Ultrasonic flow check systems for wellbores

Information

  • Patent Grant
  • 12276190
  • Patent Number
    12,276,190
  • Date Filed
    Wednesday, February 16, 2022
    3 years ago
  • Date Issued
    Tuesday, April 15, 2025
    6 months ago
Abstract
An ultrasonic flow check system for wellbores includes an ultrasonic transceiver installed within an inner surface of a bell nipple attached to a well head of a wellbore at a surface. The bell nipple receives wellbore fluid from a flow line attached to a side surface of the bell nipple. An alarm is installed on a rotary table installed above the bell nipple such that the bell nipple is between the rotary table and the well head. A ultrasonic signal is caused to be transmitted, by the ultrasonic transceiver, into the bell nipple. The ultrasonic signal is reflected by the wellbore fluid within the bell nipple resulting in an ultrasonic response signal. The ultrasonic response signal is caused to be received by the ultrasonic transceiver. Based on the ultrasonic response signal, it is determined whether the fluid level within the bell nipple is static or mobile.
Description
TECHNICAL FIELD

This disclosure relates to wellbore management, and particularly to performing flow check within a wellbore.


BACKGROUND

Wellbores are formed in subterranean zones (a formation, a portion of a formation or multiple formations) to produce hydrocarbons entrapped in the subterranean zones to the surface. When forming wellbores or when operating wellbores, the stability of well conditions is periodically checked. Flow check is one such stability test in which a fluid level within a wellbore is monitored. Often, a flow check is a manual operation performed by an operator who visually inspects fluid levels within the wellbore.


SUMMARY

This disclosure describes an ultrasonic flow check systems for wellbores.


Certain aspects of the subject matter described here can be implemented as a well tool system. The system includes a bell nipple attached to a well head of a wellbore at a surface. A rotary table is installed above the bell nipple such that the bell nipple is between the rotary table and the well head. A flow line is attached to a side surface of the bell nipple such that the flow line is between the rotary table and the well head. The flow line can permit flow of wellbore fluid into the bell nipple. An ultrasonic transceiver is attached to an inner surface of the bell nipple. The ultrasonic transceiver can transmit ultrasonic signals and receive ultrasonic response signals generated responsive to a reflection of the ultrasonic signals. An alarm is installed on the rotary table. The alarm is operatively coupled to the ultrasonic transceiver. A control system is operatively coupled to the ultrasonic transceiver and the alarm. The control system includes one or more computers, and a computer-readable medium (e.g., a non-transitory computer-readable medium) storing instructions executable by the one or more computers to perform operations. The operations include sending an instruction to the ultrasonic transceiver to transmit an ultrasonic signal into the bell nipple. The operations include receiving a signal from the ultrasonic transceiver. The received signal is representative of an ultrasonic response signal received by the ultrasonic transceiver responsive to a reflection of the transmitted ultrasonic signal by a wellbore fluid within the bell nipple. The ultrasonic response signal represents a fluid level of the wellbore fluid within the bell nipple. The operations include determining, based on the transmitted ultrasonic signal and the received ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile.


An aspect combinable with any other aspect can include the following features. The control system is installed on the rotary table.


An aspect combinable with any other aspect can include the following features. The alarm includes a visual alarm.


An aspect combinable with any other aspect can include the following features. The alarm includes an audible alarm.


An aspect combinable with any other aspect can include the following features. The transmitted ultrasonic signal is an ultrasonic status signal. Before sending the instructions to the ultrasonic transceiver to transmit the ultrasonic status signal, the operations include sending an instruction to the ultrasonic transceiver to transmit an ultrasonic test signal into the bell nipple. The operations include receiving a signal from the ultrasonic transceiver. The received signal is representative of an ultrasonic response-to-status signal received by the ultrasonic transceiver responsive to a reflection of the ultrasonic test signal by the wellbore fluid within the bell nipple. The operations include determining, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal.


An aspect combinable with any other aspect can include the following features. To determine, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal, the operations include determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches a threshold fluid level.


An aspect combinable with any other aspect can include the following features. The operations include, in response to determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches the threshold fluid level, triggering the visual alarm.


An aspect combinable with any other aspect can include the following features. The operations include, after receiving the signal from the ultrasonic transceiver, which is representative of the ultrasonic response signal received by the ultrasonic transceiver responsive to the reflection of the transmitted ultrasonic signal by the wellbore fluid within the bell nipple, determining that the fluid level within the bell nipple is mobile. In response to determining that the fluid level within the bell nipple is mobile, the operations include triggering the audible alarm.


An aspect combinable with any other aspect can include the following features. To determine, based on the transmitted ultrasonic signal and the received ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile, the operations include determining whether a magnitude of the ultrasonic response signal remains constant over time or varies over time.


An aspect combinable with any other aspect can include the following features. The operations include determining that the magnitude of the ultrasonic response signal remains constant over time. In response to determining that the magnitude of the ultrasonic response signal remains constant over time, the operations include not triggering the alarm.


An aspect combinable with any other aspect can include the following features. The operations include determining that the magnitude of the ultrasonic response signal varies over time. In response to determining that the magnitude of the ultrasonic response signal varies over time, the operations include triggering the alarm.


Certain aspects of the subject matter described here can be implemented as a method. An ultrasonic transceiver is installed within an inner surface of a bell nipple attached to a well head of a wellbore at a surface. The bell nipple receives wellbore fluid from a flow line attached to a side surface of the bell nipple. An alarm is installed on a rotary table installed above the bell nipple such that the bell nipple is between the rotary table and the well head. A ultrasonic signal is caused to be transmitted, by the ultrasonic transceiver, into the bell nipple. The ultrasonic signal is reflected by the wellbore fluid within the bell nipple resulting in an ultrasonic response signal. The ultrasonic response signal is caused to be received by the ultrasonic transceiver. Based on the ultrasonic response signal, it is determined whether the fluid level within the bell nipple is static or mobile.


An aspect combinable with any other aspect can include the following features. The transmitted ultrasonic signal is an ultrasonic status signal. Before transmitting the ultrasonic status signal, the ultrasonic transceiver is caused to transmit an ultrasonic test signal into the bell nipple. The ultrasonic transceiver is caused to receive an ultrasonic response-to-status signal responsive to a reflection of the ultrasonic test signal by the wellbore fluid within the bell nipple. Based on the ultrasonic test signal and the ultrasonic response-to-status signal, it is determined that the fluid level is ready to be determined by transmitting the ultrasonic status signal.


An aspect combinable with any other aspect can include the following features. To determine, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal, it is determined that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches a threshold fluid level.


An aspect combinable with any other aspect can include the following features. In response to determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches the threshold fluid level, the visual alarm is triggered.


An aspect combinable with any other aspect can include the following features. After determining that the fluid level is ready to be determined by transmitting the ultrasonic status signal, it is determined that the fluid level within the bell nipple is mobile. In response to determining that the fluid level within the bell nipple is mobile, the audible alarm is triggered.


An aspect combinable with any other aspect can include the following features. To determine, based on the ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile, it is determined whether a magnitude of the ultrasonic response signal remains constant over time or varies over time.


An aspect combinable with any other aspect can include the following features. It is determined that the magnitude of the ultrasonic response signal remains constant over time. In response to determining that the magnitude of the ultrasonic response signal remains constant over time, the alarm is not triggered.


An aspect combinable with any other aspect can include the following features. It is determined that the magnitude of the ultrasonic response signal varies over time. In response to determining that the magnitude of the ultrasonic response signal varies over time, the alarm is triggered.


The details of one or more implementations of the subject matter described in this specification are set forth in the accompanying drawings and the description below. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.





BRIEF DESCRIPTION OF THE DRAWINGS


FIG. 1 is a schematic diagram of an example of an ultrasonic flow check system installed within a wellbore bell nipple.



FIGS. 2A-2C are schematic diagrams of the ultrasonic flow check system of FIG. 1 in operation.



FIG. 3 is a flowchart of an example of a method of operating the ultrasonic flow check system of FIG. 1.





Like reference numbers and designations in the various drawings indicate like elements.


DETAILED DESCRIPTION

A flow check operation is performed by stopping wellbore operations (e.g., drilling, tripping, circulating or similar wellbore operations) and by monitoring to see if the wellbore is static or mobile (i.e., not static). The flow check operation is performed to ensure that the wellbore is stable. A manual flow check operation is performed by an operator who visually observes (sometimes with a flashlight) the wellbore fluid from a rig floor. In particular, the operator observes the wellbore fluid level within a bell nipple, which is a section of a large diameter tubular fitted to the top of the blowout preventers. If the wellbore fluid level is static in the bell nipple, then the operator concludes that the wellbore itself is static.


This disclosure describes an ultrasonic flow check system deployed to use ultrasonic signals to perform the flow check operation. Implementing the techniques described in this disclosure can yield accurate flow check results, which are sometimes better than the results of a manual flow check by a human operator. The techniques can prevent wellbore incidents such as blow out. Also, the techniques can warn an operator by sound and light in case the operator fails to detect blow out.



