Information
-
Patent Grant
-
6533501
-
Patent Number
6,533,501
-
Date Filed
Thursday, May 17, 200123 years ago
-
Date Issued
Tuesday, March 18, 200321 years ago
-
Inventors
-
Original Assignees
-
Examiners
- Will; Thomas B.
- Mayo; Tara L.
Agents
- Kelly Bauersfeld Lowry & Kelley, LLP
-
CPC
-
US Classifications
Field of Search
US
- 405 15
- 405 16
- 405 25
- 405 12975
- 405 107
- 405 229
- 405 2851
- 405 303
- 052 DIG 9
-
International Classifications
-
Abstract
A foundation comprising one or more layers or mattresses of tires, and a fill material provided within and/or between tires of each of the mattresses. The fill material is preferably a relatively coarse aggregate and provides a porous bed having relatively high drainage capacity. The lowermost mattress is cloth which is designed to allow the passage of water across the lowermost mattress whilst preventing the ingress of relatively finer material into the fill material and which can otherwise lead to degeneration of the foundation. At least some of the tires typically also have an upper sidewall removed therefrom.
Description
FIELD OF THE INVENTION
The present invention relates to a foundation formed from one or more layers of tyres. When the term “foundation” is used herein, it includes any weight bearing surface such as a roadway, building foundation, railway track base, etc and any causeway including drainage floors, flow channels, drainage pit base, water sump, trickle filter base, bank way (including wave mat banks in water break walls) etc. The term “foundation” is not intended to include retaining walls or the like (which are covered in the applicant's co-pending application WO 98/49400), although various of those retaining walls are disclosed herein.
BACKGROUND ART
The use of tyres (especially used tyres) in retaining walls and retaining slopes is known. AU 10006/95 suggests a use for old tyres by providing a trench formed to accommodate the tyres in a side by side position to form a drain, tunnel, duct, ventilation shaft or the like.
FR 2643400 discloses a surface stabiliser formed from tyres set in straight lines and forming squares, with one tyre at each comer of a square. Alternatively, the tyres can be provided in staggered rows with adjacent tyres forming triangles. The tyres are bound together using natural synthetic fibres and can be filled with pieces of rock and covered, after laying, with rock or stones and a layer of soil to receive plants etc. However, FR 2643400 only discloses a single row of tyres, and does not disclose any structures which would be suitable for use in high load or highly erosive environments.
Similarly, RU 2060610 discloses a terracing arrangement employing used tyres in a staggered arrangement (
FIG. 2
therein). Again, the arrangement disclosed in this document is not suitable for use in high load or highly erosive environments, but is concerned with providing a simple mat-type structure to prevent land erosion from rain.
NL 7706564 discloses a mattress for reinforcing an underwater structure. A plastic fabric has tyres secured thereto and a weighting material (a coarse rock) is positioned in those tyres. In such an arrangement, the coarse material is highly susceptible to ingress of fines material and thus breakdown. In addition, the tyres are simply provided to carry the weighting material so as to hold the plastics underlay in position. The arrangement is not concerned with load bearing applications.
SU 1312130 discloses a slope covering formed from old car tyres. The structure includes a protective earth layer reinforced with used tyres over which a stone material reinforcement layer, also reinforced with used tyres, is laid. Junction elements are provided between the tyre layers to join the two together. In addition, a polymer screen to prevent the earth layer from being leached from the structure is provided, but again there is nothing to suggest any substantial anti-erosive performance or load bearing capacity.
RU 2043455 discloses a road bed construction method which involves forming a mat of tyres which are secured in the lengthwise direction. The tyres are connected at their treads, are then covered with earth, peat or sand and are then covered with a geotextile layer. However, the construction does not prevent the ingress of fine materials into the mat, and thus would deteriorate over time.
SUMMARY OF THE INVENTION
In a first aspect the present invention provides a foundation comprising one or more layers of tyres including a lowermost layer being located adjacent to the ground, and a fill material provided within tyres of each of the layers, wherein at least the lowermost layer has a porous sheet positioned thereunder which is adapted for allowing the passage of water across the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer.
The porous sheet is provided to prevent deterioration of the fill material within the layer by the ingress of finer surrounding material. This arrangement contrasts strongly with those shown in SU 1312130 and RU 2043455, which disclose arrangements concerned with preventing the earth layer from being leached or washed away from the hydrotechnical structure disclosed therein.
In a second aspect the present invention provides a foundation comprising one or more layers of tyres including a lowermost layer being located adjacent to the ground on a geo-fabric material, with tyres in the lowermost layer having an upper sidewall removed therefrom and being provided with a fill material therewithin,
Wherein the lowermost layer is enclosed within the geo-fabric material, and further fill material and/or one or more further layers of tyres overlay the enclosed lowermost layer to define the foundation. By removing a side wall of at least some of the tyres, fill introduced therein can be compacted and thus such tyres can form a securing function in any structure in which they are used.
In a third aspect the present invention provides a method of construction on ground of a foundation as defined in the first and second aspects including the steps of:
forming one or more layers of tyres including a lowermost layer;
positioning on the ground a porous sheet which is adapted for allowing the passage of water across the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer;
locating the lowermost layer on the porous sheet adjacent to the ground; and
filling within tyres of each of the layers with the fill material.
Foundations constructed in accordance with the present invention can be suitably employed on: roads; ground or sub base such as sand and wetlands; drainage ways, courses and channels; railway track bases; mining tunnels; ramps and slopes adjacent to lakes, rivers, creeks, oceans; wave dissipation and breakwater walls; waste cell pits; stockpile bases, pavements; silt traps etc. All such environments are susceptible to erosion and deterioration through water saturation, and previous barriers employed
In the foundation and the method of constructing the same, it is preferred that the tyres within each of the layers are laid generally horizontally and are located adjacent to one another in a fixed array, each of the layers in conjunction with the fill material forming a tyre mattress. Such a “mattress” construction provides a very stable foundation base and tends to resist erosion and provide high load bearing capacity.
In the foundation, or method of constructing the same, at least two layers of tyres can be provided, and preferably each tyre in each layer has a sidewall removed therefrom so that the tyres can be oriented to be generally upwardly open in use to receive the fill material therein. When each tyre is open (having its uppermost sidewall removed therefrom) fill can be readily compacted in each tyre and an extremely stable and strong foundation can be constructed.
In the foundation and method of constructing the same, typically the fill material is a rock aggregate or cobble of a relatively coarse grade. Such fill can be susceptible to dislocation and movement in use if finer material (such as sand) penetrates into the foundation structure. This is because the fine material “lubricates” the rock and reduces the interlock between aggregate pieces. Hence the foundation in accordance with the invention is provided.
The number of layers employed in the foundation typically depends on the anticipated loadings and required stability of the foundation (eg when it is employed as an underlying road, ground or sub-base).
Typically, the lowermost layer is laid on the ground with minimal earthworks or sub-grade excavation being required. Advantageously, the foundation requires relatively low sub-grade stability and is thus suitable in marsh or swamp land and other wet areas. The layers of tyres or tyre mattresses can also be offset with respect to adjacent layers to provide distribution of the load between adjacent tyres whilst reducing the stability (bearing pressure capacity) requirements of the underlying ground or sub-base (eg. one tyre in one layer can overlay up to four tyres in an underlying adjacent layer).
