This disclosure relates to hydrocarbon well operations.
Production operations of a hydrocarbon well sometimes includes deployment of downhole production equipment, such as electric submersible pumps, on a coil tubing to promote flow of production fluids uphole in a wellbore. When production equipment needs to be removed from the wellbore, a workover rig is required to pull the tubing and the production equipment out of the well. Workover rigs are costly, and can delay production operations at the well.
This disclosure describes hanger systems for a well, for example, tubing hangers for supporting and connecting well tubing.
Some aspects of the disclosure encompass a hanger system for a well, the hanger system including a pipe spool configured to be disposed at a wellhead of a well, and a tubing hanger configured to removably couple to the pipe spool. The pipe spool includes a spool housing defining a cylindrical spool bore extending longitudinally through the spool housing, an electrical port in the spool housing having an electrical port opening in an inner surface of the spool housing, the electrical port configured to connect to a power supply, a communication port in the spool housing having a communication port opening in the inner surface of the spool housing, the communication port configured to connect to a communication module, and a control port in the spool housing having a control port opening in the inner surface of the spool housing, the control port configured to connect to a control fluid supply. The tubing hanger is configured to be disposed in the cylindrical spool bore, and includes a hanger housing defining a hanger bore extending from a first longitudinal end of the hanger housing to a second longitudinal end of the hanger housing opposite the first longitudinal end. The tubing hanger includes an electrical conduit extending through the hanger housing, a first end of the electric conduit configured to align with the electrical port opening of the pipe spool, and a second end of the electrical conduit opposite the first end configured to connect to a first channel of a coil tubing, a communication conduit extending through the hanger housing, a first end of the communication conduit configured to align with the communication port opening of the pipe spool, and a second end of the communication conduit opposite the first end configured to connect to a second channel of the coil tubing, and a control conduit extending through the hanger housing, a first end of the control conduit configured to align with the control port opening of the pipe spool, and a second end of the control conduit opposite the first end configured to connect to a third channel of the coil tubing.
This, and other aspects, can include one or more of the following features. The hanger housing can include a shoulder to land on and engage a corresponding shoulder profile of the spool housing. The tubing hanger can include an orientation element, and the pipe spool can include an orientation profile, the orientation element to engage with the orientation profile to rotationally index the tubing hanger to the pipe spool. The orientation element of the tubing hanger can include an orientation shoe, and the orientation profile of the pipe spool can include an orientation pin extending radially into the spool bore. The hanger system can further include a locking mechanism to detachably couple the tubing hanger to the pipe spool. The locking mechanism can include a lock pin of the pipe spool, the lock pin to engage with a locking profile of the tubing hanger. The tubing hanger can include a latching profile in the hanger housing at the first longitudinal end of the hanger housing, the latching profile to engage a latching mechanism. The latching profile can include a fishing neck or threading. The tubing hanger can include a sealing element to sealingly engage with the pipe spool. The tubing hanger can include a connector portion at the second longitudinal end of the hanger housing, where the electrical conduit, the communication conduit, and the control conduit extend to the connector portion, the connector portion to connect to and support the coil tubing. The pipe spool can include a bypass flow channel fluidly connecting a first portion of spool bore downhole of the tubing hanger to a second portion of the spool bore uphole of the tubing hanger.
Certain aspects of the disclosure encompass a method for connecting a hanger system in a well. The method includes positioning a tubing hanger in a cylindrical spool bore of a pipe spool of a wellhead, and aligning, with an orientation element of the tubing hanger, the tubing hanger with the pipe spool. Aligning the tubing hanger with the pipe spool includes aligning an electrical conduit of the tubing hanger with an electrical port of the pipe spool, the electrical port configured to connect to a power supply, and the electrical conduit configured to connect to a first channel of a coil tubing, aligning a communication conduit of the tubing hanger with a communication port of the pipe spool, the communication port configured to connect to a communication module, and the communication conduit configured to connect to a second channel of a coil tubing, and aligning a control conduit of the tubing hanger with a control port of the pipe spool, the control port configured to connect to a control fluid supply, and the control conduit configured to connect to a third channel of a coil tubing. The method further includes directing, with axial bore in the tubing hanger, fluid flow from the coil tubing through the tubing hanger.