FIG. 1 is a schematic diagram of an example of an ultrasonic flow check system installed within a wellbore bell nipple. The ultrasonic flow check system is a well tool system that is deployed to perform a flow check operation as described below. The ultrasonic flow check system is deployed in a wellbore 100 formed from a surface 100 of the Earth and extending into a subterranean zone (not shown). A well head 104 is installed at the surface 102 at the inlet to the wellbore 102. The well head 104 includes flow components (e.g., spools, valves, and similar components) operated to control pressure in the wellbore 100. A blow out preventer 106 is installed above the well head 104 such that the well head 104 is between the blow out preventer 106 and the surface 102. The blow out preventer 106 includes a valve at the top of the wellbore 102 to allow an operator to close the wellbore 102 upon loss of control of wellbore fluids flowing through the wellbore 102.


A bell nipple 108 is attached to the well head 104, particularly to the top of the blow out preventer 106. The bell nipple 108 is an elongated hollow tubular defining an interior volume. A flow line 110 is attached to the bell nipple 108. Specifically, an inlet to the flow line 110 is attached to a side, circumferential surface 112 of the bell nipple 108. An outlet of the flow line 110 leads to wellbore equipment installed at the surface 102, such as shale shakers and mud tanks (not shown). In operation, wellbore fluid (e.g., drilling fluid, production fluid or similar wellbore fluid) flows through the wellbore 100, through the well head 104, through the blow out preventer 106, through the bell nipple 108 and into the flow line 10.


A rotary table 114 is installed above the bell nipple 108 such that the bell nipple 108 is between the rotary table 114 and the well head 104. In some implementations, the ultrasonic flow check system is installed partly within the bell nipple 108 and partly on the rotary table 114. The ultrasonic flow check system includes an ultrasonic transceiver 116 attached to an inner surface 118 of the bell nipple 108. The ultrasonic transceiver 116 is configured to transmit ultrasonic signals and receive ultrasonic response signals generated responsive to a reflection of the ultrasonic signals. In some implementations, the ultrasonic transceiver 116 is attached near an upper end of the bell nipple 108 and is arranged such that the transceiver 116 transmits ultrasonic signals downward into the bell nipple and receives ultrasonic response signals flowing upward. By this arrangement, the ultrasonic transceiver 116 can transmit ultrasonic signals onto a surface of a wellbore fluid within the bell nipple 108 and receive ultrasonic response signals reflected at the surface of the wellbore fluid within the bell nipple 108.


The ultrasonic flow check system also includes an alarm 120 operatively coupled to the ultrasonic transceiver 116. In some implementations, the alarm 120 is installed on the rotary table 114. Alternatively, the alarm 120 can be installed on other wellbore equipment or at a location away from the wellbore 100 or wellbore equipment. In some implementations, the ultrasonic transceiver 116 and the alarm 120 are operatively coupled by wired connections. Alternatively, the connections can be wireless allowing the alarm 120 to be located at locations remote from the wellbore 100. In some implementations, the alarm 120 includes a visual alarm, e.g., a light, that turns on or off responsive to instructions. In some implementations, the alarm 120 includes an audible alarm, e.g., a speaker or other audio-producing device, that produces an audible sound responsive to instructions. In some implementations, the alarm 120 can include the visual alarm and the audible alarm.


In some implementations, the ultrasonic flow check system includes a control system 122 (or controller) that is operatively coupled (e.g., via wired or wireless connections) to the ultrasonic transceiver 116 and the alarm 120. For example, the control system 122 can be implemented as one or more computer systems and a computer-readable medium (e.g., non-transitory computer-readable medium) storing instructions executable by the one or more computers to perform operations, such as a flow check operation. Alternatively or in addition, the control system 122 can be implemented as processing circuitry, firmware, software, hardware or a combination of any of them. In some implementations, the control system 122 is a component of the ultrasonic transceiver 116 and resides in the same housing as the ultrasonic transceiver 116. Alternatively, the control system 122 can be a separate unit residing elsewhere, e.g., on the rotary table 122.


In operation, the operator decides to perform a flow check operation and ceases all flow through the wellbore 100. For example, if the operator is drilling the wellbore 100, then the operator can stop operation of the drilling equipment. In another example, if the operator is producing through the wellbore 100, then the operator can stop operation of any pumps or close flow control valves. Once flow through the wellbore 100 has ceased, the wellbore fluid rises to a location within the bell nipple 108. Once flow through the wellbore 100 has stopped, if the wellbore 100 is static, then the wellbore fluid levels within the wellbore 100 should be unchanged, i.e., the wellbore fluid levels should remain static. If the wellbore fluid levels are not static (i.e., the wellbore fluid level is mobile), then the wellbore 100 is unstable and remedial operations need to be initiated.


In some implementations, the operator can operate the control system 122 to perform the flow check operation. For example, in response to an instruction (e.g., a digital signal) from the operator (e.g., in response to being turned on), the control system 122 can send an instruction to the ultrasonic transceiver 116 to transmit an ultrasonic signal into the bell nipple 108. In response to receiving the instruction, the ultrasonic transceiver 116 generates and transmits an ultrasonic signal which travels downward into the bell nipple 108. The ultrasonic signal reflects on the surface of the wellbore fluid within the bell nipple 108 and produces an ultrasonic response signal, which travels upward toward the ultrasonic transceiver 116. Because the ultrasonic response signal is generated responsive to a reflection at a surface of the wellbore fluid within the bell nipple 108, the ultrasonic response signal represents a fluid level of the wellbore fluid within the bell nipple 108. The ultrasonic transceiver 116 receives the ultrasonic response signal and generates a signal (e.g., a digital signal) that is representative of the ultrasonic response signal. For example, a magnitude of the signal generated by the ultrasonic transceiver 116 can be directly proportional to a magnitude of the ultrasonic response signal. The control system 122 receives the signal and, using the signal, determines if the fluid level within the bell nipple 108 is static or mobile. In this manner, the ultrasonic flow check system determines whether the fluid level within the bell nipple 108 is static or mobile based on the ultrasonic signal transmitted into the bell nipple 108 and the ultrasonic response signal received responsive to a reflection of the transmitted ultrasonic signal on the surface of the wellbore fluid within the bell nipple 108.



FIGS. 2A-2C are schematic diagrams of the ultrasonic flow check system of FIG. 1 in operation. FIG. 2A is a schematic diagram of an example in which the wellbore fluid level is static (i.e., flow check is negative), and no alarm is triggered. In operation, the ultrasonic transceiver 116 generates and continuously transmits an ultrasonic signal downward and into the bell nipple 108 toward the wellbore fluid in the bell nipple 108. The ultrasonic signal reflects on the surface of the wellbore fluid in the bell nipple 108 and generates an ultrasonic response signal. The ultrasonic transceiver 116 receives the ultrasonic response signal. The ultrasonic transceiver 116 generates a digital signal representative of the ultrasonic response signal. Because the wellbore fluid level is static, the magnitude of the ultrasonic response signal (and consequently the magnitude of the digital signal) does not change over time. Specifically, any change in the magnitude of the signal over time is less than a threshold value. Upon determining that the magnitude of the digital signal does not change over time, the control system 122 (FIG. 1) does not trigger the alarm 120.


In some implementations, the visual alarm (e.g., a light bulb) included in the alarm 120 can be turned off when the ultrasonic transceiver 116 transmits and receives the ultrasonic signals, and the control system 122 processes the digital signals received from the ultrasonic transceiver 116. Upon determining that the magnitude of the signals does not change over time, the control system 122 can transmit a signal to turn on the visual alarm (i.e., turn on the light bulb). The visual alarm being turned on can communicate to the wellbore operator that the wellbore fluid levels are static.


In some implementations, the visual alarm (e.g., the light bulb) included in the alarm 120 can be turned on when the ultrasonic transceiver 116 transmits and receives the ultrasonic signals, and the control system 122 processes the digital signals received from the ultrasonic transceiver 116. Upon determining that the magnitude of the signals does not change over time, the control system 122 can transmit a signal to turn off the visual alarm (i.e., turn off the light bulb). The visual alarm being turned off can communicate to the wellbore operator that the wellbore fluid levels are static.



