 and the rear roller 11 in order to ensure an appropriate horizontal height of the under-bridge 10, and variable position platforms 8 are installed on both sides of the tail portion of the under-bridge 10, which allow the front wheel group 5 to move from bridge abutment or bridge beck onto the under-bridge 10 smoothly.
Referring to
Referring to
Referring to
The height of a connection part of the erecting trolley 6, which is for connecting with the special carrier for erecting beam, is regulatable through the control of the hydraulic system, in order to ensure a smooth movement of the special carrier for erecting beam carrying a bridge beam when the under-bridge position on height is changed.
When the trolley 6 moves onto the under-bridge 10, the trolley 6 is operable to be connected with the leg(s) fixed on a pier using a wirerope, the under-bridge 10 is operable to be driven forward and backward by the trolley 6 through sprocket translation.
The erecting procedure of erection for first bridge deck described as below will be taken as an example of carrying out the erecting method of this invention.
The erecting procedure comprises the following steps:
referring to
and then referring to
and then referring to
and then referring to
and then referring to
and then referring to
and then referring to
and then referring to
and then referring to
Referring to
In normal erecting condition, next bridge decks except for first last bridge span of an entire bridge can be erected by re-implementing the steps 7-10.
While this invention is illustrated by means of a specific embodiment, it is to be understood that numerous changes and modifications may be made therein without departing from the spirit and scope of the invention, as defined in the claims.
Number | Date | Country | Kind |
---|---|---|---|
2010 1 0185308 | May 2010 | CN | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/CN2011/000528 | 3/28/2011 | WO | 00 | 11/14/2012 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2011/143923 | 11/24/2011 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3027633 | Murphy | Apr 1962 | A |
3299191 | Mantscheff et al. | Jan 1967 | A |
3571835 | Buechler | Mar 1971 | A |
5511268 | Albus et al. | Apr 1996 | A |
6918152 | Fuessinger et al. | Jul 2005 | B2 |
8065769 | Krimpen et al. | Nov 2011 | B2 |
Number | Date | Country |
---|---|---|
2767494 | Mar 2006 | CN |
101793007 | Aug 2010 | CN |
201770947 | Mar 2011 | CN |
202187297 | Apr 2012 | CN |
2005-155160 | Jun 2005 | JP |
2006-028881 | Feb 2006 | JP |
Entry |
---|
“International Application Serial No. PCT/CN2011/000528, International Search Report mailed Jul. 7, 2011”, 4 pgs. |
Number | Date | Country | |
---|---|---|---|
20130055512 A1 | Mar 2013 | US |