Trip optimization system and method for a train

Information

  • Patent Grant
  • 9733625
  • Patent Number
    9,733,625
  • Date Filed
    Monday, March 20, 2006
    18 years ago
  • Date Issued
    Tuesday, August 15, 2017
    7 years ago
Abstract
A system for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives, the system including a locator element to determine a location of the train, a track characterization element to provide information about a track, a sensor for measuring an operating condition of the locomotive consist, a processor operable to receive information from the locator element, the track characterizing element, and the sensor, and an algorithm embodied within the processor having access to the information to create a trip plan that optimizes performance of the locomotive consist in accordance with one or more operational criteria for the train.
Description
FIELD OF THE INVENTION

The field of invention relates to optimizing train operations, and more particularly to monitoring and controlling a train's operations to improve efficiency while satisfying schedule constraints.


BACKGROUND OF THE INVENTION

Locomotives are complex systems with numerous subsystems, with each subsystem being interdependent on other subsystems. An operator is aboard a locomotive to insure the proper operation of the locomotive and its associated load of freight cars. In addition to insuring proper operations of the locomotive the operator also is responsible for determining operating speeds of the train and forces within the train that the locomotives are part of. To perform this function, the operator generally must have extensive experience with operating the locomotive and various trains over the specified terrain. This knowledge is needed to comply with perscribeable operating speeds that may vary with the train location along the track. Moreover, the operator is also responsible for assuring in-train forces remain within acceptable limits.


However, even with knowledge to assure safe operation, the operator cannot usually operate the locomotive so that the fuel consumption is minimized for each trip. For example, other factors that must be considered may include emission output, operator's environmental conditions like noise/vibration, a weighted combination of fuel consumption and emissions output, etc. This is difficult to do since, as an example, the size and loading of trains vary, locomotives and their fuel/emissions characteristics are different, and weather and traffic conditions vary. Operators could more effectively operate a train if they were provided with a means to determine the best way to drive the train on a given day to meet a required schedule (arrival time) while using the least fuel possible, despite sources of variability.


BRIEF DESCRIPTION OF THE INVENTION

Embodiments of the invention disclose a system for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives. In an exemplary embodiment, the system comprises a locator element to determine a location of the train. A track characterization element to provide information about a track is also provided. The system also has a processor operable to receive information from the locator element, and the track characterizing element. An algorithm is also provided which is embodied within the processor having access to the information to create a trip plan that optimizes performance of the locomotive consist in accordance with one or more operational criteria for the train.


An exemplary embodiment of the present invention also discloses a method for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives. The method comprises determining a location of the train on a track. The method also determines a characteristic of the track. The method further creates a trip plan based on the location of the train, the characteristic of the track, and the operating condition of the locomotive consist in accordance with at least one operational criteria for the train.


An exemplary embodiment of the present invention also discloses a computer software code for operating a train having a computer processor and one or more locomotive consists with each locomotive consist comprising one or more locomotives. The computer software code comprises a software module for creating a trip plan based on the location of the train, the characteristic of the track, and the operating condition of the locomotive consist in accordance with at least one operational criteria for the train.


An exemplary embodiment of the present invention further discloses a method for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives where a trip plan has been devised for the train. The method comprises determining a power setting for the locomotive consist based on the trip plan. The method also operates the locomotive consist at the power setting. Actual speed of the train, actual power setting of the locomotive consist, and/or a location of the train is collected. Actual speed of the train, actual power setting of the locomotive consist, and/or a location of the train is compared to the power setting.


Another exemplary embodiment of the present invention further discloses a method for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives where a trip plan has been devised for the train based on assumed operating parameters for the train and/or the locomotive consist. The method comprises estimating train operating parameters and/or locomotive operating parameters. The method further comprises comparing the estimated train operating parameters and/or the locomotive consist operating parameters to the assumed train operating parameters and/or the locomotive consist operating parameters.


Another exemplary embodiment of the present invention further discloses a method for operating a train having one or more locomotive consists with each locomotive consist comprising one or more locomotives where a trip plan has been devised for the train based on a desired parameter. The method comprises determining operational parameters of the train and/or the locomotive consist, determining a desired parameter based on determined operational parameters, and comparing the determined parameter to the operational parameters. If a difference exists from comparing the determined parameter to the operational parameters, the method further comprises adjusting the trip plan.


An exemplary embodiment of the present invention further discloses a method for operating a rail system having one or more locomotive consists with each locomotive consist comprising one or more locomotives. The method comprises determining a location of the train on a track and determining a characteristic of the track. The method further comprises generating a driving plan for at least one of the locomotives based on the locations of the rail system, the characteristic of the track, and/or the operating condition of the locomotive consist, in order to minimize fuel consumption by the rail system.


Another exemplary embodiment of the present invention further discloses a method for operating a rail system having one or more locomotive consists with each locomotive consist comprising one or more locomotives. Towards this end the method comprises determining a location of the train on a track, and determining a characteristic of the track. The method further comprises providing propulsion control for the locomotive consist in order to minimize fuel consumption by the rail system.





BRIEF DESCRIPTION OF THE DRAWINGS

A more particular description of examples of the invention briefly described above will be rendered by reference to specific embodiments thereof that are illustrated in the appended drawings. Understanding that these drawings depict only typical embodiments of the invention and are not therefore to be considered to be limiting of its scope, the invention will be described and explained with additional specificity and detail through the use of the accompanying drawings in which:



FIG. 1 depicts an exemplary illustration of a flow chart of an exemplary embodiment of the present invention;



FIG. 2 depicts a simplified model of the train that may be employed;



FIG. 3 depicts an exemplary embodiment of elements of an exemplary embodiment of the present invention;



FIG. 4 depicts an exemplary embodiment of a fuel-use/travel time curve;



FIG. 5 depicts an exemplary embodiment of segmentation decomposition for trip planning;



FIG. 6 depicts an exemplary embodiment of a segmentation example;



FIG. 7 depicts an exemplary flow chart of an exemplary embodiment of the present invention;



FIG. 8 depicts an exemplary illustration of a dynamic display for use by the operator;



FIG. 9 depicts another exemplary illustration of a dynamic display for use by the operator; and



FIG. 10 depicts another exemplary illustration of a dynamic display for use by the operator.





DETAILED DESCRIPTION OF THE INVENTION

Reference will now be made in detail to the embodiments consistent with the invention, examples of which are illustrated in the accompanying drawings. Wherever possible, the same reference numerals used throughout the drawings refer to the same or like parts.


Exemplary embodiments of the present invention solve the problems in the art by providing a system, method, and computer implemented method for determining and implementing a driving strategy of a train having a locomotive consist determining an approach to monitor and control a train's operations to improve certain objective operating criteria parameter requirements while satisfying schedule and speed constraints. Throughout this disclose the term “present invention” or “invention” is used. Even through the term “exemplary embodiment(s)” does not immediately proceed the above cited term, the intent of “present invention” or “invention” is read to mean “exemplary embodiment(s) of the present invention.” The present invention is also operable when the locomotive consist is in distributed power operations. Persons skilled in the art will recognize that an apparatus, such as a data processing system, including a CPU, memory, I/O, program storage, a connecting bus, and other appropriate components, could be programmed or otherwise designed to facilitate the practice of the method of the invention. Such a system would include appropriate program means for executing the method of the invention.


Also, an article of manufacture, such as a pre-recorded disk or other similar computer program product, for use with a data processing system, could include a storage medium and program means recorded thereon for directing the data processing system to facilitate the practice of the method of the invention. Such apparatus and articles of manufacture also fall within the spirit and scope of the invention.


Broadly speaking, the technical effect is determining and implementing a driving strategy of a train having a locomotive consist determining an approach to monitor and control a train's operations to improve certain objective operating criteria parameter requirements while satisfying schedule and speed constraints. To facilitate an understanding of the present invention, it is described hereinafter with reference to specific implementations thereof. The invention is described in the general context of computer-executable instructions, such as program modules, being executed by a computer. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types. For example, the software programs that underlie the invention can be coded in different languages, for use with different platforms. In the description that follows, examples of the invention are described in the context of a web portal that employs a web browser. It will be appreciated, however, that the principles that underlie the invention can be implemented with other types of computer software technologies as well.


Moreover, those skilled in the art will appreciate that the invention may be practiced with other computer system configurations, including hand-held devices, multiprocessor systems, microprocessor-based or programmable consumer electronics, minicomputers, mainframe computers, and the like. The invention may also be practiced in distributed computing environments where tasks are performed by remote processing devices that are linked through a communications network. In a distributed computing environment, program modules may be located in both local and remote computer storage media including memory storage devices. These local and remote computing environments may be contained entirely within the locomotive, or adjacent locomotives in consist, or off-board in wayside or central offices where wireless communication is used.


Throughout this document the term locomotive consist is used. As used herein, a locomotive consist may be described as having one or more locomotives in succession, connected together so as to provide motoring and/or braking capability. The locomotives are connected together where no train cars are in between the locomotives. The train can have more than one consist in its composition. Specifically, there can be a lead consist, and more than one remote consists, such as midway in the line of cars and another remote consist at the end of the train. Each locomotive consist may have a first locomotive and trail locomotive(s). Though a consist is usually viewed as successive locomotives, those skilled in the art will readily recognize that a consist group of locomotives may also be recognized as a consist even when at least a car separates the locomotives, such as when the consist is configured for distributed power operation, wherein throttle and braking commands are relayed from the lead locomotive to the remote trails by a radio link or physical cable. Towards this end, the term locomotive consist should be not be considered a limiting factor when discussing multiple locomotives within the same train.


Referring now to the drawings, embodiments of the present invention will be described. The invention can be implemented in numerous ways, including as a system (including a computer processing system), a method (including a computerized method), an apparatus, a computer readable medium, a computer program product, a graphical user interface, including a web portal, or a data structure tangibly fixed in a computer readable memory. Several embodiments of the invention are discussed below.



FIG. 1 depicts an exemplary illustration of a flow chart of the present invention. As illustrated, instructions are input specific to planning a trip either on board or from a remote location, such as a dispatch center 10. Such input information includes, but is not limited to, train position, consist description (such as locomotive models), locomotive power description, performance of locomotive traction transmission, consumption of engine fuel as a function of output power, cooling characteristics, the intended trip route (effective track grade and curvature as function of milepost or an “effective grade” component to reflect curvature following standard railroad practices), the train represented by car makeup and loading together with effective drag coefficients, trip desired parameters including, but not limited to, start time and location, end location, desired travel time, crew (user and/or operator) identification, crew shift expiration time, and route.


This data may be provided to the locomotive 42 in a number of ways, such as, but not limited to, an operator manually entering this data into the locomotive 42 via an onboard display, inserting a memory device such as a hard card and/or USB drive containing the data into a receptacle aboard the locomotive, and transmitting the information via wireless communication from a central or wayside location 41, such as a track signaling device and/or a wayside device, to the locomotive 42. Locomotive 42 and train 31 load characteristics (e.g., drag) may also change over the route (e.g., with altitude, ambient temperature and condition of the rails and rail-cars), and the plan may be updated to reflect such changes as needed by any of the methods discussed above and/or by real-time autonomous collection of locomotive/train conditions. This includes for example, changes in locomotive or train characteristics detected by monitoring equipment on or off board the locomotive(s) 42.


The track signal system determines the allowable speed of the train. There are many types of track signal systems and the operating rules associated with each of the signals. For example, some signals have a single light (on/off), some signals have a single lens with multiple colors, and some signals have multiple lights and colors. These signals can indicate the track is clear and the train may proceed at max allowable speed. They can also indicate a reduced speed or stop is required. This reduced speed may need to be achieved immediately, or at a certain location (e.g. prior to the next signal or crossing).


The signal status is communicated to the train and/or operator through various means. Some systems have circuits in the track and inductive pick-up coils on the locomotives. Other systems have wireless communications systems. Signal systems can also require the operator to visually inspect the signal and take the appropriate actions.


The signaling system may interface with the on-board signal system and adjust the locomotive speed according to the inputs and the appropriate operating rules. For signal systems that require the operator to visually inspect the signal status, the operator screen will present the appropriate signal options for the operator to enter based on the train's location. The type of signal systems and operating rules, as a function of location, may be stored in an onboard database 63.


Based on the specification data input into the present invention, an optimal plan which minimizes fuel use and/or emissions produced subject to speed limit constraints along the route with desired start and end times is computed to produce a trip profile 12. The profile contains the optimal speed and power (notch) settings the train is to follow, expressed as a function of distance and/or time, and such train operating limits, including but not limited to, the maximum notch power and brake settings, and speed limits as a function of location, and the expected fuel used and emissions generated. In an exemplary embodiment, the value for the notch setting is selected to obtain throttle change decisions about once every 10 to 30 seconds. Those skilled in the art will readily recognize that the throttle change decisions may occur at a longer or shorter duration, if needed and/or desired to follow an optimal speed profile. In a broader sense, it should be evident to ones skilled in the art the profiles provides power settings for the train, either at the train level, consist level and/or individual train level. Power comprises braking power, motoring power, and airbrake power. In another preferred embodiment, instead of operating at the traditional discrete notch power settings, the present invention is able to select a continuous power setting determined as optimal for the profile selected. Thus, for example, if an optimal profile specifies a notch setting of 6.8, instead of operating at notch setting 7, the locomotive 42 can operate at 6.8. Allowing such intermediate power settings may bring additional efficiency benefits as described below.


The procedure used to compute the optimal profile can be any number of methods for computing a power sequence that drives the train 31 to minimize fuel and/or emissions subject to locomotive operating and schedule constraints, as summarized below. In some cases the required optimal profile may be close enough to one previously determined, owing to the similarity of the train configuration, route and environmental conditions. In these cases it may be sufficient to look up the driving trajectory within a database 63 and attempt to follow it. When no previously computed plan is suitable, methods to compute a new one include, but are not limited to, direct calculation of the optimal profile using differential equation models which approximate the train physics of motion. The setup involves selection of a quantitative objective function, commonly a weighted sum (integral) of model variables that correspond to rate of fuel consumption and emissions generation plus a term to penalize excessive throttle variation.


An optimal control formulation is set up to minimize the quantitative objective function subject to constraints including but not limited to, speed limits and minimum and maximum power (throttle) settings. Depending on planning objectives at any time, the problem may be setup flexibly to minimize fuel subject to constraints on emissions and speed limits, or to minimize emissions, subject to constraints on fuel use and arrival time. It is also possible to setup, for example, a goal to minimize the total travel time without constraints on total emissions or fuel use where such relaxation of constraints would be permitted or required for the mission.


Mathematically, the problem to be solved may be stated more precisely. The basic physics are expressed by:










x



t


=
v

;


x


(
0
)


=
0.0

;


x


(

T
f

)


=
D











v



t


=



T
e



(

u
,
v

)


-


G
a



(
x
)


-

R


(
v
)




;


v


(
0
)


=
0.0

;


v


(

T
f

)


=
0.0





Where x is the position of the train, v its velocity and t is time (in miles, miles per hour and minutes or hours as appropriate) and u is the notch (throttle) command input. Further, D denotes the distance to be traveled, Tf the desired arrival time at distance D along the track, Te is the tractive effort produced by the locomotive consist, Ga is the gravitational drag which depends on the train length, train makeup and terrain on which the train is located, R is the net speed dependent drag of the locomotive consist and train combination. The initial and final speeds can also be specified, but without loss of generality are taken to be zero here (train stopped at beginning and end). Finally, the model is readily modified to include other important dynamics such the lag between a change in throttle, u, and the resulting tractive effort or braking. Using this model, an optimal control formulation is set up to minimize the quantitative objective function subject to constraints including but not limited to, speed limits and minimum and maximum power (throttle) settings. Depending on planning objectives at any time, the problem may be setup flexibly to minimize fuel subject to constraints on emissions and speed limits, or to minimize emissions, subject to constraints on fuel use and arrival time.


It is also possible to setup, for example, a goal to minimize the total travel time without constraints on total emissions or fuel use where such relaxation of constraints would be permitted or required for the mission. All these performance measures can be expressed as a linear combination of any of the following:






1.







min

u


(
t
)







0

T
f





F


(

u


(
t
)


)









t







-


Minimize





total





fuel





consumption









2.







min

u


(
t
)






T
f







-


Minimize





Travel





Time








3.







min

u
i







i
=
2


n
d






(


u
i

-

u

i
-
1



)

2







-






Minimize





notch





jokeying






(

piecewise





constant





input

)



















min

u


(
t
)







0

T
f






(



u

/


t


)

2








t







-







Minimize





notch





jockeying











(

continuous





input

)











4. Replace the fuel term F in (1) with a term corresponding to emissions production.


A commonly used and representative objective function is thus











min

u


(
t
)






α
1





0

T
f





F


(

u


(
t
)


)









t





+


α
3



T
f


+


α
2





0

T
f






(







u

/


t


)

2




t








(
OP
)








The coefficients of the linear combination will depend on the importance (weight) given for each of the terms. Note that in equation (OP), u(t) is the optimizing variable which is the continuous notch position. If discrete notch is required, e.g. for older locomotives, the solution to equation (OP) would be discretized, which may result in less fuel saving. Finding a minimum time solution (α1 and α2 set to zero) is used to find a lower bound on, the preferred embodiment is to solve the equation (OP) for various values of Tf with α3 set to zero. For those familiar with solutions to such optimal problems, it may be necessary to adjoin constraints, e.g. the speed limits along the path

0≦v≦SL(x)

Or when using minimum time as the objective, that an end point constraint must hold, e.g. total fuel consumed must be less than what is in the tank, e.g. via:






0
<



0

T
f





F


(

u


(
t
)


)









t





W
F






Where WF is the fuel remaining in the tank at Tf. Those skilled in the art will readily recognize that equation (OP) can be in other forms as well and that what is presented above is an exemplary equation for use in the present invention.