FIG. 2B is a schematic diagram of an example in which the fluid level in the bell nipple 108 is tested to determine if the flow check operation can be commenced. After the wellbore operations have been ceased and perform the flow check operation is performed, the wellbore fluid level needs to settle to a location within the bell nipple 108. The ultrasonic flow check system can test if the wellbore fluid has settled to that location before performing the flow check operation. To do so, in some implementations, the visual alarm (e.g., the light bulb) is turned off. Then, the controller 122 can send an instruction to the ultrasonic transceiver 116 in response to which the ultrasonic transceiver 116 can transmit an ultrasonic status signal into the bell nipple 108. The ultrasonic test signal reflects on the surface of the wellbore fluid within the bell nipple 108 and generates an ultrasonic response-to-status signal, which is representative of a depth of the wellbore fluid within the bell nipple 108. The ultrasonic response-to-status signal travels upwards toward the ultrasonic transceiver 116. Upon receiving the ultrasonic response-to-status signal, the ultrasonic transceiver 116 generates a digital signal that is representative of the ultrasonic response-to-status signal. Thus, the digital signal also represents the depth of the wellbore fluid within the bell nipple 108. The controller 122 can store a threshold fluid level (i.e., a threshold depth) at which the wellbore fluid should reside within the bell nipple 108 to commence the flow check operation. If the depth of the wellbore fluid represented by the digital signal received from the ultrasonic transceiver matches the threshold depth stored by the control system 122 (FIG. 1), then the controller 122 can determine that the flow check operation can be commenced. In such a situation, the controller 122 can transmit a signal to turn on the visual alarm to communicate to the wellbore operator that the flow check operation can be commenced.



FIG. 2C is a schematic diagram of an example in which the wellbore fluid level is mobile (i.e., flow check is positive), and the alarm is triggered. The sequence of operations implemented to perform the flow check operation are the same as those described above with reference to FIG. 2B. However, in this example, the wellbore fluid level within the bell nipple 108 is not static. That is, the fluid level is rising or falling within the bell nipple 108 indicating that the wellbore 100 is unstable. In such situations, because the fluid level within the bell nipple 108 is rising or falling, a magnitude of the ultrasonic response signal varies over time, and, in turn, a magnitude of the digital signal received by the controller 122 varies over time. Specifically, any change in the magnitude of the signal over time is greater than a threshold value. Upon determining that the magnitude of the digital signal changes over time, the control system 122 (FIG. 1) triggers the alarm 120. For example, if the visual alarm was turned off when performing the flow check operation, the control system 122 (FIG. 1) can turn on the visual alarm (i.e., turn on the light bulb). If the visual alarm was turned on when performing the flow check operation, the control system 122 (FIG. 1) can turn off the visual alarm.


If the visual alarm was turned on when performing the flow check operation and a status operation was performed to determine if the flow check operation can be performed (as described above with reference to FIG. 2B), then the visual alarm would have been turned on when performing the flow check operation. In such examples, upon determining that the magnitude of the digital signal changes over time (i.e., the flow check operation is positive), the control system 122 (FIG. 1) can further turn on the audible alarm. A triggering of the visual alarm and the audible alarm can communicate to the wellbore operator that the flow check operation was positive. In response, the wellbore operator can implement remedial operations, such as closing the blow out preventer 106 (FIG. 1).



FIG. 3 is a flowchart of an example of a method 300 of operating the ultrasonic flow check system of FIG. 1. Certain portions of the method can be implemented by a wellbore operator. Other portions of the method can be implemented by one or more components of the ultrasonic flow check system described above with reference to FIG. 1.


At 300, an ultrasonic transceiver (e.g., ultrasonic transceiver 116) is installed within an inner surface of a bell nipple (e.g., bell nipple 108) attached to a well head of a wellbore at a surface. The bell nipple receives wellbore fluid from a flow line attached to a side surface of the bell nipple.


At 304, an alarm is installed on a rotary table (e.g., rotary table 114) installed above the bell nipple such that the bell nipple is between the rotary table and the well head. The alarm can include a visual alarm (e.g., a light bulb) and an audible alarm (e.g., a speaker or siren).


At 306, an ultrasonic signal is caused to be transmitted by the ultrasonic transceiver. To do so, for example, a control system (e.g., control system 122) can send an instruction to the ultrasonic transceiver in response to which the ultrasonic transceiver transmits the ultrasonic signal into the bell nipple. The ultrasonic signal is reflected by the wellbore fluid within the bell nipple resulting in an ultrasonic response signal. The ultrasonic transceiver receives the ultrasonic response signal.


At 308, a flow check operation is performed based on the transmitted ultrasonic signal and the received ultrasonic response signal. For example, the ultrasonic signal is transmitted into the bell nipple for a duration of time, either continuously or as periodic bursts. If the fluid level is static, then the distance traveled by the ultrasonic signal and the ultrasonic response signal remains the same over the duration of time. Consequently, a magnitude of the ultrasonic response signal remains constant for the duration of time (i.e., a difference between the magnitudes of the ultrasonic response signals received over the duration remains less than a threshold). Because the control system converts the ultrasonic response signal into a digital signal, a constant ultrasonic response signal results in a constant digital signal as well (i.e., i.e., a difference between the magnitudes of the digital signals received over the duration remains less than a threshold). A constant digital signal indicates that the wellbore fluid level is static and the flow check operation is negative. The alarm need not be triggered because the flow check operation is negative.


In contrast, if the fluid level is moving (e.g., rising) within the bell nipple 108, then the distance traveled by the ultrasonic signal and the ultrasonic response signal changes over the duration of time. Consequently, a magnitude of the ultrasonic response signal changes for the duration of time (i.e., a difference between the magnitudes of the ultrasonic response signals received over the duration exceeds a threshold). Because the control system converts the ultrasonic response signal into a digital signal, a changing ultrasonic response signal results in a changing digital signal as well (i.e., i.e., a difference between the magnitudes of the digital signals received over the duration exceeds a threshold). A changing digital signal indicates that the wellbore fluid level is not static (i.e., the fluid level is mobile), and the flow check operation is positive. The alarm can be triggered because the flow check operation is positive.


In some implementations, the alarm can be triggered in stages. For example, the visual alarm can be triggered when the flow check operation is performed and the audible alarm can be further triggered if the flow check operation is positive.


Thus, particular implementations of the subject matter have been described. Other implementations are within the scope of the following claims. In some cases, the actions recited in the claims can be performed in a different order and still achieve desirable results.