Preferably, the fill material is a rock aggregate or cobble of a relatively coarse grade. In one example, the rock aggregate fill is of a nominal 75 mm diameter. . The relatively coarse fill material provides a porous layer having high drainage capacity. The relatively coarse fill material also combines with the tyres to minimise degeneration of the roadway or the drainage floor.
The performance of the coarse grade fill can deteriorate if fine material ingresses into the foundation, hence the employment of the porous sheets. Dislocation and movement of the rock aggregate can lead to potholes in gravel roadways etc. Thus typically, the lowermost layer or tyre mattress is wrapped in the porous sheet. In one example, the porous sheet is a porous cloth such as a geofabric cloth which also serves as a fire retardant.
When the foundation is used in a roadway or similar it can further comprise an edge support structure being configured to locate on opposing sides of at least an uppermost layer of the layers of tyres, the support structure acting so as to inhibit movement of the tyres and degeneration of the foundation. In one embodiment the edge support structure includes a row of support tyres being located alongside and coupled via a link structure to at least one side of eg. the uppermost layer of tyres.
Typically, the link structure includes a series of lateral tie elements each linking one of the support tyres to an adjacent tyre of the uppermost layer, and a longitudinal link element interconnecting the tie elements. In one example, the lateral tie elements and longitudinal link elements are constructed of tyre tread connected end to end or alternatively of conveyor belt material. However, other alternatives are also possible (detailed below).
The foundation can also comprise a series of drainage tyres located adjacent to one another within a trench excavated underneath the lowermost layer of tyres, and a drainage fill material can be provided within or between the drainage tyres. One or more drainage channels can extend from the trench so as to drain water away from the roadway or the drainage floor.
Typically the tyres employed as the basic constructional element have intact tread portions (i.e. a whole tyre is typically used, except that it may have an upper side wall removed therefrom. However, in some applications such as in drainage channels, silt traps etc, part tyres may be employed. For example, half a tyre, still having an upper side wall removed therefrom can be employed, and various other tyre segments can be employed.
In addition, tyres within the foundation can be further strengthened by arranging tyre portions therewithin as additional reinforcement. For example, in addition to fill material, a tyre with an upper sidewall removed therefrom can have one or more coiled tyre treads arranged therewithin, or a stack of tyre sidewalls arranged therewithin, or combinations thereof etc.
Silt trap foundations in accordance with the present invention can be formed by arranging a single lengthwise row of tyres, and by wrapping the row with lengths of tyre treads or conveyor belts to form an integrated and portable unit. Preferably such units have three tyres arranged end to end, each with an upper sidewall removed therefrom, and with tyre tread lengths extending right around and joined to the tyres.
BRIEF DESCRIPTION OF THE DRAWINGS
In order to achieve a better understanding of the nature of the present invention several preferred embodiments of different foundation structures in accordance with the invention will now be described, together with construction methods therefor, by way of example only, with reference to the accompanying drawings in which:
FIG. 1
is a sectional view of a roadway according to one embodiment of the invention;
FIG. 2
is a schematic sectional view of another embodiment of a roadway of the invention;
FIG. 3
shows a plan view and a schematic sectional view of an edge support structure for use with the roadway of
FIG. 1
;
FIG. 4
shows a plan view and a schematic sectional view of an alternative edge support structure;
FIG. 5
is a sectional view of one embodiment of a drainage floor of the invention;
FIG. 6
is a sectional and enlarged sectional view of another embodiment of a drainage floor of the invention;
FIG. 7
is a plan view of part of the drainage floor of
FIG. 6
;
FIGS. 8 and 9
, show respectively, plan and sectional side elevations (taken on the line
9
—
9
of
FIG. 8
) of a double layer tyre reinforced pavement;
FIGS. 10 and 11
show views similar to those of
FIGS. 8 and 9
, but where the double layers form the sub-base of a stockpile pavement;
FIG. 12
shows a sectional elevation through a flow channel, being similar to the drainage floor shown in
FIGS. 5 and 6
;
FIGS. 13 and 14
show, respectively, end and side sectional elevations through a flow channel incorporating a weir and silt barrier therein, with
FIG. 14
showing a view taken on the line
14
—
14
of
FIG. 13
;
FIGS. 15 and 16
show in side elevation, alternative bank protection foundations (wave mats), with
FIG. 15
showing an aquaculture pond configuration and
FIG. 16
a wave mat at a retaining wall (such as a seawall);
FIG. 17
shows a sectional elevation of an alternative wave mat arrangement for use with a retaining wall;
FIGS. 18
,
19
and
20
show side, partial plan and sectional side elevations, respectively, (
FIG. 19
taken on the line
19
—
19
of
FIG. 18
) of a trickle filter foundation for a stockpile of material or the like;
FIGS. 21 and 22
show similar views to
FIGS. 18 and 19
, but with a different tyre arrangement;
FIGS. 23
to
27
show various views of a waste disposal foundation in accordance with the invention wherein
FIG. 23
shows a plan view of one cell of the waste disposal foundation;
FIG. 24
shows a schematic plan detail of the cell showing an arrangement of tyres therein;
FIG. 25
shows a cross sectional side view through the cell of
FIG. 23
;
FIG. 26
shows a side elevation of part of the distribution channel shown in
FIG. 24
;
FIG. 27
shows a side cross-sectional view taken on the line
27
—
27
of
FIG. 26
;
FIG. 28
shows a plan view of a tyre with a side wall removed therefrom;
FIG. 29
shows, schematically, a side perspective view illustrating the removal of a tyre sidewall;
FIG. 30
shows a plan view of an alternative means for “removing” a side wall of the tyre (by splitting the tyre horizontally through its tread);
FIGS. 31
to
36
show plan elevations of various ways of arranging and binding the tyres in mattress formations within various foundations in accordance with the present invention; and
FIGS. 37
to
42
show alternative edge support structures for use with a roadway or other foundation, being alternatives to those structures shown in
FIGS. 3 and 4
;
FIG. 43
shows a side elevation of a causeway structure foundation,
FIG. 44
showing the same elevation in cross section, and
FIG. 45
showing a cross section through part of the causeway, illustrating a drainage configuration;
FIG. 46
shows in side elevation an alternative roadway and drainage foundation structure,
FIGS. 47 and 47A
show respectively a detail and plan view of the arrangement of
FIG. 46
;
FIG. 48
shows a plan view of a tyre for use in a foundation and that has been reinforced internally in accordance with the present invention;
FIG. 49
shows a sectional view through the tyre of
FIG. 48
taken on the line
49
—
49
;
FIG. 50
shows a plan view of a roadway constructed using tyres according to
FIG. 48
,
FIGS. 51 and 52
show sectional elevations through the roadway, for two alternative roadway embodiments;
FIG. 53
shows an alternative bank protection foundation incorporating tyres in accordance with
FIG. 48
,
FIG. 54
shows a side sectional elevation through the bank protection foundation of
FIG. 53
;
FIG. 55
shows a plan elevation of a foundation in the form of silt barrier units arranged in a drainage causeway in accordance with the present invention,
FIGS. 56 and 57
show, respectively, end and side sectional elevations through the arrangement of
FIG. 55
;
FIG. 58
shows an individual silt barrier unit foundation in perspective view and associated with a drain;
FIG. 59
shows an alternative silt barrier foundation to that of
FIG. 58
when located in a V drain configuration.