Reference to emissions in the context of the present invention is actually directed towards cumulative emissions produced in the form of oxides of nitrogen (NOx), unburned hydrocarbons, and particulates. By design, every locomotive must be compliant to EPA standards for brake-specific emissions, and thus when emissions are optimized in the present invention this would be mission total emissions on which there is no specification today. At all times, operations would be compliant with federal EPA mandates. If a key objective during a trip mission is to reduce emissions, the optimal control formulation, equation (OP), would be amended to consider this trip objective. A key flexibility in the optimization setup is that any or all of the trip objectives can vary by geographic region or mission. For example, for a high priority train, minimum time may be the only objective on one route because it is high priority traffic. In another example emission output could vary from state to state along the planned train route.


To solve the resulting optimization problem, in an exemplary embodiment the present invention transcribes a dynamic optimal control problem in the time domain to an equivalent static mathematical programming problem with N decision variables, where the number ‘N’ depends on the frequency at which throttle and braking adjustments are made and the duration of the trip. For typical problems, this N can be in the thousands. For example in an exemplary embodiment, suppose a train is traveling a 172-mile stretch of track in the southwest United States. Utilizing the present invention, an exemplary 7.6% saving in fuel used may be realized when comparing a trip determined and followed using the present invention versus an actual driver throttle/speed history where the trip was determined by an operator. The improved savings is realized because the optimization realized by using the present invention produces a driving strategy with both less drag loss and little or no braking loss compared to the trip plan of the operator.


To make the optimization described above computationally tractable, a simplified model of the train may be employed, such as illustrated in FIG. 2 and the equations discussed above. A key refinement to the optimal profile is produced by driving a more detailed model with the optimal power sequence generated, to test if other thermal, electrical and mechanical constraints are violated, leading to a modified profile with speed versus distance that is closest to a run that can be achieved without harming locomotive or train equipment, i.e. satisfying additional implied constraints such thermal and electrical limits on the locomotive and inter-car forces in the train.


Referring back to FIG. 1, once the trip is started 12, power commands are generated 14 to put the plan in motion. Depending on the operational set-up of the present invention, one command is for the locomotive to follow the optimized power command 16 so as to achieve the optimal speed. The present invention obtains actual speed and power information from the locomotive consist of the train 18. Owing to the inevitable approximations in the models used for the optimization, a closed-loop calculation of corrections to optimized power is obtained to track the desired optimal speed. Such corrections of train operating limits can be made automatically or by the operator, who always has ultimate control of the train.


In some cases, the model used in the optimization may differ significantly from the actual train. This can occur for many reasons, including but not limited to, extra cargo pickups or setouts, locomotives that fail in route, and errors in the initial database 63 or data entry by the operator. For these reasons a monitoring system is in place that uses real-time train data to estimate locomotive and/or train parameters in real time 20. The estimated parameters are then compared to the assumed parameters used when the trip was initially created 22. Based on any differences in the assumed and estimated values, the trip may be re-planned 24, should large enough savings accrue from a new plan.


Other reasons a trip may be re-planned include directives from a remote location, such as dispatch and/or the operator requesting a change in objectives to be consistent with more global movement planning objectives. More global movement planning objectives may include, but are not limited to, other train schedules, allowing exhaust to dissipate from a tunnel, maintenance operations, etc. Another reason may be due to an onboard failure of a component. Strategies for re-planning may be grouped into incremental and major adjustments depending on the severity of the disruption, as discussed in more detail below. In general, a “new” plan must be derived from a solution to the optimization problem equation (OP) described above, but frequently faster approximate solutions can be found, as described herein.


In operation, the locomotive 42 will continuously monitor system efficiency and continuously update the trip plan based on the actual efficiency measured, whenever such an update would improve trip performance. Re-planning computations may be carried out entirely within the locomotive(s) or fully or partially moved to a remote location, such as dispatch or wayside processing facilities where wireless technology is used to communicate the plans to the locomotive 42. The present invention may also generate efficiency trends that can be used to develop locomotive fleet data regarding efficiency transfer functions. The fleet-wide data may be used when determining the initial trip plan, and may be used for network-wide optimization tradeoff when considering locations of a plurality of trains. For example, the travel-time fuel use tradeoff curve as illustrated in FIG. 4 reflects a capability of a train on a particular route at a current time, updated from ensemble averages collected for many similar trains on the same route. Thus, a central dispatch facility collecting curves like FIG. 4 from many locomotives could use that information to better coordinate overall train movements to achieve a system-wide advantage in fuel use or throughput.


Many events in daily operations can lead to a need to generate or modify a currently executing plan, where it desired to keep the same trip objectives, for when a train is not on schedule for planned meet or pass with another train and it needs to make up time. Using the actual speed, power and location of the locomotive, a comparison is made between a planned arrival time and the currently estimated (predicted) arrival time 25. Based on a difference in the times, as well as the difference in parameters (detected or changed by dispatch or the operator), the plan is adjusted 26. This adjustment may be made automatically following a railroad company's desire for how such departures from plan should be handled or manually propose alternatives for the on-board operator and dispatcher to jointly decide the best way to get back on plan. Whenever a plan is updated but where the original objectives, such as but not limited to arrival time remain the same, additional changes may be factored in concurrently, e.g. new future speed limit changes, which could affect the feasibility of ever recovering the original plan. In such instances if the original trip plan cannot be maintained, or in other words the train is unable to meet the original trip plan objectives, as discussed herein other trip plan(s) may be presented to the operator and/or remote facility, or dispatch.


A re-plan may also be made when it is desired to change the original objectives. Such re-planning can be done at either fixed preplanned times, manually at the discretion of the operator or dispatcher, or autonomously when predefined limits, such a train operating limits, are exceeded. For example, if the current plan execution is running late by more than a specified threshold, such as thirty minutes, the present invention can re-plan the trip to accommodate the delay at expense of increased fuel as described above or to alert the operator and dispatcher how much of the time can be made up at all (i.e. what minimum time to go or the maximum fuel that can be saved within a time constraint). Other triggers for re-plan can also be envisioned based on fuel consumed or the health of the power consist, including but not limited time of arrival, loss of horsepower due to equipment failure and/or equipment temporary malfunction (such as operating too hot or too cold), and/or detection of gross setup errors, such in the assumed train load. That is, if the change reflects impairment in the locomotive performance for the current trip, these may be factored into the models and/or equations used in the optimization.


Changes in plan objectives can also arise from a need to coordinate events where the plan for one train compromises the ability of another train to meet objectives and arbitration at a different level, e.g. the dispatch office is required. For example, the coordination of meets and passes may be further optimized through train-to-train communications. Thus, as an example, if a train knows that it is behind in reaching a location for a meet and/or pass, communications from the other train can notify the late train (and/or dispatch). The operator can then enter information pertaining to being late into the present invention wherein the present invention will recalculate the train's trip plan. The present invention can also be used at a high level, or network-level, to allow a dispatch to determine which train should slow down or speed up should a scheduled meet and/or pass time constraint may not be met. As discussed herein, this is accomplished by trains transmitting data to the dispatch to prioritize how each train should change its planning objective. A choice could depend either from schedule or fuel saving benefits, depending on the situation.


For any of the manually or automatically initiated re-plans, the present invention may present more than one trip plan to the operator. In an exemplary embodiment the present invention will present different profiles to the operator, allowing the operator to select the arrival time and understand the corresponding fuel and/or emission impact. Such information can also be provided to the dispatch for similar consideration, either as a simple list of alternatives or as a plurality of tradeoff curves such as illustrated in FIG. 4.


The present invention has the ability of learning and adapting to key changes in the train and power consist which can be incorporated either in the current plan and/or for future plans. For example, one of the triggers discussed above is loss of horsepower. When building up horsepower over time, either after a loss of horsepower or when beginning a trip, transition logic is utilized to determine when desired horsepower is achieved. This information can be saved in the locomotive database 61 for use in optimizing either future trips or the current trip should loss of horsepower occur again.



FIG. 3 depicts an exemplary embodiment of elements of the present invention. A locator element 30 to determine a location of the train 31 is provided. The locator element 30 can be a GPS sensor, or a system of sensors, that determine a location of the train 31. Examples of such other systems may include, but are not limited to, wayside devices, such as radio frequency automatic equipment identification (RF AEI) Tags, dispatch, and/or video determination. Another system may include the tachometer(s) aboard a locomotive and distance calculations from a reference point. As discussed previously, a wireless communication system 47 may also be provided to allow for communications between trains and/or with a remote location, such as dispatch. Information about travel locations may also be transferred from other trains.


A track characterization element 33 to provide information about a track, principally grade and elevation and curvature information, is also provided. The track characterization element 33 may include an on-board track integrity database 36. Sensors 38 are used to measure a tractive effort 40 being hauled by the locomotive consist 42, throttle setting of the locomotive consist 42, locomotive consist 42 configuration information, speed of the locomotive consist 42, individual locomotive configuration, individual locomotive capability, etc. In an exemplary embodiment the locomotive consist 42 configuration information may be loaded without the use of a sensor 38, but is input by other approaches as discussed above. Furthermore, the health of the locomotives in the consist may also be considered. For example, if one locomotive in the consist is unable to operate above power notch level 5, this information is used when optimizing the trip plan.


Information from the locator element may also be used to determine an appropriate arrival time of the train 31. For example, if there is a train 31 moving along a track 34 towards a destination and no train is following behind it, and the train has no fixed arrival deadline to adhere to, the locator element, including but not limited to radio frequency automatic equipment identification (RF AEI) Tags, dispatch, and/or video determination, may be used to gage the exact location of the train 31. Furthermore, inputs from these signaling systems may be used to adjust the train speed. Using the on-board track database, discussed below, and the locator element, such as GPS, the present invention can adjust the operator interface to reflect the signaling system state at the given locomotive location. In a situation where signal states would indicate restrictive speeds ahead, the planner may elect to slow the train to conserve fuel consumption.


Information from the locator element 30 may also be used to change planning objectives as a function of distance to destination. For example, owing to inevitable uncertainties about congestion along the route, “faster” time objectives on the early part of a route may be employed as hedge against delays that statistically occur later. If it happens on a particular trip that delays do not occur, the objectives on a latter part of the journey can be modified to exploit the built-in slack time that was banked earlier, and thereby recover some fuel efficiency. A similar strategy could be invoked with respect to emissions restrictive objectives, e.g. approaching an urban area.


As an example of the hedging strategy, if a trip is planned from New York to Chicago, the system may have an option to operate the train slower at either the beginning of the trip or at the middle of the trip or at the end of the trip. The present invention would optimize the trip plan to allow for slower operation at the end of the trip since unknown constraints, such as but not limited to weather conditions, track maintenance, etc., may develop and become known during the trip. As another consideration, if traditionally congested areas are known, the plan is developed with an option to have more flexibility around these traditionally congested regions. Therefore, the present invention may also consider weighting/penalty as a function of time/distance into the future and/or based on known/past experience. Those skilled in the art will readily recognize that such planning and re-planning to take into consideration weather conditions, track conditions, other trains on the track, etc., may be taking into consideration at any time during the trip wherein the trip plan is adjust accordingly.



FIG. 3 further discloses other elements that may be part of the present invention. A processor 44 is provided that is operable to receive information from the locator element 30, track characterizing element 33, and sensors 38. An algorithm 46 operates within the processor 44. The algorithm 46 is used to compute an optimized trip plan based on parameters involving the locomotive 42, train 31, track 34, and objectives of the mission as described above. In an exemplary embodiment, the trip plan is established based on models for train behavior as the train 31 moves along the track 34 as a solution of non-linear differential equations derived from physics with simplifying assumptions that are provided in the algorithm. The algorithm 46 has access to the information from the locator element 30, track characterizing element 33 and/or sensors 38 to create a trip plan minimizing fuel consumption of a locomotive consist 42, minimizing emissions of a locomotive consist 42, establishing a desired trip time, and/or ensuring proper crew operating time aboard the locomotive consist 42. In an exemplary embodiment, a driver, or controller element, 51 is also provided. As discussed herein the controller element 51 is used for controlling the train as it follows the trip plan. In an exemplary embodiment discussed further herein, the controller element 51 makes train operating decisions autonomously. In another exemplary embodiment the operator may be involved with directing the train to follow the trip plan.


A requirement of the present invention is the ability to initially create and quickly modify on the fly any plan that is being executed. This includes creating the initial plan when a long distance is involved, owing to the complexity of the plan optimization algorithm. When a total length of a trip profile exceeds a given distance, an algorithm 46 may be used to segment the mission wherein the mission may be divided by waypoints. Though only a single algorithm 46 is discussed, those skilled in the art will readily recognize that more than one algorithm may be used where the algorithms may be connected together. The waypoint may include natural locations where the train 31 stops, such as, but not limited to, sidings where a meet with opposing traffic, or pass with a train behind the current train is scheduled to occur on single-track rail, or at yard sidings or industry where cars are to be picked up and set out, and locations of planned work. At such waypoints, the train 31 may be required to be at the location at a scheduled time and be stopped or moving with speed in a specified range. The time duration from arrival to departure at waypoints is called dwell time.


In an exemplary embodiment, the present invention is able to break down a longer trip into smaller segments in a special systematic way. Each segment can be somewhat arbitrary in length, but is typically picked at a natural location such as a stop or significant speed restriction, or at key mileposts that define junctions with other routes. Given a partition, or segment, selected in this way, a driving profile is created for each segment of track as a function of travel time taken as an independent variable, such as shown in FIG. 4. The fuel used/travel-time tradeoff associated with each segment can be computed prior to the train 31 reaching that segment of track. A total trip plan can be created from the driving profiles created for each segment. The invention distributes travel time amongst all the segments of the trip in an optimal way so that the total trip time required is satisfied and total fuel consumed over all the segments is as small as possible. An exemplary 3 segment trip is disclosed in FIG. 6 and discussed below. Those skilled in the art will recognize however, through segments are discussed, the trip plan may comprise a single segment representing the complete trip.



FIG. 4 depicts an exemplary embodiment of a fuel-use/travel time curve. As mentioned previously, such a curve 50 is created when calculating an optimal trip profile for various travel times for each segment. That is, for a given travel time 49, fuel used 53 is the result of a detailed driving profile computed as described above. Once travel times for each segment are allocated, a power/speed plan is determined for each segment from the previously computed solutions. If there are any waypoint constraints on speed between the segments, such as, but not limited to, a change in a speed limit, they are matched up during creation of the optimal trip profile. If speed restrictions change in only a single segment, the fuel use/travel-time curve 50 has to be re-computed for only the segment changed. This reduces time for having to re-calculate more parts, or segments, of the trip. If the locomotive consist or train changes significantly along the route, e.g. from loss of a locomotive or pickup or set-out of cars, then driving profiles for all subsequent segments must be recomputed creating new instances of the curve 50. These new curves 50 would then be used along with new schedule objectives to plan the remaining trip.


Once a trip plan is created as discussed above, a trajectory of speed and power versus distance is used to reach a destination with minimum fuel and/or emissions at the required trip time. There are several ways in which to execute the trip plan. As provided below in more detail, in one exemplary embodiment, a coaching mode the present invention displays information to the operator for the operator to follow to achieve the required power and speed determined according to the optimal trip plan. In this mode, the operating information is suggested operating conditions that the operator should use. In another exemplary embodiment, acceleration and maintaining a constant speed are performed by the present invention. However, when the train 31 must be slowed, the operator is responsible for applying a braking system 52. In another exemplary embodiment, the present invention commands power and braking as required to follow the desired speed-distance path.


Feedback control strategies are used to provide corrections to the power control sequence in the profile to correct for such events as, but not limited to, train load variations caused by fluctuating head winds and/or tail winds. Another such error may be caused by an error in train parameters, such as, but not limited to, train mass and/or drag, when compared to assumptions in the optimized trip plan. A third type of error may occur with information contained in the track database 36. Another possible error may involve un-modeled performance differences due to the locomotive engine, traction motor thermal deration and/or other factors. Feedback control strategies compare the actual speed as a function of position to the speed in the desired optimal profile. Based on this difference, a correction to the optimal power profile is added to drive the actual velocity toward the optimal profile. To assure stable regulation, a compensation algorithm may be provided which filters the feedback speeds into power corrections to assure closed-performance stability is assured. Compensation may include standard dynamic compensation as used by those skilled in the art of control system design to meet performance objectives.


The present invention allows the simplest and therefore fastest means to accommodate changes in trip objectives, which is the rule, rather than the exception in railroad operations. In an exemplary embodiment to determine the fuel-optimal trip from point A to point B where there are stops along the way, and for updating the trip for the remainder of the trip once the trip has begun, a sub-optimal decomposition method is usable for finding an optimal trip profile. Using modeling methods the computation method can find the trip plan with specified travel time and initial and final speeds, so as to satisfy all the speed limits and locomotive capability constraints when there are stops. Though the following discussion is directed towards optimizing fuel use, it can also be applied to optimize other factors, such as, but not limited to, emissions, schedule, crew comfort, and load impact. The method may be used at the outset in developing a trip plan, and more importantly to adapting to changes in objectives after initiating a trip.


As discussed herein, the present invention may employ a setup as illustrated in the exemplary flow chart depicted in FIG. 5, and as an exemplary 3 segment example depicted in detail in FIG. 6. As illustrated, the trip may be broken into two or more segments, T1, T2, and T3. Though as discussed herein, it is possible to consider the trip as a single segment. As discussed herein, the segment boundaries may not result in equal segments. Instead the segments use natural or mission specific boundaries. Optimal trip plans are pre-computed for each segment. If fuel use versus trip time is the trip object to be met, fuel versus trip time curves are built for each segment. As discussed herein, the curves may be based on other factors, wherein the factors are objectives to be met with a trip plan. When trip time is the parameter being determined, trip time for each segment is computed while satisfying the overall trip time constraints. FIG. 6 illustrates speed limits for an exemplary 3 segment 200 mile trip 97. Further illustrated are grade changes over the 200 mile trip 98. A combined chart 99 illustrating curves for each segment of the trip of fuel used over the travel time is also shown.