Claims
  • 1. A well tool system comprising: a bell nipple attached to a well head of a wellbore at a surface;a rotary table installed above the bell nipple such that the bell nipple is between the rotary table and the well head;a flow line attached to a side surface of the bell nipple such that the flow line is between the rotary table and the well head, the flow line configured to permit flow of wellbore fluid into the bell nipple;an ultrasonic transceiver attached to an inner surface of the bell nipple, the ultrasonic transceiver configured to transmit ultrasonic signals and receive ultrasonic response signals generated responsive to a reflection of the ultrasonic signals;an alarm installed on the rotary table, the alarm operatively coupled to the ultrasonic transceiver; anda control system operatively coupled to the ultrasonic transceiver and the alarm, the control system comprising: one or more computers, anda non-transitory computer-readable medium storing instructions executable by the one or more computers to perform operations comprising: sending an instruction to the ultrasonic transceiver to transmit an ultrasonic signal into the bell nipple,receiving a signal from the ultrasonic transceiver, the received signal representative of an ultrasonic response signal received by the ultrasonic transceiver responsive to a reflection of the transmitted ultrasonic signal by a wellbore fluid within the bell nipple, wherein the ultrasonic response signal represents a fluid level of the wellbore fluid within the bell nipple, anddetermining, based on the transmitted ultrasonic signal and the received ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile by determining whether a magnitude of the ultrasonic response signal remains constant over time or varies over time.
  • 2. The well tool system of claim 1, wherein the control system is installed on the rotary table.
  • 3. The well tool system of claim 1, wherein the alarm comprises a visual alarm.
  • 4. The well tool system of claim 3, wherein the alarm comprises an audible alarm.
  • 5. The well tool system of claim 4, wherein the transmitted ultrasonic signal is an ultrasonic status signal, wherein the operations comprise: before sending the instruction to the ultrasonic transceiver to transmit the ultrasonic status signal, sending an instruction to the ultrasonic transceiver to transmit an ultrasonic test signal into the bell nipple;receiving a signal from the ultrasonic transceiver, the received signal representative of an ultrasonic response-to-status signal received by the ultrasonic transceiver responsive to a reflection of the ultrasonic test signal by the wellbore fluid within the bell nipple; anddetermining, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal.
  • 6. The well tool system of claim 5, wherein determining, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal comprises determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches a threshold fluid level.
  • 7. The well tool system of claim 6, wherein the operations comprise, in response to determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches the threshold fluid level, triggering the visual alarm.
  • 8. The well tool system of claim 7, wherein the operations comprise: after receiving the signal from the ultrasonic transceiver, the received signal representative of the ultrasonic response signal received by the ultrasonic transceiver responsive to the reflection of the transmitted ultrasonic signal by the wellbore fluid within the bell nipple, determining that the fluid level within the bell nipple is mobile; andin response to determining that the fluid level within the bell nipple is mobile, triggering the audible alarm.
  • 9. The well tool system of claim 1, wherein the operations comprise: determining that the magnitude of the ultrasonic response signal remains constant over time; andin response to determining that the magnitude of the ultrasonic response signal remains constant over time, not triggering alarm.
  • 10. The well tool system of claim 1, wherein the operations comprise: determining that the magnitude of the ultrasonic response signal varies over time; andin response to determining that the magnitude of the ultrasonic response signal varies over time, triggering the alarm.
  • 11. The well tool system of claim 1, wherein determining, based on the transmitted ultrasonic signal and the received ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile comprises determining that the fluid level within the bell nipple is mobile, wherein the operations further comprise, in response to determining that the fluid level is mobile, causing flow of the wellbore fluid through the wellbore to be stopped.
  • 12. A method comprising: installing an ultrasonic transceiver within an inner surface of a bell nipple attached to a well head of a wellbore at a surface, wherein the bell nipple receives wellbore fluid from a flow line attached to a side surface of the bell nipple;installing an alarm on a rotary table installed above the bell nipple such that the bell nipple is between the rotary table and the well head;causing an ultrasonic signal to be transmitted, by the ultrasonic transceiver, into the bell nipple, wherein the ultrasonic signal is reflected by the wellbore fluid within the bell nipple resulting in an ultrasonic response signal;causing the ultrasonic response signal to be received by the ultrasonic transceiver; anddetermining, based on the ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile by determining whether a magnitude of the ultrasonic response signal remains constant over time or varies over time.
  • 13. The method of claim 12, wherein the transmitted ultrasonic signal is an ultrasonic status signal, wherein the method comprises: before transmitting the ultrasonic status signal, causing the ultrasonic transceiver to transmit an ultrasonic test signal into the bell nipple;causing the ultrasonic transceiver to receive an ultrasonic response-to-status signal responsive to a reflection of the ultrasonic test signal by the wellbore fluid within the bell nipple; anddetermining, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal.
  • 14. The method of claim 13, wherein determining, based on the ultrasonic test signal and the ultrasonic response-to-status signal, that the fluid level is ready to be determined by transmitting the ultrasonic status signal comprises determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches a threshold fluid level.
  • 15. The method of claim 14, wherein the operations comprise, in response to determining that the level of the wellbore fluid within the bell nipple represented by the ultrasonic response-to-status signal matches the threshold fluid level, triggering the visual alarm.
  • 16. The method of claim 15, wherein the method comprises: after determining that the fluid level is ready to be determined by transmitting the ultrasonic status signal, determining that the fluid level within the bell nipple is mobile; andin response to determining that the fluid level within the bell nipple is mobile, triggering the audible alarm.
  • 17. The method of claim 12, wherein the method comprises: determining that the magnitude of the ultrasonic response signal remains constant over time; andin response to determining that the magnitude of the ultrasonic response signal remains constant over time, not triggering alarm.
