Embodiments of the invention relate to scheduling systems for vehicles traveling in a transportation network.
A transportation network for vehicles can include several interconnected main routes on which separate vehicles travel between locations. For example, a transportation network may be formed from interconnected railroad tracks with rail vehicles traveling along the tracks. The vehicles may travel according to schedules that dictate where and when the vehicles are to travel in the transportation network. The schedules may be predetermined in order to arrange for certain vehicles to arrive at various locations in the transportation network at desired times and/or in a desired order.
A network planning algorithm may be used to coordinate the schedules of several vehicles in the transportation network. One goal of the network planning algorithm may be to coordinate the schedules to avoid significant slowdowns or congested areas in the flow of movement in the transportation network. For example, the network planning algorithm may seek to arrange the schedules so that the vehicles are able to move to associated destination locations as quickly as possible.
Other algorithms may be used in conjunction with the travel of the vehicles to reduce fuel consumed by the vehicles. For example, a fuel optimization algorithm may be used to determine the speeds at which the vehicles are to travel to a destination location in order to reduce the amount of fuel consumed relative to traveling to the destination location at one or more other speeds. One goal of the fuel optimization algorithm may be to reduce the amount of fuel consumed as much as possible while still allowing the vehicles to reach associated destination locations.
When used together, the network planning algorithm and the fuel optimization algorithm may have competing goals. On one hand, the network planning algorithm may seek to get all vehicles to associated destination locations as quickly as possible, regardless of the amounts of fuel consumed by the vehicles. On the other hand, the fuel optimization algorithm may seek to get the vehicles to the associated destination locations while reducing fuel consumption. The fuel optimization algorithm may cause the vehicles to slow down and, as a result, arrive at the destination locations later than the vehicles could have otherwise arrived.
The goals of the network planning algorithm and the fuel optimization algorithm compete with each other and may result in one or both of the algorithms failing to reach the associated goals. A need exists for coordinating or harmonizing the goals of the different algorithms so that vehicles can travel to destination locations while reducing the amounts of fuel consumed, without significantly slowing the flow of travel of the vehicles in the transportation network.
As the vehicles travel through the transportation network, unforeseen or unplanned events may occur. For example, vehicles may mechanically break down (and slow down to run at a reduced capacity or stop movement completely), sections of the routes in the transportation network may become damaged, additional vehicles may enter into or pass through the transportation network, and the like. These events may disrupt travel of the vehicles in the transportation network. As this travel is disrupted, traffic or congestion of the vehicles may increase, thereby decreasing the flow of vehicles in the transportation network.
If traffic or congestion of the vehicles in the transportation network increases, the vehicles may be forced to abruptly slow down or stop movement in order to avoid collisions with other vehicles or to avoid coming within a predetermined distance or buffer from other vehicles. Such slowing down or stopping can cause the vehicles to consume fuel in relatively inefficient manners, which can increase the amount of fuel consumed in order to get the vehicles to the scheduled locations.
A need exists for scheduling travel in transportation networks that can adapt to changing circumstances, such as the detection of events that disrupt the travel of vehicles in the transportation networks.
In one embodiment, a method is provided that includes forming a first schedule for a first vehicle to travel in a transportation network. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The method also includes receiving a first trip plan for the first vehicle from an energy management system. The first trip plan is based on the first schedule and designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The method further includes determining whether to modify the first schedule to avoid interfering with movement of one or more other vehicles by examining the trip plan for the first vehicle.
For example, when schedules are generated for several vehicles to concurrently travel in the transportation network, the schedules may assume that all of the vehicles will primarily travel at or near speed limits of the transportation network when the vehicles are moving. The schedules may be coordinated so that vehicles do not block each other or cause slowdowns of each other (e.g., while one vehicle waits for another vehicle to move out of the way or pass), or so that such slowdowns are reduced relative to not coordinating the schedules with each other. One or more of the vehicles may generate a trip plan to reduce the emissions generated and/or fuel consumed by the one or more vehicles. This trip plan may cause the one or more vehicles to travel slower than the speed limits and/or slower than the speeds upon which the schedules of the vehicles are based. As a result, the one or more vehicles following the trip plan may move slower than expected by the creator of the schedules and consequently interfere with movements of other vehicles. For example, a first vehicle moving slower than expected and according to a trip plan may prevent a second vehicle from moving at or near a speed limit because the second vehicle is close behind the first vehicle is required by a schedule to wait for the first vehicle to meet or pass the second vehicle, and the like. The schedule of the second vehicle may be modified in order to avoid or reduce wasteful waiting or changes in the movement of the second vehicle, such as by changing a path taken by the second vehicle, changing a time at which the second vehicle is to meet or pass the first vehicle, and the like.
In another embodiment, a system is provided that includes a scheduling unit and a communication unit. One or more of the units may alternatively be referred to as modules. As used herein, the terms “unit” or “module” include a hardware and/or software system that operates to perform one or more functions. For example, a unit or module may include one or more computer processors, controllers, and/or other logic-based devices that perform operations based on instructions stored on a tangible and non-transitory computer readable storage medium, such as a computer memory. Alternatively, a unit or module may include a hard-wired device that performs operations based on hard-wired logic of a processor, controller, or other device. The units or modules shown in the attached figures may represent the hardware that operates based on software or hardwired instructions, the software that directs hardware to perform the operations, the computer readable storage medium having the instructions that direct one or more operations, or a combination thereof.
The scheduling unit is configured to form a first schedule for a first vehicle to travel in a transportation network. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The communication unit is configured to receive a first trip plan for the first vehicle from an energy management system. The first trip plan is based on the first schedule and designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The scheduling unit also is configured to determine whether to modify the first schedule to avoid interfering with movement of one or more other vehicles by examining the trip plan for the first vehicle.
In another embodiment, a method is provided that includes receiving a first schedule for a first vehicle to travel in a transportation network from a scheduling system. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The method also includes forming a first trip plan for the first vehicle based on the first schedule. The trip plan designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The method further includes communicating the first trip plan to the scheduling system so that the scheduling system can examine the first trip plan and determine whether to modify the first schedule based on the first trip plan.
In another embodiment, a system is provided that includes a communication unit and an energy management unit. The communication unit is configured to receive a first schedule for a first vehicle to travel in a transportation network from a scheduling system. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The energy management unit is configured to form a first trip plan for the first vehicle based on the first schedule. The trip plan designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The communication unit also is configured to communicate the first trip plan to the scheduling system so that the scheduling system can examine the first trip plan and determine whether to modify the first schedule based on the first trip plan.
In one embodiment, a system (e.g., a transportation network scheduling system) includes a scheduling module and a resolution module. The scheduling module is configured to determine plural initial schedules for plural different vehicles to concurrently travel in a transportation network formed from a plurality of interconnected routes. The initial schedules include one or more locations and associated times for the vehicles to travel along the routes of the transportation network. The resolution module is configured to modify at least one of the initial schedules to one or more modified schedules based on an anomaly in at least one of the vehicles or the routes that prevents one or more of the vehicles from traveling in the transportation network according to one or more of the initial schedules associated with the one or more of the vehicles.
As used herein, the term “anomaly” or “anomalies” can refer to a condition or conditions of a vehicle and/or a route along which the vehicle is traveling or is scheduled to travel that an initial or previous schedule of the vehicle is not based on. An anomaly may be a condition of the vehicle and/or the route that prevents the vehicle from traveling to and arriving at a scheduled destination location at a scheduled arrival time. Non-exclusive examples of anomalies can include mechanical failure or need of repair of the vehicle and/or route, slow orders or areas of the transportation network where vehicles are required to reduce speed below an otherwise allowable speed of the same area of the transportation network, an addition of one or more other vehicles onto the transportation network where the schedule of the vehicle is not based on or does not account for the presence of the other vehicles in the transportation network, and the like.
The scheduling module is configured to communicate the one or more modified schedules to one or more of the vehicles so that energy management systems disposed on the one or more of the vehicles modify travel of the one or more vehicles in the transportation network according to the one or more modified schedules.
In another embodiment, another system (e.g., vehicle control system) includes an energy management module and a communication module. The energy management module is configured to generate an initial trip plan for a control unit of a first vehicle. As used herein, the term “first” is used to distinguish one vehicle from another vehicle. Thus, the term “first” does not necessarily mean that the first vehicle is in front of a group of mechanically linked vehicles and/or the first vehicle to perform a function or detect an event. The initial trip plan is based on an initial schedule of travel for the first vehicle in a transportation network formed from a plurality of interconnected routes. The initial trip plan is used by the control unit to control tractive efforts of the first vehicle in the transportation network. The communication module is configured to receive a modified schedule for travel of the first vehicle in the transportation network. The modified schedule is based on discovery of an anomaly in the transportation network that prevents the first vehicle from traveling in the transportation network according to the initial schedule. The energy management module is configured to change the initial trip plan to a modified trip plan based on the modified schedule and communicate the modified trip plan to the control unit to change the tractive efforts of the first vehicle.
In another embodiment, a method (e.g., method for network scheduling) includes determining plural initial schedules for plural different vehicles to concurrently travel in a transportation network formed from a plurality of interconnected routes. The initial schedules include one or more locations and associated times for the vehicles to travel along the routes of the transportation network. The method also includes identifying an anomaly in at least one of the vehicles or the routes that prevents one or more of the vehicles from traveling in the transportation network according to one or more of the initial schedules associated with the one or more of the vehicles and modifying at least one of the initial schedules to one or more modified schedules based on an anomaly. The method further includes communicating the one or more modified schedules to one or more of the vehicles so that energy management systems disposed on the one or more of the vehicles modify travel of the one or more vehicles in the transportation network according to the one or more modified schedules.
In another embodiment, another method (e.g., method for vehicle control) includes generating an initial trip plan for a control unit of a first vehicle. The initial trip plan is based on an initial schedule of travel for the first vehicle in a transportation network formed from a plurality of interconnected routes. The initial trip plan is used by the control unit to control tractive efforts of the first vehicle in the transportation network. The method also includes receiving a modified schedule for travel of the first vehicle in the transportation network. The modified schedule is based on discovery of an anomaly in the transportation network that prevents the first vehicle from traveling in the transportation network according to the initial schedule. The method further includes changing the initial trip plan to a modified trip plan based on the modified schedule. The modified trip plan used by the control unit to change the tractive efforts of the first vehicle.
The present inventive subject matter will be better understood from reading the following description of non-limiting embodiments, with reference to the attached drawings, wherein below:
One or more embodiments of the inventive subject matter described herein provide systems for generating schedules for vehicles to concurrently travel within a transportation network and energy management systems of the vehicles that create trip plans based on the schedules. The transportation network can be formed of plural interconnected routes, such as railroad tracks, roads, paths in water (e.g., marine shipping pathways), paths in air and/or space (e.g., airline routes), and the like. The vehicles may include powered units capable of self-propulsion, such as automobiles, airplanes, or marine vessels, locomotives, or other off-highway vehicles. The schedules may direct the vehicles to travel along the routes to destination locations at associated arrival times. Additionally or alternatively, the schedules may include one or more waypoints on the way to the destination locations and associated times that the vehicles are to travel to or past the waypoints.