Using the optimal control setup described previously, the present computation method can find the trip plan with specified travel time and initial and final speeds, so as to satisfy all the speed limits and locomotive capability constraints when there are stops. Though the following detailed discussion is directed towards optimizing fuel use, it can also be applied to optimize other factors as discussed herein, such as, but not limited to, emissions. A key flexibility is to accommodate desired dwell time at stops and to consider constraints on earliest arrival and departure at a location as may be required, for example, in single-track operations where the time to be in or get by a siding is critical.


The present invention finds a fuel-optimal trip from distance D0 to DM, traveled in time T, with M−1 intermediate stops at D1, . . . , DM-1, and with the arrival and departure times at these stops constrained by

tmin(i)≦tarr(Di)≦tmax(i)−Δti
tarr(Di)+Δti≦tdep(Di)≦tmax(i) i=1, . . . ,M−1

where tarr(Di), tdep(Di), and Δti are the arrival, departure, and minimum stop time at the ith stop, respectively. Assuming that fuel-optimality implies minimizing stop time, therefore tdep(Di)=tarr(Di)+Δti which eliminates the second inequality above. Suppose for each i=1, . . . , M, the fuel-optimal trip from Di-1 to Di for travel time t, Tmin(i)≦t≦Tmax(i) is known. Let Fi(t) be the fuel-use corresponding to this trip. If the travel time from Dj-1 to Dj is denoted Tj, then the arrival time at Di is given by








t
arr



(

D
i

)


=




j
=
1

i



(


T
j

+

Δ






t

j
-
1




)







where Δt0 is defined to be zero. The fuel-optimal trip from D0 to DM for travel time T is then obtained by finding Ti, i=1, . . . , M, which minimize










i
=
1

M





F
i



(

T
i

)









T
min



(
i
)






T
i




T
max



(
i
)







subject to










t
min



(
i
)







j
=
1

i



(


T
j

+

Δ






t

j
-
1




)






t
max



(
i
)


-

Δ






t
i






i



=
1

,





,

M
-
1











j
=
1

M



(


T
j

+

Δ






t

j
-
1




)


=
T




Once a trip is underway, the issue is re-determining the fuel-optimal solution for the remainder of a trip (originally from D0 to DM in time T) as the trip is traveled, but where disturbances preclude following the fuel-optimal solution. Let the current distance and speed be x and v, respectively, where Di-1<x≦Di. Also, let the current time since the beginning of the trip be tact. Then the fuel-optimal solution for the remainder of the trip from x to DM, which retains the original arrival time at DM, is obtained by finding {tilde over (T)}i, Tj, j=i+1, . . . M, which minimize









F
~

i



(



T
~

i

,
x
,
v

)


+




j
=

i
+
1


M




F
j



(

T
j

)








subject to








t
min



(
i
)





t
act

+


T
~

i






t
max



(
i
)


-

Δ






t
i











t
min



(
k
)





t
act

+


T
~

i

+




j
=

i
+
1


k



(


T
j

+

Δ






t

j
-
1




)







t
max



(
k
)


-

Δ






t
k










k
=

i
+
1


,





,

M
-
1









t
act

+


T
~

i

+




j
=

i
+
1


M



(


T
j

+

Δ






t

j
-
1




)



=
T





Here, {tilde over (F)}i(t,x,v) is the fuel-used of the optimal trip from x to Di, traveled in time t, with initial speed at x of v.


As discussed above, an exemplary way to enable more efficient re-planning is to construct the optimal solution for a stop-to-stop trip from partitioned segments. For the trip from Di-1 to Di, with travel time Ti, choose a set of intermediate points Dij, j=1, . . . , Ni−1. Let Di0=Di-1 and DiNi=Di. Then express the fuel-use for the optimal trip from Di-1 to Di as








F
i



(
t
)


=




j
=
1


N
i





f
ij



(



t
ij

-

t

i
,

j
-
1




,

v

i
,

j
-
1



,

v
ij


)








where fij(t,vi,j−1,vij) is the fuel-use for the optimal trip from Di,j−1 to Dij, traveled in time t, with initial and final speeds of vi,j−1 and vij. Furthermore, tij is the time in the optimal trip corresponding to distance Dij. By definition, tiNi−ti0=Ti. Since the train is stopped at Di0 and DiNi, Vi0=ViNi=0.


The above expression enables the function Fi(t) to be alternatively determined by first determining the functions fij(•),1≦j≦Ni, then finding τij, 1≦j≦Ni and vij,1≦j<Ni, which minimize








F
i



(
t
)


=




j
=
1


N
i





f
ij



(


τ
ij

,

v

i
,

j
-
1



,

v
ij


)








subject to










j
=
1


N
i




τ
ij


=

T
i











v
min



(

i
,
j

)




v
ij





v
max



(

i
,
j

)







j


=
1

,





,


N
i

-
1








v

i





0


=


v

iN
i


=
0






By choosing Dij (e.g., at speed restrictions or meeting points), Vmax(i,j)−vmin(i,j) can be minimized, thus minimizing the domain over which fij( ) needs to be known.


Based on the partitioning above, a simpler suboptimal re-planning approach than that described above is to restrict re-planning to times when the train is at distance points Dij,1≦i≦M,1≦j≦Ni. At point Dij, the new optimal trip from Dij to DM can be determined by finding τik, j<k≦Ni, vik, j<k<Ni, and τmn, i<m≦M,1≦n≦Nm, vmn, i<m≦M,1≦n<Nm, which minimize










k
=

j
+
1



N
i





f
ik



(


τ
ik

,

v

i
,

k
-
1



,

v
ik


)



+




m
=

i
+
1


M






n
=
1


N
m





f
mn



(


τ
mn

,

v

m
,

n
-
1



,

v
mn


)









subject to








t
min



(
i
)





t
act

+




k
=

j
+
1



N
i




τ
ik







t
max



(
i
)


-

Δ






t
i











t
min



(
n
)





t
act

+




k
=

j
+
1



N
i




τ
ik


+




m
=

i
+
1


n



(


T
m

+

Δ






t

m
-
1




)







t
max



(
n
)


-

Δ






t
n










n
=

i
+
1


,





,

M
-
1









t
act

+




k
=

j
+
1



N
i




τ
ik


+




m
=

i
+
1


M



(


T
m

+

Δ






t

m
-
1




)



=
T





where






T
m

=




n
=
1


N
m




τ
mn






A further simplification is obtained by waiting on the re-computation of Tm, i<m≦M, until distance point Di is reached. In this way, at points Dij between Di-1 and Di, the minimization above needs only be performed over τik, j≦k≦Ni, vik, j≦k≦Ni. Ti is increased as needed to accommodate any longer actual travel time from Di-1 to Dij than planned. This increase is later compensated, if possible, by the re-computation of Tm, i≦m≦M, at distance point Di.


With respect to the closed-loop configuration disclosed above, the total input energy required to move a train 31 from point A to point B consists of the sum of four components, specifically difference in kinetic energy between points A and B; difference in potential energy between points A and B; energy loss due to friction and other drag losses; and energy dissipated by the application of brakes. Assuming the start and end speeds to be equal (e.g., stationary), the first component is zero. Furthermore, the second component is independent of driving strategy. Thus, it suffices to minimize the sum of the last two components.


Following a constant speed profile minimizes drag loss. Following a constant speed profile also minimizes total energy input when braking is not needed to maintain constant speed. However, if braking is required to maintain constant speed, applying braking just to maintain constant speed will most likely increase total required energy because of the need to replenish the energy dissipated by the brakes. A possibility exists that some braking may actually reduce total energy usage if the additional brake loss is more than offset by the resultant decrease in drag loss caused by braking, by reducing speed variation.


After completing a re-plan from the collection of events described above, the new optimal notch/speed plan can be followed using the closed loop control described herein. However, in some situations there may not be enough time to carry out the segment decomposed planning described above, and particularly when there are critical speed restrictions that must be respected, an alternative is needed. The present invention accomplishes this with an algorithm referred to as “smart cruise control”. The smart cruise control algorithm is an efficient way to generate, on the fly, an energy-efficient (hence fuel-efficient) sub-optimal prescription for driving the train 31 over a known terrain. This algorithm assumes knowledge of the position of the train 31 along the track 34 at all times, as well as knowledge of the grade and curvature of the track versus position. The method relies on a point-mass model for the motion of the train 31, whose parameters may be adaptively estimated from online measurements of train motion as described earlier.


The smart cruise control algorithm has three principal components, specifically a modified speed limit profile that serves as an energy-efficient guide around speed limit reductions; an ideal throttle or dynamic brake setting profile that attempts to balance between minimizing speed variation and braking; and a mechanism for combining the latter two components to produce a notch command, employing a speed feedback loop to compensate for mismatches of modeled parameters when compared to reality parameters. Smart cruise control can accommodate strategies in the present invention that do no active braking (i.e. the driver is signaled and assumed to provide the requisite braking) or a variant that does active braking.


With respect to the cruise control algorithm that does not control dynamic braking, the three exemplary components are a modified speed limit profile that serves as an energy-efficient guide around speed limit reductions, a notification signal directed to notify the operator when braking should be applied, an ideal throttle profile that attempts to balance between minimizing speed variations and notifying the operator to apply braking, a mechanism employing a feedback loop to compensate for mismatches of model parameters to reality parameters.


Also included in the present invention is an approach to identify key parameter values of the train 31. For example, with respect to estimating train mass, a Kalman filter and a recursive least-squares approach may be utilized to detect errors that may develop over time.



FIG. 7 depicts an exemplary flow chart of the present invention. As discussed previously, a remote facility, such as a dispatch 60 can provide information to the present invention. As illustrated, such information is provided to an executive control element 62. Also supplied to the executive control element 62 is locomotive modeling information database 63, information from a track database 36 such as, but not limited to, track grade information and speed limit information, estimated train parameters such as, but not limited to, train weight and drag coefficients, and fuel rate tables from a fuel rate estimator 64. The executive control element 62 supplies information to the planner 12, which is disclosed in more detail in FIG. 1. Once a trip plan has been calculated, the plan is supplied to a driving advisor, driver or controller element 51. The trip plan is also supplied to the executive control element 62 so that it can compare the trip when other new data is provided.


As discussed above, the driving advisor 51 can automatically set a notch power, either a pre-established notch setting or an optimum continuous notch power. In addition to supplying a speed command to the locomotive 31, a display 68 is provided so that the operator can view what the planner has recommended. The operator also has access to a control panel 69. Through the control panel 69 the operator can decide whether to apply the notch power recommended. Towards this end, the operator may limit a targeted or recommended power. That is, at any time the operator always has final authority over what power setting the locomotive consist will operate at. This includes deciding whether to apply braking if the trip plan recommends slowing the train 31. For example, if operating in dark territory, or where information from wayside equipment cannot electronically transmit information to a train and instead the operator views visual signals from the wayside equipment, the operator inputs commands based on information contained in track database and visual signals from the wayside equipment. Based on how the train 31 is functioning, information regarding fuel measurement is supplied to the fuel rate estimator 64. Since direct measurement of fuel flows is not typically available in a locomotive consist, all information on fuel consumed so far within a trip and projections into the future following optimal plans is carried out using calibrated physics models such as those used in developing the optimal plans. For example, such predictions may include but are not limited to, the use of measured gross horse-power and known fuel characteristics to derive the cumulative fuel used.


The train 31 also has a locator device 30 such as a GPS sensor, as discussed above. Information is supplied to the train parameters estimator 65. Such information may include, but is not limited to, GPS sensor data, tractive/braking effort data, braking status data, speed and any changes in speed data. With information regarding grade and speed limit information, train weight and drag coefficients information is supplied to the executive control element 62.


The present invention may also allow for the use of continuously variable power throughout the optimization planning and closed loop control implementation. In a conventional locomotive, power is typically quantized to eight discrete levels. Modern locomotives can realize continuous variation in horsepower which may be incorporated into the previously described optimization methods. With continuous power, the locomotive 42 can further optimize operating conditions, e.g., by minimizing auxiliary loads and power transmission losses, and fine tuning engine horsepower regions of optimum efficiency, or to points of increased emissions margins. Example include, but are not limited to, minimizing cooling system losses, adjusting alternator voltages, adjusting engine speeds, and reducing number of powered axles. Further, the locomotive 42 may use the on-board track database 36 and the forecasted performance requirements to minimize auxiliary loads and power transmission losses to provide optimum efficiency for the target fuel consumption/emissions. Examples include, but are not limited to, reducing a number of powered axles on flat terrain and pre-cooling the locomotive engine prior to entering a tunnel.


The present invention may also use the on-board track database 36 and the forecasted performance to adjust the locomotive performance, such as to insure that the train has sufficient speed as it approaches a hill and/or tunnel. For example, this could be expressed as a speed constraint at a particular location that becomes part of the optimal plan generation created solving the equation (OP). Additionally, the present invention may incorporate train-handling rules, such as, but not limited to, tractive effort ramp rates, maximum braking effort ramp rates. These may incorporated directly into the formulation for optimum trip profile or alternatively incorporated into the closed loop regulator used to control power application to achieve the target speed.


In a preferred embodiment the present invention is only installed on a lead locomotive of the train consist. Even though the present invention is not dependant on data or interactions with other locomotives, it may be integrated with a consist manager, as disclosed in U.S. Pat. No. 6,691,957 and patent application Ser. No. 10/429,596 (owned by the Assignee and both incorporated by reference), functionality and/or a consist optimizer functionality to improve efficiency. Interaction with multiple trains is not precluded as illustrated by the example of dispatch arbitrating two “independently optimized” trains described herein.


Trains with distributed power systems can be operated in different modes. One mode is where all locomotives in the train operate at the same notch command. So if the lead locomotive is commanding motoring-N8, all units in the train will be commanded to generate motoring-N8 power. Another mode of operation is “independent” control. In this mode, locomotives or sets of locomotives distributed throughout the train can be operated at different motoring or braking powers. For example, as a train crests a mountaintop, the lead locomotives (on the down slope of mountain) may be placed in braking, while the locomotives in the middle or at the end of the train (on the up slope of mountain) may be in motoring. This is done to minimize tensile forces on the mechanical couplers that connect the railcars and locomotives. Traditionally, operating the distributed power system in “independent” mode required the operator to manually command each remote locomotive or set of locomotives via a display in the lead locomotive. Using the physics based planning model, train set-up information, on-board track database, on-board operating rules, location determination system, real-time closed loop power/brake control, and sensor feedback, the system shall automatically operate the distributed power system in “independent” mode.


When operating in distributed power, the operator in a lead locomotive can control operating functions of remote locomotives in the remote consists via a control system, such as a distributed power control element. Thus when operating in distributed power, the operator can command each locomotive consist to operate at a different notch power level (or one consist could be in motoring and other could be in braking) wherein each individual locomotive in the locomotive consist operates at the same notch power. In an exemplary embodiment, with the present invention installed on the train, preferably in communication with the distributed power control element, when a notch power level for a remote locomotive consist is desired as recommended by the optimized trip plan, the present invention will communicate this power setting to the remote locomotive consists for implementation. As discussed below, the same is true regarding braking.


The present invention may be used with consists in which the locomotives are not contiguous, e.g., with 1 or more locomotives up front, others in the middle and at the rear for train. Such configurations are called distributed power wherein the standard connection between the locomotives is replaced by radio link or auxiliary cable to link the locomotives externally. When operating in distributed power, the operator in a lead locomotive can control operating functions of remote locomotives in the consist via a control system, such as a distributed power control element. In particular, when operating in distributed power, the operator can command each locomotive consist to operate at a different notch power level (or one consist could be in motoring and other could be in braking) wherein each individual in the locomotive consist operates at the same notch power.


In an exemplary embodiment, with the present invention installed on the train, preferably in communication with the distributed power control element, when a notch power level for a remote locomotive consist is desired as recommended by the optimized trip plan, the present invention will communicate this power setting to the remote locomotive consists for implementation. As discussed below, the same is true regarding braking. When operating with distributed power, the optimization problem previously described can be enhanced to allow additional degrees of freedom, in that each of the remote units can be independently controlled from the lead unit. The value of this is that additional objectives or constraints relating to in-train forces may be incorporated into the performance function, assuming the model to reflect the in-train forces is also included. Thus the present invention may include the use of multiple throttle controls to better manage in-train forces as well as fuel consumption and emissions.


In a train utilizing a consist manager, the lead locomotive in a locomotive consist may operate at a different notch power setting than other locomotives in that consist. The other locomotives in the consist operate at the same notch power setting. The present invention may be utilized in conjunction with the consist manager to command notch power settings for the locomotives in the consist. Thus based on the present invention, since the consist manager divides a locomotive consist into two groups, lead locomotive and trail units, the lead locomotive will be commanded to operate at a certain notch power and the trail locomotives are commanded to operate at another certain notch power. In an exemplary embodiment the distributed power control element may be the system and/or apparatus where this operation is housed.


Likewise, when a consist optimizer is used with a locomotive consist, the present invention can be used in conjunction with the consist optimizer to determine notch power for each locomotive in the locomotive consist. For example, suppose that a trip plan recommends a notch power setting of 4 for the locomotive consist. Based on the location of the train, the consist optimizer will take this information and then determine the notch power setting for each locomotive in the consist In this implementation, the efficiency of setting notch power settings over intra-train communication channels is improved. Furthermore, as discussed above, implementation of this configuration may be performed utilizing the distributed control system.


Furthermore, as discussed previously, the present invention may be used for continuous corrections and re-planning with respect to when the train consist uses braking based on upcoming items of interest, such as but not limited to railroad crossings, grade changes, approaching sidings, approaching depot yards, and approaching fuel stations where each locomotive in the consist may require a different braking option. For example, if the train is coming over a hill, the lead locomotive may have to enter a braking condition whereas the remote locomotives, having not reached the peak of the hill may have to remain in a motoring state.