  • 18. The method of claim 12, wherein the method comprises: determining that the magnitude of the ultrasonic response signal varies over time; andin response to determining that the magnitude of the ultrasonic response signal varies over time, triggering the alarm.
  • 19. The method of claim 12, wherein determining, based on the transmitted ultrasonic signal and the received ultrasonic response signal, whether the fluid level within the bell nipple is static or mobile comprises determining that the fluid level within the bell nipple is mobile, the method further comprising, in response to determining that the fluid level is mobile, causing flow of the wellbore fluid through the wellbore to be stopped.
US Referenced Citations (544)
Number Name Date Kind
462431 McMullin Nov 1891 A
792191 Blameuser Aug 1904 A
880404 Sanford Feb 1908 A
1033655 Baker Jul 1912 A
1258273 Titus et al. Mar 1918 A
1392650 Mcmillian Oct 1921 A
1491066 Patrick Apr 1924 A
1580352 Ercole Apr 1926 A
1591264 Baash Jul 1926 A
1621947 Moore Mar 1927 A
1638494 Lewis et al. Aug 1927 A
1789993 Switzer Jan 1931 A
1796762 Paston Mar 1931 A
1843217 Fletcher Feb 1932 A
1896236 Howard Feb 1933 A
1896482 Crowell Feb 1933 A
1897297 Brown Feb 1933 A
1906933 Standlee May 1933 A
1949498 Frederick et al. Mar 1934 A
1979500 Sniffin Nov 1934 A
2047774 Greene Jul 1936 A
2121002 Baker Jun 1938 A
2121051 Ragan et al. Jun 1938 A
2187487 Burt Jan 1940 A
2189697 Baker Feb 1940 A
2222233 Mize Nov 1940 A
2286075 Evans Jun 1942 A
2304793 Bodine Dec 1942 A
2316402 Canon Apr 1943 A
2327092 Botkin Aug 1943 A
2377249 Lawrence May 1945 A
2411260 Glover et al. Nov 1946 A
2481637 Yancey Sep 1949 A
2546978 Collins et al. Apr 1951 A
2638988 Williams May 1953 A
2663370 Robert et al. Dec 1953 A
2672199 McKenna Mar 1954 A
2701019 Steed Feb 1955 A
2707998 Baker et al. May 1955 A
2708973 Twining May 1955 A
2728599 Moore Dec 1955 A
2734581 Bonner Feb 1956 A
2745693 Mcgill May 1956 A
2751010 Trahan Jun 1956 A
2762438 Naylor Sep 1956 A
2778428 Baker et al. Jan 1957 A
2806532 Baker et al. Sep 1957 A
2874781 McGaffey Feb 1959 A
2881838 Morse et al. Apr 1959 A
2887162 Le Bus et al. May 1959 A
2912053 Bruekelman Nov 1959 A
2912273 Chadderdon et al. Nov 1959 A
2915127 Abendroth Dec 1959 A
2935020 Howard et al. May 1960 A
2947362 Smith Aug 1960 A
2965175 Ransom Dec 1960 A
2965177 Le Bus et al. Dec 1960 A
2965183 Le Bus et al. Dec 1960 A
2992740 Phippen Jul 1961 A
3005506 Le Bus et al. Oct 1961 A
3023810 Anderson Mar 1962 A
3116799 Lemons Jan 1964 A
3147536 Lamphere Sep 1964 A
3187238 Wilson et al. Jun 1965 A
3191677 Kinley Jun 1965 A
3225828 Wisenbaker et al. Dec 1965 A
3255821 Curlet Jun 1966 A
3308886 Evans Mar 1967 A
3352593 Webb Nov 1967 A
3369603 Trantham Feb 1968 A
3376934 William Apr 1968 A
3380528 Durwood Apr 1968 A
3381748 Peters et al. May 1968 A
3382925 Jennings May 1968 A
3409084 Lawson, Jr. et al. Nov 1968 A
3433313 Brown Mar 1969 A
3437136 Young Apr 1969 A
3504793 More Apr 1970 A
3554278 Reistle Jan 1971 A
3667721 Vujasinovic Jun 1972 A
3747674 Murray Jul 1973 A
3752230 Bernat et al. Aug 1973 A
3833337 Desty et al. Sep 1974 A
3885629 Erb et al. May 1975 A
3897038 Le Rouax Jul 1975 A
3915426 Le Rouax Oct 1975 A
3955622 Jones May 1976 A
4030354 Scott Jun 1977 A
4039237 Cullen et al. Aug 1977 A
4039798 Lyhall et al. Aug 1977 A
4042019 Henning Aug 1977 A
4059155 Greer Nov 1977 A
4099699 Allen Jul 1978 A
4158388 Owen Jun 1979 A
4190112 Davis Feb 1980 A
4203472 Dulaney May 1980 A
4212240 Lee et al. Jul 1980 A
4215747 Cox Aug 1980 A
4227573 Pearce et al. Oct 1980 A
4254983 Harris Mar 1981 A
4265611 Reed et al. May 1981 A
4276931 Murray Jul 1981 A
4285400 Mullins Aug 1981 A
4289200 Fisher Sep 1981 A
4296822 Ormsby Oct 1981 A
4325534 Roark et al. Apr 1982 A
4336017 Desty Jun 1982 A
4349071 Fish Sep 1982 A
4391326 Greenlee Jul 1983 A
4407367 Kydd Oct 1983 A
4412130 Winters Oct 1983 A
4413642 Smith et al. Nov 1983 A
4422948 Corley et al. Dec 1983 A
4438652 Saito Mar 1984 A
4458521 Pillette Jul 1984 A
4467996 Baugh Aug 1984 A
4478286 Fineberg Oct 1984 A
4505668 Dibiano et al. Mar 1985 A
4515212 Krugh May 1985 A
4538684 Sheffield Sep 1985 A
4562888 Collet Jan 1986 A
4603578 Stolz Aug 1986 A
4611658 Salerni et al. Sep 1986 A
4616721 Furse Oct 1986 A
4696502 Desai Sep 1987 A
4735268 Harris Apr 1988 A
4791992 Greenlee et al. Dec 1988 A
4834184 Streich et al. May 1989 A
4836289 Young Jun 1989 A
4869321 Hamilton Sep 1989 A
4877085 Pullig, Jr. Oct 1989 A
4898240 Wittrisch Feb 1990 A
4898245 Braddick Feb 1990 A
4928762 Mamke May 1990 A
4953617 Ross et al. Sep 1990 A
4997225 Denis Mar 1991 A
5012863 Springer May 1991 A
5013005 Nance May 1991 A
5054833 Bishop et al. Oct 1991 A
5060737 Mohn Oct 1991 A
5117909 Wilton et al. Jun 1992 A
5129956 Christopher et al. Jul 1992 A
5139089 Wacker Aug 1992 A
5176208 Lalande et al. Jan 1993 A
5178219 Streich et al. Jan 1993 A
5197547 Morgan Mar 1993 A
5203646 Landsberger et al. Apr 1993 A
5255982 Zimmer Oct 1993 A
5295541 Ng et al. Mar 1994 A
5330000 Givens et al. Jul 1994 A
5343946 Morrill Sep 1994 A
5348095 Worrall Sep 1994 A
5358048 Brooks Oct 1994 A
5392715 Pelrine Feb 1995 A
5456312 Lynde et al. Oct 1995 A
5468153 Brown et al. Nov 1995 A
5505426 Whitby Apr 1996 A
5507346 Gano et al. Apr 1996 A
5580114 Palmer Dec 1996 A
5584342 Swinford Dec 1996 A
5605366 Beeman Feb 1997 A
5639135 Beeman Jun 1997 A
5667015 Harestad et al. Sep 1997 A
5673754 Taylor Oct 1997 A
5678635 Dunlap et al. Oct 1997 A
5685982 Foster Nov 1997 A
5697441 Vercaemer et al. Dec 1997 A
5698814 Parsons Dec 1997 A
5704426 Rytlewski et al. Jan 1998 A
5775420 Mitchell et al. Jul 1998 A
5806596 Hardy et al. Sep 1998 A
5832547 Burroughs Nov 1998 A
5833001 Song et al. Nov 1998 A
5842518 Soybel et al. Dec 1998 A
5875841 Wright et al. Mar 1999 A
5881816 Wright Mar 1999 A
5887668 Haugen et al. Mar 1999 A
5899796 Kamiyama et al. May 1999 A
5924489 Hatcher Jul 1999 A
5931443 Corte, Sr. Aug 1999 A
5944101 Hearn Aug 1999 A
5996712 Boyd Dec 1999 A
6070665 Singleton et al. Jun 2000 A
6112809 Angle Sep 2000 A
6130615 Poteet Oct 2000 A
6131675 Anderson Oct 2000 A
6138764 Scarsdale et al. Oct 2000 A
6155428 Bailey et al. Dec 2000 A
6247542 Kruspe et al. Jun 2001 B1
6276452 Davis et al. Aug 2001 B1
6371204 Singh et al. Apr 2002 B1
6378627 Tubel et al. Apr 2002 B1
6478086 Hansen Nov 2002 B1
6484816 Koederitz Nov 2002 B1
6491108 Slup et al. Dec 2002 B1
6510900 Dallas Jan 2003 B2
6510947 Schulte et al. Jan 2003 B1
6595289 Tumlin et al. Jul 2003 B2
6637511 Linaker Oct 2003 B2
6679330 Compton et al. Jan 2004 B1
6681858 Streater Jan 2004 B2
6688386 Cornelssen Feb 2004 B2
6698712 Milberger et al. Mar 2004 B2
6719056 Hoffman et al. Apr 2004 B2
6729392 DeBerry et al. May 2004 B2
6768106 Gzara et al. Jul 2004 B2
6772839 Bond Aug 2004 B1
6808023 Smith et al. Oct 2004 B2
6811032 Schulte et al. Nov 2004 B2
6843317 Mackenzie Jan 2005 B2
6854521 Echols et al. Feb 2005 B2
6880639 Rhodes et al. Apr 2005 B2
6899178 Tubel May 2005 B2
6913084 Boyd Jul 2005 B2
7000888 Wright Feb 2006 B2
7049272 Sinclair et al. May 2006 B2
7051810 Halliburton May 2006 B2
7082994 Frost, Jr. et al. Aug 2006 B2
7090019 Barrow et al. Aug 2006 B2
7096950 Howlett et al. Aug 2006 B2
7117941 Gano Oct 2006 B1
7117956 Grattan et al. Oct 2006 B2
7128146 Baugh Oct 2006 B2
7150328 Marketz et al. Dec 2006 B2
7174764 Oosterling et al. Feb 2007 B2
7188674 McGavern, III et al. Mar 2007 B2
7188675 Reynolds Mar 2007 B2