MODES FOR CARRYING OUT THE INVENTION
As shown in
FIGS. 1 and 2
a foundation in the form of a roadway
10
comprises two layers of tyres or tyre mattresses resting upon one another. Each mattress
12
,
14
includes an array of tyres such as
12
A to
12
E and
14
A to
14
D. Tyres of the upper and lower mattresses
12
and
14
are typically offset relative to each other so as to distribute the load with each of the tyres being laid horizontally. The various offset arrangements that can be adopted can be appreciated by considering, for example
FIGS. 7
,
8
and
10
. Thus one tyre in one mattress can be supported by up to four tyres in an adjacent underlying mattress. This substantially improves load distribution over previous arrangements.
The upper and lower tyre mattresses
12
and
14
are in-filled with a fill material indicated as
16
. The fill material
16
is preferably a rock aggregate or cobble having a nominal 75 mm diameter. Thus, the relatively coarse fill material
16
forms a porous bed typically both within and between adjacent tyres such as
12
A to
12
E and
14
A to
14
D thereby providing a rock aggregate bed with a high drainage and yet a high load capacity. Furthermore, the relatively coarse fill material
16
combines with the tyre mattresses
12
,
14
to provide a strong and stable structure, thereby minimising degeneration of the roadway
10
.
At least some of the tyres in at least one of the layers have a sidewall removed therefrom (or have an equivalent structure which is akin to removing a sidewall—(see eg the tyre arrangements of
FIGS. 28
to
30
)). Typically most or all of the tyres have a sidewall removed therefrom, and the tyres are positioned in the roadway so that the remaining sidewall faces downwardly (as better shown in eg FIG.
9
). By removing the tyre sidewall (or providing an equivalent structure) the fill material can be compacted within the tyre (tyres that have both sidewalls intact cannot be filled and compacted to anywhere near the same extent). Thus, each such tyre functions something like an anchor within the foundation in which it is arranged, and this greatly enhances the strength and stability and minimises degeneration of the foundation over time.
Typically at least the lower tyre mattress
14
is wrapped in a porous sheet
18
such as a geofabric cloth. The geofabric cloth
18
is designed and selected to allow the passage of water across the lower mattress
14
whilst preventing the ingress of relatively fine material into the gravel bed of the lower mattress
14
. If fines “contaminate” the gravel bed
16
this accelerates degeneration of the roadway
10
as evidenced by formation of potholes in conventional gravel roadways. The geofabric cloth
18
in the roadway construction can also serve as a fire retardant. The upper tyre mattress
12
in this embodiment is not covered in a geofabric cloth. Typically the cloth is wrapped right around the mattress with the free ends being lapped over the upward facing mattress surface after wrapping. The next mattress is then layered over those lapped ends to fasten the cloth around the mattress (and so on—as required).
The roadway
10
also includes an edge support structure
20
, which is constructed from in-filled tyres. The edge support structure is located on opposing sides of the upper and lower tyre mattresses
12
and
14
. The roadways of
FIGS. 1 and 2
incorporate two variations of the support structure
20
each using tyres
22
at least partly buried below ground level G. However, the edge support tyres
22
may also be located within a trench excavated alongside the roadway
10
. The support structure
20
of
FIG. 1
includes edge support tyres
22
oriented in an inclined plane whereas the support structure
20
′ of
FIG. 2
includes a vertically oriented series of tyres
22
forming an outermost boundary to the roadway
10
.
FIGS. 3
,
4
and
37
to
42
illustrate other forms of edge support structures
26
to those described above. These alternative support structures
26
can comprise a row of support tyres
28
each located alongside and forming a boundary to the sides of the upper and/or lower tyre mattresses
12
or
14
. A link structure shown generally as
30
includes one or a series of lateral tie elements
32
having one end connected to a longitudinal link element
34
or fastening arrangement
35
(
FIGS. 37
to
39
) both of which in turn connect the tie elements to the tyre rows
28
. The tie elements
32
can engage (by being under and/or being fastened to) the upper or lower tyre mattress
12
or
14
to couple the mattress
12
or
14
to the link structures
30
. Support structure
26
is effective in inhibiting movement of the tyre mattresses
12
and
14
which might in some circumstances lead to degeneration of the gravel bed
16
and roadway
10
.
In the support structure arrangements depicted in
FIGS. 3 and 4
, the lateral tie elements
32
each consist of a length of tyre tread or conveyor belt underlying both the boundary tyres of the tyre mattress
12
or
14
and the support tyres
28
, and being wrapped around these abutting tyres in a figure of eight arrangement as crudely illustrated by the arrows of
FIGS. 3 and 4
. The longitudinal link element
34
consists of another length of tyre tread or conveyor belt having a pair of opposing longitudinal cuts
39
(as shown in
FIG. 41
) which together define a slot through which one of the lateral tie elements
32
is passed prior to wrapping of the tie element
32
around the abutting tyres. The lengths of tyre tread are formed from one or a series of tyre treads or conveyor belts joined end to end. The tyre treads can be formed from recycled tyres having both of their sidewalls cut away whereas typically the conveyor belts are unmodified discarded belts. It will be appreciated that the in-fill material, most generally rock aggregate, within the support tyres
28
serves to lock the tie element
32
back onto itself so as to rigidly anchor the support structure adjacent to the upper and/or lower mattresses
12
or
14
. The link structure
30
of
FIG. 4
can further (or alternatively) include a recycled concrete beam
38
′ in place of a length of belt or tread.
Referring to
FIGS. 37
to
42
, alternative link structures
26
are depicted.
In
FIG. 37
, the fastening arrangement
35
includes a pair of fastening pins
36
for attaching tyre or belt tie elements
32
to each tyre in row
28
. Typically the pins are fastened to the tyre lower sidewall and can be, for example, bolts, rivets, metallic ties, etc.
FIG. 38
shows an alternative mechanism for attaching tie element
32
to tyre
28
. In this case, a clamp
37
is fastened around element
32
and the tyre lower sidewall (as depicted). The tie element can be looped up through the lower opening of the tyre and doubled back, and a clamp can then be clamped around that looped end of the tie element, sandwiching the tyre lower sidewall therebetween. Typically the clamp is preformed from a deformable metallic material which is typically also corrosion resistant.
FIG. 39
shows a similar arrangement to
FIG. 38
, but in this case the tie element is looped up through the tyre lower opening and back over the tyre lower sidewall, and then out of the tyre through an appropriate slit preformed in the tread section thereof. The free end of the tie element is then optionally fastened back onto the tie element via a bolt or pin fastening
38
.
FIG. 40
shows an arrangement somewhat similar to that shown in
FIGS. 3 and 4
, but in this case the free end of tie element
32
is passed up and right through the tyre. A pair of longitudinal slits
39
are formed in the free end of tie element
32
, and a rod
34
(eg. a corrosion resistant metal rod, a concrete pillar etc) is slotted therethrough. In use the weight of fill material then maintains the rod in position.
FIG. 41
shows a similar arrangement to
FIG. 40
, but in this case the rod
34
is replaced by a length of tyre or belt tread
34
′.
In
FIG. 42
, it can be seen that each tie element can extend right across the roadway, and under either or both of mattress
12
and mattress
14
. This further enhances the structural stability and integrity of the roadway.