The energy management systems of the vehicles may create the trip plans such that the vehicles travel to the destination locations in such a way as to reduce an amount of energy consumed by the vehicles (e.g., by reducing an amount of fuel consumed by the vehicles) and/or to reduce an amount of emissions (e.g., gaseous emissions) generated by the vehicles, as described below. The trip plan of one or more of the vehicles may result in the vehicles deviating from the schedules. For example, the trip plans may cause vehicles to arrive at the scheduled destination location at a time that is later than a scheduled arrival time and/or to pass one or more waypoints when traveling toward the destination location later than the scheduled times associated with the waypoints. The trip plan may direct a vehicle to operate at a lower throttle setting to conserve fuel and/or reduce emissions, and thereby cause the vehicle to travel at a slower rate and arrive later than a scheduled arrival time.
The trip plan of one or more of the vehicles is communicated to the scheduling system for examination. The scheduling system analyzes the trip plan to determine if travel according to the trip plan will disrupt the travel of other vehicles in the transportation network. For example, the scheduling system may determine if a first vehicle traveling at a slower rate than expected (such as by traveling below a speed limit of the routes) will impede, block, or otherwise interfere with one or more other vehicles traveling to associated scheduled destination locations. If the trip plan will cause such a disruption, then the scheduling system may modify the schedules of one or more of the vehicles to avoid the disruption, as described below.
The scheduling system can track movements of the vehicles as the vehicles travel in the transportation network according to the trip plans. The scheduling system can monitor locations and/or speeds of the vehicles in order to determine if one or more of the vehicles are deviating from associated trip plans and/or schedules. For example, mechanical malfunction and/or damage to the vehicles and/or routes, previously unknown lower speed limits on the routes, and/or other unscheduled events or occurrences may cause some of the vehicles to fall behind associated schedules. A vehicle that falls behind schedule can impede travel of other vehicles, such as by taking up space on a one-way route or otherwise slowing or preventing movement of another vehicle in the transportation network.
The scheduling system can use the actual movements of the vehicles and update the schedules accordingly. For example, if a first vehicle is slowed or prevented from traveling to a scheduled destination location at a scheduled arrival time, the scheduling system can change the destination location, arrival time, and/or path to take to the destination location. The scheduling system can send the modified schedules to the energy management systems of the vehicles, which can modify the trip plans accordingly. The back and forth between the scheduling system generating schedules, the energy management systems creating trip plans based on the schedules, the scheduling system modifying one or more schedules based on the trip plans and/or tracking actual movement of the vehicles and modifying the schedules based on deviations from the schedules of the vehicles, and so on, can allow for the scheduling system and the energy management systems to provide for improved flow of travel in and/or through the transportation network while reducing energy consumed by the vehicles and/or emissions generated by the vehicles.
One or more embodiments of the inventive subject matter described herein provide systems for modifying schedules of vehicles concurrently traveling in a transportation network when an anomaly is detected in the transportation network and/or when a previously detected anomaly in the transportation network is removed, repaired, or otherwise corrected. Systems for changing trip plans of the vehicles based on modified schedules of the vehicles also are provided. The trip plans may be changed so that the vehicles can adaptively modify tractive efforts, braking efforts, speeds, or the like, of the vehicles in order to arrive at a scheduled destination location while reducing the amount of fuel consumed by the vehicles.
Several vehicles 108 may concurrently travel along the routes 102 in the transportation network 100. In the illustrated embodiment, the vehicles 108 are shown and described herein as rail vehicles or rail vehicle consists. However, one or more other embodiments may relate to vehicles other than rail vehicles or rail vehicle consists. While four vehicles 108 are shown in
A vehicle 108 may include a group of powered units 110 (e.g., locomotives or other vehicles capable of self-propulsion) and/or non-powered units 112 (e.g., cargo cars, passenger cars, or other vehicles incapable of self-propulsion) that are mechanically coupled or linked together to travel along the routes 102 (such a vehicle is referred to as a vehicle consist). The routes 102 are interconnected to permit the vehicles 108 to travel over various combinations of the routes 102 to move from a starting location to a destination location. In the illustrated embodiment, the vehicles 108 include control systems 114 and propulsion subsystems 116. The control systems 114 generate control signals that are used to direct operations of the vehicles 108. For example, a control system 114 on a vehicle 108 may create control signals that are used to automatically change throttle settings and/or brake settings of a propulsion subsystem 116 of the vehicle 108. Alternatively, the control system 114 can generate control signals that cause an output device, such as an electronic display, monitor, speaker, tactile device, or other device, to visually, audibly, and/or tactually present instructions to an operator of the vehicle 108 to manually change the throttle settings and/or brake settings. The propulsion subsystem 116 includes components that propel the vehicle 108, such as one or more engines, traction motors, and the like, and/or one or more components that slow, stop, or otherwise effect movement of the vehicle 108, such as one or more brakes (e.g., air brakes, dynamic brakes, and the like).
The vehicles 108 travel along the routes 102 according to a movement plan of the transportation network 100. The movement plan includes schedules for the vehicles 108 to travel. For example, the movement plan may include schedules that direct different vehicles 108 to travel to various destination locations and/or waypoints at associated times, as described above. In one embodiment, the schedule for a vehicle 108 includes a list, table, or other logical arrangement of scheduled geographic locations (e.g., Global Positioning System coordinates) within and/or outside of the transportation network 100 and associated scheduled times that the vehicle 108 is to travel to or past the corresponding locations. In one embodiment, one or more schedules may direct the vehicles 108 to take a designated path (e.g., a designated combination of sections of the routes 102) to a destination location.
The schedules can include movement events between two or more vehicles 108. A movement event includes coordinated travel of the two or more vehicles 108 at a location to avoid the vehicles 108 hitting each other or coming within a designated safety distance of each other. Examples of movement events include meet events, pass events, divergence events, and convergence events.
A meet event involves a first vehicle 108 and a second vehicle 108 concurrently traveling in opposite directions along the same route 102. The first vehicle 108 pulls off of the route 102 onto a siding section route 104 that is joined with the route 102 while the second vehicle 108 passes the first vehicle 108 on the route 102. Once the second vehicle 108 has passed, the first vehicle 108 may pull back onto the route 102 from the siding section route 104 and continue to travel along the route 102 in an opposite direction as the second vehicle 108. A meet event may be included in the schedule of the first vehicle 108 in that the schedule may direct the first vehicle 108 to travel to a location of the siding section route 104 at a scheduled time, to pull onto the siding section route 104 for a designated time period, and/or to pull back onto the route 102 at another scheduled time. The meet event may be included in the schedule of the second vehicle 108 in that the schedule may direct the second vehicle 108 to arrive at the location of the meet event (e.g., where the siding section route 104 is located) at a scheduled time (e.g., after the first vehicle 108 is scheduled to pull onto the siding section route 104) and to continue along the route 102 past the meet event.
A pass event involves a first vehicle 108 and a second vehicle 108 concurrently traveling in the same or a common direction along the same route 102. A pass event alternatively may be referred to as an overtake event or an overtaking event. The first vehicle 108 leads the second vehicle 108 along the route 102. The first vehicle 108 pulls onto a siding section route 104 and allows the second vehicle 108 to pass on the route 102. The first vehicle 108 may then pull back onto the route 102 and follow the second vehicle 108. A pass event may be included in the schedule of the first vehicle 108 in that the schedule may direct the first vehicle 108 to travel to a location of the siding section route 104 at a scheduled time, to pull onto the siding section route 104 for a designated time period, and/or to pull back onto the route 102 at another scheduled time. The pass event may be included in the schedule of the second vehicle 108 in that the schedule may direct the second vehicle 108 to arrive at the location of the pass event (e.g., the location of the siding section route 104) at a scheduled time (e.g., after the first vehicle 108 is scheduled to pull onto the siding section route 104) and to continue along the route 102 past the pass event.
A divergence event involves a first vehicle 108 and a second vehicle 108 concurrently traveling in the same direction on the same or a common route 102 that splits into two or more diverging routes 102. The first vehicle 108 may lead the second vehicle 108 and may pull off of the common route 102 onto a first route 102 of the diverging routes 102. The second vehicle 108 may pull off of the common route 102 onto a different, second route 102 of the diverging routes 102 after the first vehicle 108 has pulled onto the first diverging route 102. The divergence event may be included in the schedule of the first vehicle 108 in that the schedule may direct the first vehicle 108 to travel to the location where the common route 102 diverges into the diverging routes 102 at a scheduled time and/or to pull onto the first diverging route 102 at a scheduled time. The divergence event may be included in the schedule of the second vehicle 108 in that the schedule may direct the second vehicle 108 to travel to the location where the common route 102 diverges at a time that is later than the scheduled time of the first vehicle 108 and/or to pull onto the second diverging route 102 at a scheduled time that is later than the scheduled time of the first vehicle 108.
A convergence event involves a first vehicle 108 and a second vehicle 108 concurrently traveling on different routes 102 that converge into a common route 102, with the first and second vehicles 108 traveling toward the common route 102. The first vehicle 108 pulls onto the common route 102 ahead of the second vehicle 108 and the first and second vehicles 108 continue to travel in the same direction along the common route 102. The convergence event may be included in the schedule of the first vehicle 108 in that the schedule may direct the first vehicle 108 to pull onto the common route 102 at a scheduled time. The convergence event may be included in the schedule of the second vehicle 108 in that the schedule may direct the second vehicle 108 to pull onto the common route 102 at a later scheduled time.
The schedules and/or movement plan may be determined by a scheduling system 118. As shown in
The schedules may be generated based on relative priorities between the vehicles 108. For example, in one embodiment, given a finite set of routes 102 in the transportation network 100 that are available for the vehicles 108 to travel along, the vehicles 108 may be prioritized such that vehicles 108 having higher priorities travel along one or more routes 102 before other vehicles 108 having lower priorities. The priorities may be based on one or more factors such as a financial value of a shipping or transportation contract related to the transport of cargo and/or passengers by the vehicles 108, sizes (e.g., weight and/or length) of the vehicles 108, distances to be traveled by the vehicles 108 to associated destination locations, geographic positions of the destination locations of the vehicles 108, and the like. The schedules may be based on the priorities by scheduling earlier arrival times for the vehicles 108 having higher priorities. In another example, the schedules may be based on the priorities by scheduling different paths along the routes 102 to the destination locations based on the priorities (e.g., by scheduling a shorter and/or more direct path for a higher priority vehicle 108 relative to a lower priority vehicle 108).