FIGS. 8, 9 and 10 depict exemplary illustrations of dynamic displays for use by the operator. As provided, FIG. 8, a trip profile is provided 72. Within the profile a location 73 of the locomotive is provided. Such information as train length 105 and the number of cars 106 in the train is provided. Elements are also provided regarding track grade 107, curve and wayside elements 108, including bridge location 109, and train speed 110. The display 68 allows the operator to view such information and also see where the train is along the route. Information pertaining to distance and/or estimate time of arrival to such locations as crossings 112, signals 114, speed changes 116, landmarks 118, and destinations 120 is provided. An arrival time management tool 125 is also provided to allow the user to determine the fuel savings that is being realized during the trip. The operator has the ability to vary arrival times 127 and witness how this affects the fuel savings. As discussed herein, those skilled in the art will recognize that fuel saving is an exemplary example of only one objective that can be reviewed with a management tool. Towards this end, depending on the parameter being viewed, other parameters, discussed herein can be viewed and evaluated with a management tool that is visible to the operator. The operator is also provided information about how long the crew has been operating the train. In exemplary embodiments time and distance information may either be illustrated as the time and/or distance until a particular event and/or location or it may provide a total elapsed time.


As illustrated in FIG. 9 an exemplary display provides information about consist data 130, an events and situation graphic 132, an arrival time management tool 134, and action keys 136. Similar information as discussed above is provided in this display as well. This display 68 also provides action keys 138 to allow the operator to re-plan as well as to disengage 140 the present invention.



FIG. 10 depicts another exemplary embodiment of the display. Data typical of a modern locomotive including air-brake status 72, analog speedometer with digital inset 74, and information about tractive effort in pounds force (or traction amps for DC locomotives) is visible. An indicator 74 is provided to show the current optimal speed in the plan being executed as well as an accelerometer graphic to supplement the readout in mph/minute. Important new data for optimal plan execution is in the center of the screen, including a rolling strip graphic 76 with optimal speed and notch setting versus distance compared to the current history of these variables. In this exemplary embodiment, location of the train is derived using the locator element. As illustrated, the location is provided by identifying how far the train is away from its final destination, an absolute position, an initial destination, an intermediate point, and/or an operator input.


The strip chart provides a look-ahead to changes in speed required to follow the optimal plan, which is useful in manual control, and monitors plan versus actual during automatic control. As discussed herein, such as when in the coaching mode, the operator can either follow the notch or speed suggested by the present invention. The vertical bar gives a graphic of desired and actual notch, which are also displayed digitally below the strip chart. When continuous notch power is utilized, as discussed above, the display will simply round to closest discrete equivalent, the display may be an analog display so that an analog equivalent or a percentage or actual horse power/tractive effort is displayed.


Critical information on trip status is displayed on the screen, and shows the current grade the train is encountering 88, either by the lead locomotive, a location elsewhere along the train or an average over the train length. A distance traveled so far in the plan 90, cumulative fuel used 92, where or the distance away the next stop is planned 94, current and projected arrival time 96 expected time to be at next stop are also disclosed. The display 68 also shows the maximum possible time to destination possible with the computed plans available. If a later arrival was required, a re-plan would be carried out. Delta plan data shows status for fuel and schedule ahead or behind the current optimal plan. Negative numbers mean less fuel or early compared to plan, positive numbers mean more fuel or late compared to plan, and typically trade-off in opposite directions (slowing down to save fuel makes the train late and conversely).


At all times these displays 68 gives the operator a snapshot of where he stands with respect to the currently instituted driving plan. This display is for illustrative purpose only as there are many other ways of displaying/conveying this information to the operator and/or dispatch. Towards this end, the information disclosed above could be intermixed to provide a display different than the ones disclosed.


Other features that may be included in the present invention include, but are not limited to, allowing for the generating of data logs and reports. This information may be stored on the train and downloaded to an off-board system at some point in time. The downloads may occur via manual and/or wireless transmission. This information may also be viewable by the operator via the locomotive display. The data may include such information as, but not limited to, operator inputs, time system is operational, fuel saved, fuel imbalance across locomotives in the train, train journey off course, system diagnostic issues such as if GPS sensor is malfunctioning.


Since trip plans must also take into consideration allowable crew operation time, the present invention may take such information into consideration as a trip is planned. For example, if the maximum time a crew may operate is eight hours, then the trip shall be fashioned to include stopping location for a new crew to take the place of the present crew. Such specified stopping locations may include, but are not limited to rail yards, meet/pass locations, etc. If, as the trip progresses, the trip time may be exceeded, the present invention may be overridden by the operator to meet criteria as determined by the operator. Ultimately, regardless of the operating conditions of the train, such as but not limited to high load, low speed, train stretch conditions, etc., the operator remains in control to command a speed and/or operating condition of the train.


Using the present invention, the train may operate in a plurality of operations. In one operational concept, the present invention may provide commands for commanding propulsion, dynamic braking. The operator then handles all other train functions. In another operational concept, the present invention may provide commands for commanding propulsion only. The operator then handles dynamic braking and all other train functions. In yet another operational concept, the present invention may provide commands for commanding propulsion, dynamic braking and application of the airbrake. The operator then handles all other train functions.


The present invention may also be used by notify the operator of upcoming items of interest of actions to be taken. Specifically, the forecasting logic of the present invention, the continuous corrections and re-planning to the optimized trip plan, the track database, the operator can be notified of upcoming crossings, signals, grade changes, brake actions, sidings, rail yards, fuel stations, etc. This notification may occur audibly and/or through the operator interface.


Specifically using the physics based planning model, train set-up information, on-board track database, on-board operating rules, location determination system, real-time closed loop power/brake control, and sensor feedback, the system shall present and/or notify the operator of required actions. The notification can be visual and/or audible. Examples include notifying of crossings that require the operator activate the locomotive horn and/or bell, notifying of “silent” crossings that do not require the operator activate the locomotive horn or bell.


In another exemplary embodiment, using the physics based planning model discussed above, train set-up information, on-board track database, on-board operating rules, location determination system, real-time closed power/brake control, and sensor feedback, the present invention may present the operator information (e.g. a gauge on display) that allows the operator to see when the train will arrive at various locations as illustrated in FIG. 9. The system shall allow the operator to adjust the trip plan (target arrival time). This information (actual estimated arrival time or information needed to derive off-board) can also be communicated to the dispatch center to allow the dispatcher or dispatch system to adjust the target arrival times. This allows the system to quickly adjust and optimize for the appropriate target function (for example trading off speed and fuel usage).


Based on the information provided above, exemplary embodiments of the invention may be used to determine a location of the train 31 on a track, step 18. A determination of the track characteristic may also be accomplished, such as by using the train parameter estimator 65. A trip plan may be created based on the location of the train, the characteristic of the track, and an operating condition of at least one locomotive of the train. Furthermore, an optimal power requirement may be communicated to train wherein the train operator may be directed to a locomotive, locomotive consist and/or train in accordance with the optimal power, such as through the wireless communication system 47. In another example instead of directing the train operator, the train 31, locomotive consist 18, and/or locomotive may be automatically operated based on the optimal power setting.


Additionally a method may also involve determining a power setting, or power commands 14, for the locomotive consist 18 based on the trip plan. The locomotive consist 18 is then operated at the power setting. Operating parameters of the train and/or locomotive consist may be collected, such as but not limited to actual speed of the train, actual power setting of the locomotive consist, and a location of the train. At least one of these parameters can be compared to the power setting the locomotive consist is commanded to operated at.


In another embodiment, a method may involve determining operational parameters 62 of the train and/or locomotive consist. A desired operational parameter is determined based on determined operational parameters. The determined parameter is compared to the operational parameter. If a difference is detected, the trip plan is adjusted, step 24.


Another embodiment may entail a method where a location of the train 31 on the track 34 is determined. A characteristic of the track 34 is also determined. A trip plan, or drive plan, is developed, or generated in order to minimize fuel consumption. The trip plan may be generated based on the location of the train, the characteristic of the track, and/or the operating condition of the locomotive consist 18 and/or train 31. In a similar method, once a location of the train is determined on the track and a characteristic of the track is known, propulsion control and/or notch commands are provided to minimize fuel consumption.

Claims
  • 1. A method for operating a first train having one or more locomotive consists with each locomotive consist comprising one or more locomotives, the method comprising: receiving route data and train data, wherein the route data includes data relating to one or more characteristics of a track on which the first train is to travel along a route and data relating to at least one speed limit along the route, and wherein the train data relates to one or more characteristics of the train;creating a trip plan onboard the first train at any time during travel of the train along the route, wherein the trip plan is created at a first point along the route based on the received data and covers at least a segment of the route extending to a second point further along the route than the first point, the trip plan designating operational settings of the first train as a function of at least one of distance or time along the route;automatically controlling the first train according to the trip plan as the first train travels along the route segment, said trip plan being configured for increasing efficiency of the first train by at least one of reducing fuel use of the first train or reducing emissions produced by the first train along the segment of the route;measuring actual efficiency of the train during travel of the first train according to the trip plan; andupdating the trip plan during travel of the first train based on the actual efficiency that is measured.
  • 2. The method of claim 1 further comprising revising the trip plan based on at least one of new route data or train data received as the first train travels along the route.
  • 3. The method of claim 2 wherein the trip plan is further created based on current operational information of the first train, and wherein the trip plan is revised into a revised trip plan based on new or updated current operational information of the first train as the first train travels along the route.
  • 4. The method of claim 3 wherein creating the trip plan and revising the trip plan further comprises factoring in environmental conditions into the revised trip plan.
  • 5. The method of claim 1 further comprising manually limiting a speed of the first train.
  • 6. The method of claim 1 further comprising creating separate trip plans for each of a plurality of segments of the route, wherein at least one of the multiple segments is determined by a natural location along the trip, a siding where a meet and pass may occur, a yard siding, or a waypoint.
  • 7. The method of claim 6 further comprising combining trip plan optimization of the separate trip plans created for the plurality of route segments.
  • 8. The method of claim 1 further comprising implementing train handling rules to control a power setting of the one or more locomotive consists to achieve a target speed.
  • 9. The method of claim 1 further comprising determining a power setting for each locomotive in the one or more locomotive consists to optimize a train speed based on the trip plan and a location of the first train.
  • 10. The method of claim 1 further comprising determining several trip plans that include the trip plan for the at least a segment of the route and presenting the several trip plans to a user to allow the user to select a trip plan to execute.
  • 11. The method of claim 1 wherein the user may decide when to control at least one of a propulsion system and braking system of the first train.
  • 12. The method of claim 1 wherein the trip plan includes a slack time period based on at least one of a confidence or a probability of occurrence of an unplanned delay in the trip plan.
  • 13. The method according to claim 1 further comprising updating the trip plan based on a predetermined plan parameter, wherein the plan parameter is at least one of a track condition, a request by dispatch, a change in conditions of the one or more locomotives, track speed limits, or operator input.
  • 14. The method according to claim 1, wherein creating the trip plan comprises factoring in arrival time management.
  • 15. The method according to claim 1, further comprising communicating information related to at least one of the trip plan an updated trip plan to an operator.
  • 16. The method according to claim 1, further comprising logging and reporting performance of the first train versus the trip plan.
  • 17. The method according to claim 1, further comprising using the trip plan to coach an operator of the first train.
  • 18. The method according to claim 1, further comprising: communicating an optimal power requirement; andoperating the first train or a locomotive or locomotive consist in the first train in accordance with the optimal power requirement.
  • 19. The method according to claim 18, further comprising directing an operator to operate at least one of the train, the locomotive consist, or the one or more locomotives in the first train in accordance with the optimal power requirement.
  • 20. The method according to claim 1, further comprising: communicating an optimal throttle setting; andautomatically operating at least one of the first train, the locomotive consist, or the one or more locomotives in accordance with the optimal throttle setting.
  • 21. The method according to claim 1, wherein the trip plan comprises a plurality of power settings for the first train, expressed as a function of at least one of distance or time along the route.
  • 22. The method of claim 1, wherein the trip plan is configured for reducing the emissions produced by the first train.
  • 23. The method of claim 1, further comprising receiving a train-to-train communication from a separate, second train as the first train is traveling according to the trip plan and revising the trip plan of the first train based on the train-to-train communication received from the second train.
  • 24. The method of claim 23, wherein the train-to-train communication notifies the first train that the second train is behind schedule and the trip plan is revised to coordinate movement of the first train with movement of the second train that is behind schedule.
  • 25. The method of claim 1, wherein the trip plan is created to increase the efficiency of the train by reducing at least one of fuel used or emissions produced as an objective of the trip plan, and further comprising changing the objective of the trip plan as a function of distance of the train to a destination location of the trip.
  • 26. The method of claim 1, wherein creating the trip plan includes examining previously determined trip plans and selecting the trip plan from the previously determined trip plans based on at least one of a comparison between a current train configuration and previous train configurations associated with the previously determined trip plans, a comparison between the route of the train and previously traveled routes associated with the previously determined trip plans, or a comparison between current environmental conditions and previous environmental conditions associated with the previously determined trip plans.
  • 27. The method of claim 1, wherein the trip plan is created using a designated time period that a current crew of operators the train is allowed to operate onboard the train, the trip plan created to include one or more stops of the train to allow the current crew of operators to be replaced with a replacement crew of operators.
  • 28. The method of claim 1, further comprising determining several trip plans that include the trip plan that is communicated to the train and presenting the several trip plans to an operator disposed onboard the train to allow the operator to select which of the several trip plans is to be used to control operations of the train.
STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT

This invention was made with government support under contract DE-FC04-2002AL68284 awarded by the U.S. Department of Energy. The government has certain rights in the invention.