FIG. 1
also illustrates a drainage system shown generally as
40
which may be used in conjunction with the roadway
10
. The drainage system
40
includes a trench
42
pre-excavated under the lower tyre mattress
14
, a series of drainage tyres
44
being located adjacent to one another within the trench
42
. The trench
42
and tyres
44
are in-filled with the fill material such as 75 mm rock aggregate. Alternatively, the trench
42
may include the rock aggregate fill material only without relying on drainage tyres. A number of drainage channels
46
spaced longitudinally along the roadway
10
extend away from the trench
42
so as to drain water within the trench
42
away from the roadway
10
. The roadway
10
typically includes a 1% camber or transverse run-off to further assist in water drainage.
In a further embodiment of the invention the foundation can be provided in the form of a drainage floor, shown generally as
50
in
FIGS. 5
to
7
. The drainage floor
50
is similar in construction to the roadway
10
described above, being formed as a two layer tyre mattress
52
,
54
. Mattress
52
however, can continue someway up sidewalls of a trench or canal
56
in which the floor is located (eg. providing sufficient coverage for extra fluid flow therewithin). The drainage floor
50
when located within the trench or canal
56
is thus supported on the boundary walls of the trench or canal and as a result, the drainage floor does not require an edge support structure as incorporated in the roadway
10
described above. Otherwise, the drainage floor
50
is similar to the roadway
10
in its basic construction having the lower mattress
54
wrapped in a porous layer such as geofabric cloth
58
. The upper and lower tyre mattresses
52
and
54
are both in-filled with a fill material
60
preferably being a relatively coarse grade rock aggregate.
The drainage floor
50
, although primarily designed for water drainage, may also be constructed so that it can function as a roadway. When serving the dual function of a drainage floor and roadway the drainage floor is designed with the necessary number of layers of tyres or tyre mattresses in order to adequately handle anticipated vehicle loadings. This will also be influenced by the inherent ground stability wherein additional tyre mattresses may be used with unstable or saturated ground such as that experienced in marsh and swamp lands, or in high drainage flow areas.
FIGS. 5
to
7
illustrate two forms of drainage floors
50
and
50
′ being configured according to the shape of the trench or canal. In both examples, tyres within the upper and lower mattresses
52
and
54
are offset or staggered relative to each other so as to most effectively distribute the load from the upper mattress to the lower mattress (see FIG.
7
). As illustrated in some detail in
FIG. 6
outermost tyres
54
′ of the lower mattress
54
undercut the existing bank
56
of the trench or canal. This provides additional edge support to the upper and lower mattresses if required.
Referring now to
FIGS. 8 and 9
, a tyre reinforced pavement
70
, similar in construction to the roadway
10
, is depicted (and like reference numerals will be used to denote similar or like parts). In forming the pavement
70
, rather than locating the pavement on the ground, the ground is excavated to form a trench
72
in which the pavement is laid.
Typically, a 75 mm bed of sand
74
is deposited in the base of the trench after excavation to enable a fairly flat trench base to be provided and to minimise ingress to the trench of even finer particles. Geofabric
76
(or other porous sheet) is then laid on top of the sand bed, and tyre mattress
14
is then laid on, in-filled and wrapped in the geofabric. Mattress
12
is then laid on wrapped mattress
14
and is in-filled typically with crushed stone
16
or cobble of 40 to 75 mm particle size to produce the finished pavement. During each in-filling step the fill material is preferably compacted to enhance stability, with tyre open upper ends enabling enhanced compaction.
FIG. 9
(at
78
) also illustrates how each tyre upper sidewall has been removed, to enable the aggregate to completely fill up each tyre and be compacted therein. In effect the tyres act as a reinforcing within the aggregate and also enhance the overall dimensional stability of each mattress.
FIGS. 10 and 11
show a similar arrangement to
FIGS. 8 and 9
, but in this case the pavement
70
forms a sub-base for a stockpile pavement
80
(eg formed from a concrete or a porous layer). Like reference numerals are used to indicate similar or like parts to those shown in
FIGS. 8 and 9
.
Because the stockpile pavement is typically formed of a heavier and denser material (eg a 300 mm slab) and typically supports heavy loads, a coarse sand layer
82
(typically thicker than 75 mm) is provided in the base of trench
72
. In addition, a pair of agricultural drains (typically of 100 mm diameter and slotted) are provided on either side of the trench for draining away any trapped water penetrating under the stockpile pavement.
Furthermore, because the stockpile pavement is typically laid over the pavement once it has been laid, geofabric
76
can also be provided to cover the upper tyre mattress
12
, thereby preventing the ingress of concrete into the pavement fill material.
Referring now to
FIGS. 12
to
14
, fluid flow channels (similar to the drainage floors of
FIGS. 5
to
7
) are depicted. Like numerals are used to denote similar or like parts.
FIG. 12
depicts a flow channel
90
formed from a two layer tyre mattresses
52
,
54
, and laid over a geofabric base
58
. Side tyres
92
extend partway up the channel sloped bank and it can also be seen that the flow channel itself has a
1
in
20
slope into the centre thereof. This enables, for example, an agricultural drain to be positioned centrally within or under the mattresses to facilitate better drainage.
In
FIGS. 13 and 14
, the flow channel
90
can be provided with one or more intermediate weirs
100
. Each weir includes tyre upper mattress layer
102
and tyre intermediate mattress layer
104
. Furthermore, a silt barrier
106
can be provided between the upper mattress layers
102
,
104
and lower mattress layers
52
,
54
.
The upper mattress layers
102
and
104
extend transversely across the top of the lower mattress layer
52
,
54
for the width of the flow channel to provide, in conjunction with the silt layer, the weir formation. It is typically desirable to have a weir formation in a flow channel, or on a drainage floor etc to assist in regulating flow through the channel and/or to provide a barrier to trap entrained solids in fluid flowing through the channel.
The silt barrier can function to prevent any fines being transported in the fluid flowing through the channel from being deposited and ingressing into the lower layers
52
,
54
(thereby ultimately leading to erosion). The weir formation can also allow for a low rate seepage of water across the weir (eg to provide a filtration type function). Typically the silt barrier is formed from gravel or crushed stone.
A drainage pipe
108
can also be provided in weir
100
. The pipe
108
can function as a low fluid flow pipe that still allows fluid in the trapped silt bulk to pass through the weir. The pipe
108
can also be provided in the form of a slotted agricultural type drain enabling fluid seeping through the upper layers
102
,
104
and the silt barrier
106
to drain away from the weir. The arrangement as described provides a very stable and erosion resistant construction for flow channels and floors.
Referring now to
FIGS. 15
to
17
, three different types of wave mat configurations are depicted for preventing bank erosion and scouring at ponds, lakes, seawalls etc.
Referring to
FIG. 15
, a wave mat arrangement
120
for use in eg aquaculture pond
122
is depicted. The wave mat protects the bank B against erosion and scouring from water surge in the pond. The bank extends down and away from the pond service berm SB which typically has a service road SR located thereon. As can be seen, each bank of the service berm is provided with a retaining wall structure
124
on either side thereof and formed from tyres (eg in accordance with the applicant's retaining wall construction techniques disclosed in WO 98/49400).
The wave mat includes a plurality of tyres formed in rows progressively laid along the bank and extending down the bank. Typically each tyre has a sidewall removed therefrom, and has aggregate material
16
compacted therein. Typically the tyres in adjacent rows are joined to each other via ties or other mechanisms (eg as described in relation to
FIGS. 31
to
36
).