This, and other aspects, can include one or more of the following features. Positioning the tubing hanger in the spool bore of the pipe spool can include landing on and engaging, with a shoulder of the tubing hanger, a shoulder profile of the pipe spool. The orientation element of the tubing hanger can include an orientation shoe, and aligning the tubing hanger with the pipe spool can include engaging, with the orientation shoe, an orientation pin of the pipe spool extending radially into the spool bore. The orientation element of the tubing hanger can include an orientation pin, and aligning the tubing hanger with the pipe spool can include engaging, with the orientation pin, an orientation slot of the pipe spool. The method can further include sealing the tubing hanger to the pipe spool with a sealing element of the tubing hanger. The method can further include locking the tubing hanger to the pipe spool with a locking mechanism of the pipe spool, the locking mechanism comprising a lock pin. The method can further include engaging, with a latching profile of the tubing hanger, a retrieval tool. The method can further include guiding, with the electrical conduit, an electrical connection from the power supply to the first channel of the coil tubing, guiding, with the communication conduit, a communication line from the communication module to the second channel of the coil tubing, and guiding, with the control conduit, a control fluid from the control fluid supply to the third channel of the coil tubing.
Certain aspects of the disclosure describe a well hanger for a well. The well hanger includes a tubing hanger coupled to and supporting a coil tubing, the tubing hanger configured to be removably coupled to a pipe spool. The tubing hanger includes a hanger housing defining a hanger bore extending from a first longitudinal end of the hanger housing to a second longitudinal end of the hanger housing opposite the first longitudinal end. The tubing hanger includes an electrical conduit extending through the hanger housing, a first end of the electric conduit configured to align with an electrical port opening of the pipe spool, and a second end of the electrical conduit being connected to a first channel of a coil tubing, a communication conduit extending through the hanger housing, a first end of the communication conduit configured to align with a communication port opening of the pipe spool, and a second end of the communication conduit being connected to a second channel of the coil tubing, and a control conduit extending through the hanger housing, a first end of the control conduit configured to align with a control port opening of the pipe spool, and a second end of the control conduit being connected to a third channel of the coil tubing.
The details of one or more implementations of the subject matter described in this disclosure are set forth in the accompanying drawings and the description below. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.
Like reference numbers and designations in the various drawings indicate like elements.
This disclosure describes tubing hanger systems used in wellheads of well systems, where the tubing hanger systems support tubing, such as coil tubing. The tubing can connect to and support a downhole well tool. In some instances, a tubing hanger system of a wellhead connects to and supports a coil tubing and an electric submersible pump (ESP) in a wellbore. The tubing hanger system includes a pipe spool formed in or otherwise coupled to the wellhead, and a tubing hanger connected to and supported by the pipe spool, where the tubing hanger couples to the coil tubing. The pipe spool and tubing hanger include corresponding axial support features and axial indexing features that mount the tubing hanger on the pipe spool at a desired axial position and rotational orientation, for example, to align port openings of the pipe spool with conduit openings of the tubing hanger. The tubing hanger includes one or more conduits through a housing of the tubing hanger that connect the ports of the pipe spool with corresponding channels in the coil tubing. The conduits can include an electrical conduit for connection of power between the wellhead and the coil tubing, a communication conduit for connection of signal and data between the wellhead and the coil tubing, a control conduit for connection of control fluid between the wellhead and the coil tubing, a combination of these conduits, or other conduits. In some instances, the coil tubing includes an electrical channel, communication channel, control channel, or a combination of these channels integral with a wall of the coil tubing (for example, between a radially inner wall and a radially outer wall of the coil tubing), which connect to the ESP to provide power, control (for example, hydraulic fluid, chemical fluid, or other control fluid), communication (for example, fiber optic or other communication type), or a combination of these to the ESP.