US Referenced Citations (879)
Number Name Date Kind
2104652 Inman Jan 1936 A
2059160 Wintsch Oct 1936 A
2104601 Young Jan 1938 A
2111513 Phinney Mar 1938 A
2148005 Allen et al. Feb 1939 A
2233932 Allen Mar 1941 A
2289857 Allen Jul 1942 A
2293926 Wallace Aug 1942 A
2366802 Pflasterer Jan 1945 A
2601634 Rovette Jun 1952 A
2628335 Drake Feb 1953 A
2783369 Weber Feb 1957 A
2925552 Cowan et al. Feb 1960 A
2927711 Naggiar Mar 1960 A
3016464 Bailey Jan 1962 A
3137756 Gunther et al. Jun 1964 A
3246141 Ehrlich Apr 1966 A
3393600 Bess Jul 1968 A
3508496 Larson Apr 1970 A
3517307 Wallen, Jr. et al. Jun 1970 A
3519805 Thorne-Booth Jul 1970 A
3537401 Metzner Nov 1970 A
3562419 Stewart et al. Feb 1971 A
3575596 Schatzel Apr 1971 A
3589815 Hosterman Jun 1971 A
3594912 Sauterel Jul 1971 A
3604359 Doorley et al. Sep 1971 A
3633010 Svetlichny Jan 1972 A
3650216 Harwick et al. Mar 1972 A
3655962 Koch Apr 1972 A
3696243 Risely Oct 1972 A
3718040 Freeman et al. Feb 1973 A
3781139 Lohse Dec 1973 A
3791473 Rosen Feb 1974 A
3794833 Blazek et al. Feb 1974 A
3805056 Birkin Apr 1974 A
3813885 Tabor Jun 1974 A
3821558 Mansfield Jun 1974 A
3821932 Theurer et al. Jul 1974 A
3828440 Plasser et al. Aug 1974 A
3850390 Geiger Nov 1974 A
3864039 Wilmarth Feb 1975 A
3865042 DePaola et al. Feb 1975 A
3870952 Sibley Mar 1975 A
3875865 Plasser et al. Apr 1975 A
3886870 Pelabon Jun 1975 A
3896665 Goel Jul 1975 A
3924461 Stover Dec 1975 A
3937068 Joy Feb 1976 A
3937432 Birkin Feb 1976 A
3948314 Creswick et al. Apr 1976 A
3960005 Vezina Jun 1976 A
3962908 Joy Jun 1976 A
3974991 Geiger Aug 1976 A
3987989 Geiger Oct 1976 A
3995560 Mackintosh Dec 1976 A
4003019 Tronel Jan 1977 A
4005601 Botello Feb 1977 A
4005838 Grundy Feb 1977 A
4022408 Staples May 1977 A
4040738 Wagner Aug 1977 A
4041283 Mosier Aug 1977 A
4042810 Mosher Aug 1977 A
4044594 Owens et al. Aug 1977 A
4062419 Kadota Dec 1977 A
4069590 Effinger Jan 1978 A
4075632 Baldwin et al. Feb 1978 A
4100795 Panetti Jul 1978 A
4117463 Norton Sep 1978 A
4117529 Stark et al. Sep 1978 A
4136432 Melley, Jr. Jan 1979 A
4143553 Martens et al. Mar 1979 A
4145018 Poggio et al. Mar 1979 A
4155176 Goel et al. May 1979 A
4159088 Cosley Jun 1979 A
4165648 Pagano Aug 1979 A
4173073 Fukazawa et al. Nov 1979 A
4174636 Pagano Nov 1979 A
4181278 Pascoe Jan 1980 A
4181430 Shirota et al. Jan 1980 A
4181943 Mercer, Sr. Jan 1980 A
4198164 Cantor Apr 1980 A
4207569 Meyer Jun 1980 A
4214647 Lutts Jul 1980 A
4222275 Sholl et al. Sep 1980 A
4229978 Sholl et al. Oct 1980 A
4235112 Kaiser Nov 1980 A
4241403 Schultz Dec 1980 A
4253399 Spigarelli Mar 1981 A
4259018 Poirier Mar 1981 A
4262209 Berner Apr 1981 A
4279395 Boggio et al. Jul 1981 A
4288855 Panetti Sep 1981 A
4306694 Kuhn Dec 1981 A
4324376 Kuhn Apr 1982 A
4344364 Nickles et al. Aug 1982 A
4355582 Germer Oct 1982 A
4360873 Wilde et al. Nov 1982 A
4361202 Minovitch Nov 1982 A
4383448 Fujimoto et al. May 1983 A
4389033 Hardman Jun 1983 A
4391134 Theurer et al. Jul 1983 A
4401035 Spigarelli et al. Aug 1983 A
4417466 Panetti Nov 1983 A
4417522 Theurer et al. Nov 1983 A
4425097 Owens Jan 1984 A
4429576 Norris Feb 1984 A
4430615 Calvert Feb 1984 A
4457178 Turbe et al. Jul 1984 A
4467430 Even et al. Aug 1984 A
4468966 Bradshaw Sep 1984 A
4487071 Pagano et al. Dec 1984 A
4490038 Theurer et al. Dec 1984 A
4524745 Tominari et al. Jun 1985 A
4531837 Panetti Jul 1985 A
4538061 Jaquet Aug 1985 A
4541182 Panetti Sep 1985 A
4548070 Panetti Oct 1985 A
4548164 Ylonen et al. Oct 1985 A
4561057 Haley, Jr. et al. Dec 1985 A
4565548 Davis et al. Jan 1986 A
4577494 Jaeggi Mar 1986 A
4578665 Yang Mar 1986 A
4582280 Nichols et al. Apr 1986 A
4582580 Goudal et al. Apr 1986 A
4593569 Joy Jun 1986 A
4602335 Perlmutter Jul 1986 A
4609870 Lale et al. Sep 1986 A
4615218 Pagano Oct 1986 A
4617627 Yasunobu et al. Oct 1986 A
4625412 Bradshaw Dec 1986 A
4644705 Saccomani et al. Feb 1987 A
4654973 Worthy Apr 1987 A
4655142 Theurer et al. Apr 1987 A
4662224 Turbe May 1987 A
4663713 Cornell et al. May 1987 A
4689995 Turbe Sep 1987 A
4691565 Theurer Sep 1987 A
4700223 Shoutaro et al. Oct 1987 A
4700574 Turbe Oct 1987 A
4711418 Aver, Jr. et al. Dec 1987 A
4718351 Engle Jan 1988 A
4723738 Franke Feb 1988 A
4728063 Petit et al. Mar 1988 A
4735384 Elliott Apr 1988 A
4735385 Nickles et al. Apr 1988 A
4741207 Spangler May 1988 A
4763526 Pagano Aug 1988 A
4773590 Dash et al. Sep 1988 A
4794548 Lynch et al. Dec 1988 A
4827438 Nickles et al. May 1989 A
4843575 Crane Jun 1989 A
4853883 Nickles et al. Aug 1989 A
4886226 Frielinghaus Dec 1989 A
4915504 Thurston Apr 1990 A
4932614 Birkin Jun 1990 A
4932618 Davenport et al. Jun 1990 A
4944474 Jones Jul 1990 A
4979392 Guinon Dec 1990 A
4986498 Rotter et al. Jan 1991 A
5009014 Leach Apr 1991 A
5036594 Kesler et al. Aug 1991 A
5055835 Sutton Oct 1991 A
5086591 Panetti Feb 1992 A
5094004 Wooten Mar 1992 A
5101358 Panetti Mar 1992 A
5109343 Budway Apr 1992 A
5129605 Burns et al. Jul 1992 A
5133645 Crowley et al. Jul 1992 A
5134808 Panetti Aug 1992 A
5140776 Isdahl et al. Aug 1992 A
5161891 Austill Nov 1992 A
5177684 Harker et al. Jan 1993 A
5181541 Bodenheimer Jan 1993 A
5187945 Dixon Feb 1993 A
5197438 Kumano et al. Mar 1993 A
5197627 Disabato et al. Mar 1993 A
5199176 Theurer et al. Apr 1993 A
5201294 Osuka Apr 1993 A
5203089 Trefouel et al. Apr 1993 A
5230613 Hilsbos et al. Jul 1993 A
5239472 Long et al. Aug 1993 A
5240416 Bennington Aug 1993 A
5253153 Mathews et al. Oct 1993 A
5253830 Nayer et al. Oct 1993 A
5261366 Regueiro Nov 1993 A
5275051 De Beer Jan 1994 A
5277156 Osuka et al. Jan 1994 A
5301548 Theurer Apr 1994 A
5313924 Regueiro May 1994 A
5316174 Schutz May 1994 A
5339692 Shoenhair et al. Aug 1994 A
5341683 Searle Aug 1994 A
5353512 Theurer et al. Oct 1994 A
5357912 Barnes et al. Oct 1994 A
5363787 Konopasek et al. Nov 1994 A
5365902 Hsu Nov 1994 A
5386727 Searle Feb 1995 A
5388034 Allen et al. Feb 1995 A
5394851 Cryer et al. Mar 1995 A
5398186 Nakhla Mar 1995 A
5398894 Pascoe Mar 1995 A
5419196 Havira et al. May 1995 A
5420883 Swensen et al. May 1995 A
5429329 Wallace et al. Jul 1995 A
5433111 Hershey et al. Jul 1995 A
5433182 Augustin et al. Jul 1995 A
5437422 Newman Aug 1995 A
5440489 Newman Aug 1995 A
5441027 Buchanon et al. Aug 1995 A
5452222 Gray et al. Sep 1995 A
5459663 Franke Oct 1995 A
5459666 Casper et al. Oct 1995 A
5460013 Thomsen Oct 1995 A
5462244 Van Der Hoek et al. Oct 1995 A
5475597 Buck Dec 1995 A
5487002 Diller et al. Jan 1996 A
5487516 Murata et al. Jan 1996 A
5492099 Maddock Feb 1996 A
5522265 Jaeggi Jun 1996 A
5529267 Giras et al. Jun 1996 A
5533695 Heggestad et al. Jul 1996 A
5565874 Rode Oct 1996 A
5570284 Roselli et al. Oct 1996 A
5574224 Jaeggi Nov 1996 A
5574649 Levy Nov 1996 A
5574659 Delvers et al. Nov 1996 A
5578758 Havira et al. Nov 1996 A
5579013 Hershey et al. Nov 1996 A
5583769 Saitoh Dec 1996 A
5588716 Stumpe Dec 1996 A
5598782 Wiseman et al. Feb 1997 A
5600558 Mearek et al. Feb 1997 A
5605099 Sroka et al. Feb 1997 A
5605134 Martin Feb 1997 A
5613442 Ahola et al. Mar 1997 A
5618179 Copperman et al. Apr 1997 A
5623244 Cooper Apr 1997 A
5623413 Matheson et al. Apr 1997 A
5627508 Cooper et al. May 1997 A
5628479 Ballinger May 1997 A
5636026 Mian et al. Jun 1997 A
5642827 Madsen Jul 1997 A
5651330 Jewett Jul 1997 A
RE35590 Bezos et al. Aug 1997 E
5676059 Alt Oct 1997 A
5680054 Gauthier Oct 1997 A
5681015 Kull Oct 1997 A
5698977 Simpson et al. Dec 1997 A
5699986 Welk Dec 1997 A
5713540 Gerszberg et al. Feb 1998 A
5719771 Buck et al. Feb 1998 A
5720455 Kull et al. Feb 1998 A
5721685 Holland et al. Feb 1998 A
5735492 Pace Apr 1998 A
5738311 Fernandez Apr 1998 A
5740547 Kull et al. Apr 1998 A
5743495 Welles, II et al. Apr 1998 A
5744707 Kull Apr 1998 A
5751144 Weischedel May 1998 A
5755349 Brundle May 1998 A
5756903 Norby et al. May 1998 A
5758299 Sandborg et al. May 1998 A
5769364 Cipollone Jun 1998 A
5775228 Lamba et al. Jul 1998 A
5777891 Pagano et al. Jul 1998 A
5785392 Hart Jul 1998 A
5786535 Takeuchi et al. Jul 1998 A
5786750 Cooper Jul 1998 A
5791063 Kesler et al. Aug 1998 A
5794172 Matheson et al. Aug 1998 A
5803411 Ackerman et al. Sep 1998 A
5804731 Jaeggi Sep 1998 A
5813635 Fernandez Sep 1998 A
5817934 Skantar Oct 1998 A
5820226 Hart Oct 1998 A
5828979 Polivka et al. Oct 1998 A
5832895 Takahashi et al. Nov 1998 A
5833325 Hart Nov 1998 A
5836529 Gibbs Nov 1998 A
5856802 Ura et al. Jan 1999 A
5867404 Bryan Feb 1999 A
5913170 Wortham Jun 1999 A
5924654 Anderson Jul 1999 A
5927822 Hart Jul 1999 A
5928294 Zelinkovsky Jul 1999 A
5934764 Dimsa et al. Aug 1999 A
5936517 Yeh Aug 1999 A
5944392 Tachihata et al. Aug 1999 A
5950966 Hungate et al. Sep 1999 A
5950967 Montgomery Sep 1999 A
5956664 Bryan Sep 1999 A
5957571 Koster et al. Sep 1999 A
5969643 Curtis Oct 1999 A
5970438 Clark et al. Oct 1999 A
5978718 Kull Nov 1999 A
5983144 Bonissone et al. Nov 1999 A
5986547 Korver et al. Nov 1999 A
5986577 Bezos Nov 1999 A
5986579 Halvorson Nov 1999 A
5987979 Bryan Nov 1999 A
5992241 Posgay et al. Nov 1999 A
5995737 Bonissone et al. Nov 1999 A
5995881 Kull Nov 1999 A
5998915 Scholz et al. Dec 1999 A
6005494 Schramm Dec 1999 A
6016791 Thomas et al. Jan 2000 A
6026687 Jury Feb 2000 A
6055862 Martens May 2000 A
6064428 Trosino et al. May 2000 A
6067496 Benoliel et al. May 2000 A
6067964 Ruoff et al. May 2000 A
6081769 Curtis Jun 2000 A
6088635 Cox et al. Jul 2000 A
6092021 Ehlbeck et al. Jul 2000 A
6102009 Nishiyama Aug 2000 A
6102340 Peek et al. Aug 2000 A
6112142 Shockley et al. Aug 2000 A
6114901 Singh et al. Sep 2000 A
6114974 Halvorson Sep 2000 A
6119353 Gronskov Sep 2000 A
6121924 Meek et al. Sep 2000 A
6123111 Nathan et al. Sep 2000 A
6125311 Lo Sep 2000 A
6128558 Kernwein Oct 2000 A
6129025 Minakami et al. Oct 2000 A
6135396 Whitfield et al. Oct 2000 A
6144901 Nickles et al. Nov 2000 A
6158416 Chen et al. Dec 2000 A
6158822 Shirai et al. Dec 2000 A
6163089 Kull Dec 2000 A
6163755 Peer et al. Dec 2000 A
6179252 Roop et al. Jan 2001 B1
6192863 Takase Feb 2001 B1
6195020 Brodeur, Sr. et al. Feb 2001 B1
6198993 Higashi et al. Mar 2001 B1
6216095 Glista Apr 2001 B1
6216957 Turunen, Jr. Apr 2001 B1
6219595 Nickles et al. Apr 2001 B1
6225919 Lumbis et al. May 2001 B1
6230668 Marsh et al. May 2001 B1
6243694 Bonissone et al. Jun 2001 B1
6262573 Wojnarowski et al. Jul 2001 B1
6263265 Fera Jul 2001 B1
6263266 Hawthorne Jul 2001 B1
6269034 Shibuya Jul 2001 B1
6270040 Katzer Aug 2001 B1
6275165 Bezos Aug 2001 B1
6286480 Chen et al. Sep 2001 B1
6295816 Gallagher et al. Oct 2001 B1
6304801 Doner Oct 2001 B1
6308117 Ryland et al. Oct 2001 B1
6317686 Ran Nov 2001 B1
6322025 Colbert et al. Nov 2001 B1
6324912 Wooh Dec 2001 B1
6325050 Gallagher et al. Dec 2001 B1
6332106 Hawthorne et al. Dec 2001 B1
6347265 Bidaud Feb 2002 B1
6349653 Siedlarczyk Feb 2002 B1
6349702 Nishiyama Feb 2002 B1
6349706 Hsu et al. Feb 2002 B1
6357421 Pritchard Mar 2002 B1
6360998 Halvorson et al. Mar 2002 B1
6363331 Kyrtsos Mar 2002 B1
6377215 Halvorson et al. Apr 2002 B1
6380639 Soucy Apr 2002 B1
6404129 Hendricx et al. Jun 2002 B1
6405141 Carr et al. Jun 2002 B1
6415522 Ganz Jul 2002 B1
6416020 Gronskov Jul 2002 B1
6417765 Capanna Jul 2002 B1
6421606 Asai et al. Jul 2002 B1
6427114 Olsson Jul 2002 B1
6434452 Gray Aug 2002 B1
6441570 Grubba et al. Aug 2002 B1
6443123 Aoki et al. Sep 2002 B1
6459964 Vu et al. Oct 2002 B1
6459965 Polivka et al. Oct 2002 B1
6484074 Hazard et al. Nov 2002 B1
6487478 Azzaro et al. Nov 2002 B1
6487488 Peterson, Jr. et al. Nov 2002 B1
6490523 Doner Dec 2002 B2
6493627 Gallagher et al. Dec 2002 B1
6499339 Hedstrom Dec 2002 B1
6499815 Daigle Dec 2002 B1
6501393 Richards et al. Dec 2002 B1
6505103 Howell et al. Jan 2003 B1
6515249 Valley et al. Feb 2003 B1
6516668 Havira et al. Feb 2003 B2
6516727 Kraft Feb 2003 B2
6520124 Bohm, II Feb 2003 B2
6522958 Dwyer et al. Feb 2003 B1
6523787 Braband Feb 2003 B2
6525658 Streetman et al. Feb 2003 B2
6533223 Ireland Mar 2003 B1
6549005 Hay et al. Apr 2003 B1
6549803 Raghavan et al. Apr 2003 B1
6553838 Amini Apr 2003 B2
6556945 Burggraf et al. Apr 2003 B1
6557526 Hoshino May 2003 B1
6564172 Till May 2003 B1
6570497 Puckette, IV et al. May 2003 B2
6571636 Mcwhorter Jun 2003 B1
6584953 Yomogida Jul 2003 B2
6585085 Kumar Jul 2003 B1
6588114 Daigle Jul 2003 B1
6591263 Becker et al. Jul 2003 B1
6591758 Kumar Jul 2003 B2
6604421 Li Aug 2003 B1
6609049 Kane et al. Aug 2003 B1
6612245 Kumar et al. Sep 2003 B2
6612246 Kumar Sep 2003 B2
6615118 Kumar Sep 2003 B2
6615188 Breen et al. Sep 2003 B1
6631322 Arthur et al. Oct 2003 B1
6634112 Carr et al. Oct 2003 B2
6647328 Walker Nov 2003 B2
6647891 Holmes et al. Nov 2003 B2
6676089 Katzer Jan 2004 B1
6681160 Bidaud Jan 2004 B2
6691022 Takemura et al. Feb 2004 B2
6691957 Hess, Jr. et al. Feb 2004 B2
6694231 Rezk Feb 2004 B1
6698913 Yamamoto Mar 2004 B2
6701064 De Haan et al. Mar 2004 B1
6702235 Katzer Mar 2004 B2
6712045 Mccarthy, Jr. Mar 2004 B1
6725782 Bloom et al. Apr 2004 B1
6728515 Wooh Apr 2004 B1
6728606 Kumar Apr 2004 B2
6728625 Strubhar et al. Apr 2004 B2
6732023 Sugita et al. May 2004 B2
6732032 Lowrey et al. May 2004 B1
6742392 Gilmore et al. Jun 2004 B2
6748303 Hawthorne Jun 2004 B2
6748313 Li et al. Jun 2004 B2
6763291 Houpt et al. Jul 2004 B1
6778284 Casagrande Aug 2004 B2
6782044 Wright et al. Aug 2004 B1
6789005 Hawthorne Sep 2004 B2
6804621 Pedanckar Oct 2004 B1
6810312 Jammu et al. Oct 2004 B2
6812888 Drury et al. Nov 2004 B2
6814050 Kishibata et al. Nov 2004 B2
6814060 Solomons et al. Nov 2004 B1
6823844 Steinbrenner et al. Nov 2004 B2
6824110 Kane et al. Nov 2004 B2
6833554 Wooh Dec 2004 B2
6845953 Kane et al. Jan 2005 B2
6853888 Kane et al. Feb 2005 B2
6853890 Horst et al. Feb 2005 B1
6854691 Kraeling et al. Feb 2005 B2
6856865 Hawthorne Feb 2005 B2
6863246 Kane et al. Mar 2005 B2
6865454 Kane et al. Mar 2005 B2
6873888 Kumar Mar 2005 B2
6893262 Stockman May 2005 B2
6895362 Davenport et al. May 2005 B2
6903658 Kane et al. Jun 2005 B2
6910792 Takada et al. Jun 2005 B2
6915191 Kane et al. Jul 2005 B2
6922619 Baig et al. Jul 2005 B2
6945114 Kenderian et al. Sep 2005 B2
6947830 Froloff et al. Sep 2005 B1
6948837 Suzuki Sep 2005 B2
6951132 Davenport et al. Oct 2005 B2
6953272 Hayakawa et al. Oct 2005 B2
6957131 Kane et al. Oct 2005 B2
6973947 Penaloza et al. Dec 2005 B2
6976324 Theurer et al. Dec 2005 B2
6978195 Kane et al. Dec 2005 B2
6980894 Gordon et al. Dec 2005 B1
6996461 Kane et al. Feb 2006 B2
7007561 Otto et al. Mar 2006 B1
7021588 Hess, Jr. et al. Apr 2006 B2
7021589 Hess, Jr. et al. Apr 2006 B2
7023539 Kowalski Apr 2006 B2
7024289 Kane et al. Apr 2006 B2
7031823 Chatfield et al. Apr 2006 B2
7036232 Casagrande May 2006 B2
7036774 Kane et al. May 2006 B2
7047130 Watanabe et al. May 2006 B2
7050926 Theurer et al. May 2006 B2
7051693 Tetsuno et al. May 2006 B2
7053606 Buttle et al. May 2006 B2
7054762 Pagano et al. May 2006 B2
7072747 Armbruster et al. Jul 2006 B2
7072757 Adams et al. Jul 2006 B2
7073753 Root et al. Jul 2006 B2