A geofabric layer
126
underlies the wave mats on either side of the berm, and in some applications it may also be prudent to form the wave mat and the berm on an aggregate base
128
. As can be seen, the geofabric layer extends under both wave mats and also into and through the service berm. This enhances the overall stability of the wave mat construction. The layer also prevents the ingress of finer material into the wave mat (which would otherwise cause deterioration thereof over time).
FIG. 15
also shows that the aquaculture pond has a normal water level NWL and a flushing water level FWL. In other words, during use of the aquaculture pond, the water level changes and surges. The wave mat on either side of the service berm protects both the bank and the berm itself from erosion and scouring. The wave mat also absorbs the impact of the surging water, and this absorptive capacity is increased by the presence of the resilient tyres within the wave mat.
FIG. 16
shows a retaining wall and wave mat construction for a seawall or lakewall, where water forces are likely to be significantly greater than in an aquaculture pond. The wave mat
130
is, similarly to the aquaculture pond, formed from a plurality of tyres formed in rows and in-filled with an aggregate material
16
. To enhance the stability and erosion resistance of the wave mat, a rock layer
132
(eg 250 mm thick) is positioned over the wave mat and provides sacrificial wear resistance, with the wave mat providing impact resistance and enhancing wave absorption capacity. The layer
132
can be sprayed over with a spray concrete to enhance unity and strength thereof.
The wave mat can be used in conjunction with a tyre retaining wall
134
(eg formed in accordance with the techniques of the applicant disclosed in PCT/AU98/00302). That retaining wall sits on a base
135
of coarse fill material and between the base and the wave mat, a gravel fill layer
136
is provided.
The retaining wall includes a jacroc cover
137
, a gravel infill backing layer
138
, and a compacted backfill composite material layer
139
. A concrete capping
140
(which can provide a walkway, a driveway etc) is positioned on top of the retaining wall. The lower end of the wave mat is provided with a number of stacks of tyres
142
, which are typically infilled with either a denser compact fill material or concrete (to provide an anchor function). A gravel backfill layer
143
is provided behind tyre stack
142
. Again, it is preferred that a geofabric layer
144
is laid under the wave mat
130
and tyre stack
142
to enhance the stability of the overall structure and to prevent the ingress of relatively finer material into the various fill materials employed in and between the tyres.
The wave mat arrangement of
FIG. 16
is more complex and more highly reinforced than that depicted in
FIG. 15
, to cope with the greater and more consistent/frequent wave forces applied at sea retaining walls.
Referring now to
FIG. 17
, a wave mat arrangement similar to that shown in
FIG. 16
is depicted and like reference numerals will be used to denote similar or like parts. In the wave mat of
FIG. 17
, only the upper portion thereof is formed from filled tyres (at region
150
). Typically the tyres in that region are packed with 150-250 mm rock aggregate
152
(and typically the top two rows are in turn typically then grouted therein with a mortar or concrete-type grouting). A rock layer
154
is then placed over the wave mat (eg formed from 40 mm rock, typically 100 mm thick). The remainder of the wave mat is defined by a rock protection section
156
, which is positioned between the wave mat section
150
and the tyre stack
142
. This section is stabilised by the location of the tyre stack and tyre wave mat on either side thereof, and again a very stable structure results.
Referring now to
FIGS. 18
to
21
, a foundation in the form of a trickle filter construction
160
for stockpiles such as coal etc is depicted. For stockpiles requiring spraying with a fluid (eg. such as coal stockpiles) the construction can be located on the lee side of a dam wall DW of dam D.
FIGS. 19 and 20
show how the trickle filter construction has opposing sidewalls formed from a plurality of stacked tyre rows
162
,
164
. Each tyre is infilled with a sand or chitter fill material
166
(chitter being a coal by-product). Typically the same fill material
168
is then deposited between the tyre rows. The tyre rows support an overlying condeck distributor trough
170
(or other folded metal trough) which provides a stable platform for the stockpile.
Referring specifically to
FIG. 20
, the trickle filter construction includes a sand bed base layer
172
. A polymeric liner
174
(eg. a geofabric material to prevent the ingress of finer material) is then positioned over the sand bed. However, if the liner is to be impervious to fluid flow thereacross it is typically formed from a non-porous layer (eg. high density polyethylene). A gravel base
176
is then positioned over the layer
174
. The bottom tyre
177
of each of the stacked tyre rows is also infilled with gravel. The sand bed, liner and gravel base are all arranged within a trench
178
in which the trickle filter construction
160
is located. A filter cloth
180
(typically a geofabric material to prevent the ingress of finer material into the above located lowermost layer of the tyre sidewall) is then positioned on top of the gravel base. A geofabric layer can also be positioned between (and optionally wrapped around) each bottom tyre
177
and the base
176
to prevent the ingress of finer material into the tyre sidewalls. The tyres and fill
166
,
168
are then progressively built up to form the trickle filter construction. Finally the condeck distributor is positioned on top of the construction.
FIGS. 21 and 22
show a similar trickle filter construction to
FIGS. 19 and 20
, but in this case the fill material region
168
is infilled with further stacked tyre rows
182
,
184
. The trickle filter construction is in all other respects identical to that shown and described for
FIGS. 18
to
20
. The arrangement in
FIGS. 21 and 22
is, however, more stable because of the internal stacked tyre rows.
The use of tyres and fill in the trickle filler construction as described provides a stable yet fluid porous arrangement, which can also filter out stockpile fines to prevent them entering groundwater and stormwater streams. The high drainage performance of the arrangement further tends to prevent the base of the stockpile from being dispersed into the stormwater. The arrangement can also be used with known “floc blocks” which entrap very fine material that may pass through the filter.
Referring now to
FIGS. 23
to
27
, a foundation is depicted in the form of a waste disposal cell base for use in a waste disposal leachate recirculation and distribution system.
FIG. 23
shows a schematic plan view of one cell
200
in such a waste disposal system. The cell includes sidewalls
202
, which define a square cell, and a distribution system
204
(
FIG. 24
) which is defined by a plurality of tyres
206
arranged in predetermined patterns within the cell. The tyres are infilled with a stone or cobble material which is selected to provide a desirable filtration characteristic. Typically the fill also surrounds the tyres and fills up the remaining spaces in the cell.
As can be seen in
FIG. 25
, the cell includes a seal and capping layer
208
which encloses the tyres
206
, and which has an opening
210
through which leachate to be filtered can be delivered to the cell and from which gas G can be extracted.
The leachate is typically fluid (including water) that has passed through a rubbish/refuse pile overlaying the cell.
As can be seen, tyre distribution channels
212
(which are defined by the tyres
206
) are sloped downwardly and out from a distribution column
214
, itself defined by a column of tyres (FIG.
24
). As can be seen, the distribution channels slope outwardly and downwardly by approximately 2%.
The base of the cell is defined by a liner
216
(typically a non-porous polymeric liner or a water porous layer such as a geofabric layer can sometimes be used) which prevents the ingress of finer material into the cell. A sand and gravel drainage base
218
is positioned on liner
216
. Typically the sand and gravel base is covered by a geofabric layer
219
which can then also be wrapped around a lowest course of the tyres. The layer
219
is selected to allow the flow of leachate into base
218
whilst preventing the ingress of finer material into the cell. Thus, the drainage base receives fluid which has passed through the distribution channels (and has been appropriately filtered eg. by layer
219
) and distributes this to a leachate underdrain
220
(for further treatment and/or disposal/release). Over time a layer of waste
222
accumulates in the cell, so periodically the cell is backflushed (eg. via pressurised fluid introduced at drain
220
). The flow of leachate down through the distribution channel is illustrated schematically in
FIGS. 26 and 27
(flow arrows F).