The control system 114 may form a trip plan for a trip of the vehicle 108 to travel according to the schedule of the vehicle 108. For example, the control system 114 may generate the trip plan to cause the vehicle 108 to travel to a scheduled destination location at a scheduled arrival time. The trip plan may include throttle settings, brake settings, designated speeds, or the like, of the vehicle 108 for various sections of the trip of the vehicle 108 from a current or starting location to the destination location. For example, the trip plan can include one or more velocity curves that designate various speeds of the vehicle 108 along various sections of the routes 102. The trip plan can be used by the control system 114 to determine the tractive efforts and/or braking efforts of the propulsion subsystem 116 for the trip. The control system 114 may form the control signals based on the trip plan.
In one embodiment, the trip plan is formed by the control system 114 to reduce an amount of energy (e.g., fuel) that is consumed by the vehicle 108 and/or to reduce an amount of emissions generated by the vehicle 108 as the vehicle 108 travels to the destination location associated with the received schedule. The trip plan can include throttle settings, brake settings, designated speeds, or the like, that causes the vehicle 108 to be propelled to the scheduled destination location in a manner that consumes less energy (e.g., fuel) and/or produces less emissions than if the vehicle 108 traveled to the scheduled destination location in another manner. As one example, the vehicle 108 may consume less fuel and/or produce less emissions in traveling to the destination location according to the trip plan than if the vehicle 108 traveled to the same destination location while traveling without using the trip plan, such as by traveling at another predetermined speed (e.g., a speed limit of the routes 102, which may be referred to as “track speed”). The trip plan may result in the vehicle 108 arriving at the scheduled destination later than the scheduled arrival time. For example, following the trip plan may cause the vehicle 108 to arrive later than the scheduled arrival time, but within a predetermined range of time after the scheduled arrival time.
In one embodiment, the scheduling system 118 can use the trip plans sent by the vehicles 108 as an initial guide as to where the vehicles 108 will be located at various times during travel in the transportation network 100. Based on the trip plans, the scheduling system 118 can determine whether the schedules of one or more vehicles 108 need to be updated. For example, one or more of the vehicles 108 communicate the trip plans formed by the control systems 114 to the scheduling system 118. The scheduling system 118 may examine the trip plans to determine if one or more schedules of the vehicles 108 need to be modified. For example, the trip plan of one or more vehicles 108 may result in the vehicles 108 arriving at scheduled destination locations later than the scheduled arrival times. As another example, a trip plan may cause a vehicle 108 to arrive at a movement event, such as a pass event, meet event, convergence event, and/or divergence event, later than a scheduled time. If the vehicle 108 falls sufficiently behind schedule, the vehicle 108 may not arrive at the movement event in time to avoid interfering with another vehicle 108. For example, a first vehicle 108 may be traveling behind schedule such that the first vehicle 108 may be unable or unlikely to avoid collision with, or to avoid coming within a designated safety distance from, another vehicle 108 in a movement event.
If the scheduling system 118 determines that the trip plan of one or more of the vehicles 108 will or is likely to cause interference with the movement of one or more other vehicles 108, then the scheduling system 118 may change the schedules of one or more of the vehicles 108, as described below. For example, the scheduling system 118 may delay the time that one or more vehicles 108 are scheduled to arrive at, pass, or otherwise participate in a movement event. The delayed times may cause the vehicles 108 to be able to participate in the movement event without colliding and/or coming within the designated safety distance from each other. The changes to the schedules may be communicated from the scheduling system 118 to the vehicles 108, such as prior to the vehicles 108 traveling according to the schedules or while the vehicles 108 are moving.
In one embodiment, the scheduling system 118 tracks movements of the vehicles 108 as the vehicles 108 travel according to the schedules and/or trip plans. The scheduling system 118 may monitor actual movement of the vehicles 108 in order to determine if the schedules of one or more of the vehicles 108 needs to be changed. For example, after commencing various trips of the vehicles 108, the scheduling system 118 may periodically or continuously check on current positions (e.g., geographic coordinates, distances along the routes 102 from designated reference points, and the like) and/or actual speeds of the vehicles 118 in order to determine if one or more of the vehicles 108 are significantly deviating from associated schedules. A significant deviation from a schedule may include the vehicle 108 arriving at and/or passing by a location (e.g., a waypoint, movement event, starting location, or other location) later than a scheduled time by more than a designated time threshold. For example, a vehicle 108 that arrives at or passes by a scheduled location more than 20 minutes later than a scheduled time for that location may be considered to have significantly deviated from the schedule when the time threshold is 20 minutes or less. As another example, a significant deviation from a schedule may include a vehicle 108 arriving at or passing by at least a threshold number or percentage of scheduled locations later than associated scheduled times.
The scheduling system 118 can modify the schedules of one or more vehicles 108 based on the actual movements of the vehicles 108. For example, if the scheduling system 118 determines that a vehicle 108 has significantly deviated from a schedule of the vehicle 108, then the scheduling system 118 can change the schedule of that vehicle 108 and/or one or more other vehicles 108 to account for the significant deviation. The changes to the schedules can include delaying a scheduled time and/or changing a location of a movement event, changing a scheduled arrival time at a destination location, changing the destination location, changing a path to be taken to the destination location, and the like.
When the scheduling system 118 modifies the schedules, the scheduling system 118 may communicate the modified schedules to the vehicles 108. The vehicles 108 may receive the modified schedules and the control systems 114 of the vehicles 108 can modify the trip plans of the vehicles 108. For example, based on a changed destination location, arrival time, path to be taken to the destination location, and the like, the control systems 114 may change a speed profile (e.g., one or more throttle settings and/or brake settings of the propulsion subsystems 116) so that the vehicle 108 consumes less energy and/or produces less emissions when traveling to the destination location according to the modified schedule.
The control systems 114 may then transmit the modified trip plans to the scheduling system 118 so that the scheduling systems 118 can determine whether to further modify the schedules, similar to as described above. If any schedules are modified based on the modified trip plans, the control systems 114 can modify one or more trip plans based on the modified schedules. This type of feedback loop between the scheduling system 118 and the control systems 114 can permit the scheduling system 118 and the control systems 114 to work together to coordinate the concurrent movement of several vehicles 108 in the transportation system 100 while reducing the energy consumed and/or emissions produced by the vehicles 108.
The scheduling system 118 includes an output device 204, such as an electronic display, monitor, speaker, tactile device, or other device, that visually, audibly, and/or tactually notifies an operator of output information. The output information may be alarms (e.g., to notify of a significant deviation from a schedule by a vehicle 108 shown in
The scheduling system 118 includes a tracking unit 206 that monitors actual movement of the vehicles 108 in the transportation system 100 (shown in
A communication unit 208 of the scheduling system 118 communicates with the vehicles 108 (shown in
As described above, the vehicle 108 includes the control system 114, which is communicatively coupled with the propulsion subsystem 116 of the vehicle 108. As shown in
The control system 114 includes an energy management unit 306. The energy management unit 306 forms the trip plans for the vehicle 108 that are used to control operations of the propulsion subsystem 116 of the vehicle 108 during a trip of the vehicle 108. A trip of the vehicle 108 includes the travel of the vehicle 108 along the route 102 from a starting location to a scheduled destination location. The energy management unit 308 can form a trip plan for a trip of the vehicle 108 that is dictated by the schedule (or a modified schedule) received from the scheduling system 118, as described above.
In one embodiment, the energy management unit 306 includes a software application or system such as the Trip Optimizer™ system provided by General Electric Company. The energy management unit 306 can use trip data, vehicle data, route data, and/or an update to trip data, vehicle data, or route data to form a trip plan for the vehicle 108.
Trip data includes information about the path taken by the vehicle 108 to travel to a scheduled destination location. By way of example, trip data may include a trip profile of an upcoming trip of the vehicle 108 (such as information that can be used to control one or more operations of the vehicle 108, including tractive and/or braking efforts provided by the vehicle 108 during the trip), station information (such as the location of a beginning station where the upcoming trip is to begin and/or the location of an ending station where the upcoming trip is to end), restriction information (such as work zone identifications, or information on locations where the route 102 shown in
Vehicle data includes information about the vehicle 108 and/or cargo being carried by the vehicle 108. For example, vehicle data may represent cargo content (such as information representative of cargo being transported by the vehicle 108) and/or vehicle information (such as model numbers, manufacturers, horsepower, and the like, of the vehicle 108).
Route data includes information about the route 102 (shown in
The energy management unit 306 can receive at least some of the above data to form the trip plan from an off board source (e.g., a system, device, assembly, and the like, located off of the vehicle 108), such as the scheduling system 118 (shown in
The energy management unit 306 can communicate with a control unit 310 of the control system 114. The control unit 310 generates control signals that are used to control the tractive efforts and/or braking efforts provided by the propulsion subsystem 116 of the vehicle 108. For example, the control unit 310 can form the control signals based on the trip plan that are transmitted to the motive assemblies 302 and/or braking assemblies 304 to change the tractive efforts and/or braking efforts provided by the assemblies 302, 304. The control signals may be transmitted to the propulsion subsystem 116 to automatically control the tractive efforts and/or braking efforts. Alternatively, the control signals may be transmitted to an output device 312, such as an electronic display, monitor, speaker, tactile device, or other device, that visually, audibly, and/or tactually notifies an operator of the throttle settings, brake settings, and/or changes thereto in accordance with the trip plan.
The control system 114 includes a communication unit 308 that controls communication with the vehicle 108. For example, the communication unit 308 may be communicatively coupled with the antenna 122 to communicate with the scheduling system 118 (shown in
The vehicle 108 includes an input device 314, such as a keyboard, microphone, touchscreen, electronic mouse, joystick, or other device, that is controlled by an operator of the vehicle 108 to convey information to the control system 114. For example, the operator may use the input device 314 to control throttle settings, brake settings, modify trip plans, and the like.
The scheduling system 118 (shown in
The schedule of the second vehicle 108b directs the second vehicle 108b to travel to the siding section route 104 and pass by the siding section route 104 at a scheduled time that is after when the first vehicle 108a is scheduled to pull onto the siding section route 104 (as shown in
As shown in
As described above, upon receiving the schedule from the scheduling system 118 (shown in
Additionally or alternatively, the scheduling system 118 may track actual movement of the first vehicle 108a, as described above. For example, the scheduling system 118 may monitor actual movement of the first vehicle 108a as the first vehicle 108a moves toward the meet event. Based on the monitored movements of the first vehicle 108a, the scheduling system 118 can determine if the first vehicle 108a will or is likely to arrive at the meet event later than the first time 714, similar to as described above. The scheduling system 118 can determine that the first vehicle 108a will or is likely to arrive late to the meet event and, as a result, the scheduling system 118 may modify the schedule of the first vehicle 108a.