7218235 Rainey May 2007 B1
7231975 Lavaure et al. Jun 2007 B2
7249633 Ravensbergen et al. Jul 2007 B2
7255178 Slup et al. Aug 2007 B2
7267179 Abel Sep 2007 B1
7275591 Allen et al. Oct 2007 B2
7284611 Reddy et al. Oct 2007 B2
7303010 de Guzman et al. Dec 2007 B2
7334634 Abel Feb 2008 B1
7354265 Mashhour et al. Apr 2008 B2
7363860 Wilson Apr 2008 B2
7367412 Barbera May 2008 B2
7374146 Whitby May 2008 B2
7383889 Ring Jun 2008 B2
7389817 Almdahl Jun 2008 B2
7398832 Brisco Jul 2008 B2
7405182 Verrett Jul 2008 B2
7418860 Austerlitz et al. Sep 2008 B2
7424909 Roberts et al. Sep 2008 B2
7448446 Campbell Nov 2008 B2
7487837 Bailey et al. Feb 2009 B2
7488705 Reddy et al. Feb 2009 B2
7497260 Telfer Mar 2009 B2
7533731 Corre May 2009 B2
7591305 Brookey et al. Sep 2009 B2
7600572 Slup et al. Oct 2009 B2
7617876 Patel et al. Nov 2009 B2
7621324 Atencio Nov 2009 B2
7712527 Roddy May 2010 B2
7730974 Minshull Jun 2010 B2
7735564 Guerrero Jun 2010 B2
7762323 Frazier Jul 2010 B2
7762330 Saylor, III et al. Jul 2010 B2
7802621 Richards et al. Sep 2010 B2
7878240 Garcia Feb 2011 B2
7921917 Kotrla et al. Apr 2011 B2
7934552 La Rovere May 2011 B2
7946273 Lippa et al. May 2011 B2
7965175 Yamano Jun 2011 B2
8002049 Keese et al. Aug 2011 B2
8056621 Ring et al. Nov 2011 B2
8069916 Giroux et al. Dec 2011 B2
8138927 Diepenbroek et al. Mar 2012 B2
8157007 Nicolas Apr 2012 B2
8201693 Jan Jun 2012 B2
8210251 Lynde et al. Jul 2012 B2
8275538 Surnilla et al. Sep 2012 B2
8282389 Dhulst et al. Oct 2012 B2
8376051 McGrath et al. Feb 2013 B2
8424611 Smith et al. Apr 2013 B2
8453724 Zhou Jun 2013 B2
8496055 Mootoo et al. Jul 2013 B2
8579024 Mailand et al. Nov 2013 B2
8579037 Jacob Nov 2013 B2
8596463 Burkhard Dec 2013 B2
8662182 Redlinger et al. Mar 2014 B2
8708043 Mosing et al. Apr 2014 B2
8726983 Khan May 2014 B2
8757273 Themig et al. Jun 2014 B2
8770276 Nish et al. Jul 2014 B1
8888671 Paulsen Nov 2014 B2
8899338 Elsayed et al. Dec 2014 B2
8936097 Heijnen Jan 2015 B2
8991489 Redlinger et al. Mar 2015 B2
8991505 Fleckenstein et al. Mar 2015 B2
9079222 Burnett et al. Jul 2015 B2
9109433 DiFoggio et al. Aug 2015 B2
9133671 Kellner Sep 2015 B2
9142111 Fernandes et al. Sep 2015 B2
9163469 Broussard et al. Oct 2015 B2
9181782 Berube et al. Nov 2015 B2
9200486 Leveau et al. Dec 2015 B2
9212532 Leuchtenberg et al. Dec 2015 B2
9234394 Wheater et al. Jan 2016 B2
9303482 Hall et al. Apr 2016 B2
9328585 Groesbeck et al. May 2016 B2
9335232 Scheucher May 2016 B2
9353589 Hekelaar May 2016 B2
9359861 Burgos Jun 2016 B2
9410066 Ghassemzadeh Aug 2016 B2
9416617 Wiese et al. Aug 2016 B2
9441441 Hickie Sep 2016 B1
9441451 Jurgensmeier Sep 2016 B2
9453374 Sullivan Sep 2016 B2
9476279 Bailey et al. Oct 2016 B2
9528354 Loiseau et al. Dec 2016 B2
9551200 Read et al. Jan 2017 B2
9562339 Kiest Feb 2017 B2
9574417 Laird et al. Feb 2017 B2
9612360 Zenith et al. Apr 2017 B2
9617829 Dale et al. Apr 2017 B2
9624746 Hendel et al. Apr 2017 B2
9637977 Giroux et al. May 2017 B2
9657213 Murphy et al. May 2017 B2
9677762 Tullos Jun 2017 B2
9784073 Bailey et al. Oct 2017 B2
9863214 Cronley Jan 2018 B2
9896380 Frantz et al. Feb 2018 B2
9903192 Entchev Feb 2018 B2
9951583 Gosselin et al. Apr 2018 B2
9976407 Ash et al. May 2018 B2
10018011 Van Dongen Jul 2018 B2
10024154 Gray et al. Jul 2018 B2
10087752 Bedonet Oct 2018 B2
10161194 Clemens et al. Dec 2018 B2
10189031 Funseth et al. Jan 2019 B2
10198929 Snyder Feb 2019 B2
10202817 Arteaga Feb 2019 B2
10266698 Cano et al. Apr 2019 B2
10280706 Sharp, III May 2019 B1
10301898 Orban May 2019 B2
10301989 Imada May 2019 B2
10400552 Gilmore et al. Sep 2019 B2
10544640 Hekelaar et al. Jan 2020 B2
10584546 Ford Mar 2020 B1
10626698 Al-Mousa et al. Apr 2020 B2
10655456 Espe May 2020 B2
10787888 Andersen Sep 2020 B2
10837254 Al-Mousa et al. Nov 2020 B2
10954739 Sehsah et al. Mar 2021 B2
10975645 Al-Mousa et al. Apr 2021 B2
10975654 Neacsu et al. Apr 2021 B1
10982504 Al-Mousa et al. Apr 2021 B2
11008824 Al-Mousa et al. May 2021 B2
11035190 Neascu et al. Jun 2021 B2
11105180 Al-Mousa et al. Aug 2021 B2
11136849 Al-Mousa et al. Oct 2021 B2
11142976 Al-Mousa et al. Oct 2021 B2
11156052 Al-Mousa et al. Oct 2021 B2
11225850 Al-Mousa et al. Jan 2022 B2
11230904 Al-Mousa et al. Jan 2022 B2
11268330 Al-Mousa et al. Mar 2022 B2
11274515 Grinnsbo Mar 2022 B2
11274549 Al-Mousa et al. Mar 2022 B2
11286725 Al-Mousa et al. Mar 2022 B2
20020053428 Maples May 2002 A1
20020060079 Metcalfe May 2002 A1
20020129945 Brewer et al. Sep 2002 A1
20020139528 Surjaatmadja Oct 2002 A1
20020195252 Maguire Dec 2002 A1
20030047312 Bell Mar 2003 A1
20030098064 Kohli et al. May 2003 A1
20030132224 Spencer Jul 2003 A1
20030150608 Smith Aug 2003 A1
20030155155 Dewey et al. Aug 2003 A1
20030221840 Whitelaw Dec 2003 A1
20040031940 Biester Feb 2004 A1
20040040707 Dusterhoft et al. Mar 2004 A1
20040065446 Tran et al. Apr 2004 A1
20040074819 Burnett Apr 2004 A1
20040095248 Mandel May 2004 A1
20040168796 Baugh et al. Sep 2004 A1
20040216891 Maguire Nov 2004 A1
20050024231 Fincher et al. Feb 2005 A1
20050029015 Burnett et al. Feb 2005 A1
20050056427 Clemens et al. Mar 2005 A1
20050087585 Copperthite et al. Apr 2005 A1
20050167097 Sommers et al. Aug 2005 A1
20050263282 Jeffrey et al. Dec 2005 A1
20060082462 Crook Apr 2006 A1
20060105896 Smith et al. May 2006 A1
20060213656 Clifton Sep 2006 A1
20060243453 McKee Nov 2006 A1
20070056913 Burt Mar 2007 A1
20070114039 Hobdy et al. May 2007 A1
20070137528 Le Roy-Ddelage et al. Jun 2007 A1
20070181304 Rankin et al. Aug 2007 A1
20070182583 Feluch et al. Aug 2007 A1
20070204999 Cowie et al. Sep 2007 A1
20070227722 Atencio Oct 2007 A1
20070256864 Robichaux et al. Nov 2007 A1
20070256867 DeGeare et al. Nov 2007 A1
20080007421 Liu et al. Jan 2008 A1
20080066912 Freyer et al. Mar 2008 A1
20080078699 Carr Apr 2008 A1
20080087439 Dallas Apr 2008 A1
20080185148 Carter et al. Aug 2008 A1
20080236841 Howlett et al. Oct 2008 A1
20080251253 Lumbye Oct 2008 A1
20080314591 Hales et al. Dec 2008 A1
20090167297 Chee et al. Jul 2009 A1
20090194290 Parks et al. Aug 2009 A1
20090250220 Stamoulis Oct 2009 A1
20090308656 Chitwood Dec 2009 A1
20100051265 Hurst Mar 2010 A1
20100089583 Xu et al. Apr 2010 A1
20100162812 Parkinson Jul 2010 A1
20100176956 Moerschell Jul 2010 A1
20100193124 Nicolas Aug 2010 A1
20100258289 Lynde et al. Oct 2010 A1
20100263856 Lynde et al. Oct 2010 A1
20100270018 Howlett Oct 2010 A1
20110005836 Radford et al. Jan 2011 A1
20110036570 La Rovere et al. Feb 2011 A1
20110056681 Khan Mar 2011 A1
20110067869 Bour et al. Mar 2011 A1
20110168411 Braddick Jul 2011 A1
20110203794 Moffitt et al. Aug 2011 A1
20110259609 Hessels et al. Oct 2011 A1
20110273291 Adams Nov 2011 A1
20110278021 Travis et al. Nov 2011 A1
20120012335 White et al. Jan 2012 A1
20120067447 Ryan et al. Mar 2012 A1
20120085538 Guerrero Apr 2012 A1
20120118571 Zhou May 2012 A1
20120170406 DiFoggio et al. Jul 2012 A1
20120205908 Fischer et al. Aug 2012 A1
20120241146 Unnphries Sep 2012 A1
20120285684 Crow et al. Nov 2012 A1
20130000864 Dirksen et al. Jan 2013 A1
20130008647 Dirksen Jan 2013 A1
20130062055 Tolman Mar 2013 A1
20130134704 Klimack May 2013 A1
20130140022 Leighton Jun 2013 A1
20130213654 Dewey et al. Aug 2013 A1
20130226475 Franklin Aug 2013 A1
20130240207 Frazier Sep 2013 A1
20130269097 Alammari Oct 2013 A1
20130296199 Ghassemzadeh Nov 2013 A1
20130299194 Bell Nov 2013 A1
20140090898 Moriarty Apr 2014 A1
20140138091 Fuhst May 2014 A1