7079926 Kane et al. Jul 2006 B2
7081824 Gilbert Jul 2006 B2
7082881 Schneider et al. Aug 2006 B2
7082924 Ruedin Aug 2006 B1
7092800 Kane et al. Aug 2006 B2
7092801 Kane et al. Aug 2006 B2
7092894 Crone Aug 2006 B1
7096171 Hawthorne et al. Aug 2006 B2
7127336 Houpt et al. Oct 2006 B2
7131403 Banga et al. Nov 2006 B1
7140477 Engle et al. Nov 2006 B2
7152330 Kleeberg Dec 2006 B2
7161500 Alfredsson et al. Jan 2007 B2
7164975 Bidaud Jan 2007 B2
7181851 Theurer et al. Feb 2007 B2
7188009 Hawthorne Mar 2007 B2
7197932 Sakai et al. Apr 2007 B2
7200536 Wynn Apr 2007 B2
7201350 Sugita et al. Apr 2007 B2
7219067 Mcmullen et al. May 2007 B1
7222083 Matheson et al. May 2007 B2
7226021 Anderson et al. Jun 2007 B1
7228747 Pieper Jun 2007 B2
7234449 Casabianca et al. Jun 2007 B2
7263647 Bryant et al. Aug 2007 B2
7263886 Jury Sep 2007 B2
7290807 Kumar Nov 2007 B2
7296770 Franke Nov 2007 B2
7302895 Kumar et al. Dec 2007 B2
7305885 Barshinger et al. Dec 2007 B2
7309929 Donnelly et al. Dec 2007 B2
7312607 Nygaard Dec 2007 B2
7337766 Nakayama et al. Mar 2008 B2
7340328 Matheson et al. Mar 2008 B2
7343314 Matheson et al. Mar 2008 B2
7347168 Reckels et al. Mar 2008 B2
7349797 Donnelly et al. Mar 2008 B2
7387029 Cunningham Jun 2008 B2
7389694 Hay et al. Jun 2008 B1
7392117 Bilodeau et al. Jun 2008 B1
7394553 Carr et al. Jul 2008 B2
7395141 Seck et al. Jul 2008 B1
7403296 Farritor et al. Jul 2008 B2
7416262 Ring Aug 2008 B2
7463348 Chung Dec 2008 B2
7497201 Hollenbeck Mar 2009 B2
7500436 Kumar et al. Mar 2009 B2
7502670 Harrison Mar 2009 B2
7509193 Kustosch Mar 2009 B2
7520415 Kral et al. Apr 2009 B2
7522990 Daum et al. Apr 2009 B2
7523893 Francis et al. Apr 2009 B2
7539596 Zoll et al. May 2009 B2
7539624 Matheson et al. May 2009 B2
7543670 Tamai et al. Jun 2009 B2
7557748 Zahm et al. Jul 2009 B1
7558740 Matheson et al. Jul 2009 B2
7565867 Donnelly et al. Jul 2009 B2
7575201 Bartonek Aug 2009 B2
7618011 Oleski et al. Nov 2009 B2
7659972 Magnus et al. Feb 2010 B2
7667611 Lindsey et al. Feb 2010 B2
7716010 Pelletier May 2010 B2
7734387 Young et al. Jun 2010 B1
7752913 Heckel et al. Jul 2010 B2
7755660 Nejikovsky et al. Jul 2010 B2
7770847 Severson Aug 2010 B1
7778747 Hawkins et al. Aug 2010 B2
7783397 Peltz et al. Aug 2010 B2
7811089 Bond Oct 2010 B2
7822491 Howlett et al. Oct 2010 B2
7869909 Harrison Jan 2011 B2
7872736 Rogers et al. Jan 2011 B2
7882742 Martens Feb 2011 B1
7895135 Norris et al. Feb 2011 B2
7920984 Farritor Apr 2011 B2
7937246 Farritor et al. May 2011 B2
7938370 Lechevin et al. May 2011 B1
7940389 Rogers et al. May 2011 B2
7960855 King et al. Jun 2011 B2
8020446 Bestebreurtje Sep 2011 B2
8030871 Young et al. Oct 2011 B1
8037763 Brignac et al. Oct 2011 B2
8068975 Jensen et al. Nov 2011 B2
8081320 Villar et al. Dec 2011 B2
8125219 Jungbluth et al. Feb 2012 B2
8126601 Kapp et al. Feb 2012 B2
8150568 Gray Apr 2012 B1
8154227 Young et al. Apr 2012 B1
8155811 Noffsinger et al. Apr 2012 B2
8157218 Riley et al. Apr 2012 B2
8157219 Ashraf et al. Apr 2012 B2
8160832 Luo et al. Apr 2012 B2
8195364 Norris et al. Jun 2012 B2
8264330 Yeldell et al. Sep 2012 B2
8266092 Kuhn et al. Sep 2012 B2
8305567 Hesser et al. Nov 2012 B2
8428798 Kull Apr 2013 B2
8521345 Cooper et al. Aug 2013 B2
8532842 Smith et al. Sep 2013 B2
8626366 Noffsinger et al. Jan 2014 B2
8645047 Daum et al. Feb 2014 B2
8655518 Cooper et al. Feb 2014 B2
8655519 Cooper et al. Feb 2014 B2
8682514 Falk et al. Mar 2014 B2
9108640 Jackson Aug 2015 B2
20010001131 Miller May 2001 A1
20010019263 Kwun et al. Sep 2001 A1
20010026321 Goto Oct 2001 A1
20010029411 Hawthorne Oct 2001 A1
20010045495 Olson et al. Nov 2001 A1
20010047241 Khavakh et al. Nov 2001 A1
20020010531 Hawthorne et al. Jan 2002 A1
20020059075 Schick et al. May 2002 A1
20020062819 Takahashi May 2002 A1
20020065698 Schick et al. May 2002 A1
20020072833 Gray Jun 2002 A1
20020093201 Soucy Jul 2002 A1
20020096081 Kraft Jul 2002 A1
20020103585 Biess et al. Aug 2002 A1
20020104779 Connor et al. Aug 2002 A1
20020107618 Deguchi et al. Aug 2002 A1
20020113170 Grappone Aug 2002 A1
20020148931 Anderson Oct 2002 A1
20020157901 Kast et al. Oct 2002 A1
20020174653 Uzkan Nov 2002 A1
20020188397 Biess et al. Dec 2002 A1
20020195086 Beck et al. Dec 2002 A1
20030000499 Doelker et al. Jan 2003 A1
20030001050 Katzer Jan 2003 A1
20030010872 Lewin et al. Jan 2003 A1
20030020469 Katragadda et al. Jan 2003 A1
20030034423 Hess et al. Feb 2003 A1
20030038216 Holgate Feb 2003 A1
20030055666 Roddy et al. Mar 2003 A1
20030060968 MacPhail et al. Mar 2003 A1
20030070492 Buttle et al. Apr 2003 A1
20030076221 Akiyama et al. Apr 2003 A1
20030091017 Davenport et al. May 2003 A1
20030104899 Keller Jun 2003 A1
20030105561 Nickles et al. Jun 2003 A1
20030107548 Eun et al. Jun 2003 A1
20030120400 Ahmed et al. Jun 2003 A1
20030128030 Hintze et al. Jul 2003 A1
20030139909 Ozawa Jul 2003 A1
20030158640 Pillar et al. Aug 2003 A1
20030183729 Root et al. Oct 2003 A1
20030187694 Rowen Oct 2003 A1
20030213875 Hess, Jr. et al. Nov 2003 A1
20030214417 Peltz et al. Nov 2003 A1
20030222981 Kisak et al. Dec 2003 A1
20030229097 Watkins et al. Dec 2003 A1
20030229446 Boscamp et al. Dec 2003 A1
20030233959 Kumar Dec 2003 A1
20030236598 Villarreal et al. Dec 2003 A1
20040010432 Matheson et al. Jan 2004 A1
20040024515 Troupe et al. Feb 2004 A1
20040024518 Boley et al. Feb 2004 A1
20040025849 West et al. Feb 2004 A1
20040026574 Seifert Feb 2004 A1
20040034556 Matheson et al. Feb 2004 A1
20040038831 Eadie Feb 2004 A1
20040048620 Nakahara et al. Mar 2004 A1
20040049339 Kober et al. Mar 2004 A1
20040068359 Neiss et al. Apr 2004 A1
20040073361 Tzamaloukas et al. Apr 2004 A1
20040075280 Kumar et al. Apr 2004 A1
20040093245 Matheson et al. May 2004 A1
20040095135 Nejikovsky et al. May 2004 A1
20040098142 Warren et al. May 2004 A1
20040104312 Hess et al. Jun 2004 A1
20040107042 Seick Jun 2004 A1
20040108814 Tsuda et al. Jun 2004 A1
20040111309 Matheson et al. Jun 2004 A1
20040122569 Bidaud Jun 2004 A1
20040129289 Hafemann Jul 2004 A1
20040129840 Horst Jul 2004 A1
20040133315 Kumar et al. Jul 2004 A1
20040143374 Horst et al. Jul 2004 A1
20040167687 Kornick et al. Aug 2004 A1
20040172175 Julich et al. Sep 2004 A1
20040174121 Tsuda et al. Sep 2004 A1
20040238693 Cole Dec 2004 A1
20040243664 Horstemeyer Dec 2004 A1
20040245410 Kisak et al. Dec 2004 A1
20040249571 Blesener et al. Dec 2004 A1
20050004723 Duggan et al. Jan 2005 A1
20050007020 Tsuda et al. Jan 2005 A1
20050045058 Donnelly et al. Mar 2005 A1
20050055157 Scholl Mar 2005 A1
20050055287 Schmidtberg et al. Mar 2005 A1
20050065674 Houpt et al. Mar 2005 A1
20050065711 Dahlgren et al. Mar 2005 A1
20050076716 Turner Apr 2005 A1
20050085961 Kane et al. Apr 2005 A1
20050090978 Bathory et al. Apr 2005 A1
20050096797 Matsubara et al. May 2005 A1
20050099323 Hirose May 2005 A1
20050107954 Nahla May 2005 A1
20050109882 Armbruster et al. May 2005 A1
20050120904 Kumar et al. Jun 2005 A1
20050121005 Edwards Jun 2005 A1
20050121971 Ring Jun 2005 A1
20050171655 Flynn et al. Aug 2005 A1
20050171657 Kumar Aug 2005 A1
20050186325 Luangthep Aug 2005 A1
20050188745 Staphanos et al. Sep 2005 A1
20050189815 Bryant Sep 2005 A1
20050189886 Donnelly et al. Sep 2005 A1
20050192720 Christie et al. Sep 2005 A1
20050196737 Mann Sep 2005 A1
20050205719 Hendrickson et al. Sep 2005 A1
20050210304 Hartung et al. Sep 2005 A1
20050229604 Chen Oct 2005 A1
20050234757 Matheson et al. Oct 2005 A1
20050251299 Donnelly et al. Nov 2005 A1
20050253397 Kumar et al. Nov 2005 A1
20050285552 Grubba et al. Dec 2005 A1
20050288832 Smith et al. Dec 2005 A1
20060005736 Kumar Jan 2006 A1
20060017911 Villar et al. Jan 2006 A1
20060025903 Kumar Feb 2006 A1
20060030978 Rajaram Feb 2006 A1
20060041341 Kane et al. Feb 2006 A1
20060047379 Schullian et al. Mar 2006 A1
20060055175 Grinblat Mar 2006 A1
20060060345 Flik et al. Mar 2006 A1
20060076461 Derose et al. Apr 2006 A1
20060085103 Smith et al. Apr 2006 A1
20060085363 Cheng et al. Apr 2006 A1
20060086546 Hu et al. Apr 2006 A1
20060098843 Chew May 2006 A1
20060116789 Subramanian Jun 2006 A1
20060116795 Abe et al. Jun 2006 A1
20060122737 Tani et al. Jun 2006 A1
20060155434 Kane et al. Jul 2006 A1
20060162973 Harris et al. Jul 2006 A1
20060178800 Chen et al. Aug 2006 A1
20060187086 Quintos Aug 2006 A1
20060212188 Kickbusch et al. Sep 2006 A1
20060212189 Kickbusch et al. Sep 2006 A1
20060219214 Okude et al. Oct 2006 A1
20060225710 Taglialatela-Scafati et al. Oct 2006 A1
20060231066 Demura et al. Oct 2006 A1
20060235584 Fregene et al. Oct 2006 A1
20060235604 Taglialatela-Scafati et al. Oct 2006 A1
20060253233 Metzger Nov 2006 A1
20060271291 Meyer Nov 2006 A1
20060277906 Burk et al. Dec 2006 A1
20060282199 Daum et al. Dec 2006 A1
20070006831 Leone et al. Jan 2007 A1
20070061053 Zeitzew Mar 2007 A1
20070062476 Ota et al. Mar 2007 A1
20070073466 Tamai et al. Mar 2007 A1
20070078026 Holt et al. Apr 2007 A1
20070093148 Gibbs et al. Apr 2007 A1
20070108308 Keightley May 2007 A1
20070112475 Koebler et al. May 2007 A1
20070129852 Chen et al. Jun 2007 A1
20070132463 Anderson Jun 2007 A1
20070135988 Kidston et al. Jun 2007 A1
20070137514 Kumar et al. Jun 2007 A1
20070163352 Nielsen et al. Jul 2007 A1
20070183039 Irvin Aug 2007 A1
20070209619 Leone Sep 2007 A1
20070217670 Bar Am Sep 2007 A1
20070219680 Kumar et al. Sep 2007 A1
20070219681 Kumar et al. Sep 2007 A1
20070219682 Kumar et al. Sep 2007 A1
20070219683 Daum et al. Sep 2007 A1
20070225878 Kumar et al. Sep 2007 A1
20070233335 Kumar et al. Oct 2007 A1
20070233364 Kumar Oct 2007 A1
20070241237 Foy et al. Oct 2007 A1
20070250225 Nickles et al. Oct 2007 A1
20070250255 Matekunas et al. Oct 2007 A1
20070260367 Wills et al. Nov 2007 A1
20070260369 Philp et al. Nov 2007 A1
20070261648 Reckels et al. Nov 2007 A1
20070274158 Agam et al. Nov 2007 A1
20080004721 Huff et al. Jan 2008 A1
20080010571 Farnsworth et al. Jan 2008 A1
20080041267 Denen et al. Feb 2008 A1
20080065282 Daum et al. Mar 2008 A1
20080091334 Carlson et al. Apr 2008 A1
20080109124 Daum et al. May 2008 A1
20080110249 Degeorge et al. May 2008 A1
20080125924 Daum et al. May 2008 A1
20080128563 Kumar et al. Jun 2008 A1
20080142645 Tomlinson et al. Jun 2008 A1
20080147256 Liberatore Jun 2008 A1
20080161984 Hrdlicka et al. Jul 2008 A1
20080164078 Rhodes et al. Jul 2008 A1
20080183345 Chandra et al. Jul 2008 A1
20080183490 Martin et al. Jul 2008 A1
20080201019 Kumar et al. Aug 2008 A1
20080201028 Brooks et al. Aug 2008 A1
20080201056 Moriya Aug 2008 A1
20080201089 Diaz et al. Aug 2008 A1
20080208393 Schricker Aug 2008 A1
20080296441 Anderson et al. Dec 2008 A1
20080312775 Kumar Dec 2008 A1
20090044530 Gallagher et al. Feb 2009 A1
20090063045 Figueroa et al. Mar 2009 A1
20090076664 Mccabe et al. Mar 2009 A1
20090078236 Gallagher et al. Mar 2009 A1
20090132179 Fu et al. May 2009 A1
20090140574 Gorman et al. Jun 2009 A1
20090159046 Moriya Jun 2009 A1
20090164104 Wermuth et al. Jun 2009 A1
20090177345 Severinsky et al. Jul 2009 A1
20090186325 Kumar Jul 2009 A1
20090187291 Daum et al. Jul 2009 A1
20090193899 Panetta et al. Aug 2009 A1
20090198391 Kumar et al. Aug 2009 A1
20090205028 Smeets et al. Aug 2009 A1
20090241909 Smith Oct 2009 A1
20090248220 Ecton et al. Oct 2009 A1
20090254239 Daum et al. Oct 2009 A1
20090266166 Pagano Oct 2009 A1
20090266943 Kumar et al. Oct 2009 A1
20090282923 Havira Nov 2009 A1
20090299555 Houpt et al. Dec 2009 A1
20090319092 Piche Dec 2009 A1
20100023190 Kumar et al. Jan 2010 A1
20100023240 Haskara et al. Jan 2010 A1
20100049384 Kraeling et al. Feb 2010 A1
20100049408 Abadie et al. Feb 2010 A1
20100084916 Kumar et al. Apr 2010 A1
20100114404 Donnelly May 2010 A1
20100130124 Teeter et al. May 2010 A1
20100131130 Kalyanam et al. May 2010 A1
20100152998 Schwarzmann Jun 2010 A1
20100174427 Sivasubramaniam et al. Jul 2010 A1
20100207620 Gies Aug 2010 A1
20100235022 Siddappa et al. Sep 2010 A1
20100262321 Daum et al. Oct 2010 A1
20100312493 Purekar et al. Dec 2010 A1
20100318247 Kumar Dec 2010 A1
20100332058 Kane et al. Dec 2010 A1
20110006167 Tolmei Jan 2011 A1
20110029243 Gallagher et al. Feb 2011 A1
20110035138 Kickbusch et al. Feb 2011 A1
20110060486 Meltser et al. Mar 2011 A1
20110093144 Goodermuth et al. Apr 2011 A1
20110118899 Brooks et al. May 2011 A1
20110199607 Kanellopoulos et al. Aug 2011 A1
20110216996 Rogers Sep 2011 A1
20110233293 Kral et al. Sep 2011 A1
20110255077 Rogers Oct 2011 A1
20110257869 Kumar et al. Oct 2011 A1
20110276203 Hase Nov 2011 A1
20110284700 Brand et al. Nov 2011 A1
20110307113 Kumar et al. Dec 2011 A1
20120022728 Hall et al. Jan 2012 A1
20120108204 Schell et al. May 2012 A1
20120108205 Schell et al. May 2012 A1
20120108207 Schell et al. May 2012 A1
20120135710 Schell et al. May 2012 A1
20120197504 Sujan et al. Aug 2012 A1
20120217351 Chadwick et al. Aug 2012 A1
20120245766 Cooper et al. Sep 2012 A1
20120245770 Yamamoto et al. Sep 2012 A1
20120259531 Daum et al. Oct 2012 A1
20120277940 Kumar et al. Nov 2012 A1
20120290185 Cooper et al. Nov 2012 A1
20120296545 Cooper et al. Nov 2012 A1
20120316717 Daum et al. Dec 2012 A1
20130015298 Cooper et al. Jan 2013 A1
20130035811 Schroeck et al. Feb 2013 A1
20130062474 Baldwin et al. Mar 2013 A1
20130131898 Kumar et al. May 2013 A1
20130131909 Cooper et al. May 2013 A1
20130169037 Bieg et al. Jul 2013 A1
20130171590 Kumar Jul 2013 A1
20130173083 Cooper et al. Jul 2013 A1
20130261837 Sharma et al. Oct 2013 A1
20130261856 Sharma et al. Oct 2013 A1
20130284859 Polivka et al. Oct 2013 A1
20130334373 Malone, Jr. et al. Dec 2013 A1
20140094998 Cooper et al. Apr 2014 A1
20140125356 Cooper et al. May 2014 A1
20140129154 Cooper et al. May 2014 A1
20140138493 Noffsinger et al. May 2014 A1
20140156123 Cooper et al. Jun 2014 A1
20140277824 Kernwein et al. Sep 2014 A1
20140280899 Brewster, Jr. et al. Sep 2014 A1
20150009331 Venkatraman Jan 2015 A1
20150053827 Noffsinger et al. Feb 2015 A1
20150183448 Cooper et al. Jul 2015 A1
Foreign Referenced Citations (170)
Number Date Country
2007202928 Oct 2007 AU
2010256020 Dec 2011 AU
1065039 Oct 1979 CA
2 192 151 Aug 1997 CA
2466540 Nov 2004 CA
2627074 May 2007 CA
642418 Apr 1984 CH
1511744 Jul 2004 CN
1528631 Sep 2004 CN
1636814 Jul 2005 CN
1683914 Oct 2005 CN
1819942 Aug 2006 CN
1906074 Jan 2007 CN
1958363 May 2007 CN
101351373 Jan 2009 CN
101412377 Apr 2009 CN
102556118 Jun 2014 CN
A 1 605 862 May 1971 DE
129 761 Feb 1978 DE
208 324 May 1984 DE
3538165 Apr 1987 DE
255 132 Mar 1988 DE
4225800 Nov 1993 DE
196 45 426 May 1997 DE
19654960 Jul 1998 DE
19731643 Sep 1998 DE
197 26 542 Nov 1998 DE
19830053 Nov 1999 DE
19826764 Dec 1999 DE
199 35 349 Feb 2001 DE
199 35 352 Feb 2001 DE
199 35 353 Feb 2001 DE
100 45 921 Mar 2002 DE
10226143 Feb 2006 DE
102005051077 Apr 2007 DE
202010006811 Jul 2010 DE
102010026433 Jan 2012 DE
102010045234 Mar 2012 DE
88716 Sep 1983 EP
0 114 633 Aug 1984 EP
0 257 662 Mar 1988 EP
0 341 826 Nov 1989 EP
0 428 113 May 1991 EP