In another embodiment, the scheduling system 118 may examine the schedules and/or trip plans of the vehicles 108a, 108b to determine if one or more movement events, such as the meet event, can be avoided. A movement event that involves the first vehicle 108a significantly slowing down and/or stopping while remaining in an engine idle state on the siding section route 104 can consume more energy and/or produce more emissions than the first vehicle 108a avoiding the movement event. For example, the scheduling system 118 may determine that the first vehicle 108a will or is likely to burn less fuel and/or produce fewer emissions by traveling at a slower speed to the siding section route 104 such that the first vehicle 108a avoids the meet event and avoids moving to the siding section route 104. The scheduling system 118 may make this determination by calculating how much fuel is consumed and/or emissions generated by the first vehicle 108a from previous trips of the first vehicle 108a, by using known relationships between fuel consumption or emission generation, the path traveled by the first vehicle 108a, and/or the speeds of the first vehicle 108a.
In one embodiment, the scheduling system 118 may change the schedule of the first vehicle 108a by delaying the time at which the first vehicle 108a is scheduled to arrive at the meet event. For example, the scheduling system 118 may push back the scheduled time of arrival of the first vehicle 108a at the first location 400 until after the second vehicle 108b has passed the siding section route 104 and is no longer traveling toward the first vehicle 108a on the second route 102b. With respect to the example shown in
As described above, the scheduling system 118 communicates the change in the schedule of the first vehicle 108a to the first vehicle 108a. In one embodiment, the scheduling system 118 sends the change in the schedule to the first vehicle 108a as the first vehicle 108a is moving toward the meet event. In the example shown in
With continued reference to
The schedule of the second vehicle 108b directs the second vehicle 108b to travel to the siding section route 104 and pass by the siding section route 104 at a time that is after when the first vehicle 108a is scheduled to pull onto the siding section route 104 (as shown in
As shown in
In one embodiment, the scheduling system 118 (shown in
In one embodiment, the scheduling system 118 may change the schedule of the first vehicle 108a by delaying the time at which the first vehicle 108a is scheduled to arrive at the pass event. For example, the scheduling system 118 may push back the scheduled time of arrival of the first vehicle 108a at the first location 400 such that the second vehicle 108b has already passed the first vehicle 108a when the first vehicle 108a pulls onto the second route 102b. The scheduling system 118 communicates the change in the schedule of the first vehicle 108a to the first vehicle 108a. In one embodiment, the scheduling system 118 sends the change in the schedule to the first vehicle 108a as the first vehicle 108a is moving toward the movement event. In the example shown in
With continued reference to
At 1802, schedules are created for plural vehicles to concurrently travel in a transportation network. For example, the scheduling system 118 (shown in
At 1804, one or more trip plans are formed based on the schedules. For example, the control systems 114 (shown in
At 1806, the one or more trip plans are communicated to the scheduling system 118 (shown in
At 1808, a determination is made as to whether expected movement of the vehicles 108 (shown in
If the trip plan will result in or is likely to result in a vehicle 108 (shown in
At 1810, the schedules of one or more of the vehicles 108 (shown in
At 1812, the modified schedules are communicated to the vehicles 108 (shown in
At 1814, a determination is made as to whether energy can be conserved and/or fewer emissions generated by one or more of the vehicles 108 (shown in
At 1816, the schedules of one or more of the vehicles 108 (shown in
At 1818, the modified schedules are communicated to the vehicles 108 (shown in
At 1820, actual movement of the vehicles 108 (shown in
At 1822, a determination is made as to whether the actual movements of the vehicles 108 (shown in
If the actual movements of the vehicles 108 (shown in
At 1824, the schedules of one or more of the vehicles 108 (shown in
At 1826, the modified schedules are communicated to the vehicles 108 (shown in
Several vehicles 1908 (e.g., vehicles 1908a-d) may concurrently travel along the routes 1902 in the transportation network 1900. In the illustrated embodiment, the vehicles 1908 are shown and described herein as rail vehicles or rail vehicle consists. However, one or more other embodiments may relate to vehicles other than rail vehicles or rail vehicle consists. The vehicles 1908 are individually referred to by the reference numbers 1908a, 1908b, 1908c, and 1908d. While four vehicles 1908 are shown in
A vehicle 1908 may include a group of powered units 1910 (e.g., locomotives or other vehicles capable of self-propulsion) and/or non-powered units 1912 (e.g., cargo cars, passenger cars, or other vehicles incapable of self-propulsion) that are mechanically coupled or linked together to travel along the routes 102. The routes 102 are interconnected to permit the vehicles 1908 to travel over various combinations of the routes 102 to move from a starting location to a destination location.
The vehicles 1908 travel along the routes 102 according to a movement plan of the transportation network 1900. The movement plan coordinates movement of the vehicles 1908 in the transportation network 1900. For example, the movement plan may include schedules for the vehicles 1908 to move from a starting location or a current location to a destination location at a scheduled arrival time. In one embodiment, the movement plan includes a list, table, or other logical arrangement of scheduled geographic locations (e.g., Global Positioning System coordinates) within the transportation network 1900 and associated scheduled arrival times. The vehicles 1908 move along various paths within the transportation network 1900 to arrive at the scheduled locations at the associated scheduled arrival times. The scheduled locations in the movement plan can be referred to as “scheduled waypoints.”
The movement plan may be determined by a scheduling system 1914. As shown in
The vehicles 1908 include control systems 1918 disposed on-board the vehicles 1908. The control systems 1918 receive the schedules from the scheduling system 1914 and generate control signals that may be used to control propulsion of the vehicles 1908 through the transportation network 1900. For example, the vehicles 1908 may include wireless antennas 1920, such as RF or cellular antennas that receive the schedules from the scheduling system 1914. On each vehicle, the wireless antenna 1920 communicates the received schedule to the control system 1918 that may be disposed on-board the vehicle 1908. The control system 1918 examines the schedule, such as by determining the scheduled destination location and scheduled arrival time, and generates control signals based on the schedule.
The control signals may be used to automatically control tractive efforts and/or braking efforts of the vehicle 1908 such that the vehicle 1908 self-propels along the routes 102 to the destination location. For example, the control system 1918 may be operatively coupled with a propulsion subsystem 1922 of the vehicle 1908. The propulsion subsystem 1922 may include motors (such as traction motors), engines, brakes (such as air brakes and/or regenerative brakes), and the like, that generate tractive energy to propel the vehicle 1908 and/or slow movement of the vehicle 1908. The control system 1918 may generate control signals that automatically control the propulsion subsystem 1922, such as by automatically changing throttle settings and/or brake settings of the propulsion subsystem 1922.
In another embodiment, the control signals may be used to prompt an operator of the vehicle 1908 to manually control the tractive efforts and/or braking efforts of the vehicle 1908. For example, the control system 1918 may include an output device, such as a computer monitor, touchscreen, acoustic speaker, or the like, that generates visual and/or audible instructions based on the control signals. The instructions may direct the operator to change throttle settings and/or brake settings of the propulsion subsystem 1922.
As described below, the control system 1918 may form a trip plan for a trip of the vehicle 1908 to travel to a scheduled destination location at a scheduled arrival time. The trip plan may include throttle settings, brake settings, designated speeds, or the like, of the vehicle 1908 for various sections of the trip of the vehicle 1908. For example, the trip plan can include one or more velocity curves that designate various speeds of the vehicle 1908 along various sections of the routes 102. The trip plan can be used by the control system 1918 to determine the tractive efforts and/or braking efforts of the propulsion subsystem 1922 for the trip. The control system 1918 may form the control signals based on the trip plan.
In one embodiment, the trip plan is formed by the control system 1918 to reduce an amount of fuel that is consumed by the vehicle 1908 as the vehicle 1908 travels to the destination location associated with the received schedule. The control system 1918 may create a trip plan having throttle settings, brake settings, designated speeds, or the like, that propels the vehicle 1908 to the scheduled destination location in a manner that consumes less fuel than if the vehicle 1908 traveled to the scheduled destination location in another manner. As one example, the vehicle 1908 may consume less fuel in traveling to the destination location according to the trip plan than if the vehicle 1908 traveled to the destination location while traveling at another predetermined speed, such as the maximum allowable speed of the routes 1902 (which may be referred to as “track speed”). The trip plan may result in the vehicle 1908 arriving at the scheduled destination later than the scheduled arrival time. For example, following the trip plan may cause the vehicle 1908 to arrive later than the scheduled arrival time, but within a predetermined range of time after the scheduled arrival time.
As the vehicles 1908 travel in the transportation network 1900, the vehicles 1908 may encounter one or more anomalies. For example, the condition of a vehicle 1908 may change (e.g., due to mechanical failure or a need for mechanical repair), the condition of a section of the route 1902 over which the vehicle 1908 is to travel may change (e.g., broken section of rail, a slow order is implemented, or the like), and/or one or more other vehicles 1908 may enter into the transportation network 1900 in such a manner as to impact the travel of the vehicle 1908. The anomalies may negatively impact travel of the vehicles 1908 according to the associated schedules. For example, with the presence or discovery of an anomaly, a vehicle 1908 may be prevented from traveling to the scheduled destination location at the scheduled arrival time.
The anomaly may be discovered by or reported to the scheduling system 1914. The scheduling system 1914 can modify the schedules of one or more of the vehicles 1908 in order to account for the anomaly. For example, the scheduling system 1914 can change the scheduled destination location, the scheduled arrival time, and/or the path to be taken by a vehicle 1908 during a trip. The scheduling system 1914 may modify an initial schedule or a previous schedule that was formed without taking the anomaly into consideration into a modified schedule that takes the anomaly into consideration. For example, an initial schedule may have a scheduled arrival time that cannot be made by a vehicle 1908 due to an anomaly while a modified schedule may include a later modified arrival time that can be made by the vehicle 1908 even with the anomaly impeding travel of the vehicle 1908.
The scheduling system 1914 transmits one or more of the modified schedules to the vehicles 1908. The control systems 1918 receive the modified schedules and can adjust control of the vehicles 1908 accordingly. For example, a control system 1918 may receive a modified schedule, form a modified trip plan based on a modified arrival time and/or a modified destination location of the modified schedule, and generate control signals to implement the modified trip plan. The vehicle 1908 may then travel in the transportation network 1900 according to the modified schedule.
The scheduling system 1914 includes a controller 2000, such as a computer processor or other logic-based device that performs operations based on one or more sets of instructions (e.g., software). The instructions on which the controller 2000 operates may be stored on a tangible and non-transitory (e.g., not a transient signal) computer readable storage medium, such as a memory 202002. The memory 202002 may include one or more computer hard drives, flash drives, RAM, ROM, EEPROM, and the like. Alternatively, one or more of the sets of instructions that direct operations of the controller 2000 may be hard-wired into the logic of the controller 2000, such as by being hard-wired logic formed in the hardware of the controller 2000.
The scheduling system 1914 includes several modules that perform various operations described herein. The modules are shown as being included in the controller 2000. As described above, the modules may include hardware and/or software systems that operate to perform one or more functions, such as the controller 2000 and one or more sets of instructions. Alternatively, one or more of the modules may include a controller that is separate from the controller 2000.