20140158350 Castillo et al. Jun 2014 A1
20140175689 Mussig Jun 2014 A1
20140231068 Isaksen Aug 2014 A1
20140251616 O'Rourke et al. Sep 2014 A1
20140311756 Dicke Oct 2014 A1
20150013994 Bailey et al. Jan 2015 A1
20150021028 Boekholtz Jan 2015 A1
20150047132 Sveum Feb 2015 A1
20150096738 Atencio Apr 2015 A1
20150152704 Tunget Jun 2015 A1
20150198009 Bexte Jul 2015 A1
20150260397 Talasila et al. Sep 2015 A1
20150275649 Orban Oct 2015 A1
20150292317 Flores et al. Oct 2015 A1
20160046529 Bricco Feb 2016 A1
20160076327 Glaser et al. Mar 2016 A1
20160084034 Roane et al. Mar 2016 A1
20160130914 Steele May 2016 A1
20160160106 Jamison et al. Jun 2016 A1
20160177637 Fleckenstein Jun 2016 A1
20160237810 Beaman et al. Aug 2016 A1
20160281458 Greenlee Sep 2016 A1
20160305215 Harris et al. Oct 2016 A1
20160340994 Ferguson et al. Nov 2016 A1
20170009554 Surjaatnnadja Jan 2017 A1
20170044864 Sabins et al. Feb 2017 A1
20170058628 Wijk et al. Mar 2017 A1
20170067313 Connell et al. Mar 2017 A1
20170074061 Goldspink Mar 2017 A1
20170089166 Sullivan Mar 2017 A1
20170159362 Janes Jun 2017 A1
20170254179 Horwell et al. Sep 2017 A1
20180010418 VanLue Jan 2018 A1
20180030809 Harestad et al. Feb 2018 A1
20180058167 Finol et al. Mar 2018 A1
20180080318 Schexnaider et al. Mar 2018 A1
20180175545 Engel et al. Jun 2018 A1
20180187498 Soto et al. Jul 2018 A1
20180209565 Lingnau Jul 2018 A1
20180216438 Sewell Aug 2018 A1
20180236407 Shevitz Aug 2018 A1
20180245427 Jimenez et al. Aug 2018 A1
20180252069 Abdollah et al. Sep 2018 A1
20180340381 Zhou Nov 2018 A1
20180355711 Padden Dec 2018 A1
20180363407 Kunz Dec 2018 A1
20180363424 Schroeder et al. Dec 2018 A1
20190024473 Arefi Jan 2019 A1
20190049017 McAdam et al. Feb 2019 A1
20190087548 Bennett et al. Mar 2019 A1
20190093475 Nyhavn et al. Mar 2019 A1
20190186232 Ingram Jun 2019 A1
20190195035 AlBahrani et al. Jun 2019 A1
20190203551 Davis et al. Jul 2019 A1
20190284894 Schmidt et al. Sep 2019 A1
20190284898 Fagna et al. Sep 2019 A1
20190292897 Costa De Oliveira Sep 2019 A1
20190301258 Li Oct 2019 A1
20190316424 Robichaux et al. Oct 2019 A1
20190338615 Landry Nov 2019 A1
20190375486 Beckman Dec 2019 A1
20200032604 Al-Ramadhan Jan 2020 A1
20200032648 Lu et al. Jan 2020 A1
20200040707 Watts et al. Feb 2020 A1
20200056446 Al-Mousa et al. Feb 2020 A1
20200115976 Zeidler Apr 2020 A1
20200224511 Dannish Jul 2020 A1
20200240225 King et al. Jul 2020 A1
20200325741 Hutchinson et al. Oct 2020 A1
20200325746 Lerbrekk Oct 2020 A1
20210025259 Al-Mousa et al. Jan 2021 A1
20210054696 Golinowski et al. Feb 2021 A1
20210054706 Al-Mousa et al. Feb 2021 A1
20210054708 Al-Mousa et al. Feb 2021 A1
20210054710 Neacsu et al. Feb 2021 A1
20210054716 Al-Mousa et al. Feb 2021 A1
20210131212 Al-Mousa et al. May 2021 A1
20210131215 Al-Mousa et al. May 2021 A1
20210140267 Al-Mousa et al. May 2021 A1
20210180449 Jamison Jun 2021 A1
20210198965 Al-Mousa et al. Jul 2021 A1
20210215013 Neacsu et al. Jul 2021 A1
20210215036 Heath Jul 2021 A1
20210230960 Al-Mousa Jul 2021 A1
20210262296 Al-Mousa et al. Aug 2021 A1
20210262307 Neacsu Aug 2021 A1
20210285306 Al Mulhenn Sep 2021 A1
20210293094 Al-Mousa et al. Sep 2021 A1
20210293135 Al-Mousa et al. Sep 2021 A1
20210301631 Li Sep 2021 A1
20210363839 Al-Mousa et al. Nov 2021 A1
20210388693 Machocki Dec 2021 A1
20220042389 Al-Mousa et al. Feb 2022 A1
20220042390 Al-Mousa et al. Feb 2022 A1
20220098949 Grimsbo Mar 2022 A1
Foreign Referenced Citations (89)
Number Date Country
636642 May 1993 AU
2007249417 Nov 2007 AU
2012230084 Sep 2012 AU
2017225085 Aug 2018 AU
1329349 May 1994 CA
2441138 Mar 2004 CA
2624368 Apr 2011 CA
2514492 Oct 2012 CA
2762217 May 2015 CA
2719792 Jun 2015 CA
2802988 Oct 2015 CA
2879985 Apr 2016 CA
2734032 Jun 2016 CA
203292820 Nov 2013 CN
105436067 Mar 2016 CN
103785923 Jun 2016 CN
105756668 Jul 2016 CN
104712320 Dec 2016 CN
107060679 Aug 2017 CN
107191152 Sep 2017 CN
107227939 Oct 2017 CN
108756851 Nov 2018 CN
110998059 Apr 2020 CN
2545245 Apr 2017 DK
2236742 Aug 2017 DK
015064 Apr 2011 EA
0622522 Nov 1994 EP
0792997 Sep 1997 EP
1340882 Oct 2005 EP
2119867 Nov 2009 EP
2309186 Apr 2011 EP
2737172 Jun 2014 EP
2964874 Jan 2016 EP
3135858 Mar 2017 EP
2545245 Apr 2017 EP
2275961 Mar 2011 ES
958734 May 1964 GB
2021178 Nov 1979 GB
2203602 Oct 1988 GB
2356415 May 2001 GB
2392183 Feb 2004 GB
2396634 Jun 2004 GB
2414586 Nov 2005 GB
2425138 Oct 2006 GB
2427214 Dec 2006 GB
2453279 Jan 2009 GB
2492663 Jan 2014 GB
2546996 Aug 2017 GB
2548768 Sep 2017 GB
2001271982 Oct 2001 JP
2009505013 Feb 2009 JP
20190115662 Oct 2019 KR
9201262 Feb 1994 NL
333538 Jul 2013 NO
20170293 Aug 2018 NO
5503 Apr 1981 OA
2669969 Oct 2018 RU
201603922 Feb 2016 TW
201622853 Jul 2016 TW
WO 1989012728 Dec 1989 WO
WO 1996039570 Dec 1996 WO
WO 2002090711 Nov 2002 WO
WO 2004046497 Jun 2004 WO
WO 2008106639 Sep 2008 WO
WO 2010132807 Nov 2010 WO
WO 2011041562 Apr 2011 WO
WO 2011045943 Apr 2011 WO
WO 2012027476 Mar 2012 WO
WO 2012161854 Nov 2012 WO
WO 2012164023 Dec 2012 WO
WO 2013013136 Jan 2013 WO
WO 2013109248 Jul 2013 WO
WO 2015112022 Jul 2015 WO
WO 2016011085 Jan 2016 WO
WO 2016040310 Mar 2016 WO
WO 2016123166 Aug 2016 WO
WO 2016140807 Sep 2016 WO
WO 2017043977 Mar 2017 WO
WO 2017158573 Sep 2017 WO
WO 2017173540 Oct 2017 WO
WO 2018017104 Jan 2018 WO
WO 2018034672 Feb 2018 WO
WO 2018164680 Sep 2018 WO
WO 2019027830 Feb 2019 WO
WO 2019132877 Jul 2019 WO
WO 2019231679 Dec 2019 WO
WO 2021107937 Jun 2021 WO
WO 2021145902 Jul 2021 WO
WO 2022025942 Feb 2022 WO
Non-Patent Literature Citations (65)
Entry
U.S. Appl. No. 17/131,352, filed Dec. 22, 2020, Al-Mousa et al.
U.S. Appl. No. 17/140,298, filed Jan. 4, 2021, Al-Mousa et al.
U.S. Appl. No. 17/144,824, filed Jan. 8, 2021, Al-Mousa et al.
U.S. Appl. No. 17/188,870, filed Mar. 1, 2021, Al-Mousa.
U.S. Appl. No. 17/237,822, filed Apr. 22, 2021, Al-Mousa et al.
U.S. Appl. No. 17/246,904, filed May 3, 2021, Al-Mousa et al.
U.S. Appl. No. 17/323,632, filed May 18, 2021, Al-Shaiji et al.
U.S. Appl. No. 17/329,991, filed May 25, 2021, Madan et al.
U.S. Appl. No. 17/374,505, filed Jul. 13, 2021, Al-Mousa et al.
U.S. Appl. No. 17/405,362, filed Aug. 18, 2021, Al-Mousa.
U.S. Appl. No. 17/510,027, filed Oct. 25, 2021, Al-Mousa.
U.S. Appl. No. 17/549,420, filed Dec. 13, 2021, Al-Mousa.
U.S. Appl. No. 17/648,082, filed Jan. 14, 2022, Al-Mousa.
U.S. Appl. No. 17/650,476, filed Feb. 9, 2022, Al-Mousa.
U.S. Appl. No. 17/651,268, filed Feb. 16, 2022, Al-Mousa et al.
Al-Ansari et al., “Thermal Activated Resin to Avoid Pressure Build-Up in Casing-Casing Annulus (CCA),” SA-175425-MS, Society of Petroleum Engineers (SPE), presented at the SPE Offshore Europe Conference and Exhibition, Sep. 8-11, 2015, 11 pages.
Al-Ibrahim et al., “Automated Cyclostratigraphic Analysis in Carbonate Mudrocks Using Borehole Images,” Article #41425, posted presented at the 2014 AAPG Annual Convention and Exhibition, Search and Discovery, Apr. 6-9, 2014, 4 pages.
Ashcor “Flame Smart EI+,” Burner Management Systems, <https://ashcor.com/products/flame-smart-bms/>, 2020, 2 pages.
Bautista et al., “Probability-based Dynamic TimeWarping for Gesture Recognition on RGB-D data,” WDIA 2012: Advances in Depth Image Analysis and Application, International Workshop on Depth Image Analysis and Applications, 2012, 126-135, 11 pages.
Boriah et al., “Similarity Measures for Categorical Data: A Comparative Evaluation,” presented at the SIAM International Conference on Data Mining, SDM 2008, Apr. 24-26, 2008, 12 pages.