Turning now to
FIGS. 28 and 29
there is shown a tyre
12
having the upper sidewall
19
removed therefrom (eg cut therefrom using a tyre sidewall cutter) but leaving the lower sidewall
19
′ intact. Such tyres are the most preferred tyres used in the various foundations described above.
FIG. 30
shows the tyre
12
cut almost substantially right around its tread portion, but so as to leave a hinge line
21
. This hinge joins the resultant tyre halves to each other, and provides an open upper portion in each tyre half for receiving aggregate fill therein etc. This arrangement can also be used in any of the foundations described above. Of course, the halves can be separated and can be used individually, but by leaving the halves joined at hinge line
21
, an even stronger structure can be obtained. Such arrangements can provide an equivalent function to the tyre of
FIGS. 28 and 29
when used in the various foundations described.
Referring now to
FIGS. 31
to
36
, various tyre matting arrangements
230
are shown and which can be used in various of the foundations described above. A plurality of tyres
12
(and/or tyres
14
) are joined together by connecting elements
240
. The connecting elements can be formed from tie ropes of synthetic or natural fibre, from metal clips, wire, bands, etc.
In
FIG. 34
, it can seen that a coiled length of tyre tread or conveyor belt
250
can be positioned between adjacent tyres to place the elements
240
in tension, thereby strengthening the bond between the adjacent tyres.
In
FIG. 35
, it can be seen how upper tyres
12
can be fastened to lower tyres
14
through fastening holes
252
, using appropriate fastening pins
254
(eg. bolts, rivets, clamps or other similar arrangements). Again, this further increases the stability of a foundation employing mattresses configured in this manner.
FIG. 36
shows a row of tyres
12
which are joined to each other (typically at least on one side thereof) via a length of tyre tread or conveyor belt
260
(eg via bolting, riveting, adhesion, ties etc). Again, such a configuration can be employed in any of the foundations described above.
Referring now to
FIGS. 43
to
45
, causeway
300
includes a pavement
302
, a rock-filled tyre layer
304
and a sand-filled tyre layer
306
. The causeway terminates at end wall
308
which provides a barrier to water flow in the direction of arrow F.
Layer
302
can be formed of concrete (eg, fibre reinforced concrete, 300 mm thick), coarse road rock etc. As seen in
FIGS. 44 and 45
, layer
304
is formed from three courses of rock-filled tyres
310
, and layer
306
is formed from two courses of sand-filled tyres
312
. Typically the rock used in the layer
304
is 40 to 70 mm in size, and typically layer
304
is 750 mm thick. Typically the sand-filled layer
306
is 500 mm thick.
End wall
308
is defined by ten stacked rows of rock-filled tyres
314
. Typically the rock used in the end wall tyres is 100 to 200 mm in size for maximum drainage. In addition, a geofabric layer
316
is wrapped around the outer tyre courses to prevent the ingress of relatively finer material into the rock of tyres
314
. The layer
316
can also be wrapped around the lowermost tyre course, or around course layer
306
.
Inner section
318
of wall
308
is typically a sacrificial layer (eg. formed from concrete, rock etc) and absorbs the bulk of the energy of fluid flowing through the causeway (eg. in the direction of arrow F).
As seen in
FIG. 45
, under-causeway drains
320
are provided and are supported in discrete concrete elements
322
(eg. fibre reinforced concrete). The drains are located in layer
306
and extend through the causeway and transport away any water permeating through the causeway, thus maintaining the structural integrity of the causeway.
Typically all of the tyres used in causeway
300
have an upper side wall removed therefrom to enable close packing of fill material therein.
Referring now to
FIGS. 46
to
47
A, a roadway intersection
330
is provided for a downwardly sloping roadway
332
and a horizontal roadway
334
. Each roadway is constructed from two courses of tyres
336
,
337
formed in accordance with the present invention. In this regard, typically each tyre has its upper side wall removed therefrom and is in-filled with a rock or cobble material. In addition, typically the lower course of tyres
337
is wrapped with a geofabric layer
338
to prevent the ingress of finer material therein.
At the intersection of the two roadways, the upper course of tyres
336
is replaced with a concrete slab
340
(typically 200 mm thick) and typically reinforced with a steel mesh
342
(eg. F82 mesh). The slab stabilises the intersection and prevents impact erosion from fluid streams flowing across the intersection (eg. down roadway
332
).
The lower side of roadway
332
is provided with a drainway which has a first section
344
extending across the roadway and a second section
346
extending along a side edge of the roadway. Drainage section
344
is located beneath the first row of tyres in course
336
in the downwardly sloping section of roadway
332
. This row is the first row to receive water flowing off the concrete slab, and thus a significant proportion of the water draining through roadway
332
can be captured in drainage section
344
.
The second drainage section
346
receives fluid from section
344
and terminates in a pump out sump
348
located at the side of the roadway. The sump can be fitted with a suitable pump to pump water away from the roadway. Typically each drainage section is formed from agricultural pipe.
As best seen in
FIG. 47
, each drainway section is surrounded by a drainage region
350
, typically composed of a free draining backfill material (eg. blue metal, rock, cobble etc). As also shown, the geofabric layer extends around region
350
to again prevent the ingress of a finer road-degrading material therein, and which would otherwise cause drain blockage.
Referring now to
FIGS. 48 and 49
, an alternative means for in-filling a tyre with an upper side wall removed therefrom is shown. The tyre
360
has its lower side wall
362
intact but its upper side wall removed therefrom as shown. Two lengths of tyre tread (or conveyor belt)
363
and
364
are arranged within the tyre as shown. Spacer elements
366
(typically formed from small sections of tyre tread) are positioned as shown between the tyre lengths and are joined thereto by pins
367
. The spacer elements maintain a space between adjacent lengths and also between the tyre inner wall.
Fill material
368
(eg. sand, fine rock etc) is then dispersed around the tyre tread lengths as shown, and so the tyre tread lengths provide an additional reinforcing function to the fill material within the tyre. Thus, not only may fill material be compacted within the tyre (by virtue of the upper side wall removal), but it may also be reinforced therewithin, which further enhances the structural integrity of the tyre in any foundation in which it employed.
FIG. 49
shows the tyre of
FIG. 38
in cross section and when located in a foundation structure generally indicated as
370
. A cover layer
372
(eg. a roadway or causeway upper layer, a concrete slab, pavement etc) is provided above the tyre. Optionally, cut tyre side wall
374
(eg. the upper side wall of the tyre) can be placed in/at the lower opening of the tyre to provide support for inner tyre tread length
364
.
Referring now to
FIGS. 50
to
52
, a roadway
380
formed using reinforced tyres
360
is depicted. As previously described, the roadway may be formed from one course only, or one or more additional offset upper courses
382
(shown in dotted outline) can be provided.
Referring to
FIG. 51
, typically a geofabric layer
384
is provided around the lower tyre course, to prevent the ingress of finer material into the tyres (eg. from or via the sand subgrade base
386
).