The scheduling system 1914 includes a scheduling module 2006 that creates schedules for the vehicles 1908 (shown in
The scheduling module 2006 creates schedules for the vehicles 1908 (shown in
The initial schedules of the vehicles 1908 (shown in
The throughput parameter may be based on or calculated from the statistical measures of adherence of the vehicles 1908 (shown in
The scheduling module 2006 can create and coordinate the initial schedules of the vehicles 1908 (shown in
The scheduling system 1914 can include a tracking module 2008. The tracking module 2008 can monitor travel of the vehicles 1908 (shown in
The tracking module 2008 may determine the throughput parameters used by the scheduling module 2006 to create and/or coordinate the schedules of the vehicles 1908 (shown in
Alternatively, the vehicle 1908 (shown in
The tracking module 2008 may calculate the statistical measure of adherence as a time difference between the ETA of a vehicle 1908 (shown in
The tracking module 2008 may determine the throughput parameters for the transportation network 1900 (shown in
Table 1 below provides examples of statistical measures of adherence of a vehicle 1908 (shown in
The third column includes a list of the actual times that the vehicle 1908 (shown in
The differences between when the vehicle 1908 (shown in
Alternatively, the tracking module 2008 may count the number of scheduled locations that the vehicle 1908 (shown in
The tracking module 2008 may calculate the statistical measure of adherence by the vehicle 1908 (shown in
Alternatively, the tracking module 2008 may calculate the statistical measure of adherence by the vehicle 1908 (shown in
In another embodiment, the tracking module 2008 may calculate the average statistical measure of adherence by comparing the deviation of each vehicle 1908 (shown in
The tracking module 2008 can determine the throughput parameter of the transportation network 1900 (shown in
In one embodiment, the scheduling module 2006 may generate several different sets of potential schedules for the vehicles 1908 (shown in
The vehicles 1908 (shown in
The anomalies may be detected or identified by the vehicles 1908 (shown in
The scheduling system 1914 includes a resolution module 2010 that modifies one or more of the schedules of the vehicles 1908 (shown in
The resolution module 2010 can modify the initial schedules based on one or more factors. In one embodiment, the resolution module 2010 changes the initial schedules to the modified schedules based on simulated throughput parameters of the transportation network 1900 (shown in
The resolution module 2010 can modify the initial schedules based on fuel efficiencies of the vehicles 1908 (shown in
Delaying the scheduled arrival times of the more fuel-efficient vehicles 1908 by greater amounts than the less-fuel efficient vehicles 1908 can result in consuming less total fuel by the vehicles 1908. For example, delaying the scheduled arrival time of a vehicle 1908 increases the amount of time that the vehicle 1908 is consuming fuel to move toward the scheduled destination location at the delayed arrival time. As the amount of time that a less fuel-efficient vehicle 1908 is consuming fuel increases, the vehicle 1908 consumes more fuel relative to a more fuel-efficient vehicle 1908.
Modifying the schedule of one or more vehicles 1908 (shown in
The resolution module 2010 conveys the modified schedules to the scheduling module 2006 so that the scheduling module 2006 can transmit the modified schedules to the vehicles 1908 (shown in
The control systems 1918 of the vehicles 1908 (shown in
The control system 1918 includes several modules that perform various operations described herein. The modules are shown as being included in the controller 2012. As described above, the modules may include hardware and/or software systems that operate to perform one or more functions, such as the controller 2012 and one or more sets of instructions. Alternatively, one or more of the modules may include a controller that is separate from the controller 2012.
The control system 1918 receives the schedules from the scheduling system 1914. The controller 2012 may be operatively coupled with the antenna 1920 to receive the initial and/or modified schedules from the scheduling system 1914. In one embodiment, the schedules are conveyed to an energy management module 2004 of the control system 1918 that is disposed on-board a vehicle 1908 (shown in
The energy management module 2004 receives the schedule sent from the scheduling system 1914 and generates a trip plan based on the schedule. As described above, the trip plan may include throttle settings, brake settings, designated speeds, or the like, of the vehicle 1908 for various sections of a scheduled trip of the vehicle 1908 to the scheduled destination location. The trip plan may be generated to reduce the amount of fuel that is consumed by the vehicle 1908 as the vehicle 1908 travels to the destination location relative to travel by the vehicle 1908 to the destination location when not abiding by the trip plan.
In order to generate the trip plan for the vehicle 1908 (shown in
The trip plan is formulated by the energy management module 2004 based on the trip profile. For example, if the trip profile requires the vehicle 1908 to traverse a steep incline and the trip profile indicates that the vehicle 1908 is carrying significantly heavy cargo, then the energy management module 2004 may form a trip plan that includes or dictates increased tractive efforts to be provided by the propulsion subsystem 1922 of the vehicle 1908. Conversely, if the vehicle 1908 is carrying a smaller cargo load and/or is to travel down a decline in the route 1902 based on the trip profile, then the energy management module 2004 may form a trip plan that includes or dictates decreased tractive efforts by the propulsion subsystem 1922 for that segment of the trip. In one embodiment, the energy management module 2004 includes a software application or system such as the Trip Optimizer™ system provided by General Electric Company.
The control system 1918 includes a control module 2016 that generates control signals for controlling operations of the vehicle 1908 (shown in
The energy management module 2004 can generate an initial trip plan for an initial schedule formed by the scheduling system 1914. As described above, an initial trip plan may not be limited to just the first trip plan generated for a vehicle 1908 (shown in
The vehicles 1908 (shown in
For example, an initial trip plan for a vehicle 1908 (shown in
In one embodiment, the tracking module 2008 of the scheduling system 1914 may continue to monitor movement (e.g., locations and associated times) of the vehicles 1908 (shown in
In one embodiment, the resolution module 2010 changes one or more of the modified schedules of the vehicles 1908 after an anomaly is removed. For example, if an anomaly that caused the resolution module 2010 to change one or more initial schedules of the vehicles 1908 to first modified schedules is removed from the transportation network 1900 (shown in
With respect to the vehicles 1908, one or more on-board sensors 2102 may be disposed on-board the vehicles 1908 to detect anomalies related to the vehicles 1908 (e.g., mechanical failure or characteristics of operation that indicate an impending mechanical failure). The on-board sensors 2102 can monitor operational characteristics of the vehicle 1908 to determine if an anomaly related to the vehicle 1908 occurs. For example, motor current signature analysis may be performed on-board the vehicles 1908 to determine if a bearing, axle, or other component of the vehicle 1908 has failed or is tending toward failure. A temperature sensor may determine if an engine or motor of the vehicle 1908 is overheating or tending toward overheating. Other types of sensors may be used as the on-board sensor 2102. If the characteristic being monitored by an on-board sensor 2102 exceeds or falls below one or more thresholds, then the characteristic may indicate that an anomaly has occurred or is about to occur.
The control system 1918 may periodically poll the sensors 2102 and/or the sensors 2102 may periodically report the monitored characteristics of the vehicle 1908 to the control system 1918. In another example, the sensors 2102 may report the characteristics to the control system 1918 when the characteristics indicate an anomaly (e.g., exceed or fall below a threshold) or a trend toward occurrence of an anomaly (e.g., the monitored characteristics are increasing or decreasing over time toward a threshold indicative of an anomaly). The control system 1918 may generate an output signal that represents detection of the anomaly. For example, the control module 2016 (shown in
The control system 1918 may transmit the output signal to one or more recipients, such as the scheduling system 1914 and/or a facility 2104 disposed off-board the vehicle 1908. For example, the control system 1918 may wirelessly transmit the output signal to the antenna 1916 of the scheduling system 1914 or to an antenna 2106 of the facility 2104. The scheduling system 1914 can receive the output signal to determine that an anomaly has occurred or is likely to occur and can modify one or more schedules of the vehicles 1908, as described above.
In one embodiment, the facility 2104 is a maintenance facility that repairs the vehicle 1908. The facility 2104 may receive the output signal and determine that the vehicle 1908 is in need of repair or maintenance. The facility 2104 can generate notifications to operators working at the facility 2104 that the vehicle 1908 is in need of repair or maintenance. The scheduling system 1914 may modify the schedule of the vehicle 1918 to arrive at the facility 2104. For example, the schedule of the vehicle 1908 may be modified such that the destination location is the location of the facility 2104 and the arrival time is a scheduled appointment for the vehicle 1908 to be repaired. The scheduling system 1914 can transmit the modified schedule to both the vehicle 1908 and the facility 2104 so that the vehicle 1908 travels to the facility 2104 for repair and so that the facility 2104 knows when to expect the vehicle 1908.
With respect to the off-board sensors 2100, one or more of the sensors 2100 may be disposed off-board the vehicles 1908 and alongside the routes 1902 in the transportation network 1900 to detect anomalies related to the vehicles 1908 and/or the route. The off-board sensors 2100 can monitor operational characteristics of the vehicle 1908 to determine if an anomaly related to the vehicle 1908 occurs. For example, the off-board sensors 2100 can include a hot box detector disposed alongside the route 1902 to monitor axle, bearing, and/or wheel temperatures of the vehicle 1908 as the vehicle 1908 passes the off-board sensor 2100. As another example, the off-board sensors 2100 can measure characteristics of the route 1902 (e.g., resistivity and/or conductivity of a railroad track) to determine if the route 1902 is broken or otherwise in need of repair. If the characteristic being monitored by an off-board sensor 2100 exceeds or falls below one or more thresholds, then the characteristic may indicate that an anomaly has occurred or is about to occur.
The scheduling system 1914 may periodically poll the off-board sensors 2100 and/or the off-board sensors 2100 may periodically report the monitored characteristics to the scheduling system 1914. In another example, the off-board sensors 2100 may report the characteristics to the scheduling system 1914 when the characteristics indicate an anomaly or a trend toward occurrence of an anomaly. The scheduling system 1914 may generate and transmit an alert signal when the anomaly is detected (e.g., when the characteristics representative of the anomaly or a trend toward an anomaly are received). For example, the tracking module 2008 (shown in
The alert signal is transmitted to one or more recipients, such as the facility 2104. As described above, in one embodiment, the scheduling system 1914 can modify the schedule of the vehicle 1908 and notify the facility 2104 via the alert signal such that the vehicle 1908 proceeds to the facility 2104 for repair. As another example, the scheduling system 1914 may transmit the alert signal to the facility 2104 such that the location of an anomaly related to the route 1902 is identified to the facility 2104. The facility 2104 can then arrange for one or more persons and/or equipment to go to the location to repair the route 1902 or otherwise remove or correct the anomaly.