0 445 047 Sep 1991 EP
0 485 978 May 1992 EP
0 539 885 May 1993 EP
0 554 983 Aug 1993 EP
0 594 226 Apr 1994 EP
644098 Mar 1995 EP
719690 Jul 1996 EP
755 840 Jan 1997 EP
467 377 Jun 1997 EP
0 958 987 Nov 1999 EP
1012019 Jun 2000 EP
1034984 Sep 2000 EP
1 136 969 Sep 2001 EP
1143140 Oct 2001 EP
1 253 059 Oct 2002 EP
1 293 948 Mar 2003 EP
1 297 982 Apr 2003 EP
1348854 Oct 2003 EP
1 466 803 Oct 2004 EP
1 564 395 Aug 2005 EP
1562321 Aug 2005 EP
1564395 Aug 2005 EP
1566533 Aug 2005 EP
1697196 Sep 2006 EP
1754644 Feb 2007 EP
1 816 332 Aug 2007 EP
2 129 215 Oct 1972 FR
2 558 806 Aug 1985 FR
2 767 770 Mar 1999 FR
482 625 Dec 1936 GB
1 321 053 Jun 1973 GB
1 321 054 Jun 1973 GB
2 188 464 Sep 1987 GB
2371121 Jul 2002 GB
52121192 Oct 1977 JP
60 028153 Feb 1985 JP
63268405 Nov 1988 JP
11002558 Apr 1989 JP
05077734 Mar 1993 JP
5238392 Sep 1993 JP
5278615 Oct 1993 JP
6108869 Apr 1994 JP
06153327 May 1994 JP
7132832 May 1995 JP
08-198102 Aug 1996 JP
09076913 Mar 1997 JP
9193804 Jul 1997 JP
9200910 Jul 1997 JP
10-505036 May 1998 JP
10274075 Oct 1998 JP
2858529 Feb 1999 JP
2001-065360 Mar 2001 JP
32 13459 Oct 2001 JP
2002204507 Jul 2002 JP
2002249049 Sep 2002 JP
2002294609 Oct 2002 JP
2003095109 Apr 2003 JP
2004301080 Oct 2004 JP
2004328993 Nov 2004 JP
2005-002802 Jan 2005 JP
2005-232990 Sep 2005 JP
2005-343294 Dec 2005 JP
2006219051 Aug 2006 JP
2006-320139 Nov 2006 JP
2006-327551 Dec 2006 JP
2008535871 Sep 2008 JP
2009095094 Apr 2009 JP
50-32733 Sep 2012 JP
5061347 Oct 2012 JP
386 Aug 2008 KZ
2115140 Jul 1998 RU
2207279 Jun 2003 RU
2213669 Oct 2003 RU
2233011 Jul 2004 RU
2237589 Oct 2004 RU
2238860 Oct 2004 RU
2238869 Oct 2004 RU
2242392 Dec 2004 RU
2265539 Dec 2005 RU
2272731 Mar 2006 RU
2273567 Apr 2006 RU
2286279 Oct 2006 RU
2299144 May 2007 RU
2320498 Mar 2008 RU
83221 May 2009 RU
568241 Dec 1981 SU
WO 9003622 Apr 1990 WO
WO 9525053 Sep 1995 WO
199601431 Jan 1996 WO
WO 9606766 Mar 1996 WO
9858829 Dec 1998 WO
WO 9914093 Mar 1999 WO
WO9914090 Mar 1999 WO
9960735 Nov 1999 WO
0009377 Feb 2000 WO
0186139 Nov 2001 WO
0230729 Apr 2002 WO
2002060738 Aug 2002 WO
WO 03097424 Nov 2003 WO
WO 2004023517 Mar 2004 WO
2004039621 May 2004 WO
WO 2004051699 Jun 2004 WO
WO 2004051700 Jun 2004 WO
WO 2004052755 Jun 2004 WO
2004059446 Jul 2004 WO
2005028837 Mar 2005 WO
WO 2005061300 Jul 2005 WO
WO 2006049252 May 2006 WO
2006065730 Jun 2006 WO
2006133306 Dec 2006 WO
WO 2007027130 Mar 2007 WO
WO 2007091270 Aug 2007 WO
2007110613 Oct 2007 WO
2007116123 Oct 2007 WO
WO 2007111768 Oct 2007 WO
2008012535 Jan 2008 WO
2008065032 Jun 2008 WO
2008073547 Jun 2008 WO
2008099177 Aug 2008 WO
2009087385 Jul 2009 WO
2009092218 Jul 2009 WO
2010039680 Apr 2010 WO
2010139489 Dec 2010 WO
2011146088 Nov 2011 WO
2012041978 Apr 2012 WO
2014193610 Dec 2014 WO
200101708 Aug 2001 ZA
Non-Patent Literature Citations (239)
Entry
Razouqi et al. Rynsord: A Novel, Decentralized Algorithm for Railway Networks with ‘Soft Reservation’, VTC, 1998, pp. 1585-2589, V3, New York, NY.
ISR pertaining to International application No. PCT/US2010/047251 dated Aug. 31, 2010.
ISR pertaining to International application No. PCT/US2010/035058 dated May 17, 2010.
ISR and WO pertaining to International application No. PCT/US2009/045004 dated May 22, 2009.
ISR and WO pertaining to International application No. PCT/US2009/037293 dated Mar. 16, 2009.
ISR and WO pertaining to International application No. PCT/US2009/032933 dated Nov. 3, 2009.
ISR and WO pertaining to International application No. PCT/US2009/031740 dated Jan. 23, 2009.
ISR and WO pertaining to International application No. PCT/US2008/083526 dated Nov. 14, 2008.
ISR and WO pertaining to International application No. PCT/US2008/063193 dated May 9, 2008.
ISR and WO pertaining to International application No. PCT/US2007/078340 dated Sep. 13, 2007.
ISR and WO pertaining to International application No. PCT/US2007/078016 dated Sep. 10, 2007.
ISR and WO pertaining to International application No. PCT/US2007/078001 dated Sep. 10, 2007.
ISR and WO pertaining to International application No. PCT/US2007/076699 dated Aug. 24, 2007.
ISR and WO pertaining to International application No. PCT/US2007/066697 dated Apr. 16, 2007.
ISR and WO pertaining to International application No. PCT/US2007/001428 dated Jan. 18, 2007.
ISR and WO pertaining to International application No. PCT US2006/032893 dated Aug. 24, 2006.
Grabs, Ulrike, “Modifiction of Electronic Interlocking EI S in Service”, Signal+Draht, Telzlaff Verlag GmbH, 1995, pp. 254-258, V87(7/08), Darmstadt, DE.
Cheng, J.X. et al. Article 3523-3527.
Chang et al. “Cycle Detection in Repair-Based Railway Scheduling System”, Robotics and Automation, 1996 pp. 2517-2522, V3, New York, NY.
Cheng, Yu, “Hybrid Simulation for Resolving Resource conflicts in Train Traffic Rescheduling”, Computers in Industry, 1998, pp. 233-246, V35(3), Amsterdam, NL.
Salasoo,Lembit, “Heavy vehicle systems optimization program: FY 2004 Annual Report”.
DOE, “21st Century Locomotive Technology-Quarterly Technical Status Report 6”.
DOE, “21st Century Locomotive Technology, Quarterly Technical Status Report 11”.
King, Robert D., “DOE heavy vehicle systems optimization (peer review): 21st Century Locomotive Technology”.
Unofficial English translation of Office Action issued in connection with related CN Application No. 201210161080.X on Apr. 29, 2014.
Non-Final Rejection towards related U.S. Appl. No. 13/171,712 dated May 8, 2014.
Knight, “10-4, Good Computer:Automated System Lets Trucks Convoy as One”, MIT Technology Review, May 28, 2014.
Unofficial English translation of Office Action issued in connection with related CN Application No. 201080027403.5 on Jun. 13, 2014.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/ dated Jun. 23, 2014. US2013/053128.
Notice of Allowance issued in connection with corresponding U.S. Appl. No. 13/545,271 dated Jun. 26, 2014.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2013/053124 dated Jul. 4, 2014.
Notice of Allowance issued in connection with corresponding US Appl. No. 13/595,474 dated Aug. 5, 2014.
Notice of Allowance issued in connection with related U.S. Appl. No. 14/016,310 dated Aug. 18, 2014.
Non-Final Rejection towards related U.S. Appl. No. 12/573,141 dated Aug. 29, 2014.
Final Rejection towards related U.S. Appl. No. 13/778,428 dated Sep. 9, 2014.
Non-Final Rejection towards related U.S. Appl. No. 13/618,970 dated Sep. 9, 2014.
Non-Final Rejection towards related U.S. Appl. No. 14/095,373 dated Sep. 16, 2014.
Non-Final Rejection towards related U.S. Appl. No. 13/565,571 dated Oct. 2, 2014.
Unofficial English translation of Notice of allowance issued in connection with related KZ Application No. 2013/1558.1 Nov. 6, 2014.
Notice of Allowance issued in connection with related U.S. Appl. No. 13/618,970 dated Nov. 19, 2014.
Notice of Allowance issued in connection with related AU Application No. 2010292820 dated Nov. 19, 2014.
Maldonado et al., “Autonomous Broken Rail Detection Technology for Use on Revenue Service Trains”, U.S. Department Of Transportation, Federal Railroad Administration, pp. 1-4, Dec. 2014.
Non-Final Rejection towards related U.S. Appl. No. 13/591,561 dated Feb. 13, 2015.
Final Rejection towards related U.S. Appl. No. 12/573,141 dated Mar. 10, 2015.
Non-Final Rejection towards related U.S. Appl. No. 13/171,712 dated Mar. 10, 2015.
Non-Final Rejection towards corresponding U.S. Appl. No. 14/489,126 dated Apr. 9, 2015.
Non-Final Rejection towards related U.S. Appl. No. 11/669,364 dated Apr. 23, 2015.
Notice of Allowance issued in connection with related US Appl. No. 13/653,440 dated Apr. 30, 2015.
Ridgetop Group, “Ridgetop Group Announces New Products for Rail Safety Improvements”, pp. 1-2, May 18, 2015.
Final Rejection towards related U.S. Appl. No. 13/591,561 dated Jun. 11, 2015.
Office Action issued in connection with related JP Application No. 2012-034736 dated on Jun. 16, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/491,339 dated Jun. 17, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/221,624 dated Jun. 19, 2015.
Notice of Allowance issued in connection with corresponding U.S. Appl. No. 14/489,126 dated Jun. 24, 2015.
Notice of Allowance issued in connection with related U.S. Appl. No. 11/669,364 dated Sep. 17, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/527,246 dated Sep. 22, 2015.
Final Rejection towards related U.S. Appl. No. 14/221,624 dated Oct. 5, 2015.
Non-Final Rejection towards related U.S. Appl. No. 13/939,326 dated Oct. 9, 2015.
Office Action issued in connection with related EP Application No. 11187312.1 on Oct. 15, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/457,304 dated Oct. 22, 2015.
Sperry, “Sperry B-Scan Single Rail Walking Sticks”, Informational pamphlet, Oct. 26, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/657,233 dated Nov. 18, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/679,217 dated Dec. 17, 2015.
Non-Final Rejection towards related U.S. Appl. No. 14/696,124 dated Dec. 23, 2015.
Eurasia Search Report and Written Opinion issued in connection with related EA Application No. 201591274 dated Jan. 21, 2016.
Unofficial English translation of Office Action issued in connection with related CN Application No. 201380071077.1 dated Feb. 6, 2016.
Notice of Allowance issued in connection with related U.S. Appl. No. 14/527,246 dated Feb. 23, 2016.
Office Action issued in connection with related AU Application No. 2015200168 dated Mar. 2, 2016.
Notice of Allowance issued in connection with related U.S. Appll. No. 13/591,561 dated Mar. 3, 2016.
Unofficial English translation of Office Action issued in connection with related RU Application No. 2012124894 dated Mar. 9, 2016.
Unofficial English translation of Office Action issued in connection with related CN Application No. 201310220043.6 dated Mar. 14, 2016.
Eurasia Search Report and Written Opinion issued in connection with related EA Application No. 201591504 dated Apr. 6, 2016.
Final Rejection towards related U.S. Appl. No. 14/679,217 dated Apr. 15, 2016.
Non-Final Rejection towards related U.S. Appl. No. 14/457,304 dated May 5, 2016.
Non-Final Rejection towards related U.S. Appl. No. 14/637,513 dated May 19, 2016.
Office Action issued in connection with related EP Application No. 08832181.5 dated Jun. 14, 2016.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2016/021925 dated Jun. 23, 2016.
Non-Final Rejection towards related U.S. Appl. No. 14/933,659 dated Jun. 30, 2016.
Office Action issued in connection with related AU Application No. 2013216630 dated Aug. 4, 2016.
Unofficial English translation of Notice of Allowance issued in connection with related RU Application No. 2012124894 dated Aug. 5, 2016.
Office Action issued in connection with related AU Application nNo. 2013299945 dated Aug. 8, 2016.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2016/031444 dated Aug. 24, 2016.
Non-Final Rejection towards related U.S. Appl. No. 14/657,233 dated Sep. 7, 2016.
Office Action issued in connection with related AU Application No. 2013299501 dated Oct. 7, 2016.
European Search Report and Written Opinion issued in connection with related EP Application No. 16170151.1 dated Oct. 21, 2016.
Notice of Allowance issued in connection with related U.S. Appl. No. 14/679,217 dated Oct. 24, 2016.
Notice of Allowance issued in connection with related U.S. Appl. No. 14/457,304 dated Oct. 28, 2016.
European Search Report and Written Opinion issued in connection with related EP Application No. 13856206.1 dated Nov. 11, 2016.
Unofficial English translation of Office Action issued in connection with corresponding CN Application No. 201210356915.7 dated Dec. 2, 2016.
Krevitt, “Remote Maintenance Techniques Proposed for the 200-BEV Accelerator”, IEEE Transactions on Nuclear Science, vol. No. 14, Issue No. 3, pp. 997-1003, Jun. 1967.
Kiersztyn et al., “Evaluation of Locomotive Cable Insulation Life Under Varying Temperature Loading”, IEEE Transactions on Industry Applications, vol. No. IA-21, Issue No. 4, pp. 882-888, Jul./Aug. 1985.
Hoyt et al., “Assessing the effects of several variables on freight train fuel consumption and performance using a train performance simulator”, Transportation Research, vol. No. 24A, Issue No. 2, pp. 99-112, Jan. 1, 1990.
Hooper, “Reducing Rail Costs through Innovative Methods”, Railway Track and Structures, pp. 14-17, Jul. 1993.
Grizzle et al., “Improved Cylinder Air Charge Estimation for Transient Air Fuel Ratio Control”, Proceedings of the American Control Conference, Maryland, vol. No. 2, pp. 1568-1573, Jun. 29, 1994.
Bonissone et al., “Genetic algorithms for automated tuning of fuzzy controllers: A transportation application”, Proceedings of the Fifth IEEE International Conference on Fuzzy Systems, Schenectady, NY, USA, vol. No. 1, pp. 674-680, 1996.
Ehsani et al., “Application of electrically peaking hybrid (ELPH) propulsion system to a full-size passenger car with simulated design verification”, IEEE Transactions on Vehicular Technology, vol. No. 48, Issue No. 6, pp. 1779-1787, Nov. 1999.
He et al., “On-line Parameter Identification for Freight Train Systems”, Aug. 29, 2000.
Franke et al., “An algorithm for the optimal control of the driving of trains”, Proceedings of the 39th IEEE Conference on Decision and Control, Sydney Australia, pp. 2123-2127, Dec. 2000.
Dick et al., “Predicting the Occurrence of Broken Rails: a Quantitative Approach”, In Proceedings of the American railway engineering and maintenance of way association annual conference, TX, USA, 2000.
Rose et al., “Application and potential of guided wave rail inspection”, Defect Detection in Rail, Insight, vol. No. 44, Issue No. 6, pp. 353-358, Jun. 2002.
Aharoni et al., “A Novel high-speed rail inspection system”, vol. No. 7, Issue No. 10, pp. 1-8, Oct. 2002.
Coleman, “A System for long haul Optimal Driver Advice”, Session 5b: Capacity Planning & Train Scheduling, pp. 5.61-5.69, 2003.
Dick et al., “Multivariate statistical Model for Predicting Occurrence and Location of Broken Rails”, Transportation Research Record: Journal of the Transportation Research Board, pp. 48-55, 2003.
Bosch, “Technology explained: the Common Rail diesel injection system”, May 2004.
Turner, “Feasibility of Locomotive-Mounted Broken Rail Detection”, Final Report for High-Speed Rail Idea Project 38 Idea, Transportation Research Board of the National Academies, Jun. 2004.
Hou et al., “A Rail Damage Detection and Measurement System Using Neural Networks”, IEEE International conference on Computational Intelligence for Measurement Systems and Applications, CIMSA, Boston, MA, USA, pp. 4-9, Jul. 14-16, 2004.
Chan et al., “Trip Optimizer System Description (Rev. 1.1)”, Trip Optimizer for Freight Trains Functional Description, pp. 1-24, Nov. 16, 2005.
Non-Final Rejection towards related U.S. Appl. No. 10/736,089 dated Feb. 13, 2006.