In some coil tubing and ESP operations, power, communication, or control is provided to a downhole well tool via dedicated lines alongside the coil tubing, separate from the coil tubing, or are simply not communicated from the surface to the downhole well tool. In the present disclosure, the orientation of the pipe spool, tubing hanger, and coil tubing, and their respective ports, conduits, and channels, allows a more secure communication of power, fluid, data, or other kinds of communication between surface sources (such as a power source, communication module, control fluid supply, or others) and a downhole well tool connected to and supported by the coil tubing. For example, providing power, communication, and control conduits integrally formed in the tubing hanger and the coil tubing, instead of separately provided on one or more dedicated conduits separate from the tubing hanger or coil tubing, provides a more reliable connection between the source and the downhole well tool. The tubing hanger mounts at the wellhead (for example, on the pipe spool) and supports the coil tubing such that connections for power, communication, or control can be made easily at the wellhead (for example, at the surface of the well) and are directly connected to the downhole well tool via the aligned series of ports and conduit, while also allowing for deployment and retrieval of the tubing hanger and coil tubing without requiring a workover rig or nippling operation of the wellhead. Rigless operation can be impossible or too complicated if power, communication, and control lines or conduits are to be strapped or clamped outside of the coil tubing.
The wellhead 104 defines an attachment point for other equipment of the well system 100 to attach to the well. For example, the wellhead 104 can include a Christmas tree structure including valves used to regulate flow into or out of the wellbore 102, casing attachments such as casing spool outlets, pipe spools and hangers for coil tubing or wireline connections, a combination of these elements, or other structures incorporated in the wellhead 104. The wellhead 104 can include a vertical Christmas tree, a horizontal Christmas tree, or another orientation Christmas tree, each having a number of valves to control fluid flow and pressure across the wellhead 104. In the example well system 100 of
The tubing string 110 is supported at the wellhead 104. For example, the tubing string 110 can couple to and be supported by a tubing hanger, which couples to and is supported by a pipe spool of the wellhead 104. The wellhead 104 includes conduits for power, control, and communication connections between the tubing string 110 and respective power sources, control sources, and communication sources.
The example hanger system 200 includes a pipe spool 220 disposed at a wellhead (for example, the wellhead 104 of
The example hanger system 200 also includes a tubing hanger 240 disposed in and supported by the spool bore 224. The tubing hanger 240 includes a hanger housing 242 that defines a hanger bore 244 extending longitudinally (for example, axially along center axis A-A or parallel offset from axis A-A) from a first longitudinal end of the hanger housing 242 to a second, opposite longitudinal end of the hanger housing 242. The hanger bore 244 can be an axial through-bore through the tubing hanger 240 such that the hanger bore 244 extends entirely through the tubing hanger 240. In some implementations, a cross-section of the hanger bore 244 is large enough to limit a velocity of fluid flowing through the hanger bore 244 below a velocity threshold. For example, the velocity threshold can be determined by industry standards or other factors. The tubing hanger 240 is removably coupled to the pipe spool 220, in that the tubing hanger 240 can be positioned in (for example, lowered into) the pipe spool 220 to engage with the pipe spool 220. The tubing hanger 240 couples to and supports the coil tubing 202 in the wellbore 102. In some instances, the tubing hanger includes a connector portion formed in or coupled to the hanger housing 242 at the second longitudinal end of the hanger housing, and the connector portion directly connects to and supports the coil tubing 202. In some implementations, the connector portion can incorporate a slip design, rope socket design, or other design type, and can incorporate electric penetrators that allow the secure electrical connection between the hanger 240 and the powered coil tubing 202. The hanger bore 244 directs fluid produced from the ESP and flowing through the central bore 206 of the coil tubing 202, for example, to a production fluid inlet of a wellhead.
In the example hanger system 200 of
In some implementations, the pipe spool 220, tubing hanger 240, or both, can include coupling parts, such as axial positioning features or orientation features or both, to axially position and rotationally position the tubing hanger 240 in the pipe spool 220 at one or more predetermined positions. The coupling parts allow the tubing hanger 240 to land on the pipe spool 220 at a predetermined depth and rotationally orient the tubing hanger 240 relative to the pipe spool 220 at a predetermined orientation. The coupling parts are described in more detail later.