At 2202, initial schedules of a plurality of vehicles 1908 (shown in
At 2204, the initial schedules are communicated to the vehicles 1908 (shown in
At 2206, movement of the vehicles 1908 (shown in
At 2208, a determination is made as to whether one or more anomalies are identified in the transportation network 1900 (shown in
If an anomaly is detected, then the schedules of one or more of the vehicles 1908 (shown in
In one embodiment, at 2210, one or more corrective actions are taken to remove or otherwise remediate the detected anomaly. For example, an output signal or an alert signal may be transmitted to the facility 2104 (shown in
At 2212, one or more of the initial schedules of the vehicles 1908 (shown in
At 2214, the modified schedules are communicated to the vehicles 1908 (shown in
In one embodiment, movement of the vehicles 1908 (shown in
At 2302, an initial trip plan is formed. The initial trip plan may be created based on an initial schedule received from the scheduling system 1914 (shown in
At 2304, the vehicle 1908 (shown in
At 2306, a determination is made as to whether one or more anomalies are identified in the transportation network 1900 (shown in
If an anomaly is detected, then the schedule of the vehicle 1908 (shown in
On the other hand, if an anomaly is not detected, then the flow of the method 2300 may return to 2304 where the vehicle 1908 continues to move toward the scheduled destination location according to the initial trip plan.
In one embodiment, at 2308, the anomaly is reported to an off-board location. For example, if the vehicle 1908 (shown in
At 2310, a modified schedule is received. As described above, one or more of the initial schedules of the vehicles 1908 (shown in
At 2312, the trip plan of the vehicle 1908 (shown in
At 2314, the vehicle 1908 (shown in
In one embodiment, a system includes a scheduling module and a resolution module. The scheduling module is configured to determine plural initial schedules for plural different vehicles to concurrently travel in a transportation network formed from a plurality of interconnected routes. The initial schedules include one or more locations and associated times for the vehicles to travel along the routes of the transportation network. The resolution module is configured to modify at least one of the initial schedules to one or more modified schedules based on an anomaly in at least one of the vehicles or the routes that prevents one or more of the vehicles from traveling in the transportation network according to one or more of the initial schedules associated with the one or more of the vehicles. The scheduling module is configured to communicate the one or more modified schedules to one or more of the vehicles so that energy management systems disposed on the one or more of the vehicles modify travel of the one or more vehicles in the transportation network according to the one or more modified schedules.
In another aspect, the resolution module is configured to modify the at least one of the initial schedules based on the anomaly that includes a mechanical failure of the at least one of the vehicles or the routes.
In another aspect, the resolution module is configured to modify the at least one of the initial schedules based on the anomaly that includes one or more additional vehicles entering into the transportation network and the initial schedules are based on the additional vehicles being absent from the transportation network. For example, the initial schedules may be created with the expectation or assumption that the additional vehicles are not in the transportation network when the vehicles associated with the initial schedules travel in the transportation network. Alternatively, the existence of the additional vehicles may be unknown when the initial schedules are created. Then, when the additional vehicles enter into the transportation network and the vehicles with the initial schedules are impacted or may be impacted by the additional vehicles, the initial schedules may be modified to account for the additional vehicles, such as by changing paths, schedules times, destination locations, and the like, of the initial schedules, as described above.
In another aspect, the scheduling module is configured to, responsive to receiving information of the anomaly, communicate an alert signal to a maintenance facility that provides for at least one of repair, correction, or removal of the anomaly from the transportation network.
In another aspect, the resolution module is configured to receive an output signal from at least one of the vehicles that identifies the anomaly in the transportation network.
In another aspect, the resolution module is configured to identify a location of the anomaly in the transportation network based on the output signal.
In another aspect, the output signal includes information representative of one or more of a change in tractive efforts of the at least one of the vehicles, or a change in braking efforts of the at least one of the vehicles.
In another aspect, the output signal includes a notification that the at least one of the vehicles will arrive at a destination location of the initial schedule associated with the at least one of the vehicles later than an initially scheduled time.
In another aspect, the resolution module is configured to modify at least one of the initial schedules by changing one or more of a destination location or a time at which at least one of the vehicles associated with the at least one of the initial schedules is to arrive at the destination location.
In another aspect, the system also includes a tracking module configured to monitor changing locations of the vehicles in the transportation network based on at least the modified schedules of the vehicles.
In another aspect, the resolution module is configured to modify the at least one of the initial schedules to maintain a throughput parameter of the transportation network above a non-zero threshold. The throughput parameter includes a measure of adherence by the vehicles to the modified schedules as the vehicles concurrently move through the transportation network.
In another aspect, the resolution module is configured to change one or more of the modified schedules when the anomaly is removed from the transportation network and communicate the one or more modified schedules that are changed to one or more of the vehicles.
In another aspect, the scheduling module is configured to determine the initial schedules and the resolution module is configured to modify the initial schedules for rail vehicle consists traveling in the transportation network formed from interconnected tracks.
In another embodiment, another system includes an energy management module and a communication module. The energy management module is configured to generate an initial trip plan for a control unit of a first vehicle. The initial trip plan is based on an initial schedule of travel for the first vehicle in a transportation network formed from a plurality of interconnected routes. The initial trip plan is used by the control unit to control tractive efforts of the first vehicle in the transportation network. The communication module is configured to receive a modified schedule for travel of the first vehicle in the transportation network. The modified schedule is based on discovery of an anomaly in the transportation network that prevents the first vehicle from traveling in the transportation network according to the initial schedule. The energy management module is configured to change the initial trip plan to a modified trip plan based on the modified schedule and communicate the modified trip plan to the control unit to change the tractive efforts of the first vehicle.
In another aspect, the energy management module is configured to form at least one of the initial trip plan or the modified trip plan to reduce an amount of fuel consumed by the first vehicle to travel in the transportation network according to the corresponding initial schedule or the modified schedule relative to traveling in the transportation network according to a different schedule.
In another aspect, the energy management module is configured to generate the initial trip plan based on a destination location and a time at which the vehicle is to arrive at the destination location according to the initial schedule.
In another aspect, the energy management module is configured to change the initial trip plan to the modified trip plan by modifying at least one of the destination location or the time associated with the destination location.
In another aspect, the energy management module is configured to change the initial trip plan when the first vehicle discovers the anomaly in the transportation network and prior to the communication module receiving the modified schedule.
In another aspect, the communication module is configured to transmit an output signal to an off-board network scheduling system to notify the scheduling system of the anomaly when the first vehicle discovers the anomaly.
In another aspect, the communication module is configured to notify the network scheduling system of the anomaly that includes at least one of a mechanical failure of one or more other vehicles traveling in the transportation network, a mechanical failure of one or more of the routes of the transportation network, or entry of one or more other vehicles into the transportation network.
In another aspect, the communication module is configured to notify the network scheduling system of the anomaly by transmitting the output signal to the network scheduling system.
In another aspect, the output signal includes information representative of a change in the tractive efforts of the first vehicle or a change in braking efforts of the first vehicle.
In another aspect, the output signal includes a notification that the first vehicle will arrive at a destination location of the initial schedule later than an initially scheduled time.
In another aspect, the energy management module and the communication module are configured to be disposed on-board a rail vehicle consist traveling in the transportation network formed from interconnected tracks.
In another aspect, the energy management module is configured to change the modified trip plan when the anomaly is removed from the transportation network.
In another embodiment, a method includes determining plural initial schedules for plural different vehicles to concurrently travel in a transportation network formed from a plurality of interconnected routes. The initial schedules include one or more locations and associated times for the vehicles to travel along the routes of the transportation network. The method also includes identifying an anomaly in at least one of the vehicles or the routes that prevents one or more of the vehicles from traveling in the transportation network according to one or more of the initial schedules associated with the one or more of the vehicles and modifying at least one of the initial schedules to one or more modified schedules based on an anomaly. The method further includes communicating the one or more modified schedules to one or more of the vehicles so that energy management systems disposed on the one or more of the vehicles modify travel of the one or more vehicles in the transportation network according to the one or more modified schedules.
In another aspect, the method also includes communicating the initial schedules to the vehicles, and wherein modifying the at least one of the initial schedules occurs after the initial schedules are communicated to the vehicles.
In another aspect, identifying the anomaly includes one or more of: identifying a mechanical failure of the at least one of the vehicles or the routes or determining when one or more additional vehicles enter into the transportation network when the initial schedules are based on an absence of the additional vehicles from the transportation network.
In another aspect, the method also includes communicating an alert signal to a maintenance facility that provides for at least one of repair, correction, or removal of the anomaly from the transportation network.
In another aspect, the method also includes determining a location of the anomaly in the transportation network based on an output signal from at least one of the vehicles.
In another aspect, the output signal includes information representative of one or more of a change in tractive efforts of the at least one of the vehicles, a change in braking efforts of the at least one of the vehicles, or a notification that the at least one of the vehicles will arrive at a destination location of the initial schedule associated with the at least one of the vehicles later than an initially scheduled time.
In another aspect, modifying the at least one of the initial schedules includes forming the one or more modified schedules such to maintain a throughput parameter of the transportation network above a threshold. The throughput parameter includes a measure of adherence by the vehicles to the modified schedules as the vehicles concurrently move through the transportation network.
In another aspect, determining the initial schedules includes forming the initial schedules and modifying the at least one of the initial schedules includes changing the at least one of the initial schedules for rail vehicle consists traveling in the transportation network formed from interconnected tracks.
In another embodiment, another method includes generating an initial trip plan for a control unit of a first vehicle. The initial trip plan is based on an initial schedule of travel for the first vehicle in a transportation network formed from a plurality of interconnected routes. The initial trip plan is used by the control unit to control tractive efforts of the first vehicle in the transportation network. The method also includes receiving a modified schedule for travel of the first vehicle in the transportation network. The modified schedule is based on discovery of an anomaly in the transportation network that prevents the first vehicle from traveling in the transportation network according to the initial schedule. The method further includes changing the initial trip plan to a modified trip plan based on the modified schedule. The modified trip plan used by the control unit to change the tractive efforts of the first vehicle.
In another aspect, generating the initial trip plan or changing the initial trip plan includes forming the initial trip plan or the modified trip plan to reduce an amount of fuel consumed by the first vehicle to travel in the transportation network according to the corresponding initial schedule or modified schedule relative to traveling in the transportation network according to a different schedule.
In another aspect, the method also includes transmitting an output signal to an off-board network scheduling system to notify the scheduling system of the anomaly when the first vehicle discovers the anomaly.
In another aspect, transmitting the output signal includes communicating the output signal that includes information representative of a change in the tractive efforts of the first vehicle, a change in braking efforts of the first vehicle, or a notification that the first vehicle will arrive at a destination location of the initial schedule later than an initially scheduled time.
In another aspect, generating the initial trip plan and changing the initial trip plan include forming the initial trip plan and the modified trip plan for a rail vehicle consist traveling in the transportation network formed from interconnected tracks.