Bruton et al., “Whipstock Options for Sidetracking,” Oilfield Review, Spring 2014, 26:1, 10 pages.
Cameron, “NUFLO Liquid Turbine Flow Meters: Accurate Flow Measurement,” Camera: Technical Specifications, 2013, 8 pages.
CCSC, “Bell nipple,” CCSC Petroleum Equipment Co., Ltd, 2018, retrieved Mar. 21, 2022, retrieved from URL <ww.ccscpetro.com/bell_nipple_flange.html>, 1 page.
Cudd Energy Services, “Cudd Energy Services Brochure,” 2016, 8 pages.
Daniel, “Fundamentals of Orifice Meter Measurement,” Daniel Measurement and Control White Papers, Emerson Process Management, 2010, 9 pages.
Edwards et al., “Assessing Uncertainty in Stratigraphic Correlation: A Stochastic Method Based on Dynamic Time Warping,” RM13, Second EAGE Integrated Reservoir Modelling Conference, Nov. 16-19, 2014, 2 pages.
Edwards, “Construction de modèles stratigraphiques à partir de données éparses,” Stratigraphie, Université de Lorraine, 2017, 133 pages, English abstract.
Fischer, “The Lofer Cyclothems of the Alpine Triassic,” published in Merriam, Symposium on Cyclic Sedimentation: Kansas Geological Survey (KGS), Bulletin, 1964, 169: 107-149, 50 pages.
Forum Energy Technologies “Drill Pipe Float Valves,” 2019, Catalog, 6 pages.
geodf.com [online], “GEO Drilling Fluids Manual: Drilling Practices to Reduce The Cost of PetroDrill Mud,” Geo Drilling Fluids, Inc., available at URL <https://www.yumpu.com/en/document/read/21474235/petrodrill-brochure-geo-drilling-fluids-inc/6>, 1 page.
Halliburton, “Chemical-Injection Pump,” Halliburton: Testing & Subsea, 2011, 2 pages.
Halliburton, “Coflexip Flexible Pipe: High Pressure Flexible Flow Lines,” Halliburton: Testing & Subsea, Surface Well Testing, 2016, 2 pages.
Hernandez-Vela et al., “Probability-based Dynamic Time Warping and Bag-of-Visual-and-Depth-Words for human Gesture Recognition in RGB-D,” Pattern Recognition Letters, 2014, 50: 112-121, 10 pages.
Herrera and Bann, “Guided seismic-to-well tying based on dynamic time warping,” SEG Las Vegas 2012 Annual Meeting, Nov. 2012, 6 pages.
Hydril “Checkguard” Kellyguard Drill Stem Valves, Catalog DSV 2003, Brochure, 9 pages.
Katch Kan Limited Catalog, “Upper Katch Kan,” 2007, 2 pages.
Katch Kan, “Upper Katch Kan,” Katch Kan Brochure, Product Info Sheet, Nov. 2019, 1 page.
Keogh and Ratanamahatana, “Exact indexing of dynamic time warping,” Knowledge and Information Systems, Springer-Verlag London Ltd., 2004, 29 pages.
Kurz Instruments Inc., “Saudi Aramco Used Kurz to Help Monitor Flare Emissions,” available on or before Feb. 18, 2021, retreived from URL <https://www.bing.com/search?q=http%3A%2F%2Fwww.kurzinstruments.com%2Fdownloads%2Fblog%2Fsaudi-aramco-uses-kurz-to-help-monitor-flare-emissions.pdf&qs=n&form=QBRE&msbsrank=7_7_0&sp=-1&pq=google&sc=7-6&sk=&cvid=3576A0E28A154B65BB8BDBF5B1BFCF69>, 6 pages.
Lallier et al., “3D Stochastic Stratigraphic Well Correlation of Carbonate Ramp Systems,” IPTC 14046, International Petroleum Technology Conference (IPTC), presented at the International Petroleum Technology Conference, Dec. 7-9, 2009, 5 pages.
Lallier et al., “Management of ambiguities in magnetostratigraphic correlation,” Earth and Planetary Science Letters, 2013, 371-372: 26-36, 11 pages.
Lallier et al., “Uncertainty assessment in the stratigraphic well correlation of a carbonate ramp: Method and application of the Beausset Basin, SE France,” C. R. Geoscience, 2016, 348: 499-509, 11 pages.
Lineman et al., “Well to Well Log Correlation Using Knowledge-Based Systems and Dynamic Depth Warping,” SPWLA Twenty-Eighth Annual Logging Symposium, Jun. 29-Jul. 2, 1987, 25 pages.
Micro Motion, “Micro Motion ELITE Coriolis Flow and Density Meters,” PS-00374, Product Data Sheet, Rev AM, Aug. 2021, Micromotion, Emerson, 56 pages.
Nakanishi and Nakagawa, “Speaker-Independent Word Recognition by Less Cost and Stochastic Dynamic Time Warping Method,” ISCA Archive, European Conference on Speech Technology, Sep. 1987, 4 pages.
packardusa.com [online], “Drop-in Check Valves,” Packard International, available on or before Jul. 6, 2007, via Internet Archive: Wayback Machine URL <http://web.archive.org/web/20070706210423/http://packardusa.com/productsandservices5.asp>, retrieved on May 11, 2021, URL <www.packardusa.com/productsandservices5.asp>, 2 pages.
Panametrics, “Intrumentation for real-time flare system control,” Baker Hughes Company <https://www.bakerhughesds.com/panametrics/flare-instrumentation>, 2021, 6 pages.
Pels et al., “Automated biostratigraphic correlation of palynological records on the basis of shapes of pollen curves and evaluation of next-best solutions,” Paleogeography, Paleoclimatology, Paleoecology, 1996, 124: 17-37, 21 pages.
Pollack et al., “Automatic Well Log Correlation,” AAPG Annual Convention and Exhibition, Apr. 3, 2017, 1 page, Abstract Only.
Proserv, “Sample Cylinder, Flow Through, Sulfinert Coasted, 100bar,” Proserve, Producti Specification Sheet, ingenious simplicity, 1 page.
Ritchie et al., “Glossary of Petroleum Systems Reliability Analysis,” Office of Research and Monitoring and Office of Water Program Operations U.S. Environmental Protection Agency, Aug. 1973, 2 pages.
Rudman and Lankston, “Stratigraphic Correlation of Well Logs by Computer Techniques,” The American Association of Petroleum Geologists, Mar. 1973, 53:3 (557-588), 12 pages.
Sakoe and Chiba, “Dynamic Programming Algorithm Optimization for Spoken Word Recognition,” IEEE Transactions on Acoustics, Speech and Signal Processing, ASSP-26:1, Feb. 1978, 7 pages.
Salvador and Chan, “FastDTW: Toward Accurate Dynamic Time Warping in Linear Time and Space,” presented at the KDD Workshop on Mining Temporal and Sequential Data, Intelligent Data Analysis, Jan. 2004, 11:5 (70-80), 11 pages.
Sayhi, “peakdet: Peak detection using MATLAB,” Jul. 2012, 4 pages.
Scribd.com [online], “Milling Practices and Procedures,” retrieved from URL <https://www.scribd.com/document/358420338/Milling-Rev-2-Secured>, 80 pages.
Silva and Koegh, “Prefix and Suffix Invariant Dynamic Time Warping,” IEEE Computer Society, presented at the IEEE 16th International Conference on Data Mining, 2016, 6 pages.
Smith and Waterman, “New Stratigraphic Correlation Techniques,” Journal of Geology, 1980, 88: 451-457, 8 pages.
Startzman and Kuo, “A Rule-Based System for Well Log Correlation,” SPE Formative Evaluation, Society of Petroleum Engineers (SPE), Sep. 1987, 9 pages.
TAM International Inflatable and Swellable Packers, “TAM Scab Liner brochure,” Tam International, available on or before Nov. 15, 2016, 4 pages.
Tomasi et al., “Correlation optimized warping and dynamic time warping as preprocessing methods for chromatographic data,” Journal of Chemometrics, 2004, 18: 231-241, 11 pages.
Uchida et al., “Non-Markovian Dynamic Time Warping,” presented at the 21st International Conference on Pattern Recognition (ICPR), Nov. 11-15, 2012, 4 pages.
Waterman and Raymond, “The Match Game: New Stratigraphic Correlation Algorithms,” Mathematical Geology, 1987, 19:2, 19 pages.
Weatherford, “Micro-Seal Isolation System-Bow (MSIS-B),” Weatherford Swellable Well Construction Products, Brochure, 2009-2011, 2 pages.
Zoraster et al., “Curve Alignment for Well-to-Well Log Correlation,” SPE 90471, Society of Petroleum Engineers (SPE), presented at the SPE Annual Technical Conference and Exhibition, Sep. 26-29, 2004, 6 pages.
Related Publications (1)
Number Date Country
20230258070 A1 Aug 2023 US