Ditmeyer, “Network Centric Railroading Utilizing Intelligent Railroad Systems”, World Bank Transport Forum Rail Transport for Development, pp. 1-21, Mar. 31, 2006.
Brawner et al., “Magnetometer Sensor Feasibility for Railroad and Highway Equipment Detection”, Innovations Deserving Exploratory Analysis Programs, HSR IDEA Program Final Report, pp. 1-27, Jun. 24, 2006.
Innotrack, “D4.4.1—Rail Inspection Technologies”, Innovative Track Systems, pp. 1-42, Sep. 1, 2006.
International Invitation to Pay Additional Fees issued in connection with related PCT Application No. PCT/US2007/066697 dated Sep. 21, 2007.
Chen et al., “Fault Detection and Diagnosis for Railway Track Circuits Using Neuro-Fuzzy Systems”, Control Engineering Practice, vol. No. 16, pp. 585-596, May 2008.
Non-Final Rejection towards related U.S. Appl. No. 11/858,345 dated Jun. 20, 2008.
Ho et al., “Signature Analysis on Wheel-Rail Interaction for Rail Defect Detection”, Railway Condition Monitoring, 4th IET International Conference, Hong Kong, pp. 1-6, Jun. 2008.
Non-Final Rejection towards related U.S. Appl. No. 11/858,345 dated Nov. 19, 2008.
Final Rejection towards related U.S. Appl. No. 10/736,089 dated Dec. 12, 2008.
Unofficial English translation of Notice of Allowance issued in connection with related RU Application No. 2006125429 dated Dec. 22, 2008.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2008/071958 dated Dec. 30, 2008.
Schafer II, “Effect of Train Length on Railroad Accidents and a Quantitative Analysis of Factors Affecting Broken Rails”, 2008.
Non-Final Rejection towards related U.S. Appl. No. 11/858,345 dated Mar. 6, 2009.
Ghanbari et al., “Artificial Neural Networks and regression approaches comparison for forecasting Iran's annual electricity load”, Power Engineering, Energy and Electrical Drives, Powereng, pp. 675-679, Mar. 18-20, 2009.
Unofficial English translation of Office Action issued in connection with related CN Application No. 200480040639.7 dated Apr. 17, 2009.
Xin-Yu et al., “The Research on the Mechanism of Limiting Speed Pick-Up and Set-Out Train on Railway Transportation Capacity Loss”, Second International Conference on Intelligent Computation Technology and Automation, Changsha, China, vol. No. 3, pp. 830-833, 2009.
Patra et al., “Availability Analysis of Railway Track Circuits”, Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, vol. No. 224, Issue No. 3, pp. 169-177, May 1, 2010.
Office Action issued in connection with related AU Application No. 2007333518 dated Aug. 9, 2010.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2010/035058 dated Aug. 20, 2010.
Non-Final Rejection towards related U. S. Appl. No. 10/736,089 dated Sep. 2, 2010.
Office Action issued in connection with related CN Application No. 200780001185.6 dated Oct. 27, 2010.
Xiaogang et al., “The Research and Application of 1089 t/h Circulating Fluidized Bed Unit Coordinate Control System”, International Conference on E-Product E-Service and E-Entertainment (ICEEE), China, 2010.
Xun et al., “The analysis of GSM-R redundant network and reliability models on high-speed railway”, International Conference on Electronics and Information Engineering (ICEIE), Beijing, China, vol. No. 2, pp. V2-154-V2-158, 2010.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2010/048856 dated Feb. 8, 2011.
International Invitation to Pay Additional Fees issued in connection with related PCT Application No. PCT/US10/47251 dated Mar. 4, 2011.
Unofficial English translation of Office Action issued in connection with related RU Application No. 2008110502 dated Mar. 10, 2011.
Non-Final Rejection towards related U.S. Appl. No. 11/765,443 dated Mar. 16, 2011.
Non-Final Rejection towards related U.S. Appl. No. 12/061,486 dated Apr. 1, 2011.
Unofficial English translation of Office Action issued in connection with corresponding RU Application No. 2007126476 dated Apr. 11, 2011.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2010/047251 dated Apr. 26, 2011.
Unofficial English translation of Office Action issued in connection with related RU Application No. 2010115501 dated May 26, 2011.
Office Action issued in connection with related AU Application No. 2007253963 dated on Jun. 29, 2011.
Unofficial English translation of Office Action issued in connection with corresponding RU Application No. 2008109009 dated Aug. 23, 2011.
Non-Final Rejection towards related U.S. Appl. No. 12/027,408 dated Sep. 13, 2011.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2010/045402 dated Sep. 26, 2011.
Office Action issued in connection with related AU Application No. 2008302642 dated Sep. 29, 2011.
Unofficial English translation of Office Action issued in connection with related RU Application No. 2008125850 on Sep. 29, 2011.
Non-Final Rejection towards related U.S. Appl No. 12/365,359 dated Oct. 6, 2011.
Unofficial English translation of Office Action issued in connection with related JP Application No. 2009-511134 dated Oct. 25, 2011.
Unofficial English translation of Office Action issued in connection with corresponding RU Application No. 2008108985 dated Oct. 26, 2011.
Unofficial English translation of Office Action issued in connection with related RU Application No. 2008108972 dated Oct. 28, 2011.
Notice of Allowance issued in connection with related AU Application No. 2007333518 dated Nov. 14, 2011.
Final Rejection towards related U.S. Appl. No. 12/061,486 dated Nov. 16, 2011.
Notice of Allowance issued in connection with corresponding U.S. Appl. No. 12/047,427 dated Dec. 30, 2011.
Weart, “Maintenance of Way: Track inspection technology”, pp. 1-7, Dec. 2011.
Pan et al., “Full process control strategy of fuel based on water-coal ratio of ultra supercritical units”, Electronics, Communications and Control (ICECC), IEEE International Conference, Guangzhou, China, pp. 3750-3753, 2011.
Non-Final Rejection towards related U.S. Appl. No. 12/126,858 dated Jan. 18, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/061,444 dated Jan. 31, 2012.
Non-Final Rejection towards related U.S. Appl. No. 11/622,136 dated Feb. 27, 2012.
Shantihini et al., “Electromagnetic System for Railroad Track Crack Detection”, British Journal of Science, vol. No. 4, Issue No. 1, pp. 49-56, Feb. 2012.
Unofficial English translation of Office Action issued in connection with related JP Application No. 2009-530500 dated Apr. 3, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/061,486 dated Apr. 4, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/484,278 dated Apr. 5, 2012.
Notice of Allowance issued in connection with related AU Application No. 2008302642 dated May 10, 2012.
Final Rejection towards related U.S. Appl. No. 12/128,249 dated May 15, 2012.
Notice of Allowance issued in connection with related U.S. Appl. No. 12/126,858 dated Jun. 18, 2012.
Unofficial English translation of Notice of Allowance issued in connection with related RU Application No. 2008124977 dated Jun. 22, 2012.
Unofficial English translation of Notice of Allowance issued in connection with related RU Application No. 2008110502 dated Jul. 3, 2012.
Unofficial English translation of Office Action issued in connection with related CN Application No. 200980112545.9 dated Sep. 11, 2012.
Non-Final Rejection towards corresponding U.S. Appl. No. 12/052,816 dated Sep. 12, 2012.
Final Rejection towards related U.S. Appl. No. 12/484,278 dated Sep. 20, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/556,334 dated Sep. 27, 2012.
Unofficial English translation of Office Action issued in connection with corresponding JP Application No. 2009-540342 dated Oct. 2, 2012.
Non-Final Rejection towards related U.S. Appl. No. 11/669,364 dated Oct. 17, 2012.
Final Rejection towards related U.S. Appl. No. 12/052,000 dated Oct. 24, 2012.
Unofficial English translation of Office Action issued in connection with related CN Application No. 200780001185.6 dated Oct. 29, 2012.
Unofficial English translation of Office Action issued in connection with related CN Application No. 201010584148.6 dated Oct. 30, 2012.
Final Rejection towards related U.S. Appl. No. 12/027,408 dated Oct. 31, 2012.
Unofficial English translation of Notice of Allowance issued in connection with related RU Application No. 2008125850 dated Oct. 31, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/061,486 dated Nov. 2, 2012.
Unofficial English translation of Office Action issued in connection with related CN Application No. 201010584140.X dated Nov. 21, 2012.
Notice of Allowance issued in connection with related U.S. Appl. No. 12/484,278 dated Nov. 27, 2012.
Unofficial English translation of Notice of Allowance issued in connection with corresponding RU Application No. 2008108985 dated Dec. 4, 2012.
Office Action issued in connection with related AU Application No. 2010260419 dated Dec. 6, 2012.
Non-Final Rejection towards corresponding U.S. Appl. No. 13/595,474 dated Dec. 11, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/573,141 dated Dec. 19, 2012.
Unofficial English translation of Notice of Allowance issued in connection with corresponding RU Application No. 2007126476 dated Dec. 21, 2012.
Unofficial English translation of Office Action issued in connection with related CN Application No. 200880108755.6 dated Dec. 26, 2012.
Non-Final Rejection towards related U.S. Appl. No. 12/270,160 dated Dec. 31, 2012.
Unofficial English translation of Office Action issued in connection with related JP Application No. 2009-530500 dated Jan. 8, 2013.
Unofficial English translation of Office Action issued in connection with related JP Application No. 2009-540344 dated Jan. 22, 2013.
Final Rejection towards related U.S. Appl. No. 12/061,444 dated Jan. 31, 2013.
International Invitation to Pay Additional Fees issued in connection with related PCT Application No. PCT/US2012/044367 dated Feb. 1, 2013.
Kun-Peng et al., “Design of transmission system of real-time broken rail detection”, Journal of Railway Science and Engineering, vol. No. 10, Issue No. 1, Feb. 2013.
Office Action issued in connection with related AU Application No. 2007253963 on Mar. 12, 2013.
Final Rejection towards related U.S. Appl. No. 11/622,136 dated Mar. 13, 2013.
Non-Final Rejection towards related U.S. Appl. No. 13/175,284 dated Mar. 18, 2013.
Unofficial English translation of Office Action issued in connection with related MX Application No. MX/a/2012/007335 dated Mar. 21, 2013.
Office Action issued in connection with related AU Application No. 2010292820 dated Mar. 26, 2013.
Notice of Allowance issued in connection with related U.S. Appl. No. 13/529,783 dated Mar. 29, 2013.
Notice of Allowance issued in connection with related U.S. Appl. No. 12/556,334 dated Apr. 3, 2013.
Non-Final Rejection towards related U.S. Appl. No. 13/587,966 dated Apr. 5, 2013.
International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/US2012/044367 dated Apr. 9, 2013.
Final Rejection towards related U.S. Appl. No. 11/831,492 dated Apr. 9, 2013.
Non-Final Rejection towards related U.S. Appl. No.12/365,359 dated Apr. 11, 2013.
Office Action issued in connection with related AU Application No. 2013202194 dated Apr. 17, 2013.
Non-Final Rejection towards related U.S. Appl. No. 12/027,408 dated Apr. 23, 2013.
Unofficial English translation of Office Action issued in connection with related JpP Application No. 2012-034736 dated May 14, 2013.
Notice of Allowance issued in connection with related U.S. Appl. No. 121605,498 dated May 21, 2013.
Non-Final Rejection towards related U.S. Appl. No. 13/171,712 dated May 22, 2013.
Unofficial English translation of Notice of Allowance issued in connection with corresponding RU Application No. 2008109249 dated May 29, 2013.
Notice of Allowance issued in connection with related U.S. Appl. No. 13/175,284 dated Jul. 8, 2013.
Hocking, “Rail Inspection”, The Eddy Current Solution, pp. 1-17, Jul. 10, 2013.
Popov, “Automated Ultrasonic Inspection of Rails”, pp. 1-5, Jul. 10, 2013.
Sperry, “Sperry B-Scan Dual Rail Inspection System”, Sperry Rail Service, for superior technology, training, and reporting, the solution is Sperry, Jul. 10, 2013.
Non-Final Rejection towards related U.S. Appl. No. 12/061,444 dated Aug. 1, 2013.
Non-Final Rejection towards related U.S. Appl. No. 11/831,492 dated Aug. 6, 2013.
Non-Final Rejection towards corresponding U.S. Appl. No. 13/739,133 dated Aug. 28, 2013.
Non-Final Rejection towards related U.S. Appl. No. 13/488,652 dated Sep. 9, 2013.
Non-Final Rejection towards corresponding U.S. Appl. No. 13/344,331 dated Sep. 11, 2013.
Non-Final Rejection towards related U.S. Appl. No. 11/622,136 dated Sep. 12, 2013.
European Search Report and Written Opinion issued in connection with related EP Application No. 11187312.1 dated Oct. 23, 2013.
Notice of Allowance issued in connection with related U.S. Appl. No. 11/831,492 dated Oct. 31, 2013.
Final Rejection towards related U.S. Appl. No. 12/270,160 dated Oct. 31, 2013.
Notice of Allowance issued in connection with related AU Application No. 2010260419 dated Nov. 25, 2013.
Notice of Allowance issued in connection with corresponding U.S. Appl. No. 13/739,133 dated Dec. 11, 2013.
Non-Final Rejection towards related U.S. Appl. No. 13/954,096 dated Dec. 24, 2013.
Zhang et al., “Train Detection by Magnetic Field Sensing”, Sensors and Materials, vol. No. 25, Issue No. 6, pp. 423-436, 2013.
International Invitation to Pay Additional Fees issued in connection with related PCT Application No. PCT/US2013/054284 dated Jan. 20, 2014.
Office Action issued in connection with corresponding EP Application No. 07716804.5 dated Jan. 21, 2014.
Copy of Notice of Allowance issued in connection with corresponding US Application no. 13/344,331 dated Jan. 23, 2014.
Copy of Notice of Allowance issued in connection with related US Application no. 12/365,359 dated Jan. 28, 2014.
Copy of International Search Report and Written Opinion issued in connection with related PCT Application No. PCT! dated Feb. 10, 2014. US2013/054300.
Non-Final Rejection towards related application 13/778,428 dated Feb. 25, 2014.
Copy of International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/ dated Feb. 27, 2014. US2013/071237.
Non-Final Rejection towards related application 13/653,440 dated Mar. 19, 2014.
Copy of Notice of Allowance issued in connection with related US Application no. 11/622,136 dated Mar. 27, 2014.
Copy of International Search Report and Written Opinion issued in connection with related PCT Application No. PCT/ dated Apr. 01, 2014. U52013/054284.
Copy of International Invitation to Pay Additional Fees issued in connection with related PCT Application No. PCT/ dated Apr. 02, 2014. US2013/053124.
Non-Final Rejection towards related application 13/840,656 dated Apr. 16, 2014.
Non-Final Rejection towards related application 14/016,310 dated Apr. 22, 2014.
Related Publications (1)
Number Date Country
20070219680 A1 Sep 2007 US