Embodiments of the invention relate to transportation network systems for scheduling and controlling vehicles (e.g., rail vehicles) travelling in the network. An off-board scheduling system (e.g., located at a central dispatch office) generates a movement schedule for plural vehicles in the network. For each vehicle, the movement schedule includes at least one destination and arrival time; the schedule may also include a designated route. The schedule is generated based on information of the network currently known to the scheduling system at the time the schedule is generated. The scheduling system communicates to the schedule to the plural vehicles. Based in part on the received schedule, each vehicle generates a trip plan. The trip plan is generated by an on-board energy management system, taking into account the schedule, vehicle characteristics, route characteristics, and one or more objectives, such as saving fuel or reducing emissions (versus controlling the vehicle not using the trip plan). The trip plan may be configured for control of the vehicle as described above, e.g., it establishes throttle or other vehicle fraction control settings for a plurality of points along the route, as a function of time and/or location.
Each vehicle is controlled along its respective route according to its respective trip plan. During travel, upon the occurrence and detection of an anomaly in the transportation network: (i) a vehicle trip plan may be re-planned (resulting in a modified trip plan) based on the anomaly; and/or (ii) the schedule may be re-scheduled, resulting in a modified schedule. In one aspect, the scheduling system is appraised of the anomaly before a vehicle, in which case the scheduling system generates a modified schedule, communicates the modified schedule to the vehicle, and the vehicle generates a modified trip plan, based on the modified schedule, for subsequent control of the vehicle. In another aspect, the vehicle is aware of the anomaly before receiving a modified schedule that takes into account the anomaly (and for this purpose, modified schedules may be communicated to include information about the anomaly or other reason for the modified schedule), and: (i) immediately generates a modified trip plan based on the anomaly, communicates the anomaly to the scheduling system, and generates a new modified trip plan if a modified schedule is received from the scheduling system that necessitates or warrants a new modified trip plan; or (ii) does not immediately generate a modified trip plan, but instead communicates the anomaly to the scheduling system, and generates a modified trip plan when a modified schedule is received from the scheduling system.
Thus, in an embodiment, a method for controlling a vehicle comprises a step of receiving at the vehicle an initial schedule from an off-board scheduling system, and generating an initial trip plan based in part on the initial schedule. The vehicle is controlled along a route according to the initial trip plan. The method further comprises generating a modified trip plan of the initial trip plan whenever a modified schedule is received from the scheduling system, and when the vehicle detects an anomaly associated with its travel. The method further comprises communicating the anomaly from the vehicle to the scheduling system. The method may further comprise generating the modified trip plan based on operational information of the vehicle, i.e., information relating to the vehicle in operation. In another embodiment, the method further comprises communicating information associated with a modified trip plan to the scheduling system whenever a vehicle generates a modified trip plan. In another embodiment, a modified trip plan or modified schedule is generated only if an anomaly meets one or more designated criteria. In another embodiment, different criteria are established for generating modified trip plans and generating modified schedules, that is, certain events may warrant generating a modified trip plan but not a modified schedule, and vice versa.
In another embodiment, a method is provided that includes forming a first schedule for a first vehicle to travel in a transportation network. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The method also includes receiving a first trip plan for the first vehicle from an energy management system. The first trip plan is based on the first schedule and designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The method further includes determining whether to modify the first schedule to avoid interfering with movement of one or more other vehicles by examining the trip plan for the first vehicle.
In another aspect, the method also includes modifying the first schedule into a different, modified second schedule based on the trip plan and communicating the modified second schedule to the first vehicle.
In another aspect, the method also includes receiving a different, modified second trip plan for the first vehicle that is based on the modified second schedule and determining whether to modify the modified second schedule based on the modified second trip plan.
In another aspect, the method also includes tracking actual movement of the first vehicle in the transportation network and modifying the first schedule of the first vehicle based on the actual movement.
In another aspect, the method also includes communicating the first schedule to the energy management system that is disposed on-board the first vehicle so that the energy management system can form the trip plan based on the first schedule.
In another aspect, the method also includes modifying the first schedule to avoid at least one of a meet event or a pass event between the first vehicle and one or more other vehicles.
In another aspect, the method also includes modifying the first schedule includes delaying a time that the first vehicle is to arrive at a siding section route for the at least one of the meet event or the pass event.
In another embodiment, a system is provided that includes a scheduling unit and a communication unit. The scheduling unit is configured to form a first schedule for a first vehicle to travel in a transportation network. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The communication unit is configured to receive a first trip plan for the first vehicle from an energy management system. The first trip plan is based on the first schedule and designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The scheduling unit also is configured to determine whether to modify the first schedule to avoid interfering with movement of one or more other vehicles by examining the trip plan for the first vehicle.
In another aspect, the scheduling unit is configured to modify the first schedule into a different, modified second schedule based on the trip plan and the communication unit is configured to communicate the modified second schedule to the first vehicle.
In another aspect, the communication unit is configured to receive a different, modified second trip plan for the first vehicle that is based on the modified second schedule and the scheduling unit is configured to determine whether to modify the modified second schedule based on the modified second trip plan.
In another aspect, the system also includes a tracking unit that is configured to monitor actual movement of the first vehicle in the transportation network, wherein the scheduling unit is configured to modify the first schedule of the first vehicle based on the actual movement.
In another aspect, the communication unit is configured to communicate the first schedule to the energy management system that is disposed on-board the first vehicle so that the energy management system can form the trip plan based on the first schedule.
In another aspect, the scheduling unit is configured to modify the first schedule to avoid at least one of a meet event or a pass event between the first vehicle and one or more other vehicles.
In another aspect, the scheduling unit is configured to modify the first schedule by delaying a time that the first vehicle is to arrive at a siding section route for the at least one of the meet event or the pass event.
In another embodiment, a method is provided that includes receiving a first schedule for a first vehicle to travel in a transportation network from a scheduling system. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The method also includes forming a first trip plan for the first vehicle based on the first schedule. The trip plan designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The method further includes communicating the first trip plan to the scheduling system so that the scheduling system can examine the first trip plan and determine whether to modify the first schedule based on the first trip plan.
In another aspect, the method also includes receiving a different, modified second schedule from the scheduling system that is based on the first trip plan and forming a different, modified second trip plan based on the modified second schedule.
In another aspect, the method also includes communicating the second trip plan to the scheduling system to enable the scheduling system to determine whether to modify the modified second schedule based on the modified second trip plan.
In another aspect, the method also includes reporting location information of the first vehicle to the scheduling system to permit the scheduling system to modify the first schedule of the first vehicle based on the location information.
In another embodiment, a system is provided that includes a communication unit and an energy management unit. The communication unit is configured to receive a first schedule for a first vehicle to travel in a transportation network from a scheduling system. The first schedule includes a first arrival time of the first vehicle at a scheduled location. The energy management unit is configured to form a first trip plan for the first vehicle based on the first schedule. The trip plan designates at least one of tractive efforts or braking efforts to be provided by the first vehicle to reduce at least one of an amount of energy consumed by the first vehicle or an amount of emissions generated by the first vehicle when the first vehicle travels through the transportation network to the scheduled location. The communication unit also is configured to communicate the first trip plan to the scheduling system so that the scheduling system can examine the first trip plan and determine whether to modify the first schedule based on the first trip plan.
In another aspect, the communication unit is configured to receive a different, modified second schedule from the scheduling system that is based on the first trip plan and the energy management unit is configured to form a different, modified second trip plan based on the modified second schedule.
In another aspect, the communication unit is configured to communicate the second trip plan to the scheduling system to enable the scheduling system to determine whether to modify the modified second schedule based on the modified second trip plan.
In another aspect, the system also includes a location determining device configured to determine location information of the first vehicle to permit the scheduling system to modify the first schedule of the first vehicle based on the location information.
Another embodiment relates to a method comprising, at plural vehicles in a transportation network, receiving plural respective first schedules from an off-board location. The method further comprises transmitting plural respective initial trip plans from the plural vehicles to the off-board location responsive to the plural respective first schedules, and receiving plural respective modified schedules at the plural vehicles from the off-board location responsive to the plural respective initial trip plans. The method may further comprise, at the vehicles, generating plural respective modified trip plans, for controlling the vehicles, based on the modified schedules.
In another embodiment, a method comprises generating, with an energy management system disposed onboard a first vehicle, a first trip plan using a first schedule that is received by the first vehicle. The energy management system can include one or more hardware circuits or circuitry that include and/or are connected with one or more computer processors. The first trip plan dictates first operational settings of the first vehicle as a function of at least one of time or distance traveled along one or more routes. The first schedule is for the first vehicle to travel in a transportation network (comprising the one or more routes), and is formed off-board the first vehicle at an off-board scheduling system and communicated to the first vehicle. The off-board scheduling system can include one or more hardware circuits or circuitry that include and/or are connected with one or more computer processors. The method further comprises monitoring actual movement of the first vehicle during travel of the first vehicle along the one or more routes to determine when the first vehicle deviates from the first schedule, and notifying the off-board scheduling system of deviation of the first vehicle from the first schedule. The method further comprises receiving, at the first vehicle, and from the off-board scheduling system, at least one of the first schedule that is modified by the off-board scheduling system based on a notification that the first vehicle deviates from the first schedule, or a different, second schedule for the first vehicle, which is created by the off-board scheduling system based at least in part on the notification. In another embodiment, the method further comprises, on board the first vehicle, generating a second trip plan (e.g., a revision of the first trip plan) based on the first schedule that is modified or the second schedule. The second trip plan dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The second operational settings may be all different from the first operational settings, partially different, or all the same; according to an aspect, at least some of the second operational settings are different than the first operational settings.
In another embodiment, a method comprises generating, with an energy management system disposed onboard a first vehicle, a first trip plan using a first schedule that is received by the first vehicle. The first trip plan dictates first operational settings of the first vehicle as a function of at least one of time or distance traveled along one or more routes. The first schedule is for the first vehicle to travel in a transportation network (comprising the one or more routes), and is formed off-board the first vehicle at an off-board scheduling system and communicated to the first vehicle. The method further comprises receiving, at the first vehicle, and from the off-board scheduling system, at least one of the first schedule that is modified by the off-board scheduling system, or a different, second schedule for the first vehicle, which is created by the off-board scheduling system. The modified first schedule (i.e., the first schedule that is modified) is modified by the off-board scheduling system based at least in part on a notification that actual movement of the first vehicle, which is monitored during travel of the first vehicle along the one or more routes, deviates from the first schedule; and/or the second schedule is created by the off-board scheduling system based at least in part on a notification. In another embodiment, the method further comprises, on board the first vehicle, generating a second trip plan (e.g., a revision of the first trip plan) based on the first schedule that is modified or the second schedule. The second trip plan dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The second operational settings may be all different from the first operational settings, partially different, or all the same; according to an aspect, at least some of the second operational settings are different than the first operational settings.