Referring to
FIG. 52
, a construction similar to
FIG. 51
, but more deeply recessed into surrounding ground G is shown. To stabilise the ground and roadway, a kerb
390
can be provided on both sides of the roadway. Typically the kerb
390
is formed from a pair of folded tyre walls
392
(or optionally a pair of folded tyre treads, or various combinations of walls and treads). The folded walls can be joined by pins
394
(eg. galvanised steel pins). Thus, a kerb and gutter type configuration can be provided with the roadway.
The roadway
380
of
FIGS. 50
to
52
is, in all other respects, similar in construction to the other roadways described herein in more detail.
Referring now to
FIGS. 53 and 54
, an alternative bank protection foundation
400
is shown. The bank protection foundation includes a bank protection mat
402
(eg. a wave mat) having an upper region
404
formed from internally reinforced tyres
406
. The mat also includes a lower region
408
formed from tyre side walls
409
and tyre tread lengths (or conveyor belt lengths)
410
.
The tyres
406
are internally reinforced somewhat similarly to tyre
360
(of FIGS.
48
and
49
). However, in tyres
406
, a stack
412
of tyre side walls is arranged within each tyre, to be virtually flush with the upper opening of each tyre (ie. the opening that results from the removal of the tyre upper side wall). In addition, a spiral coil
414
of tyre tread length (or conveyor belt length) is arranged within the side wall stack
412
.
In one preferred arrangement the length
410
can extend from the uppermost (horizontal) tyre
406
′ and right throughout the mat
402
to lowermost tyre side wall
409
′. Length
410
also provides a support (similar to cut tyre side walls
374
in
FIGS. 48 and 49
) for the spiral coil
414
. The length also greatly enhances the unitary structure of mat
402
.
As best seen in
FIG. 53
, spiral coils
416
of tyre tread (or conveyor belt) can also be provided in the space between four adjacent tyres as shown. Coils
416
have a tendency to unwind and thus put pressure on the adjacent tyres. This has the effect of tensioning up the entire mat structure, thus enhancing its unitary configuration. The coils also enhance any wave force absorption when adjacent tyres are impacted upon.
Uppermost tyre
406
′ is located adjacent to a concrete edging (eg. pathway)
418
, and is pinned there against by an upper anchor pin
420
. Similarly, the lowermost tyre
406
″ is pinned in positioned by lower anchor pin
421
.
Typically the tyres
406
are in-filled with a rock or cobble material, and a plastic membrane
422
(eg. PVC sheet) is arranged under the upper region
404
to prevent water from passing through the mat, and enabling it to drain down into the lower region
408
(and thus back into the adjacent water body). The more open configuration of the lower region
408
also enables water to drain therethrough (eg. water that has flowed down out of the upper region).
A geofabric layer
424
is provided under the plastic membrane, again to prevent the ingress of finer material into the mat construction. It may also be wrapped around and fastened to the entire mat (eg. by fastening pins, clamps etc).
Typically the tyres in mat
402
are all pinned together (eg. using galvanised pins or clamps, nuts and bolts etc) and the lengths
410
and coils
416
are also typically pinned to the tyres
406
and the tyre side walls
409
.
Referring now to
FIGS. 55
to
58
, a foundation in the form of a silt trap unit
430
is depicted. In
FIG. 58
, an exposed form of a silt trap unit
430
is shown at the end of the drainage channel
432
, the silt trap unit being located at the terminus of the drainage channel to drain
434
. In use, the unit is typically covered (buried) by a fill/drainage material such as sand, rock or similar and is optionally wrapped in a porous geofabric layer (to prevent the ingress of fine material).
In
FIGS. 55
to
57
, six silt trap units are arranged at the terminus of a larger drainage channel or causeway
436
, terminating at drain
438
(eg. a concrete pit).
Each silt trap unit
430
includes three tyres
440
(having an upper side wall removed therefrom) and joined together. The unit is further integrated by wrapping around the three tyres and fastening thereto tyre tread lengths (or conveyor belt lengths)
442
as shown.
In construction of the silt trap drain, the ground G adjacent to the drain is excavated, and the silt trap units are laid therein. Typically the silt trap(s) are also laid on (or wrapped in) a geofabric layer
444
prior to being laid in the excavated site and filled. The silt traps are then filled (and are typically covered) with a fill material (eg. sand, fine or coarse grade rock, blue metal or cobble etc) and parts of the silt trap may then be recovered by the ground G (as best shown in FIGS.
55
and
56
), providing a slope into the traps.
The silt traps are filled to have a natural drainage capacity, more so than the surrounding ground, and thus any fluid born solids (silt) in water that is flowing down through the drainage channel or causeway and over the silt traps, can be deposited and thus trapped in the silt trap. This helps to minimise or eliminate drain blockage with silt. The silt traps can be periodically cleaned if necessary.
Referring now to
FIG. 59
, a foundation in the form of alternative silt trap unit
450
is shown, arranged at the terminus of V-drainway
452
to drain
454
. The unit is surrounded by tyre tread lengths (or conveyor belt)
456
and again is typically wrapped in a porous layer (such as geofabric textile). However, rather than employing only whole tyres (each with an upper side wall removed therefrom) the unit includes both whole tyres
440
and half tyres
458
(both still having an upper side wall removed therefrom).
Each half tyre defines an individual silt catchrnent region, with the curve of the half tyre facing the oncoming fluid flow down drain
452
. Thus an enhanced (doubled) trapping function (over the unit
430
) is provided by unit
450
.
In all other respects, the unit
450
can be constructed and positioned in place as per the units
430
of
FIGS. 55
to
58
.
The general steps involved in construction of, for example, a roadway or drainage floor will now be outlined for illustrative purposes only.
1. Minimal (if any) site excavation is conducted depending on the sub-base stability and requirement for excavating trenches in providing edge support.
2. Geofabric cloth or another suitable porous sheet is laid at the location of the roadway or drainage floor with excess geofabric provided on opposing sides of the roadway or drainage floor to allow for wrapping of the-geofabric about at least the lower mattress of tyres.
3. The lower mattress of tyres (typically already having the upper sidewall removed therefrom) is located on the geofabric and a suitable fill material, preferably relatively coarse aggregate, is spread between and through the tyres of the lower mattress and is typically then compacted.
4. The excess geofabric is wrapped over an upper surface of the lower mattress thereby enveloping the tyres of the lower mattress together with the bed of rock aggregate.
5. An upper layer of tyres (again having the upper sidewall removed) is located upon and in a staggered relationship relative to the lower mattress of tyres. The upper layer can also be located on a geofabric cloth or porous sheet, optionally with excess cloth being provided for upper layer wrapping.
6. The upper mattress of tyres is in-filled with the relatively coarse aggregate material and is typically then compacted. Usually surplus aggregate is provided so as to form a layer of aggregate above the upper mattress of tyres.
The applicant has conducted tests on roadways and similar foundations constructed in accordance with the steps described above. The preliminary tests involved passing a laden truck of approximately
21
tonne across both a single and two-layered tyre mattress similar to that described. The foundation was constructed on a sub-base with no preparation having a relatively high level of saturation. The foundation showed no signs of degeneration or any associated problems during the testing.