The tubing hanger 240 of the example hanger system 200 can be deployed and seated in the pipe spool 220, and couples to and supports the coil tubing 202 in the wellbore 102. The coil tubing 202 includes a coil tubing wall 204 that defines a central bore 206. The central bore 206 fluidly connects to the hanger bore 244 and extends along the coil tubing 202, for example, to fluidly connect to the ESP. The example hanger system 200 includes a network of channels through the pipe spool 220, tubing hanger 240, and coil tubing 202 that allow for the connection of power equipment, communication instrumentation, and control systems at a surface of the well to the downhole tool, such as the ESP, disposed in the wellbore on the coil tubing 202. The network of channels provides for connection of power, communication, and control between sources proximate to the wellhead (for example, at the surface) and the ESP disposed downhole, while also allowing for retrieval or deployment of the of the hanger 240, coil tubing 202, and ESP without requiring a workover rig operation or nippling down operation of the Christmas tree wellhead. For example, the network of channels includes at least three ports in the spool housing 222 of the pipe spool 220, at least three conduits in the hanger housing 242 of the tubing hanger 240 that align with respective ports of the pipe spool 220, and at least three channels embedded in the coil tubing wall 204 of the coil tubing 202 that align with respective conduits in the hanger housing 242. One or more or each of the ports and conduits can include caps, or plugs, at exposed ends of the ports and conduits, for example, to seal off end openings of the respective ports or conduits during installation or retrieval processes of the tubing hanger 240, coil tubing 202, and downhole tool or ESP. The channels embedded in the coil tubing wall 204 extend from an uphole longitudinal end of the coil tubing 202, where they couple to respective conduits of the tubing hanger 240, to the ESP or other downhole tool. The conduits of the tubing hanger 240 align with the ports of the pipe spool 220 to ultimately connect the embedded channels of the coil tubing 202 to respective sources connected at the wellhead proximate to the pipe spool 220. This network of channels allows for the connection of electric equipment (for example, wiring), communication equipment (for example, fiber optic cable or other), control equipment (for example, hydraulic fluid, chemical fluid, or other fluid types), or other equipment to directly connect between an ESP or other downhole tool and a source at a surface of the well.
The network of channels can take many forms and include multiple channels. In the example hanger system 200 of
The pipe spool 220 includes an electrical port 230, a communication port 232, and a control port 234 in the spool housing 222, each port having a respective port opening in an inner surface (for example, radially inner surface adjacent the well bore) of the spool housing 222. The electrical port 230, communication port 232, and control port 234 extend through the spool housing 222. In some instances, the ports 230, 232, and 234 are horizontal ports extending from the radially inner surface of the pipe spool housing 222 to an outer surface of the pipe spool housing 222, and the ports 230, 232, and 234 can be radially distributed evenly or unevenly about the spool housing 222. In
The tubing hanger 240 includes an electrical conduit 250 extending through the hanger housing 242, a communication conduit 252 extending through the hanger housing 242, and a control conduit 254 extending through the hanger housing 242. With the tubing hanger 240 positioned in the pipe spool 220, the electrical conduit 250 aligns with the electrical port 230 of the pipe spool 220, the communication conduit 252 aligns with the communication port 232 of the pipe spool 220, and the control conduit 254 aligns with the control port 234 of the pipe spool 220. For example, a first end 256a of the electric conduit 250 aligns with the opening of the electrical port 230, a first end 258a of the communication conduit 252 aligns with the opening of the communication port 232 of the pipe spool 220, and a first end 260a of the control conduit 254 aligns with the opening of the control port 234 of the pipe spool 220. A second end 256b of the electrical conduit 250 opposite the first end 256a connects to the first channel 208a of the coil tubing 202. A second end 258b of the communication conduit 252 opposite the first end 258a connects to the second channel 208b of the coil tubing 202. A second end 260b of the control conduit 254 opposite the first end 260a connects to the third channel 208c of the coil tubing 202. In some instances, the conduits 250, 252, and 254 can be radially distributed evenly or unevenly about axis A-A in the hanger housing 242. In
In some implementations, one or more or all of the first end 256a, first end 258a, first end 260a, or opening of the ports in the pipe spool 220 includes a cap, or plug, over the respective opening to seal the respective opening. The cap provides a temporary seal at the opening to prevent or restrict unwanted infiltration of fluid, contaminants, or other unwanted material into the respective ports or conduits, for example, during deployment or retrieval of the tubing hanger 240 in the pipe spool 220. The cap(s) can be removed following installation of the tubing hanger 240 in the pipe spool 220 to allow for surface power, fiber optic or other communication equipment, or control fluid connection along the conduits. In some examples, the caps (or plugs) can have screws with hexagonal sockets on their tops to allow them to be tightened or untightened from the hanger with keys (for example, Allen keys). In some instances, the electric conduit 250, communication conduit 252, or both, allow for dry mate connections to the respective electrical port 230, communication port 232, or both, of the pipe spool 220.