In another embodiment, a system comprises an energy management system configured to be disposed onboard a first vehicle and to receive a first schedule from a scheduling unit configured to be disposed off-board the first vehicle. The first schedule is for the first vehicle to travel in a transportation network having one or more routes. The energy management system also is configured to generate a first trip plan using the first schedule that is received, the first trip plan dictating first operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The system further comprises a tracking unit configured to monitor actual movement of the first vehicle during travel of the first vehicle along the one or more routes to determine when the first vehicle deviates from the first schedule. The tracking unit also is configured to notify the scheduling unit of deviation of the first vehicle from the first schedule. The energy management system also is configured to generate a second trip plan (e.g., a revision of the first trip plan) responsive to receiving from the off-board scheduling unit the first schedule that is modified by the scheduling system, or a different, second schedule for the first vehicle that is created by the scheduling unit. The modified first schedule (i.e., first schedule that is modified) is modified by the scheduling system responsive to receiving a notification from the tracking unit that the first vehicle deviates from the first schedule; and/or the second schedule is created by the scheduling system responsive to receiving the notification. The second trip plan dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The second operational settings may be all different from the first operational settings, partially different, or all the same; according to an aspect, at least some of the second operational settings are different than the first operational settings.
In another embodiment, a system comprises an energy management system configured to be disposed onboard a first vehicle and to receive a first schedule from a scheduling unit configured to be disposed off-board the first vehicle. The first schedule is for the first vehicle to travel in a transportation network having one or more routes. The energy management system also is configured to generate a first trip plan using the first schedule that is received, the first trip plan dictating first operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The energy management system also is configured to generate a second trip plan (e.g., a revision of the first trip plan) responsive to receiving from the off-board scheduling unit the first schedule that is modified by the scheduling system, or a different, second schedule for the first vehicle that is created by the scheduling unit. The modified first schedule (i.e., first schedule that is modified) is modified by the scheduling system responsive to receiving a notification from a tracking unit that the first vehicle deviates from the first schedule; and/or the second schedule is created by the scheduling system responsive to receiving the notification. (For example, actual movement of the first vehicle along the one or more routes may be monitored by the tracking unit, to determine when the first vehicle deviates from the first schedule, with the tracking unit configured to send the notification to the scheduling unit of deviation of the first vehicle from the first schedule.) The second trip plan dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The second operational settings may be all different from the first operational settings, partially different, or all the same; according to an aspect, at least some of the second operational settings are different than the first operational settings.
In another embodiment, a method comprises forming a first schedule for a first vehicle to travel in a transportation network having one or more routes. The first schedule is formed off-board the first vehicle at an off-board scheduling system and communicated to the first vehicle, for use by an energy management system disposed onboard the first vehicle to generate a first trip plan that dictates first operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The method further comprises monitoring actual movement of the first vehicle during travel of the first vehicle along the one or more routes to determine when the first vehicle deviates from the first schedule. The method further comprises, responsive to receiving a notification that the first vehicle deviates from the first schedule, the scheduling system at least one of modifying the first schedule for the first vehicle, creating a different, second schedule for the first vehicle, or modifying one or more other schedules of one or more other vehicles traveling in the transportation network. At least one of the first schedule that is modified is communicated to the first vehicle (e.g., for the energy management system to generate a second trip plan based on the first schedule that is modified, which dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes; the second operational settings may be same or different from the first operational settings), the different, second schedule is communicated to the first vehicle (e.g., for the energy management system to generate the second trip plan based on the second schedule), or the one or more other schedules that are modified are communicated to the one or more other vehicles.
In another embodiment, a method comprises forming a first schedule for a first vehicle to travel in a transportation network having one or more routes. The first schedule is formed off-board the first vehicle at an off-board scheduling system and communicated to the first vehicle, for use by an energy management system disposed onboard the first vehicle to generate a first trip plan that dictates first operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes. The method further comprises, responsive to receiving a notification that the first vehicle deviates from the first schedule (e.g., a determination that the first vehicle deviates from the first schedule may be based on monitoring actual movement of the first vehicle during travel of the first vehicle along the one or more routes to determine when the first vehicle deviates from the first schedule), the scheduling system at least one of modifying the first schedule for the first vehicle, creating a different, second schedule for the first vehicle, or modifying one or more other schedules of one or more other vehicles traveling in the transportation network. At least one of the first schedule that is modified is communicated to the first vehicle (e.g., for the energy management system to generate a second trip plan based on the first schedule that is modified, which dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes; the second operational settings may be same or different from the first operational settings), the different, second schedule is communicated to the first vehicle (e.g., for the energy management system to generate the second trip plan based on the second schedule), or the one or more other schedules that are modified are communicated to the one or more other vehicles.
In another embodiment, a system comprises a scheduling unit configured to be disposed off-board a first vehicle and to form a first schedule for the first vehicle to travel in a transportation network. The first schedule is communicated to the first vehicle for an energy management system configured to be disposed onboard the first vehicle to generate a trip plan using the first schedule that is received, the trip plan dictating operational settings of the first vehicle as a function of at least one of time or distance traveled along one or more routes. The system further comprises a tracking unit configured to monitor actual movement of the first vehicle during travel of the first vehicle along the one or more routes to determine when the first vehicle deviates from the first schedule. The tracking unit also is configured to notify the scheduling unit of deviation of the first vehicle from the first schedule, wherein, responsive to the scheduling unit receiving a notification that the first vehicle deviates from the first schedule, the scheduling unit is configured to at least one of modify the first schedule for the first vehicle, create a different, second schedule for the first vehicle, or modify one or more other schedules of one or more other vehicles traveling in the transportation network. The system further comprises a communication unit configured to be disposed off-board the first vehicle and to communicate at least one of the first schedule that is modified to the first vehicle (e.g., for the energy management system to generate a second trip plan based on the first schedule that is modified, which dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes; the second operational settings may be same or different from the first operational settings), the different, second schedule to the first vehicle (e.g., for the energy management system to generate the second trip plan based on the second schedule), or the one or more other schedules that are modified to the one or more other vehicles.
In another embodiment, a system comprises a scheduling unit configured to be disposed off-board a first vehicle and to form a first schedule for the first vehicle to travel in a transportation network. The first schedule is communicated to the first vehicle for an energy management system configured to be disposed onboard the first vehicle to generate a trip plan using the first schedule that is received, the trip plan dictating operational settings of the first vehicle as a function of at least one of time or distance traveled along one or more routes. Responsive to the scheduling unit receiving a notification that the first vehicle deviates from the first schedule (e.g., the scheduling unit may be configured to receive the notification from a tracking unit that is configured to monitor actual movement of the first vehicle during travel of the first vehicle along the one or more routes to determine when the first vehicle deviates from the first schedule), the scheduling unit is configured to at least one of modify the first schedule for the first vehicle, create a different, second schedule for the first vehicle, or modify one or more other schedules of one or more other vehicles traveling in the transportation network. The system further comprises a communication unit configured to be disposed off-board the first vehicle and to communicate at least one of the first schedule that is modified to the first vehicle (e.g., for the energy management system to generate a second trip plan based on the first schedule that is modified, which dictates second operational settings of the first vehicle as a function of at least one of time or distance traveled along the one or more routes; the second operational settings may be same or different from the first operational settings), the different, second schedule to the first vehicle (e.g., for the energy management system to generate the second trip plan based on the second schedule), or the one or more other schedules that are modified to the one or more other vehicles.
It is to be understood that the above description is intended to be illustrative, and not restrictive. For example, the above-described embodiments (and/or aspects thereof) may be used in combination with each other. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the inventive subject matter without departing from its scope. While the dimensions and types of materials described herein are intended to define the parameters of the inventive subject matter, they are by no means limiting and are exemplary embodiments. Many other embodiments will be apparent to one of ordinary skill in the art upon reviewing the above description. The scope of the inventive subject matter should, therefore, be determined with reference to the appended claims, along with the full scope of equivalents to which such claims are entitled. In the appended claims, the terms “including” and “in which” are used as the plain-English equivalents of the respective terms “comprising” and “wherein.” Moreover, in the following claims, the terms “first,” “second,” and “third,” etc. are used merely as labels, and are not intended to impose numerical requirements on their objects. Further, the limitations of the following claims are not written in means-plus-function format and are not intended to be interpreted based on 35 U.S.C. §112, sixth paragraph, unless and until such claim limitations expressly use the phrase “means for” followed by a statement of function void of further structure.
This written description uses examples to disclose several embodiments of the inventive subject matter and also to enable one of ordinary skill in the art to practice the embodiments of inventive subject matter, including making and using any devices or systems and performing any incorporated methods. The patentable scope of the inventive subject matter is defined by the claims, and may include other examples that occur to one of ordinary skill in the art. Such other examples are intended to be within the scope of the claims if they have structural elements that do not differ from the literal language of the claims, or if they include equivalent structural elements with insubstantial differences from the literal languages of the claims.
The foregoing description of certain embodiments of the present inventive subject matter will be better understood when read in conjunction with the appended drawings. To the extent that the figures illustrate diagrams of the functional blocks of various embodiments, the functional blocks are not necessarily indicative of the division between hardware circuitry. Thus, for example, one or more of the functional blocks (for example, processors or memories) may be implemented in a single piece of hardware (for example, a general purpose signal processor, microcontroller, random access memory, hard disk, and the like). Similarly, the programs may be stand-alone programs, may be incorporated as subroutines in an operating system, may be functions in an installed software package, and the like. The various embodiments are not limited to the arrangements and instrumentality shown in the drawings.
As used herein, an element or step recited in the singular and proceeded with the word “a” or “an” should be understood as not excluding plural of said elements or steps, unless such exclusion is explicitly stated. Furthermore, references to “one embodiment” of the present invention are not intended to be interpreted as excluding the existence of additional embodiments that also incorporate the recited features. Moreover, unless explicitly stated to the contrary, embodiments “comprising,” “comprises,” “including,” “includes,” “having,” or “has” an element or a plurality of elements having a particular property may include additional such elements not having that property.
This application is a continuation-in-part of U.S. patent application Ser. No. 13/311,759, which was filed on 6 Dec. 2011, and is entitled “Transportation Network Scheduling System And Method” (the “'759 Application”). This application also is a continuation-in-part of U.S. patent application Ser. No. 13/311,807, which also was filed on 6 Dec. 2011, and is entitled “Transportation Network Scheduling System And Method” (the “'807 Application”). The '759 Application and the '807 Application are related to U.S. patent application Ser. No. 13/311,977, which was filed on 6 Dec. 2011, and is entitled “System And Method For Allocating Resources In a Network” (the '977 Application”). The entire disclosures of the '759 Application, the '807 Application, and the '977 Application are incorporated by reference.
Number | Date | Country | |
---|---|---|---|
Parent | 13311759 | Dec 2011 | US |
Child | 14158024 | US | |
Parent | 13311807 | Dec 2011 | US |
Child | 13311759 | US |