Now that several preferred embodiments of the present invention have been described in some detail it will be apparent to those skilled in the art that the foundations described, and associated methods of construction, have at least the following advantages:
1. The foundation can be constructed with limited sub-base preparation eliminating the need for relatively heavy earthmoving machinery;
2. The foundation has one or more layers of tyres together with a suitable fill material and is thus well suited to construction upon relatively unstable or saturated ground;
3. The positioning of a layer porous to water but impervious to finer grade material under the lowermost layer enhances the life of the foundation, and minimises fill degradation (due to the ingress of relatively finer material);
4. The foundation is relatively inexpensive and simple to construct whilst requiring minimal maintenance; and
5. The foundation disposes of and utilises efficiently waste and used tyres, conveyor belts, and other waste materials (which otherwise represent an environmental hazard).
Those skilled in the art will appreciate that the invention described herein is susceptible to variations and modifications other than those specifically described. For example, the foundation may be formed from one or more tyre layers depending largely on the ground stability and loading requirements. The fill material may alone provide sufficient drainage capacity to avoid silting of the fill material bed.
Construction of the various foundation arrangements may vary in specific detail whilst remaining within the scope of the present invention. For example, the lowermost layer or mattress of tyres may be laid upon a bed of tyre sidewalls, rather than directly upon the ground/sub-base or geofabric cloth, which bed can provide added stability to an otherwise relatively unstable or saturated sub-base. Those sidewalls may also be tied together (similar to those techniques described above). The drainage floor, wave banks etc may be extended to include a single or multi-layered tyre mattress extending up the embankment. A silt barrier formed of one or more tyre layers extending transversely across the drainage floor together with a throughgoing pipe may also be provided to remove silt flowing along the drainage floor. The silt barrier can function in the same way as a “berm” with the silt barrier tyres being located upon and the throughgoing pipe passing through a bed of stone provided on the drainage floor.
Of course tyres from any vehicle type can be employed in the various foundations in accordance with the present invention including car, truck, tractor, fourwheel drive automobiles, etc.
All such variations and modifications are to be considered within the scope of the present invention, which can be embodied in many other forms.
Claims
- 1. A foundation comprising one or more layers of tires including a lowermost layer being located adjacent to the ground, and a fill material having a preselected grade provided within tires of each of the layers, wherein at least the lowermost layer has a porous sheet positioned thereunder which is adapted for allowing the passage of water through the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer.
- 2. A foundation as claimed in claim 1 wherein the lowermost layer is at least partly enclosed by the porous sheet.
- 3. A foundation as claimed in claim 1 or claim 2 wherein at least some of the tires have a side wall removed therefrom.
- 4. A foundation as claimed in claim 3 wherein all tires have their upper sidewall removed therefrom, and fill introduced therein is compacted in each layer and in each tire.
- 5. A foundation as claimed in claim 1 wherein the tires within each of the layers are laid generally horizontally and are located adjacent to one another in a fixed array, with each of the layers in conjunction with the fill material forming a tire mattress.
- 6. A foundation as claimed in claim 5 wherein at least two layers of tires are provided, and wherein each tire in each layer has a sidewall removed therefrom so that the tires can be oriented to be generally upwardly open in use to receive the fill material therein.
- 7. A foundation as claimed in claim 5 wherein the layers of tires or tire mattresses are offset with respect to adjacent layers to provide distribution of the load between adjacent tires.
- 8. A foundation as claimed in claim 7, wherein one tire in one layer overlays up to four tires in an underlying adjacent layer.
- 9. A foundation as claimed in claim 1 wherein the porous sheet is a geofabric textile layer allowing the passage of water through the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer.
- 10. A foundation as claimed in claim 1 wherein the fill material is a rock aggregate or cobble of a relatively coarse grade.
- 11. A foundation as claimed claim 1 further comprising an edge support structure that is located on opposing sides of at least an uppermost layer of the layers of tires, wherein the support structure is adapted to inhibit lateral movement of the tires.
- 12. A foundation as claimed in claim 11, wherein the edge support structure includes a row of support tires located alongside and coupled via a link structure to at least one side of the uppermost layer of tires.
- 13. A foundation as claimed in claim 12, wherein the link structure includes a series of lateral tie elements each linking one of the support tires to an adjacent tire of the uppermost layer and a longitudinal link element interconnecting the tie elements.
- 14. A foundation as claimed in claim 13, wherein the lateral tie elements and longitudinal link elements are constructed of tire tread connected end-to-end, or are constructed of conveyor belt material.
- 15. A foundation as claimed in claim 1, further comprising a series of drainage tires located adjacent to one another within a trench excavated underneath the lowermost layer of tires, with a drainage fill material being provided within or between the drainage tires.
- 16. A foundation as claimed in claim 15, wherein one or more drainage channels extend from the trench so as to drain water away therefrom.
- 17. A foundation as claimed in claim 1 wherein at least some of the tires within the foundation have tire portions arranged therewithin as additional reinforcement.
- 18. A foundation as claimed in claim 17, wherein, in addition to fill material, each tire has upper sidewall removed therefrom and has one or more coiled tire treads arranged therewithin, or a stack of tire sidewalls arranged therewithin, or combinations thereof.
- 19. A foundation as claimed in claim 1 wherein each tire employed has an intact tread portion.
- 20. A foundation as claimed in claim 19 wherein, when the foundation is employed in drains, drainage channels and, silt traps, and, part tires are also or optionally employed.
- 21. A foundation as claimed in claim 20, wherein each part tire is half a tire but still has an upper side wall removed therefrom.
- 22. A foundation as claimed in claim 20 that is formed by arranging a single lengthwise row of tires, and by wrapping the row with at least one length of tire tread or conveyor belt to form an integrated and portable unit.
- 23. A foundation as claimed in claim 22, wherein each layer further includes at least one unit, each unit having three tires arranged end-to-end, each with an upper sidewall removed therefrom, and with said at least one length of tire tread or conveyor belt extending around and joined to the tires.
- 24. A foundation as claimed claim 1 that is provided within:a road; ground or sub base in sand and wetlands; a drainage way, course or channel; a railway track base; a mining road or tunnel; a ramp, slope or mat adjacent to lakes, rivers creeks, oceans; a wave dissipation or breakwater wall; a waste cell pit; a stockpile base or pavement; or a silt trap.
- 25. A method of constructing on ground a foundation as defined in claim 1 including the steps of:forming one or more layer of tires including a lowermost layer; positioning on the ground a porous sheet which is adapted for allowing the passage of water through the lowermost layer whilst preventing the ingress of matter of a grade finer than the fill material into the lowermost layer; locating the lowermost layer on the porous sheet adjacent to the ground; and filling within tires of each of the layers with the fill material.
Priority Claims (3)
Number |
Date |
Country |
Kind |
PP5836 |
Aug 1998 |
AU |
|
PQ1575 |
Dec 1998 |
AU |
|
PQ0454 |
Apr 1999 |
AU |
|
PCT Information
Filing Document |
Filing Date |
Country |
Kind |
PCT/AU99/00640 |
|
WO |
00 |
Publishing Document |
Publishing Date |
Country |
Kind |
WO00/08265 |
2/17/2000 |
WO |
A |
US Referenced Citations (10)
Foreign Referenced Citations (6)
Number |
Date |
Country |
1000695 |
Jul 1995 |
AU |
2643400 |
Aug 1990 |
FR |
7706564 |
Dec 1978 |
NL |
2403455 |
Sep 1995 |
RU |
2060610 |
May 1996 |
RU |
1312130 |
May 1987 |
SU |