The hanger system 200 allows rigless retrieval and deployment of the ESP or other downhole tool by retrieval and deployment of the tubing hanger 240 and coil tubing 202, while keeping the Christmas tree structure of the wellhead in place. In some instances, the tubing hanger 240 includes a latch structure proximate an uphole longitudinal end of the tubing hanger 240 to engage a retrieval and deployment tool to selectively retrieve or deploy the tubing hanger 240 in the pipe spool 220. The latch structure can take a variety of forms. For example, the latch structure of the tubing hanger 240 can include a latch profile 262, such as a fishing tool profile, threading, or other profile that can selectively engage with a retrieval and deployment tool.
The pipe spool 220 and tubing hanger 240 can have corresponding coupling parts to position and orient the tubing hanger 240 in the pipe spool 220, for example, to align the conduits of the tubing hanger 240 with the respective ports of the pipe spool 220. In some implementations, the pipe spool 220 and tubing hanger 240 include axial positioning features to axially position (for example, along axis A-A) the tubing hanger 240 in the pipe spool 220 at one or more predetermined axial positions. The axial positioning features can take a variety of forms. For example, in the example hanger system 200 of
In some implementations, the pipe spool 220 and tubing hanger 240 have corresponding orientation features to rotationally orient (for example, about axis A-A) the tubing hanger 240 in the pipe spool 220 at one or more predetermined radial positions. The orientation features can take a variety of forms, and can include a self-orienting feature. For example, in the example hanger system 200 of
The coupling parts, including one or both of the axial positioning features or orientation features, can take other forms or include additional components to axially position and rotationally position the tubing hanger 240 relative to the pipe spool 220. For example, the pipe spool 220 can include a lock pin 236 to secure the tubing hanger 240 in the pipe spool 220 and substantially prevent uphole axial movement of the tubing hanger 240 while the lock pin 236 is engaged. The lock pin 236 can be retractable, for example, to allow for retrieval of the tubing hanger 240 from the pipe spool 220.
The example hanger system 200 provides connections for power, communication, and control fluid between a surface wellhead and a downhole powered ESP or other downhole tool, and provides for a rigless deployment and retrieval of the ESP or other downhole tool without rendering tree valves or other valves of a wellhead (for example, Christmas tree-type wellhead) non-functional. For example, a well operator can deploy or retrieve an ESP on a coil tubing supported on a tubing hanger without a workover rig or a nippling-down operation of the wellhead.
A number of implementations have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the disclosure.
Number | Name | Date | Kind |
---|---|---|---|
3638732 | Huntsinger | Feb 1972 | A |
4154302 | Cugini | May 1979 | A |
4181175 | McGee et al. | Jan 1980 | A |
4289199 | McGee | Sep 1981 | A |
4491176 | Reed | Jan 1985 | A |
4627489 | Reed | Dec 1986 | A |
5848642 | Sola | Dec 1998 | A |
7699099 | Bolding | Apr 2010 | B2 |
7770650 | Young et al. | Aug 2010 | B2 |
9593561 | Xiao et al. | Mar 2017 | B2 |
20030141071 | Hosie | Jul 2003 | A1 |
20100206577 | Martinez | Aug 2010 | A1 |
20110300008 | Fielder et al. | Dec 2011 | A1 |
20150068769 | Xiao et al. | Mar 2015 | A1 |
20150330194 | June | Nov 2015 | A1 |
20150354308 | June | Dec 2015 | A1 |
20180058157 | Melo et al. | Mar 2018 | A1 |
Number | Date | Country |
---|---|---|
0637675 | Feb 1995 | EP |
2504104 | Jan 2014 | GB |
WO 2016012245 | Jan 2016 | WO |
Entry |
---|
International Search Report and Written Opinion issued in International Application No. PCT/US2020/020770 dated May 18, 2020, 14 pages. |
Number | Date | Country | |
---|---|---|---|
20200284118 A1 | Sep 2020 | US |